Loading...
HomeMy WebLinkAboutM10-0231NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT 0 MW OF 0) Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT ADUP Job Address: 395 FOREST RD VAIL Location.....: Parcel No...: 210107113019 OWNER FOREST ROAD DEVELOPMENT LLC 10/13/2010 IN CARE OF NAME TRIUMP DEVELOPMENT 8120 WOODMONT AVE STE 800 BETHESDA MD 20814 APPLICANT R & H MECHANICAL LLC 10/13/2010 Phone: (970) 328 -2699 PO BOX 810 EAGLE CO 81631 License: 184 -M CONTRACTOR R & H MECHANICAL LLC 10/13/2010 Phone: (970) 328 -2699 PO BOX 810 EAGLE CO 81631 License: 184 -M Desciption: HVAC /RADIANT HEAR/SNOWMELT SYSTEM Valuation: $235,000.00 ALL TIMES Permit #: M 10 -0231 Project #: PRJ10 -0009 Status ...: ISSUED Applied..: 10/13/2010 Issued. .: 10/13/2010 Expires. .: 04/11/2011 Mechanical Permit Fee --- > $4,700.00 Will Call------ - - - - -> $4.00 Total Calculated Fees --- > $5,879.00 Plan Check------ - - - - -> $1,175.00 Use Tax Fee - - ---> $0.00 Additional Fees --- ------ > $0.00 Investigation--------- - - - - -> $0.00 TOTAL PERMIT FEE - -> $5,879.00 Total Calculated Fees - -> $5,879.00 Payments -------------- —> $5,879.00 BALANCE DUE--- - --- -> $0.00 APPROVALS Item: 05100 BUILDING DEPARTMENT 10/13/2010 DRHOADES Action: AP DRAWINGS SUBMITTED /APPROVED WITH BUILDING PERMIT (PER MARTIN) Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FQ.R INSPECTION L ADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM - 4 PM. I � O l SignaturWbf Owner Contractor e I � 6 Print Name mech ca n ica I –pe rm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001563 Amount: $5,879.00 10/13/201010:09 AM Payment Method: Check Init: LC Notation: #17096 / R & H MECHANICAL ----------------------------------------------------------------------------- Permit No: M10 -0231 Type: MECHANICAL PERMIT Parcel No: 2101 - 071 - 1301 -9 Site Address: 395 FOREST RD VAIL Location: Total Fees: $5,879.00 This Payment: $5,879.00 Total ALL Pmts: $5,879.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- MP 00100003111100 MECHANICAL PERMIT FEES 4,700.00 PF 00100003112300 PLAN CHECK FEES 1,175.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 f +6 t f V '4* _ N , Department of Community Development 75 South Frontage Road Vail, Colorado 81657 Tel: 970 - 479 -2128 Fax: 970-479-2452 Web: www.vailgov'.com Development Review Coordinator J IT " ­.000000100n� MECHANICAL PERMIT r✓omplete Mechanical Room Floor Plan with Dimensions J VOO'c'-Ombustion Air Duct Size and Location /Flue detail or Vent size, location & termination PJA ❑ Gas Piping layout including development length calculations VO"Heat Loss Calculations I 19 0 ' Boiler size & efficiency A► ❑ Equipment Cut Sheets for Fireplaces /Log Sets tivianuracturer's Into snowing ma Ke, model & approval listing) Office Use: D EV j o voo (p DA Project #: V )1) - C009 Building Permit #: —R ` nn I R Mechanical Permit #: " I o _ 0oZ,3 Project Street Address: 31 Fo ".T' �p�o (Number) (Street) f"0V4%*,,J kQTA .AT- (Suite #) Building /Complex Name: VNt`�J�Lry Contractor Information: Company:" N ) tt1. L Company Address: PO `*c al 0 (- City: �,A(,u State: Ito Zip: " R1�73� ,{� Contact Name. '"/4IL O � A(.t� I b Contact P Q 70 hoone 3 - A4 4 1 1 5 E -Mail TC i#jR�eN s«ew�c� 111 Lot #: Block # Subdivision: Define Sco a and Location of Work 'J A C_ s ysT (use additional sheet if necessary) ❑ Gas Piping Included • Gas Piping by Others • Wood to Gas Fireplace Conversion To n f Va C ntractor Regist do o.: Boiler Location: Interior (>6 Exterior ( ) Other ( ) X Number of Existing