EN�INEERIIVG C�NSIJLTFINTS
May 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and post tension tendons placed for
Level 3, Pour 4. We observed that J.D. Steel had corrected the discrepancies listed on our
5/4/2009 report. The reinforcing steel and post tension tendons appeared to be placed in
general accordance with the project plans and site specifications.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 3 columns 429, 430,
433, & 442. We observed the reinforcing steel for bar size, spacing, clearance, and lap splice.
The reinforcing steel for bar size, spacing, clearances, and lap splices. The reinforcing steel
appeared to be placed in general accordance with the project plans and specifications.
We also observed holes drilled by PCL on the Upper Basement Level at Gridlines MM-65.4.
PCL utilized a wire brush and a shop vacuum to clan the holes. We observed the holes for
depth, diameter, and the overall condition. The holes appeared to be in general accordance
with the project plans and site specifications of 4" depth for #6 bar using a Hilti RE500 epoxy.
Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the slab extension on
the Terrace Level at Gridlines BSSS.6-48 and for Level 3 columns 417, 418, 422, 427, 428,
431, 432, 434, 443, & 444. We observed the reinforcing steel for bar size, spacing, clearances,
and lap splices. The reinforcing steel appeared to be placed in general accordance with the
project plans and specifications.
In addition, we observed holes drilled by PCL into the existing slab on Level 2 at Gridlines 71-(L-
EE). PCL utilized a wire brush and a shop vacuum to clean the holes. We observed the holes
for depth, diameter, and the overall cleanliness. The holes appeared to be in general
accordance with the manufacturer's recommendations. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 7, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for sheer wall #5 on level
3. We observed the reinforcing steel for bar size, spacing, clearances, and lap splices. The
reinforcing steel appeared to be placed in general accordance with the site specifications. Andy
with PCL was notified of our observations.
In addition, we observed J.D. Steel stressing post tension tendons on Level 3, Pour 4. We
observed gauge pressures, measured elongations, and observed J.D. Steel perform lift-offs.
See our pt elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing the post tension tendons at various
locations throughout the Terrace Level. We measured elongations, verified gauge pressure,
and observed J.D. Steel perform lift offs. See our pt elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for level 3 columns 505,
424, 425, 426, and 506. We observed the reinforcing steel for bar size, spacing, clearances,
and lap splices. The reinforcing steel appeared to be placed in general accordance with the site
specifications. Andy with PCL was notified of our observations.
In addition, we observed J.D. Steel stressing post tension tendons at various locations
throughout terrace level, pours 5 and 6. We observed gauge pressures, measured elongations,
and observed J.D. Steel perForm lift-offs. See our pt elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed the reinforcing steel and post tension tendon placed by J.D.
Steel of Level 3, Pour 5. We observed the reinforcing steel for proper bar sizing, spacing
tolerances, lap splices, and form clearances. Several bars were observed to misplaced or
missing. Manny with J.D. Steel and Andy with PCL were notified and the bars will be re-
observed prior to concrete placement.
The post tension tendons were observed for quantity, spacing, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. A few profiles were observed to be
incorrect, several back up bars, and bursting steel were missing. A kink in one tendon was
observed and a discrepancy in the plans was noted. Manny with J.D. Steel and Andy with PCL
were notified of our observations.
The pt and reinforcing steel will be re-observed prior to the concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed holes drilled by PCL into column #415 on Level 1. PCL utilized
a wire brush and a vacuum to clean the holes. We observed the holes for depth, diameter, and
the overall cleanliness. The holes appeared to be in general accordance with the project plans
and manufacturer recommendations of 4 '/2" deep for #4 bar using Hilti HY150 epoxy. Andy
with PCL was informed of our observations.
In addition, we observed J.D. Steel stressing PT Tendons at various locations on the Terrace
Level and Level 1. We verified gauge pressure, measured elongations, and observed J.D. Steel
perform lift-offs. See our pt elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 12, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and post tension tendons placed by J.D.
Steel on Level 3, Pour 5. We observed J.D. Steel had corrected the discrepancies listed on
5/11/2009 report. The reinforcing steel and post tension tendons appeared to be placed in
general accordance with the site specifications. Andy with PCL was informed of our
observations.
