Loading...
HomeMy WebLinkAboutB10-0327NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOM OF VAIL Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT COMM BUILD PERMT Job Address: 183 GORE CREEK DR VAIL Location......: LOBBY Parcel No....: 210108210006 OWNER SITZMARK AT VAIL INC 183 GORE CREEK DR VAIL CO 81657 APPLICANT NEDBO CONSTRUCTION P.O. BOX 3419 VAIL CO 81658 License: 251 -A CONTRACTOR NEDBO CONSTRUCTION P.O. BOX 3419 VAIL CO 81658 License: 251 -A 09/27/2010 09/27/2010 Phone: 970-845-1001 09/27/2010 Phone: 970-845-1001 Description: REMODEL OF EXISTING LOBBY. COFFERED CEILING, HEATER COVERS AND TRIM WORK. Occupancy: mixed Type Construction: IIA Permit #: 1310 -0327 Project #: Status .. : ISSUED Applied ..: 09/27/2010 Issued ...: 10/22/2010 Expires ...: 04/20/2011 Valuation: $65,000.00 Total Sq Ft Added: 0 FEE SUMMARY ##### fi# ..... ############################. fifififififififi # # # # # # # #.fififi # # # # # # # # # # # # # #fi # ## Building Permit Fee ------ > $748.75 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $2,339.44 Plan Check--------------- - - - - -> $486.69 Use Tax Fee --------------------- > $1,100.00 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $2,339.44 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00 Payments ------------------------------- > $2,339.44 Total Calculated Fees--- - - - - -> $2,339.44 BALANCE DUE ------------------------ > $0.00 # fi# fifi fifififififififififififififiRfififiRRfifrtftrRRRHffiVfiY, 4R, 4i( fi#### fififi######## fifix# w###### fifififi########################################## fi## fi###### Yr, Ffi####### fi## fifi###### fi### fi #41r1r# #ffiffi #fifififi# # # # ##fifi #fifififi# DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS F9,R INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. Si nature of 9dWr or Contractor Date 69 V Print Namq bld_a It_constructio n_perm it_041908 APPROVALS Permit #: B10 -0327 as of 10 -22 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 10/12/2010 cg Action: CR project comments sent to applicant 10/21/2010 cg Action: AP APPROVED PLANS ADDRESSING COMMENTS PLUMBING AND ELECTRICAL PLANS INCLUDED WITH BUILDING PERMIT. NO MECH IN SCOPE OF WORK Item: 05600 FIRE DEPARTMENT 09/28/2010 mvaughan Action: AP approved pending receipt of asbestos clearance letter. See the Conditions section of this Document for any that may apply. bld_alt_construction _pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0327 as of 10 -22 -2010 Status: ISSUED Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. bld_a It_co nstruction _perm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001657 Amount: $2,339.44 10/22/201009:10 AM Payment Method: Check Init: SAB ----------------------------------------------------------------------------- Notation: 37191 NEDBO Permit No: B10 -0327 Type: ADD /ALT COMM BUILD PERMT Parcel No: 2101 - 082 - 1000 -6 Site Address: 183 GORE CREEK DR VAIL Location: LOBBY Total Fees: $2,339.44 This Payment: $2,339.44 Total ALL Pmts: $2,339.44 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code -------------- - - - Description Current Pmts - -- BP 00100003111100 ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 748.75 PF 00100003112300 PLAN CHECK FEES 486.69 UT 11000003106000 USE TAX 4W 1,100.00 WC 00100003112800 ----------------------------------------------------------------------- WILL CALL INSPECTION FEE 4.00 - - - - -- it.of Community Development 75 South Frontage Road Vail, Colorado 81657 ,. Tel: 970 - 479 -2128 Fax: 970 -479 -2452 Web: www.vailgov.com elopmen ery rdi to y C BUILDING PERMIT APPLICATION Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. Project Street Address: It Ifs3 S. Goy Cftcy- Df'.. # t (Number) (Street) / (Suite #) Building /Complex Name: JI{Zwlivfk- O�cIIL. Contractor Information: Company: Ncdbo %nSt"XA- ✓►'1 Company Address: ?0 90A 3 N iq City: VAi I State: (0 Zip: fsi (66:6 Contact Name: 9411-e k. vf.10 Contact Phone: 470- f%45- 100i E -Mail fo z-ent 6,.iy%wi Town of VailContzt7; gistr t ion No.: A Z!51 X ,,� Contractor Signat a (r fired) Property Information Parcel #: z1oz- oifZ- 10— 006 (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or visit www.eaglecounty.us /patie) Lot #: A rY Block # 'T6 Subdivision: .I ViII14L i l. Tenant Name: Owner Name: Jii'Lmkek Q V40 rgz, Valuations (Labor & Materials) Building: $?go-0o Plumbing: $ �i ocy Electrical: $ S, C7CTO Mechanical (including Fireplace): $ Total $ CS OW I �a33o • C: \cdcv \forms \permits \buil ding \resi dcntial_bu it dine _permit_010110 Office Use: n / Project #: PR'T 1 (J(o 11 Building Permit #: '?) I C) — o 3 a� Detailed Scope and Location of Work: �t��i►ty . %Ks��ci' %y�t/5 _ �n� Tr�i►'t 4J»i1G, (use additional sheet if necessary) Work Class: New ( ) Addition ( ) Remodel (X) Repair ( ) Other ( ) Work Type Interior (X) Exterior ( ) Both ( ) Type of Building: Single - Family ( ) Duplex ( ) Multi - Family ( ) Commercial ()() Other ( ) Does a Fire Alarm Exist? Yes (g) No( ) Monitored Alarm? Yes ()() No( ) Does a Sprinkler System Exist? Yes (X) No( ) # & Type of Existing Fireplaces: Gas Appliances ( ) Gas Log ( ) Wood /Pellet ( ) Wood Burning ( ) # & Type of Proposed Fireplaces: Gas Appliances ( ) Gas Log ( ) Wood /Pellet ( ) Wood Burning ( ) Date Received: ft 0 V L D C n = 2JN10 TOWN OF V/AIL Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing reauired? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 30 square feet All Others: 160 square feet Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued Project Checklist My project falls into the category checked below: Will not disturb more than the threshold limits identified above. ❑ Tested negative, or at 1% or below (2 copies of test results included) 0 Tested positive at more than 1 %, requires abatement (2 copies of test results included) Tips & Facts: Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: David Rhoades, Fire Inspector Vail Fire Department 75 S Frontage Rd drhoades @vailgov.com 970 - 477 -3454 www.vailgov.com c: \cdev \forms \permits \bui I ding \comm_buildi ng _permit_010110 State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos @state.co.us wvvw.cdphe,state.co.us Asbestos Inspection and Sampling Report Sitzmark Lodge -183 E Gore Creek Dr. #1 in Vail, Colorado 81657 Presented to: Mr. Ronald Kjesbo Nedbo Construction PO Box 3419 Vail, CO 81658 Performed & Prepared by: Mr. Brandon Sinkbeil DS Consulting, Inc. PO Box 6864 Avon, CO 81620 970 - 476 -4182 Project Details: