HomeMy WebLinkAboutF10-0091 TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2135
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
SPRINKLER PERMIT Permit #: F10 -0091
Job Address: 16 VAIL RD VAIL Status ...: ISSUED
Location • 160 LEVEL, BUILDING B ATRIUM Applied ..: 11/02/2010
Parcel No...: 210108285053 Issued . . : 11/03/2010
Project No : Expires . .:
OWNER FERRUCO VAIL VENTURES LLC 11/02/2010
701 BRICKELL AVE STE 2550
MIAMI
FL 33131
APPLICANT ALL STATE FIRE PROTECTION, I 11/02/2010 Phone: 303 - 288 -3901
6045 E 76TH #12
COMMERCE CITY
CO 80022
License: 370 -S
CONTRACTOR ALL STATE FIRE PROTECTION, I 11/02/2010 Phone: 303 - 288 -3901
6045 E 76TH #12
COMMERCE CITY
CO 80022
License: 370 -S
Desciption: ADD SPRINKLER HEAD UNDER THE WALKWAY FOR THE REAR ATRIUM
PEDESTRIAN BRIDGE (INTERIOR)
Valuation: $200.00
************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Mechanical - - -> $0.00 Restuarant Plan Review - -> $0.00 Total Calculated Fees - - -> $440.50
Plan Check - - -> $432.00 DRB Fee > $0.00 Additional Fees > ($224.50)
Investigation -> $0.00 TOTAL FEES > $440.50 Total Permit Fee > $216.00
Will Call > $0.00 Payments > $216.00
BALANCE DUE > $0.00
************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Item: 05100 BUILDING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
11/02/2010 mvaughan Action: AP
CONDITION OF APPROVAL
************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEP - ONE AT 970 - 479 -2252
FROM 8:00 AM - 5 PM. i
io
I'
SI NA' RE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R100001755 Amount: $216.00 11/03/201009:07 AM
Payment Method:Credit Crd Init: SAB
Notation: VISA - RYAN
HERTZLER /ALL STATE FIRE PROTECTION
Permit No: F10 -0091 Type: SPRINKLER PERMIT
Parcel No:
Site Address: 16 VAIL RD VAIL
Location: 160 LEVEL, BUILDING B ATRIUM
Total Fees: $216.00
This Payment: $216.00 Total ALL Pmts: $216.00
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
PF 00100003112300 PLAN CHECK FEES 216.00
r
a
WPM
Ai a i ^
Departmentof Community Development
75 South Frontage Road
,f Va.il,.Colorado:�.8165
w1 el: 970479 -2128
e Fax:�970 -479 -2452
r Web:.www.vailgov . cofn'
Development Review Coordinator
l�+
FIRE SPRINKLER PERMIT
Commercial & Residential Fire Alarm shop drawings are required at the time of
application submittal and must include the following information:
1. A Colorado Registered Engineer's stamp or N.I.C.E.T level III (min) stamp
2. Equipment cut sheets of materials
3. Hydraulic calculations
4. A State of Colorado contractor registration number
S. Plans must be submitted by a Registered Fire Protection Contractor
Project Street Address
100 E. Meadow Dr.
(Number) (Street) (Suite #)
Building /Complex Name: Sebastia Hotel
Contractor Information:
Company All -State Fire Protection, Inc.
Company Address: 6045 E. 76th Ave #12
City: Commerce City State: CO
Contact Name Michael Krzastek
Office Use;
Project #: 2R 10 D 39 I
Building Permit #: B I n —off 49
Sprinkler Permit # ) Q Q
Lot #. Block # Subdivision
Detailed Description of Work: A sp rinkler head
Z,p under the walk way
Contact Phone: 303 - 288 -3901
E -Mail mike k @alfstatefire protection, com
I own of Vail Contractor Registration No.: 370 - S
X
Contractor Signatur (required)
Property Information
Parcel # 2101- 082 -56 -024
(For parcel #, con-.ac! Eagle County Assessors Office at 970 - 328 -8640 or
visit www.eaglecounty.us /patie)
Tenant Name Ferruco Vail Ventures
Owner Name:
Complete Valuation for Fire Sprinkler Permit
Fire Sprinkler $ $200
(use additional sneet if necessary)
Detailed Location of Work: 160 level - buildlna B.
