5 ' "� 01.7
�� I ,cpworth- Pawlak Geotechnical, Inc.
1020 County Road 154
Glenwood Springs, Colorado ](101
Phone: Q70- 94i-79ti8
Fax: 970-04 - .4 - 4 i4
entail: hE�e�;�il��•e�.�Cich.cnnt
o [E (IM EUWE
SEA' 2 2010
P.O. Box 3233 TOWN OF VAIL
Avon, Colorado 81620
Job No. 110 228A
Subject: Observation of Excavation, Proposed Addition, - Lot 2, Block E, Vail Das
Shone, Filing 1, 2606 Davos Trail, Vail, Colorado
Dear Mr. Barry:
C J
As requested, a representative of Hepworth - Pawlak Geotechnical, Inc. observed the
excavation at the subject site on August 13, 2010 to evaluate the soils exposed for
foundation support. The findings of our observations and recommendations for the
foundation design are presented in this report. The services were performed in
accordance with our agreement for professional engineering services to JB Builders,
dated July 21, 2010.
The proposed addition will be one story wood frame construction above a partial
crawlspace and partially slab -on- grade. The addition will be located on the west side of
the residence. The existing residence is two story wood frame construction above a
walkout level:
At the time of our visit to the site, the addition excavation was nearly completed and had
been cut in one level from 4 to 9 feet below the adjacent ground surface. Three footing
pad excavations had been cut separate just south of the main excavation. The soils
exposed in the bottom of the excavation consisted of slightly gravelly sandy clay. Results
of swell - consolidation testing performed on samples taken from the site, shown on Figure
1, indicate the soils are slightly compressible under conditions of light loading and
wetting. The samples showed slight to moderate compressibility under additional loading
after wetting. No free water was encountered in the excavation and the soils were slightly
moist to moist. The bottom of the footing of the residence was exposed along the east
side of the excavation.
Considering the conditions exposed in the excavation and the nature of the proposed
construction, spread footings placed on the undisturbed natural soil designed for an
allowable soil bearing pressure of 2,000 psf should be adequate for support of the
proposed addition. The exposed soils tend to compress when wetted and there could be
some post - construction settlement of the foundation if the bearing soils become wet.
• Footings should be a minimum width of 16 inches for continuous walls and 2 feet for
Parker 303-841- • Colorado S prings 719 - 633 -5;62 ♦ Silverdwo Q i0- 6,-, -1 QS9
-- l..lu11u%11
August 24, 2010
Page 2
columns. Loose disturbed soils and any existing fill in footing areas should be removed
and the bearing level extended down to the undisturbed natural soils. Exterior footings
should be provided with adequate soil cover above their bearing elevations for frost
protection. Continuous foundation walls should be reinforced top and bottom to span
local anomalies such as by assuming an unsupported length of at least 12 feet.
Foundation walls acting as retaining structures should also be designed to resist a lateral
earth pressure based on an equivalent fluid unit weight of at least 55 pcf for on -site soil as
backfill. A perimeter foundation drain should be provided to prevent temporary buildup
of hydrostatic pressure behind the crawlspace walls and prevent wetting of the lower
level. Structural fill placed within floor slab areas can consist of the on -site soils
compacted to at least 95% of standard Proctor density at a moisture content near
optimum. Backfill placed around the structure should be' compacted and the surface
graded to prevent ponding within at least 10 feet of the building.
The recommendations submitted in this letter are based on our observation of the soils
exposed within the foundation excavation and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation influence. This
study is based on the assumption that soils beneath the footings have equal or better
support than those exposed. The risk of foundation movement may be greater than
indicated in this report because of possible variations in the subsurface conditions. In
order to reveal the nature and extent of variations in the subsurface conditions below the
excavation, drilling would be required. It is possible the data obtained by subsurface
• exploration could change the recommendations contained in this letter. Our services do
not include determining the presence, prevention or possibility of mold or other biological
contaminants (MOBC) developing in the future. If the client is concerned about MOBC,
then a professional in this special field of practice should be consulted.
If you have any questions or need further assistance, please call our office.
