Loading...
HomeMy WebLinkAboutStr Fill ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 1 Structural February 13, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Cat 321 Hoe and a walk-behind compactor Area Represented East Sewer Pump Station at Gridline BPP.9/65 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 1 3' north of Pump Station 8086 138.9 4.7 149.5 3.9 93% Pass A-1-a 2 3' north of Pump Station 8086 137.9 5.4 149.5 3.9 92% Pass A-1-a 3 6'west of Pump Station 8086 138.4 5.9 149.5 3.9 93% Pass A-1-a 4 5' south of Pump Station 8087 143.7 5.7 149.5 3.9 96% Pass A-1-a 5 5' south of Pump Station 8087 142.4 4.6 149.5 3.9 95% Pass A-1-a 6 5'west of Pump Station 8087 138.6 5.4 149.5 3.9 93% Pass A-1-a 7 5' north of Pump Station 8087 137.9 5.1 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density -2 to +2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 2 Structural February 13, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Cat 321 Hoe and a walk-behind compactor, Area Represented East Sewer Pump Station at Gridline BPP.9/65 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 8 3'west of Pump Station 8088 135.9 5.9 149.5 3.9 91% Pass A-1-a 9 5' north of Pump Station 8088 1392 5.8 149.5 3.9 93% Pass A-1-a Specifications: Min. 90 % Max Dry Density -2 to +2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 61 Field Technician: John Williams Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 3 Structural Fill February 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel&Brian Equipment Utilized: 2 Trackhoes, a walk-behind sheepsfoot compactor,and a jumping jack Area Represented Backfill for spread footings 211 and 212 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 10 North Side of 211 Footer 2' BTF 139.1 5.1 149.5 3.9 93% Pass A-1-a 11 West side of 211 Footer 2' BTF 141.6 4.8 149.5 3.9 95% Pass A-1-a 12 West side of 212 Footer 2' BTF 130.3 7.9 149.5 3.9 87% Fail A-1-a 13 South side of 212 Footer 2' BTF 142.4 4.5 149.5 3.9 95% Pass A-1-a 12.1 West side of 212 Footer 2' BTF 140.2 5.3 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Brian Comments: BTF = Below Top of Footing Nuclear Gauge No.: 9 Field Technician: Michael Konopka Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 4 Structural Fill February 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: MVC Representative Notified: Miguel&Brian Equipment Utilized: 2 trackhoes, a sheepsfoot, and a jumping jack Area Represented Spread footing 211 and 212 backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 14 North Side of 211 Footer 1' BTF 140.5 4.7 149.5 3.9 94% Pass A-1-a 15 West side of 211 Footer 1' BTF 139.3 4.4 149.5 3.9 93% Pass A-1-a 16 West side of 212 Footer 1' BTF 141.7 5.0 149.5 3.9 95% Pass A-1-a 17 South side of 212 Footer 1' BTF 140.4 5.2 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Brian Comments: BTF = Below Top of Footing Nuclear Gauge No.: 9 Field Technician: Michael Konopka Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 5 Structural Fill February 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: MVC Representative Notified: Miguel&Brian Equipment Utilized: 2 trackhoes, a walk-behind sheepsfoot,and a jumping jack Area Represented Spread Footing 211 and 212 backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 18 North side of 211 Footer TOF 142.4 4.2 149.5 3.9 95% Pass A-1-a 19 West side of 211 Footer TOF 140.6 4.5 149.5 3.9 94% Pass A-1-a 20 South side of 211 Footer TOF 141.8 3.9 149.5 3.9 95% Pass A-1-a 21 North side of 212 Footer TOF 141.3 4.8 149.5 3.9 95% Pass A-1-a 22 East side of 212 Footer TOF 140.5 5.5 149.5 3.9 94% Pass A-1-a 23 South side of 212 Footer TOF 141.7 5.3 149.5 3.9 95% Pass A-1-a 24 West side of 212 Footer TOF 140.4 5.6 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Brian Comments: TOF =Top of Footing Nuclear Gauge No.: 9 Field Technician: Michael Konopka Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 6 Structural Fill February 21, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: 322 Hoe and a walk-behind compactor Area Represented Backfill around footer at KK/B65.4 and east pump station Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 25 West side of footer 8089 139.6 5.5 149.5 3.9 93% Pass A-1-a 26 North side of footer 8089 135.8 5.3 149.5 3.9 91% Pass A-1-a 27 East side of footer 8089 136.5 5.8 149.5 3.9 91% Pass A-1-a 28 South side of footer 8089 141.4 5.3 149.5 3.9 95% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Field Technician: Nathan Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 7 Structural Fill February 26, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: West Valley Construction Representative Notified: Stevie Ray Equipment Utilized: Walk-Behind sheepsfoot Area Represented First level footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 29 63.6/BTT.8 1.5 Below 133.1 8.9 149.5 3.9 89% Fail A-1-a Grade 30 68.9/BTT.7 1.5 Below 129.6 9.6 149.5 3.9 87% Fail A-1-a Grade 31 68.9/BTT.8 1.5 Below 130.5 10.1 149.5 3.9 87% Fail A-1-a Grade 32 66.0/B22.8 1.5 Below 134.7 8.2 149.5 3.9 90% Fail A-1-a Grade Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff with PCL Comments: Failing locations to be reworked prior to retesting Nuclear Gauge No.: 74 Std Counts: - Field Technician: Nathan Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 8 Structural Fill February 27, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: West Valley Construction Representative Notified: Stevie Ray Equipment Utilized: Walk-Behind sheepsfoot Area Represented First level footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 29.1 63.6/BTT.8 1.5 Below 136.7 5.1 149.5 3.9 91% Pass A-1-a Grade 30.1 68.9/BTT.7 1.5 Below 135.9 5.5 149.5 3.9 91% Pass A-1-a Grade 31.1 68.5/BTT.8 1.5 Below 140.2 4.8 149.5 3.9 94% Pass A-1-a Grade 32.1 66/B22.8 1.5 Below 138.7 5.6 149.5 3.9 93% Pass A-1-a Grade Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Retests from failing areas on 2/26/08 Nuclear Gauge No.: 74 Std Counts: - Field Technician: Nathan Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 9 Structural Fill February 29, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: West Valley Construction Representative Notified: Stevie Ray Equipment Utilized: Cat 330 hoe and a walk-behind compactor Area Represented Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 33 5'south of plinth at Gridline BLL.8/B65.4 8094 136.0 5.9 149.5 3.9 91% Pass A-1-a 34 North side of footing at Gridline BTT.7/63.6 8093 143.9 5.5 149.5 3.9 96% Pass A-1-a 35 East side of footing at Gridline BTT.7/63.6 8093 145.6 5.8 149.5 3.9 97% Pass A-1-a 36 South side of footing at Gridline BTT.7/63.6 8090 136.9 5.6 149.5 3.9 92% Pass A-1-a 37 West side of plinth at Gridline BEE.6/B65.4 8094 140.0 5.8 149.5 3.9 94% Pass A-1-a 38 15'south of plinth at Gridline BEE.6/B65.4 8095 140.0 5.6 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Nuclear Gauge No.: 61 Std Counts: - Field Technician: John Williams Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 10 Structural Fill March 5, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: West Valley Construction Representative Notified: Stevie Ray Equipment Utilized: Walk-behind compactor Area Represented East Side footing backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 39 BRR.5/61.5 RSG 135.8 5.5 149.5 3.9 91% Pass A-1-a 40 BTT.1/B57.2 1.5 BG 137.5 5.9 149.5 3.9 92% Pass A-1-a 41 BTT.10/B57.2 RSG 135.0 5.7 149.5 3.9 90% Pass A-1-a 42 BTT.7/67 1.5 BG 136.1 5.9 149.5 3.9 91% Pass A-1-a 43 BZZ.9/67 1.5 BG 137.5 4.8 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: BG=Below Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 11 Structural Fill March 7, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Jeff with PCL Equipment Utilized: Small sheepsfoot and a skidster Area Represented Footing backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 44 BGGG.9/53.7 RSG 132.1 8.5 149.5 3.5 88% Fail A-1-a 45 BTT.1/57.2 RSG 132.6 9.9 149.5 3.9 89% Fail A-1-a 46 BKK.8/53.7 RSG 124.7 8.6 149.5 3.9 83% Fail A-1-a 47 BGG.1/53.7 RSG 127.1 8.7 149.5 3.9 85% Fail A-1-a 43 BZZ.9/67 1.5 BG 137.5 4.8 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: BG=Below Grade; RSG=Rough Surface Grade (Top of Footing) Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 12 Structural Fill March 7, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Jeff with PCL Equipment Utilized: Skidster and a small sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 44.1 BGGG.9/53.7 4' Below 134.8 5.7 149.5 3.9 90% Pass A-1-a Grade 45.1 BTT.1/57.2 4' Below 135.1 5.9 149.5 3.9 90% Pass A-1-a Grade 47.1 BKK.8/53.7 4' Below 137.4 5.9 149.5 3.9 92% Pass A-1-a Grade 46.1 BGG.1/53.7 4' Below 135.1 5.3 149.5 3.9 90% Pass A-1-a Grade 48 BEEE.8-42.6 2' Below 139.3 5.1 149.5 3.9 93% Pass A-1-a Grade 49 BWW.5-47.5 1' Below 135.5 4.9 149.5 3.9 91% Pass A-1-a Grade 50 BAAA.2-48.4 RSG 141.3 4.9 149.5 3.9 95% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: RSG=Rough Surface Grade (Top of Footing) Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 13 Structural Fill March 8, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Jeff with PCL Equipment Utilized: Two skidsters and two small sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 51 BEEE.8-60 3' Below 136.3 4.9 149.5 3.5 91% Pass A-1-a Grade 52 BAAA.2-53.5 3' Below 141.1 5.3 149.5 3.9 94% Pass A-1-a Grade 53 BTT.9-66.5 3' Below 137.1 5.3 149.5 3.9 92% Pass A-1-a Grade 54 MM-57.2 RSG 129.5 5.5 149.5 3.9 87% Fail A-1-a 55 BNNN.4-52.3 RSG 137.4 4.7 149.5 3.9 92% Pass A-1-a 54.1 MM-57.2 RSG 140.2 5.7 149.5 3.9 94% Pass A-1-a 56 BQQQ.4-48.4 RSG 140.7 5.9 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: RSG=Rough Surface Grade (Top of Footing) Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 14 Structural Fill March 8, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Jeff with PCL Equipment Utilized: Two skidsters and two small sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 57 BTT.7-66 3' Below 138.2 5.7 149.5 3.5 92% Pass A-1-a Grade 58 BGGG.9-53.5 2' Below 130.1 6.9 149.5 3.9 87% Fail A-1-a Grade 59 BEEE.8-70 2' Below 136.6 5.4 149.5 3.9 91% Pass A-1-a Grade 60 MM-63.4 2' Below 142.3 5.1 149.5 3.9 95% Pass A-1-a Grade 58.1 BGGG.9-53.5 2' Below 135.5 5.6 149.5 3.9 91% Pass A-1-a