Loading...
HomeMy WebLinkAboutFP10.9.6 Q, 6' i.>> � z ro-h�O r ��� v1 O O O + � � <�L` Q � � � EAST TRASH CHUTE 9 � ^`�-� � �' � o � � � � '`, +`1-, � •� � o � � 0 a' � � }1 0 '� .� WATER ENTRY IN CHILLER ROOM L114 ON UPPER GARAGE LEVEL ��,�� � �� `� � C,, � o � � `9 -E' � Q� �' 0 .� co `L� 9 �o cb � �� � U N bvA HYDRAULIC-SYSTEM ,�,+°�" �o��` �+ ' �' ��� a� O �, � � � ,� � �ti �' 1--� �••� � This building is protected ��+ �4,- N � � � � ry � � � �. �h + � � � � � � by a Hydraulically Designed ��� 4' `L�'� � � U o � Automatic Sprinkler System. ��o �o ,�� � � � o + `3� �"'� � ° EAST TRASH CHUTE ��ry =� U Location oe- ? �, r T , �o �� � �ti -�'�'� �� 9 �,� ^- 3� ^ No. of Sprinklers 0 ��� ^�-�� + f `b VALVE ROOM G168 ON GARDEN LEVEL f � ,�O 1� �' Basis of Design +�� 6" x 2" GROOVED MECHANICAL TEE � 1.DENSITY N/A GPM/SQ.FT. ��'' DO� F� 2.DESIGNED AREA OF DISCHARGE N/A SQ.FT. �'�� �J rl. System Demand � ���� 1.GPM DISCHARGE 131.80 GPM �f � 2.RESIDUAL PRESSURE AT THE 47.473 Psi ,`�� FIRE RISER ROOM + �,ry WESTERN STATES FIRE PROTECTION �o°� ;� 9=0 (303) 792-0022 a`` � � " " � � ¢ ��\��t,'�'L ��`�- Q z o f� � ��� �' � ��" '° w�` 6' o +� r° t'o �o -t�+- ,ti ���,�, �. _ c�s + '` � O� �`r.'zS `� LL �+ � M1r �`9 ^Q�� � � Z = = � s � `� �`� Go ti ^ �o. << - ��^��_ +. � � w � `b � # � � ,ry � �+�� �' �^ 0 �\�v 2" DRY VALVE IN TRASH ROOM 123 ON LEVEL ONE ^,+4' �002-- �� �\�5 ti � ��ti 3 �f `b^ `�`O� SPRINKELR STANDPIPE SUPPLY @ FIRST FLOOR d f .�., C� w �'��,ry W � J �`ry ��� Y � � ��� � P�� � � G �^� � � �^ w � � o ��� GENERAL NOTES w � •! �, J �� �} � `� � 1. SCOPE OF WORK CONSISTS OF INSTALLING TWO NEW � � � PG� AUTOMATIC DRY PIPE FIRE SPRINKLER SYSTEMS TO PROTECT � e' THE EAST AND WEST TRASH CHUTES. PIPING TO BE z ��P LOW POINT DRAIN (INSPECTORS TEST) IN TRASH L111 CONNECTED TO SPRINKLERS PRE-INSTALLED CHUTE ASSEMBLY. 0 QQ o � � � J �^°� 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA w �, �g "� f� 13 AND THE REQUIRMENTS OF VAIL FIRE PREVENTION BUREAU. z � Y �o f O z z _ � 3�� 3. SYSTEM DESIGN IS BASED ON DIRECTION GIVEN IN SECTION � � a � `�� � 13.15 OF NFPA 13,2002 EDITION AND SECTION 3-2.5 OF NFPA 82, � w � �P�Q-�' 1999 EDITION. w � Q ���0 4. MINIMUM DISCHARGE OF CHUTE SPRINKLERS IS NOT � _ � �� �ro' ADDRESSED IN EITHER APPLICABLE NFPA STANDARD SO ALL J f �° SPRINKLERS WERE CALCULATED AS DISCHARGING THE NFPA 13 m � �f MINIMUM OF 7 PSI. } � � � ���'' S. SPRINKLERS PROTECTING THE EAST CHUTE ARE LOCATED AT p:ti� FLOORS 6,4,2,GARDEN AND UPPER GARAGE. SPRINKLERS PROTECTING THE WEST CHUTE ARE LOCATED AT FLOORS 5,3, 1 � U U AND UPPER GARAGE. m m m 6. BRANCHLINE PIPING TO BE GALVANIZED SCH. 10 AND SCH.40 WITH MECHANICAL OUTLETS,CLASS 125 THREADED FITTWGS AND GROOVED FITTINGS. 