HomeMy WebLinkAbout008 2-5 to 3-4 ������
EN�INEERIIVG C�NSIJLTFINTS
February 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel for Level 5, shear wall, elevator core, and
columns 485, 486, 487, 497, and 503 previously placed by PCL. We observed the reinforcing
steel for size, spacing, amount, grade, type, clearance, splice lengths, rust cover, ties, and
corner bars. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Dustin Rosburg
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel for columns 495, 496, 501, and 502 on
Level 4, Pour 3. The reinforcing steel was observed for specified bar size, lap splice, spacing
tolerance, and clearance from forms. One hairpin was observed to not properly tied in place.
Andy with PCL and J.D. Steel were informed and corrected the problem immediately. The
reinforcing steel then appeared to be in general conformance with the project plans and
specifications.
We also observed post tension tendon stressing and measured elongations for Level 1, Pour 3,
Level 2, Pour 3, Level 3, Pour 3, and Level 4, Pour 4. Andy and Scott with PCL were notified of
today's results.
Sincerely,
GROUND Engineering Consultants, Inc.
Michael Konopka & Eric Mocko
Field Representatives
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 9, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel placed by J.D. Steel for Level 1, pour 4A,
and for Level 4, columns 480, 493, 494, 492, 498, 499, and 500. We observed the reinforcing
steel for bar size, spacing, clearance, and lap splice. The reinforcing steel for the Level 4
columns appeared to be placed in general compliance with the site specifications.
We observed missing top & bottom beam bars, tie bars, trim bars, and top and bottom mat bars
at various locations throughout Level 1, Pour 4A. We immediately informed Pedro with J.D.
Steel and Andy with PCL of our observations and J.D. Steel informed us that they would install
the missing reinforcing steel. We will re-observe with reinforcing steel prior to the concrete
placement. Andy with PCL was notified of our observations.
In addition, we observed J.D. Steel stressing post tension tendons on the Terrace Level pours 3
&4.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure & Eric Mocko
Field Representatives
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 10, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for shear wall #3 on Level
1 as well as the brick ledge on the east side of terrace level. We observed the reinforcing steel
for bar size, spacing, clearance, and lap splice. The reinforcing steel appeared to be placed in
general compliance with the site specifications. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendons for Level 1, Pour 4A. A large portion of
the deck was not yet placed. This pour will be re-observed in the morning. Pedro with J.D. Steel
and Andy with PCL was notified.
Post tension tendon stressing was also observed for Level 5, Pour 1, Level 1, Pour 2, and the
Terrace Level, Pour 3.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for the Level 1, pour 4A deck and for
column 372. We observed the reinforcing steel for bar size, spacing, clearance, and lap splice.
We observed missing top & bottom mat bars, and trim bars. We immediately informed Pedro
with J.D. Steel and Andy with PCL of our observations and J.D. Steel informed us that they
would install the missing bars. We will re-observe the reinforcing steel prior to the concrete
placement. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 12, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for Level 1, Pours 4A and 5. The reinforcing
steel was observed for specified bar sizing, spacing, splice lengths, and clearance form the
forms. Several bars were missing in beams, construction joints, and top and bottom mats. Alex
with J.D. Steel and Pedro with J.D. Steel were notified. They began correcting the issues and
the decks will be re-observed in the morning. Andy with PCL was notified.
We also observed post tension tendons for Level 1, Pours 4A and 5. The tendons were
observed for quantity, spacing, profile heights, back up bars, and bursting steel. Several
tendons were missing as well as several pinch points in the tendons were observed. Alex and
Pedro with J.D. Steel were notified and began correcting the issues. The decks will be re-
observed in the morning. Andy with PCL was notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed PCL placing reinforcing steel for the brick ledge on the east
side of the building as well as for the south and west sides of shear wall #5 We observed the
reinforcing steel placed for size, tying, clearance from forms, and the overall condition. It
appeared that the reinforcing steel placed for the shear wall and the brick ledge was in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Dustin Rosburg
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed Level 1, Pours 4A and 5 for both reinforcing steel and post
tension tendons. Several items were still not placed upon our initial observations while concrete
was being placed. Pedro and Manny with J.D. Steel were notified and corrected the issues. The
concrete placement had to moved to other portions of the deck while JD steel placed/moved
reinforcing steel. The reinforcing steel and post tension tendons then appeared to be placed in
general accordance with the project plans and specifications. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 16, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the north and east
walls of shear wall 5 on Level 1 as well as columns 303, 304, 305, 306, 307, 308, 309, 310,
320, 322, 323, 324, & 326. We observed the reinforcing steel for bar size, spacing, clearance,
and lap splice. The reinforcing steel appeared to be placed in general compliance with the site
specifications. Grant with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 18, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel had placed post tension tendons for Level 5, Pour 2.
