Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perForm construction materials
testing. We observed reinforcing steel for terrace level, pour 2A. The reinforcing steel
observations were made for number of bars, grade, diameter, spacing, lap length, and
clearance. The missing ties, L-bars, and construction joint bars from yesterday's observations
had been placed by J.D. Steel. The reinforcing steel then appeared to generally conform with
the project plans and specifications. Manny with J.D. Stee� was informed of our observations.
The post tension tendons were also observed for the terrace level, pour 2A for number of
tendons, spacing, profile, back up bars, bursting steel, and the overall condition of the tendons.
Several tendons could not reach the full profile height through the columns, though no reverse
curvature appeared to be present in these locations. Manny with J.D. Steel was informed. The
post tension tendons appeared to be placed in general accordance with the project plans and
specifications. Andy Rose with PCL and Manny with J.D. Steel were informed of today's
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 14, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perForm construction materials
testing. We observed reinforcing steel placed for level 3, columns 457, 454, 451, 447, 448, 450,
452, 456, and 462 for bar size, number of bars, spacing, clearance, and lap splice. The
reinforcing steel appears to be placed in general compliance with the site plans and
specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 17, 2008
Job Name: Materials Testing, Ritz Cariton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perform construction materials
testing. We observed the reinforcing steel placed for level 3, columns 445, 446, 455, 458, &
461. We observed the reinforcing steel for bar size, number of bars, spacing, clearance, and
lap splice. We observed missing #3 ties and #4 cross tie bars in columns 445, 446, 455, & 461.
We immediately informed Andy with PCL & Pedro with J.D. Steel of the missing bars. J.D. Steel
informed us that they would install the missing bars.
In addition, we observed the reinforcing steel placed for footers 1207 & 1208. We observed the
reinforcing steel for bar size, number of bars, spacing, clearance, and lap splice. The reinforcing
steel appears to be placed in general compliance with the site specifications. Andy with PCL
was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O.Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 Tel:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax: (303)289 6742 Fax: (970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 18, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perForm construction materials
testing. We observed reinforcing steel placed for columns 445, 446, 455, 460, & 461 on level 3.
We observed the reinforcing steel for specified bar sizes, number of bars, spacing, clearance,
and lap splice. The reinforcing steel appeared to be placed in general compliance with the site
specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 19, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perForm construction materials
testing. We observed reinforcing steel placed for the slab on grade in the lower basement level,
Gridlines 21-28, BN.6-T. We also observed the reinforcing steel placed for columns 445 & 446
on Level 3 and for the upper terrace level pour 5 post tension deck.
The reinforcing steel for the areas/items mentioned above was observed for specified number of
bars, grade, spacing, diameter, lap length, and clearance. Several cross ties and stir ups were
missing in the columns. Several L-bars were observed to be missing in the post tension deck.
We also observed the tendons placed for the terrace level post tension deck, pour 5. These
tendons were observed for placement of back up bars, busting steel, tendon profiles, spacing,
hot tendons, and the overall condition of the tendons. One profile height needed correcting and
back up bars need to be placed for the temperature tendons.
The pt deck and columns will be re-observed prior to concrete placement tomorrow. The
reinforcing steel placed for the lower basement level SOG appeared to be in general
compliance with the project plans and specifications. Andy with PCL and Manny with J.D. Steel
were notified of today's observations.
Finally, we observed the stressing/re-stressing of tendons for level 1, pours 1, 2, & 3. Tendons
elongations were recorded and gauge pressure were observed, these measurement will be
forwarded separately.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko, Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 20, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a representative of GROUND visited the project to perForm construction materials
testing. We observed reinforcing steel placed for column 453 on Level 3 for bar size, number of
bars, spacing, clearance, and lap splice. The reinforcing steel appeared to be placed in general
compliance with the site specifications. Andy with PCL was notified of our observations.
The concrete cure box was observed to be un-plugged upon our arrival in the morning. We
measured a temperature of 43 Degrees F.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 21, 2008
Job Name: Materials Testing, Ritz Cariton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly„
As requested, a representative of GROUND visited the project to perform construction materials
testing. We observed reinforcing steel placed for footers 1196 & 1225 for specified bar sizes,
number of bars, spacing, clearance, and lap splice. The reinforcing steel appeared to be placed
in general compliance with the site specifications. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O.Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 Tel:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax: (303)289 6742 Fax: (970)524 0721
CRDU�IIn
ENGINEERING CDNSULTRNTS
November 24, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a representative of GROUND visited the project to perform construction materials
testing. We observed reinforcing steel for the Terrace Level, columns 403, 374, 383, 328, 382,
& 373 and for Level 3, column 459. We observed the reinforcing steel for bar size, number of
bars, spacing, clearance, and lap splice. The reinforcing steel appeared to be in general
accordance with the site specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,Colorado 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
November 25, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for footers 1195 & 1226, and for the
terrace level columns 364, 366, & 367 for specified bar size, number of bars, spacing,
clearance, and lap splice. The reinforcing steel appeared to be placed in general compliance
with the site plans and specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
November 25, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension deck for Level 2, Pour 3. We observed the number
of tendons, spacing, profile, back up bars, bursting steel, and the overall condition of the
tendons. Several profiles were observed to not be within project plans and specifications.
