Loading...
HomeMy WebLinkAboutB09-0197 Plans/ GEWERLINE OF STREAM R% DEMOLITION NOTE5: °�. EDGE STREAM I. AT JOB SITE VERIFY ALL EXISTING CONDITIONS BEFORE G AND STRUCTURAL ENGINEER REGARDING ANY DISCREPANCIES FROM / "'`�. ` `1� ` `\, THESE PLANS. 2. CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS AND CONDITIONS ON THE JOB SITE PRIOR TO COMMENDING ANY WORK. APPROX LOCATION HIGH ,,,,` '`•�. •� 5.�3 3. CONTRACTOR TO PREPARE, PAINT, PATCH t REPAIR ALL EXISTING 5EVER.ITY ROGKFALL CONSTRUCTION (INCLUDING BUT NOT LIMITED TO DEMOLITION OF HAZARD ZONE (5W OF EXISTING FIN15H MATERIALS) TO ACCEPT NEW CONSTRUCTION 1D LINE) WHERE APPLICABLE. r y 4. VERIFY W/OWNER BEFORE DISPOSAL OF ANY ITEMS THAT COULD Q '`• BE SALVAGED FOR REUSE. 0 j GENERAL GON5TRUGTION NOTE5: J I. EXISTING CONDITIONS INFORMATION TAKEN FROM DRAWINGS TITLED "8x87 LUPINE DRIVE, A DUPLEX DEVELOPMENT BY R.F. KELLER" DATED JULY 13, 1 PRODUCED BY THE TROUT GREEK COLLABORATIVE ARCHITECTS GROUP. �. 2. ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH THE LATEST ADOPTED EDITIONS OF THE 2003 INTERNATIONAL BUILDING CODE, / 0 2003 INTERNATIONAL RE51 DENTI AL CODE, 2003 INTERNATIONAL / 'ti / 0 FIRE CODE, 2003 INTERNATIONAL MECHANICAL CODE, 2003 INTERNATIONAL FUEL 6A5 CODE, 2003 INTERNATIONAL PLUMBING f PARCEL ,4 �.. CODE, 2003 INTERNATIONAL ENERGY CONSERVATION CODE AND 2008 NATIONAL ELECTRICAL CODE AND TOWN OF VAIL BUILDING -� AND ZONING DEPARTMENT CODES AND REGULATIONS. 3. VERIFY EXISTING DIMENSIONS IN FIELD, NOTIFY ARCHITECT OF ANY DISCREPANCIES. 4. AFTER EXCAVATION AND BEFORE ANY CONCRETE WORK VERIFY BUILDING FARGEL E3 ALL EXISTING FOUNDATION CONDITIONS, WALL SIZES AND FOOTING APPROX. LOCATION ABOVE 0.3762 ACRES ELEVATIONS - VERIFY W5TRUCTURAL ENGINEER THAT ALL AVALANCHE POWDER CONNECTIONS OF NEW CONSTRUCTION TO OLD WILL WORK AS BLAST-WNE (SW OF LINE) DETAILED. RAWINC� INDEX: \ � \� -- -° . ARCHITECTURAL 5. THE CONTRACTOR 15 TO VERIFY ALL DIMENSIONS AND NOTIFY THE / ^ 50' STREAM SETBACK ARCHITECTURAL 1.0 SITE PLAN ARCHITECT OF ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL, A 2.0 FIRST $ SECOND FLOOR PLAN STRUCTURAL AND EXISTING PLANS. � REMOVE STONE FIREPLACE A 2.1 SECOND FLOOR i ROOF PLAN � X T G A 2.2 FIRST 4 SECOND FLOOR REFLECTED GEILING PLANS 6. AREAS OF CONFLICT OR DISCREPANCIES MUST BE FULLY \ NOOD AND SHINGLED ROOF ABOVE A 3.0 NORTH s EAST ELEVATION RESOLVED BEFORE CONSTRUCTION CONTINUES IN TH05E AREAS. \ DECK A 3.1 WEST ELEVATIO' , ,'5EGTION B t WINDOW SCHEDULE 7. ALL PLAN DIMENSIONS ARE TO FACE OF WOOD OR CONCRETE ~ EXISTING ROGK WALL A 4,0 BUILDING SECTIONS UNLESS OTHERWISE NOTED. STRUCTURAL 8. ALL BATHROOMS ARE TO BE VENTED TO THE EXTERIOR WITH A FAN �` 2 STORY 1J2 5 1.0 FOUNDATION PLAN, DETAILS AND SPECIFICATIONS AND DUCT 5Y5TEM TO PROVIDE 5 AIR GHANOE5 PER HOUR/PER DUPLEX NEW FIREPLACE 5 2.0 MAIN LEVEL FRAMING, SECOND LEVEL AND LOWER ROOF FRAMING CODE (MINIMUM). / CHASE j 55.0 THIRD LEVEL FRAMING, UPPER ROOF FRAMING / � ,� / � \ � . a. ALL INTERIOR DOOR OPENINGS ARE TO BE CENTERED IN WALL EXIST f RIDGE S INF ORM ATION: FACE OR 4 I /2" (MIN) FROM WALL FACE, UNLE55 NOTED OTHERWISE. ".. " "'.4 BUILDING. 