ENGINEERIN� C�NSIJLTRNTS
December 29, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stress the Post Tension Tendons on the east side of
Level 4, Pour 1. We measured the elongation of the tendons and observed gauge pressures.
Andrew with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Derek Richards
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
December 31, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed for the level 4 columns 451, 453, &
454 for bar size, number of bars, spacing, clearance, and lap splice. The reinforcing steel
placed for these columns appeared to be in general accordance with the site specifications.
Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 2, 2008
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed J.D. Steel stressing Post Tension Tendons for
Level 3, Pour 3. We measured the elongations and observed gauge pressures. We notified
Manny with J.D. Steel and Andy with PCL of the test results and observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin Kamay
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and Post Tension Tendons placed for the
Terrace Level, Pour 4 for bar size, number of bars, spacing, clearance, lap splice, number of
tendons, spacing of tendons, tendon profile, and the general condition of the tendons.
We observed missing top & bottom mat bars, beam bars, back up bars, and Post Tension
Tendons in various locations throughout the deck. Pedro with J.D. Steel and Andy with PCL
were immediately notified of the observations and J.D. Steel informed us that they would have
the missing bars and tendons installed by January 5, 2009. We will re-observe the deck prior to
concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel placed for Level 3, columns 493,
494, 495, 496, 497, 486, 499, 500, 501, 502, 503, & 487 for bar size, number of bars, spacing,
clearance, and lap splice. The reinforcing steel appeared to be in general accordance with the
project specifications.
In addition, we observed J.D. Steel had installed the observed missing reinforcing steel and
Post Tension Tendons for the Terrace Level, Pour 4, prior to the concrete placement as noted
in our January 2"d Daily Report. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel placed for Level 3, columns 480,
485, 492, & 498 and the Terrace Level columns 305, 310, 321, 322, 323, 324, 326, 334, 510, &
511. We observed the reinforcing steel for bar size, number of bars, spacing, clearance, and
lap splice. The reinforcing steel appeared to be placed in general accordance with the site
specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 7, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel placed for the Terrace Level
Columns 311, 312, 318, 319, 320, 301, 333, 307, 308, & 309. We observed this reinforcing
steel for specified bar size, number of bars, spacing, clearance, and lap splice. The reinforcing
steel appeared to be placed in general compliance with the site specifications. Andy with PCL
was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel for bar sizes, number of bars,
spacing, clearance, and lap spliced as placed for the Terrace Level Columns 313, 314, 315,
325, 329, 330, 331, 332, & 321. The reinforcing steel appeared to be placed in general
compliance with the project plans and specifications. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 9, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed J.D. Steel place reinforcing steel for the Terrace
Level Columns 304, 305, & 302. The reinforcing steel was observed for specified bar size,
spacing, splice, and clearance. Column 304 was missing several cross ties and stirrups. The
other columns appeared to be placed in general accordance with the project plans and
specifications.
Preliminary observations were also made on the beam reinforcing steel for Level 1, Pour 8.
Several bars were not yet in place and the deck will be re-observed upon completion. Andy with
PCL and Pedro with J.D. Steel were informed of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel previously placed by J.D. Steel
for the basement floor slab, pour 16 & 17 and for column 304 and elevator walls on the Terrace
Level as well as Shear Wall 1 north, east, and south walls also on the Terrace Level. The
observations were made for specified bar size, spacing tolerance, lap splice, and clearance.
The reinforcing steel appeared to be placed in general accordance with the project plans and
specifications. Manny with J.D. Steel was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Dustin Rosburg
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 14, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel for Level 4, Pour 2, and shear
walls 1 & 2 on the Terrace Level. We observed the reinforcing steel for sizing, spacing
tolerances, lap, and clearances from the forms. Several trim bars, back up bars, and mat bars
were observed to be missing on Level 4, Pour 2. J.D. Steel was notified and immediately
corrected the problems. Crossties, stir ups, corner bars, and vertical bars were observed to be
missing in the west wall of Sheer Wall 1, and the north, south, and west walls of Sheer Wall 2.
