HomeMy WebLinkAboutB10-0023Community Development Department
75 South Frontage Road
Vail, Colorado USA 81657
CERTIFICATE OF OCCUPANCY
This certificate is issued pursuant to the requirements of Title 10, Section 10 -1 -2, ADOPTED CODES of the Vail Town
Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various
ordinances of the town regulating building construction or use for the following:
Name and description of project: Rams Horn Lodge Unit 17
Address of project: 416 Vail Valley Drive, Vail, Colorado
Owner name and address TYM International LTD, 416 Vail Valley Drive, Vail, Colorado, 81657
IBC Edition: 2009 IBC Occupancy Group(s): R2, Type(s) of Construction: VA
Permit Number(s) B10 -0023 Occupant Load:
Sprinkler System Y/N Type:
Y1.
Martin Haeberle, Building Official
12/21/2010
Date
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to:
o -0voy
() Revisions
() Response to Correction Letter
_attached copy of correction letter
( ) Deferred Submittal
Other
Project Street Address: So I
H) 1,0 VR1�- �A�� H �2, (��o Q Description /List of Changes:
i
(Number) (Street) (Suite #) TPST A Jp (__�At.,A, 1 Lo je t9-
Building /Complex Name: s f�W✓ J 1J►., •T '� — t3 1D
a 2 - f310- Clot 9
Contact Information:
Company: &l G __). S o w
Company Address: ZS V CAS CAre Aje STr - qyi?
City: 6 L O A.RO d SPA -�4S State: Cb Zip: q) d -2 ,
Contact Name: .)u V'tO25tx'�
Contact Phone: 301 - 6 `l'D - `3 S
E -Mail horsc_�\j r. qQ �o Inn JU✓�. L v w..
Valuations (Labor & Material))
Building:
Plumbing:
Electrical:
Mechanical:
Total
R
Attention:
J 2 vA10 a 0AA 1_ o_.J
309 - 03S'9
50q - 03( 3
*� It T2,",
) 9 - F;)6 -0022
- vk us - 1309 - 6 365
4� 1S -- Bo 9 - 0 b
4 - 1 - 0 )a A 0023
(use additional sheet if necessary)
Date Received:
D IE �IE PMrF
DEC 0 8 2010
TOWN OF VML
1- Sep -09
TRANSMITTAL FORM
PAGE 8179
STINCy COMPLETE P.O. BOX 27706
ADJUSTING MECHANICAL DENVER, CO. 80227
SYSTEM BALANCING BALANCING, INC FAX 303 - 972 -7453
TABB CERTIFIED PHONE 303 - 948 -5429
Zl Town of Vail
�✓ (� l _ U 0 C �I GENERAL INFORMATION
�AFFIC E C OPY
PROJECT
LOCATION
ARCHITECT
MECHANICAL ENGINEER
SHEETMETAL CONTRACTO
BALANCING CREW C.CATLETT J.CATLETT G.CATLETT J.FREEMAN
FLOW HOOD
RAM'S HORN LODGE TENANT FINISH
ANEMOMETER
SPEED INDICATOR
AMMETER / V OLTMETER
INCLINED DRAFT GAGE
MAGNEHELIC GAGE
PRESSURE GA
PRESSURE GAGE DIFFERENTIAL
PYROMETER
THERMOMETE
MICROMANOMETER
BARCO 0 -50" 0 -100" 300" 500" 0 -100'
Mu"M 1 P m
#0m
Ti�Yia. A% =B CAob "
TABB Technician
Name: Jimmie Cadeu
TABB IDs BB957485T
Exphudon Dates 12/31/2011
ALNOR
FLUKE TYPE 52
ALNOR TYPE 530
PROJECT ALTITUDE 8200'
FLOW HOOD CORRECT 1.1 APPLIED TO; AREA (K FACTOR)
STATIC PRESSURE CORRECTION 1.21
RECORDED PRESSURE READINGS ARE MEASURED X
D .
DEC 0 � 2010 r
TOWN OF VAIL —.
Cull Cwstt
SNOW=
Not VaW Unkm Sipped
INSTRUMENTS U SED
- 30 - - +30 PSI 0 -60 PSI 0 -100 PSI
M -TECH SYSTEMS, INC.