841 q' -6 3J8" A EXISTING ROCK WALL k. BOVE / y .� LOT 8: 53,2 � 1.13 SO FT 10. VERIFY ALL PLUMBING FIXTURE LOCATION PRIOR TO INSTALLATION. TO BE MODIFIED / / TOV ZONING TWO FAMILY RESIDENTIAL DHELLIN65 11. PROVIDE BLOWN -IN INSULATION AS FOLLOWS: ALLOWABLE SITE COVERAGE = 20% = 6,654.23 50 FT A EXTERIOR WALLS / N EI EXISTING 4,454 SQ FT B ROOF /ATTICS R -49 MIN R IDNG /' PROPOSED 265 50 FT G @ GONG FDTN WALLS @ LIVING SPACE R -21 MIN NEW HEATED 8412' -a 5/8" STONE ENTRY / AREA OF GRFA OA LGULATION5: 12. PROVIDE PERIMETER FOUNDATION DRAINS PER 5011-5 REP7T. SEE NEW COVERED ADDITION j STRUCTURAL DRAWINGS. ENTRY ENTRY PORCH ALLOWABLE GRFA 8, 646 SQ FT 2 PROPOSED ORFA - PARCEL B `454 50 FT` 13. GRAWL5PACE5 ARE TO BE VENTED PER CODE. NEW HEATED CONCRETE APRON o O PROPOSED TOTAL 1,501 50 FT GR EXISTING �Q` ROOF HEIGf�T ASPHALT \ f NEW ROOF HEIGHT = 25' -a 5/8" r DRIVEWAY !✓ / NEW ROOF HEIC2HT 6-8 3/4" LOWER THAN EXISTING HI6HE5T R106E @ MAIN HOUSE \ GARAGE OFFICE EXIST EXTEND EXISTING NOTES: / ' RIDGE / DECK 1. DATUM ELEVATION: ELEVATION &55 THE TOP OF STRUCTURAL DECKING AT THE \ / FIRST FLOOR, PER THE ORIGINAL BUILDING DRAWINGS "3q8c1 EXIST -f� \ f LUPINE DRIVE, A DUPLEX DEVELOPMENT BY R.F. KELLER "" PRODUCED BY: I' CMP �. `. / THE TRnlJT rP-FFK r(')l I ARtOF2ATIVF TV PED —I EXIST \ 1 GMP T\/ CJr—i"')_. b o rn U Q w t!� 0- O _ co L (10 C tCS oo C 0 O cy')� X a O m0 U3 n: > 0 m< Xpii( 1 5 t9 ww Zz t!)S ,jjw�UO Q d O� J W LL w 3 vDW w w �azwo w 26QZ�a w �+nWUt - °W u) U fw = aw= ti4 n ��v 0 °iau w - nce< W Zdn x . z,' D< dz m � O - GOOF' J � QU J"T- W "�- U W N w w- ° a �ma�au ° z ooQ��z _ 2M<0�0 -z o O p. z, W 0 o w 0 W z< h m w P z - 3D O 0. TWwOW ra �-o -U O =w- mufTWz za >zm�w U 1- m 0 (L n -6.0 ¢Ow aa�S<C 0 i • mi r . 0 >,. i i 0 u 0 (a) uJ i uJ ii 00 i 0 � < IM LL Fm mi 1 W Lu �% i i 00 a) 0 o w m Imm i r�o psi N�ui "r y qW" Al mO AUG 0 6 2009 TOWN OF VAIL w a_ i r�o psi N�ui "r y qW" Al mO AUG 0 6 2009 TOWN OF VAIL I EXISTING ROOF 4 EX15TIN(5 FIREPLACE BELOW TO BE REMOVED rE3 / f f \� { �\�\ STANDING SEAM COPPER ROOF �BELOW NEW FIREPLACE ............. EXISTING COLUMN - VERIFY LOCATION NEW VERIFY NEW WALLS KEN BATH 2 TILE v A 2 NEW FLOOR TO BE NEW VANITY CAB . . USED AS CLOSET F _7 AND TOP, SINK, TOILET AND TILE SHOWER -0 Vvy.1mim ZVI .2 J ­`�x EX15T % BEDROOM 2 RPT. 115 SKY REMAIN L16HT TO BE EX15TINC7 CARPET Q �-SHELVIN L NEW GAR qET NEW TILE a TUB/ 6LOS 5HONER SURROUND I EW' CARPE (5LASS 5LIDINC7 DO ju REMOVE EXISTING I F'F E 5T XI 4ci BATH 5 15T NEH GRIP It NEN CFFT - I 't . 