As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for shear wall #5 on the
west side of Level 6. We observed that J.D. Steel had corrected the discrepancies listed on
7/23/2009 report. The reinforcing steel appeared to be placed in general accordance with the
project plans and specifications. Eric with PCL was informed of our observations.
Upon our return in the afternoon, we were informed by Eric with PCL that the reinforcing steel
and drilled holes would not be ready today and that he would reschedule for a later date.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
July 27, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for Shear Wall #3 on
Level 6. We observed the reinforcing steel for bar size, spacing, clearances, and lap splices.
The reinforcing steel appeared to be placed in general accordance with the project plans and
specifications.
Additionally, we observed holes drilled by PCL into the existing slab on the Upper Basement
Level at Gridlines (HHH-QQQ)-(1.2-1.5). PCL utilized a wire brush and a shop vac to clean the
holes. We observed the holes for depth, diameter, and the overall cleanliness. The holes
appeared to be in general accordance with project plans and specifications of 6 3/4" deep for a
#6 bar using Hilty HY150 epoxy. Eric with PCL was informed of our observations.
We collected previously cast concrete cylinders and transported them to our laboratory for
future compressive strength testing; results will be forwarded upon completion.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
July 28 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. Upon our arrival, we were informed by Eric with PCL that the reinforcing steel
and drilled holes would not be ready today and that he would reschedule for a later date.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
July 29, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed holes drilled by PCL into the existing slab on the Terrace Level
at Gridlines RRR-25. PCL utilized a wire brush and a shop vac to clean the holes. We
observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to be
in general accordance with the project plans and specifications of 5 5/8" deep for#5 bars using
Hilty HY150 epoxy.
In addition, we observed reinforcing steel placed by PCL for the site wall on the Terrace level at
Gridlines (QQQ-UUU)-(23.5-26). We observed the reinforcing steel for bar size, spacing,
clearances, and lap splices. The reinforcing steel appeared to be placed in general accordance
with the project plans and specifications. Jeff with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
July 31, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for shear wall #3 on Level
7. We observed the reinforcing steel for bar size, spacing, ciearances, and lap splices. The
reinforcing steel appeared to be placed in general accordance with the project plans and
specifications. Eric with PCL was informed of our observations.
In addition, Miguel with WVC informed us that they would not be ready for any backfill testing
until approximately 2:00 pm. Upon our return in the afternoon Miguel with WVC informed us
that would not be ready for any backfill testing today.
Upon our afternoon return Eric with PCL informed us that the concrete and drilled holes
observation was cancelled today and that he would reschedule for a later date.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for footers at Gridlines
(J.6-Q)-(16.5-20). We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Eric with PCL was informed of our observations.
In addition, upon our arrival Eric with PCL informed us that the drilled holes on the Upper
Basement Level would not be ready today.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and post tension tendons placed by J.D. Steel
for Level 7, Pour 1. We observed the reinforcing steel for bar size, spacing clearances, and lap
splices. We observed the post tension tendons for quantity, profile heights, back up bars,
bursting steel, and the overall condition of the tendons. The reinforcing steel and post tension
tendons appeared to be placed in general accordance with the project plans and specifications.
Eric with PCL was informed of our observations.
In addition we observed holes drilled by PCL into the existing slab on the Upper Basement
Level at Gridlines BBB-2 and on Level 1, Unit #129 balcony. PCL utilized a wire brush and a
shop vac to clean the holes. We observed the holes for depth, diameter, and the overall
cleanliness. The holes appeared to be in general accordance with the project plans and
specifications of at least 4" deep for #6 bars using Hilty RE500 epoxy. Eric with PCL was
informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 5, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for site walls on the
Terrace Level at Gridlines HHH.5-23.5. We observed the reinforcing steel for bar size, spacing,
clearances, and lap spiices. The reinforcing steel appeared to be placed in general accordance
with the project plans and specifications. Eric with PCL was informed of our observations.
Additionally, Eric with PCL informed us that the drilled holes would not be ready today.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 6, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed holes drilled by PCL on the Upper Basement Level at Gridlines
GGG.8-1.4. PCL utilized a wire brush and a shop vacuum to clean the holes. We observed the
holes for depth, diameter, and the overall cleanliness. The holes appeared to be in general
accordance with the project plans and specifications of at least 4" deep for #6 bars using Hilty
RE500 epoxy. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 7, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for a shear wall #1 top
slab, retaining wall at Gridlines J.6-20 to Q-16.5 and for pump core block outs on Levels 2-6 at
Gridlines U-36. We observed the reinforcing steel for bar size, spacing, clearances, and lap
splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 10, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed J.D. steel stressing post tension tendons on Level 7, Pour 1.