ALNOR / SHORTRIDGE
DAVIS TYPE
BIDDLE TYPE
LCA 6000
9915
AMPROBE TYPE 0 DIGITAL
DWYER 0- 0.25" 0- 0.50" 400"
0- 0.50" 0 -1.0" 0 -2.0" 0 -4.0" 0 -8.0"
X
DATE NOVEMBER 2010
VELOCITY
CORRECTED
Complete Page 8179 -65
Mechanical Date 11 -18 -10
Balancing, Inc. Contrac M -TECH
Balance. J.C. & J.F. _
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO.
FC -1
PLAN LOC.
MAKE
ENVIROTECH
MODEL NO.
H2O
SER. NO.
NONE GIVEN
RATING
1900 CFM ® 0.8"
E.S.P.
INITIAL RPM
968
B) MOTOR
WEG
HP.
1
FINAL RPM
RATED EFF /PF
968
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
1740
MEAS.VOLTS (L /L)
210
SF.
1.15
RATED VOLTS
115/208 -230
INITIAL AMPS
4.92
FR.
D56
RATED AMPS
14/6.8 -7.0
MEAS.VOLTS (L /G)
S F AMPS
NONE GIVEN
FINAL AMPS
C) STARTER
4.92
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
D) DRIVEN
AK54H
SHEAVE X BORE
H 3/4"
DRIVER
1VL44
SHEAVE X BORE
5/8"
BELTS
A38
SIZE X NO. BELTS
_
1
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
NONE
BELT CHANGE
NONE
E) FILTERS IN
-0.31 IN.
OUT
-0.30
IN.
DROP
0.01 IN.
HEAT COIL IN
-0.30 IN.
OUT
N/A
IN.
DROP
0.30 IN.
COOL C OIL IN
N/A IN.
OUT
-0.62
IN.
DROP
-0.62 IN.
FAN IN
-0.62 IN.
OUT
0.06
IN.
DROP
0.68 IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
--
PSI
RISE
PSI FT
H) REMARKS
- --
OSA AREA= 0.
SQ. FT.X
759
FPM=
600 CFM
FINAL: 0.79
SQ. FT.X
759
FPM=
600 CFM
100%
COMPLETE
MECHANICAL PROJECT RAM'S HORN LODGE UNIT # 17
BALANCING LOCATION VAIL CO
FAN SYSTEM FC -1
CONTRACTOR M -TECH SYSTEMS, INC.
PAGE NO
DATE
8179 -66
11 -18 -10
BALANCER J.C. & J.F.
REMARKS
AIRBAL
SIZE
REQUIRED
TEST 1
TEST
2 TEST 3
FINAL
OPENING PLAN
CT'
ARE
VEL
CFM
VEL
%
VEd
%
VE
%
VEL
CFM
%
REMARKS
FC -1 -1 18/6
1.16
129
150
0
130
151
101
2 20/8
1.161
345
400
400
116
355
412
103
3 20/8
1.161
345
400
400
116
355
412
103
4 20/8
1.161
345
400
330
96
350
406
102
100% OPEN
5 20/8
1.16
345
400
330
96
350
406
102
TOTAL-
1750
1786
REMARKS
AIRBAL
Complete
Mechanical
Balancing, Inc.
EQUIPMENT DATA
Page 8179 -67
Date 11 -18 -10
Contrac M -TECH
Balance J.C. & J.F.
A) PROJECT
RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO.
FC -2
PLAN LOC.
SHEAVE X BORE
MAKE
ENVIROTECH
MODEL NO.
HLP -40
SER. NO.
NONE GIVEN
SHEAVE X BORE
RATING
500 CFM @ 0.3" E.S.P.
INITIAL RPM
DIRECT DRIVE
B) MOTOR
WEG HP.
1/6
FINAL RPM
RATED EFF /PF
DIRECT DRIVE
NONE GIVEN
TYPE
U185B1 PH.
1
RATED SPEED
1350 3 SPEED
MEAS.VOLTS (L /L)
210 SF.
NONE GIVEN
RATED VOLTS
208 -230
INITIAL AMPS
.80 FR.
NONE GIVEN
RATED AMPS
.9
MEAS.VOLTS (L /G)
E) FILTERS
IN
S F AMPS
NONE GIVEN
FINAL AMPS
.80
IN.
DROP
-0.02 IN.
C) STARTER SIZE
THERMALS (EXIST) AMP. RATING
THERMALS (REQ'D) AMP. RATING
OTHER BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SHEAVE X BORE
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS
IN
-0.03
IN.
OUT
-0.05
IN.