56" HIGH NEW TILE 2 VANITIES AND 5INK5 2 _P5 11b X i LINE ` REMODEL ' �o CARPE VERIFY LOCATION OF j TEFP 13ATH . ..... EXISTING SKYLIGHT - BATH J: L L _OOR REMOVE ONLY IF REQUIRE D EX15T NENrILE5 F WE eCTRIC HEAT BY NEW CONSTRUCTION OR HALL _j MAT EX15TINO 5KYLI(5HT OL05 I 2 NEN CARPET T-5 EXIST C ONDITION - ® — — — — — — — — — — — — — — - 4NEN CARPET A VERIFY A EXISTING WOOD REUSE UPPER CA BINETS EX15T NEW., FROM EXISTING 12� -7 4 PLANT L AUNDRY ROOM 71 PANELIN L LAUNDRY -7 CARPET TILE TRELLIS TO BE REMOVED EXISTIN 6 --- - - - ----- . ..... . ............ NEW MEDICINE CABINET ONE AT EACH VANITY EXISTING PLANT SHELF ABOVE (TYP) FLAT 50REEN TV ON ADJUSTABLE ARM - RECE55ED FIREPLACE VERIFY HC7T Af3V FLR WONNER — NEW TILE 4 NEN 18" HIGH SHOWER BENCH - EXISTING STEAM TO REMAIN — REMOVE SECTIONS OF WALL DOWN TO TUB SURROUND - ADD NEW C7LA55 PANELS AND DOOR (2'-4" FRWELE55) — REPLACE EXISTING TUB 4 PLATFORM WITH NEN-VERIFY SIZES CREATE NEV45TORA61E AT EXISTING VOID - EMOVE EX15TIN& - W' 1 1 EX15T 0 STAIR I N , STAIR % A '. F RpT ' VERIFY EX15TINC5 FLUE 51ZE5 AND LOCATION TOWER AND ROOF Y 'nLE I !rl s ' N 31/2 5KYL16HT5 ABOVE - SEE C/A4.0 FOR LOCATION \,A4. ROOF SEE A/4.0 FOR STAIR BELOW DIMS 4 CEILING BREAK LINES (TYP) RE: REFLECTED GEILIN& PLA COPPER DOWNSPOUT (PATINA) WHEAT TAPE FROM ABOVE 1% -4— !? .77 0 LLJ I ? 0 -HALL -2 NEN 0RPT' w 0; Q. 41-I 1 MST 0 Y ff,IF NEW -1 rL x AREA OF ADDITION/REMODEL NEW CONSTRUGTION EX15TIN6 CONSTRUCTION TO REMAIN EXISTIN6 GON5TRUCTION - — — — — — TO BE REMOVED 9 SMOKE DETECTOR NEW 6RFA CALOULATION5 — UNIT 5 (CALCULATED PER TOWN OF VAIL ZONING REC-A)LATIONS) FIRST FLOOR NEW MUD ROOM /STAIR = 305 50 FT AREA REMOVED AT FIREPLACE = -25 50 FT TOTAL FIRST FLOOR = 285 50 FT 5EWND—FLOOR = 14q 50 FT TOTAL NE 6fRFA 434 50 FT A 'N EX15T � E 5T BATH 4 GRPT NEW TILE >1 START NEW HALL AT CORNER OF EX15TIN(5 GARAGE 2 EXIST O FF IC E I EXIST CRPT -J \ ..... ...... ...... ....... ...... ADD POCKET DOOR TO EX15TIN6 TOILET COMPARTMENT - NEW TOILET \,A4.0 NEW ROOF BELOW REMOVE EX15TIN6 WINDOW - ADD THREE NEW WINDOWS - INFILL/PATCH HALL ....... .... .. ... EXISTING STONE KA\ NAL INFILL DEGK TO MATCH \ EX15TIN67 23 SQUARE FEET OF 6RFA NEW EXHAUST HOOD �7 REMOVED AT EXISTING vi/51DE VENT ABOVE EXISTING 6A5 FIREPLACE MA55 TO BE A3.1 OUTLET REMOVED ADD KALL5 TO BOTTOM OF SOFFIT FOR AND NEW "SPARK" RIBBON 6A5 BARBECUE 5GREENINC FIREPLACE • r ................ . .......... EQ 4--6' EO FROM 13EAM REMOVE 5LIDINC5 (5LA55 ABV 2'-0 1/2. DOOR, INFILL WALL AND A649 EX15T 5NINC7 DOOR - SET DOOR L I VINC7 ROOM 3 1/2' FLUSH TO NORTH SIDE OF NEW CARPET BARBECUE EXISTING OPENING LINE OF NEW FLOOR F L O OR A NE RE- SECOND BY OWNER NEW TOILET PLAN - 7 / PROVIDE NEW REPLACE EX15TINC7 BARBECUE vq/PFDI5TAL SINK REMOVE RETURNS AND HEADER a OPENING To EXIST GEILINC7 - PATCH TO MATCH ROOM X15TINC7 STONE REPLACE EX15TIN& WOOD FRONT5 EX 1ST > FOYER EXISTING STONE EX15T EX15TIN(5 NEW FRONT DOOR /— SELECTED BY OWNER EXISTING WOOD DECK 7 EX15T DINING ROOM NEW CARPET REMOVE RETURNS AND HEADER a OPENING TO CEILING - PATCH TO MATCH 15" DEEP CUPBOARDS ABOVE SHELVING —, =Vic--r REPLACE / EXIST \ DECK GOUNTERTOP5 KITCHEN REMOVE EXISTING NEW TILE CIRCULAR STAIR AND TONER ........... 