Grade Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 15 Structural Fill March 10, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Steve Equipment Utilized: Skidster and a sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 61 Gridlines BEEE.8-60 1' Below 134.3 5.3 149.5 3.9 90% Pass A-1-a Grade 62 Gridlines BZZ.9-54.5 1' Below 134.1 5.7 149.5 3.9 90% Pass A-1-a Grade 63 Gridlines BZZ.9-63.7 RSG 135.2 4.8 149.5 3.9 90% Pass A-1-a 64 Gridlines BLLL.O-71 RSG 138.1 4.8 149.5 3.9 92% Pass A-1-a 65 Gridlines BGGG.2-66 RSG 117.5 10.3 149.5 3.9 79% Fail A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Failing areas to be reworked and retested Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 16 Structural Fill March 11, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: 320 track hoe and a walk-behind compactor Area Represented Southeast corner Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 65.1 Gridlines BGGG.2/66 8094 130.8 7.9 149.5 3.9 87% Fail A-1-a 66 BAAA.6-66 8093 136.4 5.6 149.5 3.9 91% Pass A-1-a 67 BAAA.6-60 8093 130.7 7.7 149.5 3.9 87% Fail A-1-a 67.1 BAAA.6-60 8093 132.1 7.4 149.5 3.9 88% Fail A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Failing areas to be reworked and retested Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�IIn Job Name Client: ENGINEERING CDNSULTRNTS RitzCarltonResidences RCRVaiILLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 17 Structural Fill March 12, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Steve Equipment Utilized: Track hoe, a loader, a skidster, and a small and big sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCation Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 65.2 Gridlines BGGG.2-66 8094 128.3 8.3 149.5 3.9 86% Fail A-1-a 67.2 BAAA.6-60 8093 130.1 5.8 149.5 3.9 87% Fail A-1-a 68 BDDD.5-57.2 8094 135.4 5.9 149.5 3.9 91% Pass A-1-a 69 BQQQQ.4-49.5 8092 138.2 5.9 149.5 3.9 92% Pass A-1-a 65.3 BGGG.2-66 8094 129.2 8.0 149.5 3.9 86% Fail A-1-a 67.3 BAAA.9-60 8093 141.3 5.7 149.5 3.9 95% Pass A-1-a 70 BNNN.4-47.5 8092 139.7 5.4 149.5 3.9 93% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Test are 65 to be retested when reworked. Nuclear Gauge No.: 70 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 18 Structural Fill March 13, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Equipment Utilized: Track hoe, a loader,a skidster, and a sheepsfoot Area Represented Footings subgrade at BNNN.4-71 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 71 BNNN.8-70 8092 138.2 5.7 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1In Job Name Client: ENGINEERING CDNSULTRNTS RitzCarltonResidences RCRVaiILLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 19 Structural Fill March 18, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Equipment Utilized: Loader, a skidster,and sheepsfoot(large and small) Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LocatiOn Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 72 BNNN.4-48.4 8092 140.3 5.6 149.5 3.9 94% Pass A-1-a 73 BNNN.8-54 8092 131.4 7.9 149.5 3.9 88% Fail A-1-a 74 BHHH.9-66 8093 139.1 5.4 149.5 3.9 93% Pass A-1-a 75 TVV.5-47.7 8093 132.2 5.6 149.5 3.9 88% Fail A-1-a 76 BTT.7-48.2 8092 135.1 5.7 149.5 3.9 90% Pass A-1-a 77 BGGG.9-57.2 8092 135.7 5.7 149.5 3.9 91% Pass A-1-a 73.1 BNNN.8-54 8092 132.1 6.9 149.5 3.9 88% Fail A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: Nuclear Gauge No.: 70 Field Technician: Nathan Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�IIn Job Name Client: ENGINEERING CDNSULTRNTS RitzCarltonResidences RCRVaiILLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 20 Structural Fill March 19, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: PCL Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCation Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 78 Grade beams at BQQQ.4/48.4 8092 139.0 5.1 149.5 3.9 93% Pass A-1-a 65.4 BGGG.2/66 RETEST 8094 142.0 4.1 149.5 3.9 95% Pass A-1-a 75.1 TVV.5/47.7 RETEST 8093 141.8 3.7 149.5 3.9 95% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: Nathan Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 21 Structural Fill March 20, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: PCL Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot/skidster Area Represented Footings backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 79 50/Y.2 Tower Crane Footing 3' Below 141.6 5.2 149.5 3.9 95% Pass A-1-a Grade 80 BZZ.9/57.2 RSG 142.1 5.6 149.5 3.9 95% Pass A-1-a 81 BAAA.2/61.2 RSG 140.7 4.9 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 22 Structural Fill March 24, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: PCL Construction Representative Notified: Jeff Equipment Utilized: A sheepsfoot compactor Area Represented Structural backfill around the crane footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 82 5'west of crane footing 3' Below 142.2 4.7 149.5 3.9 95% Pass A-1-a Top of 83 5' north of crane footing 3' Below 145.2 4.7 149.5 3.9 97% Pass A-1-a Top of 84 5'south of the crane footing 3' Below 142.7 3.8 149.5 3.9 95% Pass A-1-a Top of Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 60 Field Technician: Nurlan Nurniyazov Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 23 Structural Fill March 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 85 BEEE.8/70 TOF 138.6 5.7 149.5 3.9 93% Pass A-1-a 86 BAAA.2/07 TOF 136.5 5.9 149.5 3.9 91% Pass A-1-a 87 BAAA.2/63.6 TOF 137.9 4.1 149.5 3.9 92% Pass A-1-a 88 BGGG.9/66 TOF 139.0 5.4 149.5 3.9 93% Pass A-1-a 89 BNNN.4/63.6 TOF 139.4 5.1 149.5 3.9 93% Pass A-1-a 90 MM/55 TOF 134.1 5.4 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF = Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 24 Structural Fill March 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A skidster and a small sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 91 BNNN.8/69 Top of 134.7 5.5 149.5 3.9 90% Pass Native Footing 92 East of elevator shaft-BGGG.9/58 Top of 127.6 6.0 149.5 3.9 85% Fail Native Footing 93 North of elevator shaft-BEEE.8/61.5 Top of 130.7 5.7 149.5 3.9 87% Fail Native Footing Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor Native General Contractor: PCL Construction Representative Notified: Jeff Comments: Failing areas to be reworked then retested Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�IIn Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 25 Structural Fill March 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A skidster and a small sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCation Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 92.1 East of elevator shaft-BGGG.9/58 TOF 134.7 5.5 149.5 3.9 90% Pass A-1-a 93.1 North of elevator shaft-BEEE.8/61.5 TOF 138.7 4.2 149.5 3.9 93% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor Native General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF = Top of footing Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 26 Structural Fill April 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A skidster and a small sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 93 BEEE.8/47.5 RSG 135.2 5.9 149.5 3.9 90% Pass A-1-a 94 BPPP.9/47.5 RSG 136.3 5.8 149.5 3.9 91% Pass A-1-a 95 H/49 RSG 139.1 5.1 149.5 3.9 93% Pass A-1-a 96 H/57.2 RSG 147.2 3.9 149.5 3.9 98% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�IIn Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 27 Structural Fill April 17, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCation Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 97 BLL.8/57.2 RSG 136.4 5.9 149.5 3.9 91% Pass A-1-a 98 BLL.8/56.9 RSG 136.9 4.8 149.5 3.9 92% Pass A-1-a 99 M/61.5 RSG 135.2 5.2 149.5 3.9 90% Pass A-1-a 100 M.1/61.5 RSG 135.9 5.9 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 28 Structural Fill April 18, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot and skidster Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 101 Footing at M/57.2 (1092) RSG 135.9 4.7 149.5 3.9 91% Pass A-1-a 102 Footing at M/57.2 (1092) RSG 136.4 5.9 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 29 Structural Fill April 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind/sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 103 Z/47.5 TOF 134.5 5.1 149.5 3.9 90% Pass A-1-a 104 Z/48.4 TOF 138.6 5.5 149.5 3.9 93% Pass A-1-a 105 W/52.3 TOF 134.1 5.9 149.5 3.9 90% Pass A-1-a 106 Y/52.3 TOF 134.7 5.8 149.5 3.9 90% Pass A-1-a 107 KK/53 TOF 134.2 5.5 149.5 3.9 90% Pass A-1-a 108 BLL.8/52.3 TOF 132.9 6.4 149.5 3.9 89% Fail A-1-a 108.1 BLL.8/52.3 TOF 135.1 5.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 30 Structural Fill April 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind/sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 109 KK/63 TOF 146.4 4.1 149.5 3.9 98% Pass A-1-a 110 W/66 TOF 134.0 5.8 149.5 3.9 90% Pass A-1-a 111 Footing C.4 at Gridline C/52-56 TOF 134.3 5.6 149.5 3.9 90% Pass A-1-a 112 M/61.5 TOF 133.9 5.8 149.5 3.9 90% Pass A-1-a 113 R/68 TOF 134.5 5.9 149.5 3.9 90% Pass A-1-a 114 Y/68 TOF 134.0 5.7 149.5 3.9 90% Pass A-1-a 115 KK/68 TOF 134.2 5.4 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 31 Structural Fill April 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 116 KK/63 TOF 135.2 5.5 149.5 3.9 90% Pass A-1-a 117 W/66 TOF 134.4 5.7 149.5 3.9 90% Pass A-1-a 118 M/61.5 TOF 133.9 5.7 149.5 3.9 90% Pass A-1-a 119 R/68 TOF 136.2 5.8 149.5 3.9 91% Pass A-1-a 120 Y/68 TOF 139.1 5.1 149.5 3.9 93% Pass A-1-a 121 KK/68 TOF 134.1 4.9 149.5 3.9 90% Pass A-1-a 122 KK/53 TOF 134.9 5.6 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 32 Structural Fill April 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 123 Y/53 TOF 134.2 4.7 149.5 3.9 90% Pass A-1-a 124 67/BPP.9 TOF 131.4 6.2 149.5 3.9 88% Fail A-1-a 124.1 67/BPP.9 TOF 135.0 5.9 149.5 3.9 90% Pass A-1-a 125 R/66 TOF 133.9 5.2 149.5 3.9 90% Pass A-1-a 126 R/68 TOF 134.2 5.7 149.5 3.9 90% Pass A-1-a 127 Y/62 TOF 130.1 7.0 149.5 3.9 87% Fail A-1-a 127.1 Y/62 TOF 134.0 6.