HomeMy WebLinkAbout006 5-7 to 6-9 ������
EN�INEERIIVG C�NSIJLTFINTS
May 7, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BTT.9-(65-71) from 2' to 4', at 71-(BGGG.9-BQQQ.4) from 8' to 12', and at R-
B65.4 from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel
bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of the
walls. The CMU walls appeared to be constructed in general accordance with the project plans
and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU wall constructed by Vogelman West on the Terrace Level
at Gridlines 71-(BAA.2-BQQQ.4) from 12' to 16, BTT.9-(65.5-70) from 4' 8", T-65.5 from 4' to 8',
BEEE.8-61 from 0' to 4', and BNNN.4-57.2 from 0' to 4', and on the Upper Basement Level at
Gridlines 65.5-(MM-PP) from 2' to 4'. We observed the placement of CMU, mortar, bond
beams, reinforcing steel, bar size, spacing, clearance, lap splices, ladder placement, and the
overall condition of the walls. Based on our observations the CMU walls appeared to b
constructed in general accordance with the project plans and specifications. Grant with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 14, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BEEE.8-61 from 4' top 8', BAAA.2-71.5 from 0' to 2' and on the upper
vasement level at Gridlines (MM-PP)-65.5 from 4' to 8'. We observed the placement of CMU,
mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder
placement, and the overall condition of the walls. The masonry walls appeared to be
constructed in general accordance with the project plans and specifications. Andy with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines 71.5-BNNN.8 from 8' to 12', BAAA.2-(40.3-47.5) and (29.8-34.5) from 0' to 2'.
We observed the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing,
clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our
observations the CMU walls appeared to be constructed in general accordance with the project
plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines 71-BNNN.8 from 12' to 16', BAAA.2-(29.8-34.5) and (40.3-47.5) from 2' to 4',
BAAA.2-(34.5-40.3) from 0' to 2' and Q-65 from 4' to 8'. We observed the placement of CMU,
mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder
placement, and the overall condition of the walls. Based on our observations the CMU walls
appeared to be constructed in general accordance with the project plans and specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 21, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU walls constructed by Vogelman West on the Terrace
Level at Gridlines BAAA.2-(29.8-34.5) and (40.3-47.5) from 4' to 8', BAAA.2-(34.5-40.3) from 2'
to 4', Q-65 from 8' to 12', and on Level 2 at Gridlines 71-(D-EE) from 0' to 4'. We observed the
placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap
splices, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed Vogelman West on Level 2 at Gridlines 48.5-(WW-EEE) from 0'
to 4', and on the Lower Basement Level at Gridlines (AAA-FFF)-(6-11) form 0' to 2. We
observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing,
clearances, lap splices, ladder placement, and the overall condition of the walls. Based on our
observations the CMU walls appeared to be constructed in general accordance with the project
plans and specifications. Grant with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 27, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines
(AAA-FFF)-(6-11) from 2' to 4', and on the terrace level at gridlines BAAA.2—(34.5-40.3) from 4'
to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size,
spacing, clearances, lap splices, ladder placement, and the overall condition of the walls.
Based on our observations the CMU walls appeared to be constructed in general accordance
with the project plans and specifications. Grant with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 28, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines
AAA-(6-8.5) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing
steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of
the walls. Based on our observations the CMU walls appeared to be constructed in general
accordance with the project plans and specifications. Grant with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 29, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed Vogelman West on the Lower Basement Level at Gridlines
FFF-(6-11) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing
steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of
the walls. Based on our observations the CMU walls appeared to be constructed in general
accordance with the project plans and specifications. Grant with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on Level 1 at Gridlines
BQQQ.4-57.2, 61.5, & 63.6 from 0' to 4', and on the Lower Basement Level at Gridlines
(BNNN.4-TTT)-(1-1.3) form 0' to 2' and (NN-BTT.9)-10.9 from 0' to 2'. We observed the
placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearances, lap
splice, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on Lower Basement Level at
Gridlines (BNNN.4-TTT)-(1-1.3) from 2' to 4' and (NN-BTT.9)-10.9 from 2' to 4'. We observed
the placement of CMU, mortar, bond beams, reinforcing steel, bar size, spacing, clearances, lap
splice, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
In addition, we observed holes drilled by PCL into the existing footing at Gridlines E.9-23. We
observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to be
in general accordance with the project plans and specifications of at least 6 3/4" deep for #6 bar
using Hilty HY150 epoxy. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Terrace Level at
Gridlines BAAA.2-(47.5-49) from 0' to 2', on the Upper Basement Level at Gridlines BTT.9-70
from 4' to 8', on the Lower Basement Level at Gridlines (BNNN.4-TTT)-(1-1.3) from 4' to 8',
BEEE.8-8 from 0' to 4', and (NN-BTT.9)-10.8 from 4' to 8'. We observed the placement of
CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearances, lap splices, ladder
placement, and the overall condition of the walls. Based on our observations it appeared that
the CMU walls were constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines (BNNN.4-TTT)-(1-1.3) from 8' to 12', (NN-BTT.9)-10.8 from 4' to 8', and BEEE.8-8
from 4' to 8', and on the Terrace Level at Gridlines BAAA.2-(47-49) from 0' to 4', and BAAA.2-
(49-56) from 0' to 2'. We observed the placement of CMU, mortar, bond beams, reinforcing
steel bar size, spacing, clearances, lap splices, ladder placement, and the overall condition of
the walls. Based on our observations the CMU walls appeared to be constructed in general
accordance with the project plans and specifications. Grant with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Terrace Level at
Gridlines BAAA.2-(49-56) from 2' to 4' and at BSSS.4-48 from 0' to 4'. We observed the
placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap
splices, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the site specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 9, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines BTT.9-(7-11) from 0' to 2', on the Upper Basement Level at Gridlines MMM.5-65.5
from 0' to 4', and on the Terrace Level at Gridlines BAAA.2-(47-56) from 4' to 8'. We observed
the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap
splices, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721