Fireplaces: ��iM Co it actor Signature (required) i Gas Appliances Gas Logs Wood /Pellet Prop rty Information - - - - Parcel #: '9AQ1 -0 - �� Number of Proposed Fireplaces: 04 (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or Gas Appliances Gas Logs Wood /Pellet visit www.eaglecounty.us /patie) % - -- Type of Building: Tenant Name: (Commercial P operties Single - Family ( ) Duplex ( Multi - Family ( ) Commercial ( ) Owner Name: FiT , 4D �t a; h.. I `L, Restaurant( )Other ( ) Date Received: V LS Complete Valuation for Mechanical Permit: (including fireplaces) FA Mechanical $: Z3�,000 QCT 1 2 2U1U 45 = 9. 0 () TOWN OF VAIL C: \cdcrV2rnns`,pcnnits \build i ng`ancchanical _perm it_0101 10 cG�i:. SuG�tc s"„n��c 0 kf.(,,, IDI _s�: �� ` C V 4 t " DID MR =SS 6-C 0 BTLYS 1 UIPUl: - 0 AL I I / LDS . . -7(e ��a! UT 353 353 - 70 �I ( GARAGE 000 SNOW VIE-j- 0 ; AL 3 i? is �r4 t I -6, -Gic H l/A,2- 00 1 0 cu � 1 " �f'1•t ng ::;I , =. i `52 I 2 ON7RACTOR': d(t%A A_lJcc- ------ yt 57 MIT 0 Cat) DU u ....... .... AF � f tc Fr Y6 KL�4 S 5 �- Oo LTal HIGH EFFICIENCY COMMERCIAL CONDENSING BOILERS COMMERCIAL BO /LfR ,S M TX c 1 OPERATING CONTROL FEATURING A BUILT -IN CASCADING SEQUENCER 5 MODELS: 399,000 - 800,000 BTU /HR FIRING RATE MODULATION TO 5:1 LESS THAN 20 ppm NOx DIRECT VENT FLEXIBILITY TO 100 FEET _'gh Ertciencg R'aterBeaters. Boilers and Poo) Heaters' . - Ai , Loch invar.com Havancea reatures lnctuae: • MULTI -COLOR GRAPHIC LCD DISPLAY • NAVIGATION DIAL • USB PORT • ABILITYTO CONTROL UP TO THREE DIFFERENT S ETPO I NT TEMPERATURES • MODBUS CAPABILITY (OPTIONAL) • DHW MODULATION LIMITING • DHW NIGHT SETBACK • 0-10 V BOILER RATE OUTPUT • 0-10V SIGNAL TO CONTROL VARIABLE SPEED BOILER PUMP • 0-10V SYSTEM PUMP SIGNAL INPUT • HEAT DEMAND FROM 0-10V INPUT • INSTALLER TO PROGRAM NAME AND NUMBER INTO THE BOILER • FREEZE PROTECTION PARAMETERS INSTALLER ADJUSTABLE • SEPARATELY ADJUSTABLE SH/DHW SWITCHING TIMES • INSTALLER ACCESS TO BMS AND RAMP DELAY SETTINGS * EXCLUSIVE To LOCHI NVAR SMART SYSTEM b rl e C R Ot L t cif BLUE SCREEN YELLOW SCREEN RED SCREEN Normal system Maintenance due - shows Lockout mode. operation. the installer's name and NEW SELECTABLE CASCADE OPTIONS number on the display. When multiple KNIGHT boilers are installed together, the SMART SYSTEM built -in sequencer can be set for "Lead -Lag" cascade or "Efficiency Optimized" cascade operation. LEAH -LAG CASCADL EFFICIENCY OPTIMIZED CASCADE The "lead unit" boiler modulates with demand to capacity. As demand increases, additional boilers fire and modulate to capacity. This continues, with additional boilers firing and modulating to capacity until all units are operating. Every 24 hours, the SMART SYSTEM automatically shifts the lead boiler role to the next in the sequence, distributing lead -lag runtimes equally. A This feature optimizes the modulation capabilities of the Boiler Plant while evenly distributing run time across all cascaded boilers. Every 24 hours the SMART SYSTEM automatically shifts the 1st boiler on role to the next in the sequence, distributing run time equally. SMART SYSTEM Cascade option allows 2 - 8 boilers to be sequenced. FLEXIBLE VENTING OPTIONS Direct Vent Sidewall Direct Vent Vertical Room Air Sidewall Room Air Vertical Vertical w /Sidewall Air Direct Vent Vertical* Direct Vent Sidewall* *Optional Concentric Vent Kit Sold Separately (for 399 -600 Models) A I N A I A � R a *Optional Concentric Vent Kit Sold Separately (for 399 -600 Models) A I N A I A B OILER AND S PECIFICA TIONS LOW VOLTAGE LEFT SIDE A 1N' -1 -1W ADJUSTAKE FRONT KB N 701 M13 o dr 7 P `ate s � 'o 0 s Knight X1 Boiler, Natural Gas, 700,000 Btu /hr input, M13 firing controls r KNIGHT XL HEATING BOILER - DIMENSIONS STANDARD FEATURES AND SPECIFICATIONS > Up to 94.6% Thermal Efficiency > SMART SYSTEM Digital Operating Control > 120 VAC / 60 Hertz / 1 Phase Power Supply > Modulating Burner with 5:1 Turndown > Multi - Colored Graphic LCD Display w/ Navigation Dial > Three sets of Pump Contacts with Pump Relays. M odel In Max Thermal Output > Low Voltage Terminal Strip > Low NOx Operation with curves for three set point temperature inputs > 24 VAC Device Relay 1 > Built in Cascading Sequencer for up to 8 Boilers > Proving Switch Contacts Lead Lag > Flow Switch Contacts Low Gas Pressure Operation Num KBN400 80 399 93.3% 372 324 42 -1/2" 15 -1/2' 27 -3/4' 3 -3/4" 20 -3/4' 21" 14' 34" 34' 2" 18.3/4" 1" 1 -1/2" 4" 4" 280 � KBN501 100 500 93.3% 467 _...._........ ---- 406 ._.....__..... 42 -1 15 -1 12" 31 -112' 3 -314" 2 5-1/2" 21" 14" 32 -1/2" 36" 2" 18" 1' 1 -112 4" 4" 310 1 KBN601 120 600 94.6% 567 493 -- 42 -1/2" . 15 -1/2' 36 -114" - .._.._.._._............- 3 -3/4" 25 21" 14' 36" 32 -3/4' 5 -112' 19-1/2" 1' r 4" 4" 340 KBN701 140 700 94.3% 660 574 _._....__...........- 42 -1/2" ---._......._.......__.._ 15 -112' 40 -1 /4" ..........................__..._....................._..._..----.............._....__......_....._....._..._.-._..._..._..............._...—_.............----...----- 3-314" 29" 23" 17' 36" 32 -3/4" 3 -114' 23-112" 1' r 4" 6" 370 KBN801 160 800 94.0% 752 654 42 -1/2" 15-112' 45 -1/4' 3 -3/4" 33 -1/4' 23" 17" 36° 32 -3/4' 3 -1/4' 27 -3/4' 1" 2" 4° 6" 405 Notes: Indoor installation only. All information subject to change. Change "N" to "L" for LP gas models. W AISIM r chhm STANDARD FEATURES SMART SYSTEM FEATURES >High Voltage Terminal Strip > Up to 94.6% Thermal Efficiency > SMART SYSTEM Digital Operating Control > 120 VAC / 60 Hertz / 1 Phase Power Supply > Modulating Burner with 5:1 Turndown > Multi - Colored Graphic LCD Display w/ Navigation Dial > Three sets of Pump Contacts with Pump Relays. > Direct - Spark Ignition > Three Reset Temperature Inputs > Low Voltage Terminal Strip > Low NOx Operation with curves for three set point temperature inputs > 24 VAC Device Relay > Sealed Combustion > Built in Cascading Sequencer for up to 8 Boilers > Proving Switch Contacts Lead Lag > Flow Switch Contacts Low Gas Pressure Operation ; Efficiency Optimization Alarm on Any Failure Contacts > ASME Stainless Steel Heat Exchanger > Outdoor Reset Control with Outdoor Air Sensor > Runtime Contacts ASME Certified, "H" Stamped > Programmable System Efficiency Optimizers > DHW Thermostat Contacts Gasketless Heat Exchanger > Night Setback > 3 Space Heat Thermostat Contacts > 160 psi Working Pressure > DHW Night Setback > System Sensor Contacts > 50 psi ASME Relief Valve > Anti - Cycling > DHW Tank Sensor Contacts > Highly efficient, condensing design > Outdoor Air Reset Curve Ramp Delay > Outdoor Air Sensor Contacts > Vertical & Horizontal Direct -Vent > Boost Temperature & Time > Cascade Contacts > 0 -10 VDC BMS External Control Contact > Category IV venting up to 100 feet > Three Pump Control > 0.10VDC Boiler Rate Output Contacts > PVC, CPVC or AL29 - 4C Venting up t0 100 Feet > System Pump With Parameter for Continuous Operation > 0 - 10VDC Variable Speed System Pump Signal Input > Factory Supplied Sidewall Vent Termination > Boiler Pump With Variable Speed Pump Control* , 0 -10VDC Signal to control variable Speed Boiler Pump > Smart System Control Y > Domestic Hot Water Pump > Modbus Contacts > Other features > Domestic Hot Water Prioritization > Time Clock On/Off Switch DHW tank piped with priority in the boiler loop > Data Logging > Adjustable High Limit w/ Manual Reset DHW tank piped as a zone in the system with the pumps controlled by the Smart System Hours Running, Space Heating Automatic Reset High Limit DHW Modulation Limiting Hours Running, Domestic Hot Water Flow Switch > Separately Adjustable SH /DHW Switching Times* > Ignition Attempts > Flue Temperature Sensor > Building Management System Integration > Last 10 Lockouts Low Air Pressure Switch > MODBUS Communication (Optional) > Other Features ; 0.10VDC Input to Control Modulation or Set Point > Low Water Flow Safety Control & Indication > Temperature & Pressure Gauge > 0 -10VDC Input Signal from Variable Speed > Password Security Adjustable Leveling Legs System Pump* > Inlet & Outlet Temperature Readout > Condensate Trap > 0 -10VDC Modulation Rate Output > Customizable Freeze Protection Parameters Zero Clearances to Combustible Material > 0 -10VDC Input to Enable /Disable call for heat Custom Maintenance Reminder with Contractor Into 10 Year Limited Warrant ( See Warrant tY > Access to BMS Settings through Display *Exclusive fea available onl from Lochinvor FIRING CODES OPTIONAL EQUIPMENT Alarm Bell Low Water Cutoff w /Manual Reset & Test > M9 Standard Construction Condensate Neutralization Kit) SMART SYSTEM PC Software M7 California Code Concentric Vent Kit (KB400- KB6o1) > Stainless Steel Vent Kits (KB70i- KB8o1) M13 CSD1 / FM / GE Gap (KB501- KB801) > High & Low Gas Pressure Switches w/ Manual > Stack Frame Reset (KB5oi- KB8oi) s t t Imo• Q W AISIM r chhm M E M B E R Patent Pending ' High EBidency Water Heaters. Boilers and Pool Beaters CONDENSING RESIDENTIAL GAS BOILERS LESS THAN 20 ppm NOx DIRECTVENT FLEXIBILITYTO 100 FEET UP TO 98% THERMAL EFFICIENCY 'High EfTiciency � \ater Heaters. BoJers and Puul Heaters QUALIFIES FOR UP TO $1500 ENERGY TAX CREDIT! knightheatingboi ter. com HEATING BOILERS _ - ____ -___ UP TO 96% DOE AFUE EFFICIEN KNIGHT is recognized for it's reliable, proven performance and high quality standards. Its award winning design assures contractors and home owners peace of mind and long term savings in operating costs. Now, Lochinvar has raised the KNIGHT standard to even greater heights. The dramatically enhanced SMART SYSTEM'" control with color display gives installers and maintenance personnel a greater level of control than ever before. It's easier to access all the information they need to setup, troubleshoot and monitor all boiler functions. Additionally, two new cascading options allow the installer to fine -tune sequencing of multiple boiler installations. More than ever, KNIGHT is the best choice for traditional hydronic space heating, radiant floor heating and domestic hot water applications. NONE ��� a l z E JOW NOx _s HEATING BOILERS FLOOR STANDING MODELS The KNIGHT Floor - standing lineup features 5 small footprint models from 80,000 to 285,000 Btu /hr. KNIGHTXL COMMERCIAL XL Need more BTU's? KNIGHT XL Commercial Boilers are available in 5 sizes from 399,000 to 800,000 Btu /hr. See KNIGHT XL literature for more details. All KNIGHT Boilers meet or exceed the most stringent requirements, with less than 20 ppm NOx. ENERGY STAR The KNIGHT Boiler has earned the ENERGY STAR, signifying that it has met strict energy - effliciency guidelines set by the EPA and U.S. Department of Energy. WALL-MOUNT MODELS 5 space - saving KNIGHT Wall -Mount Boilers are available from 50,000 to 210,000 Btu /hr. REFINED DESIGN PUTS MORE CONTRO AND INFORMATION ATYOUR FINGERTI The new SMART SYSTEM" is the most advanced integrated boiler control on the market today. P Est - F Care .w I NAVIGATION DIAL k" OWN For fast transitions from screen to scree > �' �..4A �., and easy adjustment of settings. USB PORT USB port permits connection to a laptop computer. SMART SYSTEM PC software may be used to troubleshoot and program KNIGHT "functions, set date and time, monitor historical data, including faults, trends and energy consumption. BLUE SCREEN Normal system operation. Sele YELLOW SCREEN Maintenance due - shows the installer's name and number on the display. NEW SELECTABLE CASCADE OPTIONS RED SCREEN Lockout mode. Is E When multiple KNIGHT boilers are installed together, the SMART SYSTEM built -in sequencer can be set for "Lead -Lag" cascade or "Efficiency Optimized" cascade operation. XII NNIPMANTEN T 11 The "lead unit' boiler modulates with demand to capacity. As demand increases, additional boilers fire and modulate to capacity. This continues, with additional boilers firing and modulating to capacity until all units are operating. Every 24 hours, the SMART SYSTEM automatically shifts the lead boiler role to the next in the sequence, distributing lead -lag runtimes equally. This feature optimizes the modulation capabilities of the Boiler Plant while evenly distributing run time across all cascaded boilers. Every 24 hours the SMART SYSTEM automatically shifts the 1st boiler on role to the next in the sequence, distributing run time equally. SMART SYSTEM Cascade option allows 2 - 8 boilers to be sequenced. A A 0 0 0z�, L D A A A 0 0 0 A 0 KNIGHTr' $OILER DIMENSIONS AND SPECIFICATIONS - FLOOR-STANDING MODELS Mode4s: KBN 081.211 BACK FK.A E_'MN A FRONT WALL -MOUNT MODELS M I J FLJE O AiR INLET TOP zs yr Models: WBNO51 -211 ELECTRICAL cora+ECTo S 00 00 -oo OUTLET 0 E E O G INLET 3- p�OENSATE WBN081 16 80 95.3 72 63 29 -114 15-314 NA 10 -3/4 10-3/4 2 6-3/4 NA 3 -1/4 4 -114 2 -3/4" 112 1 2 2" 130 MN106 21 105 95.4 94 82 29.114 15 -3/4 NA 10 -3/4 10-3/4 3 -112 5 -1/2 NA 3 -1/4 4 -1/4' 2 -314 112 1 2 2 134 WBN151 30 150 95.5 135 119 29 -1 /4 20-3/4 NA 15 -314 8 -1/2 3 -1/2 5 -1R NA 8- 314 9-3/4 1 -112 1/2 1 3 3 WBN211 42 210 95.7 190 165 29 -1/4 25 NA 20 12 3 -112 5 -1/2 NA 13 14 1 -1/2 112" 1 3" 3 177 KBNO81 16 80 95.3 72 63 33 -1/4 14 5 -314 5 3 20-1/2 22 1 -3/4 6-1/2 NA 1/2 1 3 3 125 KBN106 21 105 95.4 94 82 33 -1 /4 14 1 6 -112 5 -3/4 4 -112 1 -11 20-1/2 22 1 -3/4 6-1/2 NA 1/2 1 3 3 129 KBN151 30 150 95.5 135 119 33 -1/4 18 12 -1/4 11 -112 10 1 -3/8 21 -1/4 23 1 -3/4 12 NA 1/2' 1 3 3 157 QQ J5 1 UN2i1 42 210 95.7 190 165 33 -1/4 22 -1/4 16.1/2 15-314 14-1/4 5-1/4 21 -1 /4 23 1 -3/4 16-1/4 NA iR 1 3 3 9-1 KBN286 57 285 96.0 260 226 42 -1/4" 19 -3/4' 12 -3/4" 13 -1/1' 6' 2" 34" 31" 11-314" 4-1/4" NA 3/4" 1 -114' 4' 4' 224 Notes: Indoor installation only. All information subject to change. Change 'N' to 'L' for LP gas models. SMART SYSTEM FEATURES > SMART SYSTEM Digital Operating Control Multi- Colored Graphic LCD Display with Navigation Dial and Soft Keys )Three Setpoint Temperature Inputs > Built -in Cascading Sequencer for up to 8 Boilers Lead Lag Efficiency Optimization > Outdoor Reset Control with Outdoor Air Sensor Programmable for Three Reset Temperature Inputs > Programmable System Efficiency Optimizers Night Setback DHW Night Setback Anti- Cycling Outdoor Air Reset Curve Ramp Delay Boost Temperature & Time > Three