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 33 Structural Fill April 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 128 BTT.9/66 TOF 134.7 4.7 149.5 3.9 90% Pass A-1-a 129 66/BPP.9 TOF 131.2 5.9 149.5 3.9 88% Fail A-1-a 129.1 66/BPP.9 TOF 135.4 5.9 149.5 3.9 91% Pass A-1-a 130 R/68 TOF 133.1 6.2 149.5 3.9 89% Fail A-1-a 130.1 R/68 TOF 135.0 5.8 149.5 3.9 90% Pass A-1-a 131 R/66 TOF 137.2 5.9 149.5 3.9 92% Pass A-1-a 132 Y/53 TOF 135.7 4.9 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 34 Structural Fill April 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 133 M/61.5 TOF 124.3 3.2 149.5 3.9 83% Fail A-1-a 133.1 M/61.5 TOF 134.3 3.2 149.5 3.9 90% Pass A-1-a 134 SS/70 TOF 135.6 5.5 149.5 3.9 91% Pass A-1-a 135 BPP.9/66 TOF 137.2 4.5 149.5 3.9 92% Pass A-1-a 136 BHH.9/69 TOF 134.7 5.7 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 35 Structural Fill April 24, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 137 KK/66 TOF 129.2 5.4 149.5 3.9 86% Fail A-1-a 138 M/66 TOF 132.5 3.9 149.5 3.9 89% Fail A-1-a 139 M/58 TOF 134.5 6.2 149.5 3.9 90% Fail A-1-a 137.1 KK/66 TOF 134.5 5.5 149.5 3.9 90% Pass A-1-a 138.1 M/66 TOF 135.2 3.7 149.5 3.9 90% Pass A-1-a 139.1 M/58 TOF 136.2 5.8 149.5 3.9 91% Pass A-1-a 140 R/68 TOF 135.7 3.5 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 36 Structural Fill April 24, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Sheepsfoot/walk behind Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 141 W/59 TOF 137.2 5.4 149.5 3.9 92% Pass A-1-a 142 R/59 TOF 140.1 5.2 149.5 3.9 94% Pass A-1-a 143 M/59 TOF 147.2 5.9 149.5 3.9 98% Pass A-1-a 144 H/70 TOF 130.4 4.2 149.5 3.9 87% Fail A-1-a 145 W/70 TOF 134.7 5.1 149.5 3.9 90% Pass A-1-a 146 BEEE.9/70 TOF 133.9 5.9 149.5 3.9 90% Pass A-1-a 144.1 H/70 TOF 135.2 4.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 37 Structural Fill April 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Walk behind Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 147 H/70 RSG 134.2 7.3 149.5 3.9 90% Fail A-1-a 148 H/66 RSG 133.9 7.7 149.5 3.9 90% Fail A-1-a 149 H/61.9 RSG 135.2 6.9 149.5 3.9 90% Fail A-1-a 150 H/57.2 RSG 134.1 6.4 149.5 3.9 90% Fail A-1-a 147.1 H/70 RSG 135.2 6.2 149.5 3.9 90% Fail A-1-a 148.1 H/66 RSG 134.0 6.9 149.5 3.9 90% Fail A-1-a 149.1 H/62.9 RSG 137.5 5.8 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff/Steve Ray Comments: TOF=Top of Footing Notified Stevie Ray of moisture failures. Will retest when areas is reworked. Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 38 Structural Fill April 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: Walk behind Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 150.1 H/57.2 TOF 135.7 6.0 149.5 3.9 91% Fail A-1-a 147.2 H/70 TOF 135.4 5.7 149.5 3.9 91% Pass A-1-a 148.2 H/66 TOF 134.7 6.0 149.5 3.9 90% Pass A-1-a 150.2 H/57.2 TOF 135.7 5.9 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of Footing Notified Stevie Ray of moisture failures Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 39 Structural Fill May 5, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 151 M/07 2' BTF 141.9 5.5 149.5 3.9 95% Pass A-1-a 152 H/72 2' BTF 129.9 5.7 149.5 3.9 87% Fail A-1-a 152.1 H/72 Retest 2' BTF 125.6 6.3 149.5 3.9 84% Fail A-1-a 152.2 H/72 Retest 2' BTF 134.6 5.9 149.5 3.9 90% Pass A-1-a 153 H/70 2' BTF 136.2 5.7 149.5 3.9 91% Pass A-1-a 154 H/68 2' BTF 134.9 6.1 149.5 3.9 90% Fail A-1-a 154.1 H/68 Retest 2' BTF 134.7 5.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTF=Below Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 40 Structural Fill May 5, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 155 D/59 2' BTF 134.4 5.6 149.5 3.9 90% Pass A-1-a 156 D/62 2' BTF 135.6 5.2 149.5 3.9 91% Pass A-1-a 157 D/65 2' BTF 138.9 5.9 149.5 3.9 93% Pass A-1-a 158 D/70 2' BTF 134.5 6.1 149.5 3.9 90% Fail A-1-a 158.1 D/70 Retest 2' BTF 134.8 5.6 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTF=Below Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 41 Structural Fill May 5, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 159 H/72 1' BTF 135.2 5.9 149.5 3.9 90% Pass A-1-a 160 H/70 1' BTF 132.2 4.9 149.5 3.9 88% Fail A-1-a 160.1 H/70 Retest 1' BTF 135.1 5.2 149.5 3.9 90% Pass A-1-a 161 H/68 1' BTF 131.2 5.7 149.5 3.9 88% Fail A-1-a 161.1 H/68 Retest 1' BTF 137.2 5.7 149.5 3.9 92% Pass A-1-a 162 A/59 1' BTF 135.7 5.9 149.5 3.9 91% Pass A-1-a 163 A/65 1' BTF 134.9 5.1 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTF=Below Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 42 Structural Fill May 6, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 164 D/71 1' BTOF 135.2 5.3 149.5 3.9 90% Pass A-1-a 165 D/68 1' BTOF 134.2 5.9 149.5 3.9 90% Pass A-1-a 166 D/66 1' BTOF 131.5 5.9 149.5 3.9 88% Fail A-1-a 166.1 D/66 retest 1' BTOF 135.9 5.9 149.5 3.9 91% Pass A-1-a 167 BNNN.4/70 1' BTOF 136.1 5.9 149.5 3.9 91% Pass A-1-a 168 BNNN.4/66 1' BTOF 134.5 5.7 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BG = Below Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 43 Structural Fill May 7, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 169 M/66 2' BTOF 133.2 5.4 149.5 3.9 89% Fail A-1-a 169.1 M/66 2' BTOF 134.5 5.5 149.5 3.9 90% Pass A-1-a 170 M/66.2 2' BTOF 135.0 4.9 149.5 3.9 90% Pass A-1-a 171 BNNN.4/70 1' BTOF 135.7 5.9 149.5 3.9 91% Pass A-1-a 172 BNNN.4/68 1' BTOF 134.0 5.5 149.5 3.9 90% Pass A-1-a 173 BNNN.4/66 1' BTOF 133.9 6.1 149.5 3.9 90% Fail A-1-a 173.1 BNNN.4/66 1' BTOF 134.1 5.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BG = Gelow Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 44 Structural Fill May 7, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 174 M/66 1' BTOF 134.0 5.6 149.5 3.9 90% Pass A-1-a 175 M/66.2 1' BTOF 135.7 5.2 149.5 3.9 91% Pass A-1-a 176 BNNN.4/70 TOF 132.1 5.4 149.5 3.9 88% Fail A-1-a 176.1 BNNN.4/70 TOF 133.9 5.5 149.5 3.9 90% Pass A-1-a 177 BNNN.4/68 TOF 135.2 5.9 149.5 3.9 90% Pass A-1-a 178 BNNN.4/66 TOF 135.4 5.2 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTF=Below Top of Footing; TF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 45 Structural Fill May 12, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Footing backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 179 H/40 1' BTOF 135.2 5.4 149.5 3.9 90% Pass A-1-a 180 H/42 1' BTOF 133.2 5.9 149.5 3.9 89% Fail A-1-a 180.1 H/42 Retest 1' BTOF 134.2 5.8 149.5 3.9 90% Pass A-1-a 181 H/38 1' BTOF 136.1 5.4 149.5 3.9 91% Pass A-1-a 182 F/40.3 1' BTOF 134.1 5.2 149.5 3.9 90% Pass A-1-a 183 G/46 1' BTOF 132.5 4.7 149.5 3.9 89% Fail A-1-a 183.1 G/46 Retest 1' BTOF 134.1 4.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BG = Below Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 46 Structural Fill May 12, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 184 H/40 TOF 134.1 5.8 149.5 3.9 90% Pass A-1-a 185 H/46 TOF 133.1 5.5 149.5 3.9 89% Fail A-1-a 185.1 H/46 Retest TOF 134.7 5.7 149.5 3.9 90% Pass A-1-a 186 F/39 TOF 135.4 5.9 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 47 Structural Fill May 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 187 BTT.9/68 TOF 135.1 5.4 149.5 3.9 90% Pass A-1-a 188 BTT.9/61.9 TOF 133.9 5.9 149.5 3.9 90% Pass A-1-a 189 BEEG.8/B62.4 TOF 137.2 4.7 149.5 3.9 92% Pass A-1-a 190 BGGG.2/63.6 TOF 134.6 5.2 149.5 3.9 90% Pass A-1-a 191 BGGG.9/66 TOF 129.7 5.7 149.5 3.9 87% Fail A-1-a 191.1 BGGG.9/66 retest TOF 134.2 5.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of Footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 48 Structural Fill May 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 192 HHH/48 130.0 7.6 149.5 3.9 87% Fail A-1-a 192.1 HHH/48 retest 131.0 75.0 149.5 3.9 88% Fail A-1-a 193 HHH/648.4 136.0 6.1 149.5 3.9 91% Fail A-1-a 193.1 HHH/B48.4 retest 135.1 6.0 149.5 3.9 90% Fail A-1-a 194 HHHB52.3 124.3 6.2 149.5 3.9 83% Fail A-1-a 194.1 HHH/652.3 132.7 5.9 149.5 3.9 89% Fail A-1-a 195 HHH/55 133.9 5.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Will retests at 8:00 AM May 29, 2008. We notiifed Stevie Ray (let dry out) Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 49 Structural Fill May 29, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Slab on grade under pre-cast Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 192.2 HHH/48 retest from 5/29/2008 Top of 134.0 5.6 149.5 3.9 90% Pass A-1-a Footer 193.2 HHH/648.4 Top of 133.9 5.9 149.5 3.9 90% Pass A-1-a Footer 194.2 HHH/B52.3 Top of 135.1 5.9 149.5 3.9 90% Pass A-1-a Footer Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 50 Structural Fill May 30, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Slab on grade Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 196 60/BTT.9 Top of 127.6 4.7 149.5 3.9 85% Fail A-1-a Footer 196.1 60/BTT.9 Retest Top of 134.0 4.9 149.5 3.9 90% Pass A-1-a Footer 197 61.9/BTT.12 Top of 133.9 4.3 149.5 3.9 90% Pass A-1-a Footer 198 B62.4/BTT.15 Top of 135.6 3.9 149.5 3.9 91% Pass A-1-a Footer 199 B57.2/BTT.12 Top of 132.6 4.1 149.5 3.9 89% Fail A-1-a Footer 199.1 B57.2/BTT.12 Retest Top of 135.1 4.5 149.5 3.9 90% Pass A-1-a Footer Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 51 Structural Fill June 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind vibrating plate Area Represented Backfill footers 39-42/A Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 200 H/36 3" BF 142.3 3.7 149.5 3.9 95% Pass Gravel 201 H/42 3" BF 139.7 4.5 149.5 3.9 93% Pass Gravel 202 C/39 3" BF 115.9 15.6 149.5 3.9 78% Fail Gravel Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor Gravel General Contractor: PCL Construction Representative Notified: Jeff Comments: #202 failed we notified Stevie Ray, he will let it dry out before re-working the area Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 52 Structural Fill June 24, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 202.1 C/39 3" BF 139.4 4.9 149.5 3.9 93% Pass A-1-a 203 H/29 3" BF 137.2 4.7 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BF=Bottom of the Footer Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 53 Structural Fill June 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 204 28/R 5' BTOF 134.5 4.7 149.5 3.9 90% Pass A-1-a 205 28/M 5' BTOF 136.0 5.2 149.5 3.9 91% Pass A-1-a 206 32/P 5' BTOF 133.0 5.0 149.5 3.9 89% Fail A-1-a 206.1 32/P 5' BTOF 134.5 4.7 149.5 3.9 90% Pass A-1-a 207 BN.6/31 5' BTOF 138.2 4.6 149.5 3.9 92% Pass A-1-a 208 Z/30 5' BTOF 137.2 4.6 149.5 3.9 92% Pass A-1-a 209 34/BN.6 5' BTOF 134.2 4.