HomeMy WebLinkAbout007 6-10 to 7-1 ������
EN�INEERIIVG C�NSIJLTFINTS
June 10, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines BTT.9-(7-11) from 2' to 4' and on the Terrace Level at Gridlines BAAA.2-(47-56)
from 8' to 12'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar
size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls.
Based on our observations the CMU walls appeared to be constructed in general accordance
with the project plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines BTT.9-(7-11) from 4' to 8'. We observed the placement of CMU, mortar, bond
beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the
overall condition of the walls. Based on our observations the CMU walls appeared to be
constructed in general accordance with the project plans and specifications. Grant with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 16, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines R-(34.3-39.5) from 0' to 2' and at Gridlines (O-Q)-(34.3-39.5) from 0'-4'. We
observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing,
clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our
observations the CMU walls appeared to be constructed in general accordance with the project
plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 18, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level
at Gridlines R-(34.3-39.5) from 2' to 4', at Gridlines (O-Q)-(34.3-39.5) from 4'-8', and at Gridlines
(C-T)-(40.5-42) from 0'-2'. We observed the placement of CMU, mortar, bond beams,
reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall
condition of the walls. Based on our observations the CMU walls appeared to be constructed in
general accordance with the project plans and specifications. Grant with PCL was informed of
our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the lower
garage level at gridlines R-(34.3-39.5) from 4' to 8' and at gridlines (C-T)-(40.5-42) from 2'-4'.
We observed the reinforcing steel placed by Vogleman West for specified bar size, spacing
tolerances, clearance, and lap splices. We also observed the placement of CMU block, bond
beams, ladder placement, mortar, grout, and the overall condition of the wall. The CMU walls
appeared to be constructed in general accordance with the project plans and specifications.
Sergio with Vogelman West and Andy with PCL were informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Marvin Troxel
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 23, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the lower
garage level at gridlines (C-T)-(40.5-42) from 4'-8'. We observed the reinforcing steel placed
by Vogleman West for specified bar size, spacing tolerances, clearance, and lap splices. We
also observed the placement of CMU block, bond beams, ladder placement, mortar, grout, and
the overall condition of the wall. The CMU walls appeared to be constructed in general
accordance with the project plans and specifications. Sergio with Vogelman West and Andy
with PCL were informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 24, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the lower
garage level at gridlines Q-34.3 from 0'-4' and on the upper garage level at gridlines (L-N.6)-
(34.3-35) from 8'-12'. We observed the reinforcing steel placed by Vogleman West for
specified bar size, spacing tolerances, clearance, and lap splices. We also observed the
placement of CMU block, bond beams, ladder placement, mortar, grout, and the overall
condition of the wall. The CMU walls appeared to be constructed in general accordance with
the project plans and specifications. Sergio with Vogelman West and Andy with PCL were
informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 25, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the lower
garage level at gridlines 0-42.4 from 4'-8' and on the upper garage leve� at gridlines EEE.7-57.2
from 0'-4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size,
spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based
on our observations the CMU walls appeared to be constructed in general accordance with the
project plans and specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 30, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the upper
garage level at gridlines (B-H)-(28-31) from 0'-4', at gridlines EEE.7-57.2 from 4'-8', and on the
terrace level at gridlines AAA.2-61.5 from 4'-8'. We observed the placement of CMU, mortar,
bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and
the overall condition of the walls. Based on our observations the CMU walls appeared to be
constructed in general accordance with the project plans and specifications. Grant with PCL
was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
July 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the construction of CMU walls by Vogleman West on the upper
garage level at gridlines (B-H)-(28-31) from 4'-8' and at gridlines N-29 from 0'-4'. We observed
the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap
splices, ladder placement, and the overall condition of the walls. Based on our observations the
CMU walls appeared to be constructed in general accordance with the project plans and
specifications. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721