Manny with J.D. Steel was informed and immediately corrected the problem. The back up bars
and bursting steel were observed to be incorrect in beam 2TG3,4,5. J.D. Steel will correct the
problem. The horizontal profile in beam 2TG12 was observed to be greater than a 1:12 ratio in
the south end. J.D. Steel began correcting this and will finish it tomorrow. Sheathing was being
added in the southern end of a few tendons as well.
These discrepancies will be re-observed in the morning. A coupler added to one tendon also
needed to have tape placed over the ends of the PVC piping.
We also observed the stressing of tendons for for Level 2, Pour 3 and Level 1, Pour 3.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
November 26, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for the terrace level columns 365, 368,
369, 370, & 371 for bar size, number of bars, spacing, clearance, and lap splice. The
reinforcing steel appeared to be placed in general compliance with the site specifications. Andy
with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 1, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O'Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. O'Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. Upon arrival we collected previously cast concrete cylinders and returned
them to our office for future compressive strength testing.
Sincerely,
GROUND Engineering Consultants, Inc.
Evan Kuhn
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 1, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for terrace level columns 382, 373, &
363 for specified bar size, number of bars, spacing, clearance, and lap splice. The reinforcing
steel appears to be placed in general compliance with the site specifications. Andy with PCL
was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 2, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site we observed the reinforcing steel that had been placed for the
terrace level column 223 and the level 2 columns 485, 486, 487, 495, 496, 497, 501, 502, and
503. The reinforcing steel was observed for bar size, number of bars, spacing, clearance, and
lap splice. The reinforcing steel appeared to be placed in general accordance with project plans
and specifications.
We also observed JD Steel stressing post-tension tendons on level 2, pour 3. We observed
gauge pressures and tendon elongations. Andy with PCL was notified of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 3, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site we observed the placement of post-tension tendons and
reinforcing steel for level 3, pour 2. The post tension tendons were observed for specified
quantities, profile heights, and general placement within the forms. The reinforcing steel was
observed for specified sizes, quantities, splice lengths, clearance, and general placement within
the forms. Several chairs were observed to be broken and/or missing across the pour area.
Several back-up bars and hairpin bursting steel bars were observed to be missing in many of
the banded tendons. Severa� bars also needed to be placed and/or tied securely across the
pour area as well. Manny with JD Steel was informed and immediately began correcting the
discrepancies.
The pour area will be re-observed in the morning prior to concrete placement. Andy with PCL
and Manny with JD Steel were informed of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko and Evan Kuhn
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 5, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed the reinforcing steel for level 2, columns 492, 493,
494, 498, 499, and 500 for bar size, number of bars, spacing, clearance, and lap splice. The
reinforcing steel appeared to be placed in general compliance with the site specifications. Andy
with PCL was notified of our observations.
In additional, we observed J.D. Steel stressing Post Tension tendons for the Terrace Level,
Pour 2.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 8, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel for columns 464, 465, 466, and
469 on the third level, Pour 2. We observed the reinforcing steel for lap, bar size, spacing,
clearance, number of bars, and the overall condition. The reinforcing steel observed appeared
to be in general compliance with the project plans and specifications. Andy with PCL was
informed of our observations.
We picked up concrete cylinders that were previously cast on-site and transported them back to
the laboratory for future compressive strength testing.
Sincerely,
GROUND Engineering Consultants, Inc.
Derek Richards
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 10, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for bar size, number of bars, spacing,
clearance, and lap sp�ice for level 3, columns 470, 473, 478, and 479 and Level 2, co�umn 480.
The reinforcing steel appears to be placed in general compliance with the site specifications.
Andy with PCL was notified of our observations.
In addition, we observed J.D. Steel stressing Post Tension Tendons for Level 3, Pour 2.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 11, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for Level 3, columns 477, 471, 468, and 463
and for the sheer wall 6. We observed the reinforcing steel for bar size, number of bars,
spacing, clearance, and lap splice. The reinforcing steel appears to be placed in general
compliance with the site specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 15, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for columns 467, 472, & 478 on Level
3, pour 2. We observed the columns for number of bars, grade of bars, spacing, diameter, lap,
and clearance. The reinforcing steel appeared to generally conform with the project plans and
specifications. Manny with J.D. Steel and Andy with PCL were notified of today's observations.