Arturo with J.D. Steel was notified and will correct the issues.
We also observed the post tension tendon placement for Level 4, Pour 2. We observed the
tendons for spacing, profile height, back up bars, bursting steel, and the overall general
condition of the tendons. A few live heads were observed to be not complete, where plans
specified fully encapsulated heads. Some of the back up bars and chairs were also observed to
be missing as well. Manny with J.D. Steel was notified and corrected the problems. The post
tension tendons and reinforcing steel for L4P2 appeared to generally conform with the project
plans and specifications. Andy with PCL was notified of today's observations.
We arrived on-site at 7:45 am to begin Post Tension Tendon stressing as requested. Stressing
did not begin until 11:00 am for Level 1, Pour 1 staged stressing. We recorded the elongations
and observed gauge pressures.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 15, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. While on-site, we observed reinforcing steel placed for level 1, pour 8,
Terrace Level shear wall 1 west wall, and shear wall 2, south wall, and elevator 9 topping slab
Gridlines 8 to W.8. We observed the reinforcing steel for the specified bar sizing, spacing,
tolerances, lap, and clearances from the forms. Several bars were observed to be missing in the
beams, bottom mat, top mat, and the columns in beams for level 1, pour 8. Pedro and Manny
with J.D. Steel were notified and began correcting these items.
We also observed the Post Tension Tendons placed for level 1, pour 8. The tendons were
observed for quantity of tendons, spacing tolerances, profile height, back up bars, bursting
steel, and the overall condition of the tendons. There were several tendons observed to be
missing in two beams and in the south end of the pour. Pedro and Manny with J.D. Steel were
notified and began correcting the issues. Level 1, pour 8 will be re-observed in the morning
before the concrete placement. Andy with PCL was notified of today's observations.
Post Tension stressing was also observed for level 1, pour 1. We measured elongations and
observed gauge pressures.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 16, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed for level 1 pour 8 for bar size,
spacing tolerances, lap splice, and clearance from forms. We observed that the area still
missing several bars upon our arrival. Manny with J.D. Steel was notified and the bars were
placed prior to concrete placement.
We also observed the reinforcing steel placed column 301 on the Terrace Level. Both column
301 and Level 1, pour 8 reinforcing steel appeared to be in general accordance with the project
plans and specifications.
We observed the post tension tendons for Level 1, pour 8. We re-observed the tendons for
quantity of tendons, spacing tolerances, back up bars, bursting steel, and the overall condition
of the tendons. The Post Tension Tendon placement appeared to be in general accordance
with the project plans and specifications. Andy with PCL and Manny with J.D. Steel were
notified of our observations.
We observed J.D. Steel stressing tendons for level pours 1 & 2. We measured elongations and
observed gauge pressures.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Mr. Cody O' Kelly
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed for Level 4 columns 463-468, 470-
471, 473, 478-479 and shear wall #2. We observed the reinforcing steel for sizes, quantities,
splice lengths and general placement within the forms. The reinforcing steel placed for these
columns and shear wall appeared to be in general compliance with the project plans. Andy with
PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed for level 1, pour 7 for bar size,
spacing, clearance, and lap splice. We observed missing top & bottom mat bars, top & bottom
beam bars, and trim bars in various locations. Andy with PCL and Pedro with J.D. Steel were
immediately informed of our observations and J.D. Steel informed us that they would install the
missing reinforcing steel. We will re-observe this reinforcing steel prior to the concrete pour.
In addition, we observed reinforcing steel placed for level 4, columns 469, 474, 475, & 477 and
for level 1 columns 428, 432, 431, 442, & 443 for bar size, spacing, clearance, and lap splice.
The reinforcing steel placed for these columns appears to be in general accordance with the
site specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 21, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing post tension tendons for Level 4, pour 2.