7. CROSSMAIN PIPING TO BE GALVANIZED SCH. 10 WITH WELDED z Q OUTLETS AND GROOVED FITTINGS. p z � � O 8. HANGERS SHALL BE PLACED AND SPACED IN ACCORDANCE � � m � WITH NFPA 13 AND MANUFACTURER'S SPECIFICATIONS. � U � � m 9. FREEZE PROTECTION THROUGH PROPER SYSTEM 0 O a MAINTENANCE SHALL BE THE RESPONSIBILITY OF THE OWNER. �s 6' �� 10. BRANCHLINE PIPING SHALL PITCH AT LEAST'/z'PER 10FT AND ? MAIN PIPING SHALL PITCH AT LEAST%"PER 10FT FOR PROPER � o DRAINAGE IN ACCORDANCE WITH SECTION 8.15.2.3.1 OF NFPA 13, w o��o 0 2002 EDITION. ¢ T o 11.SYSTEM DRY VALVE FOR THE EAST CHUTE IS LOCATED IN � o T TRASH ROOM 123 ON LEVEL 1. SYSTEM DRY VALVE FOR THE p a a a a Q Q WEST CHUTE IS LOCATED IN ELEVATOR LOBBY 137 ON LEVEL 1. z 12.TOTAL VOLUME OF DRY PIPE SPRINKLER SYSTEM DRAWN BY: Brian Houser PROTECTING THE EAST TRASH CHUTE-15 GAL. TOTAL VOLUME OF DRY PIPE SPRINKLER SYSTEM PROTECTING THE WEST TRASH CHUTE-16 GAL. DATE: 10/20/10 13.THE LOW POINT DRAIN QNSPECTORS TEST) FOR THE EAST a s z , o z a s e CHUTE SYSTEM IS LOCATED IN TRASH ROOM L111 ON LOWER � � � � � � � � � GARAGE LEVEL. THE LOW POINT DRAIN QNSPECTORS TEST)FOR �o �p THE WEST CHUTE SYSTEM IS LOCATED IN TRASH ROOM L104 ON SCALE 118"=1'-0" �p�- LOWER GARAGE LEVEL. WEST TRASH CHUTE ^�+� ooQ-- � !'��� vJ1ry `\ ^��' �p�'�+ �� cb - V1 r °t � F-I " oe- C� 4� Q �5 ,��+�����-° � j � JQ-- ti � 'LI �-I � ^ro�' � � � O I�� °^ • W 6"x 2" GROOVED MECHANICAL TEE o � � � 9 ,\�' �,+ o� � � o �� � � � � 'i- .��Q`� `ti FLOW TEST INFO VAIL FIRE DEPARTMENT FIREFLOW ADJUSTMENTS � � � ��� � ^h4j 1472 GPM x 82.22%= 1210 GPM r� w Q �f `b STATIC PRESSURE 150psi 1472= 29.7 x 6.25�x 82.22% O Q • � f RESIDUAL PRESSURE 145psi {[(1472/.8222)/29.71]/6.25}2= 92.96 PSI � . ,� o � � �89 `=9�, ��o FLOW 1472 gpm ADJUSTED FLOW TEST INFO �~ � �,+ �oo�" TEST CONDUCTED BY WSFP STATIC PRESSURE 150psi � ' -.9+� �p� &WITNESSED BY EAGLE RIVER RESIDUAL PRESSURE 93psi � HYDRA LI - Y TEM =�: ��'��=L WATER& PCL ON DEC. 4TH, 2007 FLOW 1210 gpm � � p"� U CS S ��+ ° ,�+_ � ,�� � � � This building is protected s' �s `� f� N ('y by a Hydraulically Designed �� `� � � � Automatic Sprinkler System. ,��� r +g�`ry 2" DRY VALVE IN ELEVATOR LOBBY 137 ON LEVEL ONE `b'� '��ry @- � �I Location WEST TRASH CHUTE _ ��oo 5� F��^3ti No. of Sprinklers 0 �f � f ,ry Basis of Design ^�� ti 1.DENSITY N/A GPM/SQ.FT. '�, �J��' � 2.DESIGNED AREA OF DISCHARGE N�A SQ.FT. O�i� P<2- Q System Demand �4,�.`i-^ 1.GPM DISCHARGE 97.64 GPM �� CONTRACT NUMBER O 2.RESIDIJAL PRESSURE AT THE 41.478 psi ��' 700405 FIRE RISER ROOM ,�1'�- � WESTERN STATES FIRE PROTECTION e-PG DRAWING FILE NAME P (303) 792-0022 QQ�Q-o Trash Chute Calc.cad ��, � ��.�� FLOOR 1 AREA �f ALL I TRASH CHUTES 150 �� SHEET NUMBER Q-P G� � 2-- O�� � v �ro� �\ ° FP 10.9.6 � �� , LOW POINT DRAIN (INSPECTORS TEST) IN TRASH L104 �� OVERALL TRASH CHUTES ISOMETRIC VIEW \- J SCALE : 118" = 1'-0" PLAN NORTH 46 OF 46