atrium
Does a Monitored Fire Alarm Exist? Yes (,) No ( )
Does a Sprinkler System Exist? Yes (, ) No ( )
Work Class:
New ( ) Addition ( ) Remodel (e) Repair ( )
Retro -Fit ( ) Other( )
Type of Building:
Single - Family ( ) Duplex ( ) Multi- Family (. )
Commercial ( ) Restaurant ( ) Other ( )
Date Received
TOWN OF VAIL
OCT 2 s 2010
01- Fcb -10
May 14, 2010
_fw� I MIRAGE° STANDARD AND
TECHNICAL DATA QR CONCEALED PENDENT
SPRINKLER VK462 AND HP
SPRINKLER VK463 K5.6
Sprinkler 54a
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269 - 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269 - 818 -1680 Email: techsvcs @vikingcorp.com
DESCRIPTION
Viking Mirage® Standard and Quick Response Concealed Pendent Sprinkler VK462 and
HP Sprinkler VK463 are thermosensitive glass -bulb spray sprinklers designed for installa-
tion on concealed pipe systems where the appearance of a smooth ceiling is desired.
The sprinkler is pre - assembled with a threaded adapter for installation with a low- profile
cover assembly that provides up to ' /2 " (12.7 mm) of vertical adjustment. The two -piece
design allows installation and testing of the sprinkler prior to installation of the cover plate.
The "push -on ", "thread -off' design of the concealed cover plate assembly allows easy
installation of the cover plate after the system has been tested and the ceiling finish has
been applied. The cover assembly can be removed and reinstalled, allowing temporary
removal of ceiling panels without taking the sprinkler system out of service or removing
the sprinkler.
. W=rm.�
LISTINGS AND APPROVALS
cULus Listed: Category VNIV
FM Approval: Class 2015
NYC Approved: MEA 89 -92 -E, Volume 32
VdS Approved: Certificate G4080021
LPC Approved: Ref. No. 096e/12
CE Certified: Standard EN 12259 -1, EC- certificates of conformity 0832 -CPD -2032 and 0786 -CPD -40249
Refer to Approval Chart 1 and Design Criteria on page 54c for cULus Listing requirements, and refer to Approval Chart 2 and
Design Criteria on page 54d for FM Approval requirements that must be followed.
Viking Technical Data may be found on
The Viking Corporation's Web site at
http: / /www.vikinggroupinc.com.
The Web site may include a more recent
edition of this Technical Data Page.
'cULus Listing, FM Approval, and NFPA 13 installs require a minimum of 7 psi (0.5 bar). The minimum operating pressure for LPCB and CE
Approvals ONLY is 5 psi (0.35 bar).
tMetric K- factor measurement shown is when pressure is measured in Bar. When pressure is measured in kPa, divide the metric K- factor shown by 10.0.
3. TECHNICAL DATA
Specifications:
Available since 2006.
Minimum Operating Pressure: 7 psi (0.5 bar)'
Maximum Working Pressure: Sprinkler VK463 is rated for use with water
working pressures ranging from the minimum 7 psi (0.5 bar) up to
250 psi (17.2 bar) for high - pressure systems. High - pressure (HP)
sprinklers can be identified by locating "250" stamped on the deflec-
tor. Sprinkler VK462 is rated to a maximum 175 psi (12 bar) wwp.