We observed gauge pressure, measured elongations, and observed J.D. Steel perform lift offs.
See Ground Engineering Post Tension Tendon Elongations report for details.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 10, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the west sidewalk. We
observed the reinforcing steel for bar size, spacing, clearances, and lap splices. The reinforcing
steel appeared to be placed in general accordance with the project plans and specifications.
Upon our return in the afternoon, we observed the reinforcing steel placed by J.D. Steel for
retaining wall footer at Gridlines Q-16.2 to NN-7. We observed the reinforcing steel for bar size,
spacing, clearances, and lap splices. The reinforcing steel appeared to be placed in general
accordance with the project plans and specifications.
Additionally, we observed holes drilled by PCL on Level 1 at Gridlines (MM-RR)-46 and (JJ-TT)-
(21-28). PCL utilized a wire brush and a vacuum to clean the holes. We observed these holes
for depth, diameter, and overall cleanliness. The holes at Gridlines (MM-RR)-46 appeared to be
in general accordance with the project plans and specifications of at least 3" deep for a #4 bar
using Hilty RE500 epoxy. The holes at Gridlines (JJ-TT)-(21-28) appeared to be in general
accordance with the project plans and specifications of at least 4 '/2" deep for#4 bars using Hilty
HY150 epoxy. Grant with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 11, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for a beam inside of the
shear wall #5 on Level 2. We observed the reinforcing stee� for bar size, spacing, clearances,
and lap splices. The reinforcing steel appeared to be placed in general accordance with the site
specifications. Jeff with PCL was informed of our observations.
We also picked up previously cast concrete cylinders and transported them to our laboratory for
future compressive strength testing; results will be forwarded upon completion.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 12, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel placed by J.D. Steel for the retaining wall at
Gridlines Q-16.2 to NN-7. We observed the reinforcing steel for bar size, spacing, clearances,
and lap splices. The reinforcing steel appeared to be placed in general accordance with the
project plans and specifications.
In addition, we observed holes drilled into the existing slab by PCL on Level 6 at Gridlines BBB-
65.5 and on the Terrace Level at Gridlines (EEE.8-JJJ)-23.4. PCL utilized a wire brush and a
vacuum to clean the holes. We observed the holes for depth, diameter, and the overall
cleanliness. The holes on Level 6 appeared to be in general accordance with the project plans
and specifications of 4 '/2" deep for #4 bar using Hilty HY150 epoxy. The holes on Terrace
Level appeared to be in general accordance with the project plans and specifications of 6 3/4"
deep for#6 bar using Hilty HY150 epoxy. Jeff with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 13, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We observed reinforcing steel and wire mesh placed by J.D. Steel for the slab
on metal deck on Level 6 at Gridlines BBB-65.5 and on Level 5 at Gridlines (EEE-QQQ)-(6-20).
We observed the reinforcing steel for bar size, spacing, clearances, and lap splices. We
observed several missing bars at various locations throughout the Level 5 deck. We
immediately notified Jeff with PCL and JD Steel of our observations. The reinforcing steel
placed for the Level 6 deck appeared to be in general accordance with the project plans and
specifications. The Level 5 deck will be re observed prior to concrete placement
In addition, we observed holes drilled by PCL into the existing slab on Terrace Level at Gridlines
(B.9-D)-(49-56), at U-35, and on the Upper Basement Level at U-35. We observed the holes for
depth, diameter, and the overall cleanliness. We observed that holes in three locations had not
been cleaned of debris. We immediately informed Jeff with PCL of our observations and he
informed us that they would clean the holes again.
Upon our return in the afternoon, the holes on the Terrace Level at Gridlines (B.9-D)-(49-56
appeared to be in general accordance with the project plans and specifications of 4" deep for#6
bars using Hilty RE500 epoxy and were cleaned of the debris. Jeff with PCL was informed of
our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 14, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was present to perform
materials testing. We re-observed reinforcing steel and wire mesh placed by J.D. Steel for the
slab on metal deck on Level 5, gridlines (EEE-QQQ)-(6-20). We observed that J.D. Steel had
corrected all discrepancies noted on our 8-13-09 report. The reinforcing steel and wire mesh
appear to be placed in general compliance with site specifications. Jeff with PCL was informed
of our observations.
