Loading...
HomeMy WebLinkAboutB10-0372NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MA OVK Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: B10 -0372 Project #: PRJ10 -0682 Job Address: 4301 COLUMBINE DR VAIL Location......: UNIT A Parcel No....: 210112225001 OWNER HOLTER, ARLEN R. & ELIZABETH 10/14/2010 7029 DOWN RD EDINA MN 55439 -1729 APPLICANT B & M ROOFING OF COLORADO,IN 10/14/2010 Phone: 303 - 443 -5843 P.O. BOX 18150 BOULDER CO 80308 License: 211 -S CONTRACTOR B & M ROOFING OF COLORADO,IN 10/14/2010 Phone: 303 - 443 -5843 P.O. BOX 18150 BOULDER CO 80308 License: 211 -S Description RE -ROOF Occupancy: Type Construction: Status .. : ISSUED Applied ..: 10/14/2010 Issued ...: 10/18/2010 Expires ...: 04/16/2011 Valuation: $17,245.00 Total Scl Ft Added: 0 FEE SUMMARY Building Permit Fee ------ > $293.25 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $632.76 Plan Check--------------- - - - - -> $190.61 Use Tax Fee --------------------- > $144.90 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $632.76 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00 Payments ------------------------------- > $632.76 Total Calculated Fees--- - - - - -> $632.76 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. Signatyie of Owner or Contractor Date Print Name bld_alt_constructio n_perm it_041908 APPROVALS Permit #: B10 -0372 as of 10 -18 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 10/14/2010 DRHOADES Action: AP Item: 05400 PLANNING DEPARTMENT Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS See the Conditions section of this Document for any that may apply. bld_a It_construction_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0372 as of 10 -18 -2010 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 44 (BLDG 2009): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R314 OF THE 2009 IRC, IF APPLICABLE UNLESS A MONITORED FIRE ALARM SYSTEM IS REQUIRED. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 bld_alt_construction_perm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001607 Amount: $632.76 10/18/201011:42 AM Payment Method: Check Init: SAB Notation: 034362 -B & M ROOFING ----------------------------------------------------------------------------- Permit No: B10 -0372 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101 - 122 - 2500 -1 Site Address: 4301 COLUMBINE DR VAIL Location: UNIT A Total Fees: $632.76 This Payment: $632.76 Total ALL Pmts: $632.76 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code -------------- - - - Description Current Pmts - -- BP 00100003111100 ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 293.25 PF 00100003112300 PLAN CHECK FEES 190.61 UT 11000003106000 USE TAX 496 144.90 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 t W. Department of Community Development 75 South Frontage Road Vail, ,Colorado..81657, Tel: 970- 479- 212ik.. r Fait: 970-4797214.52 i Weft; www.vailgov',, o eview.Corinatol" ,y }p Development R od -' 1 j BUILDING PERMIT APPLICATION Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. Project Street Address: f\ LJ_ '))() �'c)lu(VN1�rnjL art �1l l \ (Number) (Street) (Suite #) Building/Complex Name: 1O ' Q ' RC__6'(y )C Contractor Information: (� V Company: `l,` �A�y1�- Oy��/��r�+�J Company Address.' 