0 9 Noop COUNTERTOP TO REMAIN 7 s.: w r EX15T NEK REMOVE EXISTING REMOVE STONE STONE TA B WINDOW , . , ..vt=NEER - PREP INFILL/PATGH HALL WALL AS NEC, TO 1 -& 1/2 __ NEW HOO D ii SIDING TO MATCH 31/2 F115TIN6 STONE " ^TMm MATCH ST ��OOR TO REMAIN 0 AS REG' b _ _ O.( p 1 0 Q 1 -.2 . lb. �'NEP`15 FLI MA-­ SEE A/4. FOR STAIR "A0 NE-1041 P TO MMATU 0 AX F-D. :.MUD ROOM DIMS Q) N STONE TO., MEO HANk . ........ ... .. MATCH EX15T m. TO HAtCH - A 2 HOOD' < "BENCH Pq/CU \5T AIR I8 HIGH GARPE'T'el AE30 VE r-311211 51/2' 51/2.' V-1 - VERIFY . . . . . 13 . 1 T'. vilu To MATCH EXIST 5TAI TOVER'. a NEA mod) OAT �A3.1,r At Z� " VE, ' " T 112. PZ REMOVE PORTION OF EXISTING PLANTER, irliv T T - RECONFIGURE AS 5H0 NEW HALL TO MATCH EXISTING IqEyi N 5TONEX REMOVE EXISTING DECK REPLACE WITH MUD SET FLAGSTONE ON CON UP II i SLAB v4/5NONMELT - T.0 STONE = T.O. EXISTING DECK i l VERIFY FLOOR ELEV AT Jl EX15TIN6 AIRLOCK- OVER EXIST REMOVE EXISTING 51TE WALL FRAME AS NEC TO ALIGN WITH LOCK 2 EX15T FLOOR ELEV a MAIN NEW 5TO TO HOUSE MATCH EX15 COPPER DOWNSPOUT (PATINA) WHEAT TAPE FROM ABOVE —FREEZE PROOF HOT AND COLD H05E BIBB WPAIL HOOK NEW UNDER STAIR STORAG 18 CRANLSPAGE NEW CARPETa ACCESS PER CODE NEW HEATED CONCRETE APRON LINE OF FLOOR ABOVE a 4'-O"± ABOVE SLAB SLOPE TO 5KALE - REMOVE EXISTING ASPHALT START NEW WALL AT CORNER OF EXISTING GARAGE NOTE-5 I. SEE ROOM NAME FOR FLOOR MATERIAL. 2. VERIFY CEILING GONFIC7URATION WARCHITECTECT AT FRAMING. D's VERI L CATION ATE EXISTING H EGIUP, FLUES TO N MECH ROOM RELOCATE EX15TIN65 EXHAUST FOR COOKTOP -PROVIDE R-21 INSULATION AT KALL5 BETWEEN NEE MECH/NNE STORAGE AND THE .. .. ....... MEN MUD ROOM n— — REMOVE PORTION OF EXISTING 51TE WALL \—EXTEND EXISTING DEG TO MATCH - FRAME OVER EXISTING DOG RUN SLAB PORTION OF STEEL MESH FENCE 4 LID a EXISTING DOG RUN- VERIFY EXTENT WITH OWNER - DO NOT DEMO SLAB WITH HYDRONIC HEATING REUSE EXISTING AIR LOCK DOOR AT GARAGE -ADD HEATHER5TRIPPIN6 5MOKE5EAL AND AUTO CLOSURE EX15TIN(5 DCr,-. RUN I'-o" NO QEEA NORTH MUD •O• M/5TAIR = 306 EEbQ)mI2 a F ISEEL&C TOTAL AT FIRST FLOOR = 2 d _C) — m c\j 't Q0 (.0 r- C.) cl) : t :: ! 0) U cr) CL 0 r 00 u') (o cu 00 (=� "t" o 0 co c) P x 0 0 0 0 C 0 cc U) cL > ow (.9 W w ( - z' ow wo o z 0 , ' it E O zO 2 w w ow (L - % 'u 0 6:� 8 9 W O D Zl w w w� << LL Z o z F- 0-6wo6�� 2 0 T z ol uj cr z - w w 0 w z m w r 0 EL < 0 0 w z w (1) :) 0 EL 3: - X (L I) w o ( 0 o § �- ') F , u z 0 xw� W i zw x 0 �_ m 6) (L o :: ) ) P (') <ow< 3:< 0 z 0 0 w > 0 cc L) 0 ii W4L >= W Fm m z z w W 0 u 0 (m) W ( .9 W W •0 UJ 0 C I w mi UJ ' > Fm cL LL cl) ui 0 Z 0 co 0 0) 0 om M Fm NEW 5( 5" HIGH GAB4NET, VANITY TOP AND SINK - VERIFY' 5INK LOCATION NEW TOILET AND TUB (WITHOUT 5LIVIN6 DOORS) • NEW 5( 5" HIGH GAB4NET, VANITY TOP AND SINK - VERIFY' 5INK LOCATION NEW TOILET AND TUB (WITHOUT 5LIVIN6 DOORS) : . • • • .