•
Sincerely,
HEP I A OTECHNICAL, INC.
Louis E. Eller
Reviewed by: L, p
q
7'��
Steven L. Pawlak P 1 6222 *
8r
LEE /ksw
e •� 'D�k�. �e
attachment Figure 1 — F ation Test Results
cc: Monroe & Newell Engineers — Attn: Craig Carroll
JVU 1 11V LUSH
GfC f ec 1
I It
0
No movement
upon
wetting
Density = 90 pcf
Sample of: Sandy Clay
From: Bottom of Excavation at South Side, East
Pad
Moisture Content = 8.2 percent
Dry
0
Compression
upon
wetting
1
0 2
C_
0
2 3
a
E
0
U
4
5
6
0.1 1.0 10
100
APPLIED PRESSURE - ksf
0
C
0
� 1
a
E
0
U 2
0.1 1.0 10 100
APPLIED PRESSURE - ksf
H
110 228A
SWELL- CONSOLIDATION TEST RESULTS
Figure 1
HEPWORTH•PAW LAK GEOTECHNICAL
0
No movement
upon
wetting
Density = 90 pcf
Sample of: Sandy Clay
From: Bottom of Excavation at South Side, East
Pad
Compression
upon
wetting
0
No movement
upon
wetting
Moisture Content = 12.5 percent
Dry Density = 107 pcf
Sample of: Sandy Clay
From: Bottom of Excavation at Center of West
Wall
��
0 HEPWORTH - PAWLAK GEOTECHNICAL
CONSTRUCTION ACTIVITY REPORT
5020 County Road 154
Glenwood Springs, CO 8160
Phone: 970 - 945 -7988
Fax: 970 - 945 -8454
hpgeo @hpgeotech.com
Client: JB Builders Job No.: 110 228A Day: Monday
John Barry Date: 8116/10
P.O. Box 3233 Page: 1 of 1
Avon, Colorado 81620
Project: Proposed Addition, Lot 2, Block E, Vail Das Shone, Filing 6a368.Davos Trail, Vail,
Colorado
Weather: Cloudy, light breeze, light rain Temperature: 65 °F at 1:00 pm -
Contractor's Construction Activities: Forming and reinforcing steel installation was in progress for
addition on west side of building. Footing dowels were
installed into the existing foundation.
Equipment in Use: Concrete drill, air compressor, epoxy caulk gun
HP Geotech's Site Activities: As requested, we observed the dowel installation. Two dowel
holes were drilled 6 inches deep at each of three footing lines,
cleaned with compressed air, epoxied, and then #4 by 3'6"
dowels were installed 6 inches into the existing foundation.
Installation was observed to be in compliance with Kirkham
Architects Drawing S2.1 dated 6/25/10.
Verbal Communication:
distribution:
0WIE
SEE 21 M10
TOWN OF VAIL
JB was informed of our observations
Thomas J. Westhoff, CET Steven L. Pawlak, P.E.
Field Technician Reviewed By
/ksw
G ovow*
oV&ech
HEPWORTH - PAWLAK GEOTECHNICAL
Joe Bened
CONSTRUCTION ACTIVITY REPORT
Client: JB Builders Job No.: 110 228A Day: Monday
John Barry Date: 8/23/10
P.O. Box 3233 Page: 1 of 1
Avon, Colorado 81620
.2GOlo
Project: Proposed Addition, Lot 2, Block E, Vail Das Shone, Filing 6,2" Davos Trail, Vail,
Colorado
Weather: Partly Cloudy Temperature: 75 °F at 12:30 pm
Contractor's Construction Activities: L -hook dowels
Equipment in Use:
HP Geotech's Site Activities: As requested we visited the site to observe dowel installation
in the walls.
Verbal Communication: JB & Foundation foreman were advised that the dowel
installation was adequate.
distribution:
/ksw
p�C U T LE
SEP 2 `1
TOWN OF VAIL
5020 County Road 154
Glenwood Springs, CO 8160
Phone: 970- 945 -7988
Fax: 970 - 945 -8454
hpgeo @hpgeotech.com
Steven L. Pawlak, P.E.
Field Technician Reviewed By