DSC Project #: 2668 Conducted: August 19, 2010 Consulting EXECUTIVE SUMMARY On August 19, 2010, Mr. Brandon Sinkbeil of DS Consulting, Inc. (DSC) performed a limited inspection and asbestos sampling in the Sitzmark Lodge at 183 E Gore Creek Dr. #1 in Vail, Colorado, in order to identify potentially hazardous friable and non - friable asbestos - containing materials (ACM) within portions of the above - referenced hotel scheduled for a renovation. The Colorado Department of Public Health and Environment's (CDPHE) Regulation 8, Part B defines an asbestos - containing material (ACM) as a material containing more than 1% asbestos. Mr. Sinkbeil performed asbestos bulk - sampling of drywall and spray -on texture (surfacing material) in a total of fifteen (15) locations within the main lobby, room 215, and the second and third floor main hallways of the hotel. All fifteen (15) bulk - samples were analyzed by Aerobiology & Associates laboratory in Lakewood, Colorado (NVLAP #200860 -0) with eleven (11) laboratory results being positive for asbestos at 3% to 4% Chrysotile (see Appendix B for laboratory results). The following sampled materials were found to contain asbestos greater than 1 % (ACM): Sample Material Sample Material Friable/ Estimated Material Asbestos ID D• Quantities* 2HCT -1 Spray -on 2nd Floor Hall Surfacing Friable N/A Good 3% Ceiling Texture Ceiling Texture Materials Chrysotile 2HCT -2 Spray -on 2nd Floor Hall Surfacing Friable N/A Good 3% Ceiling Texture Ceiling Texture Materials Chrysotile 2HCT -3 Spray -on 2.d Floor Hall Surfacing Friable N/A Good 3% Ceiling Texture Ceiling Texture Materials Chrysotile 3HCT -1 Spray -on 3,d Floor Hall Surfacing Friable N/A Good 4% Ceiling Texture Ceiling Texture Materials Chrysotile 3HCT -2 Spray -on 3rd Floor Hall Surfacing Friable N/A Good 4% Ceiling Texture Ceiling Texture Materials Chrysotile 3HCT -3 Spray -on 3rd Floor Hall Surfacing Friable N/A Good 4% Ceiling Texture Ceiling Texture Materials Chrysotile 215CT -1 Spray -on Room 215 Surfacing Friable +/-1,50 0 ft2 Good 4% Ceiling Texture Ceiling Texture Materials Chrysotile ?15CT -3 Spray -on Room 215 Surfacing Friable +/- 1,500 ft 2 Good 2% Ceiling Texture Ceiling Texture Materials Chrysotile JLDW -1 Drywall & Upper Level Surfacing Friable +/- 1,000 ft 2 Good 4% Texture Lobby Ceiling Materials Chrysotile JLDW -2 Drywall, joint Compound & Upper Level Surfacing Friable +/- 1,000 ft 2 Good 3 -4% Texture Lobby Ceiling Y g Materials Chrysotile JLDW -3 Drywall & Upper Level Surfacing Friable +/- 1,000 ft 2 Good 3% Texture Lobby Ceiling Y g Materials Chrysotile *Quantities are approximations and subject to field verification. 2 PROJECT OVERVIEW I. Introduction A limited inspection and bulk- sampling for ACM was conducted in the Sitzmark Lodge at 183 E Gore Creek Dr. #1 in Vail, Colorado, by Mr. Sinkbeil on August 19, 2010, at the request of Mr. Ronald Kjesbo with Nedbo Construction. Mr. Sinkbeil is a Colorado State Certified Building Inspector; having EPA Accreditation #13442 (see Appendix A for certificate). The purpose of the inspection was to identify, sample and assess potentially hazardous friable and non - friable ACM within certain areas of the hotel scheduled for a remodel. II. Structural Design The structure is a multi -story commercial hotel in the Vail Village. III. Sampling and Analytical Procedures The inspection, assessment and sampling were conducted by an EPA and AHERA accredited Building Inspector qualified by experience, education and training in the recognition of potential ACM and approved bulk - sampling techniques. The asbestos bulk- sampling was conducted on suspect ACM with a limited number of bulk - samples being collected within the building. The inspection, assessment and sampling were performed in accordance with Environmental Protection Agency / AHERA recommended procedures. These procedures call for the visual inspection of the area of concern and the collection and analysis of representative bulk - samples of suspect material. Some minor destructive sampling was conducted. Walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Random bulk - samples, representative of the suspect asbestos - containing building materials (ACBM) of each homogeneous area (HA), were collected according to the guidelines published as Environmental Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763. Representative sampling is based on the following criteria: 1. The distribution of the suspect material throughout the HA. 2. The suspect material's physical characteristics and application. 3. Random sampling patterns determined for each HA. Suspect materials sampled and analyzed should be considered to be representative of materials in each HA if they exhibit similar physical characteristics and the application of the sampled material can be correlated to the application of un- sampled material. Bulk - samples collected were analyzed utilizing the EPA's Method for the Determination of Asbestos in Bulk Building Materials (EPA 600/R/116, July, 1993) and the McCrone Research Institute's The Asbestos Particle Atlas as methods references. Analysis of the bulk - samples was performed on the "date reported," as listed in the bulk - sample analysis report 3 IV. Notes on Report Format Suspect materials alike in appearance and application were sampled as HAs. Suspect materials were divided into three classifications: 1. Surfacing Material: sprayed or troweled onto structural building member. 2. Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation. 