Loading...
HomeMy WebLinkAboutB07-0314 inspections . . B07-0314: Entries for Item:90 - BLDG-Final 14:13 05/15/2013 Action Comments By Date Unique_ Ke AP BW 10/06/2009 A000128 295 Total Rows: 1 Page 1 t �:- , . _ _ _, - �3l � 03-29-2013 Inspection Request Reporting Page 6 4:12 pm �il, �Citv �f Requested Inspect Date: Monday,April 01,2013 Inspection Area: CG 5ite Address: 3996 LUPINE DR VAIL WEST UNIT A/P/D Information Activity: 607-0314 Type: A-BUILD Sub Type: ADUP Status: ISSUED Const Type: Occu ancy: Use: V-B Insp Area: CG Owner: SKARAJUNSKY VINCEN�C. & Phone: 390-1432 HEIDIHANNEMl�NN Contrador: SALTIRE DEVELOPMENT INC Phone: 970-949-0660 Description: REMODEL AND ADDITION TO EXISTING DUPLEX Requested Inspection(s)��� i ,'�� 1 v. Item: 90 �I.B6-Firra� Requested Time: 09:00 AM Requestor: Phone: Comments: FOLLOW UP Assigned To: SGREMMER Entered By: JMONDRAGON K Action: Time Exp: Comme[lt� C��I'V`� - a " �� � Insaection Historv Item: 10 BLDG-FOOTING **Approved" 07/11/08 Inspector: JGG Action: AP APPROVED Comment: Pads fo piers OK footings OK. 06/10/09 Ins ector: SHA11N Action: AP APPROVED Comment: W�ST ENTRY FOOTER AND TWO 36X36X12 REBAR OK 06/16/09 Ins ector: JRM Action: AP APPROVED Comment: FO�ENTRY STAIRS Item: 20 BLDG-Foundation/Steel '*Approved'* 07/17/08 Inspector: JGG Action: AP APPROVED Comment: Foundation wall steel OK. Upri�hts are tied in. Item: 21 PLAN-ILC Foundation Plan *•Approved ' 10/01/08 Inspector: Warren Action: AP APPROVED Comment: Item: 30 BLDG-Framing "Approved*" 03/31/09 Inspector: JRM Action: APCR APPROVED/CORRECTION REQD Comment: APPROVED WITH CORRECTIONS. 1. LETTER FROM ENGINEER ALLOWING ONLY 2 BOLTS IN LIEU OF THE 3 AS PER PLAN 2 F REPLEi4CE ROUGH R QU�IRE� 3.ADD NAIL PLATES. 4.BACK BOX ELECTRICAL PANELS(GARAGE SEPARATION) 04/08/09 Inspector: JRM Action: AP APPROVED Comment: Item: 22 PLAN-ILC FRAMING **Ap�pr�oved** 10/01/08 Inspector: Warren Action: AP APPROVED Comment: Item: 50 BLDG-Insulation •*A�pproved*' 04/08/09 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG-Sheetrock Nail **Approved** 07/14/08 Inspector:. JGG Action: PA PARTIAL APPROVAL Comment: Party wall is OK. 04/15/09 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: ALL EXCEPT FOR GARAGE IS COMPLETE 05/12/09 Ins ector: JRM Action: AP APPROVED Comment: C�MPLETE Item: 70 BLDG-Misc. Item: 533 PLAN-TEMP. C/O REPT131 Run Id: 15092 B07-0314 (Locks Holds Notices attached to this permit) Date Comments 10/3/2007 ROUTED TO THE PLAN RACK, SCOT HUHN, FIRE AND PUBLIC WORKS 10/11/2007 APPROVED FIELD SET IN BIN B-4 10/11/2007 PERMIT ISSUANCE PENDING PLANNING AND PW APPROVALS 10/12/2007 Applicant to submit site and landscape plan(s) prior to completing plan check; must show all limits of disturbance, trees to be removed, grading, drainage, retainage and reveg. 10/19/2007 Applicant submitted site/landscape plan showing grading, limits of disturbance, new areas of sod and new plantings. 07/17/2008 Change order received from architect Tom BuBois. Also received soils report from LKP Eng. Copy to file. 12/11/2008 Per Stan Hahn via Martin Haberlee, this permit is on HOLD until issue with VFD are resolved 12/16/2008 sprinkler requirement is in effect for this half immediately. Alarm system is also required. 05/22/2009 alarm and sprinkler permit were issued so i lifted the hold. —Rachel 05/22/2009 REVISION RECIEVED FOR PORCH EXTENSION. $15,000 ADDED TO VALUATION. ROUTED TO RACHEL AND PLAN RACK A4. 05/26/2009 RESCHECK COMPLIANCE CERTIFICATE RECEIVED VIA FAX 5/22/09 ROUTED TO CHRIS GUNION 06/09/2009 RESCHECK COMPLIANCE FORM RECEIVED, ROUTED TO CHRIS GUNION