• co 0 .. •► • • • • • . e� 0 i z o z � �r - z v w� U q¢ a O� 2U W }� �j'SU w �?Ow w W3 4 m owZwo� -. O w UUw�¢ - p=6aOw H CJSt- CWL-6 omrrwap 21-W VZ � O p Q a a Q UOU� - `S Z aai4� -�z OOOE - - `n z zo aw 'oz dadw0Owd w?�F'mw� �?w 0wN00 �d -U o xw� z >zwaw U t - mu)a�r -Q < dowda3:¢ , 121, 12 I IlWa 12i _-.. / E E O REMOVE EXISTING ROOF !j �_.. Q VELUX "'V5 106'" VEN ILATING 4 f � I ' T f � 4 DORMER MALL TO SKYLIGHT w/ELEGTR G • -° OFFICE OPERATE (2 THUS) - 5EE \- 1 •� . G /A4.0 TO L ATE AE4.:0 \64.Oj 4 - I/2:1 I 4 � - -- 5TANDIN6 SEAM w 5 0 TANDING 'SEAM COPPER ROOF COPPER ROOF a LFY �_ ...._.._.. I ........................._�._. \ LOWER ROOF LOWER ROOF ...,_ ..... ..........._..- ..,_.. a.............. _._ 0 Cia 0% REBUILD DORMER - MATCH TIMBER COLUMN r �`.\ '}� \ EXISTING PITCH _ -_ - _ .. BELOW r' `+� \ X v/ \ 5TANDING 5EAM COPPER ROOF PORTION OF NEN z VERIFY ROOF PITCH W/ BEAM r' r / {r r \ rrr \ ROOF OVE GARAGE ROOF BEARING (ALIGN wfSOFFiT) AND I2 " •/ z OFFSET FROM EXISTING WINDOW 51LL .. . . E W RE: 5EGTION G /A4.0 B / � REPAIR PORTION OF EXISTING w 0 '� ROOF A5 NEGE55ARY Q C 5NOW CLIP5 FOR COPPER ROOF - Z T PATINAED w �u COPPER GUTTER (PATINA) AND DOWNSPOUT WHEAT TAPE 2 I I I 2 �wQ REMOVE FA5CIA AND DORMER \,A 4.0, r ROO NOTES: 4.0 W W OVERFRAME PORTION OF NEW ROOF ! I ( I I OVER GARAGE ROOF L 1. ALL NEW ROOFS TO BE COPPER "^ j STANDING SEAM - PATINA C 0 2. AT ALL NEW ROOFS PROVIDE 50# FELT I W OVER "HIGH TEMPERATURE" FULL GOVERAGE SELF ADHESIVE r► Z i WATERPROOF MEMBRANE. LL I 3. AT ALL NEW VALLEYS PROVIDE TWO I 2 LAYERS OF SELF ADHESIVE �J i WATERPROOF MEMBRANE WRAPPED UP I I W W 0 LE6END _ ! ROOF FROM VALLEY 3' -0". SECOND LAYER TD BE LAID PERPENDICULAR TO I I � THE FIRST. V NEW ROOF - STANDING 5EAM 1 4. ALL NEW VALLEY, SAVE AND WALL I I I COPPER ROOF - PATINA FLASHING; GUTTERS AND DOWNSPOUTS; AND ALL ROOF PENETRATIONS ARE TO \ BE COPPER, UNLE55 NOTED OTHERWI5E. \� NEW ROOF TO MATCH EXI5TING a PORTION OF EXI5TIN6 ROOF TO , 5. VERIFY LOCATION OF ALL NEW / - - -� BE REPAIRED r PLUMBING VENT5/PENETRATION5 PRIOR co W w Z \ r TO INSTALLATION - LOCATE AWAY QO f \ / FROM ROOF VALLEYS. / NOT-E5 () o CK fJ') 00 EXI5TING ROOF TO REMAIN I. 5EE ROOM NAME FOR FLOOR MATERIAL. � W F W = \ f Co. ALL RIDGE ELEVATION MARKERS ARE 13' (n co W TO TOP OF 5HEATHING AND ROUNDED TO 2. VERIFY CEILING CONFIGURATION " Z 5; F THE NEAREST V8 w /AR-,HITEGTEGT AT FRAMING. 0') o wW Z ® Q - 1. NEW ROOF PITCHES MARKED W/± ARE DETERMINED BY PLATE HEIGHT AND E N O 1 RIDGE HEIGHT. SEE BUILDING SECTIONS Z (o co o — S. ALL NEW ROOF OVERHAN65 TO MATCH ° p N W R001 FLAN TH I RO FLOOR IL < A LU EXISTING UNLE55 OTHERWISE NOTED, ROOF OVERHANG DIMENSIONS ARE SCALE: I/4" = 1' -0" NORTH FIN15H DIMENSIONS. 