Loading...
HomeMy WebLinkAboutDRB100578Design Review Board ACTION FORM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: TRIUMPH DEVELOPMENT DRB Number: DRB100578 Project Description: change to approved plans (landscaping) Participants: OWNER FOREST ROAD DEVELOPMENT LLC 10/25/2010 IN CARE OF NAME TRIUMP DEVELOPMENT 8120 WOODMONT AVE STE 800 BETHESDA 20814 80210 APPLICANT FOREST ROAD DEVELOPMENT LLC 10/25/2010 IN CARE OF NAME TRIUMP DEVELOPMENT 8120 WOODMONT AVE STE 800 BETHESDA 20814 80210 Project Address: 375 FOREST RD VAIL Location: Legal Description: Lot: 3 Block: 2 Subdivision: VAIL VILLAGE FILING 3 Parcel Number: 2101 - 071 - 1301 -9 Comments: BOARD /STAFF ACTION Motion By: Action: STAFFAPP Second By: Date of Approval: 10/29/2010 Vote: Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Bill Gibson DRB Fee Paid: $20.00 4 Department of Community Development 75 South Frontage Road Vail,.Colorado 81657 M Tel: 970 - 479 -212x: 14� Fax: 970 - 479 -2462: Web: www.va ilgov:corn' evelopment Review Coordinator General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An ap- plication for Design Review cannot be accepted until all required information is received by the Community Development Department. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Submittal Requirements: 1. Three (3) Copies of all pertinent approved plans with illustrated, labeled changes 2. Joint Property Owner Written Approval Letter, if applicable Fee: $20 Single Family Description of the Request: Physical Address: r D Parcel Number: I071 3 Q • (Contact Eagle Co. Assessor Property Owner: Mailing Address: Owner's Signature: Primary Contact/ Owner Representative: Mailing Address: C /o 970 - 328 -8640 for parcel no.) Phone: ;>V 3 ' Phone: J I u `_' — " E -Mail: Vhf (,'0 Fax: OCT 2 0 1010 TOWN OF VAIL For Office Use Only: Cash_ ✓CC: Visa / MC Last 4 CC # Fee Paid: S o1©, D D Meeting Date: Planner Auth # Check # Re F D RB No.: i • ` Zoning Land Use: Location of the Proposal: Lot: _ Block: Subdivision: yPrIL VI 1.L/ -GC 5lL.IAl2 3 01- fan -10 Application for Design Review Changes to Approved Plans _ Duplex Multi - Familv Cnmmarrial i� TOWNOFVAII.' " JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER This form is applicable to all Design Review applicants that share ownership of the subject property. For exam- ple, the subject property where construction is occurring is a duplex, condominium or multi- tenant building. This form shall be completed by the applicant's neighbor/ joint property owner. In the case of a multiple - family dwell- ing or multi- tenant building, the authority of the association shall complete this form and mail to: Community Development Department, 75 South Frontage Road, Vail, CO 81657 or fax to 970.479.2452. I, (print name) located at written