Pump Control System Pump with Parameter for Continuous Operation > Boiler Pump with Variable Speed Pump Control' > Domestic Hot Water Pump > Domestic Hot Water Prioritization > DHW tank piped with priority in the boiler loop > DHW tank piped as a zone in the system with the pumps controlled by the Smart System DHW Modulation Limiting Separately Adjustable SH /DHW Switching Times* > Building Management System Integration 0 -10VDC Input to Control Modulation or Set Point 0.10VDC Modulation Rate Output r0 -10VDC Input Signal from Variable Speed System Pump* 0 -10VDC Input to Enable /Disable call for heat r I fdY°�L ;+ H ayu n.® ��' M t M 8 e R > High - Voltage Terminal Strip 120 VAC / 60 Hertz / 1 Phase Power Supply Three Sets of Pump Contacts > Low Voltage Terminal Strip > 24 VAC Device Relay Proving Switch Contacts Flow Switch Contacts Alarm on Any Failure Contacts Runtime Contacts DHW Thermostat Contacts 3 Space Heat Thermostat Contacts System Sensor Contacts DHW Tank Sensor Contacts Outdoor Air Sensor Contacts Cascade Contacts 0.10VDC BMS External Control Contact 0 -10VDC Boiler Rate Output Contacts 0.10VDC Variable Speed System Pump Signal Input 0 -10VDC Signal to Control Variable Speed Boiler Pump Modbus Contacts > Time Clock > Data Logging Hours Running, Space Heating Hours Running, Domestic Hot Water Ignition Attempts Last 10 Lockouts > Access to BMS Settings through Graphic LCD Display > Maintenance Reminder Custom Maintenance Reminder with Contractor Info Installer Ability to De- activate Service Reminder > Low -Water Flow Safety Control & Indication > Password Security > Customizable Freeze Protection Parameters "Exclusive feature, available only from Lochinvor Patent Pending STANDARD FEATURES > Energy Starr" Qualified > Up to 96% DOE AFUE Efficiency > Modulating Burner with 5:1 Turndown Direct -Spark Ignition Low -NOx Operation Feld Convertible from Natural to LP Gas > ASME Stainless Steel Heat Exchanger > 30 psi ASME Relief Valve > Vertical & Horizontal Direct -Vent PVC, CPVC or SS Venting up to 100 feet Factory Supplied Sidewall Vent Termination > Smart System Control > Condensate Trap > Other Features Adjustable High Limit w /Manual Reset Boiler Circulating Pump Adjustable Leveling Legs (KB Models only) Wall -Mount Bracket (WB Models only) Zero Clearances to Combustible Materials 12 -Year Limited Warranty (See Warranty for Details) OPTIONAL EQUIPMENT > Modbus Communication Flow Switch Low -Water Cutoff w /Manual Reset & Test Alarm Belt Concentric Vent Kit SMART SYSTEM PC Software Stack Frame FIRING CODES M9 Standard Construction M7 California Code ' .Ll V Lhm n:esco;ek.sr vraru..,m:Eaitu. ae ha a..t... 11 -09 -2011 Inspection Request Reporting Page 32 4:22 pm Vail, CO - City Of Requested Inspect Date: Thursday, November 10, 2011 Site Address: 395 FOREST RD VAIL A/P /D Information Activity: M10 -0231 Type: B -MECH Sub Type: ADUP Status: FINAL Const Type: Occupancy: Use: Insp Area: Owner: FOREST ROAD DEVELOPMENT LLC Contractor: R & H MECHANICAL LLC Phone: (970) 328 -2699 Description: HVAC /RADIANT HEAR / SNOWMELT SYSTEM Requested Inspection(s) Item: 390 MECH -Final Requested Time: 11:30 AM Requestor: R & H MECHANICAL LLC Phone: (970) 328 -2699 Comments: 471 -5665 Assigned To: * * * * * * * * * * ** Entered By: JMONDRAGON K Action: Time Exp: Comment: l� Inspection History Item: 200 MECH -Rough ** Approved ** 03/23/11 Inspector: sgremmer Action: PA PARTIAL APPROVAL Comment: Ducts, bath exhaust, partial on vents for boilers need to see attachment Item: 310 MECH - Heating ** Approved ** 10/15/10 Inspector: rm Action: AP APPROVED Comment: PARTIAL IN LOOR HEAT BASEMENT LEVEL (WEST SIDE ONLY) 100 # AIR TEST 10/25/10 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: EAST HALF IN FLOOR HEAT BASEMENT LEVEL 05/06/11 Inspector: JRM Action: AP APPROVED Comment: INFLOOR HEAT 100 # AIR TEST THRU OUT APPROVED 05/16/11 Inspector: sgremmer Action: AP APPROVED Comment: 05/31/11 Inspector: JRM Action: AP APPROVED Comment: IN FLOOR GARAGE SLAB 100 # AIR TEST 06/29/11 Inspector: JRM Action: AP APPROVED Comment: SNOWMELT PADS AND PATIOS 100 #AIR TEST 08/18/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Back patio onry 10/07/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: LOWER HALF OF THE EAST SIDE DRIVEWAY SNOWMELT 100 # AIR TEST 10/21/11 Inspector: JRM Action: AP APPROVED Comment: DRIVEWAY SNOW MELT Item: 315 PLMB -Gas Piping Item: 320 MECH - Exhaust Hoods Item: 330 MECH - Supply Air Item: 340 MECH -Misc. 04/29/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: whole hydro heat system test at 100 psi 07/13/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Snow melt at North side patios and stair wholes stem on test 100 Psi 08/02/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Snow melt tested at 100psi Item: 390 MECH -Final ** Approved ** 11/08/11 Inspector: sgremmer Action: AP APPROVED Comment: REPT131 Run Id: 13768 11 -04 -2011 Inspection Request Reporting Page 11 4:03 Dm Vail, CO City Of Requested Inspect Date: Monday November 07, 2011 Site Address: 395 FOREST RD VAIL A /P /D Information Activity: M10 -0231 Type: B -MECH Const Type: Occupancy: Owner: FOREST ROAD DEVELOPMENT LLC Contractor: R & H MECHANICAL LLC Description: HVAC /RADIANT HEAR / SNOWMELT SYSTEM Sub Type: ADUP Use: Phone: (970) 328 -2699 Status: ISSUED Insp Area: Requested Inspection(s Item: 390 MECH -Final Requestor: R & H MECHANICAL LLC Comments: 471 -566 Assigned To O Action: Time Exp: Requested Time: 11:00 AM Phone: (970) 328 -2699 Entered By: JMONDRAGON K ) I q ,I Inspection History 4t Item: 200 MECH -Rough *' Approved 03/23/11 Inspector: sgremmer Action: PA PARTIAL APPROVAL Comment: Ducts, bath exhaust, partial on vents for boilers need to see attachment Item: 310 MECH - Heating — Approved "" 10/15/10 Inspector: Lrm Action: AP APPROVED Comment: PARTIAL INFLOOR HEAT BASEMENT LEVEL (WEST SIDE ONLY) 100 # AIR TEST 10/25/10 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: EAST HALF IN FLOOR HEAT BASEMENT LEVEL 05/06/11 Inspector: JRM Action: AP APPROVED Comment: INFLOOR HEAT 100 # AIR TEST THRU OUT APPROVED 05/16/11 Inspector: sgremmer Action: AP APPROVED Comment: 05/31/11 Inspector: JRM Action: AP APPROVED Comment: IN FLOOR GARAGE SLAB 100 # AIR TEST 06/29/11 Inspector: JRM Action: AP APPROVED Comment: SNOWMELT PADS AND PATIOS 100 #AIR TEST 08/18/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Back patio only 10/07/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: LOWER HALF OF THE EAST SIDE DRIVEWAY SNOWMELT 100 # AIR TEST 10/21/11 Inspector: JRM Action: AP APPROVED Comment: DRIVEWAY SNOW MELT Item: 315 PLMB -Gas Piping Item: 320 MECH - Exhaust Hoods Item: 330 MECH - Supply Air Item: 340 MECH -Misc. 04/29/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: whole hydro heat system test at 100 psi 07/13/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Snow melt at North side patios and stair wholes stem on test 100 Psi 08/02/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Snow melt tested at 100psi Item: 390 MECH -Final REPT131 Run Id: 13759