HomeMy WebLinkAboutDRB100337i
O M , .7 MU
1 �`' ✓ # Department of Community Development
T04WORAI ' 75 South Frontage Road, flail, Colorado 81657
tel: 970.479.2139 fax* 970.479.2452
cx "T'foeVE MENT web: www.vailgov.com
Project Name: Bald Mtn. Rec. Path DRB Number: DRB100337
Project Description:
Reconfigure recreation path through Bald Mtn Underpass
Participants:
OWNER VAIL COLORADO MUNICIPAL BLDG 07/28/2010
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT VAIL COLORADO MUNICIPAL BLDG 07/28/2010
75 S FRONTAGE RD
VAIL
CO 81657
Project Address: 75 S FRONTAGE RD W VAIL Location:
I -70 Underpass at Bald Mountain
Legal Description: Lot: Block: Subdivision: UNPLATTED
Parcel Number: 2101 - 064 - 0000 -3
Comments: See conditions
BOARD /STAFF ACTION
Motion By: Gillette Action: APPROVED
Second By: Kjesbo
Vote: 4 -0 -0 Date of Approval: 08/04/2010
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS.
Cond:202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Cond: CON0011550
The applicant shall install a section of guard rail on the north side of the curve
General Information: This application is for new construction of a residential or commercial structure. Applicable Vail
Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects re-
quiring design review must receive approval prior to submitting a building permit application. An application for Design
Review cannot be accepted until all required information is received by the Community Development Department, as
outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Plan-
ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a
building permit is issued and construction commences.
Fee: $6S0
Single Family Duplex Multi- Family Commercial
Description of the Request: Reconfigure the recreation path thr t he Bald Mountain Underpass.
The existing path and walls are to be removed and the Frontage Rd will be widened to accommodate a bike lane as
well as a pedestrian walkway.
Physical Address. Rd /1 -70 Underp betw Aspen Lane and Mann's Ranch Road
Parcel Number: NA (Contact Eagle Co. Assessor at 970 -328 -8640 for parcel no.)
Property Owner: To o V ail
Mailing Address: 75 South Fronta R Vail, CO 81657
Phone: 9 70 -479 -2337
Owner's Signature:
IV V U Primary Contact) Owner Representative: Gregg Barrie, Town of Vail Department of Public Works
Mailing Address: 1309 Elkhorn Drive, Vail, CO 81657
E -Mail: gbarde @vailgov.com
Fax: 970- 479 -2166
For Office Use O Cash_ CC: Visa / MC Last 4 CC #
Fee Paid: Received Fi
Meeting Date: c { 1 DRB No.: _
Planner: Project No:
Zoning:
Location of the Proposal: Lot: Block:
Land Use:
Phone: 970- 479 -2337
Auth #
Check #
33
JUL 28 10 Ij
TOW OL I
01- Jan -10
Application for Design Review
New Construction
LL
> � .-
®IX °a
�o � a)
cu M®Z
°ca ° ° p°
o w °-
• L .— C (1) • ° L �d tlV.LH
yr O :3 C (1) ® LU
a) P . C O ti O
a) 4 - 7 � a) C .0 a) E
'-' C 0) CO O N O CL a)
- 0 Ca 0 ca .0) Q O t6 = �r
N O V O u7 a) c
V O O 0 '0 �O '
co § > , (1 0
Q" Co C a F- 'cn N to
U) 0 Co cc c a) O 0)
ca -0 m -0 V a)
C m a c ca O
0- cu Z G O C O C a)
([f L V CL
0 CL 0 - ca cll O O 0
�—
(D %u O O -O �, .0 _ LL O CL
to — O Q p Q) O O m a) U d
O to cu cL O a) +_' .L- ° O a 4-
m .0 LL N
Z ti a) O O O a) N d - a co LO O N I- M
s? _ m 0 a) G W Q U a
o ° a ., C) �c ca 3: a�a�i me cca
C) ru ca ti E �a ° a) O O
U) c � a ��0 `n��ca m Cc a oa
c c6 a ° ���� - a 0) � � � Q a)v � . co CO
o a � nrE ?)cam° cn"a?•�o °�� ° v)
U)
m m'x N . - c c a��i U c U o N o
G O O N � N O •. e s V C V C D V
W LI. — a 0 C s= �a -� .��N
o c 5 a)
O _ 4-- s a)
. H m �a -Ca)a
Q Q !- N - 0 - a fn ° aa a U) s? Q
0
uj
0
w
LL :
ui o
\�
| .