We observed gauge pressure and measured tendon elongations. The post tension tendon
stressing was scheduled to begin at 8:30 am, but did not begin until 10:00 am.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
�R�U�II�
EN�INEERIIVG C�NSIJLTFINTS
January 22, 2009
Job Name: Materials Testing, Ritz Cariton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perForm
materials testing. We observed post tension placement for Level 1, Pour 7. We observed the
PT for quantity of tendons, spacing, back up bars, bursting steel, profile height, and the overall
condition of the tendons. The following discrepancies were observed in regards to the PT:
• Missing 3 blue-green tendons (banded) in PB 179/180 Fixed by J.D. Steel
• Missing 4 purple temperature tendons Fixed by J.D. Steel
• 6 gold-blue-yellow tendons not per plan OK per e-mail with Mitchell and Haynes
Whaley
• 1 yellow pink uniform tendon missing a head Fixed by J.D. Steel
• Tendon profiles not per plan and touching metal sleeves in PB130 Verbal ok from
Mitchell with Haynes Whaley
• Tendon profile too high at BB/30 Fixed by J.D. Steel
• Incorrect chair heights, 41 to 46, YY to X
• Missing back up bars along the western edge and at gridlines KK/42 to 46
We also observed the reinforcing steel placed for the slab and the beams. This reinforcing steel
was observed for specified bar sizes, quantities, splice lengths and general placement within
the forms. We observed several slab areas with missing top/bottom mat bars. We also observed
bar missing from some of the beams. Pedro with JD Steel was notified immediately of these
areas.
J.D. Steel began working to resolve these discrepancies immediately, or they were approved by
Mitchell with Haynes Whaley as noted above. Pedro with J.D. Steel and Andy with PCL were
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
Ritz Carlton Residences
Vail,Colorado
notified of today's observations. We will re-observe the deck tomorrow prior to concrete
placement.
Sincerely,
GROUND Engineering Consultants, Inc.,
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 Tel:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
ENGINEERIN� C�NSIJLTRNTS
January 22, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed by J.D. Steel for Level 1 columns
434 and 444. We observed the reinforcing steel for bar size, spacing, clearance, and lap splice.
The reinforcing steel appears to be placed in general compliance with the site specifications.
Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
January 23, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and post tension tendons placed for
Level 1, Pour 7. Yesterday's outstanding discrepancies of missing backup bars, improper chair
heights and missing slab reinforcing steel appears to have been corrected. The reinforcing
steel and post tension tendons placed for L1 P7 now appears to be in general conformance with
the project plans and specifications. PCL and JD Steel were notified of our observations.
Approximately 530cu yds of concrete was placed for level 1 pour 7 on this date. The slump test
results on 7 of the 11 trucks tested exceeded the specified 8-inch maximum. Tom with PCL and
John T. with B&B were notified of the results after each test.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
January 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 1, columns 429,
430, 435, 437, 439, & 441 and for shear wall 6 on Level 4. We observed the reinforcing steel
placed for bar size, spacing, clearance, and lap splice. The reinforcing steel for Level 1,
columns 429, 430, 435, 437, 439, & 441 appeared to be placed in general compliance with the
site specifications. We observed missing bars on the west, south and east sides of shear wall
6. We immediately informed Andy with PCL and Pedro with J.D. Steel of our observations and
J.D. Steel informed us that they would install the missing reinforcing steel. We will re-observe
this shear all prior to concrete placement. Andy with PCL was notified of our observations.
In addition, we observed reinforcing steel placed by J.D. Steel for the stem walls on the upper
basement level at Gridlines 1-(HHH-UUU) and UUU-(1-1.3). We observed the reinforcing steel
for bar size, spacing, clearance, and lap splice. The reinforcing steel placed for theses stem
walls appeared to be in general compliance with the site specifications. Andy with PCL was
notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
January 28, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed by J.D. Steel for Level 4, shear wall
6 intermediate wall. We observed the reinforcing steel for bar sizes, quantities, splice lengths
and general placement. The reinforcing steel placed for this shear wall appeared to be in
general accordance with the specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
January 29, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel and PT Tendons placed by J.D. Steel for
Level 5, Pour 1, and for Level 1 columns 368, 369, 370, & 371. We observed the reinforcing
steel for bar size, spacing, clearance, and lap splice. We observed missing top & bottom mat
bars at various locations and immediately informed Andy with PCL of our observations and he
informed us that he would notify J.D. Steel.
