Loading...
HomeMy WebLinkAbout007 6-10 to 7-1 ������ EN�INEERIIVG C�NSIJLTFINTS June 10, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines BTT.9-(7-11) from 2' to 4' and on the Terrace Level at Gridlines BAAA.2-(47-56) from 8' to 12'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 11, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines BTT.9-(7-11) from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 16, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines R-(34.3-39.5) from 0' to 2' and at Gridlines (O-Q)-(34.3-39.5) from 0'-4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 18, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed CMU placed by Vogelman West on the Lower Basement Level at Gridlines R-(34.3-39.5) from 2' to 4', at Gridlines (O-Q)-(34.3-39.5) from 4'-8', and at Gridlines (C-T)-(40.5-42) from 0'-2'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 19, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the lower garage level at gridlines R-(34.3-39.5) from 4' to 8' and at gridlines (C-T)-(40.5-42) from 2'-4'. We observed the reinforcing steel placed by Vogleman West for specified bar size, spacing tolerances, clearance, and lap splices. We also observed the placement of CMU block, bond beams, ladder placement, mortar, grout, and the overall condition of the wall. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Sergio with Vogelman West and Andy with PCL were informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Marvin Troxel Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 23, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the lower garage level at gridlines (C-T)-(40.5-42) from 4'-8'. We observed the reinforcing steel placed by Vogleman West for specified bar size, spacing tolerances, clearance, and lap splices. We also observed the placement of CMU block, bond beams, ladder placement, mortar, grout, and the overall condition of the wall. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Sergio with Vogelman West and Andy with PCL were informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 24, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the lower garage level at gridlines Q-34.3 from 0'-4' and on the upper garage level at gridlines (L-N.6)- (34.3-35) from 8'-12'. We observed the reinforcing steel placed by Vogleman West for specified bar size, spacing tolerances, clearance, and lap splices. We also observed the placement of CMU block, bond beams, ladder placement, mortar, grout, and the overall condition of the wall. The CMU walls appeared to be constructed in general accordance with the project plans and specifications. Sergio with Vogelman West and Andy with PCL were informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 25, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the lower garage level at gridlines 0-42.4 from 4'-8' and on the upper garage leve� at gridlines EEE.7-57.2 from 0'-4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS June 30, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the upper garage level at gridlines (B-H)-(28-31) from 0'-4', at gridlines EEE.7-57.2 from 4'-8', and on the terrace level at gridlines AAA.2-61.5 from 4'-8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 ������ EN�INEERIIVG C�NSIJLTFINTS July 1, 2009 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was present to perform materials testing. We observed the construction of CMU walls by Vogleman West on the upper garage level at gridlines (B-H)-(28-31) from 4'-8' and at gridlines N-29 from 0'-4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splices, ladder placement, and the overall condition of the walls. Based on our observations the CMU walls appeared to be constructed in general accordance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721