DROP
-0.02 IN.
HEAT COIL
IN
N/A
IN.
OUT
N/A
IN.
DROP
IN.
COOL COIL
IN
N/A
IN.
OUT
-0.06
IN.
DROP
-0.06 IN.
FAN
IN
-0.05
IN.
OUT
N/A
IN.
DROP
0.05 IN.
G) PUMP
IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD
IN
PSI
OUT
PSI
RISE
PSI FT
H) REMARKS
HIGH SPEED
AREA=
SQ. FT.X
FPM=
CFM
FINAL:
SQ. FT.X
FPM=
CFM
COMPLETE
MECHANICAL PROJECT RAM'S HORN LODGE UNIT # 17 PAGE NO 8179 -68
BALANCING LOCATION VAIL CO DATE 11 -18 -10
FAN SYSTEM FC -2 BALANCER J.C. & J.F.
CONTRACTOR M -TECH SYSTEMS, INC.
SIZE REQUIRED TEST 1 TEST 2 TEST 3 FINAL
=OPENIG
PLAN
CT'
A REA
VEL
CFM
VEL
%
%
%
VEL
CFM
%
REMARKS
FC -2 -6
18/ 10
1.16
431
500
445
103
1
445
516
103
7
18/10
1.16
1
DELETED
TOTAL
500
516
REMARKS
MRBAL
Complete Page 8179 -69
Mechanical Date 11 -18 -10
Balancing, Inc. Contrac M -TECH
Balance J.C. & J.F.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO. FC -3 PLAN LOC.
MAKE ENVIROTECH MODEL NO. H -08
SER. NO. NONE GIVEN
RATING 600 CFM ® 0.8" E.S.P. INITIAL RPM 1478
FINAL RPM 720
B) MOTOR WEG HP. 1 RATED EFF /PF NONE GIVEN
TYPE NONE GIVEN PH. 1 RATED SPEED 1750
MEAS.VOLTS (L /L) 210 SF. 1.15 RATED VOLTS 115/208 -230
INITIAL AMPS 2.98 FR. D56 RATED AMPS 14/6.8 -7.0
MEAS.VOLTS (L /G) S F AMPS NONE GIVEN
FINAL AMPS 2.06
C) STARTER SIZE
THERMALS (EXIST) AMP. RATING
THERMALS (REQ'D) AMP. RATING
OTHER BUILT IN OVERLOAD PROTECTION
D) DRIVEN
AK46
SHEAVE X BORE
H 3/4"
DRIVER
1VP44
SHEAVE X BORE
5/8"
BELTS
A38
SIZE X NO. BELTS
1
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
1VP34
BELT CHANGE
A36
E) FILTERS
IN
-0.01
IN.
OUT
-0.03
IN.
DROP
-0.02 IN.
HEAT COIL
IN
-0.03
IN.
OUT
N/A
IN.
DROP
0.03 IN.
COOL COIL
IN
N/A
IN.
OUT
-0.23
IN.
DROP
-0.23 IN.
FAN
IN
-0.23
IN.
OUT
0.08
IN.
DROP
0.31 IN.
G) PUMP
IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD
IN
PSI
OUT
PSI
RISE
PSI FT
H) REMARKS
AREA=
SQ. FT.X
FPM=
CFM
FINAL:
SQ, FT.X
FPM=
CFM
COMPLETE
MECHANICAL PROJECT
BALANCING LOCATION
FAN SYSTEM
CONTRACTOR
RAM'S HORN LODGE UNIT # 17
VAIL CO
FC -3
M -TECH SYSTEMS, INC.
PAGE NO 8179 -70
DATE 11 -18 -10
BALANCER J.C. & J.F.
REMARKS
AIRBAL
SIZE
REQUIRED
TEST 1
TEST 2
TEST 3
FINAL
OPENING
PLAN
CT'
AREA
VEL
CFM
VEL
%
VEL
%
VEL
%
VEL
CFM
%
REMARKS
FC -3 -8
18/
172
2001
475
276
180
209
104
9
18/6
1.16
172
200
290
168
180
209
104
100% OPEN
TOTAL
400
418
REMARKS
AIRBAL
Complete Page 8179 -71
Mechanical Date 11 -18 -10
Balancing, Inc. Contrac M -TECH
Balance J. C. & J.F.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT #17 TENANT FINISH
UNIT NO. FC -4 PLAN LOC.