In addition, we observed reinforcing steel placed by J.D. Steel for a beam inside shear
wall #5 on level 3. We observed the reinforcing steel for bar size, spacing, clearance, and lap
splicing. The reinforcing steel appears to be placed in general compliance with site
specifications. Jeff with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 19, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed holes drilled by PCL into the existing slab on the
Terrace Level at Gridlines S-29. PCL utilized a wire brush and a vacuum to clean the holes.
We observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to
be in general accordance with the project plans and specifications of 4" depth for #6 bars using
Hilty Re500 epoxy. Andy with PCL was informed of our observations.
In addition, Andy with PCL informed us that the reinforcing steel observations scheduled for the
slab on metal deck and slab extensions on the Terrace Level were the same areas that we had
already observed on 8/14/2009.
We observed the reinforcing steel placed for sidewalk curbs containing one #4 horizontal bar.
We observed the reinforcing steel for bar size, spacing, clearances, and lap splices. The
reinforcing steel appeared to be placed in general accordance with the project plans and
specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 20, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for the pool deck
curbs on Level 1 at gridlines (JJ-UU)-(23-25). We observed the reinforcing steel for bar size,
spacing, clearances, and lap splices. The reinforcing steel appeared to be placed in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
Additionally, we observed holes drilled into the existing slab by PCL on the Terrace Level at
Gridlines S-29 and on Level 1 at gridlines (LL-SS)-(27-28). PCL utilized a wire brush and a
vacuum to clean the ho►es. We observed the holes for depth, diameter, and the overall
cleanliness. The holes on the Terrace Level appeared to be in general accordance with the
project plans and specifications of 4" depth for #6 bar using Hilty RE500 epoxy. The holes on
Level 1 appeared to be in general accordance with the project plans and specifications of 3"
depth for#4 bars using Hilty RE500 epoxy. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 21, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for the pool deck
pedestals on Level 1. We observed the reinforcing steel for bar size, spacing, clearances, and
lap splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 24, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by J.D. Steel for shear wall
#5 beams on �evels 4, 5 & 6 and for shear wall #2 cap. We observed the reinforcing steel for
bar size, spacing, clearances, and lap splices. The reinforcing steel appeared to be placed in
general accordance with the project plans and specifications. Andy with PCL was informed of
our observations.
In addition, we observed J.D. Steel stressing repaired post tension tendons on Level 2 at
gridlines UU-70. The first two tendons that J.D. Steel attempted to stress popped and lost
pressure at 2500psi gauge pressure and the third tendon at 1500psi gauge pressure. We
immediately informed Scott Keenan with PCL and he told J.D. Steel to stop stressing for today.
Scott informed us that he would speak with KLG about the tendons.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 25, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for curbs on Level
1 at Gridlines (SS-XX)-(24-26) and for pump core block outs on the Lower Garage Level, Upper
Garage Level, and Terrace Level.
We observed the reinforcing steel for bar size, spacing, clearances, and lap splices. We
observed several #4 bars for the pump core block out on the Terrace Level that were spaced at
18" on center where the project plans and specifications call for #4 bar at 12" on center. We
immediately notified Andy with PCL of our observations. PCL corrected the noted item,
afterward, the reinforcing steel for the curbs on Level 1 and the pump core block outs on Lower
Garage Level and Upper Garage Level appeared to be placed in general accordance with the
project plans and specifications.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 26, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for curbs on Level
1 at Gridlines ZZ.1-30.5 and at ZZ.1-40 and for pool wall at Gridlines AAA.5-34.5. We observed
the reinforcing steel for bar size, spacing, clearances, and lap splices. The reinforcing steel
appeared to be placed in general accordance with the project plans and specifications. Andy
with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tei:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 27, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for the pump core
block out on Level 1 at Gridlines U-35 and for the sloped stair slab from Terrace Level to Level 1
at Gridlines HHH-23.1. We observed the reinforcing steel for bar size, spacing, clearances, and
lap splices. The reinforcing steel appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
In addition, we observed holes drilled by PCL into the existing slab on Level 1 for the pump core
block out at gridlines U-35 and for the sloped stair slab from Terrace Level to Level 1 at
Gridlines HHH-23.1. PCL utilized a wire brush and a shop vacuum to clean the holes. We
observed the holes for specified depth, diameter, and the overall cleanliness of the holes. The
holes for the pump core block out appeared to be in general accordance with the project plans
and specifications of 4 '/2" depth for#4 bar using Hilty HY150 Epoxy. The holes for the stair slab
appeared to be in general accordance with the project plans and specifications of 4 '/z" for #4
bar and 6 3/4" for #6 bar using Hilty HY150 Epoxy. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 28, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel and wire mesh placed by PCL for
shear wall #4 lid on Level 6 and for shear wa�l #5 beam on Level 6. We observed the
reinforcing steel and wire mesh for bar size, spacing, clearances, and lap splices. The
reinforcing steel and wire mesh appeared to be placed in general accordance with the project
plans and specifications. Andy with PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
August 31, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed drilled holes on the Lower Garage Level at
Gridlines KNNN/61.5 and G/63.7. The holes were observed for depth, diameter, and the overall
cleanliness. The holes appeared to be in general accordance with the project plans and
specifications. Andy with PCL was informed.