3. Miscellaneous Material: other suspect materials, floor tile, sheet vinyl /linoleum, ceiling tiles, insulation, and finishing materials. Condition assessments were performed by the accredited inspector at the time of inspection. Condition assessments are listed in the following section. Ratings of "good," "damaged," and "significantly damaged" are meant to indicate the overall condition of the material. A material in "good" condition has no visible damage or deterioration, or showing only very limited damage or deterioration. A material in "damaged" condition has the following characteristics: The surface is crumbling, blistered, water - stained, gouged, marred or otherwise abraded over less than one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. A material in "significantly damaged" condition has one or more of the following characteristics: • The surface is crumbling or blistered over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). • One -tenth (one - quarter, if localized) of the material is hanging from the surface, deteriorated, or showing adhesive failure. • Water stains, gouges, or mars are over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. Response- action recommendations for asbestos - containing HAs are listed in the section VII. Recommendations may be for more than one HA, if materials are alike. Recommendations are either "general" or "immediate." An immediate recommendation indicates the presence of asbestos greater than 1% within the bulk - sample, or a bulk - sample in the same HA, and should be addressed accordingly. A general recommendation indicates asbestos does not exist greater than 1% within the bulk - sample, or a bulk - sample in the same HA, and no further abatement activities are required for removal of the material. Any sample reporting a "TRACE" amount of asbestos must be considered to be positive for asbestos greater than 1% unless it is analyzed by the point -count method to be less than 1 %. V. Inspector Comments Asbestos was identified during the bulk - sampling conducted in the Sitzmark Lodge at 183 E Gore Creek Dr. #1 in Vail, Colorado. A total of fifteen (15) bulk - samples were collected from the main lobby, room 215, and the 2nd and 3rd floor main hallways of the above - referenced building. Eleven (11) bulk - samples tested positive greater than 1% for asbestos. 4 VI. Homogeneous Area Descriptions The following section contains sampled HA descriptions and sample locations. Percent - asbestos content for each sample indicated can vary depending on sample locations, homogeneity of the materials, and type of application. The following samples were collected from the Sitzmark Lodge at 183 E Gore Creek Dr. #1 in Vail, Colorado, on August 19, 2010. The quantities are approximations and are subject to field verification: Homogeneous Area #01 Sample #: 2HCT -1 Homogeneous Area #01 Sample #: 2HCT -2 Sample Description: Spray -on Surface Texture Sample Description: Spray -on Surface Texture Sample Location: 2nd Floor Main Hallway Ceiling Sample Location: 2nd Floor Main Hallway Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: Unknown Material Quantity. Unknown Material Condition: Good Material Condition: Good Physical Description (layers): White texture w/ white paint; White foamy texture Physical Description (layers): White perlitic texture w white paint; White foamy texture Asbestos Content (layers): 3% Chrysotile; Negative Asbestos Content (layers): 3% Chrysotile; Negative Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogeneous Area #01 OMMO Sample #: 2HCT -3 Homogeneous Area #02 Sample #. 3HCT -1 Sample Description: Spray -on Surface Texture Sample Description: Spray -on Surface Texture Sample Location: 2nd Floor Main Hallway Ceiling Sample Location: 3rd Floor Main Hallway Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: Unknown Material Quantity: Unknown Material Condition: Good Material Condition: Good Physical Description (layers): White perlitic texture w white paint; White foamy texture Physical Description (layers): White perlitic texture w white paint Asbestos Content (layers): 3% Chrysotile; Negative Asbestos Content (layers): 4% Chrysotile Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII 5 Homogeneous Area #02 Sample #: 3HCT -2 Homogeneous Area #02 Sample #: 3HCT -3 Sample Description: Spray -on Surface Texture Sample Description: Spray -on Surface Texture Sample Location: 3rd Floor Main Hallway Ceiling Sample Location: 3rd Floor Main Hallway Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: Unknown Material Quantity: Unknown Material Condition: Good Material Condition: Good Physical Description (layers): White perlitic texture w white paint Physical Description (layers): White perlitic texture w white paint Asbestos Content (layers): 4% Chrysotile Asbestos Content (layers): 4 %Chrysotile Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogeneous Area #03 Sample #: 215CT -1 Homogeneous Area #03 Sample #: 215CT -2 Sample Description: Spray -on Surface Texture Sample Description: Spray -on Surface Texture Sample Location: Room 215 Ceiling Sample Location: Room 215 Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: +/ -1,500 ftz Material Quantity: +/ -1,500 ft2 Material Condition: Good Material Condition: Good Physical Description (layers): White perlitic texture w white paint; White foamy texture Physical Description (layers): White foamy texture Asbestos Content (layers): 4% Chrysotile; Negative Asbestos Content (layers): Negative Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogtneous Area., #03 Sample #: 215CT -3 Homogeneous Area #04 Sample #: LLDW -01 Sample Description: Spray -on Surface Texture Sample Description: Drywall Sample Location: Room 215 Ceiling Sample Location: Lower Level Lobby Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: +/ -1,500 ft2 Material Quantity: >1,000 ft2 Material Condition: Good Material Condition: Good Physical Description (layers): White perlitic texture w/ white paint Physical Description (layers): Yellow fibrous woven; White joint compound; White tape; White texture w white aint; White tan drywall Asbestos Content (layers): 4% Chrysotile Asbestos Content (layers): Negative; Negative; Negative; Negative; Negative Recommendations: IMMEDIATE - See Section VII Recommendations: GENERAL - None Homogeneous Area #04 Sample #: LLDW -02 Homogeneous Area #04 Sample #: LLDW -03 Sample Description: Drywall Sample Description: Drywall Sample Location: Lower Level Lobby Ceiling Sample Location: Lower Level Lobby Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: >1,000 ft2 Material Quantity: >1,000 ft2 Material Condition: Good Material Condition: Good Physical Description (layers): White tape; White joint compound; White texture w/ white paint; White tan drywall Physical Description (layers): ): Yellow fibrous woven; White texture w/ white paint; White /tan drvwall Asbestos Content (layers): Negative; Negative; Negative; Negative Asbestos Content (layers): Negative; Negative; Negative Recommendations: GENERAL - None Recommendations: GENERAL - None 1111'i1 ' 1 5- Sample #: ULDW -01 -Homogeneous Area 1 Sample #: ULDW -02 Sample Description: Drywall Sample Description: Drywall Sample Location: Upper Level Lobby Ceiling Sample Location: Upper Level Lobby Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: >1,000 ft2 Material Quantity: >1,000 ft2 Material Condition: Good