We observed the PT tendons for quantity of tendons, placement, profile, backup bars, bursting
steel and the overall condition of the tendons. Several discrepancies wee observed:
• Hairpins missing at Gridline EE, 72 Corrected by J.D. Steel
• Several profile heights incorrect Corrected by J.D. Steel
• Several pinch points in tendons Corrected by J.D. Steel
• Incorrect anchor heights Corrected by J.D. Steel
• Missing chairs Corrected by J.D. Steel
• Missing backup bars
• Sleeve obstructing post tension tendons at Gridline TT, 61
• Broken tendons for Pour 1 at Gridline TT, 61
The last three discrepancies will be re-observed in the morning. Scott with PCL and Manny and
Arturo with J.D. Steel were notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko, Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 18, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel on Level 5, Pour 2. We
observed the reinforcing steel for bar size, spacing, clearance, and lap splice. We observed
missing top and bottom mat bars, back up bars, hairpins, trim bars, and corner bars in various
locations throughout the deck. We immediately informed J.D. Steel and Andy with PCL of our
observations and J.D. Steel informed us that they would install the missing reinforcing steel.
After J.D. Steel placed the missing reinforcing steel, we re-observed the reinforcing steel. The
reinforcing steel appeared to be placed in general accordance with the site specifications. Andy
with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the post tension tendons on Level 5, Pour 2. Outstanding
discrepancies observed previously were resolved and the post tension tendons appear to have
been placed in general conformance with the project plans and specifications.
Post tension tendons were observed today for Level 1, Pour 6. The post tension tendons were
observed for spacing tolerances, quantity, profile heights, bursting steel, back up bars, and the
overall condition of the tendons. The following discrepancies were observed:
• Several chairs missing Corrected by J.D. Steel
• Twist in tendons of column at Gridline GGG/2 Corrected by J.D. Steel
• Back up bars and bursting steel not yet in place
The backup bars and bursting steel will be re-observed in the morning. Alex with J.D. Steel and
Andy with PCL were notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed PCL drilling holes to epoxy #4 dowels into the western edge of
Level 1, Pour 5. The holes were observed for cleanliness, depth, and diameter. One hole
needed to be cleaned more. Jeffro with PCL was immediately informed and corrected the
issue. The holes then appeared to generally conform with the project plans, specifications, and
manufacturers recommendations.
We also observed the reinforcing steel for columns 416 and 417 on Level 1. The reinforcing
steel was observed for bar sizing, spacing tolerances, lap length, and clearance. The reinforcing
steel appeared to generally conform to the project plans and specifications. Representative of
J.D. Steel and Andy with PCL were notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 1, pour 6. We
observed the reinforcing steel for bar size, spacing, clearance, and lap splice. We observed
missing top and bottom mat bars and trim bars at various locations throughout the deck. We
immediately informed Pedro with J.D. Steel and Andy with PCL of the missing bars and J.D.
Steel informed us that they would install the missing reinforcing steel. We will re-observe the
reinforcing steel prior to the concrete placement. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the post tension tendons and reinforcing steel for placed
Level 1, Pour 6 deck. Upon our arrival to the site we were informed that the pour was going to
start at the southwest corner of the deck, as the reinforcing steel had not yet been corrected or
re-observed in the opposite corner. While we were observing other portions of the proposed
deck we observed that the pour had switched sides and concrete was being placed where we
had not yet observed the proposed corrections to the reinforcing steel. The reinforcing steel was
previously placed in the wrong locations, we were unable to determine if it had been moved to
the correct layout. The corrections could not be observed from Gridlines AAA to TT. for the
pour.
We also re-observed the PT tendons, all of which appeared to be placed in general accordance
with the project plans and specifications. The reinforcing steel with the exception of the
previously mentioned areas appeared to be in general accordance with the project plans and
specifications. Alex with J.D. Steel and Andy with PCL were notified.
The reinforcing steel was also observed for columns 420, 421, & 425 on Level 1, and shear wall
7 for Level 6. The reinforcing steel was observed for bar sizing, spacing, tolerances, lap splice,
and clearances. Several hairpins were observed to be missing in shear wall 7. Manny with J.D.