approval of the plans dated a joint owner, or authority of the association, of property provide this letter as Town of Vail Community Development Department for the proposed improvements to be completed at the ad- which have been submitted to the dress noted above. I understand that the proposed improvements include: (Signature) (Date) Additionally, please check the statement below which is most applicable to you: o I understand that minor modifications may be made to the plans over the course of the review process to en- sure compliance with the Town's applicable codes and regulations. (Initial here) L7 I request that all modifications, minor or otherwise, which are made to the plans over the course of the re- view process, be brought to my attention by the applicant for additional approval before undergoing further re- view by the Town. (Initial here) f:\ cdev \forms\permits \PIR$_Changes to approved Plans 010110 y 1VW11O T1ll6) DESIGN REVIEW PROCESS Pre - application Meeting A pre - application meeting with Town of Vail Staff is not required; however, highly recommended. The purpose of a pre - application meeting is to identify any critical issues pertaining to the proposal and to determine the appropriate develop- ment review process for an application. Town of Vail Planning Staff reserves Thursday afternoons for pre - application meetings. Please call the Development Review Coordinator at 970 - 479 -2128 to schedule a meeting for Thursday after- noon. Deadlines and Meeting Dates The Design Review Board meets on the 1st and 3rd Wednesdays of each month beginning at 3:00 pm. Complete appli- cations are due in the Office of Community Development no later than 12:00 noon on the submittal deadlines below: Submittal Deadline Meeting Date December 14, 2009 January 6, 2010 Continued. , , Continued, , , December 28, 2009 January 20, 2010 Submittal Deadline Meeting Date January 11, 2010 February 3, 2010 July 12, 2010 August 4, 2010 January 25, 2010 February 17, 2010 July 26, 20009 August 18, 2010 February 8, 2010 March 3, 2010 August 9, 2010 September 1, 2010 February 22, 2010 March 17, 2010 August 23, 2010 September 15, 2010 March 15, 2010 April 7, 2010 September 13, 2010 October 6, 2010 March 29, 2010 April 21, 2010 September 27, 2010 October 20, 2010 April 12, 2010 May 5, 2010 October 11, 2010 November 3, 2010 April 26, 2010 May 19, 2010 October 25, 2010 November 17, 2010 May 10, 2010 June 2, 2010 November 8, 2010 December 1, 2010 May 24, 2010 June 16, 2008 November 22, 2010 December 15, 2010 June 14, 2010 July 7, 2010 December 13, 2010 January 5, 2010 June 28, 2010 July 21, 2010 December 27, 2010 January 19, 2010 Application Submittal Submit all required information under the submittairequirementssection of this application by the deadlines stated