Material Condition: Good Physical Description (layers): White perlitic texture w/ white paint; White /tan drywall Physical Description (layers): White tape; White perlitic texture w/ white paint; White joint compound; White tan drywall Asbestos Content (layers): 3% Chrysotile; Negative Asbestos Content (layers): Negative; 4% Chrysotile; 3% Chrysotile; Negative Recommendations. IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogeneous Area 1 Sample #: ULDW -03 Sample Description: Drywall Sample Location: Upper Level Lobby Ceiling Material Classification: Surfacing Material Material Quantity. >1,000 ft2 Material Condition: Good Physical Description (layers): White perlitic texture w white paint; White tan drywall Asbestos Content (layers): 3% Chrysotile; Negative Recommendations: IMMEDIATE - See Section VII M. Recommendations IMMEDIATE: The laboratory results of the potential ACM sampled at the Sitzmark Lodge at 183 E Gore Creek Dr. #1 in Vail, Colorado, on August 19, 2010, indicate that the bulks samples of drywall collected from the upper - level ceiling of the main lobby as well as the ceiling- texture samples collected from room 215 and the 2nd and 3rd floor main hallways were reported as positive for asbestos from 3 to 4% Chrysotile. If the above - referenced ACM is to be disturbed or removed from the hotel and the total quantity exceeds any of the regulatory trigger levels of 260 linear feet on pipes, 160 square feet on other surfaces, or the volume equivalent of a 55- gallon drum, a Colorado- licensed asbestos abatement contractor is required to perform the work, including formal notification to the Colorado Department of Public Health and Environment prior to the abatement of the ACM. APPENDIX A CERTIFICATION :i��'� •c�_',,.r��rf��. °., a }���f r. t ,rkV �e `t fi;• � ✓�i `r •�. 5, trr i:''tr� ,`f+r�.. �lf,Y•. . t.j ,r . c�`ir' + "r � tdr `.,;f ek0.' ♦ i4"� i ttr� 'fit �'�. ttl,..� �•f+ 1 .. '*'•:�r �� •y�1"i`�+�� r�/hfrre.'r%e''�rr .h•v °f.'i• ✓N:rvW.thAf e„ V`• s,d rr..I ,• ,r'r'. ,a r r.vr 1rr �r �. i �e r r `1 rW f JPrr r• ' `,"N r'�,I �,rrr'.r r „ et,'Frr r r d +«7 • a `rhii' �� 4 rty'r•' F�r`� {!1/ .f ♦,t .,r , ai' .7rt,�Y , �kMF'. 7 i� ;ta it °�� �'„l 5'C r / \4 ` ' • }t� ,�`�' f %r i�ti rF , r ,!w,�F yr �,r7s.�}r , �� 1J1,r �4r. , i � ' r.di ` 2 k. � r L♦ "•'� - 1 . • .. . _ .: .• ... ..,. ..•..r .;: i'- to •fit to ql STATE OF COLORADO ;x ASBESTOS �Y CERTIFICATION *I Colorado Department of Public Health and Environment Air Pollution Control Division "'? This certifies that Brandon Sinkbeil , , • 1 Certification No: 13442 has met the requirements of 25 -7 -507, C.R.S. and Air Quality Control' Commission Regulation No. 8, Part B, and is here gul by certified by the state of Colorado in the following discipline: `' f Building lnspectork ' ?��.. . Issued: 5/1612010 ss Expires on: 5/16/2011 x / Y »'t r ! ✓ i i 1. ~•�� `'1 Au d APtb Representative 11 ♦Z I i •♦, x. `this certificate is fu/id only mi1G the puucc.rnu oja current Dirisiou approt cd traiuluf; course r 4{ cotifuurina in the discipline specified uGura v 4` �1 ._, � •i' ,�" /'.wc ,j;. t . n � -, # �. . N..:h r f � _ r. ",. Y=: ?t,,:- v::,F- - ; j . � � Sf, i� rr f +� « ��♦ !%':� ti, Zt1 'i.i �• �` i // r t�, S;SS r r�"r � ,,rtN r � +K � . ` aZ 1JN•y r ti ",d,. ;SYS .'; 1 ti„ �" Ji t'ti�! s f 'M14 t �: f l rr' ''i��' 7` � , tk �1s yi7:•r r• ' f� �� s �, "1T�,Jke w �Jtlfe� • ;,rr'r�''� j Z .r�rr,rd';j�.� .�'Ja',• ti • �' t . r • irr .r ' e, r •v ' �••4� y rte , E Sam le Identification ASSOCIATES, INCORPORATED Homo- geneous es /no Number of La ers % 13949 W. C oitax Ave Lab Sam le Number 215CT1 105926 -713 White Foamy Texture Suite 205 2,70% CONSULTING LABOR ATOI2Y 105926 -8 White Foamy Texture Lakewood, CO 80491 1,100% 215CT3 Certificate of Analysis White Perlitic Texture W/ White Paint 303.232.3746 1,100% LLDW1 105926 -IOA Yellow Fibrous Woven www.aerobiolo_qv.net Client Name DS Consluting. Inc. White Joint Compound N 5,3% Street address 5366 Flatrock Ct. n Date Collected: 08/19/10 City, State ZIP Morrison. CO 80465 15 Date Received: 08/19/10 Attn: Brandon Sinkbeil Date Analyzed: 08/19/10 Client Project Name: Sitzm ark Lodge 183 E. Gore Creek Dr. Vail. CO #200860 -0 Date Reported: 08/19/10 4,10% Project ID: 105926 Job ID: Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA -600 /R- 93/116, July 1993. Sam le Identification Physical Description of Sample; Additional Comments Homo- geneous es /no Number of La ers % Client Lab Sam le Number 215CT1 105926 -713 White Foamy Texture N 2,70% 215CT2 105926 -8 White Foamy Texture N 1,100% 215CT3 105926 -9 White Perlitic Texture W/ White Paint N 1,100% LLDW1 105926 -IOA Yellow Fibrous Woven N 5,3% rl 05926 -1OB White Joint Compound N 5,3% 0 5926 -1OC White Tape N 5,5% 105926 -1OD White Texture w/ White Paint N 5,20% 105926 -IOE White/Tan Drywall N 5,69% LLDW2 105926 -I IA White Tape N 4,4% 105926 -1113 White Joint Compound N 4,10% Asbestos Detected Non - Asbestos Fibers area % Non - Fibrous Material area % Matrix Material (composition) Q = Qum C = Negative AN = Anffiophyllite 100 G Negative 100 G G = Gypsum POSITIVE 4% CHRY 96 P,C M = Mica Negative 98% FBG 2 NTR = Non - Asbestiform TR Negative Laboratory Analyst rY Y 100 C Negative 98% CELL 2 Negative 100 C Negative 15% CELL 85 G Negative 98% CELL 2 Negative 100 C it = Amoslte AC = Actinolite CELL = Cellulose MW = Mineral Wool Q = Qum C = AN = Anffiophyllite FBG = Fiberglass Carbonates V = Vermiculite CHRY= Chrysotile SYN = Synthetic G = Gypsum CR = Crocidolite WO = Wollastonite M = Mica Paul Knappe am um e s Y TR = Tremolite ° Trace =Less Than 1 /o NTR = Non - Asbestiform TR T = Tar Laboratory Analyst rY Y Asbestos Laboratory Supervisor r NAC = Non- Asbestifonn AC P = Perlite FT = Fibrous Talc O = Organic AH = Animal Hair B = Binder APPENDIX B LABORATORY ANALYSIS 10 Sam le Identification ASSOCIATES, INCORPORATED CONSULTING LABORATORY Homo - geneous es /no Client 13949 W. Coltax Ave Suite 205 Lakewood, CO 80101 2HCT 1 Certificate of Analysis White Texture w/ White Paint 303.232.3746 ww.aerobioloav net www.aerbiology.net 08/19/10 08/19/10 08/19/10 08/19/10 Client Name DS Coosiuting. Inc. Street address 5366 Flatrock Ct. City, State ZIP Morrison. CO 80465 Attn: Brandon Sinkbeil Client Project Name: Sitzmark Lodge 183 E. Gore Creek Dr. Vail, CO �= LrJ #200860 -0 Date Collected: Date Received: Date Analyzed: Date Reported: 105926 -2A White Perlitic Texture w/ White Paint N Project ID: 105926 Test Requested: 3002, Asbestos