MAKE ENVIROTECH MODEL NO. HLP40
SER. NO. NONE GIVE
RATING 320 CFM @ 0.3" E.S.P. _ INITIAL RPM DIRECT DRIVE
FINAL RPM DIRECT DRIVE
B) MOTOR FASCO HP. 1/16 RATED EFF /PF NONE GIVEN
TYPE U 185B 1 PH. 1 RATED SPEED 1350 3 SPEED
MEAS.VOLTS (L /L) 209 SF. NONE GIVEN RATED VOLTS 208 -230
INITIAL AMPS .70 FR. NONE GIVEN RATED AMPS .9
MEAS.VOLTS (L /G) S F AMPS NONE GIVEN
FINAL AMPS .70
C) STARTER SIZE
THERMALS (EXIST) AMP. RATING
THERMALS (REQ'D) AMP. RATING
OTHER BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SQ. FT.X
FPM=
CFM
FINAL:
SQ. FT.X
FPM=
SHEAVE X BORE
H 3/4"
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS
IN
-0.02
IN.
OUT
-0.04
IN.
DROP
-0.02 IN.
HEAT COIL
IN
N/A
IN.
OUT
N/A
IN.
DROP
IN.
COOL COIL
IN
N/A
IN.
OUT
-0.05
IN.
DROP
-0.05 IN.
FAN
IN
-0.04
IN.
OUT
N/A
IN.
DROP
0.04 IN.
G) PUMP
IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD
IN
PSI
OUT
PSI
RISE
_
PSI v FT
H) REMARKS
MEDIUM SPEED
AREA=
SQ. FT.X
FPM=
CFM
FINAL:
SQ. FT.X
FPM=
CFM
COMPLETE
MECHANICAL PROJECT
BALANCING LOCATION
FAN SYSTEM
CONTRACTOR
RAM'S HORN LODGE UNIT # 17
VAIL CO
FC -4
M -TECH SYSTEMS, INC.
PAGE NO
DATE
8179 -72
11 -18 -10
BALANCER J.C. & J.F.
REMARKS
AIRBAL
SIZE
REQUIRED
TEST 1
TEST 2
TEST 3
FINAL
OPENING
PLAN
CT'
ARE
VEL
CFM
VEL
%
VEL
%
VEL
%
VEL
CFM
%
REMARKS
FC -4 -10
18/61
1.161
147
1701
160
109
135
157
92
100% OPEN
it
18/61
1.161
129
1501
160
124
135
157
104
TOTAL
320
313
REMARKS
AIRBAL
Complete Page 8179 -73
Mechanical Date 11 -17 -10
Balancing, Inc. Contrac M -TECH
Balance: J.C. & G.C.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO.
EF- lA
66
FPM=
PLAN LOC.
CFM
MAKE
PANASONIC
SQ. FT.X
65
MODEL NO.
AFV -08VF2
SER. NO.
005
RATING
80 CFM Cad 0.375
E.S.P.
INITIAL RPM
DIRECT DRIVE
B) MOTOR
PANASONIC
HP.
NONE GIVEN
FINAL RPM
RATED EFF /PF
DIRECT DRIVE
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
NONE GIVEN
MEAS.VOLTS (L /L)
SF.
NONE GIVEN
RATED VOLTS
120
INITIAL AMPS
.17
FR.
NONE GIVEN
RATED AMPS
.2
MEAS.VOLTS (L /G)
120
S F AMPS
NONE GIVEN
FINAL AMPS
C) STARTER
.17
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SHEAVE X BORE
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS IN
IN.
OUT
IN.
DROP
IN.
HEAT COIL IN
IN.
OUT
IN.
DROP
IN.
COOL COIL IN
IN.
OUT
IN.
DROP
IN.
FAN IN
ATMOS IN.
OUT
N/A IN.
DROP
IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
PSI
RISE
PSI FT
H) REMAR
-
- - - -- -- -
AREA=
1.16
SQ. FT.X
66
FPM=
76
CFM
FINAL:
1.16
SQ. FT.X
65
FPM=
75
CFM 99%
Complete Page 8179 -74
Mechanical Date 11 -17 -10
Balancing, Inc. Contrac M -TECH
Balance. J.C. & G.C.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO.
EF -1B
PLAN LOC.
MAKE
PANASONIC
MODEL NO.
AFV -08VF2
SER. NO.
005
RATING
80 CFM @ 0.375 E.S.P.
INITIAL RPM
DIRECT DRIVE
B) MOTOR
PANASONIC
HP.