We observed the placement of Post Tension Tendons for Level 4, Pour 1. We observed the
tendons for spacing, quantity, profile heights, smoothness, back up bars, bursting steel, and the
overall condition of the tendons. Two groups of tendons were observed to not be fully
encapsulated on the balcony in the southwest corner of the slab. Several areas were also
missing back up bars and bursting steel.
We also observed the reinforcing steel placed for L4P1. The reinforcing steel was observed for
number of bars, spacing, grade, diameter, lap length, and clearance. Several bars in both the
bottom and top mats were observed to be missing or not properly tied in place. Stud rails
around the columns were also observed for quantity and direction. Several columns still needed
the stud rails to be placed. Manny with J.D. Steel and Andy with PCL were immediately
informed of the discrepancies observed. J.D. Steel will correct the issues and we will re-
observe the deck in the morning before the concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 16, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and PT placed for L4P1. The previously
missing reinforcing steel and the PT in the balcony at the SW corner had been placed/corrected
and the reinforcing steel and PT now appears to be in general accordance with the project plans
and specifications. Manny with JD and Andy with PCL were notified of our observations.
We observed reinforcing steel for bar size, number of bars, spacing, clearance, and lap splice
for level 3, column 474. The reinforcing steel appears to be placed in general compliance with
the site specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure / Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 16, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendon placement for the Terrace Level, Pour 3.
The PT was observed for specified number of tendons, spacing, profile, horizontal span, back
up bars, bursting steel, and the overall condition of the tendons. The pink-purple tendons were
not yet placed. Several back up bars were observed to be missing as well. Several of the
tendon heads were not yet installed on the north side of the pour break as well. A few of the
temperature tendons were also observed to have a significant amount of horizontal sway.
Manny and Pedro with J.D. Steel were notified and began correcting the discrepancies. We will
re-observe these areas before the concrete placement. Andy with PCL was notified of today's
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 17, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for Terrace Level, Pour 3, and for the loading
dock footer for bar size, number of bars, clearance, and lap sp�ice. We observed missing beam
bars (top & bottom mats), trim bars, construction of joint bars, and tie bars at various locations
throughout the deck. We immediately informed Pedro with J.D. Steel and Andy with PCL of the
missing bars and we observed J.D. Steel placing the missing bars. The reinforcing steel
appears to be in general accordance with the project plans and specifications. Andy with PCL
was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 18, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for Level 4, columns 452, 455, 456, 459, 460,
& 461 and for shear wall 7. We observed the reinforcing steel for bar size, number of bars,
spacing, clearance, and lap splice. We observed missing bars on the south and east walls of
Shear wall 7, and missing vertical bars for column 455 and missing ties for column 459. We
immediately informed Manny with J.D. Steel and Andy with PCL. J.D. Steel informed us that
they would install the missing bars. The reinforcing steel for columns 452, 456, 460, and 461
appeared to be placed in general compliance with the site specifications as well as the north
and west sides of Shear Wall 7. Andy with PCL was notified of our observations.
We also observed JD Steel lifting-off several tendons on Level 3 and the Terrace Level. Gauge
pressures were recorded and elongations were re-measured.
We re-observed the deck for Terrace Level, Pour 3. The missing tendons, back-up bars, and
tendon heads had been placed. The tendon horizontal sway had also been fixed. The post
tension tendons then appeared to be in general accordance with the project plans and
specifications. Pedro with J.D. Steel and Andy with PCL were notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 19, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for bar size, number of bars, spacing,
clearance, and lap splice for Level 4, columns 459, 455, and shear wall #7 north and east sides.
The reinforcing steel appeared to be in general accordance with the project specifications.
Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 22, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed for Level 3,
Pour 3 for bar size, number of bars, spacing, clearance, lap splice, number of tendons, and
tendon profiles. We observed missing top and bottom mat bars, back up bars, and bursting
steel at various locations throughout the deck. We immediately informed Manny with J.D. Steel
and Jeff with PCL of the missing bars. J.D. Steel placed the missing reinforcing steel. The
reinforcing steel and post tension tendons appear to be placed in general compliance with the
site specifications. Jeff and Scott with PCL were informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 23, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed for Level 4, Columns 462, 450, 449,
448, & 447 for specified sizes, number of bars, spacing, clearance, and lap splice. The
reinforcing steel appeared to be placed in general compliance with the site specifications. Jeff
with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 29, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stress the Post Tension Tendons on the east side of
Level 4, Pour 1. We measured the elongation of the tendons and observed gauge pressures.
Andrew with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Derek Richards
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 29, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing Post Tension Tendons for Level 4, Pour 1,
and the Terrace Level, Pour 3. We measured the elongations and observed gauge pressures.
We reported our results to PCL and JD Steel.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721