above. Incomplete applications will not be processed. Upon receipt of a complete application, the Community Develop- ment Department shall review the submitted materials for general compliance with the appropriate requirements of the zoning code. If the application is not in compliance with zoning code requirements, the application and submittal materi- als shall be returned to the applicant with a written explanation of non - compliance. Staff Review The Administrator (a member of the Planning Staff) will review and either approve a Design Review application, approve it with conditions, deny the application, or refer the application to the Design Review Board for a decision. All Staff ap- provals are reviewed by the Design Review Board and any administrative decision is subject to final approval by the Board. The Board reviews applications and may approve, approve with conditions, deny the application, or table the ap- plication to allow applicants to respond to comments. Design Review Board Meeting Requirements Prior to the meeting, for new construction and additions, the applicant must stake and tape the project site to indicate property lines, proposed buildings and building corners. All trees proposed to be removed must be marked. The appli- cant must ensure that staking done during the winter is not buried by snow. The applicant, or their representative(s), shall be present at the Design Review Board public meeting. The item will be postponed if the applicant fails to appear before the Design Review Board, on their scheduled meeting date. f: \cdev\ forms\ permits \Planning \DRB \DRB_Changes to approved Plans 10 n PROPOSED MATERIALS Building Materials Type of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: Please specify the manufacturer's name, the color name and number and attach a color chip. f:\cdev \forms\permits \Planning \DRB \DRB_Changes to approved Plans_010110 PROPOSED LANDSCAPING C 1 OI 05 0h �(lbmi 44 Botanical Name Common Name u nti P b h c � , PROPOSED TREES AND SHRUBS EXISTING TREES TO BE REMOVED Minimum Requirements for Landscaping: Deciduous Trees — 2" Caliper Coniferous Trees — 6' in height Shrubs — 5 Gal. Type Square Footage GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.) f: \cdev \forms\ permits \Planning \DRB\DRB_Changes to approved Plans_010110 PLANT LE G-,7END zL� TREE5 SYM130L QQThbl" N&C CdQ1ftJZ H&C QV&WTY, - I - POPULUS TREMULOIDES C15 GORNU5 5ERIGEA '15ANTI' JU JUNIPERU5 SABINA 'SIERRA SPREADER' PO PHYSOCARPU5 OPULIFOLIU5 'NANU5 RE RHU5 AROMATIC 'ORO-LOW' RR RIDES 'RED LAKE RO RUBU5 ODORATU5 RD R.U5U5 DELIGI05U5 55 5ORBARIA 5ORBIFOLIA so 5YMPHORIGARP05 OREOPHILLU5 COLORADO SPRUCE SEE PLAN 10 ASPEN 2" CALIPER C 0 .22 ED rn W) x co E 0 0 V y 0 04 CD a co CD M o (5 uj 8 0 0 00 00 0 4-1 Cd - g) o: a� a 0 0 V) U11 0� 0 rno LLM 4-J U 0 Ln rn > C) b4 - L7 0 I.L LAG 0 6 tko (04) cd L.n 0 > U_ 0 111 +� —.