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF= Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 54 Structural Fill June 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 210 28/R 4' BTOF 136.2 5.5 149.5 3.9 91% Pass A-1-a 211 BN.6/31 4' BTOF 136.7 5.2 149.5 3.9 91% Pass A-1-a 212 BN.6/34 4' BTOF 134.2 5.9 149.5 3.9 90% Pass A-1-a 213 Z/30 4' BTOF 131.2 4.7 149.5 3.9 88% Fail A-1-a 213.1 Z/30 4' BTOF 133.9 4.7 149.5 3.9 90% Pass A-1-a 214 28/N 4' BTOF 138.2 5.6 149.5 3.9 92% Pass A-1-a 215 32/P 4' BTOF 135.4 5.1 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF= Below top of footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 55 Structural Fill June 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 216 Z/30 3' BTOF 133.9 4.7 149.5 3.9 90% Pass A-1-a 217 32/P 3' BTOF 134.7 5.2 149.5 3.9 90% Pass A-1-a 218 34/BN.6 3' BTOF 134.1 5.5 149.5 3.9 90% Pass A-1-a 219 28/R 3' BTOF 135.1 5.0 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF= Below top of footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 56 Structural Fill June 30, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 220 28/M 3' BTOF 134.2 5.7 149.5 3.9 90% Pass A-1-a 221 28/R 3' BTOF 139.2 4.7 149.5 3.9 93% Pass A-1-a 222 BN.6/31 3' BTOF 133.9 5.2 149.5 3.9 90% Pass A-1-a 223 Z/30 3' BTOF 129.5 4.2 149.5 3.9 87% Fail A-1-a 223.1 Z/30 3' BTOF 133.9 4.0 149.5 3.9 90% Pass A-1-a 224 BN.6/33 3' BTOF 137.2 5.9 149.5 3.9 92% Pass A-1-a 225 32/P 3' BTOF 135.7 5.0 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF=Below top of footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 57 Structural Fill June 30, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 226 Z/30 3' BTOF 129.2 4.2 149.5 3.9 86% Fail A-1-a 226.1 Z/30 3' BTOF 135.7 5.0 149.5 3.9 91% Pass A-1-a 227 R/32 3' BTOF 137.6 4.7 149.5 3.9 92% Pass A-1-a 228 R/32 3' BTOF 140.1 5.2 149.5 3.9 94% Pass A-1-a 229 BN.6/31 3' BTOF 133.9 5.9 149.5 3.9 90% Pass A-1-a 230 BN.6/33 3' BTOF 134.6 4.1 149.5 3.9 90% Pass A-1-a 231 P/32 3' BTOF 135.8 5.0 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF=Below top of footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 58 Structural Fill June 30, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 232 37/W TOF 139.6 5.8 149.5 3.9 93% Pass A-1-a 233 R/28 TOF 135.1 4.8 149.5 3.9 90% Pass A-1-a 234 R/32 TOF 133.9 5.2 149.5 3.9 90% Pass A-1-a 235 BN.6/34 TOF 135.6 5.7 149.5 3.9 91% Pass A-1-a 236 Z/30 TOF 134.1 5.1 149.5 3.9 90% Pass A-1-a 237 32/P TOF 134.2 4.6 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of footing Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 59 Structural Fill July 1, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 238 35/M 2' BTOF 134.2 5.7 149.5 3.9 90% Pass A-1-a 239 35/W 2' BTOF 135.7 4.8 149.5 3.9 91% Pass A-1-a 240 30/W TOF 138.1 5.1 149.5 3.9 92% Pass A-1-a 241 Y/B27.4 TOF 137.6 5.1 149.5 3.9 92% Pass A-1-a 242 35/M TOF 133.9 5.2 149.5 3.9 90% Pass A-1-a 243 35/W TOF 134.6 5.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�IIn Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 60 Structural Fill July 1, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCation Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 244 34.5/D TOF 140.5 4.7 149.5 3.9 94% Pass A-1-a 245 34.5/H TOF 139.8 4.4 149.5 3.9 94% Pass A-1-a 246 35/P TOF 134.5 5.7 149.5 3.9 90% Pass A-1-a 247 32/BN.6 TOF 145.0 4.0 149.5 3.9 97% Pass A-1-a 248 35/W TOF 139.1 5.7 149.5 3.9 93% Pass A-1-a 249 35/M TOF 129.5 4.8 149.5 3.9 87% Fail A-1-a 249.1 35/M TOF 134.6 4.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 61 Structural Fill July 2, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A small sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 250 B40.3/B 2' BTOF 135.2 5.9 149.5 3.9 90% Pass A-1-a 251 B34.5/B 2' BTOF 141.0 5.4 149.5 3.9 94% Pass A-1-a 252 B35/E 2' BTOF 136.1 5.0 149.5 3.9 91% Pass A-1-a 253 B40.5/B TOF 134.6 4.7 149.5 3.9 90% Pass A-1-a 254 B34.5/B TOF 140.1 5.9 149.5 3.9 94% Pass A-1-a 255 B35/E TOF 130.1 4.7 149.5 3.9 87% Fail A-1-a 255.1 B35/E TOF 134.2 4.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of footing, BTOF=Below top of footing Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 62 Structural Fill July 9, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 256 Footings 1061 at 34/SS 3' BTOF 129.5 4.7 149.5 3.9 87% Fail A-1-a 256.1 Footings 1061 at 34/SS-Retest 3' BTOF 134.0 4.5 149.5 3.9 90% Pass A-1-a 257 Footing 1061 at 34/SS 3' BTOF 134.7 5.2 149.5 3.9 90% Pass A-1-a 258 Footing 1033 3' BTOF 129.0 5.5 149.5 3.9 86% Fail A-1-a 258.1 Footing 1033 retest 3' BTOF 133.1 5.7 149.5 3.9 89% Fail A-1-a 258.2 Fooing 1033 retest 3' BTOF 143.3 5.2 149.5 3.9 96% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of footing, BTOF=Below top of footing Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 63 Structural Fill July 11, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 259 Footings 1032-34/BAAA.2 BOF 131.2 4.7 149.5 3.9 88% Fail A-1-a 259.1 RETEST Footings 1032-34/BAAA.2 BOF 134.7 4.9 149.5 3.9 90% Pass A-1-a 260 Footing 1031-34/4BEEE.8 BOF 135.8 5.7 149.5 3.9 91% Pass A-1-a 261 42.4/BEEE.8 TOF 143.2 4.7 149.5 3.9 96% Pass A-1-a 262 35/BNNN.4 TOF 140.1 5.2 149.5 3.9 94% Pass A-1-a 263 48.4/BGGG.9 TOF 135.1 5.7 149.5 3.9 90% Pass A-1-a 264 35/BGGG.2 TOF 137.5 5.0 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 64 Structural Fill July 14, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 265 36/s5 2' BTOF 132.0 4.7 149.5 3.9 88% Fail A-1-a 265.1 Retest-36/s5 2' BTOF 135.0 5.9 149.5 3.9 90% Pass A-1-a 266 40/BTT.9 TOF 135.4 5.2 149.5 3.9 91% Pass A-1-a 267 38/BTT.9 TOF 136.7 4.7 149.5 3.9 91% Pass A-1-a 268 36/S5 1' BTOF 134.5 4.7 149.5 3.9 90% Pass A-1-a 269 36/BAAA.2 1' BTOF 134.7 5.7 149.5 3.9 90% Pass A-1-a 270 36/BNNN.4 1' BTOF 137.5 4.8 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Std Counts: 618/2241 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 65 Structural Fill July 14, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 271 Footing 1029 at BQQQ.4/B34.5 BOF 135.4 3.9 149.5 3.9 91% Pass A-1-a 272 Footing 1030 at BNNN.4/B34.5 BOF 133.0 4.7 149.5 3.9 89% Fail A-1-a 272.1 Footing 1030 at BNNN.4/B34.5 BOF 134.2 4.6 149.5 3.9 90% Pass A-1-a 273 Spread Footer B.6 BQQQ.4/B34.5-B42.4 BOF 136.9 4.5 149.5 3.9 92% Pass A-1-a 274 Footer B.6 BOF 132.5 4.7 149.5 3.9 89% Fail A-1-a 274.1 Footer B.6 BOF 134.5 4.8 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 66 Structural Fill July 14, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 275 Footing 1104 at BNNN.4/B29.4 BOF 132.1 4.7 149.5 3.9 88% Fail A-1-a 275.1 Footing 1104 at BNNN.4/B29.4 BOF 135.6 4.8 149.5 3.9 91% Pass A-1-a 276 36/BAAA.2 TOF 129.6 3.9 149.5 3.9 87% Fail A-1-a 276.1 36/BAAA.2 TOF 134.2 4.7 149.5 3.9 90% Pass A-1-a 277 36/BNNN.4 TOF 136.7 4.2 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 67 Structural Fill July 15, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 278 SS/B42.4 TOF 131.0 4.0 149.5 3.9 88% Fail A-1-a 278.1 SS/B42.4 TOF 134.6 4.2 149.5 3.9 90% Pass A-1-a 279 BAAA.2/36 TOF 128.9 4.3 149.5 3.9 86% Fail A-1-a 279.1 BAAA.2/36 TOF 135.7 4.8 149.5 3.9 91% Pass A-1-a 280 Footing 1169 at BEEE.8/B29.5 BOF 135.2 4.2 149.5 3.9 90% Pass A-1-a 281 BPPP.9/B40.3 BOF 136.2 5.3 149.5 3.9 91% Pass A-1-a 282 Footing 1104 at B29.5/BNNN.8 BOF 137.7 5.2 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 68 Structural Fill July 15, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 283 Footing 1168 at B29.8/BAAA.2 BOF 135.2 3.9 149.5 3.9 90% Pass A-1-a 284 Footing 1170 at B29.8/BTT.9 BOF 134.9 4.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 69 Structural Fill July 16, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind and a walk behind Area Represented Sla on grade Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 285 BZZ.9/B55 RSG 135.5 4.7 149.5 3.9 91% Pass A-1-a 286 B57.2/BTT.9 RSG 131.2 5.2 149.5 3.9 88% Fail A-1-a 286.1 B57.2/BTT.9 RSG 134.5 5.0 149.5 3.9 90% Pass A-1-a 287 B48.4/BZZ.1 RSG 130.1 4.7 149.5 3.9 87% Fail A-1-a 287.1 B48.4/BZZ.1 RSG 133.9 4.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C Q N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 70 Structural Fill July 17, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footers Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 288 S.O.G. at 59-63/E-M RSG 131.2 42 149.5 3.9 88% Fail A-1-a 288.1 S.O.G. at 59-63/E-M-Retest RSG 134.5 4.0 149.5 3.9 90% Pass A-1-a 289 Footing 1173 at BTT.9/B25.8 BOF 134.0 4.7 149.5 3.9 90% Pass A-1-a 290 Footing 1173 at BTT.9/B25.8 BOF 135.2 5.2 149.5 3.9 90% Pass A-1-a 291 Footing 1167 at B25.8/BAAA2 BOF 137.2 4.7 149.5 3.9 92% Pass A-1-a 292 Footing 1105 at B27.8/BSSS.3 BOF 131.6 5.7 149.5 3.9 88% Fail A-1-a 292.1 Footing 1105 at B27.8/BSSS.3-Retest BOF 135.7 5.2 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 71 Structural Fill July 17, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 293 Footing B.7 at BSSS.3/28-B34.5 BOF 135.6 5.9 149.5 3.9 91% Pass A-1-a 294 Footing B.7 at BSSS.3/28-B34.5 BOF 139.6 4.5 149.5 3.9 93% Pass A-1-a 295 34/BNNN.4 2' BTOF 135.6 5.2 149.5 3.9 91% Pass A-1-a 296 34/BEEE.8 2' BTOF 131.2 4.7 149.5 3.9 88% Fail A-1-a 296.1 34/BEEE.8-Retest 2' BTOF 133.9 4.6 149.5 3.9 90% Pass A-1-a 297 34/BAAA.2 2' BTOF 139.6 4.5 149.5 3.9 93% Pass A-1-a 298 HHH/34 2' BTOF 134.6 5.