Loading...
HomeMy WebLinkAboutMarch 2, 2026 Agenda1.Call to Order 2.Citizen Participation 3.Main Agenda 3.1 Approval of Feb. 2, 2026 meeting minutes. 3.2 AIPP & Vail Art Studio program and calendar discussion. (30 mins) 3.3 Vail Art Studio adjacent landscaping update. (5 mins) 3.4 Vail Valley Charitable Fund 30th Anniversary mural as funded by Discover Vail on Town of Vail property. (5 mins) 3.5 Dobson Arena Art Selection Committee site-visit at 9:30 a.m. (60 mins) 4.Coordinator Updates 5.Adjournment ART IN PUBLIC PLACES MEETING Agenda Vail Town Council Chambers Site Visit to Dobson Arena with Dobson Arena Art Selection Committee @ 9:30 - 10:30 a.m. via zoom webinar: https://vail.zoom.us/j/86945085984 8:30 AM, March 2, 2026 February 2, 2026 Minutes.pdf Art Studio North Lawn - Drawings and Rendering.pdf Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website www.vail.gov. All Town Council meetings will be streamed live by High Five Access Media and available for public viewing as the meeting is happening. The meeting videos are also posted to High Five Access Media website the week following meeting day, www.highfivemedia.org. Please call 970-479-2460 for additional information. Sign language interpretation is available upon request with 48 hour notification dial 711. 1 1 Art in Public Places Board Meeting Minutes February 2, 2026 AIPP Board members present: Lindsea Stowe, Susanne Graff, Tracy Gordon, Ramsey Cotter, Kathy Langenwalter, Jared Biniecki & Kirk Hansen representing VRD for Dobson Art Selection Committee, Courtney St. John Community Member – Dobson Art Selection Committee; Scott O’Connell – Deputy Executive Director, Vail Recreation District; Tom Kassmel – Director Public Works, Town of Vail. Others present: Molly Eppard - AIPP Coordinator; Squire Broel via zoom; Cortney Stell – Black Cube Nomadic Art Museum. 1. Call to Order 2. Citizen Participation Ian Grask – Complimented “Conversation with Jen Stark” program at the Vail Art Studio. 3. Main Agenda 3.1 Approval of January 12, 2026 meeting minutes. January 12, 2026 Minutes.pdf Ramsey motions to approve, Tracy seconds and all in favor. 3.2 Art Studio adjacent landscape design update, Gregg Barrie Landscape Architect Town of Vail. Art Studio North Lawn Concept Rendering Gregg presents the proposed landscaping design for the area north of the Vail Art Studio in collaboration with the BFAG. 3.3 Art Studio "Mud Room" site-specific proposal, Amy Dose & Pamela Olson Vail Art Studio Challenge recognized artists. Art Studio Mud Room Proposal Kathy moves to approve the proposal as presented by Amy Dose in the amount of $5,000, Tracy seconds and all in favor. Molly discusses the possibility of activations with local potters and ceramicists in connection with the installation. 3.4 Dobson Arena public art integration update and next steps discussion with Dobson Arena Art Selection Committee and advisors. Molly reviews the process and timeline dating back from July 2025 to the present for the selection of Dobson Arena public art. This includes creating a project specific selection jury as approved by the AIPP Board, as well as the Jan. 22 RFP meeting. Molly reviews the established AIPP guidelines for the project specific selection jury and advisors. This includes Black Cube Nomadic Musuem as the project managers for the Dobson Arena public art selection process and Squire Broel providing conservation consultation approved by the AIPP Board. POLICIES AND GUIDELINES A. ADVISORS The AIPP Board may consult advisors for specific projects. Advisors may recommend and/or provide professional guidance to the AIPP Board or to a project selection jury. Advisors may include, but are not limited to, art and architecture professionals, appraisers, engineers, contractors, maintenance and conservation specialists. 