Steel was notified and immediately corrected the problem. The reinforcing steel placed for
these columns generally appeared to be placed in general accordance with the project plans
and specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 23, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for columns 302, 304, 301, 313, 314, 311, 312,
318, 319, 325, 329, 330, 331, & 332. The reinforcing steel observations were made for bar
sizing, lap splice, clearance from forms, and spacing tolerances. A few columns had missing
hairpins and stirrups no in the pour. Wes with J.D. steel was notified and immediately corrected
the issues. The reinforcing steel then generally appeared to be in general accordance with the
project plans and specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 24, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for shear wall 6 on Level 5 and beams
for the Terrace Level, Pour 6. A few corner bars and hairpins were observed to be missing.
Manny with J.D. Steel was notified and placed then immediately. Some bars were observed to
have insufficient clearance on the east wall as well by the middle doorway. This was corrected
as well by J.D. Steel. Several bars need to be moved to place steel imbeds in the southwest
corner. This section will need to be re-observed in the morning. The beams will also be re-
observed before the concrete placement. Andy with PCL and Manny with J.D. Steel were
notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 25, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendons for proper spacing, quantity, profile,
height, back up bars, bursting steel, and the overall condition of the tendons. Several profile
heights were observed to be insufficient and many locations still needed back up bars and
bursting steel in Level 5, Pour 3. The post tension tendons will be re-observed in the morning.
Andy with PCL was notified of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 25, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform materials
testing. We observed the reinforcing steel placed for shear wall 2 on Level 1. The reinforcing steel was
observed for bar sizing, lap splice, clearances, and proper spacing. Shear wall 2 was observed to have
missing hairpins, horizontal bars and missing hairpins on the east wall. John with J.D. Steel was notified
and immediately corrected the issue. The reinforcing steel placed for shear wall 2 then appeared to be in
general accordance with the project plans and specifications.
We observed the reinforcing steel placed for Level 5, Pour 3 for specified sizes, quantities, spacing and
general placement within the forms. We observed the following discrepancies:
• Missing 1 #5 at G.2, 7.2 bottom mat
• Missing 6#5 from Gridlines 46-72 bottom mat
• Missing 4 $5 at G, 59 top mat
• Missing 2#7 at G, 59 top mat
Andy with PCL was notified of the observations. Level 5, Pour 3 will be re-observed tomorrow morning.
We also re-observed the reinforcing steel placed for Level 5, shear wall 6. The previously noted
discrepancies appear to have been corrected. The reinforcing steel placed for shear wall 6 appeared to
be in general accordance with the project plans and specifications.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendons for the Terrace Level, Pour 6. The
tendons were observed for quantity, proper spacing, profile height, back up bars, bursting steel,
and the overall condition of the tendons. The following discrepancies were observed:
• 1 blue brown temperature tendon missing
• 1 add brown red with incorrect length
• Missing back up bars
• Several incorrect profile heights
The rebar and post tension were also re-observed for Level 5, Pour 3. The discrepancies noted
on 2/25 appear to have corrected. The reinforcing steel and pt tendon placement for L5P3
appeared to be in general accordance with the project plans and specifications. Arturo with J.D.
Steel and Andy with PCL were notified.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the Terrace Level,
Pour 6. We re-observed the reinforcing steel for bar size, spacing, clearance, and lap splice.
We observed missing top and bottom mat bars, top and bottom beam bars at various locations
throughout the deck. We immediately informed Pedro with J.D. Steel and Andy with PCL of our
observations and J.D. Steel informed us that they would install the missing bars. We will re-
observe the reinforcing steel prior to the concrete placement. Andy with PCL was informed of
our observations.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 5, shear wall #6 for bar
size, spacing, clearance, and lap splice. The reinforcing steel for the shear wall appeared to be
placed in general accordance with the site specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
February 27, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed for the mechanical pads on the upper
and lower garage levels, slab on grade for elevator#3, SW2, footer for Unit 8 balcony, and brick
ledge on the east side of the building east of W9. The reinforcing steel placed in these areas
was observed for bar sizing, spacing tolerances, lap splices, and clearance from forms. The
reinforcing steel placed for the above mentioned items appeared to be in general accordance
with the project plans and specifications.