- L n P.., rn > rd cn Date: 25 January 20 Date: 5 February 201 Date: 16 May 20 A 20 May 2010 2 \ 14 June 20 5 27 August 20 4 13 September 20 Title: PLANTING PLAN Scale: I If 10 1-011 Sheet: LP1 ■ COMMON NAME GAIANTITY REPTHIO DOGWOOD 4'545 @ ro' or, 2 51ERRA SPREADER JUNIPER #5 @ 4' or, 3 DNARF NINEBARK #5 @ 55' 00 20 ORO-LOW SUMAC RED LAKE CURRENT THIMBLEBERRY THIMBLEBERRY ASH-LEAF FALSE 5PIREA MOUNTAIN 5NOPqBERRY #5 @ 535 oa #5 @3.5'06 #5 @ 4'oo #5 @ Woo #5 @ 35 or, #5 @ 3' oc. 2 12 26 - 7 GUANTITY 10 ORNAMENTAL 6A;2_A55E5 22Z" W-TAHICAL NAME Q=10 N61M K GALAMAOR05TI5 AGUT. 'KARL FOER5TER' KARL FOER5TER OROUNPGOVER5 5yhMQL COMMON M-1--ic :7 7/7 PERENNIALS NATIVE I TATION REVEOETATION SPECIFICATIONS: AFTER CONSTRUCTION ALL DISTURBED AREAS SHALL BE PLANTED WITH TREES, SHRUBS AND PERENNIALS OR SHALL BE REVE&ETATED WITH NATIVE ORA55. ALL DISTURBED AREAS DESIGNATED TO RECEIVE NATIVE ORA55 TREATMENT SHALL BE REVE&ETATED BY 50KN6 THE FOLLOKNO SEED MIXTURE AT A RATE 42LB. PER ACRE: 205 MANCHAR SMOOTH BROME 20% LINN PERENNIAL RYE 20% KENTUCKY FESCUE 10% POTOMAC ORCHARD ORA55 20% TIMOTHY 10% SHEEP FESCUE ONE APPLICATION OF A 01-AMMONIUM PHOSPHATE FERTILIZER, 18 -46-05HALL BE BROADCASTED PRIOR TO 5EEDINO; THE RATE OF APPLICATION SHALL BE 7 -8]_B PER 1000 S.F. ALL SEED SOWN AND FERTILIZED AREAS ARE TO BE LIGHTLY RAKED INTO THE 501L AND GENERALLY MOISTENED. MULCH ALL SEED SOWN AREAS WITH 2-&-5A OF 5TRAH OR HAY THAT 15 FREE OF NEEDS. ALL 5TRAH-MULGHED AREAS ARE TO BE TACKIFIED HITH APPROVED ORGANIC TAGKIFIER AT THE RATE OF 120L13 PER AREA. IRR16ATION LE6END 8 RAIN BIRD I8O&-FR5-I5r5T/55T POP-UP TURF HEAD 15 .6 1, 1.21 I.cl 50 5YME30L RAIN E31 RD 1512-FR5 -5 POP-UP 5HRUB HEAD 5 .10,.13,.20,.41 1.85 0 T H F MANUFA01. MODEL NO. 1 DE50RIPTION RADIUS GPM FRECIP P51 50 0 e p RAIN BIRD 1512-PR5-UIO POP -UP SHRUB HEAD 10 .31, .52,.lcl, 1.5 1.55 hL _AL _AL _W RAIN BIRD 1500 -FR5-5 POP-UP TURF HEAD 5 12 1.53 50 V V '7 ♦ RAIN BIRD I800-FR5-U5 POP-UP TURF HEAD 5' .20, .55,.52,1.05 1.55 50 50 V W RAIN BIRD I506-FR5-UI0 POP-UP TURF HEAD 10 3cl, 3:2, .1cf, 1.5 1.85 E30 50 in ■ RAIN BIRD I500-FR5-UI2 POP-UP TURF HEAD 12 15 2.01 30 [3 CS E3 El RAIN BIRD Ie506-FR5-UI5 POP-UP TURF HEAD 15 20 1.55 50 0 @0 A5 APPROVED F\10 BALL VALVE, LINE 51ZE, COMPAOT, NON - THREADED, 5EALEED TYPE. 9 A5 AFFRC\/T=D WICK COUPLING VALVE A55EMBLY & NETAFIM TFO"75-140-6-12 - TEOHFILTER - 140 ME5H, TO BE U55D AT BOTH NPETAFIM 5HRUB DRIP ZONE5 AS APFRC\/T=P I" POLY PIPE A5 LATERAL LINT=5 A5 APPROVED F\/0 FIFE I" OL :200 AS MAINLINE5 A5 AFFRO\/t=P NETAFIM 5U55URFACE IRRIGATION FOR PERENNIAL PLANTING BED A5 APPROVED PVC PIPE 50H. 40 AS 5LEEVIN67, MIN. TWICE THE DIAMETER OF PIPE OR WIRE BUNDLE CARRIED PLACE