HomeMy WebLinkAboutE10-0327 TdWNO�'VAC��� Town of Vail Community Development
75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149
ELECTRICAL PERMIT
Job Address: 352 E MEADOW DR VAIL Permit#...: E10-0327
Location.......: UNIT 301/313 (COMBINED), VAIL MTN LODGE Project#..: PRJ10-0074
Parcel No.....: 210108255006 Issued......: 11/29/2010
OWNER ANGELO, JOHN M. &JUDITH H. 11/22/2010
IN CARE OF NAME ANGELO GORDON & CO LP
245 PARK AVE 26 FL
NEW YORK
NY 10167
CONTRACTOR MARMOT ELECTRIC 11/22/2010 Phone: 970-926-0990
P.O. BOX 4511
AVON
CO 81620
License: 250-E
Desciption of Work: ADDITION: 69 SQ FT HALLWAY IN ATTACHED ACCOMODATION UNIT
(313); RECESS LIGHTING AND SWITCHING
Valuation: $2,000.00 Square feet: 69
*****************«*****«******************«««««*****************«****„******,.*****«**«**************«*�***********„*„*,.*,.*******,.******�********
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
*��****************��*,.**********�*********************,.******�.********�,**„*****************�***************************�**«*„****************
INSPECTIONS
If more than two inspections are performed an additional inspection fee will be applied for each inspection requested/needed.
All electrical inspections are performed on Tuesdays and Thursdays. Requests must be received the day before and not later
than 4 p.m.
***************************************.*****«*�*************,.***.*********************«********************************************************
DECLARATIONS
I hereby acknowledge that I ha d is application, filled out in full the information required, completed an accurate plot
plan, and state that all the ' r tion s required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinan a state aws, and to build this structure according to the towns zoning and subdivision codes,
design review app ed, er�ati al Building an sidential Codes and other ordinances of the Town applicable thereto.
SIGNATURE. � � Date �/` ��` � r ��
(Master/homeo er/or non-licensed contractor performing work)
PRINTED NAME: �'��✓ �--C.���?"�``-,S
elec_permi100109
� b
********************************************************************************************
TOWN OF VAIL, COLORADO Statement
*****************************************************************************+*+*+**********
Statement Number: R100001912 Amount: $193 .75 11/29/201009:55 AM
Payment Method: Check Init: RFD
Notation: 8380 JOHN T
CUMMINS III
-----------------------------------------------------------------------------
Permit No: E10-0327 Type: ELECTRICAL PERMIT
Parcel No:
Site Address: 352 E MEADOW DR VAIL
Location: UNIT 301/313 (COMBINED) , VAIL MTN LODGE
Total Fees: $193 .75
This Payment: $193.75 Total ALL Pmts: $193.75
Balance: $0.00
**************************************************+*****************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
EP 00100003111100 ELECTRICAL PERMIT FEES 115.00
PF 00100003112300 ELEC PLAN REVIEW 74.75
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
P �5 �k � - � _ .IP� _ f�
�y� .�I �°��` ���r����rtmunky�pmen�
�+� � f` 4 �§ " ,:� � 'N3 SoUth Frc�tntage
�,� ► ���'�� �- � � 4f: - '� -' � ��`_ . �j 1��"�� '�
� =s , �.�!, a ,,,,�'�°�' #
��; ,' �'$4 �7 �„� e x . . .. ^�r_ .w$�'" i ��ir �
t.
a.'� li �.., �� m��� • �' #�4�� ,��
,�.
# t;� •,;t�.'��k ,�Y��� � . f�� _��
aF � `
�
_ ..
.�
�� _ , . � e.
.. ., � , .�;t,y..
T
ELECTRICAL PERMIT
E�ical Permit Submittal Reauirements Includina Heat Taue Installation
❑ Floor plan/Site plan showing proposed work
❑ Building Type
❑ Occupancy Group listed on plans
❑ Load Calculations and one-line diagram when loads or circuits are being added
NOTE:For Multi-Family and Commercial buildings—plans and calculations must be prepared by a Colorado Licensed Electrical Engineer
Project Street Address: Office Use:
�SZ �/�v��cl�J� � Project#: -`I���.L �����'
(Number) (Street) (Suite#)
1I ,l Building Permit#: � �v Ci 7iU�j
Building/Complex Name: VDJr./"`etNf�rv � �7
T Electrical Permit#: � � L J C7 (�
Contractor Infortr�ation: .
P y ���—��C����� Lot#: Blodc# Subdivision:
Com an :
Company Address: � YSl�I
�/ � 62� Define Scope and Location of Work:
City:��i'(�bt� State: � Zip: � C, ` �
Contact Name:
��k+� _! //�+-/ TC �
Contact Phone: �� �O� C�('Z,O
E-Mail (use additional sheet if necessary)
Town of Vail � istra' o.: �25�
l Includes Temporary Service: ( )Yes (�(No
X
Contra r Signature(required) Work Class:
New( ) Addition( ) Remodel�Repair( )
Property Information Other( )
Parcel#:Z����g u—�d�6
(For parcel#,corttact Eagle County Assessors Office at 970-328-8640 or Type of Building:
visit www.eaglecouny.us/patie) Single-Family( ) Duplex(�Multi-Family( ) Commercial
Tenant Name: �� ��-� ( ) Restaurant( ) Other( )
Owner Name: �r�E(L1 ��Z.C�
Date Received: � � ,.�Q � �
Provide BOTH square footage of area of work AND Valuation D �
(Labor 8�Materials)
Amount of SQ Ft.: 6 ` 59 N�V 1 8 2��0
Electrical$: �GdO '`
' TOWN OF VAIL
�
� 1�����
O1-Jan-10
Marmot Eiectric Inc.
P.O.Box 4511 • Avon,CO 81620 • Phone(970)524-0990 • Fax(970)524-0991 • www.marmotelectric.com
� c � —v3Z�—
lane Snyder
Mosaic Architects
1829 Pearl Street
Boulder,CO 80302
Re: Scope of work for the Angelo Unit 313 Hall Capture
1ane,
Here are the items that I see in our scope of work at the Angelo 313 Hall Capture project.
• Relocate electrical distribution panel as shown on page A3.0.Any existing wiring for panel that is
not sufficient length to reach new panel location will be spliced in an accessible junction box in
ceiling.
• Relocate Vail Mountain Lodge hall cove lighting as shown on schematic electrical plan on page
A3.0.
• Separate any Vail Mountain Lodge wiring from Unit 313 wiring.
• Add lighting and outlets as shown on schematic electrical plan on page A3.0.
• Relocate switching as shown on schematic electrical plan on page A3.0.
• Remove exit sign as shown on schematic electrical plan on page A3.0.
• Add floor heat at new entry floor, remove junction box for existing floor heat and re-feed floor
heat with new wall outlet. Provide new separate control.
• Add arc fault breakers and tamper proof for remodel areas.
• Fire sprinkler and fire/smoke alarm work is not included in the scope of work performed by
Marmot Electric.
Let me know if you have any further questions regarding this scope of work.
Tha n ks,
Jim Mires
Marmot Electric
E10-0327: Entries for Item:190 - ELEC-Final 10:17 07/03/2013
Action Comments By Date Unique_
Ke
AP sgremmer 12123/2010 A000140
214
Total Rows: 1
Page 1