Loading...
HomeMy WebLinkAboutDRB100430 PlansBENCH MARK ELEV.= 1000.00 FOUND SURVEY MONUMENT 1.25" YELLOW PLASTIC CAP ON #5 REBAR ILLEGABLE N46 "E 40.00' ►_►J_I FA / s r / / / / O / CC) , 4 \\ \\ \\ \\ \\ \\ \\ \\ \\ RAPHIC SCALE \\ ( IN \FEET } inch = \ \ 20 ft. MARCIN ENGINEERING AVON, \COLORADO I / 86020100 E ) 79 LOT 19 3 PINE J PINE r r r / Ile r / /PINE /4 .-- r PINE/ 4„ ��� / ` PIIyE PINE / FOUND SURVEY MONUMENT 2" // ASPHALT 11 ALUMINUM CAP IN ASPHALT // DRIVE ILLEGABLE / r / / f / / I / f / I i 1 / 1 3 k2"C 3 " 3"C / �D �OF ,,rC / / 3 „ /6 „-C / C / / r •- 6 „/C /J 0 =112 0 ' ” / A 5 , ,� R =43. Q) L. - 88.40 T= 6 7 .41 /4 / C�T J(NW00 909.3 C13 CH -- S43 11 11 W / "** �TELE. PED. 2” 'INE C) / I i / 1 r✓ l / I '` 7. 14 A=23 00' , PINE /` / R 91.0 0 L— 78.89 4t PINE T-40.02 $p 4 t p _ /` RINE /// CB 78. / loy CH 0 10 00 PINE / ! / // STONE ` r ' // PILLAR(TYP) LOT 14 F ---'IAO I f / lV !/ O O M s DRE • A UG 2 0 r� v� C) Q c� L CL C�7 Of r� cy C Q> CP a i °E C w cQ- / O M s DRE • A UG 2 C) C) Q c� Of r� cy 0 O M s DRE • A UG 2 0 Il e` 00 CR / / 1 / 1 (}�j 1 1 / c N46 1 E C) 0) 40. UU T 20// LO T 0.4884 ACRES 0 LOT 19 C 9) l J J J l j , f f 0) / l f f l J � / j / / f / / / f / , , l/ / 259.36 ) QDp�4� Ow VV , 6tr Don Qr o >o. O • A d ,, ASPEN PIN 3 / ASPHALT I NE / DRIVE �� 4' `,/ LIGHT l f f. f / / i f f r f POLE, c,� ' f 1 GENERAL NOTES: C�'' J J / J j co l 1 �� �� � 12 l� J f 0) f / 1 PINE J o � / f Q � J• � q 1. ALL PLANT MATERIAL SHALL BE PLACED IN PITS HAVING A MINIMUM DIAMETER OF 150% OF THE PLANTS TOTAL ROOT BALL OR CONTAINER VOLUME i f J J 1 ) 4 2. ALL PLANT MATERIAL SHALL BE BACK FILLED WITH ONE PART COMPOST TO TWO PARTS TOPSOIL +e l QTY h NAME SIZE CONDITION / C� >IsZea pungens 8 ' Full branching w /new growth I o Coloradq Blue Spruce �— L-Li W 24 Populus �muloides 2'5-3.5" Full branching w /new growth Quaking A§pen caliper V 0 3 Prunus 'Spring o 2.5" .5 cal. � � N a B & B Q CU a- ca— a Q> r-- 0 O Q> Q> C> � a CU 2 E Q L 2 Z; E CU a X i+ ° v w Cl— 3. ALL DECIDUOUS TREES ARE TO BE STAKED WITH 5 FOOT STEEL T" STAKES AND GUYED WITH f / I J I ► 12 \ #12 GAUGE, GALVANIZED WIRE AND 1 -1/2 INCH WIDE GREEN NYLON TREE STRAPS. \ 4. ALL NEWLY PLANTED TREES SHALL BE ROOT FED AT THE TIME OF PLANTING. ROOT FEEDING SHALL J PINE \ RELEASE CONSIST OF A LIQUID FORM, ROOT GROWTH STIMULATOR INCLUDING VITAMIN B -2 AND A SLOW f 5 FERTILIZER HAVING A COMPOS11ION OF 14 -14 -10 + 2� IRON. l f ( 1 f F A TI �J f `� ! 1 J Q ) t 6. AREAS TO BE REVEGETATED WITH NATIVE GRASSES SHALL BE TILLED TO A DEPTH OF MINIMUM. ( © ALL DEBRIS AND STONES LARGER THAN 2" IN DIAMETER SHALL BE REMOVED. SPREAD 1 -2" OF PEAT AND TOPSOIL AND TILL INTO PREPARED AREA, RAKE SMOOTH TO INSURE PROPER DRAINAGE. 