BELOW ALL PAVING, HARD50APE, ETC. SEE PLAN FOR SLEEVE SIZES AND GUANTITIE5. AS APPROVED LATERAL PIPE TO POINT SOURCE 5HRUB AND TREE EMITTER5: U\1 RADIATION RE515TANT POLYETHYLENE (5/4-INCH SIZE, ROUTINC715 DIAGRAMMATIC) USE ONE 2 6PH EMITTER FOR EACH 5HUB USE TWO 2 C7FH EMITTERS FOR EACH 2" CALIPER A5PEN AND 54B SHRUB OR TREE. 00 NOT USE POINT SOURCE DRIP EMITTERS ON 5MCE TREES NETAFIM P.O.O. INLINE EMITTER TREE NRAF5: NETAFIME TLOV (A CWH EMITTERS WITH 12" 5FACINC7) OR APPROVED EQUAL. CONNECT VOYSIN5TREAM OF THE EX15TIN& 5/4" DOMESTIC METER, VERIFY SIZE, LOCATION, AND PRE55URE IN FIELD, WITH ONNER'5 AUTHORIZED REPRESENTATIVE PRIOR, TO COMMENCING WORK FM NO 5'*(MBOL S UNKNOWN NILKIN5 RAIN BIRD CONTROLLER / 5TATION # —\/AL\/E SIZE RE-U5E EX15TINC7 RAIN BIRD CONTROLLER. VERIFY PROGRAM AVAILABILITY AND LOCATION. 5R4 I" PRE55URE REGULATOR, 5ET A5 REOUIRED. FIELD VERIFY. PROVIDE A MDOFOAP FLUSH CAP AT END OF DRIP D150HARC717 HEADER U51NC7 MOOF FITTING, INSTALL FLUSH VALVE INSIDE A 5EPERATE VALVE BOX, ONE AT EACH END OF THE TUBING RUNS IN EACH DIRECTION, INSTALL 15" FROM PAVING WHEN RADIUS OF SPRINKLER HEADS, REQUIRED FOR PROPER COVERAGE, 15 LESS THAN RADIUS 5HOYqN ON LEGEND, THE CONTRACTOR SHALL EQUIP HEAD WITH A RAIN BIRD "P05" PRE55URE COMPEN5ATINC7 SCREEN FOR FLOW AND RADIUS CONTROL. SELECT SCREEN ON P05 NOZZLE SCREEN SELECTION CHART, PROVIDED BY MANUFACTURER, FOR APPROPRIATE RADIUS. WHEN INSTALLING SPRINKLER HEADS USING NOZZLES THAT REQUIRE ARC. PATTERNS OTHER THAN THE STANDARD ARC PATTERNS (560 IWO, 120 qOo, ETC) THE CONTRACTOR SHALL USE VARIABLE ARC, OR ADJU5TABLE NOZZLES. RADIUS OF ADJUSTABLE NOZZLES SELECTED TO MATCH SITE CONDITIONS. C 0 '4 E X o 0 Co . -0 Cd 00 cn 'o "o L > U , 0 " 0 - 5 o6 C6 0 0 LI F= 0 C 4-1 03 0 g 0* b• ' 0 (L LU 0- 0 0 V) LU Q� 0 rno LjL1 +-) U 0 C Cd 0 LL 0� o d Lf) > 0 U_ 0 11 *+ = Ln C%3 r.. rn > rn Date: 25 January 20 Date: 5 February 20 Date: 16 May 201 20 May 20 A2 14 June 201 3 27 August 20 4 13 September 201 Title: IRRIGATION PLAN Scale: I '# 10 I-off Sheet: L11 ■ tb 8 RAIN BIRD I8O&-FR5-I5r5T/55T POP-UP TURF HEAD 15 .6 1, 1.21 I.cl 50 hL RAIN E31 RD 1512-FR5 -5 POP-UP 5HRUB HEAD 5 .10,.13,.20,.41 1.85 30 (5 RAIN BIRD 1512-FR5-U5 POP-UP SHRUB HEAD 5 .26, 35,52,1.05 1,85 50 0 e p RAIN BIRD 1512-PR5-UIO POP -UP SHRUB HEAD 10 .31, .52,.lcl, 1.5 1.55 50 0 o e 0 RAIN E31RD 1512-FR5-U I2 POP -UP 5HRUB HEAD 12 .65, al, 1.5, 2.6 2.01 50 0 t9 e 0 RAIN E31RD 1512 -FR5-U I5 POP -UP 5HRUB HEAD 15 .q5, 1.25, 1.55, 5.10 1.55 50 it D RAIN BIRD I5I2-PR5-I5E5T/55T POP -UP 5HRUB HEAD 15 .61, 1.21 I.cf 50 0 RAIN BIRD I8I2-FR5-Ie5\/AN FOP-UP 5HRUB HEAD 15 1.55, 2.66, 5.cfc1, 5.52 1.55 50 0 00 HUNTER 5R ROTOR HEAD 20 .45,.10,1. .4 40 0 00 HUNTER 5R ROTOR HEAD 25 .65,13,2:7 .45 40 0 00 HUNTER I-20-Ar,>\//56\/-I.0/2.014.0 ROTOR HEAD 