Factory tested hydrostatically to 500 psi (34.5 bar)
Testing: U.S.A. Patent No. 4,831,870
Thread size: 1/2" (15 mm) NPT
Nominal K- Factor: 5.6 U.S. (80.6 metrict)
Glass -bulb fluid temperature rated to -65 °F ( -55 °C)
Patents Pending
Material Standards:
Sprinkler Body: Brass UNS- C84400
Deflector: Copper UNS- C19500 for Sprinkler VK462
Phosphor Bronze UNS- C51000 for Sprinkler VK463
Deflector Pins: Stainless Steel Alloy
Bulb: Glass, nominal 3 mm diameter
Pip Cap and Insert Assembly: Copper UNS- C11000 and Stainless Steel UNS- S30400
Button: Brass UNS- C36000
Screws: 18 -8 Stainless Steel
Belleville Spring Sealing Assembly: Nickel Alloy, coated on both sides with Teflon Tape
Yoke: Phosphor Bronze UNS- C51000
Cover Adapter: Cold Rolled Steel UNS- G10080, Finish: Clear Chromate over Zinc Plating
Form No. F_103005
Replaces page 54a -e, dated August 13, 2009. (Split the Approval Charts
to separate cULus Listing requirements from FM Approval requirements.)
Sprinkler 54b
May 14, 2010
Cover Assembly Materials:
Cover: Copper UNS- C11000
Base: Brass UNS- C26000 or UNS- C26800
Springs: Nickel Alloy
Solder: Eutectic
Ordering Information: (Also refer to the current Viking price list.)
Viking Mirage' Standard and Quick Response Concealed Pendent Sprinklers and Cover Plate Assemblies must be ordered separately:
Sprinkler: Base Part No. 13503A, 14697A, or HP Base Part No. 13667A
Specify sprinkler temperature rating by adding the appropriate suffix for the temperature rating to the base part number:
Temperature Suffix ( °F / °C): 155 ° /68° = B, 175 ° /79° = D. 200 ° /93° = E
For example, sprinkler VK463 with a 155 °F/68 °C temperature rating = 13667AB.
Cover Plate Assembly: Base Part No. 13504 (2 -3/4" diameter), Base Part No. 13642 (3- 5/16" diameter), or Base Part No.
15394 (square cover plate, 3- 5/16" diameter)
Specify finish and temperature rating of the cover plate assembly by first adding the appropriate suffix for the finish and then the
appropriate suffix for the cover temperature rating to the base part number:
Finish Suffix: Polished Chrome = F, Brushed Chrome = F - /B, Bright Brass = B, Antique Brass = B - /A, Brushed Brass = B - /B,
Brushed Copper = E - /B, Painted White = M- /SW1004, Painted Ivory = M- /SW1634, Painted Black = M- /SW1007
Temperature Suffix ( °F / °C): 135 ° /57° UL (139 ° /59° FM) = A, 165 ° /74° = C
For example, cover 13504 with a Polished Chrome finish and a 165 °F /74 °C temperature rating = 13504FC.
Note: Square cover plate 15394 cULus Listing is for the 135 T (57 °C) temperature rated cover plate only. Refer to the Approval Chart.
Available Finishes And Temperature Ratings: Refer to Table 1.
Accessories: (Also refer to the "Sprinkler Accessories" section of the Viking data book.)
Sprinkler Wrenches ":
A Heavy Duty Wrench Part No. 14047W/B (available since 2006), or
B. Head Cabinet Wrench Part No. 14031 — (available since 2006)
C. Optional Concealed Cover Plate Installer Tool Part No. 14412 for cover 13504, or Part No. 14867 for the large diameter cover
(available since 2007)
"Requires a '' /�" ratchet (not available from Viking). — Optional for removal of the protective cap. Ideal for sprinkler cabinets.
Sprinkler Cabinet: Part No. 01731A, Capacity: five (5) sprinklers (available since 1971)
4. INSTALLATION
Refer to appropriate NFPA Installation Standards.
5. OPERATION
During fire conditions, when the temperature around the sprinkler approaches its operating temperature, the cover plate detaches.
Continued heating of the exposed sprinkler causes the heat - sensitive liquid in the glass bulb to expand and the bulb to shatter,
releasing the yoke, pip -cap and sealing spring assembly. Water flowing through the sprinkler orifice strikes the sprinkler deflector,
forming a uniform spray pattern to extinguish or control the fire.
6. INSPECTIONS, TESTS AND MAINTENANCE
Refer to NFPA 25 for Inspection, Testing and Maintenance requirements.
AVAILABILITY
Viking Sprinklers VK462 and VK463 are available through a network of domestic and international distributors. See The Viking
Corporation web site for the closest distributor or contact The Viking Corporation.