3"M E0 1 y Q City Q 1 L State: 00 Zip: 0OLi7 11 Contact Name: Contact Phone: 306 E -Mail Town of Vail Contractor Registration No.: y X u &la � ,dl Q Contractor Signature (requlr5l Property Information Parcel #: (For parcel #, contact Eagle County Assessors Office at 970- 328.8640 or visit %"'AV.eaglecouty.us/patie) Tenant Name: i TIZO .i f & -o`r 14oLre c Owner Name: -S P� )-k- I-) 2-1 Valuations (Labor &Material)) 1 � Building: $ Plumbing: $ Electrical: $ Mechanical: S Total: $ S0,00 Office Use: ((''�� Project #: _ ` p, U ' C)&T Nf3 ' CL c DRB #: - ( 0545 Building Permit M 3 10 - (D Lot #: Block # Subdivision: �{l r S Detailed Description of Work: TQG(„t' (� �- C tic q -C{tL o coop � (1 c� u)se additional sheet if necessary) Work Class: New ( ) Addition ( ) Remodel ( ) Repair �A) Other ( Work Type Interior ( ) Exterior A) Both ( j Type of Building: Single - Family V) Duplex( ) Multi-Family( } Commercial ( ) Other ( } Does a Fire Alarm Exist? Yes ( ) No( ) Monitored Alarm? Yes ( ) No( ) Does a Sprinkler System Exist? Yes ( } No( ) it & Type of Existing Fireplaces: Gas Appliances Gas Log _ Wood /Pellet — Wood Burning # & Type of Proposed Fireplaces: Gas Appliances _ Gas Log _ Woo nr1 Rurnin DPI Date Received: D OCT 0 5 2010 TOWN OF VAIL Apr -09 B &M Roofing of Colorado Inc. "Quality Has No Substitute, Depend on Us" 3768 Eureka Way, Frederick, CO 80516 Phone: (303)443.5843 Fax: (303)938 -9642 ROOTINGSYSTEMPROPOSAL & AGREEd1F.NT Propusal SubmiIled to: Arlen and Betsy Holler 4301 Columbine Unit A Vail, CO 81657 bate: September 15, 2010 Phone: 970 - 481 -1690 Email/Fax: fullerj!a?peoplepe.com Job: Bighorn Road Reroofs Location: Unit "A" Vail, CO 801657 ROOFING SYSTEM DESCRIPTION & PROPOSAL B & M Roofing proposes to do the following work at the above referenced properly: 1 SURFACE PREPARATION • Remove and dispose of one layer of existing WOOD SHAKE roofing malarial. • Inspect plywood roof deck and re- secure any loose sheets. • Replace rottenhvatcr damaged plywood after approval by Owner. If this work is required, a separate tulle and material price of S60.00 per sheet will be added. IINDERLAYMENT • Install one layer of Grace ice and watershield membrane over entire roof surface. FLASHINGS • Install new 2 "x 4" prelinished drip edge flashing at lower cave edge, and rake edges of roof. • Install prelinished w- valley in valley areas, open style. • Install new prelnished step flashings along sidewall areas, as necessary. • Install new prelinished head wall flashings where roof slope meets a vertical wall, as necessary. • Install and paint new vent flashings on pipe penetrations. • Install new ridge vent to facilitate proper attic /roof ventilation. • All flashings to be 26 gauge prof inished, unicss otlncnvisc noted, ROOFING SYSTEM • Install new PRESIDENTIAL 50 YF,AR IIF.AVVWEIGIIT ROOFING SYSTEi1T, as manufactured by Certainteed, over underlayment, including all starter, hip and ridge. • Color and manufacturer will be chosen by Owner, prior to material order by B &M Roofing. TAXES AND MISCELLANEOUS • Debris caused by the roofing operation will be properly disposed of by B&M Roofing. • Liability and workmen's compensation insurance is carried by our firm for your protection. • Applicable sales tax on materials included in our System Price on this project. • The applicable city building permit fee is included in our System Price. • We will complete the roofing work utilizing the driveway to access the property. A roll -off garbage container, or trailer will be located in the driveway during the re- roofing project. • We will provide a 2 -year B &M Roofing of Colorado, Inc.'s roofing guarantee on labor upon completion of the work and receipt of final payment. • A standard 50- manufacturer's warranty covering material will be provided upon completion of the work and receipt of payment. • Painting, carpentry, heat tape, gutters, snow removal, snow retention, and soffit venting are excluded. T07AL PRESIDENTIAL. 