in Bulk Samples 105926 -3A Job ID: N 105926 -3B White Foamy Texture Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA - 600 /R- 93/116, July 1993. White Perlitic Texture w/ White Paint Sam le Identification Physical Description of Sample; Additional Comments Homo - geneous es /no Client Lab Sample Number 2HCT 1 105926 -1A White Texture w/ White Paint N 105926 -1B White Foamy Texture N 2HCT2 105926 -2A White Perlitic Texture w/ White Paint N 105926 -2B White Foamy Texture N 2HCT3 105926 -3A White Perlitic Texture w/ White Paint N 105926 -3B White Foamy Texture N 3HCT1 105926 -4 White Perlitic Texture w/ White Paint N 3HCT2 105926 -5 White Perlitic Texture w/ White Paint N 3HCT3 105926 -6 White Perlitic Texture w/ White Paint N 215CT1 105926 -7A White Perlitic Texture w/ White Paint N Paul Knappe Laboratory Analyst 1 Aaam Humpttreys Asbestos Laboratory Supervisor of Fibers I Material I Material 2,15% I 3% CHRY I 1 97 I C 2,85% I Negative I I 100 G 2,30% I 3% CHRY I I 97 I P,C 2,70% I Negative I I 100 G 2,5% I 3% CHRY I I 97 I P,C 2,95% I Negative I I 100 I G 1, 100% I 4% CHRY I I 96 I P,C 1,100% 4% CHRY 96 P,C POSITIVE 100% 4% CHRY 96 P,C 2,30% I 4% CHRY I I 96 I P,C A = Amosite AC = Actinolite CELL = Cellulose MW = Mineral Wool Q = Quartz AN = Anthophyllite FBG = Fiberglass C = Carbonates V = Vermiculite CHRY = Chrysotile CR = Crocidolite SYN = Synthetic G = Gypsum TR = Tremolite WO = Wollastonite NTR = Non - Asbestiform TR M = Mica T = Tar Trace =Less Than 1% NAC = Non - Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder ASSOCIATES, WCORPORATED 13949 W. ColtaxAve Suite 205 CONSULTING LABORATOR LABORATORY Lakewood, Lakewood, CO 80401 Certificate of Analysis www.aeobiology.net Client Name DS Consluting. Inc. y Street address 5366 Flatrock Ct. n (� (1 �� Date Collected: 08/19/10 City, State ZIP Morrison. CO 80165 l�L° —J�UJ) Date Received: 08/19/10 Attn: Brandon Sinkbeil Date Analyzed: 08/19/10 Client Project Name: Sitzmark Lodge 183 E. Gore Creek Dr. Vail CO #200860 -0 Date Reported: 08/19/10 Project ID: 105926 Job ID: Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA 600 /R- 93/116, - July 1993. Sample Identification Physical Description of Sample; Homo- Number Asbestos Detected Non - Asbestos Non - Fibrous Matrix Client Lab Sam le Number Additional Comments geneous es /no of La ers % Fibers Fibia Material l Material area % area %) (compositi 105926-11 C White Texture w/ White Paint N 4,20% Negative LLDW2 100 C 105926 -11 D White /Tan Drywall N 4,66% Negative 15% CELL 85 G 105926 -12A Yellow Fibrous Woven N 3,4% Negative 98% FBG 2 LLDW3 105926 -12B White Texture w/ White Paint N 3,16% Negative 100 C 105926 -12C White/Tan Drywall N 3,80% Negative 15% CELL 85 G 105926 -13A White Perlitic Texture w/ White Paint N 2,7% POSITIVE 4% CHRY ULD W 1 96 P 105926 -13B White /Tan Drywall N 2,93% Negative 15% CELL 85 G 105926 -14A White Tape N 4,2% Negative 98% CELL 2 ULD W2 105926 -14B White Perlitic Texture w/ White Paint N 4,5% POSITIVE 4% CHRY 96 P 105926 -14C White Joint Compound N 4,15% POSITIVE 3% CHRY 97 G A = Amosite AC = Actinolite AN = Anthophyllite CELL = Cellulose MW = Mineral Wool FBG = Fiberglass C —Quartz C = Carbonates CHRY= Chrysotile SYN = Synthetic Vermiculite CR = Crocidolite WO = Wollastonite G = Gyps Gypsum / Paul Knappe am um e s p TR = Tremolite M =Mica NTR = Non - Asbestiform TR T = Tar Laboratory Analyst y t7 Y Asbestos Laboratory Supervisor o Trace =Less Than 1 /o NAC = Non - Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder - 4%w - -- - — — - — - -- --I I _ _ — . - T ASSOCIATES, INCORPORATED CONSULTING LABORATORY Certificate of Analysis 13949 W. Uoltax Ave Suite 205 Lakewood, CO 804'01 303.232.3746 www. aerob ioloay.iiet Client Name DS Consluting, Inc. Homo- geneous es /no N Street address 5366 Flatrock Ct. ��n (� (�� Date Collected: 08/19/10 City, State ZIP Morrison. CO 80465 l�Lr��IJrJ Date Received: 08/19/10 Attn: Brandon Sinkbeil Date Analyzed: 08/19/10 Client Project Name: Sitzrnark lodge 183 G. Gore Creek Dr. Vail CO #200860 -0 : d Date Reported8/1/10 09 8/19/1 P 105926 -15B Project I : N 2,93% Negative Job ID: 85 Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials- F.PA- 600 /R -91i1 16 1..k, r ooi Sample Identification Q = Quartz Physical Description of Sample; Additional Comments White /Tan Drywall Homo- geneous es /no N Number of La ers % 4,78% Asbestos Detected Non- Asbestos Fibers area % 15% CELL Non - Fibrous Material area % 85 Matrix Material (composition) G Client ULDW2 Lab Sample Number 105926 -14D Negative ULDW3 105926 -15A White Perlitic Texture W/ White Paint N 2,7% POSITIVE 3% CHRY 97 P 105926 -15B White/Tan Drywall N 2,93% Negative 15% CELL 85 G 'rzaz — Paul Knappe Laboratory Analyst 1111,11 11111 mp eys Asbestos Laboratory Supervisor A = Amosite AC = Actinolite AN = Anthophyllite CHRY = Chrysolite CR = Crocidolite TR = Tremolite Trace =Less Than 1% CELL = Cellulose Q = Quartz MW = Mineral Wool C = Carbonates FBG = Fiberglass V = Vermiculite SYN = Synthetic G = Gypsum WO = Wollastonite M = Mica NTR = Non- Asbestiform TR T = Tar NAC = Nov- Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder AERobiolociy LAbORATORy ASSOCIATES, INCORPORATED CONSULTING LABORATORY Certificate of Analysis 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 www.aerc)bloloqy.net US Consluting. Inc. 5366 Flatrock Ct. ^Cl ,, Date Collected: 08/19/10 Morrison, CO 80465 [M U ��) Date Received: 08/19/10 �� ^g Brandon Sinkbeil Date Analyzed: 08/19/10 Client Project Name: Sitzntark Lodge 183 L. Gore Creek Dr. Vail, CO #200860 -0 Date Reported: 08/19/10 Project ID: 105926 General Notes Job ID: Negative indicates no asbestos was detected; the method detection limit is 1 %. • Trace or " <1" indicates asbestos was identified in the sample, but the concentration is less than the method detection limit of 1 %. • All regulated asbestos minerals (i.e. chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite) were sought in every layer of each sample, but only those asbestos minerals detected are listed. Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunterite. Crocidolite is the common name used for the asbestiform variety of the mineral reibekite. ♦ Tile, vinyl, foam, plastic, and fine powder samples may contain asbestos fibers of such small diameter (< 0.25 microns in diameter) that these fibers cannot be detected by PLM. For such samples, more sensitive analytical methods (e.g. TEM, SEM, and XRD) are recommended if greater certainty about asbestos content is required. Semi - quantitative bulk TEM floor tile analysis is accepted under the NESHAPS regulations. • These results are submitted pursuant to Aerobiology Laboratory Associates, Inc.'s current terms and conditions of sale, including the company's standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted. • Unless notified in writing to return the samples covered by this report, Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty (30) days before discarding. A shipping and handling charge will be assessed for the return of any samples. Notes Required by NVLAP • This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. ♦ This test report relates only to the items tested or calibrated. ♦ This report is not valid unless it bears the name of a NVLAP- approved signatory. • Any reproduction of this document must include the entire document in order for the report to be valid. 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 TRANSMITTAL FORM Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: B1C) --0327 (�,. ( ) R� isions (y)'fZesponse to Correction Letter _attached copy of correction letter () Deferred Submittal () Other Project Street Address: I Description / List of Changes: i (Number) (Street) (Suite #) 7-Ci Commeu, ►'.S; Building /Complex Name: 41,1 , f4 i 'A A - a.3 Contact Information: ^ C Company: M&D irk E—) . I , �' o 1, Q JI;z 0F92, Company Address: City: State: Zip: Contact Name: p��(�\_' )O LC— Contact Phone: t -7 7 ' Q` S 2- E -Mail fY�QCk< co-, f1Q A�bp C_Cin Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) / use additional sheet if necessary) Building: $ Plumbing: $ i1 Date Received: Electrical: $ ' OCT 2 0 2010 I Mechanical: $ i I Total: $ TOWN OF VAIL O1- Jan -10 TOWN np VA IIT y OCT 2 U 1070 O TOWN OF VAIL Department of Community Development 5 South Frontage Road Vail, Colorado 81657 970 - 479 -2138 FAX 970 - 479 -2452 www.vailgov.com PROJECT REVIEW COMMENTS DATE: 10/12/10 TO: Rollie @nedbo.com PERMIT APPLICATION #: PROJECT ADDRESS: OCCUPANCY GROUP: TYPE OF CONSTRUCTION: NUMBER OF STORIES: BUILDING AREA: B10 -0327 183 E Gore Creek Dr R- 2,R -1, B,M,S -2 IIA existing existing • Submit complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. • Please respond in writing to each comment with a response letter addressing each comment BUILDING DEPARTMENT COMMENTS Revise plans to indicate the building occupancy type, construction and fire sprinkler /alarm information on the plan cover sheet per 2009 IBC — Noted on Plans 2 Revise plans to indicate the applicable building codes as adopted by Town of Vail. — Noted on Plans 3 Revise plans to provide 1 '/4 " -2" handrails on both sides of the stairway with extensions per IBC 1012 — Noted on Plans 4 Show stair rise /run and width per IBC 1009 - Noted on Plans 5 Revise plans to include complete construction details showing size, spacing, attachment, tie wire for the suspended unistrut superstructure and the attachment of the structure to the floor slab. Special inspection is required for epoxy anchors per IBC ch. 17. Please complete the attached TOV special inspection form. Plans shall be stamped by a Colorado State Licensed Engineer — See Revised Structural's 6 Revise ceiling construction detail to comply with IBC 803.11 for set -out construction. Non- combustible backing is required - Noted on Plans 7 Include a gas piping plan per 2009 IFGC — Noted on Plans 8 Include a fireplace venting and combustion air plan. 2009 IFGC, IMC — Noted on Plans 9 Provide a Comcheck lighting compliance certificate per 2009 IECC — Comcheck will be attached. 10 Provide an electrical load calculation and panel schedule per 2008 NEC - Comcheck will be attached 11 Show all emergency lighting an illuminated exit signage on the electrical plans, 2008 NEC and IBC 1006,1011 - Noted on Plans 12 Revise sheet S1 to indicate 2009 IBC as the applicable building code. - Noted on Plans 13 Show accessible route to and throughout the area of remodel per IBC 3411 and ANSI 117.1 2003. - Noted on Plans 14 Show minimum 20" depth hearth at fireplace. IBC 2111 - Noted on Plans 15 Clarify if new fireplace will be site built masonry per IBC 2111 , or prefabricated masonry. Include listing if prefabricated fireplace. - Noted on Plans 16 Provide an accessible counter and the reception area with maximum 36" height. IBC 1109.11.3. ANSI 117.1 2003 - Noted on Plans Sitzmark Lodge Lobby Remodel (10/14/10) Electrical Load Calculation & Panel Schedule Maid's Closet Electrical Panel 100A 3 Phase Panel Board Circ. # Description Poles Breaker Load 1. Outlets (Reception Area) 1 20 27.5__ 2. Spare 1 N/A 0 3. Room 101 Outlets (Lobby) 1 20 1200 4. Sidewalk Heat 2 30 3500 5. Room 101 Outlets (Lobby) 1 20 150 6. Sidewalk Heat 2 30 3500 7. Maid's Closet Outlet 1 20 25 8. Fire Panel 1 15 60 9. Maid's Closet Lights 1 20 128 10. Inner Hall 1 20 570 11. Spare 1 N/A 0 12. Upper Lobby Lights 1 20 412 13 Sidewalk Heat (Outer) 2 30 3500 14. Upper Lobby Lets 1 20 584 15. Sidewalk Heat (Outer) 2 30 3500 16. Room 104 Outlets 1 20 450 17. Snare 1 N/A 0 18. Room 104/105 Lights 1 20 220 19. Room 105 Outlets 1 20 450 20. Room 104/105 Lights 1 20 220 Total Load: 18744 Total Connected Load 18744 AmpNVolts Maid's Closet Panelboard Total Connected Amps 52 Amps 2009 IECC COMcheck Software Version 3.8.0 Envelope Compliance Certificate Section 1: Project Information Project Type: Alteration Project Title : Sitzmark Lodge Construction Site: Owner /Agent: 183 Gore Creek Dr. Vail, CO 81657 Section 2: General Information Building Location (for weather data): Vail, Colorado Climate Zone: 6b Activity Type(s) Floor Area lobby (Hotel) 1024 Section 3: Requirements Checklist Envelope TOO: No envelope assemblies specified Climate- Specific Requirements: Designer /Contractor: R -Value Proposed Max. Allowed Post - Alteration Assembly Cavity Cont. U- Factor SHGC U- Factor SHGC Air Leakage, Component Certification, and Vapor Retarder Requirements: ❑ 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor - permeable wrapping material installed in accordance with the manufacturer's installation instructions. ❑ 2. Windows, doors, and skylights certified as meeting leakage requirements. L] 3. Component R- values & U- factors labeled as certified. F-i 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. n 5. 