HomeMy WebLinkAboutB07-0314 inspections . .
B07-0314: Entries for Item:90 - BLDG-Final 14:13 05/15/2013
Action Comments By Date Unique_
Ke
AP BW 10/06/2009 A000128
295
Total Rows: 1
Page 1
t �:- , . _ _ _, - �3l
�
03-29-2013 Inspection Request Reporting Page 6
4:12 pm �il, �Citv �f
Requested Inspect Date: Monday,April 01,2013
Inspection Area: CG
5ite Address: 3996 LUPINE DR VAIL
WEST UNIT
A/P/D Information
Activity: 607-0314 Type: A-BUILD Sub Type: ADUP Status: ISSUED
Const Type: Occu ancy: Use: V-B Insp Area: CG
Owner: SKARAJUNSKY VINCEN�C. & Phone: 390-1432
HEIDIHANNEMl�NN
Contrador: SALTIRE DEVELOPMENT INC Phone: 970-949-0660
Description: REMODEL AND ADDITION TO EXISTING DUPLEX
Requested Inspection(s)��� i ,'�� 1
v.
Item: 90 �I.B6-Firra� Requested Time: 09:00 AM
Requestor: Phone:
Comments: FOLLOW UP
Assigned To: SGREMMER Entered By: JMONDRAGON K
Action: Time Exp:
Comme[lt�
C��I'V`�
- a " ��
�
Insaection Historv
Item: 10 BLDG-FOOTING **Approved"
07/11/08 Inspector: JGG Action: AP APPROVED
Comment: Pads fo piers OK footings OK.
06/10/09 Ins ector: SHA11N Action: AP APPROVED
Comment: W�ST ENTRY FOOTER AND TWO 36X36X12 REBAR OK
06/16/09 Ins ector: JRM Action: AP APPROVED
Comment: FO�ENTRY STAIRS
Item: 20 BLDG-Foundation/Steel '*Approved'*
07/17/08 Inspector: JGG Action: AP APPROVED
Comment: Foundation wall steel OK. Upri�hts are tied in.
Item: 21 PLAN-ILC Foundation Plan *•Approved '
10/01/08 Inspector: Warren Action: AP APPROVED
Comment:
Item: 30 BLDG-Framing "Approved*"
03/31/09 Inspector: JRM Action: APCR APPROVED/CORRECTION REQD
Comment: APPROVED WITH CORRECTIONS.
1. LETTER FROM ENGINEER ALLOWING ONLY 2 BOLTS IN LIEU OF THE 3 AS PER PLAN
2 F REPLEi4CE ROUGH R QU�IRE�
3.ADD NAIL PLATES.
4.BACK BOX ELECTRICAL PANELS(GARAGE SEPARATION)
04/08/09 Inspector: JRM Action: AP APPROVED
Comment:
Item: 22 PLAN-ILC FRAMING **Ap�pr�oved**
10/01/08 Inspector: Warren Action: AP APPROVED
Comment:
Item: 50 BLDG-Insulation •*A�pproved*'
04/08/09 Inspector: JRM Action: AP APPROVED
Comment:
Item: 60 BLDG-Sheetrock Nail **Approved**
07/14/08 Inspector:. JGG Action: PA PARTIAL APPROVAL
Comment: Party wall is OK.
04/15/09 Inspector: JRM Action: PA PARTIAL APPROVAL
Comment: ALL EXCEPT FOR GARAGE IS COMPLETE
05/12/09 Ins ector: JRM Action: AP APPROVED
Comment: C�MPLETE
Item: 70 BLDG-Misc.
Item: 533 PLAN-TEMP. C/O
REPT131 Run Id: 15092
B07-0314 (Locks Holds Notices attached to this permit)
Date Comments
10/3/2007 ROUTED TO THE PLAN RACK, SCOT HUHN, FIRE AND PUBLIC WORKS
10/11/2007 APPROVED FIELD SET IN BIN B-4
10/11/2007 PERMIT ISSUANCE PENDING PLANNING AND PW APPROVALS
10/12/2007 Applicant to submit site and landscape plan(s) prior to completing plan check;
must show all limits of disturbance, trees to be removed, grading, drainage,
retainage and reveg.
10/19/2007 Applicant submitted site/landscape plan showing grading, limits of disturbance,
new areas of sod and new plantings.
07/17/2008 Change order received from architect Tom BuBois. Also received soils report
from LKP Eng. Copy to file.
12/11/2008 Per Stan Hahn via Martin Haberlee, this permit is on HOLD until issue with VFD
are resolved
12/16/2008 sprinkler requirement is in effect for this half immediately. Alarm system is also
required.
05/22/2009 alarm and sprinkler permit were issued so i lifted the hold. —Rachel
05/22/2009 REVISION RECIEVED FOR PORCH EXTENSION. $15,000 ADDED TO
VALUATION. ROUTED TO RACHEL AND PLAN RACK A4.
05/26/2009 RESCHECK COMPLIANCE CERTIFICATE RECEIVED VIA FAX 5/22/09
ROUTED TO CHRIS GUNION
06/09/2009 RESCHECK COMPLIANCE FORM RECEIVED, ROUTED TO CHRIS GUNION