In addition, we observed J.D. Steel stressing post tension tendons on Level 1, Pour 4A. We
observed gauge pressures, measured elongations, and observed J.D. Steel perform lift-offs.
See our pt elongation report for details.
We also observed reinforcing steel placed by J.D. Steel for Level 3 columns 350, 351, 353, &
365. We observed the reinforcing steel for bar size, spacing, clearances, and lap splices. The
reinforcing steel appeared to be placed in general accordance with the site specifications. Andy
with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 3, Pour 6. We observed the reinforcing steel for bar size, spacing, clearance, and lap
splice. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. We observed missing top and bottom
mat bars, back up bars, bursting steel, and trim bars at various locations throughout the deck.
We immediately informed Manny with J.D. Steel and Andy with PCL of our observations. J.D.
Steel informed us that they would correct any discrepancies. We will re-observe the reinforcing
steel and post tension tendons prior to the concrete placement.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 3, shear walls #3 & 4
and columns 414, 419, 359, 363, 368, 369, 370, & 372. We observed the reinforcing steel for
bar size, spacing, clearances, and lap splices. The reinforcing steel appeared to be in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 14, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 3, Pour 6. We observed that J.D. Steel appeared to have corrected the discrepancies
listed on 5/13/2009 report. The reinforcing steel and post tension tendons appeared to be
placed in general accordance with the project plans and specifications.
In addition, we observed J.D. Steel stressing post tension tendons on Level 3, Pour 5. We
verified gauge pressure, measured elongations, and observed J.D. Steel perForm lift-offs. See
our pt elongation report for details.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 3 columns 415, 416,
504, 356, 423, 364, 366, 371, & 367. We observed the reinforcing steel for bar size, spacing,
clearances, and lap splices. The reinforcing steel appeared to be placed in general accordance
with the project plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 15, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing tendons at various locations for Level 1,
Pour 7. We measured the elongation of the tendons and observed gauge pressures. Kurt with
J.D. Steel was informed of our observations. See our measurement sheet for details.
Sincerely,
GROUND Engineering Consultants, Inc.
April Wyatt
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 18, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 3, Pour 7. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. We observed the post tension tendons for quantity, profile heights, clearances, back up
bars, bursting steel, and the overall condition of the tendons. We observed missing top &
bottom mat bars, back up bars, bursting steel, and trim bars at various locations throughout the
deck as well as several post tension tendon profile heights which did not appear to comply with
the site specifications. We informed Manny with J.D. Steel and Andy with PCL of our
observations. We will re-observe the reinforcing steel and post tension tendons prior to the
concrete placement.
In addition we observed reinforcing steel placed by J.D. steel for level 3, shear wall #2 and
columns 333, 334, 335, 336, 337, 338, 340, 341, 343, 344, 345, 346, 347, 348, 349, 354, 411,
and 412. We observed the reinforcing steel for bar sizes, quantities, spacing, clearances, and
lap splices. The reinforcing steel appeared to be in general accordance with the project plans
and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 18, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for walls on Level 1 at
Gridlines YY-34. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications.
In addition, we observed holes drilled by PCL into the existing slab on the Terrace Level at
Gridlines BAAA.2-(40.3-49). We observed the holes for depth, diameter, and the overall
cleanliness. PCL utilized a wire brush and a shop vacuum to clean the holes. The holes
appeared to be in general accordance with the manufacturer specifications of 6 3�4�� for #6 bars
using a Hilty HY150 epoxy. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed holes drilled by PCL on the Terrace Level at Gridlines BAAA.2-
(34.5-40.3). PCL utilized a wire brush and a shop vacuum to clean the holes. We observed the
holes for depth, diameter, and the overall cleanliness. The holes appeared to be in general
accordance with the manufacturer specifications of 6 3/4" for the #6 bars using a Hilty HY150
epoxy. Andy with PCL was informed of our observations.
We also re-observed the pt tendons and reinforcing steel placed for L3 P7. JD Steel was still
fixing discrepancies during the concrete pour. It appeared that JD steel corrected all the pt and
rebar discrepancies prior to concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed holes drilled by PCL into the Lower Basement Level slab at
Gridlines (BAAA.2-DDD)-(6-8). PCL utilized a wire brush and a shop vacuum to clean the
holes. We observed the holes for depth, diameter, and overall cleanliness. The holes appeared
to be in general accordance with the manufacturer specifications of 4" for #6 bar using Hilty
RE500 epoxy.
