Loading...
HomeMy WebLinkAbout004 2-26 to 3-31 ������ EN�INEERIIVG C�NSIJLTFINTS February 26, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the CMU walls constructed for elevator 8 and stair 3 up to 6'. We observed the placement of reinforcing steel, spacing, sizing, clearance, dur o wall, bond beams, placement of block, mortar thickness, and the overall condition of the wall. These walls appeared to be constructed in general accordance with the project plans and specifications. Jeff with PCL and Sergio with Vogelman West were notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS February 27, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the CMU placed for the walls surrounding and in shear wall #9 up to 11' 4". The walls were observed for mortar thickness, placement of block, reinforcing steel size, spacing, clearances, cleanliness of cells, dur o wall, bond beams, and the overall condition of the wall. Several cells needed to be cleaned before grout placement and some corner bars for the bond beams were also missing. Sergio with Vogelman West was notified and immediately corrected these items. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 4, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU for lower basement on Gridlines J from B65.4 to 69 from 0' to 4' on B65.4 from E to J from 0' to 2', and on 34.2 from A8 to K from 0' to 4'. We observed reinforcing steel spacing, size, clearance, dur o wall, bond beams, mortar thickness, placement of block, and the overall condition of the wall. Initially the vertical cells were not clear. Sergio with Vogelman West was notified and immediately corrected the issues. The walls appeared to be in general accordance with the project plans and specifications. Grant with PCL was notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 5, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placement on Gridlines B65.4 from E to M from 2' to 4' and Gridlines 34.2 from D to J form 4' to 8'. The CMU was observed for reinforcing steel, size, spacing, clearance, dur o wall, bond beams, mortar, thickness, placement of block, and the overall condition of the wall. The walls appeared to be in general accordance with the project plans and specifications. Sergio with Vogelman West and Grant with PCL were notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 6, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU for the Lower Level Garage on Gridlines B65.4 from E to M from 4' to 8'. The CMU was observed for reinforcing steel, size, spacing, clearance, mortar thickness, dur o wall, bond beams, and the overall condition of the wall. The CMU appeared to be in general accordance with the project plans and specifications. Grant with PCL and Sergio with Vogelman West were notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 9, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls for the upper and lower garage on Gridline 69 from K to M, 4' to 8'. We observed the reinforcing steel size, spacing, clearances, dur-o-wall, bond beams, mortar thickness, and the overall condition of the wall. The walls appeared to generally conform with the project plans and specifications. Sergio with Vogelman West and Grant with PCL were notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 12, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West for the Terrace Level rooms, G160 from 0' to 2' on the west wall and 0' to 4' on the north, south, and the east walls, G166 from 0' to 4' on all walls, and G168 from 0' to 4' on the west wall and on the Upper Basement Level at B63.5-(E to L) from 0' to 4'. We observed the placement of CMU, mortar, reinforcing steel, size, spacing, clearance, bond beams, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general compliance with the site specifications. Jeff with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 17, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the placement of CMU on the Terrace Level on Gridlines 68 from BEE.6 to T, on T from B62.7 to 67, on 61.5 from R to M, on 61.9 from I to D, also on I from 61.9 to 69, from 0' to 4'. We observed the reinforcing steel placed for sizing, spacing, clearances, as well as mortar thicknesses, cell cleanliness, block placement, dur o wall, bond beams, and the overall condition of the wall. A few vertical bars were observed to be missing in the corners and at the intersection of the walls. Sergio with Vogelman West was notified and immediately corrected the issue. We also observed the wall on the Upper Garage, Gridlines 65.5, from I to E, 2' to 4'. These walls appeared to be in general accordance with the project plans and specifications. Grant with PCL was notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 18, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Terrace Level, rooms G162 from 4' to 8' on all walls and at Gridlines I to R, 60 to 61 from 4' to 8'. We observed the placement of CMU, mortar thickness, bond beams, reinforcing steel, size, spacing, and clearance, ladder placement, and the overall condition of the walls. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 19, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed drilled holes on the Terrace Level on Gridlines BLL.89 from 65 to 60, and on 60 and 65 form BLL.8 to BEE.6. We observed the holes for depth, diameter, and cleanliness. These holes were observed to be between 3 '/2" to 4" deep. The manufacturer recommends a minimum depth of 6 3/4" for #6 bar. These holes will be re-observed at a later date. Grant with PCL was notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 23, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at (I to R)-61 from 8' to 10', room G168 south and east walls from 4' to 8', G187 south wall from 4' to 8', Upper Basement Level at (E to L)-B63.5 from 4' to 8', and the Lower Basement Level Room L106 east wall from 0' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearance, and lap splice, ladder placement, and the overall condition of the walls. The CMU walls appeared to be constructed in general accordance with the site specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 24, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level, rooms G170 west wall form 4' to 8', G168 south and east walls from 8' to 12', G187, south wall from 8' to 12', and G166 west wall from 4' to 8'. We observed the placement of CMU, mortar thickness, grout, bond beams, reinforcing steel, ladder placement, and the overall condition of the walls. We perFormed slump and temperature tests on the grout that was mixed on-site utilizing a drum mixer, yielding a 9 '/2" slump at 61 Degrees F. The CMU walls appeared to be constructed in general accordance with the site specifications. Grant with PCL was notified of our observations and test results. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 25, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the CMU walls constructed by Vogelman West on the Terrace Level, Emergency Gen. G169 room, northwest walls on W line and 69 line from 4' to 8', Terrace Level, water softener room G187, west wall from 8' to 12' and the Lower Garage Level Room L106 north wall from 4' to 8'. We observed the placement of reinforcing steel for bar size, placement, spacing, lap splice, and cell clearances. We also observed the placement of the block, bond beams, ladder placement, mortar, and the overall condition of the walls. Based on our observations it appeared that the CMU walls were constructed in general accordance with the project plans and specifications. We notified Grant with PCL of our observations. Sincerely, GROUND Engineering Consultants, Inc. Derek Richards Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 27, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level, rooms G173, 174, & 175 from 0' to 2' on all the walls. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, and lap splice, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the site specifications. Jeff with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS March 31, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level, rooms G173, 174, & 175 from 2' to 4' on all the walls and Lower Basement Level rooms L106 south and west walls from 0' to 2'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, and lap splice, ladder placement, and the overall condition of the walls. Based on our observations the masonry walls appeared to be constructed in general accordance with the site specifications. Jeff with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721