50 1.0, 1.5, 5:7 .465 40 0 00 HUNTER ROTOR HEAD 55 1.4,2.4,4.cl .45 40 0 00 HUNTER I-2O-AD\//5&\/-- ROTOR HEAD 40' .42 40 RAIN BIRD RAINE31RD CONTROL VALVE-: (NON-50RUBBER VALVE) 100-DvF-55, SIZE AS NOTED Y41 BALL VALVE (PLASTIC) RAIN BIRD DRIP CONTROL VALVE A55EMBLY: XOZ 0 @0 A5 APPROVED F\10 BALL VALVE, LINE 51ZE, COMPAOT, NON - THREADED, 5EALEED TYPE. 9 A5 AFFRC\/T=D WICK COUPLING VALVE A55EMBLY & NETAFIM TFO"75-140-6-12 - TEOHFILTER - 140 ME5H, TO BE U55D AT BOTH NPETAFIM 5HRUB DRIP ZONE5 AS APFRC\/T=P I" POLY PIPE A5 LATERAL LINT=5 A5 APPROVED F\/0 FIFE I" OL :200 AS MAINLINE5 A5 AFFRO\/t=P NETAFIM 5U55URFACE IRRIGATION FOR PERENNIAL PLANTING BED A5 APPROVED PVC PIPE 50H. 40 AS 5LEEVIN67, MIN. TWICE THE DIAMETER OF PIPE OR WIRE BUNDLE CARRIED PLACE BELOW ALL PAVING, HARD50APE, ETC. SEE PLAN FOR SLEEVE SIZES AND GUANTITIE5. AS APPROVED LATERAL PIPE TO POINT SOURCE 5HRUB AND TREE EMITTER5: U\1 RADIATION RE515TANT POLYETHYLENE (5/4-INCH SIZE, ROUTINC715 DIAGRAMMATIC) USE ONE 2 6PH EMITTER FOR EACH 5HUB USE TWO 2 C7FH EMITTERS FOR EACH 2" CALIPER A5PEN AND 54B SHRUB OR TREE. 00 NOT USE POINT SOURCE DRIP EMITTERS ON 5MCE TREES NETAFIM P.O.O. INLINE EMITTER TREE NRAF5: NETAFIME TLOV (A CWH EMITTERS WITH 12" 5FACINC7) OR APPROVED EQUAL. CONNECT VOYSIN5TREAM OF THE EX15TIN& 5/4" DOMESTIC METER, VERIFY SIZE, LOCATION, AND PRE55URE IN FIELD, WITH ONNER'5 AUTHORIZED REPRESENTATIVE PRIOR, TO COMMENCING WORK FM NO 5'*(MBOL S UNKNOWN NILKIN5 RAIN BIRD CONTROLLER / 5TATION # —\/AL\/E SIZE RE-U5E EX15TINC7 RAIN BIRD CONTROLLER. VERIFY PROGRAM AVAILABILITY AND LOCATION. 5R4 I" PRE55URE REGULATOR, 5ET A5 REOUIRED. FIELD VERIFY. PROVIDE A MDOFOAP FLUSH CAP AT END OF DRIP D150HARC717 HEADER U51NC7 MOOF FITTING, INSTALL FLUSH VALVE INSIDE A 5EPERATE VALVE BOX, ONE AT EACH END OF THE TUBING RUNS IN EACH DIRECTION, INSTALL 15" FROM PAVING WHEN RADIUS OF SPRINKLER HEADS, REQUIRED FOR PROPER COVERAGE, 15 LESS THAN RADIUS 5HOYqN ON LEGEND, THE CONTRACTOR SHALL EQUIP HEAD WITH A RAIN BIRD "P05" PRE55URE COMPEN5ATINC7 SCREEN FOR FLOW AND RADIUS CONTROL. SELECT SCREEN ON P05 NOZZLE SCREEN SELECTION CHART, PROVIDED BY MANUFACTURER, FOR APPROPRIATE RADIUS. WHEN INSTALLING SPRINKLER HEADS USING NOZZLES THAT REQUIRE ARC. PATTERNS OTHER THAN THE STANDARD ARC PATTERNS (560 IWO, 120 qOo, ETC) THE CONTRACTOR SHALL USE VARIABLE ARC, OR ADJU5TABLE NOZZLES. RADIUS OF ADJUSTABLE NOZZLES SELECTED TO MATCH SITE CONDITIONS. C 0 '4 E X o 0 Co . -0 Cd 00 cn 'o "o L > U , 0 " 0 - 5 o6 C6 0 0 LI F= 0 C 4-1 03 0 g 0* b• ' 0 (L LU 0- 0 0 V) LU Q� 0 rno LjL1 +-) U 0 C Cd 0 LL 0� o d Lf) > 0 U_ 0 11 *+ = Ln C%3 r.. rn > rn Date: 25 January 20 Date: 5 February 20 Date: 16 May 201 20 May 20 A2 14 June 201 3 27 August 20 4 13 September 201 Title: IRRIGATION PLAN Scale: I '# 10 I-off Sheet: L11 ■