50ALE: 1/4 " = 1'-0" NORTH a. QUANTITY s LOCATION OF SNOW CLIPS A 2ml DETERMINED BY MANUFACTURER SELECTED. 2 REf=LECTEO 5GALE: 1/4" = 1'-0" NORTH EXISTING DRYWALL WRAPPED BEAMS -8.0. BEAM 0 q' -O" EXISTING PLANT SHELF ® 6' -10 1/2" REMODEL 'ASTER BATH VARIE5 EXISTING DRYWALL WRAPPED BEAMS -13.0. BEAM a q' -O" TIMBER BEAM RE: 5TRUGT — 3X RAFTER RE: 5TRUGT (TYPICAL) 2X DEGKING RE: 5TRUGT (TYPICAL) 2x FA5G(A (TYPICAL) HEIGHT5 ARE FROM TOP OF FIN15H FLOOR TO BOTTOM OF FRAMING. ILING HEIGHT5 MARKED WITH "" REPRE5ENT THE HE16HT .0. FIN FLOOR TO BOTTOM OF THE FLOOR STRUCTURE ALL GEILING GONFIGURATION5 AT ADDITION AND REMODEL .GHITEGT BEFORE DRYWALL. HEI6HT5 ARE ROUNDED TO THE NEAREST INCH. 'RIOR CEILING5 ARE GYP BRD, PAINTED UNO. �, -- 50ALE- 1/4" = 1'-0" NORTH i cq . co CD x • • • •• • • * N • • • • CY) 12 • x • 0 • u • t � ° O s�m a wJ uwii n t 23o- z `cauao�w tizzvs °O U om K R ao�z�a w Jf17 W UhW tt1 U w <C a T 2tz- w Zai QT�C, d 'Z o ° �4 owz Qti zc �Q =U�QWp Q —Q0 W X ,w z zd�z ' am Qo r h- n z 2 m< 29 o9 - -z O oo ww p UU G4 ��pul aoF-s�zw oa-dwppW° w?¢r m_Wh z k K �O O Tw ZK zx w U hm00.Dr -mW ¢°W¢f. ¢ 0 i C/) 0 mi � mi > 0 cc 0 CO E =) >n W Fm i • i i UJ i 4 •0 0 J um i r o m 0 i .o i t •• 00 •• • CD LL p i • • o • • • • t • • C C •♦ • •• ,,�! CL 0 NEW ROOF a ADDITION - COPPER 5TANDIN6 SEAM FA501A a NEW ROOF TO MATCH EXISTIN6 — REMOVE EX15TIN6 ROOF AT HALL BETWEEN MAIN HOUSE AND OFFICE SEE STRUCTURAL DRAV41N65 EXISTIN6 6ARA6E R106E T.O. 5HEATHIN6 ....... .......... EL. 125'-5 518 "± (8415'— 3 518 ") REBUILD DORMER — COPPER STANDING SEAM ROOF NEW CLAD WINDOW TO MATCH EX15TIN6 (3 THU5) - TRIM TO MATCH EX15TIN6 NEW ROOF - COPPER STANDING SEAM FASCIA a NEW ROOF TO MATCH EXISTIN6 REMOVE/REWORK PORTION OF EX15TIN6 STEEL MESH FENCE AND LID AT EX15TIN6 DOG RUN - VERIFY Pi/OWNER EXISTIN6 5EGOND FLOOR T.O. PLYWOOD T EL, 106-11 Ile REMOVE PORTION OF STONE WALL - SEE FIRST FLOOR PLAN EXISTIN6 , T.O. SLAB ...... .... * . ....... T EL. qq'-4" (85qrq'-4') 5 CALE: 1/4" = V-0" EX15TINO FLUE CHASE TO BE USED FOR NEW OAS FIREPLACE FLUE COPPER FLA5HIN6 (TYPICAL) NEW COPPER 5TANDIN6 SEAM SHED ROOF AT FIREPLACE CHASE MATCH EXISTING PITCH FASCIA TO MATCH EXISTINC7 EXISTIN6 0j L T.O. HALL ... ................ .... . ......... ................ .......... - EL. 114 5/8" REMOVE EX15TINC2 STONE FIREPLACE CHASE AND SHINGLED ROOF EX15TIN6 SECOND FLOOR T.O. PLYWOOD EL. 105 118" 51DIN6 TO MATCH EXISTIN6 a NEW FIREPLACE CHASE .......... LOW STONE HALL DASHED FOR CLARITY EX15TIN6 FIRST FLOOR � O ' -O " ° LYNOOD (538 r .......... ........... ...... ... . ......... .......... .. • L ............... ................. HALL PANEL a EXHAUST H00r,> (WSIDE VENT) FOR 13AR13EGUE - 5IDIN6 TO MATCH EX15TIN6 NORTH ELPVATION 5(,'ALF.