8. GUARANTEE
For details of warranty, refer to Viking's current list price schedule or contact Viking directly.
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269 - 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269 - 818 -1680 Email: techsvcs @vikingcorp.com
May 14, 2010
Sprinkler 54c
CUSTp� v
Q f�
Y �
o n
r- O
J r`
y VIKING
Identification of Custom Paint Color:
All custom color painted cover plates will
have an identifying label affixed to the
inside of the cover that indicates custom
color and will have a representative sample
(a paint dot) of the paint on the label.
Figure 1: Identification of Custom Paint Color for Concealed Covers
D❑ NOT PAINT
�-3-5/16' (84.1 mm)i►
Figure 2: Square Cover Assembly 15394
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269- 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269- 818 -1680 Email: techsvcs @vikingcorp.com
TABLE 1: AVAILABLE SPRINKLER
TEMPERATURE
RATINGS AND FINISHES
prinkler Temperature
Sprinkler Nominal
Maximum Ambient
Temperature Rating of Cover
Classification
Temperature Rating'
Ceiling Temperature'
Color
Assembly (Required)
Ordinary
155 °F (68 °C)
100 °F (38 °C)
135 °F (57 'C) cULus Red
139 °F (59 °C) FM
Intermediate
175 °F (79 °C)
150 °F (65 °C)
165 °F (74 °C) Yellow
Intermediate
200 °F (93 °C)
150 °F (65 °C)
165 °F (74 °C) Green
Cover Plate Finishes: Polished Chrome, Brushed Chrome, Bright Brass. Antique Brass, Brushed Brass, Brushed Copper, Painted
White, Painted Ivory, or Painted Black
Footnotes
The sprinkler temperature rating is stamped on the sprinkler deflector.
Based on NFPA -13. Other limits may apply, depending on fire loading, sprinkler location, and other requirements of the Authority Having Jurisdiction.
Refer to specific installation standards.
CUSTp� v
Q f�
Y �
o n
r- O
J r`
y VIKING
Identification of Custom Paint Color:
All custom color painted cover plates will
have an identifying label affixed to the
inside of the cover that indicates custom
color and will have a representative sample
(a paint dot) of the paint on the label.
Figure 1: Identification of Custom Paint Color for Concealed Covers
D❑ NOT PAINT
�-3-5/16' (84.1 mm)i►
Figure 2: Square Cover Assembly 15394
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269- 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269- 818 -1680 Email: techsvcs @vikingcorp.com
Sprinkler 54d May 14, 2010
Approval Chart 1 (UL) -= Sp- lile,TempmaureRaWq —
- Cover Plate TemperaWre gatlrp
Mirage'® Concealed Pendent Sprinklers VK462 a
Sprinkler Base
NPT Thread Size
Nominal K- Factor
Maximum
Listings and Approvals'
(Refer also to Design Criteria below.)
SIN
Water Working
Inch mm
U.S. metricz
cULuss NYC VdS LPCB E
Part No.'
Pressure
Standard Response Applications
13503A
VK462
1/2"
15
5.6
80.6
1 175 psi (12 bar)
AY1, CZ1
—
14697A
VK462
1/2" 1
15
5.6
80.6
1 175 psi (12 bar)
—
I AV2, BW2
AV2, BW2'
Quick Response Applications
13503A
VK462
1/2"
15
5.6
80.6
175 psi (12 bar)
AV1, BX1
I AV1, BWt
I —
I
AY2. CZ2
14697A
VK462
112"
15
5.6
80.6
175 psi (12 bar)
AV1, BX1
AV1, B
—
—
—
13667A
VK463
1/2"
15
5.6
80.6
250 psi (17.2 bar)
AV1, BX1
AV1, BW1
Cover Plate Assembly Temperature Ratings'
Cover Plate Assembly Finishes
Sprinkler Temperature Ratings
V - 135 'F (57 'C) cULus Listed cover 13504' or 13642' (large diameter)
1 - Polished Chrome, Brushed
W - 165 'F (74 'C) cover 13504' or 13642' (large diameter)
Chrome, Bright Brass, Antique
A - 155 °F (68 °C)
X - 165 'F (74 'C) cover 13504 13642' (large diameter), or 15394'
Brass, Brushed Brass, Brushed
B - 175 'F (79'C) and 200 'F (93 'C)
(square cover plate)
Copper, Painted White, Painted
C - 200 - F (93 °C)
Y - 135 'F (57 'C) cover 13504'
Ivory, or Painted Black
Z - 165 'F (74 'C) cover 13504'
2 - Polished Chrome, Painted White
Footnotes
' Part number shown is the base part number. For complete part number, refer to current Viking price list schedule.