2 2 B. PROJECT SPECIFIC SELECTION JURY The AIPP Board together with the AIPP Coordinator will determine if a Selection Jury is needed; if not, the AIPP Board shall serve as the selection jury. Selection jurists may include, but are not limited to, art and architecture professionals, community representatives and AIPP Board members. Each juror has one vote. If a consensus cannot be reached, a majority vote carries the decision. The jury has the right to make no selection if no proposal is judged to be of sufficient merit. Voting members of selection jury: Art Selection Committee, composed of the Town’s Art in Public Places Board and staff member, a staff and board member from the Vail Recreation District Board, and a resident of the Town of Vail; including advisement from, a representative from Populous, and a representative of Black Cube Nomadic Art Museum, as well as an art conservator. This group ensures a balance of aesthetic, architectural, civic, and community perspectives. Evaluation Criteria: ● Quality and Innovation: Proposed artworks should demonstrate artistic excellence and innovation. While Dobson Arena is largely used for athletic purposes, the Art Selection Committee is not explicitly seeking sports or mountain themed art proposals. ● Compatibility with Site: Proposed artworks should be compatible in style, scale, material, and form with the Dobson Arena. Preference will be given to artworks that emphasize durability and longevity. Preference will also be given to artworks that thoughtfully relate in design to the specific location Dobson Arena—i.e. through the architecture, geography, light qualities, physical attributes, etc. ● Feasibility: The proposed production timeline and budget should be appropriate for the artwork. Molly recaps next steps as a result of the Jan. 22 RFP meeting: Present two selected artist proposals and locations at Feb. 17 Town Council meeting so that we may enter into the contract; not to move forward above the stairs as a public art location and Molly is looking at alternate opportunities; and requesting a refined proposal for the West Vestibule. Kathy comments that Lindsea called members of the Art Board to reconsider their decisions from Jan. 22 and has called for a coalition to change the jury decisions. Kathy’s concerns are that the entire selection committee was not contacted for this discussion. Lindsea believes the RFP selection process was rushed and not making decisions was irresponsible given the committee’s time and expenses spent thus far. Susanne comments that most artists were willing to have open dialogue in reviewing their proposals and that should be pursued. Kathy remarks that the selection committee was not prepared in advance about the site limitations and reviewing the proposals using the stated evaluation criteria as representatives of the community versus their personal wants. Kirk agrees that the group needs to come together to make decisions. Courtney believes in an obligation to the whole community and is open to revisit spaces, artists, and media. 