In addition, we observed the reinforcing steel placed by J.D. Steel for Level 3 columns 307, 308,
309, 310, 323, 326, & 327. We observed the reinforcing steel for bar size, spacing, clearances,
and lap splices. The reinforcing steel appeared to be placed in general accordance with the
project plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 21, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 3, columns 304,
305, 306, 320, 321, 322, & 324. We observed the reinforcing steel for bar size, spacing,
clearances, and lap spiices. The reinforcing steel appeared to be placed in general accordance
with the project plans and specifications.
In addition, we observed holes drilled by PCL into the existing shear wall #6 on Level 1. PCL
utilized a wire brush and a shop vacuum to clean the holes. We observed the holes for depth,
diameter, and overall cleanliness. The holes appeared to be in general accordance with the
manufacturer specifications of 6 3�4�� depth for #6 bar using Hilty HY150 epoxy. Andy with PCL
was informed of our observations.
We also observed J.D. Steel stressing post tension tendons on Level 3, Pour 7. We observed
gauge pressure, measured elongations, and observed J.D. Steel perForm lift offs. See our pt
elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 22, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing post tension tendons at various locations
throughout Level 1, Pours 7 and 9. We observed gauge pressures, measured elongations, and
observed J.D. Steel perForm lift offs. See our pt elongations report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons for Level 4, Pour 4
placed by J.D. Steel. We observed the reinforcing steel for bar size, spacing, clearances, and
lap splices. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. We observed missing top and bottom
mat bars, back up bars, bursting steel, and trim bars at various locations throughout the deck as
well as several post tension tendon profiles that did not comply with the site specifications. We
immediately informed Pedro with J.D. Steel and Andy with PCL of our observations. We will re-
observe the reinforcing steel and post tension tendons prior to the concrete placement.
In addition, we observed J.D. steel stressing post tension tendons at various locations on Level
1. We observed gauge pressure, measured elongations, and observed J.D. Steel perform lift
offs. See our pt elongation report for details.
We observed reinforcing steel placed by J.D. Steel for the footers at gridlines C — 24. We
observed the reinforcing steel for bar size, quantity, spacing, clearance, and lap splice. The
reinforcing steel appeared to be placed in general accordance with the project plans and
specifications.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 27, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed the reinforcing steel and post tension tendons placed by J.D.
Steel for Level 4, Pour 4. We observed that J.D. Steel appeared to have corrected the
discrepancies listed on 5/26/2009 report. The reinforcing steel and post tension tendons
appeared to be placed in general accordance with the project plans and specifications.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 28, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons for Level 3, Pour 8
placed by J.D. Steel. We observed the reinforcing steel for bar size, spacing, clearances, and
lap splices. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. We observed missing top and bottom
mat bars, back up bars, bursting steel, and trim bars at various locations throughout the deck as
well as several post tension tendon profiles that did not comply with the site specifications. We
immediately informed Pedro with J.D. Steel and Andy with PCL of our observations. We will re-
observe the reinforcing steel and post tension tendons prior to the concrete placement.
In addition, we observed reinforcing steel placed by J.D. Steel for level 3 columns 301, 318,
319, 325, 329, 330, 331, and 332, and level 4 columns 426, 427, 428, 429, 430, 431, 432, 433,
442, 443, 444, 505, 506, 507, 508, and 509. We observed the reinforcing steel for bar size,
spacing, clearance, and lap splice. The reinforcing steel appeared to be placed in general
accordance with the site plans and specifications. Andy with PCL was notified of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
May 29, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel and post tension tendons placed by J.D.
Steel for Level 3, Pour 8. It appeared that JD Steel had corrected the discrepancies listed in our
5/26/2009 report. The reinforcing steel and post tension tendons appeared to be placed in
general accordance with the project plans and specifications.
In addition, we observed J.D. Steel stressing post-tension tendons on level 4, pour 4. We
measured the elongations, observed the gauge pressures, and observed J.D. Steel perForm lift
offs. See our pt elongation report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 4, Pour 5. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. We observed missing top & bottom mat
bars, back up bars, bursting steel, and trim bars at various locations throughout the deck, as
well as several post tension tendon profile heights that did not comply with the site
specifications. We immediately informed Manny with J.D. Steel and Andy with PCL of our
observations. J.D. Steel informed us that they would correct the discrepancies. We will re-
observe the reinforcing steel and post tension tendons prior to the concrete pour.