'Other' components have supporting documentation for proposed U- Factors. Fi 6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. F-1 8. Cargo doors and loading dock doors are weather sealed. ­1 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. Lj 10. Building entrance doors have a vestibule equipped with closing devices. Exceptions: L] Building entrances with revolving doors. ❑ Alteration projects that replace an existing door, provided, however, that existing vestibules (i.e., pre - alteration) are not removed, J Doors that open directly from a space less than 3000 sq. ft, in area. Project Notes: Lobby remodel Project Title: Sitzmark Lodge Report date. 10/14/10 Data filename: C: \Users \Big Dog \Documents \COMcheck \Sitzmark Lobby Comcheck,cck Page 1 of COMcheck Software Version 3.8.0 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: Alteration Project Title : Sitzmark Lodge Construction Site: Owner /Agent: 183 Gore Creek Dr. Vail, CO 81657 Section 2: Interior Lighting and Power Calculation Designer /Contractor: A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Hotel 1024 1.0 1024 Total Allowed Watts = 1024 Area Category Exemption Qualifications Total Wattage Total Pre -Alt. # Fixtures Activity Area Pre -Alt. Post- t. Fixtures Repl. /Added Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps! # of Fixture (C X D) Fixture Fixtures Watt. lobby ( Hotel 1024 sq.ft.) Compact Fluorescent 1: Spiral 13W / Electronic 1 8 13 104 Compact Fluorescent 2: Spiral 15W / Electronic 1 10 15 150 Track lighting 1: Wattage based on total luminaires 0 0 0 300 Track lighting 2: Wattage based on low- voltage transformer capacity 0 0 0 350 Track liq_htinq_ 3. Wattage based on total luminaires 0 0 0 92 Total Proposed Watts = 996 Section 4: Requirements Checklist Lighting Wattage: 1 Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 1024 996 Passes Controls, Switching, and Wiring: F-1 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. ❑ 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions. i] Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. Project Title: Sitzmark Lodge Report date: 10/14/10 Data filename: C: \Users \Big Dog \Documents \COMcheck \Sitzmark Lobby Comcheck.cck Page 2 of LJ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. ❑ 4. Independent controls for each space (switch /occupancy sensor). Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. ❑ Lighting in stairways or corridors that are elements of the means of egress. 5. Master switch at entry to hoteVmotel guest room. ❑ 6. Individual dwelling units separately metered. ❑ 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Lj 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps, switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exceptions: L] Only one luminaire in space. ❑ An occupant- sensing device controls the area. J The area is a corridor, storeroom, restroom, public lobby or sleeping unit. ❑ Areas that use less than 0.6 Watts /sq.ft. F-I 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: C] Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. ❑ 10. Photocell /astronomical time switch on exterior lights. Exceptions: C] Lighting intended for 24 hour use. 11.Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: O Electronic high - frequency ballasts; Luminaires on emergency circuits or with no available pair. Intcrior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting alteration project has been designed to meet the 2009 IECC, Chapter 8, requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist. j Le - Racr Name - Title gnatu Date Project Title: Sitzmark Lodge Report date: 10/14/10 Data filename: C: \Users \Big Dog \Documents\COMcheck\Sitzmark Lobby Comcheck.cck Page 3 of Colorado Department of Public Health and Environment Air Pollution Control Division - Indoor Environment Program - Asbestos /IAQ Unit 4300 Cherry Creek Drive South, APCD -IE -81 Denver, Colorado 80246 -1530 PRJ10 -0(olI Phone: 303-692-3100- Fax: 303 - 782 -0278 E -mail: asbestos @state.co.us X310- 03oZ�% This permit is granted subject to Colorado Air Quality Control Commission Regulation No. 8, Part B, adopted December 21, 2007, and effective January 30, 2008, the Colorado Air Pollution Prevention and Control Act (25 -7 -101 or 25 -7 -501 et seq., C.R.S.) and the following provisions. It is only for the purpose of allowing asbestos abatement. ADDITIONAL PERMIT PROVISIONS: By performing work under this permit the abatement contractor agrees that the Division may revoke or suspend this permit should the Division find that the contractor: • has violated or has aided and abetted in the violation of 25 -7 -101 or 25 -7 -501 et seq., C.R.S. or Regulation No. 8, Part B, or an order of the Division or Commission, • has failed to meet any permit and notification requirement or failed to correct any violations cited by the Division during any inspection within a reasonable- period of time, as may be determined by the Division, • has used misrepresentation or fraud in obtaining this permit, or, • has committed any act or omission which does not meet generally accepted standards of the practice of asbestos abatement. As a contractor, you may be subject to other licenses and permits, depending on the requirements of the county and municipality in which the work is being performed. The Colorado Department of Public Health and Environment, Air Pollution Control Division strongly suggests that you check with county and municipal authorities in order to determine any other local building/permitting requirements that must be met. THE ORIGINAL PERMIT MUST BE POSTED ON SITE AT ALL TIMES. Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail (address above) and the appropriate county health department by fax. Project modifications include changes in the scope of work or the scheduled work dates, etc. This asbestos abatement permit is valid beginning 10/4/2010 through 11:59 PM on 11/2/2010. The actual scheduled work dates are from 10/4/2010 through 10/7/2010. Approval issued on: 9/20/2010 Record number: 74557 Notice Number: IOEA3179A Variance: None Comments: None For the location specified below: Sitzmark Lodge Main Lobby 183 Gore Creek Dr. Vail Eagle County This permit has been issued to: MDR Corporation 10650 Irma Drive, #15 Northglenn, CO 80233 -3626 S L� Fee paid: $400.00 Check number: 23773 Project Supervisor: Nicolas A. Gonzales Cerification No.: 4457 Project AMS: David F. Sawitsky Cerification No.: 13463 Project Manager: 1 fZMArK 54, Issued : LBM r' 0 C0 Colorado Department of Public Health and Environment ASBESTOS ABATEMENT NOTIFICATION and PERMIT APPLICATION FORM FEE