>ZUJ
03:W
Do
A
CC 0 Z
cc:
w
Z
U)
Lij
LIJ Z
!R 5
0
n- rw-
C) C)
T - -r-
C) C)
C C\j
>, C
0-
C
C U
L- (a
0 D-
a o
CU
0 a)
a).(
CL
E
Co
x
w
0 0
-0
<
SOUTH FRONTAGE ROAD WIDENING AT BALD MOUNTAIN ROAD
INTERSTATE 70 UNDERPASS, MILE POST #179
PROPOSED ROADWAY WIDENING PLAN
x
=Q
or"
A- 16
Y
as z
'loll
7X
UL
INTERSTATE 70
WEST BOUND
RAT MOUNTAIN RD. UNDERPASS
SOUTH FRONTAGE ROAD WIDENING
AT INTERSTATE 70 RILE POST #179
TOWN OF VAIL
EAGLE COUNTY, COLORADO
mougmm mmgg� MAMRSH 3 - W& - Wm LM L I S HEET 3 OF 3
. . ..... WA� DAM 07t201201 !j PLC X801718
4 �/4
031u
wn
jf V'xm PWM
INTERSTATE 70
M 0 KXf
'vow
2r
'utf—
Z V l
.
-
In
lem
A- 16
Y
as z
'loll
7X
UL
INTERSTATE 70
WEST BOUND
RAT MOUNTAIN RD. UNDERPASS
SOUTH FRONTAGE ROAD WIDENING
AT INTERSTATE 70 RILE POST #179
TOWN OF VAIL
EAGLE COUNTY, COLORADO
mougmm mmgg� MAMRSH 3 - W& - Wm LM L I S HEET 3 OF 3
. . ..... WA� DAM 07t201201 !j PLC X801718
4 �/4
031u
wn
INTERSTATE 70
EAST BOUND
S OUTH '• '•AI WIDENING AT BALD MOUNTAIN '•A1
INTERSTATE 1 UNDE POST #179
2M "Fail
TYPICAL SECTION D —D
T_" ROADWAY AND PATH SECTION
EXISTIN OPTION # I EXISTING
BRIDGE
COLUMN COLUMN
~ \SAW CUT
EXISTING RECREATION PATH I I
PROPOSED ROADWAY
CONCRETE SIDEWALK BIKE LANE DRIVING LANE CENTERLINE DRIVING LANE BIKE LANE
i ( 5.50' 5.00' — — 12.00' 12.00' — 5.00'
4" CONCRETE 2.2.1
SLOPE PAVING - SHIFT CONCRETE 2:1 /
OVER 4" OF I 2.00' P I
BASE COURSE MATCH MATCH
2.00% EXISTING EXISTING
----. SAW CUT GRADE E G RADE SAW CUT
REMO — EXISTING HAL
IN NG AA ST— x
VE 24" OF �
o SECTION SCALE:
.. 30" CARRY ASPHALT AND PROPOSED ROADWAY
1 " =5' H &V INSTALL PATCH BACK WIDENING WITH 6" OF
INSTALL EXPANSION TYPE CURB OF 6" OF HBP OVER HBP OVER 8" ABC
e. JOINT MATERIAL AND GUTTER 8" OF ABC WIDTH VARIES
0
AROUND ALL EXISTING 30" CARRY
CONCRETE BRIDGE TYPE CURB
COLUMNS AND GUTTER
ASPHALT WIDENING OF 6" OF HBP OVER 8" OF PROVIDE A SAW CUT SMOOTH EDGE ALONG ALL 18" RCP
COMPACTED BASE COURSE PER SOILS ENGINEERS PROPOSED ASPHALT WIDENING A MINIMUM OF 1,0' FROM STORM PIPE
RECOMMENDATIONS THE EXISTING EDGE OR A MINIMUM 2' PATCH BACK WIDTH
COORDINATE WITH THE TOWN AND THE ENGINEER IF
UNSUITABLE SUB —GRADE CONDITIONS ARE ENCOUNTERED
SOUTH FRONTAGE ROAD WIDENING AT BALD MOUNTAIN ROAD
INTERSTATE 70 UNDERPASS, MILE POST #179
MEWIM Mill
aD
.m
41;l
pq
0,4 %
7
v-
A
nn— -
INTERSTATE 70
WEST BOUND
Ulu
& ar _aa9se : / �' /,j, % ✓�� /' / / <' //' �, r'/
INTERSTATE 70
EAST BOUND
.x
SCALE: I" = 40'
OF -
BALD MOUNTAIN RD. UNDERPASS
SOUTH FRONTAGE ROAD WIDENING
AT INTERSTATE 70 ME POST J179
TOW OF VAIL
EAGLE COUNTY, COLORADO
-- -I
ft Km I I SHEET
% 07t&/Mi PLC J000 1716 1 OF 3