In addition, we observed reinforcing steel placed by J.D. Steel for Level 4, columns 418, 422,
423, 424, 425, 432, 434, 351, 353, 359, 363, 365, 368, 369, 370, 371, & 504. We observed the
reinforcing steel for bar size, spacing, clearances, and lap splices. The reinforcing steel
appeared to be placed in general accordance with the project plans and specifications. Andy
with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel and post tendon tendons placed by J.D.
Steel for Level 4, Pour 5. We observed that J.D. steel had corrected the discrepancies listed on
6/1/2009 report. The reinforcing steel and post tension tendons appeared to be placed in
general accordance with the project plans and specifications.
In addition, we observed J.D. Steel stressing post tension tendons on Level 3, Pour 8. We
measured elongations, observed gauge pressure, and observed J.D. Steel perForm lift offs. See
Ground Engineering post tension tendon report for details.
We also observed reinforcing steel placed by J.D. Steel for stem walls at Gridlines D-65.5 and
(D-M)-72.5. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 4, shear walls 3
& 4 and for columns 356, 358, 367, & 364. We observed the reinforcing steel for bar size,
spacing, clearances, and lap splices. The reinforcing steel appeared to be placed in general
accordance with the project plans and specifications.
In addition, we observed J.D. Steel stressing post tension tendons at various locations
throughout the Terrace Level. We measured elongations, observed gauge pressure, and
observed J.D. Steel perform lift offs. See Ground Engineering Post Tension Elongation report
for details. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. Steel stressing post tension tendons on Level 4, Pour 5.
We measured elongations, observed gauge pressure, and observed J.D. Steel perform lift offs.
See Ground Engineering Post Tension Elongations report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Marvin Troxel
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 4, Pour 6. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons.
We observed missing top & bottom mat bars, back up bars, bursting steel, and trim bars at
various locations throughout the deck, as well as several post tension tendon profile heights that
did not comply with the site specifications. We immediately informed Manny with J.D. Steel and
Andy with PCL of our observations. J.D. Steel informed us that they would correct the
discrepancies. We will re-observe the reinforcing steel and post tension tendons prior to the
concrete pour.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel and post tendon tendons placed by J.D.
Steel for Level 4, Pour 6. We observed that J.D. steel had corrected the discrepancies listed on
6/4/2009 report. The reinforcing steel and post tension tendons appeared to be placed in
general accordance with the project plans and specifications.
In addition, we observed reinforcing steel placed by J.D. Steel for level 4, columns 336, 337,
338, 340, 343, 344, 345, 354, 357, and 411. We observed the reinforcing steel for bar size,
spacing, clearance, and lap splice. The reinforcing steel appeared to be placed in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 8, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel for Level 4, columns 341, 346, 348, 355, 366,
372, & 414. We observed the reinforcing steel for bar size, spacing, clearance, and lap splices.
The reinforcing steel appeared to be placed in general accordance with the site specifications.
In addition, we observed holes drilled into the existing slab by PCL on the Upper Basement
Level at Gridlines MMM.5-65.5 and on Level 4 into the existing columns 307, 308, 309, 318,
324, 329, 330, 331, & 332. PCL utilized a wire brush and a shop vacuum to clean the holes.
We observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to
be in general accordance with the project plans and specifications of at least 4" depth for #6
bars using Hilty RE500 epoxy. Eric Hansen with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 9, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Level 4 columns 326,
327, 333, 335, & 360. We observed the reinforcing steel for bar size, spacing, clearances, and
lap splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Eric Hansen with PCL was informed of our observations.
In addition, we observed J.D. steel stressing post tension tendons for Level 4, Pour 6. We
measured elongations, observed gauge pressure, and observed J.D. Steel perForm lift offs. See
Ground Engineering Post Tension Elongations report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
June 10, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for shear wall #6 pit slab
as well as Level 4 columns 347, 349, and 412. We observed the reinforcing steel for bar size,
spacing, clearances, and lap splices. The reinforcing steel appeared to be placed in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721