NONE GIVEN
FINAL RPM
RATED EFF /PF
DIRECT DRIVE
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
NONE GIVEN
MEAS.VOLTS (L /L)
SF.
NONE GIVEN
RATED VOLTS
120
INITIAL AMPS
.19
FR.
NONE GIVEN
RATED AMPS
.2
MEAS.VOLTS (L /G)
120
S F AMPS
NONE GIVEN
FINAL AMPS
C) STARTER
.19
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SHEAVE X BORE
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS IN
IN.
OUT
IN.
DROP
IN.
HEAT COIL IN
IN.
OUT
IN.
DROP
IN.
COOL COIL IN
IN.
OUT
IN.
DROP
IN.
FAN IN
ATMOS IN.
OUT
N/A IN.
DROP
IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
PSI
RISE
PSI FT
H) REMARKS
- -
AREA= 1. 16
SQ. FT.X
66
FPM=
76 CFM
FINAL: 1.16
SQ. FT.X
65
FPM=
75 CFM
99%
Complete Page 8179 -75
Mechanical Date 11 -17 -10
Balancing, Inc. Contrac M -TECH
Balance: J. C. & G. C.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO.
EF -1C
PLAN LOC.
MAKE
PANASONIC
MODEL NO.
AFV -08VF2
SER. NO.
005
RATING
80 CFM Q 0.375 E.S.P.
INITIAL RPM
DIRECT DRIVE
B) MOTOR
PANASONIC
HP.
NONE GIVEN
FINAL RPM
RATED EFF /PF
DIRECT DRIVE
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
NONE GIVEN
MEAS.VOLTS (L /L)
SF.
NONE GIVEN
RATED VOLTS
120
INITIAL AMPS
.17
FR.
NONE GIVEN
RATED AMPS
.2
MEAS.VOLTS (L /G)
120
S F AMPS
NONE GIVEN
FINAL AMPS
C) STARTER
.17
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SHEAVE X BORE
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS IN
IN.
OUT
IN.
DROP
IN.
HEAT COIL IN
IN.
OUT
IN.
DROP
IN.
COOL COIL IN
IN.
OUT
IN.
_
DROP
IN.
FAN IN
ATMOS IN.
OUT
N/A IN.
DROP
IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
PSI
RISE
PSI FT
H) REMARKS
AREA= 1. 16
SQ. FT.X
66
FPM=
76 CFM
FINAL: 1.16
SQ. FT.X
65
FPM=
75 CFM
99%
r
Complete
Mechanical
Balancing, Inc.
EQUIPMENT DATA
Page 8179 -76
Date 11 -17 -10
Contrac M -TECH
Balance. J.C. & G.C.
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO. EF -1D PLAN LOC.
MAKE PANASONIC MODEL NO. AFV -08VF2
SER. NO. 005
RATING 80 CFM Q 0.375 E.S.P. INITIAL RPM DIRECT DRIVE
FINAL RPM DIRECT DRIVE
B) MOTOR
PANASONIC
HP.
NONE GIVEN
RATED EFF /PF
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
NONE GIVEN
MEAS.VOLTS (L /L)
SF.
NONE GIVEN
RATED VOLTS
120
INITIAL AMPS
.19
FR.
NONE GIVEN
RATED AMPS
.2
MEAS.VOLTS (L /G)
120
S F AMPS
NONE GIVEN
FINAL AMPS
C) STARTER
.19
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
_
D) DRIVEN
SHEAVE X BORE
DRIVER
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS IN
IN.
OUT
IN.
DROP
IN.
HEAT COIL IN
IN.
OUT
IN.
DROP
IN.
COOL COIL IN
IN.
OUT
IN.
DROP
IN.
FAN IN
ATMOS IN.
OUT
N/A IN.
DROP
IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
PSI
RISE
PSI FT
H) REMARKS
AREA= 1. 16 SQ. FT.X 66 FPM= 76 CFM
FINAL: 1.16 SQ. FT.X 65 FPM= 75 CFM 99%
J
Complete Page 8179 -77
Mechanical Date 11 -17 -10
Balancing, Inc. Contrac M -TECH
Balance. J. C. & G. C.
EQUIPMENT DATA
A) PROJECT RAM'S HORN LODGE UNIT # 17 TENANT FINISH
UNIT NO. EF- lE PLAN LOC.