50 YEAR HEAVI'IVEIGHT ROOFING SYSTEM PRICE: $17,245.00 'thank you for the opportun to submit this proposal. Please contact us with any questions you may have. We took forward to ser ng your needs on t 's project. Accepted by :. _. Date: 601- Proposal good for lhirly (30) days. Authorized Signnlure . All/ ./rsulaL Brad Taylor, Vice President • To accept, sign and return one color. • (hrner ir111 pro0de certiflcullon guaranteeing that fuuuuls horn been set aside for partnenl, if regmestell • Fhmrnce charges of 1.5 percent per innnrh (18 %A.P.R) will be adder)to any mnpald balance: • Owner shall be responsible for all charges (including altornep's fees) related to collet ion efforts by contractor. • R,01 Roofing Stamb ird General Conditions are atlaehed and made a part hereof. Technical Data Sheet CertainTeedCH QW11ify wndt arlaln. $rfitJarflon guaranfrrJ.'" Presidential Shake TL T"' Shingles Presidential Shake TM Shingles PRODUCT INFORMATION Presidential Shake TL, with its sculpted rustic edges, is constructed using three laminated layers of the industry's strongest, most durable materials, making it one of the thickest, toughest and best looking shingles on the market. The beauty of a wood shake with less cost and better performance. It is designed to resist blow off in high wind conditions up to 110 -mph Presidential Shake, with its unique sculptured tab, provides the distinct styling, depth and dimension of wood shakes. Constructed using two laminated layers of the industry's strongest, most durable roofing materials. It is designed to resist blow off in high wind conditions up to 11 0-mph. Presidential Shake TL AR (Algae Resistant) and Presidential Shake AR (Algae Resistant) shingles help protect against staining or discoloration caused by algae. Colors Please refer to the product brochure or Certain-reed website for the colors available in your region. Limitations: It is recommended to apply these shingles at slopes of 4 "per foot slope and greater in order to achieve optimum appearance. Low slope applications (2" up to 4" per foot) of Presidential TL shingles require CertainTeed's WinterGuardT"' Waterproofing Shingle Underlayment, or its equivalent meeting ASTM D1970, be applied to the entire deck surface, according to application instructions provided with the product and on the shingle package. For low slope applications of Presidential Shake shingles apply CertainTeed WinterGuard Waterproofing Shingle Underlayment or its equivalent, or two layers of 36" wide felt shingle underlayment (Roofers' Select High - Performance Underlayment or product meeting ASTM D4869 or ASTM D6757) lapped 19 ", over entire deck according to the application instructions provided with the product. In areas where icing along the eaves can cause the back -up of water (all slopes), apply WinterGuard, or its equivalent, according to application instructions provided with the product and on the shingle package. On slopes greater than 21" per foot, use nine nails and apply 1" diameter spots of asphalt roofing cernent (ASTM D4586 Type II) under each shingle lab, according to application instructions provided with the product and the shingle package. Product Composition: Presidential Shake TL and Presidential Shake shingles are composed of a fiber glass mat base. Ceramic- coated mineral granules are tightly embedded in carefully refined, water - resistant asphalt. The laminated pieces are firmly adhered in a special tough asphaltic cement. These fiber glass based shingles have self - sealing adhesive applied. Applicable Standards: ASTM D 3018, Type 1 ASTM D 3462 ASTM E 108 Class A Fire Resistance ASTM D 3161 -08b, Class F Wind Resistance (110 -mph) ASTM D 3161 -03b, Class F Wind Resistance (110 -mph) ASTM D 7158 Class H Wind Resistance UL 2390 /ASTM D6381 Class H Wind Resistance TDI Windstorm Resistance UL 790 Class A Fire Resistance UL 997 Wind Resistance NYC -MEA- 120 -79 -M ICC -ES Evaluation Report ESR -1389 