We observed the PT tendons for number, profile, and the overall condition of the tendons. We
observed that several tendon heads were not yet installed. We informed Andy with PCL. We
will re-observe the Post Tension and reinforcing steel placed for Level 5, Pour 1 prior to the
concrete placement.
The reinforcing steel placed for Level 1 columns 368, 369, 370, & 371 appeared to be in general
accordance with the site plans and specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
January 31, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 4, pour 3. We observed the reinforcing steel for bar size, spacing, clearance, and lap
splice. We observed post tension tendons for the number of tendons, profile, and the overall
condition of the tendons. The reinforcing steel and post tension tendons appeared to be placed
in general compliance with the site specifiations. Andy with PCL was notified of our
observations.
In addition, we observed J.D. Steel stressing tendons for Level 1, Pours 1 & 2.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel placed by J.D. Steel for Level 5, Pour 1. A
few bars still needed to be placed. The reinforcing steel will be re-observed before the concrete
placement. The post tension tendons will also be re-observed for new profile heights before the
concrete placement.
Some of the reinforcing steel for Level 1, Pour 4 was also observed for specified bar sizing,
spacing tolerance, lap splice, and clearance from forms. Several bars were observed to not yet
be placed. This deck will be re-observed prior to the concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendons on Level 1, Pour 4. The post tension
tendons were observed for spacing, profiles, quantity, back up bars, bursting steel, and the
general condition of the tendons. The following discrepancies were observed:
• Several tendons heads needed to be secured in place.
• Missing 4 gold-yellow tendons at BAAA.2/B29.8
• Missing 1 orange tendons in PB169 at 38, corrected by J.D. Steel
• Observed "cuts" in the sheathing of the tendons, several sections of tendons need to be
repaired.
• Profiles were observed to be incorrect for uniform tendons east of Gridlines B40.3
• Several back up bars and bursting steel were observed to be missing, profiles needed
correcting in PB187/186/185 and in PB124/125
Pedro with J.D. Steel and Grant and Jeff with PCL were notified of today's observations. Level
1, Pour 4 will be re-observed prior to the concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed post tension tendons and reinforcing steel for Level 5, Pour
1. Several profiles were observed to be incorrect. Manny with J.D. Steel and Scott with PCL
were notified. J.D. Steel corrected the issue. The post tension tendons and reinforcing steel
then generally appeared to conform with the project plans and specifications.
The reinforcing steel was also observed for Level 1, Pour 4. The reinforcing steel was observed
for specified bar sizing, spacing tolerances, lap splice, and clearance from forms. The following
discrepancies were observed:
• 16 missing #7 bars along B29.8
• 17 missing #4 bars along BNNN.4
• 2 missing #5 bars in PB104/105
• 3 missing #6 bars in PB124
• Missing steel around conduits in PB124
• Missing construction joint bars
• 1 missing #7 bar in PB149/150 at BAAA.2
The reinforcing steel will be re-observed in the morning prior to the concrete placement. Grant
with PCL and Pedro with J.D. Steel were notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko, Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
on Level 1, Pour 4. We observed the reinforcing steel for bar size, spacing, clearance, and lap
splice. We observed post tension tendons for number of tendons, profile, back up bars, bursting
steel, and the overall condition of the tendons. The reinforcing steel and post tension tendons
appeared to be placed in general accordance with the project plans and specifications. Andy
with PCL was notified of our observations.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 1, column 424. We
observed the reinforcing steel for bar size, spacing, clearance, and lap splice. The reinforcing
steel appeared to be placed in general compliance with the site specifications. Andy with PCL
was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed Vogelman West constructing CMU Walls for rooms upper
garage U144 and lower garage U140. We observed the masonry for placement of reinforcing
steel, mortar, cleanliness, and the overall condition of the wall. It appeared that the walls
observed during our visit were constructed in general accordance with the project plans and
specifications. Jeff with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Dustin Rosburg
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721