We also observed the reinforcing steel placed for Level 1 hot tub wall extensions and horizontal
dowels from Gridlines BTT.9/31-38. We observed the reinforcing steel for bar size, spacing, lap
length, and clearances. The drilled holes in this area had been filled with epoxy prior to our
arrival. Other than the epoxied holes, the reinforcing steel appeared to be placed in general
accordance with the project plans and specifications. Andy with PCL was informed.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
September 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed JD Steel stressing the replacement #9 Orange
White 3/8" tendon on Level 1 Pour 4. Gauge 24 was utilized and the tendon was stressed to
the jacking pressure of 2996 psi. The recorded elongation was 5 3/4" with a specified elongation
of 5 7/8". Several other areas where replacement tendons will be utilized were also observed,
and will be stressed at a later date. Scott with PCL was informed of today's observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Eric Mocko
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
September 1, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed PCL drill holes for block-out fill in Unit 211, Level 2
at Gridlines T/24. PCL utilized a wire brush and a shop vacuum to clean the holes. We
observed the holes for depth, diameter, and the overall cleanliness. The holes appeared to be
in general accordance with the manufacturer's specifications for diameter and depth. Andy with
PCL was informed of our observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Marvin Troxel
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
September 2, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by J.D. Steel for footer at
gridlines HH-7 to TT.9-4.9 and for shear wall #3 lid on Level 6. We observed the reinforcing
steel for bar size, spacing, clearances, and lap splices. We observed several missing #4 Z
bend bars at the east end of the footer. We immediately informed Andy with PCL of our
observations. The missing reinforcing steel was still not in place at the start of concrete
placement. The reinforcing steel placed for the lid of shear wall #3 appeared to be in general
accordance with the project plans and specifications. Andy with PCL was informed of our
observations.
In addition, we observed holes drilled by PCL into the existing slab on the Terrace Level at
Gridlines DDD-(15-29.8) and into existing footer at Gridlines HH-7. PCL utilized a wire brush
and shop vacuum to clean the holes. We observed the holes for depth, diameter, and overall
cleanliness. We observed that the holes in the footer and on the Terrace Level contained
excessive debris in them. We immediately informed Andy with PCL of our observations. The
holes for the footer were still not properly cleaned at the start of concrete placement.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
September 3, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. We observed reinforcing steel placed by PCL for stairs on the
Upper Basement Level at Gridlines 111.9-1.4. We observed the reinforcing steel for bar size,
spacing, clearances, and lap splices. We observed several missing corner bars at the top of the
stairs. We immediately informed Andy with PCL of our observations. PCL informed us that they
would correct the discrepancies prior to concrete placement. We will re-observe the reinforcing
steel prior to concrete placement.
In addition, we observed holes drilled by PCL into the existing slab on the Terrace Level at
Gridlines DDD-(15-29.8). PCL utilized a wire brush and shop vacuum to clean the holes. We
observed the holes for depth, diameter, and overall cleanliness. The holes appeared to be in
general accordance with the manufacturer's specifications. Andy with PCL was informed of our
observations.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721
������
EN�INEERIIVG C�NSIJLTFINTS
September 4, 2009
Job Name: Materials Testing, Ritz Carlton
Residences, Vail, Colorado
Job Number: 08-6502
Vail Resorts Development Company
953 S. Frontage Rd. West, Suite 215
Vail, Colorado 81657
Attn: Mr. Cody O' Kelly,
As requested, a GROUND Engineering Consultants representative was on site to perform
construction materials testing. Upon our arrival Miguel with WVC informed us that they would
not be placing any backfill today.
In addition, upon our return Andy with PCL informed us that the drilled holes scheduled for
today were not ready and that he would reschedule for a later date.
Sincerely,
GROUND Engineering Consultants, Inc.
Kevin McClure
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box 464
Englewood,CO 80112-5412 Commerce City,CO 80022-1834 Gypsum,CO 81637
Tel:(303)289 1989 TeI:(303)289 1989 Tel:(970)524 0720
Fax: (303)289 1686 Fax:(303)289 6742 Fax:(970)524 0721