MAKE PANASONIC MOD NO. AFV -08VF2
SER. NO. 005
RATING 80 CFM ® 0.375 E.S.P. INITIAL RPM DIRECT DRIVE
FINAL RPM DIRECT DRIVE
B) MOTOR
PANASONIC
HP.
NONE GIVEN
RATED EFF /PF
NONE GIVEN
TYPE
NONE GIVEN
PH.
1
RATED SPEED
NONE GIVEN
MEAS.VOLTS (L /L)
SF.
NONE GIVEN
RATED VOLTS
120
INITIAL AMPS
.19
FR.
NONE GIVEN
RATED AMPS
.2
MEAS.VOLTS (L /G)
120
S F AMPS
NONE GIVEN
FRiAL AMPS
C) STARTER
.19
SIZE
THERMALS
(EXIST)
AMP. RATING
THERMALS
(REQ'D)
AMP. RATING
OTHER
BUILT IN OVERLOAD PROTECTION
D) DRIVEN
SHEAVE X BORE
DRIVER
_
_
SHEAVE X BORE
BELTS
SIZE X NO. BELTS
MOT. ADJ. IN /OUT
CL. DIST.
DRIVE CHANGE
BELT CHANGE
E) FILTERS IN
IN.
OUT
IN.
DROP
IN.
HEAT COIL IN
IN.
OUT
IN.
DROP
IN.
COOL COIL IN
IN.
OUT
IN.
DROP
IN.
FAN IN
ATMOS IN.
OUT
N/A IN.
DROP
IN.
G) PUMP IN
PSI
OUT
PSI
RISE
PSI FT
DEAD HEAD IN
PSI
OUT
PSI -
— RISE
PSI FT
H) REMARKS
-- - - - --
- --
AREA= 1.16
SQ. FT.X
66
FPM=
76 CFM
FINAL: 1.16
SQ. FT.X
65
FPM=
75 CFM
99%
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention: ( -) Revisions
() Response to Correction Letter
j ) u > OD Z 7 MA 4 - 1 - 1 J � � _attached copy of correction letter
( ) Submittal
W 09 -0004 /piZ510_005(o ( -0ther
Project Street Address:
(Number) (Street) (Suite #)
Building /Complex Name: CAS , I s ► b2_)
Description / List of Changes:
Ts VA LA,,a -
Contact Information:
Company: C
Company Address: ZS C,a 5 ea os .AJZ STK %t p jj
City: State: C — Zip: 9
Contact Name:Jt4Srj.,
Contact Phone: % 3 0 - ( 3 Sl D
E -Mail �vrsc� Rt;,�..scr• c��..-
Valuations (Labor & Material))
Building: $ '4S , 2 (o a
Plumbing: $ (use additional sheet if necessary)
Electrical: $
Mechanical:
Date Received:
Total: $ y5 , 1
DEC 0 6 2010
TOWN OF VAIL
1- Sep -09
TRANSMITTAL FORM
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
TOWN OF VAd
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD /ALT MF BUILD PERMIT Permit #: B10 -0023
Project #: PRJ10 -0056
Job Address: 416 VAIL VALLEY DR VAIL
Location......: UNIT 17, RAMSHORN
Parcel No....: 210108258024
OWNER TYM INTERNATIONAL LTD 03/03/2010
416 VAIL VALLEY DR
VAIL
CO 81657
APPLICANT G.E. JOHNSON CONSTRUCTION
25 NORTH CASCADE AVE # 400
COLORADO SPRINGS
CO 80903
License: 128 -A
CONTRACTOR G.E. JOHNSON CONSTRUCTIOIN
25 NORTH CASCADE AVE # 400
COLORADO SPRINGS
CO 80903
License: 128 -A
03/03/2010 Phone: 719-473-5321
03/03/2010 Phone: 719- 473 -5321
Status .. :
ISSUED
Applied ..:
03/03/2010
Issued...:
04/07/2010
Expires ...:
10/04/2010
Description:
NEW DWELLING UNIT, "VANILLA BOX" ONLY, UNIT TO BE COMPLETED
UNDER SEPARATE BUILDING PERMIT
Occupancy: R2 Valuation: $316,950.00
Type Construction:VA Total Sq Ft Added: 0
......... ........ »....,..,.,,.,x�....x.� ...... .........,..,...............,.. FEE SUMMARY ....,......,.............,.................... ....,.,..,....,.,,...,. >,,...,.