I Metric K- factor measurement shown is when pressure is measured in Bar. When pressure is measured in kPa, divide the metric K- factor shown by 10.0.
'The Water Working Pressure rating is stamped on the deflector.
This chart shows the listings and approvals available at the time of printing. Other approvals may be in process. Check with the manufacturer for any
additional approvals.
Listed by Underwriter's Laboratories for use in the U.S. and Canada.
Accepted for use, City of New York Department of Buildings, MEA Number 89 -92 -E, Vol. 32.
(Certified, Standard EN 12259 -1, EC- certificate of conformity 0832 -CPD -2032.
e CE Certified, Standard EN 12259 -1, EC- certificate of conformity 0786 -CPD- 40249.
The 135/139 'F cover has an orange label. The 165 'F cover has a white label.
'Painted finish consists of Polyester Baked Enamel. Other paint colors are available on request with the same listings as the standard paint colors.
Listings and approvals apply for any paint manufacturer. Contact Viking for additional information.
NOTE: Custom colors are indicated on a label inside the cover assembly. Refer to Figure 1.
(Also refer to Approval Chart 1 above.)
cULus Listing Requirements:
Mirage` Concealed Pendent Sprinklers VK462 and VK463 are cULus Listed as quick response for installation in accordance with the latest edition of
NFPA 13 for standard coverage pendent spray sprinklers as indicated below.
For hazard occupancies up to and including Ordinary Hazard, Group II.
Protection areas and maximum spacing shall be in accordance with the tables provided in NFPA 13. Maximum spacing allowed is 15 ft. (4.6 m).
Minimum spacing allowed is 6 ft. (1.8 m) unless baffles are installed in accordance with NFPA 13.
Minimum distance from walls is 4 in. (102 mm).
Maximum distance from walls shall be no more than one -half of the allowable distance between sprinklers. The distance shall be measured
perpendicular to the wall.
The sprinkler obstruction rules contained in NFPA 13 for standard coverage pendent spray sprinklers must be followed.
NOTE: Concealed sprinklers must be installed in neutral or negative pressure plenums only.
IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to page
SR1 -3 or QR1 -3 for general care, installation, and maintenance information. Viking sprinklers are to be installed
in accordance with the latest edition of Viking technical data, the appropriate standards of NFPA, LPCB, APSAD,
VdS or other similar organizations, and also with the provisions of governmental codes, ordinances, and stand-
ards, whenever applicable.
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269 - 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269 - 818 -1680 Email: techsvcs @vikingcorp.com
May 14, 2010
Sprinkler 54e
_> Approval Chart 2 (FM) SpkW T11K Rat1,V 1I
:.: ... , ..,,:....,, TV _...... Covar ptala Tamparatura Ratlnp
Bard Response Concealed Pendent Sprinkler VK462 AW14 Cover WalaFiash KEY I
Sprinkler Base
NPT Thread Size
Nominal K- Factor
Maximum
FM Approvals'
pp s
Part No.
SIN
Water Working
(Refer also to Design Criteria below.)