CSA Standard A123.5 -98 (& -05) Miami -Dade Product Control Approved Florida Product Approval # FL5444 Technical Data Sheet (Continued) Presidential Shingles Page 2 of 3 Technical Data: Presidential Shake Presidential Shake TL Weight/Square (approx.): 355 lb 480 lb Dimensions (overall): 14 1/4" x 40" , 14 1/4" x 40" Shingles /Square: 90 % 90 Weather Exposure: 4" 4" INSTALLATION Detailed installation instructions including diagrams are supplied on each bundle of Presidential Shake TL and Presidential Shake shingles, or separate application sheets may be obtained from CertainTeed. The following is a general summary of the installation methods. NOTE - Refer to application instructions supplied with the shingles for further information and application procedure. IMPORTANT NOTE - Presidential Starter or an approved alternative starter system must be used for the two - layered starter course. Roof Deck Requirements: Apply shingles to minimum 318" thick plywood, minimum 7/16" thick non - veneer, or minimum 1" thick (nominal) wood decks. The plywood or non - veneer decks must comply with the specifications of APA — The Engineered Wood Association. Ventilation: Provisions for ventilation should meet or exceed current HUD standards. To best ensure adequate ventilation, use a combination of continuous ridge ventilation (using Ridge FilterVent or Ridge Filter ShingleVent II, manufactured by Air Vent Inc, or a comparable product with an external baffle) and balanced soffit venting. Valleys: Open valley is recommended. Valley liner must be applied before shingles. It must be minimum 18" wide 16 oz. copper, or its equivalent, installed over 36" wide self- adhering CertainTeed WinterGuard Waterproofing Shingle Underlayment (apply directly to deck), or applied over 36" wide mineral surfaced roll roofing. After WinterGuard has been applied, install the 16 -oz. copper centered in the valley. For application of copper valley, use copper cleats or large head copper nails. Closed -Cut valley application is an acceptable alternate, provided the shingles are not damaged while being formed into place. Refer to the application instructions on the shingle packaging for further information. Underlayment: At standard slopes (4" per foot or greater) a single layer of Roofers' SelectT" High - Performance shingle underlayrnent (or product meeting ASTM D 4869 or ASTM D 6757) is recommended. For UL fire rating, Underlayment may be required. Corrosion - resistant drip edge is recommended and should be placed over the Underlayment at the rake and beneath the underlayment at the eaves. Low Slope Underlayment: Low slope applications (2" up to 4" per foot) of Presidential Shake TL shingles require WinterGuard"-' Waterproofing Shingle Underlayment, or its equivalent meeting ASTM D1970, be applied to the entire deck surface, according to application instructions provided with the product and on the shingle package. For low slope applications of Presidential Shake shingles apply CertainTeed WinterGuard Waterproofing Shingle Underlayment or its equivalent, or two layers of 36" wide felt shingle underlayrnent (Roofers' Select High - Performance Underlayment or product meeting ASTM D 4869 or ASTM D 6757) lapped 19 ", over entire deck according to the application instructions Provided with the product. When WinterGuard is applied to the rake area, the drip edge may be installed under or over WinterGuard. At the eave, when WinterGuard does not overlap the gutter or fascia, the drip edge should be installed under WinterGuard. When WinterGuard overlaps the fascia or gutter, the drip edge or other metal must be installed over it. Standard Fastening: For slopes of 21" per foot or less, five fasteners are required per