Loading...
HomeMy WebLinkAbout012 2-4-10 to end ������ EN�INEERIIVG C�NSIJLTFINTS March 3, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a GROUND Engineering Consultants representative was on site to perform construction materials testing. We observed the CMU placed by Vogelman West on unit #105 balcony pilasters, (north and south) to 8'. We observed the reinforcing for steel bar size, spacing, lap splice and cell clearances. We also observed durowall, mortar thickness and the overall condition of the walls. The pilasters appeared to generally conform with the project plans and specifications. Sergio with Vogelman West and Jeff with PCL were informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 12, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West on Terrace level for elevator #2 and #3 doorways from 0' to 4' and on level 2 unit #207 balcony from 0' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU wall appears to be constructed in general compliance with the project plans and specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 16, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West on Terrace level for elevator #2 and #3 doorways from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU wall appears to be constructed in general compliance with the project plans and site specifications. Jeff with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 18, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West on Terrace level for elevator#9 doorway from 0' to 4' and on level 2 for unit #218 and #220 balconies from 0' to 4'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, and the overall condition of the wall. Based on today's observations the CMU walls appeared to be constructed in general compliance with the project plans and site specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 19, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed drilled holes for curbs on the pool deck, gridlines R13.0-R13.5/RL.O. We observed the holes for depth, diameter and cleanliness. The holes appeared to generally conform with the project plans and manufacturer's recommendations. Jesse with PCL was notified. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 23, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West on lower basement level for room #113 from 0' to 4', on the Terrace level for elevator #9 doorway from 4' to 8' and on level 2 for unit #218 balcony from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU walls appear to be constructed in general compliance with the project plans and site specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 25, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU on lower level garage room #113, east and south walls, from 0' to 4'. We observed the reinforcing steel for bar sizing, spacing tolerances, cell clearances and lap splice. We also observed mortar thicknesses, durowall, bond beams and the overall condition of the wall. The walls appeared to generally conform with the project plans and site specifications. Armando with Vogelman West and Grant with PCL were informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Eric Mocko Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS March 26, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West on lower basement level for room #113 from 4' to 8. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU walls appear to be in general compliance with the project plans and site specifications. Grant with PCL was informed of our observations. We also picked up cylinders. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS May 11, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West for the elevator #6 doorway in the lower basement, upper basement and terrace levels for 0' to 4'. We observed the placement of CMU, mortar, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU walls appeared to be constructed in general compliance with the project plans and site specifications. Grant with PCL was informed of our observations. In addition Thrall with PCL informed us that the compaction testing scheduled for today was cancelled. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721 CRDU�IIn ENGINEERING CDNSULTRNTS May 13, 2010 Job Name: Materials Testing, Ritz Carlton Residences, Vail, Colorado Job Number: 08-6502 Vail Resorts Development Company 953 S. Frontage Rd. West, Suite 215 Vail, Colorado 81657 Attn: Mr. Cody O' Kelly, As requested, a representative of GROUND visited the project to perform materials testing. We observed CMU placed by Vogelman West for elevator #6 doorway on the lower basement, upper basement and terrace levels for 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's observations the CMU walls appeared to be constructed in general compliance with the project plans and site specifications. Grant with PCL was informed of our observations. Sincerely, GROUND Engineering Consultants, Inc. Kevin McClure Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464 Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637 Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720 Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721