March 3, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed the CMU placed by Vogelman West on unit #105
balcony pilasters, (north and south) to 8'. We observed the reinforcing for steel bar size,
spacing, lap splice and cell clearances. We also observed durowall, mortar thickness and the
overall condition of the walls. The pilasters appeared to generally conform with the project
plans and specifications.
Sergio with Vogelman West and Jeff with PCL were informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 12, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West on Terrace level for elevator #2 and #3 doorways
from 0' to 4' and on level 2 unit #207 balcony from 0' to 4'. We observed the placement of CMU,
mortar, bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement
and the overall condition of the wall. Based on today's observations the CMU wall appears to be
constructed in general compliance with the project plans and specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 16, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West on Terrace level for elevator #2 and #3 doorways
from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar
size, spacing, clearance, lap splice, ladder placement and the overall condition of the wall.
Based on today's observations the CMU wall appears to be constructed in general compliance
with the project plans and site specifications.
Jeff with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 18, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West on Terrace level for elevator#9 doorway from 0' to 4'
and on level 2 for unit #218 and #220 balconies from 0' to 4'. We observed the placement of
CMU, mortar, bond beams, reinforcing steel bar size, spacing, clearance, and the overall
condition of the wall. Based on today's observations the CMU walls appeared to be constructed
in general compliance with the project plans and site specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 19, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed drilled holes for curbs on the pool deck, gridlines R13.0-R13.5/RL.O. We observed the
holes for depth, diameter and cleanliness. The holes appeared to generally conform with the
project plans and manufacturer's recommendations.
Jesse with PCL was notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 23, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West on lower basement level for room #113 from 0' to 4',
on the Terrace level for elevator #9 doorway from 4' to 8' and on level 2 for unit #218 balcony
from 4' to 8'. We observed the placement of CMU, mortar, bond beams, reinforcing steel bar
size, spacing, clearance lap splice, ladder placement and the overall condition of the wall.
Based on today's observations the CMU walls appear to be constructed in general compliance
with the project plans and site specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 25, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU on lower level garage room #113, east and south walls, from 0' to 4'. We
observed the reinforcing steel for bar sizing, spacing tolerances, cell clearances and lap splice.
We also observed mortar thicknesses, durowall, bond beams and the overall condition of the
wall. The walls appeared to generally conform with the project plans and site specifications.
Armando with Vogelman West and Grant with PCL were informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
March 26, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West on lower basement level for room #113 from 4' to 8.
We observed the placement of CMU, mortar, bond beams, reinforcing steel bar size, spacing,
clearance, lap splice, ladder placement and the overall condition of the wall. Based on today's
observations the CMU walls appear to be in general compliance with the project plans and site
specifications.
Grant with PCL was informed of our observations.
We also picked up cylinders.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
May 11, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West for the elevator #6 doorway in the lower basement,
upper basement and terrace levels for 0' to 4'. We observed the placement of CMU, mortar,
reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the overall
condition of the wall. Based on today's observations the CMU walls appeared to be constructed
in general compliance with the project plans and site specifications.
Grant with PCL was informed of our observations.
In addition Thrall with PCL informed us that the compaction testing scheduled for today was
cancelled.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
May 13, 2010
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform materials testing. We
observed CMU placed by Vogelman West for elevator #6 doorway on the lower basement,
upper basement and terrace levels for 4' to 8'. We observed the placement of CMU, mortar,
bond beams, reinforcing steel bar size, spacing, clearance, lap splice, ladder placement and the
overall condition of the wall. Based on today's observations the CMU walls appeared to be
constructed in general compliance with the project plans and site specifications.
Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721