shingle. Nails are required for Presidential TL. Fasteners are to be located on the nailing guide line, 9" above the lowermost edge of the shingle, two located 1 to 1 -112" in from each edge and the remaining three evenly spaced between (about 9" to 10" apart). Fasteners must be of sufficient length to penetrate into the deck 3/4" into or through the thickness of the decking, whichever is less. Nails are to be 11- or 12- gauge, corrosion - resistant roofing nails with 3/8" heads. Technical Data Sheet (Continued) Presidential Shingles Page 3 of 3 Steep Slope Fastening: For roof slopes greater than 21" per foot, nine fasteners are required per shingle. Nails are required for Presidential TL. After applying 5 nails in nailing guideline, apply 4 nails 1" above tab cutouts, making certain tabs of overlying shingle covers nails. Also at slopes greater than 21" per foot, apply 1" diameter spots of asphalt roofing cement (ASTM D4586 Type II) under each shingle tab, according to application instructions provided for the product and on the shingle package. Standard Application: Presidential Starter or an approved alternative starter system must be used for the two - layered starter course. The required application method is the 5" & 15" Offset, Four- Course, Diagonal Method found on each bundle of shingles. These shingles may be used for new construction or for reroofing over one layer of old shingles, but due to the heavy weight of this shingle, it is important to determine that the roof deck system is satisfactory for the application of these shingles. Refer to product wrap for detailed reroofing limitations. All shingles on the finished roof must be applied with five fasteners. Always cut shingles frorn the left edge. Flashing: Use corrosion - resistant metal flashing. Please refer to illustration on our shingle packaging. Hips and Ridges: Use only Presidential Accessory or Mountain Ridge shingles of a like color for capping the hips and ridges. MAINTENANCE Presidential Shake TL and Presidential Shake shingles require virtually no maintenance when installed according to manufacturer's application instructions. However, to protect the investment, any roof should be routinely inspected at least once a year. Older roofs should be looked at more frequently. WARRANTY Presidential Shake and Presidential Shake TL carry a lifetime limited transferable warranty against manufacturing defects for the original homeowner. In addition, both Presidential Shake TL and Presidential Shake shingles also carry SureStartTl.' 10 Protection. For specific warranty details and limitations, refer to the warranty itself (available from the local supplier, roofing contractor or on -line at www,certainteed.com ). FOR MORE INFORMATION Sales Support Group: 800 - 233 -8990 Web site: %vww.certainteed.com See us in Sweets and ARCAT printed and electronic publications CertainTeed Roofing P.O. Box 860 Valley Forge, PA 19482 O Copyright CertainTeed Corporation, 2009. CertainTeed C-6 All rights reserved. Updated: 12/2009 Qua lily mude eel Laiu. tlis /atfinnquurauktr.~ "WWI }•' 4ti,�liGli�Z3 ,; t >2ix ;> .t / } ?�t �y. it 1 tSf �lra!')i s iF •� i } -,r . N •7.:v t ; xh AM , =Yy. i : +i. ri •' k 'f' r +IS 5. iii! i�sY�{ i.°� .' •F't Srt ♦S7i : ='��{ �a,- ,:L -L t' /r p} 3 r�, s. isrr ^ {. �. s k. <T4 i's`7 :�'•.. t - SF Li.'- '' �� "iiii� '2. � . °:.1 c t _t. Ogg 7j r;•r re,..s• rr /1 4�s" M:� ja . 5 3 i if ji'.j: +': },+•2- S a 7 - •� /• .i S y'I:...... r. .'t . w f L , � } },i• :..�::1.' -.:. +.`•. Ft •e '( t ,si �•r na;�t:.,i�'-.. ,y♦. L� s:1.:a:.r' Rt.?1i•..Y:T..,S'•:SLt ?a,, >r'1. r s r} _tS 8 . s' <..'w•i i!:.! �.: •i i ct t - f;t. •:4 •i�'7t:Cti�.',; •: `• t` "r ��• f: ''1 4 l -rYN '� / mi. .-iar •.t,• :iii :, ,.;¢ ,,: . R ' .