3 3 Molly’s reservations about the stairwell are the constraints of the space given the low ceiling height, proposed suspended artworks extending over the stairwell railings, physical reach, maintenance, conservation, and the fiscal responsibility with those considerations, as well as the adjacent location of Lewis’ memorial bench. Jared remarks on the perspective he has from physically being in the space. There is an artistic side to the architectural design which should be considered. He confirmed the stairwell is extremely tight at only 5 feet width and any suspended art will be hidden behind an existing support beam. He recommends the committee have a site visit now that the spaces can be seen. Molly shares updated images of the Dobson Arena from Populous: Dobson Updated Construction Images - Populous Molly comments that now as the building takes shape public art opportunities arise and it is worth reevaluating how the space flows with egress from a visitor and operational standpoint. It will be worthwhile to reevaluate locations as a responsibility to the community with the consideration of not pursuing an artwork valued at $70,000 that will not physically work within the space. Tom agrees a site visit is important and given it is a significant project for the Town of Vail we should not feel rushed in making selections. The Selection Committee would like to see additional refined proposals from artists for the West Vestibule which Molly will discuss with Black Cube as to how best proceed. Kathy requests an understanding of the glass, reflectivity and glazing products from the Populous for the West Vestibule for both daytime and evening visibility. Molly will arrange a site visit to Dobson. 3.5 Art Studio programming The “Conversation with Jen Stark” moderated by Ben Belgard went very well. The Drawing Club is convening for the first time this Wednesday. May – necessary facility maintenance so will likely not have any programs. June – Jason Middlebrook residency Board will further review documents outlining studio program is tabled until the March meeting. 4. Coordinator Updates Winterfest has been going well and has been embraced by the public. Molly compliments Alpine Ice’s flexibility with the temperatures and changing dates. Ramsey asks why not more locations for ice sculptures. Molly informs her this is the Winterfest location for 19 years given it is a shaded accessible park setting in the heart of the village. We presently have had two additional ice sculptures promoting Winterfest in Lionshead and at the Covered Bridge. 5. Adjournment 4 8191 8193 8194 8190 8192 DESIGNED BY DATE CHECKED BY DRAWN BY SHEET TOV JOB NO. FILE NAME To w n o f V a i l De p a r t m e n t o f P u b l i c W o r k s ph 9 7 0 . 4 7 9 . 2 1 5 8 fa x 9 7 0 . 4 7 9 . 2 1 6 6 ww w . v a i l g o v . c o m 13 0 9 E l k h o r n D r i v e Va i l , C O 8 1 6 5 7 SCALE EX I S T I N G C O N D I T I O N S GB GB GB BASE 2 2/18/26 30-9090 1"= 20' C-3 AR T S T U D I O N O R T H L A W N NORTH SCALE: 1"= 20' 0 5'10'20' VAIL ART STUDIO BETTY FORD ALPINE GARDEN EDUCATION CENTER PARK RESTROOMS WEST B E T T Y F O R D W A Y TO M A N O R V A I L TO SOUT H F R O N T A G E R D PROJECT AREA 2-VEHIC L E S T A G I N G A R E A NOTES: 1.CONTRACTOR SHALL INSTALL AND MAINTAIN GREEN PLASTIC CONSTRUCTION FENCE AROUND THE PERIMETER OF THE WORK AREA. 2.CONTRACTOR SHALL INSTALL AND MAINTAIN TREE PROTECTION FENCING (GREEN PLASTIC) AS SHOWN. FENCING SHALL NOT BE REMOVED WITHOUT THE APPROVAL OF THE OWNER'S REPRESENTATIVE. NO MATERIALS SHALL BE STORED WITHIN FENCING. 3.STAGING SHALL OCCUR WITHIN THE PROJECT SITE, OR IN THE PULLOFF ON THE EAST SIDE OF WEST BETTY FORD WAY (WBFW). 4.NO PERSONAL VEHICLES WILL BE ALLOWED ON SITE. PARKING PASSES FOR THE VILLAGE STRUCTURE OR FORD PARK PARKING LOT CAN BE ISSUED BY REQUEST TO THE OWNERS REPRESENTATIVE. 5.NO PARKING ON THE GRASS AS SHOWN. 