Loading...
HomeMy WebLinkAboutB10-0287NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES 70WOFvnI Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT MF BUILD PERMIT Permit #: 1310 -0287 Project #: PRJ10 -0256 Job Address: 1379 WESTHAVEN CR VAIL Status .. ISSUED Location......: NORTH & SOUTH UNITS Applied ..: 09/10/2010 Parcel No....: 210312402007 Issued...: 09/21/2010 Expires...: 03/20/2011 OWNER JACK F. KEMP REVOCABLE TRUST 09/10/2010 1901 PENNSYLVANIA AVE NW STE 300 WASHINGTON DC 20006 -5805 APPLICANT CASABONNE ENTERPRISES 09/10/2010 Phone: 970 - 476 -5435 PO BOX 516 VAIL COLORADO 81658 License: 165 -B CONTRACTOR CASABONNE ENTERPRISES 09/10/2010 Phone: 970 - 476 -5435 PO BOX 516 VAIL COLORADO 81658 License: 165 -B Description: REMOVE STAIR FROM SE DECK, REPLACE 109 COLUMNS WITH 8X8s, REPLACE 109 RAILS WITH 8X8 POSTS AND METAL RAILS. Occupancy: Valuation: $34,800.00 Type Construction: Total Sq Ft Added: 0 .............................................. x ................,,,,,.......,,, FEE SUMMARY ....... ,.... >....................., ......,. .....,..........,....,,........ Building Permit Fee ------ > $492.25 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $1,312.21 Plan Check--------------- - - - - -> $319.96 Use Tax Fee --------------------- > $496.00 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $1,312.21 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00 Payments ------------------------------- > $1,312.21 Total Calculated Fees--- - - - - -> $1,312.21 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUES FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 Signature of Owner or Contractor bate Print Name b Id_a It_constructio n_pe rm it_041908 APPROVALS Permit #: B10 -0287 as of 09 -21 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 09/21/2010 JRM Action: AP Item: 05400 PLANNING DEPARTMENT See the Conditions section of this Document for any that may apply. b Id It_co n st ru ct i o n_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0287 as of 09 -21 -2010 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. bld_a It_construction_permit_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement Statement Number: R100001349 Amount: $1,312.21 09/21/201001:28 PM Payment Method: Check Init: LC Notation: B10 -0287 Permit No: B10 -0287 Type: ADD /ALT MF BUILD PERMIT Parcel No: 2103 - 124 - 0200 -7 Site Address: 1379 WESTHAVEN CR VAIL Location: NORTH & SOUTH UNITS Total Fees: $1,312.21 This Payment: $1,312.21 Total ALL Pmts: $1,312.21 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- BP 00100003111100 BUILDING PERMIT FEES 492.25 PF 00100003112300 PLAN CHECK FEES 319.96 UT 11000003106000 USE TAX 4% 496.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 STRUCTURAL SPECIFICATI 1) All foundation around perimeter of structure shall have minimum frost protection i of 48" to bottom of footing. 2) All lumber shall be Doug -Fir 42 S4S or better, all wolmanized lumber shall be Hem -Fir 42 S4S or better (all lumber within 18" of finish grade or in contact with concrete must be wolmanized). Provide solid blocking at 8'-0" on center in all diaphragms. All columns to be continuous bearing to foundation. All timbers to be Doug -Fir #1 or better. 3) Structural steel shall be ASTM A36 or better, anchor bolts and bolts shall be A307 or better. All structural steel is to be detailed, fabricated, painted and erected in accordance with AISC STEEL CONSTRUCTION MANUAL, 2005 and CODE OF STANDARD PRACTICE. All welding to be performed by a certified welder and conform to AISC and AWS STRUCTURAL WELDING CODE, 2000, all electrodes to be EE -70YX . Grout beneath all base plates and beam bearing plates shall be non - shrink epoxy with minimum 28 day compressive strength of 5000 psi. All Epoxy Anchors to be installed according to manufacturer's specifications and details. 4) Sheath floors with '/4" T and G plywood with minimum span rating of 40/20 or better and glue with PL400. Nail plywood with I Od @ 6" oc to all joists, field coordinate screw option. Cover decks with 2x6 Redwood with 2 screws per bearing point. 5) Live loads used for design- - Deck -100 psf. - Wind -90 mph (3 second gust), Exposure B. - Earthquake -Zone C -IBC. 6) All construction must comply with the 2009 International Building Code as adopted by the Town of Vail Building Department and the "General Conditions of the Contract for Construction" (AIA Document A201). All construction must be completed within the tolerances described in the "Residential Construction Performance Guidelines" as prepared by the NATIONAL ASSOCIATION OF HOME BUILDERS. 7) All beams, joists, and rafters are to bear upon walls or beams, or be hung with SIMPSON Strong -Tie hangers or approve equals. 8) All structural members are shown in their final positions properly . braced and supported; during construction it may be necessary to temporarily shore portions of the structure while other portions are being constructed. Contact the engineer for consultation as required. 9) General Contractor is responsible for all non - specified comiections, contact engineer for details as required. The engineer is to approve all structural substitutions. 