`•t t' fi ;: r- r 1 Y�- 1 -,>z, :.}- r'�'.is r.' ~'r .,•t:•, -. + ./ rt "- iS'rf ` '�Vr.i.�.:: e. .. Sy,?; t,l �.y 'Vi Tom! ';�• •y`� "i:'wt:;�i• •.;r : ,'• r{1 F.1' - i•r +}'�R• NN, r i k !.� �::�.rj�r'":�r.?1v.., 1 7'e 'i•i;' 'i:;a•. /i-'�d: ^: ?;; a,'r...,.. J''•;::L -7.•. ;t1:. i;J i;:..•,. «.7Ll::t. �Jf �}1.�r)L. _rJti:.•�SiJ.� )n)-•. ir. <J'l4: ".7: 3�`r ._t:`':v.} �. \ i !px )s't }.� ::.! _ { (c } r', i:.: ;..,'•� ^4 . ^�.. y�r tf r JF \ ' ;T(. •1 .,.•r...l i ^Y`4``iS: y. !r s q �2 F j r- tJ };s- . ;..• :.�,f+�`. �'.'(§ %::•r %ft �;' J.. :• �.�T�,': ".'' .1':; S; it '" r,i. s,..� .1•i � �• •:r?'k:st t 'v- �Ji:�2�;.r.- ;....� -' t :,'..:,;i ::�'S,;i;,•.; r5 .;� y( _1�:- ,i,...;.y;• t<<v4 ..,. ,s .� :;��.,•i�.:tr.✓•:> u : i .1r�; l� �'�'(�r :•iSc i/ 1 r' �. • t }'r -7.;. s�:: i }y ^?'a.3 s+`Z..'; �. '� 3 i a •Y:f,.�;.Y `: �t, �. 1 f •. �' ••2 r w s t t��tiss. }, {r a t�r`k {y1S ,jet~ �3 F •{ti�'7�p��.'•'�� i r��� 7• , ,r t '1 c Cs c � �s .l t( r r Jt� Yr. ei : b'-tv, t . � 7�a s2 {d!%t i` h �` {1 `'!1 r tac ty) i �a. �.£f�'. iv ,i•`• rt r! r / } x � r r? i ,C' i i v �t4 f i o i - lY�•`�j,f�, �,;.e #' e+i1/ h „� Yi. s 5�.. `2!'.:� •fi � 2 � i . 1 4' t t y F r .v . f � r � i 5 p v s *" r C7i 'Y .(iii;! #, "' ;x72y:*•%i.�_ r r.aj.'.`-+ v.) y s f. i 1 1wE. r �,'t•�?�, >a1�ayy�i� �'4�G } <' >ist�� "G. xty_33.M��; �i;:i.�'.•.- .t•.= -t ' .;/ �i'Lt i !`„ 4Tr � L ti�- 'a�•,.tv mot,+ _ . � .. d � � . _�ys. �;ti.'x'i v r r i �.7`t �i:6t Q :R� ?�tti(C�� + . •r,' . � - 2 2 y+ s ,Y.-r -� Sil ��` t N i'^' ti� -. L �r � �; f�� &r a -� Via'. •.s,` i i rvf� r ,ta {" t '. t �i, �) G , ,t•'�T• ty t'Lty�' r�:� n +� tt .*,; t i. i31• > h t� '� �xl'� < � Y >1ia 17, ! �,. �.wJ is . \.cf� 1 ��•Yfp .. ": +.: +� -i Mr J! a a aS j f ,. t t r S� ?7�Z r). Y t' t _��y x esv��'t'+`:5 `v�s3,s�tk�" .� t trr�s:_ +? ='iii 4" � .E� irL .:, 1•w _r t � 1 `" , 1?Ra i.� i.J�`�`}t3'M�'�•rr��'}. a�• •��: �•�S T �r�; s t74:,.�rtfrit ij �t J: ty It '.. ii i�,s ! tt dr y�`. t t.• _ CF`ir•>r•NCi'? fit a4 '� �:7'i}`r,'1/ 4 �i •vy_.}•1 k1s ... e a Fy (,+� : S.A. >J SsF ! � :.; .', .: ti. ) ��t ffi+•Z:,i! _ x4 i kJS a� -z� � i ,.a ty S �r7 � n4,a °T�d"4xi�.l�{;s:: G ) . ?., �iy ✓:f, •fi;.•`.�, ,tti� t�.�F �' lri t ti� 1;: } i :�., i_, ' �. ^i.Yi:�.• d_ r tl r).♦ �� M _�� x,. ��r17rt r' LAi JJ��4 kti:( ��s5� 151 ?,�r?tk. r.. 04 -12 -2012 Inspection Request Reporting Page 8 8:00 am Vail cn _ Gifu of Pal ,r-ncA 7 Requested Inspect Date: Thursday, April 12, 2012 Inspection Area: DR Site Address: 4301 COLUMBINE DR VAIL UNIT A A/P /D Information Activity: B10 -0372 Type: A -BUILD Sub Type: ADUP Const Type: Occupancy: Use: Owner: HOLTER, ARLEN R. & ELIZABETH R. Contractor: B & M ROOFING OF COLORADO,INC Phone: 303 - 443 -5843 Description: RE -ROOF Requested Inspection(s Item: 90 BLDG -Final Requestor: 501 PW- Access /Staging /Erosion Comments: follow u Assigned To: SG Action: Time Exp: Comment: Sn1tv n FOOT -Rough I Item: L� Inspection History Item: 501 PW- Access /Staging /Erosion Item: 10 BLDG - FOOTING Item: Item: 504 PW- Retaining Wall Layout 502 PW [Triveway Grade -Rough Item: 20 BLDG - Foundation /Steel Item: 21 PLAN -ILC Foundation Plan Item: 410 Special Ins ppect - pprogress rept Item: 22 PLAN -ILC FRAMING Item: 30 BLDG - Framing Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Item: 70 BLDG -Misc. Item: 535 DIA - 30 DAY REMINDER Item: 536 DIA - SITE /LANDSCAPING Item: 533 PLAN -TEMP. C/O Item: Item: 420 Special Inspect -final rept 503 PW -Final Driveway Grade Item: 542 PLAN -FINAL Item: 543 PW FINAL Item: 90 BLDG -Final 11/19/10 Inspector: Martin Comment: Snow on roof Status: ISSUED Insp Area: DR Requested Time: 01:00 PM Phone: Entered By: JMONDRAGON K Action: DN DENIED REPT131 Run Id: 14338