- 1/4* = 1'-0" R. REMOVE EXISTIN6 5LIDINC? DOOR — INFILL WALL, 510IN6 TO MATCH EXISTIN6 REPLACE SLIDING DOOR Pq/ CLAD FRENCH 5V41N6 DOOR TO MATCH EX15TIN6 WINDOWS — TRIM TO MATCH EXISTIN6 EX15TIN6 LOW STONE WALL DASHED FOR CLARITY EXISTING MAIN R106E T.O. SHEATHING EL. 132 518" (841ci'—& 3/8 ") EXISTIN6 FLUE CHASE TO BE USED FOR NEW 6A5 FIREPLACE FLUE NEW FIREPLACE VENT TERMINATION FOR NEW OAS APPLIANCE FIREPLACE 1 A .......... .. . ........ T - — ii Ln -i Innil ........... .... I 1 11 1 1 1 FLA5HIN6 SIDING TO MATCH EX15TIN6 AT ADDITION REMOVE PORTION OF STONE WALL NEW 5'-O"x(5'-8" DOOR a NEW 5TORA6E ROOM EXTEND EX15TINC7 DECK - SEE FLOOR PLAN 12' MIN E ............ - ....... ... ......... . ...... $3 , .... ....... _J2 31 2 ............................ NEW COPPER STANDING SEAM SHED ROOF AT FIREPLACE CHASE - MATCH EX15TIN6 PITCH NEW SECOND FLOOR a ADDITION T.O. PLYWOOD EL. 108 I/a" (TO MATCH EXISTIN6) 51DIN6 TO MATCH EX15TIN6 a NEW FIREPLACE CHASE NEW FIRST FLOOR 0 ADDITION T.O. PLYWOOD T EL. 100'-0" (838l (TO MATCH EX15TIN6) A.' N (.0 flo rl— t- c) X I-- < u- 2 • .......... ........... ...... ... . ......... .......... .. • L ............... ................. HALL PANEL a EXHAUST H00r,> (WSIDE VENT) FOR 13AR13EGUE - 5IDIN6 TO MATCH EX15TIN6 NORTH ELPVATION 5(,'ALF.- 1/4* = 1'-0" R. REMOVE EXISTIN6 5LIDINC? DOOR — INFILL WALL, 510IN6 TO MATCH EXISTIN6 REPLACE SLIDING DOOR Pq/ CLAD FRENCH 5V41N6 DOOR TO MATCH EX15TIN6 WINDOWS — TRIM TO MATCH EXISTIN6 EX15TIN6 LOW STONE WALL DASHED FOR CLARITY EXISTING MAIN R106E T.O. SHEATHING EL. 132 518" (841ci'—& 3/8 ") EXISTIN6 FLUE CHASE TO BE USED FOR NEW 6A5 FIREPLACE FLUE NEW FIREPLACE VENT TERMINATION FOR NEW OAS APPLIANCE FIREPLACE 1 A .......... .. . ........ T - — ii Ln -i Innil ........... .... I 1 11 1 1 1 FLA5HIN6 SIDING TO MATCH EX15TIN6 AT ADDITION REMOVE PORTION OF STONE WALL NEW 5'-O"x(5'-8" DOOR a NEW 5TORA6E ROOM EXTEND EX15TINC7 DECK - SEE FLOOR PLAN 12' MIN E ............ - ....... ... ......... . ...... $3 , .... ....... _J2 31 2 ............................ NEW COPPER STANDING SEAM SHED ROOF AT FIREPLACE CHASE - MATCH EX15TIN6 PITCH NEW SECOND FLOOR a ADDITION T.O. PLYWOOD EL. 108 I/a" (TO MATCH EXISTIN6) 51DIN6 TO MATCH EX15TIN6 a NEW FIREPLACE CHASE NEW FIRST FLOOR 0 ADDITION T.O. PLYWOOD T EL. 100'-0" (838l (TO MATCH EX15TIN6) I z u q� `'[pi iU z lwlw Z x 3 � Lu I w 'L ci w w w 0 0 W 'W' u=0" ;F Cc [6 �0 0 . e 0 0� 0,z 'z',Z < W , 0 OT068 w W poo �xwz 'If w t ww<§�z p0a53:z 0 z � < ° ca wwa o OMW2�-z 0w0wW w�w�o Zt W,ZOOWWO wzn�- z < L (L 0 m I ' - I �2WWOWDO �-*�0 -'0 0 :r wt w (1) a: w z z z rf W W 0 r- m 0) (L :) 1- 0- 5) < a w < CL 3: < z 0 cl) 0 mi =mi 0 ii E =) >= W cl) 1�w w z z w W 0 U 0 w Jorik tzj Im ULI cr) > uJ •0 LLJ w W 0 J ULl mi UJ W > IM �j CL U. MJ Z 00 0 0 CL w wz si • 00 W=) C/)W F- 0 • Gi CO (.5 c2m 0 C:) C) • 406 F- w CL 6m — cD — m N (.0 flo rl— t- c) X