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 72 Structural Fill July 17, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 299 27.8/BNNN.4 2' BTOF 130.1 4.8 149.5 3.9 87% Fail A-1-a 299.1 27.8/BNNN.4 2' BTOF 134.2 4.5 149.5 3.9 90% Pass A-1-a 300 37.8/BEEE.8 2' BTOF 136.2 4.7 149.5 3.9 91% Pass A-1-a 301 37.8/BTT.9 2' BTOF 135.7 3.9 149.5 3.9 91% Pass A-1-a 302 34/BNNN.4 2' BTOF 134.1 4.2 149.5 3.9 90% Pass A-1-a 303 34/BEEE.8 2' BTOF 129.1 4.5 149.5 3.9 86% Fail A-1-a 303.1 34/BEEE.8-Retest 2' BTOF 134.1 4.3 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 73 Structural Fill July 17, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 304 HHH/34 2' BTOF 135.1 5.8 149.5 3.9 90% Pass A-1-a 305 34/BAAA.2 2' BTOF 136.4 5.0 149.5 3.9 91% Pass A-1-a 306 34/BEEE.8 TOF 132.6 4.9 149.5 3.9 89% Fail A-1-a 306.1 34/BEEE.8 TOF 134.5 4.9 149.5 3.9 90% Pass A-1-a 307 34/BNNN.4 TOF 137.6 5.9 149.5 3.9 92% Pass A-1-a 308 HHH/34 TOF 133.9 5.6 149.5 3.9 90% Pass A-1-a 309 37.8/BNNN.4 TOF 139.5 4.7 149.5 3.9 93% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 74 Structural Fill July 21, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 310 S.O.G. H/59 RSG 131.2 4.8 149.5 3.9 88% Fail A-1-a 310.1 S.O.G. H/59-Retest RSG 135.4 4.5 149.5 3.9 91% Pass A-1-a 311 S.O.G. H/49 RSG 139.6 4.8 149.5 3.9 93% Pass A-1-a 312 S.O.G. H/56 RSG 135.2 5.2 149.5 3.9 90% Pass A-1-a 313 B27.4/BTT.9 2' BTOF 134.2 4.7 149.5 3.9 90% Pass A-1-a 314 B27.4/BAAA.2 2' BTOF 133.9 4.9 149.5 3.9 90% Pass A-1-a 315 B25/BTT.10 2' BTOF 135.6 5.6 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 75 Structural Fill July 21, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 316 25/BTT.9 2' BTOF 135.7 5.7 149.5 3.9 91% Pass A-1-a 317 25/BAAA.2 2' BTOF 133.1 4.8 149.5 3.9 89% Fail A-1-a 317.1 25/BAAA.2-Retest 2' BTOF 134.6 4.5 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 76 Structural Fill July 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented S.O.G. Backfill Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 318 S.O.G. at H/48 RSG 137.5 5.3 149.5 3.9 92% Pass A-1-a 319 S.O.G. at M/51 RSG 134.2 4.3 149.5 3.9 90% Pass A-1-a 320 S.O.G. at H/56 RSG 135.2 4.6 149.5 3.9 90% Pass A-1-a 321 Footing 1106 BOF 129.5 4.3 149.5 3.9 87% Fail A-1-a 322 Spread Footer B.8 BOF 129.6 3.9 149.5 3.9 87% Fail A-1-a 321.1 Footing 1106-Retest BOF 135.6 4.5 149.5 3.9 91% Pass A-1-a 322.1 Spread Footer B.8-Retest BOF 133.9 4.1 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 77 Structural Fill July 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented S.O.G. Backfill Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 323 HHH/20 6' BMH 141.6 4.5 149.5 3.9 95% Pass A-1-a 324 HHH/21 6' BMH 139.5 4.4 149.5 3.9 93% Pass A-1-a 325 HHH/19 6' BMH 135.7 4.8 149.5 3.9 91% Pass A-1-a 326 BNNN.4/21 6' BMH 139.1 4.5 149.5 3.9 93% Pass A-1-a 327 HHH/20 4' BMH 131.2 5.3 149.5 3.9 88% Fail A-1-a 327.1 HHH/20-Retest 4' BMH 134.6 5.4 149.5 3.9 90% Pass A-1-a 328 HHH/21 4' BMH 135.6 5.8 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 78 Structural Fill July 22, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill manhole Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 329 HHH/19 4' BMH 140.1 5.7 149.5 3.9 94% Pass A-1-a 330 BNNN.4/21 4' BMH 138.1 5.8 149.5 3.9 92% Pass A-1-a 331 HHH/20 2' BMH 130.1 5.2 149.5 3.9 87% Fail A-1-a 331.1 HHH/20-Retest 2' BMH 134.1 5.0 149.5 3.9 90% Pass A-1-a 332 HHH/19 2' BMH 135.1 5.2 149.5 3.9 90% Pass A-1-a 333 BNNN.4/21 2' BMH 134.2 4.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 79 Structural Fill July 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area RepreSented Backfill footins and manhole Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 334 HHH/20 1' BMH 136.7 4.8 149.5 3.9 91% Pass A-1-a 335 HHH/19 1' BMH 135.2 5.2 149.5 3.9 90% Pass A-1-a 336 BNNN.4/21 1' BMH 134.9 5.0 149.5 3.9 90% Pass A-1-a 337 Spread Footer B.8 BOF 141.0 4.8 149.5 3.9 94% Pass A-1-a 338 Footing 1107 BOF 130.1 5.6 149.5 3.9 87% Fail A-1-a 338.1 Footing 1107-Retest BOF 134.9 5.7 149.5 3.9 90% Pass A-1-a 339 Footing 111 BOF 136.5 4.8 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BMH= BOF=Bottom of footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 80 Structural Fill July 23, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area RepreSented Backfill footins and manhole Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 340 Footing 1165 BOF 134.9 5.9 149.5 3.9 90% Pass A-1-a 341 1165 BOF 133.9 5.6 149.5 3.9 90% Pass A-1-a 342 Footer 1164 BOF 129.1 4.2 149.5 3.9 86% Fail A-1-a 342.1 Footer 1164-Retest BOF 136.0 4.5 149.5 3.9 91% Pass A-1-a 343 Footer 1164 BOF 137.2 4.9 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 81 Structural Fill July 24, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footer Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 345 Footing 1141 BOF 137.8 4.8 149.5 3.9 92% Pass A-1-a 346 Footing 1145 BOF 139.1 5.2 149.5 3.9 93% Pass A-1-a 347 Footing 1146 BOF 132.4 3.9 149.5 3.9 89% Fail A-1-a 347.1 Footing 1146-Retest BOF 136.2 4.2 149.5 3.9 91% Pass A-1-a 348 Footing 1112 BOF 134.2 5.7 149.5 3.9 90% Pass A-1-a 349 Footing 1114 BOF 136.7 5.2 149.5 3.9 91% Pass A-1-a 350 Footing 1121 BOF 134.1 4.8 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 82 Structural Fill July 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footers Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 351 Footing 1111 at 23/BNNN.4 BOF 128.5 4.8 149.5 3.9 86% Fail A-1-a 351.1 Footer1111 at23/BNNN.4-Retest BOF 135.6 5.2 149.5 3.9 91% Pass A-1-a 352 Footing 1137 BOF 137.2 5.8 149.5 3.9 92% Pass A-1-a 353 Footing 1133 BOF 135.6 4.8 149.5 3.9 91% Pass A-1-a 354 Footing 1129 BOF 140.6 5.2 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 83 Structural Fill July 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented S.O.G./Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 355 S.O.G. at W-BEE.6/47-59 RSG 137.6 9.8 149.5 3.9 92% Fail A-1-a 355.1 S.O.G. at W-BEE.6/47-59-Retest RSG 135.4 5.9 149.5 3.9 91% Pass A-1-a 356 Footing 1128 BOF 135.4 5.5 149.5 3.9 91% Pass A-1-a 357 Footing 1129 BOF 138.2 5.8 149.5 3.9 92% Pass A-1-a 358 Footing 1137 BOF 141.2 5.2 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Area was pumping we notified Stevie Ray, he will replace with dry soil (will retest) BOF=Bottom of footer/RSG=Rough Surface Grade Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 84 Structural Fill July 29, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented S.O.G./Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 359 S.O.G. at BPP.9/52.3 RSG 129.2 5.2 149.5 3.9 86% Fail A-1-a 359.1 S.O.G. at BPP.9/52.3-Retest RSG 135.2 5.6 149.5 3.9 90% Pass A-1-a 360 S.O.G. at B61.5/BTT.7 RSG 137.4 5.0 149.5 3.9 92% Pass A-1-a 361 S.O.G. at BPP.9/61.5 RSG 120.1 4.8 149.5 3.9 80% Fail A-1-a 361.1 S.O.G. at BPP.9/61.5-Retest RSG 133.9 5.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 85 Structural Fill July 30, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented S.O.G./Footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 362 S.O.G. at 52.3/BTT.9 RSG 135.6 4.8 149.5 3.9 91% Pass A-1-a 363 S.O.G. at 56/BLL.8 RSG 137.4 5.2 149.5 3.9 92% Pass A-1-a 364 S.O.G. at 59/BPP.9 RSG 134.7 5.6 149.5 3.9 90% Pass A-1-a 365 Footing 1120 at 18/BNNN.4 RSG 129.7 5.2 149.5 3.9 87% Fail A-1-a 365.1 Footing 1120 at 18/BNNN.4 RSG 135.6 5.8 149.5 3.9 91% Pass A-1-a 366 Footing 1137 at 1/TTT RSG 136.5 4.8 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 86 Structural Fill July 31, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk behind Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 367 Footer 1141 at JJJ/1 BOF 138.1 4.6 149.5 3.9 92% Pass A-1-a 368 Footer B16 at 1.3/TTT BOF 137.2 5.2 149.5 3.9 92% Pass A-1-a 369 Footer D.1 at 1/RRR-JJJ BOF 135.9 5.5 149.5 3.9 91% Pass A-1-a 370 Footers 1206-1203 at RA/R1-R4 BOF 132.1 4.4 149.5 3.9 88% Fail A-1-a 370.1 Footers 1206-1203 at RA/R1-R4 BOF 135.2 4.9 149.5 3.9 90% Pass A-1-a 371 Footer 1206-1203 BOF 136.7 5.5 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 87 Structural Fill August 1, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 372 B17.7/HHH 4' BTOF 141.6 5.7 149.5 3.9 95% Pass A-1-a 373 B23.4/HHH 4' BTOF 137.6 5.5 149.5 3.9 92% Pass A-1-a 374 BNNN.4/21 4' BTOF 135.7 4.8 149.5 3.9 91% Pass A-1-a 375 B24/HHH 4' BTOF 130.1 5.2 149.5 3.9 87% Fail A-1-a 375.1 B24/HHH-Retest 4' BTOF 135.6 5.4 149.5 3.9 91% Pass A-1-a 376 BEEE.8/24 4' BTOF 134.9 4.8 149.5 3.9 90% Pass A-1-a 377 BNNN.4/24 4' BTOF 136.8 5.0 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF=Below Top of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 88 Structural Fill August 1, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 378 B23.4/HHH 3' BTOF 135.6 4.8 149.5 3.9 91% Pass A-1-a 379 BNNN.4/24 3' BTOF 134.6 5.2 149.5 3.9 90% Pass A-1-a 380 B24/HHH 3' BTOF 136.2 5.0 149.5 3.9 91% Pass A-1-a 381 BEEE.8/24 3' BTOF 135.1 5.7 149.5 3.9 90% Pass A-1-a 382 B17.7/HHH 3' BTOF 134.6 5.2 149.5 3.9 90% Pass A-1-a 383 BNNN.4/21 3' BTOF 131.7 5.1 149.5 3.9 88% Fail A-1-a 384 BNNN.4/21-Retest 3' BTOF 134.6 5.4 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF=Below Top of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 89 Structural Fill August 4, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 385 B.15 at B24.4/TTT BOF 128.6 4.5 149.5 3.9 86% Fail A-1-a 385.1 B.15 at B24.4/TTT-Retest BOF 135.6 5.2 149.5 3.9 91% Pass A-1-a 386 1127 at 3/TTT BOF 136.5 5.4 149.5 3.9 91% Pass A-1-a 387 D.4 at BEEE.8/1.3 BOF 135.2 4.9 149.5 3.9 90% Pass A-1-a 388 1203 at RA/R4 BOF 138.1 5.2 149.5 3.9 92% Pass A-1-a 389 D.7 at RA/R3.5 BOF 137.9 5.6 149.5 3.9 92% Pass A-1-a 390 B.11 at B17.7/TTT BOF 134.6 5.1 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 90 Structural Fill August 4, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 391 1.1/BNNN.4 TOF 130.1 5.6 149.5 3.9 87% Fail A-1-a 391.1 1.1/BNNN.4-Retest TOF 134.5 5.8 149.5 3.9 90% Pass A-1-a 392 1.4/BNNN.4 TOF 135.6 4.9 149.5 3.9 91% Pass A-1-a 393 B23/QQQ TOF 134.7 5.7 149.5 3.9 90% Pass A-1-a 394 B17.7/BNNN.4 TOF 127.1 4.9 149.5 3.9 85% Fail A-1-a 394.1 B17.7/BNNN.4-Retest TOF 134.7 5.2 149.5 3.9 90% Pass A-1-a 395 15/QQQ TOF 137.8 5.9 149.5 3.9 92% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: TOF=Top of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 91 Structural Fill August 7, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 396 B.14 at 6/QQQ RFSG 136.5 5.9 149.5 3.9 91% Pass A-1-a 397 1150 at BEEE.8/5 RFSG 134.6 5.8 149.5 3.9 90% Pass A-1-a 398 1125 at 7/UUU RFSG 130.6 5.6 149.5 3.9 87% Fail A-1-a 398.1 1125 at 7/UUU RFSG 133.9 5.7 149.5 3.9 90% Pass A-1-a 399 B.13 at B8.5/UUU RFSG 134.7 5.4 149.5 3.9 90% Pass A-1-a 400 1123 at B10.8/UUU RFSG 128.1 6.1 149.5 3.9 86% Fail A-1-a 400.1 1123 at B10.8/UUU RFSG 133.9 5.