7. D AREAS SHALL RELIEVE AN APPROVED 1 PRIOR TO SEEDING AND /OR PLANTING, NEWLY PREPARE AR FERTILIZER APPLICABLE TO EXPOSURE AND MICRO- CLIMATE OF THE SITE. FOLLOW MANUFACTURER'S \ SPECIFICATIONS AND GUIDELINES REGARDING APPLICATION OF FERTILIZER. ( j 8 }) 8. NATIVE GRASSES: 157. CREEPING RED FESCUE, 5% SHEEP FESCUE, 25% ARIZONA FESCUE, " ( ASPEN \ 30% CANADA BLUE GRASS, 10% IDAHO FESCUE, AND 15% SLENDER WHEATGRASS. APPLY AT 7 �' \ A RATE OF 42 LBS PER ACRE. APPLICATION MAY BE BY DISK, HYRO - SEEDING WITH TACK MULCH, / , Q " P N OR BROADCAST AND COVERED WITH APPROVED STRAW AND NETTING. I f 2 �l / E AUTOMATIC DRIP IRRIGATION SHALL BE PROVIDED AT ALL NEW TREES FOR A PERIOD OF TWO YEARS. �} ASPEN 2 j / 9. GIVEN THE CONDITION OF THIS SITE REGARDING GRADES, PLANTING METHODOLOGIES WILL BE DETERMINED ASPEN AT TIME OF PLANTING REGARDING THE SITE CONSTRAINTS AND OPPORTUNITIES TO INSTALL GIVEN PLANT MATERIALS. ALL EFFORTS SHALL BE TAKEN TO INSURE THE INTEGRITY OF THE EXISTING SLOPES AS IS. 12" r WHERE POSSIBLE, EXISTING PLANT MATERIALS TO BE REMOVED WILL BE GOVERNED BY THE PHYSICAL �� / v' I (te ff CONDITIONS OF THE SITE TO INSURE POTENTIAL EROSION IS CONTROLLED. Cj r ASPEN (_ _ f1 -~ J �{' :/ 10. Ri$TING PLANT MATERIALS WHICH WERE CUT /PRUNED WILL BE REMOVED BY AS APPROPRIATE TO THE / I / r- r PINE SITE`CONDITIONS. iT IS HOPED THE EXISTING ROOTS MAY BE LEFT IN PLACE TO STABILIZE THE BANKS / �/ ALTHOUGH ALL EXISTING REMNANTS OF THE TRUNK AND SUCKERS FROM EXISTING TRUNKIS AND ROOT ZONES / » WILL BE CHEMICALLY ALTERED TO STOP FUTURE GROWITH. WHERE POSSIBLE, AN EXISTING TREE WHICH CAN / f I 1 ( Q 4 /% f REMOVED ALLOWING A REPLACEMENT TO BE MADE WITHOUT DAMAGE TO THE SITE, THIS WILL OCCUR. 3 I of PINE 11. PLANTING PLAN IS IN ACCORDANCE WITH MEETING BETWEEN THE TOWN OF VAIL AND SAMURA & ASSOCIATES PINE , REGARDING THE SEVERITY OF THIS SITE AND THE GOAL OF ESTABLISHING A PARK LIKE SETTING AT THE BASE OF SITE. „! 1 ( _ � \ PINES r �� �� PINE NOTE: ONCE PLANT MA IALS HAVE BECOME ESTABLISHED, THE TEMPORARY l 7g DRIP SYSTEM MAY REMOVED. t .FINE /4 -ri f f I l r ; PINES I nT 14 PLANT LIST Key Populus tremuloides (caliper sizes will be mixed during planting to create a sense of age within this garden. See notes above regarding site. � \ r \ Colorado Blue /Green Spruce p. � � Crabapple \ +e QTY h NAME SIZE CONDITION / DAIE OF W >IsZea pungens 8 ' Full branching w /new growth Coloradq Blue Spruce B & B L-Li W 24 Populus �muloides 2'5-3.5" Full branching w /new growth Quaking A§pen caliper B & B 3 Prunus 'Spring o 2.5" .5 cal. Full branching w /new growth Springsnow Crobapp e a B & B Key Populus tremuloides (caliper sizes will be mixed during planting to create a sense of age within this garden. See notes above regarding site. � \ r \ Colorado Blue /Green Spruce p. � � Crabapple \ +e SHEET TITLE PLANTING PLAN f i f ffi / DAIE OF W 1 1 05 1 1 1__ C) SHEET TITLE PLANTING PLAN i DAIE OF W 1 1 05 1 1 1__ C) N a t Q r-- SHEET TITLE PLANTING PLAN i DAIE OF W 1 1 05 1 1 1__