10) General Contractor is to coordinate all diaphragm penetrations (i.e., chimneys, plumbing, sewers, etc.) through floors, walls, roofs and foundation walls with appropriate sub - contractors. General Contractor is responsible for the means, methods, techniques, sequences, procedures, workmanship, seasonal scheduling and job -site safety associated with this project. The General Contractor is to verify all dimensions and elevations with the architectural drawings. Notify engineer of all conflicts and omissions between various elements of the working drawings and the existing conditions prior to commencing with that portion of the project. General Contractor is to inspect remodel projects and verify prior use and proper disposal of existing materials (i.e., asbestos, etc.) as required by code. Identity of all existing hidden structural plans based upon plans by JOHN M. PERKINS, ARCHITECT, AIA and BOYLE ENGINEERING, INC. dated March 1989. 11) All materials exposed to exterior and or moisture conditions shall be treated for these conditions (i.e., chemical treatment, staining, painting, damproofing, membranes, flashing, etc.) as required by code. All materials to be treated or protected for fire resistance as required by code. 12) Special inspection to be completed by building official approved inspection agency for epoxy anchors into existing piers. Inspection reports to be prepared in accordance with IBC Chapter 17 on approved forms, verifying compliance with construction documents and be submitted to the building official for review and approval, copying the owner, general contractor and engineer. Coordinate inspections with general contractor so that special inspections can be periodic rather than continuous. UPPER LEVEL f-�Q&r °F PoRn -N or peck To Be_ Ff_�MoVeo vow FRAMI 4=o" -L f,xVSTiM6 VFA"106 To pr--Mfri N �-x4sTir4O 3 -2x12 To FemPON 1-0 F* VW FAWiw f'r-,Mal r4 DETAIL B 2X& pE�� tcz�D A DETAIL A s2 'I✓X15o►N6 fr-AM INCA Tb F40IMN 14m— %4 Ir1A'r�>J, �YSTIM !N� -uflINC -9 a il 2 -, � Nth 14t &L;r5 TOP co-nu of $x$ coVreksvNI- wP FL066Ep �X(b Vp # 6oLV fulsmoG PAPIPIER To REMMN r pf: *1 8x$ taLVNr+ PeK Afc*'L5 2- 4 1 M " 4e of $IC$ coorq - ksos* � pwcxa�� 4Y2' 9(,PER 11 Y 4" 4x V NU "T" N �C 4' v >V. �V ?� Pwc,ry �w m X =1i E X O m V W ~ � U IL N Ow�a S20F 2 "T" w 4' z M,$, r"go $X COVOI Q27JNl- AW �V ?� Pwc,ry �w m X =1i () =(Oo W ~ � U IL N Ow�a 3z> W w CV) 0 T IM 2 W LLJ se CL W S20F 2 Department of Community Development R 75 South Frontage Road Vail.Colorado..81657 Tel: 970- 479 -2128 Fax 970 - 479 -2452 Web: www.vailgov.com Development. Review Coordinator BUILDING PERMIT APPLICATION Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. Project Street Address: 13 wasTHwas (Number) (Street) (Suite #) Building /Complex Name: Contractor Information: E Company: (^5F)f3Q W- FNMKKN TN Company Address: 7.0 -TJS'� t J tLJ I F City: V F L State: CC Zip: f `<: Contact Name: i Contact Phone: 376 bb b 3 E E -Mail C-P) SP! FrtiT ® Up, IL N G r Town of Vai Contractor Registration No.: Lot #: Block # Subdivision: Detailed Scope and Location of Work: 1 �5MCA! STR 1(L ltq ?n►Ls w/ e.x lb PosTs L (use additional sheet if necessary) Work Class: New ( ) Addition ( ) Remodel ( ) Repair (r/)"other ( ) X Work Type Contractor Signature (required) Interior ( ) Exterior (zx <Rth ( ) Property Information Parcel #: 7 -1 (3 , 5 - 12 7 (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or visit www.eaglecounty.us /patie) Type of Building: _ Single - Family ( ) Duplex (KIlm",ulti- Family O ffice P ► R t r C Building Permit #: i 00 Commercial( ) Other( Tenant Name: Owner Name: KEn"p Valuations (Labor & Materials) Building: $ 0�) Plumbing: $ Electrical: $ Mechanical: (including fireplace) $ Does a Fire Alarm Exist? Yes (Y) No( ) Monitored Alarm? Yes ( ) No( ) Does a Sprinkler System Exist? Yes ( ) No( ) # & Type of Existing Fireplaces: Gas Appliances Gas Log Wood /Pellet Wood Burning # & Type of Proposed Fireplaces: Gas Appliances Gas Log Wood /Pellet Wood Burning Date Received: Total: $ 1 SEP 0: 1 I 15- May -10 12 -06 -2010 Inspection Request Reporting Page 21 6:22 pm Vail, CO - City Of Requested Inspect Date: Tuesday, December 07, 2010 Inspection Area: CG Site Address: 1379 WESTHAVEN CR VAIL NORTH & SOUTH UNITS A/P /D Information Activity: B10 -0287 Type: A -MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: CG Owner: JACK F. KEMP REVOCABLE TRUST Contractor: CASABONNE ENTERPRISES Phone: 970 - 476 -5435 Description: REMOVE STAIR FROM SE DECK, REPLACE 109 COLUMNS WITH 8X8s, REPLACE 109 RAILS WITH 8X8 POSTS AND METAL RAILS. Requested Inspection(s) Item: 534 PLAN - FINAL C/O Requestor: CASABONNE ENTERP Assigned To: BGIBSON Action: Time Exp: It e.4: 90 BLDG -Final Reque r: CASABONNE ENTE RISES Assign To: JMONDRAGON ction: Time Exp: Inspection History Item: 10 BLDG - FOOTING Item: 20 BLDG - Foundation /Steel Item: 30 BLDG - Framing "' Approved 09/30/10 Inspector: Martin Comment: Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Item: 70 BLDG -Misc. Item: 90 BLDG -Final Item: 534 PLAN -FINAL C/O Requested Time: 08:00 AM Phone: -or- 970 - 390 - 8683 -PETER Entered By: SBELLM K Requested Time: 02:00 PM Phone: PETER 390 -8683 Entered By: SBELLM K Action: \SAP APPROVED REPT131 Run Id: 12270