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RFSG=Rough Footer Surface Grade Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 92 Structural Fill August 11, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill footings Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 401 Footer 1202 at 5/W BOF 133.9 5.8 149.5 3.9 90% Pass A-1-a 402 Footer D.8 at 4/W BOF 135.6 5.9 149.5 3.9 91% Pass A-1-a 403 Footer 1187 at 6/BZZ.9 BOF 134.2 6.5 149.5 3.9 90% Fail A-1-a 403.1 Footer 1187 at 6/BZZ.9-Retest BOF 135.2 5.8 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Footer 1187 had water issues, the water was pumped out and let dry BOF=Bottom of Footer Nuclear Gauge No.: 34 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 93 Structural Fill August 12, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Footer 1184 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 404 Footer 1184 at 6/BTT10 BOF 139.3 4.4 149.5 3.9 93% Pass A-1-a 405 B2.4/BEEE.8 3' BTOF 141.2 4.8 149.5 3.9 94% Pass A-1-a 406 3/HHH 3' BTOF 137.2 5.2 149.5 3.9 92% Pass A-1-a 407 B2.4/HHH 3' BTOF 139.7 5.6 149.5 3.9 93% Pass A-1-a 408 B2.4/BEEE.8 2' BTOF 132.1 5.2 149.5 3.9 88% Fail A-1-a 408.1 B2.4/BEEE.8-Retest 2' BTOF 134.6 5.4 149.5 3.9 90% Pass A-1-a 409 3/HHH 2' BTOF 135.1 4.9 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 94 Structural Fill August 12, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Backfill Prep Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 410 B2.4/BEEE.8 TOF 135.7 4.6 149.5 3.9 91% Pass A-1-a 411 B3/HHH TOF 133.9 5.8 149.5 3.9 90% Pass A-1-a 412 B2.4/HHH TOF 133.1 4.8 149.5 3.9 89% Fail A-1-a 412.1 B2.4/HHH-Retest TOF 134.6 4.9 149.5 3.9 90% Pass A-1-a 413 7/HHH TOF 135.2 5.8 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 95 Structural Fill August 14, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 414 Footer 1063 at 34/BHH.9 BOF 133.2 4.1 149.5 3.9 89% Fail A-1-a 414.1 Footer 1063 at 34/BHH.9-Retest BOF 137.2 5.0 149.5 3.9 92% Pass A-1-a 415 Footer 1064 at 40/BHH.9 BOF 141.6 5.2 149.5 3.9 95% Pass A-1-a 416 Placing boom footer at 37/Y BOF 134.2 4.1 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 96 Structural Fill August 19, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheepsfoot Area Represented Footer backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 420 Footer 1124 at B8.5/QQQ BOF 136.8 4.1 149.5 3.9 92% Pass A-1-a 421 B47.5/BPP.9 3' BTOF 140.8 3.6 149.5 3.9 94% Pass A-1-a 422 B48.7/BHH.9 3' BTOF 136.3 5.0 149.5 3.9 91% Pass A-1-a 423 Y/B47.5 3' BTOF 148.9 3.1 149.5 3.9 100% Pass A-1-a 424 B47.5/BPP.9 2' BTOF 134.7 3.1 149.5 3.9 90% Pass A-1-a 425 B48.7/BHH.9 2' BTOF 133.1 3.8 149.5 3.9 89% Fail A-1-a 425.1 B48.7/BHH.9-Retest 2' BTOF 134.2 4.2 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 97 Structural Fill August 19, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footer backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 426 Y/B47.5 2' BTOF 134.7 3.7 149.5 3.9 90% Pass A-1-a 427 B47.5/BPP.5 TOF 135.6 5.2 149.5 3.9 91% Pass A-1-a 428 B48.7/BHH.9 TOF 140.1 3.6 149.5 3.9 94% Pass A-1-a 429 Y/B47.5 TOF 135.7 4.8 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 98 Structural Fill August 21, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footer backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 430 16/BNNN.4 2' BTOF 136.7 5.2 149.5 3.9 91% Pass A-1-a 431 B17.7/RRR 2' BTOF 134.2 4.8 149.5 3.9 90% Pass A-1-a 432 16/BWWW.4 1' BTOF 132.1 4.2 149.5 3.9 88% Fail A-1-a 432.1 16/BWWW.4 1' BTOF 134.5 4.5 149.5 3.9 90% Pass A-1-a 433 16/BNNN.4 TOF 137.8 3.5 149.5 3.9 92% Pass A-1-a 434 B17.7/RRR TOF 140.1 4.2 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 99 Structural Fill August 21, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footer backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 435 B12.8/BRR.7 at 1178 3' BTOF 133.1 4.5 149.5 3.9 89% Fail A-1-a 435.1 B12.8/BRR.7 at 1178 3' BTOF 134.9 4.8 149.5 3.9 90% PASS A-1-a 436 7/QQQ at 1124 3' BTOF 137.1 4.8 149.5 3.9 92% PASS A-1-a 437 B12.8/BRR.7 at 1178 2' BTOF 135.7 5.2 149.5 3.9 91% PASS A-1-a 438 7/QQQ at 1124 2' BTOF 138.1 4.8 149.5 3.9 92% PASS A-1-a 439 B12.8/BRR.7 at 1178 TOF 134.6 5.0 149.5 3.9 90% PASS A-1-a 440 7/QQQ at 1124 TOF 135.1 5.5 149.5 3.9 90% PASS A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BTOF=Below Top of Footer TOF=Top of Footer Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C Q N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 100 Structural Fill August 25, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 441 Spread Footer D.9 at 6/BTT.9 BOF 135.1 3.9 149.5 3.9 90% Pass A-1-a 442 Placing Board#2 7/BEEE.8 BOF 1332 4.1 149.5 3.9 89% Fail A-1-a 442.1 Placing Board#2 7/BEEE.8 BOF 137.5 4.5 149.5 3.9 92% PASS A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of Footer Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C Q N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 101 Structural Fill August 26, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind Area Represented Footing Backfill Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 443 1154 at 9/BAAA2 BOF 139.2 4.6 149.5 3.9 93% Pass A-1-a 444 1154 at 9/BEEE.8 BOF 140.1 5.4 149.5 3.9 94% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: BOF=Bottom of Footer Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 102 Structural Fill August 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheep's foot compactor Area Represented Slab on grade Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 445 S.O.G. at R10/RH RSG 135.1 4.6 149.5 3.9 90% Pass A-1-a 446 S.O.G. at A/36 RSG 134.6 4.0 149.5 3.9 90% Pass A-1-a 447 S.O.G. at C/34 RSG 136.2 5.1 149.5 3.9 91% Pass A-1-a 448 S.O.G. at A/43 RSG 132.4 4.2 149.5 3.9 89% Fail A-1-a 448.1 S.O.G. at A/43 RSG 139.4 4.2 149.5 3.9 93% Pass A-1-a 449 S.O.G. at E/32 RSG 135.1 4.7 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 103 Structural Fill August 28, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A walk-behind sheep's foot compactor Area Represented Footer Prep Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 450 Footer 1154 at 9/BAAA.2 RSG 130.4 4.0 149.5 3.9 87% Fail A-1-a 450.1 Footer 1154 at 9/BAAA.2 RSG 133.9 4.2 149.5 3.9 90% Pass A-1-a 451 Footer 1154 at B12.4/BAAA.2 RSG 129.5 4.5 149.5 3.9 87% Fail A-1-a 451.1 Footer 1154 at B12.4/BAAA.2 RSG 134.2 5.0 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 46 Field Technician: James Ford Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 104 Structural Fill September 3, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray/Jeff Equipment Utilized: A walk-behind sheep's foot compactor Area Represented Footing Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 452 Fooitng BAA2-18 4' Below 142.3 4.2 149.5 3.9 95% Pass A-1-a Grade Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Construction Representative Notified: Jeff Comments: Nuclear Gauge No.: 56 Field Technician: April Wyatt Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 105 Structural Fill September 5, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Construction Representative Notified: Stevie Ray Equipment Utilized: A skidster and a walk behind sheepsfoot Area Represented Footing 1190, Footing 1154, 1163, 1162 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 453 16/W 2 BG 135.6 4.2 149.5 3.9 91% Pass A-1-a 454 20/W.5 2 BG 137.2 4.0 149.5 3.9 92% Pass A-1-a 455 17/DDD 3 BG 135.9 3.8 149.5 3.9 91% Pass A-1-a 456 21 /DDD.5 1 BG 134.9 4.6 149.5 3.9 90% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: WVC Representative Notified: Stevie Ray Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 106 Structural Fill September 6, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Ray Equipment Utilized: A walk behind sheepsfoot Area Represented Footing 1190, 1154, 1163, 1162 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 457 9/W.8 3' Below 136.7 5.0 149.5 3.9 91% Pass A-1-a Grade 458 16/DDD 3' Below 135.9 3.9 149.5 3.9 91% Pass A-1-a Grade 459 17/DDD 2' Below 140.2 4.6 149.5 3.9 94% Pass A-1-a Grade 460 20/W.8 2' Below 138.6 5.0 149.5 3.9 93% Pass A-1-a Grade 461 17/BAAA.2 2' Below 137.4 4.2 149.5 3.9 92% Pass A-1-a Grade 462 17/W 1' Below 139.2 5.1 149.5 3.9 93% Pass A-1-a Grade 463 13/DDD 1' Below 140.7 4.8 149.5 3.9 94% Pass A-1-a Grade Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff T Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 107 Structural Fill September 9, 2008 Mr. David Williams On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot and a skidster Area Represented Footings 1193, 1171 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 464 Footing#1171 RSG 138.1 3.5 149.9 3.9 92% Pass A-1-a 465 Footing#1193 RSG 136.2 3.7 149.5 3.9 91% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff T Comments: . Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 108 Structural Fill September 11, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Ray Equipment Utilized: 1 walk behind shhepsfoot Area Represented Footings 1194 and 1172 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 466 Footing#1194 RSG 136.1 4.6 149.5 3.9 91% Pass A-1-a 467 Footing#1172 RSG 139.4 4.0 149.5 3.9 93% Pass A-1-a Specifications: Min. 90 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff T Comments: . Nuclear Gauge No.: 74 Field Technician: Nate Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 109 Structural Fill September 16, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Ray Equipment Utilized: A sheepsfoot Area Represented Slab on Grade B29.8/B57.2, BAAA.2/BSSS.4 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 468 B34.5/BNNN.4 RSG 135.1 4.0 140.0 6.0 97% Pass A-2-4 469 BEEE.5/52.3 RSG 132.6 4.6 138.8 6.6 96% Pass A-2-4 470 BGGG.9/B25.8 RSG 133.8 5.8 138.8 6.6 96% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Thompson Comments: . Nuclear Gauge No.: 70 Field Technician: Nate Fintel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 110 Structural Fill September 18, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Ray Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Basement Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 471 42.4-KK RSG 142.7 5.4 149.5 3.9 95% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Thompson Comments: Nuclear Gauge No.: 72 Std Counts: 758/2812 Field Technician: Stephen Buckeridge Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 111 Structural October 13, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Steve Equipment Utilized: A sheepsfoot Area Represented Garage level slab on grade pour 10 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 472 Gridline 4.9-BGGG.2 RSG 134.0 4.4 138.3 6.6 97% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2 Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 112 Structural October 21, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A bobcat,two walk behind sheepsfoot