6.PERFORM A STUMP GRIND ON BOTH LARGE COTTONWOODS, 8-12" DEPTH AS POSSIBLE. REMOVE ROOT SYSTEM OF SMALL 3" COTTONWOOD. ABSOLUTELY NO PARKING ON THE GRASS ABSOLUTELY NO PARKING ON THE GRASS ABSOLUTELY NO PARKING ON THE GRASS G O R E C R E E K TREE TO BE REMOVED TREE PROTECTION FENCING LEGEND: STRIP AND DISPOSE OF SOD AND OTHER VEGETATION AS NEEDED FOR INSTALLATION OF IMPROVEMENTS SHOWN ON SHEET C-3 STRIP AND STORE TOPSOIL FOR REUSE ADJUST TREE PROTECTION FENCING AS NEEDED FOR SITE PREP. COORDINATE W/ OWNER'S REPRESENTATIVE 5 8191 8192 8193 8194 8190 91.10 91.1091.10 91.10 90.66 90.00 90.60 92.70 EX 4.75 % 2% MAX 2% 3-4% + / - 90.25 90.40 94.04 EX 94.00 92.00 92.00 90.50 90.30 90.00 2% M A X 8192.00 FFE DESIGNED BY DATE CHECKED BY DRAWN BY SHEET TOV JOB NO. FILE NAME To w n o f V a i l De p a r t m e n t o f P u b l i c W o r k s ph 9 7 0 . 4 7 9 . 2 1 5 8 fa x 9 7 0 . 4 7 9 . 2 1 6 6 ww w . v a i l g o v . c o m 13 0 9 E l k h o r n D r i v e Va i l , C O 8 1 6 5 7 SCALE SI T E L A Y O U T A N D G R A D I N G P L A N GB GB GB BASE 2 2/18/26 30-9090 1"= 10' C-3 AR T S T U D I O N O R T H L A W N VAIL ART STUDIO WEST B E T T Y F O R D W A Y 2-VEHICL E S T A G I N G A R E A ABSOLUTELY NO PARKING ON THE GRASS ABSOLUTELY NO PARKING ON THE GRASS 6' AT ATTACHMENT TO WBFW COLORADO BUFF FLAGSTONE WALKWAY ORGANIC LOCK CRUSHER-FINE WALK WITH STEEL EDGING EACH SIDE, COLOR BEIGE18' 10' 45° 18' 6.25' SOD AREA, SEE SHEET L-1 GRANITE LANDSCAPE BOULDERS, TYP. 5' WIDE x 18" DEEP x 6" HT CUT SANDSTONE STEPS (3) 6" RISERS (4) 6" RISERS SANDSET FLAGSTONE SANDSET FLAGSTONE SANDSET FLAGSTONE ORGANIC LOCK BORDER WITH STEEL EDGING, COLOR BEIGE 4 12' WIDTH, TYP. 6' RADIUS SOD AREA SOD AREA EXISTING PLANT BORDER EXISTING GRAVEL EXISTING GRAVEL BORDER 5' TYP. 6 8191 8192 8193 8194 8190 DESIGNED BY DATE CHECKED BY DRAWN BY SHEET TOV JOB NO. FILE NAME To w n o f V a i l De p a r t m e n t o f P u b l i c W o r k s ph 9 7 0 . 4 7 9 . 2 1 5 8 fa x 9 7 0 . 4 7 9 . 2 1 6 6 ww w . v a i l g o v . c o m 13 0 9 E l k h o r n D r i v e Va i l , C O 8 1 6 5 7 SCALE LA N D S C A P E P L A N GB GB GB BASE 2 2/18/26 30-9090 1"= 10' L-1 AR T S T U D I O N O R T H L A W N VAIL ART STUDIO WEST B E T T Y F O R D W A Y 2-VEHICL E S T A G I N G A R E A (1) RLR (1) BAG (3) GLS (1) TBR (5) PGB (1) BCM (3) PSB (1) BAG (11) LMC (3) WSB (3) PGB (1) WR (1) BAG (1) BCM (3) GLS (1) TBR (1) BCM (2) SMS (3) IDW FUTURE ROCK GARDEN BY BETTY FORD ALPINE GARDEN SOD AREA SOD AREA SOD AREA NATIVE AREA BOUNDARY NATIVE AREA BOUNDARY EXISTING SOD AREA PLANT KEY: Common Name Scientific Name Size Qty BAG BLUE AVENA GRASS Helictotrichon sempervirens #5 3 BCM BAILEY COMPACT MAPLE Acer ginnala 'Bailey Compact'#5 3 GLS GRO LOW SUMAC Rhus aromatica 'Gro Low'#5 6 IDW ISANTI DOGWOOD Cornus sericea 'Isanti'#5 3 LMC LOWSCAPE MOUND CHOKEBERRY Aronia melanocarpa 'Low Scape Mound'#5 11 PGB PIXWELL GOOSEBERRY Ribes uva-crispa 'Pixwell'#5 8 RLR RED LEAFED ROSE Rosa glauce #5 1 SMS SNOWMOUND SPIREA Spirea nipponica 'Snowmound'#5 3 TBR TALL BLUE RABBITBRUSH Ericamerea nauseosus var speciosa #5 2 WR WOODS ROSE Rosa woodsii #5 1 WSB WESTERN SNOWBERRY Symphoricarpos albus #5 3 LANDSCAPE NOTES: 1.ALL SOD AREAS TO BE 8" MIN TILLED TOPSOIL. SEE SPECIFICATIONS 2.COORDINATE PLANTING LAYOUT WITH OWNER'S REPRESENTATIVE IRRIGATION NOTES: 3.DRIP IRRIGATION FROM EXISTING SYSTEM ON THE SOUTH END OF ART STUDIO. BURY POLY LINE ALONG WEST SIDE OF BUILDING 4.COORDINATE SPRAY IRRIGATION WITH TOWN OF VAIL IRRIGATION MANAGER. ALL NOZZLES TO BE MP ROTORS FUTURE ART INSTALLATION FUTURE ART INSTALLATION LANDSCAPE EDGING LANDSCAPE EDGING LANDSCAPE EDGING EXISTING PLANTINGS LANDSCAPE EDGING WOOD MULCH 7 8191 8192 8193 8194 8190 DESIGNED BY DATE CHECKED BY DRAWN BY SHEET TOV JOB NO. FILE NAME To w n o f V a i l De p a r t m e n t o f P u b l i c W o r k s ph 9 7 0 . 4 7 9 . 2 1 5 8 fa x 9 7 0 . 4 7 9 . 2 1 6 6 ww w . v a i l g o v . c o m 13 0 9 E l k h o r n D r i v e Va i l , C O 8 1 6 5 7 SCALE SI T E P L A N GB GB GB BASE 2 2/18/26 30-9090 1"= 10' C-3 AR T S T U D I O N O R T H L A W N 8