Loading...
HomeMy WebLinkAbout006 5-7 to 6-9 ������ EN�INEERIIVG C�NSIJLTFINTS May 7, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at Gridlines BTT.9-(65-71) from 2' to 4', at 71-(BGGG.9-BQQQ.4) from 8' to 12', and at R- B65.4 from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 13, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU wall constructed by Vogelman West on the Terrace Level at Gridlines 71-(BAA.2-BQQQ.4) from 12' to 16, BTT.9-(65.5-70) from 4' 8", T-65.5 from 4' to 8', BEEE.8-61 from 0' to 4', and BNNN.4-57.2 from 0' to 4', and on the Upper Basement Level at Gridlines 65.5-(MM-PP) from 2' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to b constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 14, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at Gridlines BEEE.8-61 from 4' top 8', BAAA.2-71.5 from 0' to 2' and on the upper vasement level at Gridlines (MM-PP)-65.5 from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. The masonry walls appeared to be constructed in general accordance with the project plans and specifications. Andy with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 19, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at Gridlines 71.5-BNNN.8 from 8' to 12', BAAA.2-(40.3-47.5) and (29.8-34.5) from 0' to 2'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 20, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at Gridlines 71-BNNN.8 from 12' to 16', BAAA.2-(29.8-34.5) and (40.3-47.5) from 2' to 4', BAAA.2-(34.5-40.3) from 0' to 2' and Q-65 from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 21, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU walls constructed by Vogelman West on the Terrace Level at Gridlines BAAA.2-(29.8-34.5) and (40.3-47.5) from 4' to 8', BAAA.2-(34.5-40.3) from 2' to 4', Q-65 from 8' to 12', and on Level 2 at Gridlines 71-(D-EE) from 0' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 26, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed Vogelman West on Level 2 at Gridlines 48.5-(WW-EEE) from 0' to 4', and on the Lower Basement Level at Gridlines (AAA-FFF)-(6-11) form 0' to 2. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 27, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines (AAA-FFF)-(6-11) from 2' to 4', and on the terrace level at gridlines BAAA.2—(34.5-40.3) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 28, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines AAA-(6-8.5) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS May 29, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines FFF-(6-11) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was notified of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 1, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on Level 1 at Gridlines BQQQ.4-57.2, 61.5, & 63.6 from 0' to 4', and on the Lower Basement Level at Gridlines (BNNN.4-TTT)-(1-1.3) form 0' to 2' and (NN-BTT.9)-10.9 from 0' to 2'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearances, lap splice, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 2, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on Lower Basement Level at Gridlines (BNNN.4-TTT)-(1-1.3) from 2' to 4' and (NN-BTT.9)-10.9 from 2' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearances, lap splice, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. In addition, we observed holes drilled by PCL into the existing footing at Gridlines E.9-23. We observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to be in general accordance with the project plans and specifications of at least 6 3/4" deep for #6 bar using Hilty HY150 epoxy. Andy with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 3, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Terrace Level at Gridlines BAAA.2-(47.5-49) from 0' to 2', on the Upper Basement Level at Gridlines BTT.9-70 from 4' to 8', on the Lower Basement Level at Gridlines (BNNN.4-TTT)-(1-1.3) from 4' to 8', BEEE.8-8 from 0' to 4', and (NN-BTT.9)-10.8 from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations it appeared that the CMU walls were constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 5, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines (BNNN.4-TTT)-(1-1.3) from 8' to 12', (NN-BTT.9)-10.8 from 4' to 8', and BEEE.8-8 from 4' to 8', and on the Terrace Level at Gridlines BAAA.2-(47-49) from 0' to 4', and BAAA.2- (49-56) from 0' to 2'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 8, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Terrace Level at Gridlines BAAA.2-(49-56) from 2' to 4' and at BSSS.4-48 from 0' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the site specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 9, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines BTT.9-(7-11) from 0' to 2', on the Upper Basement Level at Gridlines MMM.5-65.5 from 0' to 4', and on the Terrace Level at Gridlines BAAA.2-(47-56) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721