compactor Area Represented Garage Level Gridline MM, B34.5 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 473 Gridline MM, B34.5 RSG 134.1 5.9 138.3 6.6 97% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2 Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 113 Structural November 4, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Jeff Equipment Utilized: A walk behind sheepsfoot compactor Area Represented SOG 13/4 under precast lamp GL BEEE.8-BTT.9 and 11-23 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 474 Gridline GL BEEE.8-22 RSG 143.5 5.0 149.5 3.9 96% Pass A-1-a 475 Gridlines GL BTT.9-15 RSG 144.7 5.2 149.5 3.9 97% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2 Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 114 Structural November 5, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Steve Equipment Utilized: A bobcat, a vibratory walk behind sheepsfoot compactor Area Represented Lower garage level-Gridlines BTT.9, 34.5-46+F-A, 21-26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 476 Gridlines AA42 RSG 143.2 5.6 149.5 3.9 96% Pass A-1-a 477 Gridlines NN 38 RSG 143.9 5.9 149.5 3.9 96% Pass A-1-a 478 Gridline D24 RSG 145.1 4.3 149.5 3.9 97% Pas A-1-a Specifications: Min. 95 % Max Dry Density +/-2 Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences Vail Resorts Development Company Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 115 Structural November 6, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Steve Equipment Utilized: Sheepsfoot compactor,trackhoe Area Represented Footings#1182, 1176, 1175, 1197 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 479 Footing 1182 RSG 141.5 5.9 149.5 3.9 95% Pass A-1-a 480 Footing 1176 RSG 144.3 5.8 149.5 3.9 97% Pass A-1-a 481 Footing 1175 RSG 142.2 5.6 149.5 3.9 95% Pass A-1-a 482 Footing 1197 RSG 143.1 5.3 149.5 3.9 96% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2 Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Jeff Rodriguez Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 115 Structural Fill November 18, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Equipment Utilized: A track hoe,a skidster, and a walk behind sheepsfoot Area Represented (A-F)-(21-26)&slab on grade subgrade at(BN.6-P)-(21-28) Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 483 Gridline 0/25 RSG 135.6 6.5 138.3 6.6 98% Pass A-2-4 484 Gridline A.5/25 17' Below 133.9 6.3 138.3 6.6 97% Pass A-2-4 Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Standard Proctor A-2-4 General Contractor: PCL Representative Notified: Andy Comments: RSG=Rough Surface Grade Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 116 Structural Fill November 19, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Equipment Utilized: A track hoe,a skidster, and a walk behind sheepsfoot Area Represented (A-F)-(21-26) Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 485 Gridline C/24 16' Below 137.1 5.9 144.1 5.0 95% Pass A-2-4 Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 117 Structural Fill November 20, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Equipment Utilized: A track hoe,a skidster, and a walk behind sheepsfoot Area Represented (A-F)-(21-26) Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 486 Gridline D/23 14' Below 134.4 6.2 140.0 6.0 96% Pass A-2-4 Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 18 Structural Fill November 21, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Equipment Utilized: A track hoeand a walk behind sheepsfoot Area Represented Footers 1196& 1225 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 487 Gridline Z/17 RSG 133.6 6.3 140.0 6.0 95% Pass A-2-4 488 Gridline KK/20 RSG 134.8 6.5 140.0 6.0 96% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 ��Q��� Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 119 Structural Fill November 24, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Stevie Equipment Utilized: A track hoe and a walk behind sheepsfoot Area Represented Footers 1195& 1226 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 489 Footer 1226 RSG 135.4 6.1 140.0 6.0 97% Pass A-2-4 490 Footer 1195 RSG 137.2 6.4 140.0 6.0 98% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Jeff Comments: Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices: Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 120 Structural Fill December 3, 2008 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: Bobcat Area Represented Garage Level Gridline A-J,21-26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 491 Gridline E.O, 23.0 16' BG 128.6 8.9 139.8 6.3 92% Fail A-1-a 492 Gridline F.O, 24.0 16' BG 129.5 8.4 139.8 6.3 93% Fail A-1-a 491.1 Retest Gridline E.O, 23.0 16' BG 132.6 7.1 139.8 6.3 95% Pass A-1-a 492.1 Retest Gridline F.O, 24.0 16'BG 132.7 7.0 139.8 6.3 95% Pass A-1-a 493 Gridline F.O, 25.0 15' BG 132.8 6.8 139.8 6.3 95% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andrew Comments: BG = Below Grade Nuclear Gauge No.: 46 Field Technician: Derek Richards Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 121 Structural Fill February 10, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Equipment Utilized: A skidster and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 494 Gridline B/24 10' Below 143.2 2.9 149.5 3.9 96% Pass A-1-a Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andrew Comments: Nuclear Gauge No.: 70 Std Counts: - Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 122 Structural Fill March 16, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 495 Gridline A.1/25 6' Below 120.3 11.3 120.8 11.0 100% Pass A-2-6 Grade 496 Gridlines B/23 7' Below 118.6 11.6 120.8 11.0 98% Pass A-2-6 Grade 497 Gridlines D/24 7' Below 118.3 12.1 120.8 11.0 98% Pass A-2-6 Grade 498 Gridlines E/22 6' Below 112.4 17.9 120.8 11.0 93% Fail A-2-6 Grade 499 Gridlines A/24 5' Below 112.3 16.8 120.8 11.0 93% Fail A-2-6 Grade 500 Gridlines B/25.5 6' Below �12.7 16.9 120.8 11.0 93% Fail A-2-6 Grade 498.1 Gridlines E/22-Retest 6' Below 116.8 13.0 120.8 11.0 97% Pass A-2-6 Grade Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 70 Std Counts: 667/2541 Field Technician: Eric Mocko Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 123 Structural Fill March 16, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 499.1 Gridline A/24-Retest 5' Below 116.2 13.4 120.8 11.0 96% Pass A-2-6 Grade 500.1 Gridlines B/25.5 6' Below 117.0 12.5 120.8 11.0 97% Pass A-2-6 Grade 501 Gridlines A.5/24.5 4' Below 117.5 13.0 120.8 11.0 97% Pass A-2-6 Grade 502 Gridlines B/23 4' Below 116.2 12.8 120.8 11.0 96% Pass A-2-6 Grade 503 Gridlines C.5/23.5 5' Below 118.6 12.3 120.8 11.0 98% Pass A-2-6 Grade Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 70 Std Counts: 667/2541 Field Technician: Eric Mocko Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 124 Structural Fill March 17, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 504 Gridline A.2/24.5 3' Below 116.5 12.5 120.8 11.0 96% Pass A-2-6 Grade 505 Gridlines D/24 4' Below 118.8 12.6 120.8 11.0 98% Pass A-2-6 Grade 506 Gridlines C/22 3' Below 116.6 12.7 120.8 11.0 97% Pass A-2-6 Grade Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Jeff Comments: Sample I.D. #1106 Nuclear Gauge No.: 70 Std Counts: 667/2534 Field Technician: Eric Mocko Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 125 Structural Fill March 19, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 507 Gridline A/23 3' BFG 111.2 16.1 120.8 11.0 92% Fail A-2-6 508 Gridlines C/21 3' BFG 107.5 17.5 120.8 11.0 89% Fail A-2-6 509 Gridlines B/25 3' BFG 110.7 15.9 120.8 11.0 92% Fail A-2-6 507.1 Gridlines A/23-Retest 3' BFG 120.7 11.3 120.8 11.0 100% Pass A-2-6 508.1 Gridlines B/25-Retest 3' BFG 121.0 11.0 120.8 11.0 100% Pass A-2-6 509.1 Gridlines B/25 3' BFG 120.9 11.3 120.8 11.0 100% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Jeff Comments: BFG=Below Footer Grade Nuclear Gauge No.: 72 Std Counts: 752/2776 Field Technician: Eric Mocko Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 126 Structural Fill March 19, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 510 Gridline E/24 2' BFG 120.3 10.9 120.8 11.0 100% Pass A-2-6 511 Gridlines D/23 2' BFG 121.1 11.3 120.8 11.0 100% Pass A-2-6 512 Gridlines A.2/25 2' BFG 121.3 11.2 120.8 11.0 100% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 72 Std Counts: 752/2776 Field Technician: Eric Mocko Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 127 Structural Fill June 8, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 513 Gridline E/23 6' BFG 115.8 11.3 120.8 11.0 96% Pass A-2-6 514 Gridlines B/24 5' BFG 119.7 11.6 120.8 11.0 99% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 70 Std Counts: 752/2776 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 128 Structural Fill June 9, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 515 Gridline B-25 4' BFG 120.3 9.9 120.8 11.0 100% Pass A-2-6 516 Gridlines C-21 4' BFG 117.5 10.4 120.8 11.0 97% Pass A-2-6 517 Gridlines A.5-23.5 3' BFG 114.8 10.7 120.8 11.0 95% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 70 Std Counts: 667/2540 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 129 Structural Fill June 10, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 518 Gridline A-23 2' BFG 119.3 9.5 120.8 11.0 99% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 70 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 130 Structural Fill June 15, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe,a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 519 Gridline C-22 2' BFG 116.4 10.2 120.8 11.0 96% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 70 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 131 Structural Fill June 16, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe,a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 520 Gridline D-25 1' BFG 111.3 11.5 120.8 11.0 92% Fail A-2-6 520.1 Gridline D-25 1' BFG 117.6 10.8 120.8 11.0 97% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: BFG=Below Footer Grade Nuclear Gauge No.: 70 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�In Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 132 Structural Fill June 25, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe,a skidster,and a walk behind sheepsfoot Area Represented Gridlines A to F and 21 to 