HomeMy WebLinkAboutFP10.9.6 Q, 6'
i.>> �
z
ro-h�O r ��� v1 O O O
+ � �
<�L` Q � � �
EAST TRASH CHUTE 9 � ^`�-� � �' � o � �
� �
'`, +`1-, � •� � o � �
0
a' � � }1 0 '� .�
WATER ENTRY IN CHILLER ROOM L114 ON UPPER GARAGE LEVEL ��,�� � �� `� � C,, � o � �
`9 -E' � Q� �' 0 .�
co `L� 9 �o cb � �� � U N bvA
HYDRAULIC-SYSTEM ,�,+°�" �o��` �+ ' �' ��� a� O �, � � �
,� � �ti �' 1--� �••� �
This building is protected ��+ �4,- N �
� � � ry � � �
�. �h + � � � � � �
by a Hydraulically Designed ��� 4' `L�'� � � U o �
Automatic Sprinkler System. ��o �o ,�� � � � o
+ `3� �"'� � °
EAST TRASH CHUTE ��ry =� U
Location oe- ? �, r T ,
�o �� � �ti
-�'�'� �� 9 �,� ^- 3� ^
No. of Sprinklers 0 ��� ^�-�� +
f `b VALVE ROOM G168 ON GARDEN LEVEL
f �
,�O
1� �'
Basis of Design +�� 6" x 2" GROOVED MECHANICAL TEE �
1.DENSITY N/A GPM/SQ.FT. ��'' DO�
F�
2.DESIGNED AREA OF DISCHARGE N/A SQ.FT. �'��
�J rl.
System Demand � ����
1.GPM DISCHARGE 131.80 GPM �f �
2.RESIDUAL PRESSURE AT THE 47.473 Psi ,`��
FIRE RISER ROOM +
�,ry
WESTERN STATES FIRE PROTECTION �o°� ;� 9=0
(303) 792-0022 a`` � � " " �
� ¢
��\��t,'�'L ��`�-
Q z o
f� � ��� �'
� ��" '° w�` 6'
o +� r° t'o �o
-t�+- ,ti ���,�, �. _
c�s + '` � O� �`r.'zS `� LL
�+ � M1r �`9 ^Q�� � � Z
= = � s �
`� �`� Go ti ^ �o.
<< - ��^��_ +. � �
w
� `b � #
�
�
,ry
� �+�� �'
�^ 0
�\�v
2" DRY VALVE IN TRASH ROOM 123 ON LEVEL ONE ^,+4' �002--
��
�\�5 ti � ��ti
3
�f `b^ `�`O� SPRINKELR STANDPIPE SUPPLY @ FIRST FLOOR d
f
.�., C�
w
�'��,ry W
� J
�`ry ��� Y
� �
��� �
P�� � �
G �^� �
� �^ w
� � o ��� GENERAL NOTES w
� •! �, J
�� �} �
`� � 1. SCOPE OF WORK CONSISTS OF INSTALLING TWO NEW �
� � PG� AUTOMATIC DRY PIPE FIRE SPRINKLER SYSTEMS TO PROTECT �
e' THE EAST AND WEST TRASH CHUTES. PIPING TO BE z
��P LOW POINT DRAIN (INSPECTORS TEST) IN TRASH L111 CONNECTED TO SPRINKLERS PRE-INSTALLED CHUTE ASSEMBLY. 0
QQ o �
�
� J �^°� 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA w
�, �g "� f� 13 AND THE REQUIRMENTS OF VAIL FIRE PREVENTION BUREAU. z � Y
�o f O z z
_ � 3�� 3. SYSTEM DESIGN IS BASED ON DIRECTION GIVEN IN SECTION � � a
� `�� � 13.15 OF NFPA 13,2002 EDITION AND SECTION 3-2.5 OF NFPA 82, � w �
�P�Q-�' 1999 EDITION. w � Q
���0 4. MINIMUM DISCHARGE OF CHUTE SPRINKLERS IS NOT � _ �
�� �ro' ADDRESSED IN EITHER APPLICABLE NFPA STANDARD SO ALL J
f �° SPRINKLERS WERE CALCULATED AS DISCHARGING THE NFPA 13 m �
�f MINIMUM OF 7 PSI. }
� � �
���'' S. SPRINKLERS PROTECTING THE EAST CHUTE ARE LOCATED AT
p:ti� FLOORS 6,4,2,GARDEN AND UPPER GARAGE. SPRINKLERS
PROTECTING THE WEST CHUTE ARE LOCATED AT FLOORS 5,3, 1 � U U
AND UPPER GARAGE. m m m
6. BRANCHLINE PIPING TO BE GALVANIZED SCH. 10 AND SCH.40
WITH MECHANICAL OUTLETS,CLASS 125 THREADED FITTWGS
AND GROOVED FITTINGS.
