HomeMy WebLinkAboutB10-0105 response to corrections 7-23-2010 and 8-27-2010qA a
Department, of Community Development
75 South Frontage Road
,. Vail, CQ.lorac v 816,57Y
Te( 970=479 20ir
f r
-x
TRANSMITTAL FORM
Revision Submittals:
1. "Field Set' of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to:
kio -aoyp
Attention: CK Revisions
kAo!qa ( ) Response to Correction Letter
_attached copy of correction letter
() Deferred Submittal
() Other
Project Street Address:,, ,!
I Z - 1pril IAXIA �U Description / List of Changes:
(Number) (Street) (Suite #) [_ I%1�
Building /Comple Name: , k
Contact Inf rmation:
Company- {{��
Company Address: 1'. r)
City: ice.. State: Zip:
Contact Name: A571w Ile,
Contact Phone: �� (� OV IZ
E -Mail V
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building: $ C
Plumbing: $ � 1
Electrical: $
Mechanical:
Total: $
yy
°3. x
(use additional sheet if necessary)
Date Received:
SEP 0 3 2010
TOWN OF VAIL
01- Jan -10 ;0
U
J
J
f
lie
iQ U
� C
o Q
E �
� o
ArchilecIure
1' f a n n i n g
7/23/10
Martin Haeberle
Chief Building Official
Town of Vail
75 South Frontage Road
/ n l e r i n r s Vail, CO 81657 MV 09 -oov 1
pits 10- o I94
Re: Permit Application #B 10 -0105
Vail Fire Station 43
2399 North Frontage Road
Dear Mr Haeberle,
The following is in response to comments marked -up on the permit set.
1. G -0.0 Cover Sheet - Revised plans to be submitted prior to framing
inspection, see redlined sheets.
The following revised sheets are attached to this response letter (see detail
in responses below):
G -0.2
G -0.3
A -2.0 - A -2.2
E -4.2
2. G -0.2 and G -.03 - Fire fighters shift quarters to be B type occupancy.
This has been revised on the attached G -0.2 and G -0.3 sheets.
U
J
J
O �
as °
m c�
Architecture
Planning
Interiors
8/27/10
Martin Haeberle
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, CO 81657
Re: Permit Application #B 10 -0105
Vail Fire Station #3
2399 North Frontage Road
Dear Mr Haeberle,
Attached are revised, stamped drawings for your review. These sheets document
changes made to the scope -of -work since issuance of the approved Permit Set.
1. Roof Pitch: The pitch of the reverse gable roofs have been revised from
2.5/12 to 2/12. This change has been submitted for DRB/PEC approval.
The changes are marked with a delta 5 on the following sheets:
G -0.6 Roof Height Calculations
G -0.7 Historical Roof Heights
A -2.7 Roof Plan
A -3.0 - 3.2 Exterior Elevations
2. Storm Sewer: In response to review comments from CDOT, certain
changes were made to Frontage Road and storm water improvements. The
changes are marked with a delta 4 on the following sheets:
C -1.2 Demolition Plan
C -1.3 Site Plan
C -1.8 Storm water Plan
P.Q. Bax 1306
Fort Collins. C`Q 80522
Ph. 970.407.0070
3. Grading: Further review of the grading plan revealed problems with
sidewalk slopes at accessible routes connecting the main entry to the public
right -of -way and the accessible parking stall to the north, secondary entry.
Slight grading changes were made along the walk and adjacent drive to
result in a maximum 5% grade (1:20) along the accessible routes. This
change has been reviewed by Tom Kassmel. The changes are marked with
a delta 5 on the following sheets:
C -1.5 Grading Plan
C -1.8 Storm water Plan
Please let me know if you have any concerns as a result of your review of these
issues.
Respectfully,
Don Watkins
Belford Watkins Group Architects
Cc Fire Chief Mark Miller
Adam Williams
Scott Warner