26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test Location Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 521 Gridline C-23.5 RFG 119.2 10.9 120.8 11.0 99% Pass A-2-6 522 Gridline A.5-24 RFG 116.1 11.4 120.8 11.0 96% Pass A-2-6 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-6 General Contractor: PCL Representative Notified: Cowboy Comments: RFG=Rough Footer Grade Nuclear Gauge No.: 70 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 133 Structural Fill July 2, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and jumping jacks Area RepreSented Southwest retaining walls Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 523 JJJ /0.5 4 BG 137.2 6.7 140.0 7.3 98% Pass A-1 524 UUU.5/ 1 3 BG 135.4 6.2 140.0 7.3 97% Pass A-1 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 134 Structural Fill July 6, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and jumping jacks Area RepreSented Southwest retaining walls Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 525 TTT/0.5 2 BG 138.1 7.1 142.4 6.5 97% Pass -1; 12%roc 526 UUU.5/ 1 1 BG 137.7 6.5 142.4 6.5 97% Pass -1; 12%roc Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 135 Structural Fill July 14, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and jumping jacks Area Represented gridlines A to F and 20-24 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 527 B.1 /21.2 5 BG 135.4 6.6 140.0 7.3 97% Pass A-1 528 A.5/23 4 BG 134.1 7.7 140.0 7.3 96% Pass A-1 529 B/23 3 BG 135.5 7.0 140.0 7.3 97% Pass A-1 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 136 Structural Fill July 15, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and jumping jacks Area Represented gridlines A to F and 20-24 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 530 C/21 5 BG 138.2 7.1 140.0 7.3 99% Pass A-1 531 D/22 4 BG 135.1 7.6 140.0 7.3 97% Pass A-1 532 B.1 /21 3 BG 137.5 6.8 140.0 7.3 98% Pass A-1 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1 General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 137 Structural Fill August 3, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and jumping jacks Area Represented Retaining wall footer at Gridline(J.6-Q)-(16.5-20) Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 533 Gridline N.6-17 RSG 145.3 5.0 149.5 3.9 97% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 138 Structural Fill August 7, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Footer subgrade at Gridlines Q-12 to CC-7.6 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 534 Gridlines Z-9 RSG 138.3 6.1 140.3 5.4 99% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Cowboy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 139 Structural Fill August 20, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area RepreSented Retaining wall at gridlines KK-7 to Q-12 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 535 Gridlines AA-8 2' BG 134.6 5.1 140.3 5.4 96% Pass A-1-b 536 Gridlines V-9 1' BG 135.8 6.5 140.3 5.4 97% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 140 Structural Fill September 2, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Footer at Gridlines HH-7 to TT.9-4.9 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 537 Gridlines PP-5.5 2' BG 143.7 4.9 149.5 3.9 96% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 141 Structural Fill September 4, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe and a sheepsfoot Area Represented west Retaining wall Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 538 Gridlines HH/11.1 RSG 130.2 6.4 133.0 7.3 98% Pass A-2-4 539 Gridlines HH/11.1 RSG 130.8 7.0 133.0 7.3 98% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Andy Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 70 Field Technician: Marvin Troxel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 141 Structural Fill September 9, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Footer at Gridlines VV/1.5 to AAA/1.3 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 538 Gridlines VV/1.4 RSG 144.8 3.4 149.5 3.9 97% Pass A-1-a Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 142 Structural Fill September 11, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Footer at Gridlines TT.9/5 to JJ/7 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 539 Gridlines NN/5.3 2' Below 145.9 4.6 149.5 3.9 98% Pass A-1-a Grade 540 Gridlines PP/6.5 3' Below 144.1 4.3 149.5 3.9 96% Pass A-1-a Grade 541 Gridlines TT/5.5 2' Below 147.1 5.1 149.5 3.9 98% Pass A-1-a Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 143 Structural Fill September 14, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe, a skidster,and a sheepsfoot Area Represented Retaining Wall at Gridlines TT.9/5 to JJ/7 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 542 Gridlines NN/6.2 1' Below 144.8 5.6 149.5 3.9 97% Pass A-1-a Grade 543 Gridlines TT/6.5 2' Below 143.9 4.9 149.5 3.9 96% Pass A-1-a Grade Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-1-a General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Std Counts: 762/2715 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 144 Structural Fill September 17, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A track hoe and jumping jack Area Represented Footer subgrade approximatley 10'north of Gridline A between Gridlines 24-26 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 544 Approximately 9' north of Gridlines A/25 RSG 128.4 8.5 133.0 7.3 97% Pass A-2-4 Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Modified Proctor A-2-4 General Contractor: PCL Representative Notified: Andy Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 74 Std Counts: 769/2719 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 145 Structural Fill September 23, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a jumping jack Area Represented Stem wall at Gridlnes A-1.3/VV.1-1.5 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 545 Gridlines YY/1.4 RSG 129.5 9.4 140.3 9.4 92% Fail A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 74 Std Counts: 770/2725 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 146 Structural Fill September 25, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A jumping jack Area Represented Stem wall at Gridlines AAA/1.3 and VV.1/1.5 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 545.1 RETEST Gridlines YY/1.4 RSG 130.4 9.3 140.3 5.2 93% Fail A-1-b 545.2 RETEST Gridlines YY/1.4 RSG 132.6 7.2 140.3 5.2 95% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: RSG=Rough Surface Grade Nuclear Gauge No.: 74 Std Counts: 782/2721 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 147 Structural Fill September 30, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A skidster and a jumping jack Area Represented Approximatley 15'north of Gridlines A.0 between 24.0-31.0 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 546 Approximately 12' north of Gridline A.0 at Gridline 24.5 3' Below 135.0 6.9 140.3 5.4 96% Pass A-1-b Grade 547 Approximately 15' north of Gridline A.0 at Gridline 28 2� Below 138.1 5.4 140.3 5.4 98% Pass A-1-b Grade Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 148 Structural Fill October 1, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A skidster and a jumping jack Area Represented Approximatley 15'north of Gridlines A.0 between 24.0-31.0 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 548 Approximately 13' north of Gridline A.0 at Gridline 26.5 RSG 137.1 5.9 140.3 5.4 98% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 149 Structural Fill October 7, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A skidster and a jumping jack Area Represented Marriot Alley Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 549 Gridlines MMM.O/74.0 4' BRSG 134.4 5.8 140.3 5.4 96% Pass A-1-b 550 LLL.O/74 RSG 135.7 7.0 140.3 5.4 97% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2% Optimum Moisture Content Standard Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 34 Std Counts: 2209/623 Field Technician: Marvin Troxel Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 150 Structural Fill October 9, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe, a skidster,and a sheepsfoot Area Represented Approximatley 10'east of Gridline 71.0 between ZZ.9-NNN.8 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 551 Approximately 10'east of 71.0/GGG.2 1' Below 136.3 6.1 140.3 5.4 97% Pass A-1-b Grade 552 Approximately 10'east of 71.0/MMM.O RSG 133.9 5.4 140.3 5.4 95% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721 CRDU�1[n Job Name Client: E N G I N E E R I N G C D N 5 U LTR NTS Ritz Carlton Residences RCR Vail LLC Address: NUCLEAR SOIL DENSITY AND MOISTURE Job Number 953 South Frontage Road West, Suite 215 CONTENT 08-6502 Vail, Colorado 81657 Report Number Report Type Report Date Attn: 151 Structural Fill October 13, 2009 Mr. Cody O' Kelly On the date specified above, Ground Engineering Consultants, Inc (GROUND) was requested to perform materials testing services for this project on soil materials. GROUND performed testing in general accordance with the frequencies required and / or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the methods employed by the contractor and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and not be onsite during entire soil placement,the contractor should be consulted for precise details. Earthwork Contractor: WVC Representative Notified: Miguel Equipment Utilized: A back hoe and a jumping jack Area RepreSented Marriott Alley approximatley 10'east of building Gridlines 710 between Gridlines EE.6-TT.9 Test Field Dry Field Moisture Max Density Opt Moisture Percent No: Test LoCBtion Elevation Density(pcf) (%) (pcf) (%) Compaction Pass or Fail Soil Type 553 Gridines HH.9, 7'east of 71.0 1' Below 136.2 6.8 140.3 5.4 97% Pass A-1-b Grade 554 Gridines PP.9, 10' east of 71.0 RSG 133.9 5.4 140.3 5.4 95% Pass A-1-b Specifications: Min. 95 % Max Dry Density +/-2°/o Optimum Moisture Content Modified Proctor A-1-b General Contractor: PCL Representative Notified: Andy Comments: Nuclear Gauge No.: 74 Field Technician: Kevin McClure Corpoate Office Gypsum Office 41 Inverness Drive East P.O.Box 464 Englewood,CO 80112 Gypsum CO 81637 Tel:(303)289 1989 Tel:(970)524-0720 Fax:(303)289 1686 Offices:Denver,Loveland,West Slope,Granby Fax:(970)524-0721