7. CROSSMAIN PIPING TO BE GALVANIZED SCH. 10 WITH WELDED z Q
OUTLETS AND GROOVED FITTINGS. p z �
� O
8. HANGERS SHALL BE PLACED AND SPACED IN ACCORDANCE � � m �
WITH NFPA 13 AND MANUFACTURER'S SPECIFICATIONS. � U � �
m
9. FREEZE PROTECTION THROUGH PROPER SYSTEM 0 O a
MAINTENANCE SHALL BE THE RESPONSIBILITY OF THE OWNER.
�s 6'
�� 10. BRANCHLINE PIPING SHALL PITCH AT LEAST'/z'PER 10FT AND
? MAIN PIPING SHALL PITCH AT LEAST%"PER 10FT FOR PROPER � o
DRAINAGE IN ACCORDANCE WITH SECTION 8.15.2.3.1 OF NFPA 13, w o��o 0
2002 EDITION. ¢ T o
11.SYSTEM DRY VALVE FOR THE EAST CHUTE IS LOCATED IN � o T
TRASH ROOM 123 ON LEVEL 1. SYSTEM DRY VALVE FOR THE p a a a a Q Q
WEST CHUTE IS LOCATED IN ELEVATOR LOBBY 137 ON LEVEL 1. z
12.TOTAL VOLUME OF DRY PIPE SPRINKLER SYSTEM DRAWN BY: Brian Houser
PROTECTING THE EAST TRASH CHUTE-15 GAL. TOTAL VOLUME
OF DRY PIPE SPRINKLER SYSTEM PROTECTING THE WEST TRASH
CHUTE-16 GAL. DATE: 10/20/10
13.THE LOW POINT DRAIN QNSPECTORS TEST) FOR THE EAST a s z , o z a s e
CHUTE SYSTEM IS LOCATED IN TRASH ROOM L111 ON LOWER � � � � � � � � �
GARAGE LEVEL. THE LOW POINT DRAIN QNSPECTORS TEST)FOR
�o �p THE WEST CHUTE SYSTEM IS LOCATED IN TRASH ROOM L104 ON SCALE 118"=1'-0"
�p�- LOWER GARAGE LEVEL.
WEST TRASH CHUTE
^�+� ooQ--
� !'��� vJ1ry
`\ ^��'
�p�'�+ �� cb
- V1
r °t � F-I
" oe- C� 4� Q
�5 ,��+�����-° � j �
JQ-- ti � 'LI �-I
� ^ro�' � �
�
O
I�� °^ • W
6"x 2" GROOVED MECHANICAL TEE o � � �
9 ,\�'
�,+ o� � � o
�� � � �
�
'i- .��Q`� `ti FLOW TEST INFO VAIL FIRE DEPARTMENT FIREFLOW ADJUSTMENTS � � �
��� � ^h4j 1472 GPM x 82.22%= 1210 GPM r� w
Q �f `b STATIC PRESSURE 150psi 1472= 29.7 x 6.25�x 82.22% O Q • �
f RESIDUAL PRESSURE 145psi {[(1472/.8222)/29.71]/6.25}2= 92.96 PSI � . ,�
o � �
�89 `=9�, ��o FLOW 1472 gpm ADJUSTED FLOW TEST INFO �~
� �,+ �oo�" TEST CONDUCTED BY WSFP STATIC PRESSURE 150psi � '
-.9+� �p� &WITNESSED BY EAGLE RIVER RESIDUAL PRESSURE 93psi �
HYDRA LI - Y TEM =�: ��'��=L WATER& PCL ON DEC. 4TH, 2007 FLOW 1210 gpm � � p"�
U CS S
��+ ° ,�+_ � ,�� � � �
This building is protected s' �s `� f� N ('y
by a Hydraulically Designed �� `� � � �
Automatic Sprinkler System. ,��� r +g�`ry
2" DRY VALVE IN ELEVATOR LOBBY 137 ON LEVEL ONE
`b'� '��ry @- � �I
Location WEST TRASH CHUTE _ ��oo
5�
F��^3ti
No. of Sprinklers 0 �f �
f
,ry
Basis of Design ^��
ti
1.DENSITY N/A GPM/SQ.FT. '�, �J��'
�
2.DESIGNED AREA OF DISCHARGE N�A SQ.FT. O�i�
P<2- Q
System Demand �4,�.`i-^
1.GPM DISCHARGE 97.64 GPM �� CONTRACT NUMBER
O
2.RESIDIJAL PRESSURE AT THE 41.478 psi ��' 700405
FIRE RISER ROOM ,�1'�- �
WESTERN STATES FIRE PROTECTION e-PG DRAWING FILE NAME
P
(303) 792-0022 QQ�Q-o
Trash Chute Calc.cad
��, � ��.�� FLOOR 1 AREA
�f ALL I TRASH CHUTES 150
�� SHEET NUMBER
Q-P
G� �
2--
O�� �
v �ro� �\
° FP 10.9.6
�
�� ,
LOW POINT DRAIN (INSPECTORS TEST) IN TRASH L104 �� OVERALL TRASH CHUTES ISOMETRIC VIEW \- J
SCALE : 118" = 1'-0"
PLAN NORTH 46 OF 46