We also re-observed the TLP6 reinforcing steel and post tension tendons. Tendon #7 of the
Gold Orange uniforms in PB34 still had a kink in the tendon that could not be straitened. With
the exception of the kinked tendon, the pt and reinforcing steel placed for TLP6 appeared to be
in general accordance with the project plans and specifications. Manny with J.D. Steel and
Andy with PCL were notified of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for columns on the
Terrace Level, Pour 6. We observed the reinforcing steel for bar sizing, spacing, clearance, and
lap splices. We observed missing vertical bars, stirrups, and cross ties. We immediately
informed Pedro with J.D. Steel and Andy with PCL of our observations and J.D. Steel informed
us that they would install the missing reinforcing steel. We will re-observe the reinforcing steel
prior to the concrete placement. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the post tension tendons placed for Terrace Level, Pour 7. We
observed the tendon quantity, spacing, profile heights, back up bars, bursting steel, and the
overall condition of the tendons. The following discrepancies were observed:
• Missing 1 add Yellow Brown Uniform Placed by J.D. Steel
• Missing 2 add Orange Uniform Placed by J.D. Steel
• Incorrect profiles in several areas (T63.6, BTT.9, T629)
• Tendon sheathing damaged in TG29 and 1 Gold Yellow Orange uniform tendon
• Missing back up bars
These items will be re-observed in the morning, before concrete placement. J.D. Steel and
Andy with PCL was notified.
PT Stressing was observed for Level 5, Pour 3.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the Terrace Level,
Pour 7. We observed the reinforcing steel for bar size, spacing, clearance, and lap splices. We
observed missing top and bottom mat bars, top beam bars, trim bars, and back up bars at
various locations throughout the deck. We immediately informed Pedro with J.D. Steel and
Andy with PCL of the missing bars, and J.D. Steel informed us that they would install the
missing reinforcing steel. We will re-observe the reinforcing steel for Terrace Level prior to the
concrete pour.
We re-observed the reinforcing steel placed for the Terrace level columns #350, 351, 362, and
413. The reinforcing steel now appears to have been placed in general compliance with the site
specifications. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 2, Pour 4. We
observed the reinforcing steel for bar size, spacing, clearance, and lap splices. We observed
missing top and bottom mat bars, trim bars, back up bars, and bursting steel. We immediately
informed Pedro with J.D. Steel and Andy with PCL of our observations and J.D. Steel informed
us that they would install the missing reinforcing steel. We will re-observe the reinforcing steel
prior to the concrete placement. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed post tension tendon placement for Level 2, Pour 4. We
observed the post tension quantity, spacing, profile height, back up bars, bursting steel, and the
overall condition of the tendons. The following discrepancies were observed:
• Several incorrect profiles
• Missing Chairs at in various areas
• "Unfinished" tendons through expansion joint at BB, 46
• Several damaged tendon sheathings
• Missing backup bars and bursting steel
We also observed stud rail placement for Level 2, Pour 6. We observed size and locations. We
observed incorrect sizes and placement of stud rails around columns 444, 418, and 422.
These stud rails on L2P4 and the post tension placed for L2P4 will be re-observed tomorrow,
prior to concrete placement. Andy with PCL was notified of our observations .
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and post tension tendons placed for
Terrace Level, Pour 7. The discrepancies noted on 3/3/09 appear to have been fixed. The pt
and reinforcing steel placed for TLP7 now appears to be in general accordance with the project
plans and specifications.
We observed the holes drilled for the dowels at column 465 on Levels 1 2, and 3. We observed
the drilled holes for cleanliness, depth and diameter. They appeared to be in general
accordance with the project plans and specifications.
Finally, we observed the reinforcing steel placed for shear walls 1 & 2 on Level 1. We observed
the reinforcing steel for bar sizes, spacing tolerances, lap splices, and clearances from forms.
Shear Wall 1 was missing a corner bar and a stirrup. Ernesto with J.D. Steel was notified and
corrected the issue. SW1 then appeared to be in general accordance with the project plans and
specifications. In SW2 we observed inadequate lap splices. JD Steel was notified, we will re-
observe SW2 tomorrow. Andy with PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
March 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel placed by J.D. Steel for Level 2, Pour 4. On
March 3�d we observed this same pour and observed several areas with missing reinforcing
steel. We observed the reinforcing steel for bar size, spacing, clearance, and lap splice. At the
time of our observations, we still observed missing top & bottom mat bars at various locations
throughout the deck. We immediately informed Andy with PCL of our observations. We were
unable to locate any J.D. Steel representatives on-site to inform of the missing reinforcing steel.
We will observe the reinforcing steel, a third time, prior to the concrete placement. Andy with
PCL was notified of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721