Inch
mm
U.S.
metric'
Pressure
13503A
VK462
1/2"
15
5.6
80.6
175 psi (12 bar)
AW1. BX1
Cover Plate Assembly Temperature Ratings'
Cover Plate Assembly Finishes'
Sprinkler Temperature Ratings
W - 135 `F (57 °C) cULus Listed cover 13504', 13642'
1 - polished Chrome, Brushed Chrome, Bright
A - 155 - F (68 `C)
(large diameter), or 15394 (square cover plate) FM
°F °C)
Brass, Antique Brass, Brushed Brass,
Approved as 139 (59
B - 175 °F (79 °C) and 200 °F (93 °C)
X - 165 °F (74 °C) cover 13504 13642' (large diam-
Brushed Copper, Painted White, Painted
eter), or 15394' (square cover plate)
Ivory, or Painted Black
Footnotes
Part number shown is the base part number. For complete part number, refer to current Viking price list schedule.
' Metric K- factor measurement shown is when pressure is measured in Bar. When pressure is measured in kPa, divide the metric K- factor shown by 10.0.
' This chart shows the FM Approvals available at the time of printing. Other approvals may be in process. Check with the manufacturer for any additional
approvals.
" The 135/139 °F cover has an orange label. The 165 °F cover has a white label.
5 Painted finish consists of Polyester Baked Enamel. Other paint colors are available on request with the same listings as the standard paint colors.
Listings and approvals apply for any paint manufacturer. Contact Viking for additional information.
NOTE: Custom colors are indicated on a label inside the cover assembly. Refer to Figure 1.
aI Chart 2 above.)
FM Approval Reauirements:
Viking Concealed Pendent Sprinkler VK462 is FM Approved as a standard response Non - Storage concealed pendent sprinkler as indicated in the FM
Approval Guide. For specific application and installation requirements, reference the latest applicable FM Loss Prevention Data Sheets (including Data
Sheet 2 -0). FM Global Loss Prevention Data Sheets contain guidelines relating to, but not limited to: minimum water supply requirements, hydraulic
design, ceiling slope and obstructions, minimum and maximum allowable spacing, and deflector distance below the ceiling.
NOTE: The FM installation guidelines may differ from cULus and /or NFPA criteria.
IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to page
SR1 -3 for general care, installation, and maintenance information. Viking sprinklers are to be installed in ac-
cordance with the latest edition of Viking technical data, the appropriate standards of NFPA, FM Global, LPCB,
APSAD, VdS or other similar organizations, and also with the provisions of governmental codes, ordinances, and
standards, whenever applicable.
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269 - 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269 - 818 -1680 Email: techsvcs @vikingcorp.com
I
Sprinkler 54f
2 -1/4' (57,2 mm)
diameter opening
is required in
the ceiling. Ef
1.1
ap
Dr
Ise
.K)
Sprinkler
Wrench
(Part No.
1047W /B)mx(
Is shown)
KA 1/2' ratchet
s required (not
!table from Viking).
Sprinkler
Frame
Arms
Step 1; Carefully slide the
wrench sideways around
the deflector and pins.
Step 21 Carefully press the
wrench upward and turn slightly
to ensure engagement with the
sprinkler wrench flats,
May 14, 2010
Sprinkler
Wrench
Flat
NEVER install the sprinkler
by applying the installation
wrench across the frame arms.
D❑ NOT overtighten,
Use only the designated
sprinkler wrench, Viking Part
Number 14047W/B or 14031.
D❑ NOT apply more than
25 ft. lbs, of torquie. A leak
tight seal should be achieved
by turning the sprinkler
clockwise 1 to 1 -112 turns
beyond finger tight.
Figure 3: Sprinkler Installation and Correct Use of Wrenches
1/2' =_
(15 mm)
NPT
2 -9/16" "Ail 2 -1/16
2 -3/16' (65 mm ( 52 mm)
(55 mm) Maximum
Minimum
2 -3/4' (70 mm) or
3 -5/16" (84.1 mm)
Note: Upon sprinkler activation, the deflector descends
to approximately 13/16' (20,6 mm) below the sprinkler body,
Figure 4: Sprinkler Dimensions and Cover Installation
Form No. F103005 Replaces page 54a -e, dated August 13, 2009. (Split the Approval Charts
to separate cULus Listing requirements from FM Approval requirements.)
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269- 945 -9501 Technical Services: 877 - 384 -5464 Fax: 269 - 818 -1680 Email: techsvcs @vikingcorp.com