Building Permit Fee ------ > $2,208.95 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $9,787.77
Plan Check--------------- - - - - -> $1,435.82 Use Tax Fee --------------------- > $6,139.00 Additional Fees------------------ - - - - -> $0.00
Add'I Plan Check Hours- $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $9,787.77
Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00
Payments ------------------------------- > $9,787.77
Total Calculated Fees--- - - - - -> $9,787.77 BALANCE DUE ------------------------ > $0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION YkLL T WENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
Signature o O 7 Co actor Date
n CZ
Print Name
bld_alt_construction_perm it_041908
APPROVALS
Permit #: B10 -0023 as of 04 -07 -2010 Status: ISSUED
Item: 05100 BUILDING DEPARTMENT
03/15/2010 cg Action: CR see laserfishe
03/31/2010 cg Action: AP
Item: 05600 FIRE DEPARTMENT
03/04/2010 drhoades Action: AP See conditions.
See the Conditions section of this Document for any that may apply.
bld_alt_construction_perm it_041908
CONDITIONS OF APPROVAL
Permit #: B10 -0023 as of 04 -07 -2010 Status: ISSUED
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 51
(FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL
COMPLY WITH NFPA 72(2007) AND VFES STANDARDS.
Cond: 53
(FIRE 2007) Monitored fire sprinkler system required and
shall comply with NFPA 13 (2007) and VFES Standards.
bld_alt_construction_perm it_041908
TOWN OF VAIL, COLORADO Statement
Statement Number: R100000157 Amount: $1,435.82 03/03/201011:23 AM
Payment Method: Check Init: JLE
Notation: 43822 GE
JOHNSON
------------------------------------ ----------------------------------- - - - - --
Permit No: B10 -0023 Type: ADD /ALT MF BUILD PERMIT
Parcel No: 2101- 082 - 5802 -4
Site Address: 416 VAIL VALLEY DR VAIL
Location: UNIT 17, RAMSHORN
Total Fees: $9,787.77
This Payment: $1,435.82 Total ALL Pmts: $1,435.82
Balance: $8,351.95
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PF 00100003112300 PLAN CHECK FEES 1,435.82
De"partmen# of Community Development
75 South Front,
�.
Vatl, C . r c
to
� ale
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical, fir etc.
Project Street Address:
Ll � � �
Office Use:
pd
I ( i I (), II �, ,
Project #:
(Number) (Street) �— (Suite #)/
Ll
DRB #:
Building /Complex Name: ►" 15 H oc `1 LOG IC E
Building Permit #:
Contractor Information:
Lot #: Block # Subdivision:
Company: �7 r OL 12- R ( L2115
� J
• 'J - c� '1
2\ X Q
�!
Company Address:
Detailed Scope and ovation f Work: / d
h�w"
City: W State: � v Zip:
D i
Contact Name: �a D U
l
Contact Phone: tV 2 _�
/ A b U 1 Cd i L*'1 4 hd Ay we / I -
-
(C' � — 7
(use additional sheet if necessary)
E - Mail �C�n�� mac. ' �C- i � n t vi - � D
U I Z � �
Town Vail C tra R No.:
,Work Class:
of or istration
New (�) Addition ( )Remodel Repair ( )Other ( )
X
Work Type
Contractor Si ature (required)
Interior (X ) Exterior ( ) Both ( )
Property Inform t' n
Type of Building:
Parcel #: 2 k n1 Qt 2�2 - 34-
Single- Family ( ) Duplex ( ) Multi - Family ( )
(For parcel # contact Eagle County A ssessors Office at 970 - 328 -8640 or
Commercial(() Other( )
visit www.eaglecounty.us /patie)
Tenant Name:
r �rC ��,•, c
Does a Fire Alarm Exist? Yes ( ) No ( )
Owner Name: o' L� �[( - J;� nlah
Monitored Alarm? Yes ( ) No ( )
Does a Sprinkler System Exist? Yes ( ) No ( )
# & Type of Existing Fireplaces: Gas Appliances
Valuations (Labor & Materials)
Gas Loq Wood /Pellet Wood Burning
Building:
Plumbing:
Electrical:
Mechanical: (including fireplace)
Total:
$ I
i iq is tz f' /k Fu
# & Type of Proposed Fireplaces: Gas Appliances
Gas Log Wood /Pellet Wood Burning
Date Received:
TOWN OF VAIL M O1- Jan -]0