April 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on Lower Basement
Level room L106 south and west walls from 2' to 4'. We observed the placement of CMU,
mortar, bond beams, reinforcing steel bar size, spacing, clearance, and lap splice, ladder
placement, and the overall condition of the walls. Based on our observations the masonry walls
appeared to be constructed in general accordance with the site specifications. Jeff with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Lower
Basement Level, room L106 south and west walis form 4' to 8'. We observed the placement of
CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, and lap splice, ladder
placement, and the overall condition of the walls. Based on our observations the CMU walls
appeared to be constructed in general accordance with the site specifications. Jeff with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level, rooms G173, 174, & 175 from 8' to 12' on all the walls and G176 from 0' to 2' on the west
wall. We observed the placement of CMU, block, mortar, bond beams, reinforcing steel bar
size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls.
Based on our observations the CMU walls appeared to be constructed in general accordance
with the site specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 7, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level, room G176 for the west wall from 2' to 4' and on the east wall from 0' to 4'. We observed
the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap
splice, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the site specifications.
Grant with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level room G176 east & west walls from 4' to 8' and on the Lower Basement Level room L106
north wall from 0' to 4'. We observed the placement of CMU, mortar, grout, bond beams,
reinforcing steel bar size, spacing, clearance, lap splice, ladder placement, and the overall
condition of the walls. We perFormed slump and temperature tests on the grout mixed on-site, 9
'/2" at 51 Degrees F. Based on our observations and test results the CMU walls appeared to be
constructed in general accordance with the site specifications. Grant with PCL was informed of
our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level, room G176 east wall from 0' to 4' at Gridlines BPP.9-BTT.9 and from 4' to 8' at Gridlines
BEE.6-BPP.9. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar
size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls.
Based on our observations the CMU walls appeared to be constructed in general accordance
with the project plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 15, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines 69-(BPP.9-BTT.9) from 4' to 8', (65-66)-(BRR.5-BTT.7) from 0' to 4', and (65-
71)-(BNNN.8-BQQQ.4) from 0' to 2'. We observed the placement of CMU, mortar, bond beams,
reinforcing steel, bar size, spacing, clearances, lap splice, ladder placement, and the overall
condition of the walls. Based on our observations the CMU walls appeared to be constructed in
general compliance with the site specifications. Grant with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 16, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines 69-(BPP.9-BTT.9) from 8' to 12', (57-65)-(BNNN.8-BQQQ.4) from 0' to 4', and
(65-71)-(BNNN.8-BQQQ.4) from 2' to 6'. We observed the placement of CMU, mortar, bond
beams, reinforcing steel, bar size, spacing, clearances, lap splice, ladder placement, and the
overall condition of the walls. Based on our observations the CMU walls appeared to be
constructed in general compliance with the site specifications. Grant with PCL was informed of
our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines (57-65)-(BNNN.8-BQQQ.4) from 4' to 8' and (65-71)-(BNNN.8-BQQQ.4) from
6' to 10'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size,
spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based
on our observations the CMU walls appeared to be constructed in general accordance with the
site specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 21, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines (65-71)-(BNNN.8-BQQQ.4) from 10-14', (59-65)-(BNNN.8-BQQQ.4) from 8' to
12' and (65-66)-(BRR.5-BTT.7) from 4' to 8'. We observed the placement of reinforcing steel for
bar size, spacing, clearances, lap splice, ladder placement, and the general condition of the
walls CMU. Based on our observations the CMU walls appeared to be constructed in general
compliance with the site specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 22, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BQQQ.4-66 and 59, and at (SS-BTT.7)-(63.5-63.7) from 8' to 12'. We
observed the placement of CMU, block, mortar, bond beams, reinforcing steel bar size, spacing,
clearances, lap splice, ladder placement, and the overall condition of the walls. Based on our
observations the CMU walls appeared to be constructed in general compliance with the project
plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 23, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines (BAAA.2-BEEE.8)-(61.9-71) from 0' to 2'. We observed the placement of
CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder
placement, and the overall condition of the walls. Based on our observations the CMU walls
appeared to be constructed in general compliance with the site specifications. Grant with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 28, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at 61.9-(BAAA.2-BEEE.8) form 4' to 8', BAAA.2-(61.9-70) from 2' to 4', on Level 1 at
BQQQ.4-(57-71) from 0' to 4', and 71-(BAAA.2-BQQQ.4) form 0' to 4'. We observed the
placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap
splice, ladder placement, and the general condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the site specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
April 29, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BAAA.2-(61.9-71) from 4' to 8' and at 71-(BGGG.9-BNNN..4) from 0' to 2' and
on Level 1 at Gridlines 71-(MM-QQ) from 0' to 4'. We observed the placement of CMU, mortar,
bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and
the overall condition of the walls. Based on our observations the CMU walls appeared to be
constructed in general accordance with the site specifications. Jeff with PCL was informed of
our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines 71-(BGGG.9-BNNN..4) from 2' to 4'. We observed the placement of CMU,
mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder
placement, and the overall condition of the walls. Based on our observations the CMU walls
appeared to be constructed in general accordance with the site specifications. Jeff with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BTT.9-(65-71) from 0' to 2', at 71-(BGGG.9-BQQQ.4) from 4' to 8', and at R-
B65.4 from 0'-4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel
bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the
walls. The CMU walls appeared to be constructed in general accordance with the project plans
and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721