MUST ACCOMPANY THIS FORM. INCOMPLETE APPLICATIONS WILL BE RETURNED. Single Family Residential Dwelling (SFRD) > 50 LF or 32 SF or a 55-gal. dram, but 5 260 LF or 160 SF or a 55 -galon drum Public and Commercial Building, School, and Single-Family Residential Dmang: > 260 LF or 160 SF or a 55- gallon drum code 200 ❑ $0 Courtesy Notice f code 100 ❑ $0 Courtesy Notice code 205 code 210 $60 $60 Non - Public Access Notice (Opt Out Notice code 105 code 110 $80 $80 Non - Public Access Notice Notice code 230 ❑ $180 30-Day Permit code 1301232 $400 30-Da P &C/SFRD Permit code 290 $300 90-Day Permit I code 190/292 5800 90-0a y P &C/SFRD Permit code 265 $420 1 365-Day Permit code 165/267 $1200 --- Day P &C /SFRD Permit [ code 180/280 J ❑ $55 Notice or Permit Transfer I code 1771 [1 $80 Phase of Multiple Phase Permit # submd form to: Permit Coordinator Colorado Dept of Public Health and Environment APCD -IE-81 4300 Cherry Creek Drive South Deaver, CO 80246 -1530 Phone: 303 - 692 -3100 Fax 303 -782 -0278 asbestosGmstate.00.us Abatement Contractor Abatement Site Building Owner Company Name M Building Name S 'f-z- ma, k Lo Owner Name Si fiiamckrk Lcd- Street Address Specify location in the buildrg where work will take ptace le.g, floor, roan, wing, etc.) Contact 10650 Irma Drive, Unit # 15 i d l / Q t Y� L Gl.h � � GC VI � � Fri �iLc lh City Northglenn State CO Zip code 80233 1 Street Address / e?3 ;��, �t�riC D iv,< Street Address % 3 Clc �� �'c�. ,,4e- Telephone # _ Fax # — City C� k' County G,u �Q S j City ( State `ill code Project Supervisor CO" Cert # k Vic: t� " S % Building Contact Cell Phqne # rt^ .tC� Telephone # Fax # 11 ('c n n c'. r y741 76 " 5 00 1 ( r: 764 Y Project Personnel Project Information Disposal Site CO Project Mgr. Name Start Date End Date Landfill Name )1 'I',,_ /� Y /-o /cJ ` /v Denver Arapahoe Disposal Site Cell Phone # CO Project Designer # Start Time End Time I Street Address ( ) // e� AM AM -330 PM 3500 Gun Club Road PM CO Project Designer Name A�l IA Circle day(s) of ration: Su f�l` bi F Sa city Aurora a Cote code 8040 Cell Phone # CO Project Designer# Emergency? i Type aofACM: TSI, Texture, VAT, etc. CDPHE Use Onl y ( ) Y N iVi.-)c-�-L Consulting Firm Name Rectistratir # Linear Feet / Type Square Feet / ype 55 gal. Drums Postmark or Delivery date Approved by. /� -3� fr Name A.M.S. D a V e !—S Form of Payment & # PM req'd1 Cell Phone # CO A.M.S. Cert # Permit # Record # Date Issued: rrc UUZAA UC uarvw mu wvrr. praunxa arru NrVx;ruurCS w VU errrpruyeu m VDnaucamg the aoatement or aSDeStos. tSt Indicate type(s) of ACBM to be abated (e "g. VAT, ceiling tile, TSI, etc.). Use another page if necessary. Abatement of d c:.d -Cro E c el t V, C; Procedures used will be isolation of work area with holy /decon /bagout (full containment), HEPA air cleaning,thoroughly wet the ACM with amended water,and seal the material in properly labeled leak tight containers for disposal. Form: AANPA08 November 16, 2010 Subject: Summary of Special Inspection Services, Sitzmark Lobby Remodel, Vail, Colorado Job Number. 10 -6603 TOV Permit Number: Nedbo Construction PO Box 3419 Vail, Colorado 81658 Attn: Mr. Mark Doyle This letter summarizes the special inspections GROUND Engineering Consultants, Inc. (GROUND) performed during the improvements to the Lobby in the Sitzmark Lodge located at 183 Gore Creek Drive in Vail, Colorado. The special inspection services were performed at times scheduled by the Owner, Contractor and /or Subcontractors. The structural steel welded and bolted connections for the improvements around the existing fireplace in the lobby were observed during construction by a certified welding inspector (CWI). These observations were completed on November 8 & 9, 2010 as scheduled by the Contractor. A representative of GROUND also observed the installation of the anchor bolts in the fireplace header on November 5, 2010. Based on our observations on this date and the documentation received from the Contractor, it is our opinion that the materials tested and /or observed for the field welded and bolted connections were in general accordance with project plans, specifications, or applicable RFI's. The observations and materials testing as indicated above were performed periodically to provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the tested materials and/or work with the contract documents at the times of our observation and testing. We did not supervise, direct or have any control over any of the Contractor's or Subcontractor's work. We were not responsible for the Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or completed the work in accordance with the contract documents or construction industry standards. If you have any questions concerning this letter, please contact our office. Sincerely, GROUND Engineering Consultants, Inc. Evan E. Kuhn GROUND ENGINEERING CONSULTRNTS INC Reviewed by Michael K. Wariner, P.E. 101A Airpark Dr., Unit 9, PO Box 464, Gypsum, CO 81637 Phone (970) 524 -0720 Fax(970)524-0721 www.groundeng.com Office Locations: Englewood Commerce City Loveland Granby Gypsum M Type- A-COMM Vers: 2008 ADD/ALT COMM BUILD PERMT Sub-Type. ACOM (ActKity) 1-,qz Permit N: 1810-0327 Address: 1183 GORE CREEK DR VAIL Status: IFINAL OWNER: ISITZMARK AT VAIL INC Date: F09/27/2-010 Back §top F A_JL LOP LIN r Display Updateable Items Only Pt Entrie!s for Item:90 • BLDG -Final LLI Action i Comments I By _TDate imm K� Action: AP By: JRM Date: Begin Time: End Time: OR Elapsed Time: Start Miles: 0. End Milev�9 OR Total Mileage: Vehicle Id: Violations:�—� Select I Comment Add Entry Update E ntty Qelete Entry Refresh Ian Lntered UaW I I /,/if I //Ulu el ffy.-p Print Toci6a, Order Select Select Muki* r Multiple for Insp Document Doc aoak Exit I!Z Inspection Items for B10-0327 Inspections I Guide Sheet Sec Item Id Description Appr A q ltems�, Action F Inher Add 30 BLDG- Framing Yes 0 1 N Item 50 BLDG -Insulation es $ 0 1 AP N Insert ­ 60 BLDG-Sheetrock Nail Yes 0 1 AP N Item 70 BLDd.MiSc. No 0 0 N A emove 90 BLDG-FirW Yes R 1 AP N Item r Display Updateable Items Only Pt Entrie!s for Item:90 • BLDG -Final LLI Action i Comments I By _TDate imm K� Action: AP By: JRM Date: Begin Time: End Time: OR Elapsed Time: Start Miles: 0. End Milev�9 OR Total Mileage: Vehicle Id: Violations:�—� Select I Comment Add Entry Update E ntty Qelete Entry Refresh Ian Lntered UaW I I /,/if I //Ulu el ffy.-p Print Toci6a, Order Select Select Muki* r Multiple for Insp Document Doc aoak Exit