I-- < u- 2 • CL 0 r co IV u') (0 C T- cu 00 C 0 "t - 0 (y) x 0 0 go m () c: d __.:, * Fu (/) CL* > I z u q� `'[pi iU z lwlw Z x 3 � Lu I w 'L ci w w w 0 0 W 'W' u=0" ;F Cc [6 �0 0 . e 0 0� 0,z 'z',Z < W , 0 OT068 w W poo �xwz 'If w t ww<§�z p0a53:z 0 z � < ° ca wwa o OMW2�-z 0w0wW w�w�o Zt W,ZOOWWO wzn�- z < L (L 0 m I ' - I �2WWOWDO �-*�0 -'0 0 :r wt w (1) a: w z z z rf W W 0 r- m 0) (L :) 1- 0- 5) < a w < CL 3: < z 0 cl) 0 mi =mi 0 ii E =) >= W cl) 1�w w z z w W 0 U 0 w Jorik tzj Im ULI cr) > uJ •0 LLJ w W 0 J ULl mi UJ W > IM �j CL U. MJ Z 00 0 0 CL w wz si • 00 W=) C/)W F- 0 • Gi CO (.5 c2m 0 C:) C) • 406 F- w CL 6m VERIFY LOCATION OF EXISTING SKYLIGHT - REMOVE ONLY IF REQUIRED BY NEW CONSTRUCTION OR 5KYLI6HT CONDITION EXISTIN6 MAIN RIDGE T.O. SHEATHING EL, 152' -6 5/8" 6841q' -6 518 ") W NEW RIDGE T.O. 5HEATHI NG _ T EL. 125' —q 5 /5" (5412'— q 5/8 ") REMOVE EXI5TIN6 STONE STAIR TOWER G A4,4 VELUX "V5 106" VENTILATIN6 ' 5KYLI6HT W/ELEGTRIC OPERATION (2 THU5) i 11 I .1 NEW ROOF a ADDITION - COPPER 5TANDIN6 SEAM EX15T1 N6 6ARA6E RIDGE T.O. SHEATH I NCa EL. 128' -5 5/8"± 68415- 5 5 18 ") (VERIFY) REMOVE EXISTING DORMER; OVERFRAME NEW ROOF a EXI5TIN6 6ARA6E ROOF / REMOVE EXI5TIN6 5LIDIN6 DOOR - INFILL WALL, 51D1N(5 TO MATCH EXISTING REPLACE SLIDING DOOR w/ CLAD NO. LOCATION FRENCH 5KN6 DOOR TO MATCH MFR. NO, OR CUSTOM SIZE R.O. WIDTH EXISTING WiNDOW5 - TRIM TO MATCH '• HEAD HEIGHT GLASS EXISTING NO. i NEW COPPER STANDING SEAM SHED BEDROOM 2 FRENCH OUT5WIN6 ROOF AT FIREPLACE CHASE - MATCH V -2 3/4' b" -10 7/8" EXISTING PITCH NEW NEW OR REHUN6 DOOR TO BATHROOM 2 / / I 5EGOND FLOOR a ADDITION 2 NEW STAIR T.Q PLYWOOD OCA2424 -21 j EL. 106-11 I/8" _ .............................. _._......... ,..............................................................__....................................... .............................._ ......... (TO MATCH EXI5TING) ;{ 2 5 FASCIA TO MATCH EXI5TIN6 ✓ e #€ FIXED AWNING CCA2424 -21 4'-O 3/4" 2' -0 3/4" 5' -q 3 /4 "t * TEMP * T.O. ROUGH OPENING TO EQUAL B.O. STRUGT HEADER T.O. R.O. FROM 5ECOND LEVEL 5TRUCT DECK 5 51DIN6 TO MATCH EX15TING NEW STAIR FIXED AWNING a NEW FIREPLACE CHASE 4`-0 3/4" 2 V -q 3 /4't * BREEZI =WAY EXISTING LOW STONE 5 NEW STAIR LANDING WALL NEN CCC5060 -2 5'-O 3/4" F R5T FLOOR 4iii ADDITI I I II I s TEMP T.O. PLY I f _.._.._ .......... ! ..... ,. , ..I I 6 EL. 100'_0 AWNING GCA2424 -21 (TO MATCH EXISTING) 2' -0 3f4" 5'-q 3/4 "t * WEST r-LEYATION /SECTION B SCALE: 1/4" = I'-0" BEDROOM 3 I {t I y 2 1 i Dui a T" t f, 1 1 I 1 (E 3 I I I t t �I fl • I I I I II .11 _ __ -___iL I FASCIA o NEW ROOF TO MATCH EXISTING COPPER FLA51-1ING (TYPICAL) NEW CLAD WINDOW TO MATCH EXISTING - TRIM TO MATCH EXI5TIN6 (TYPICAL) SIDING TO MATCH EXISTING AT ADDITION NEW LOW PITCH ROOF - COPPER 5TANDIN6 SEAM FASCIA a NEW ROOF TO MATCH EXISTING COPPER GUTTER (PATINA) AND DOWNSPOUT WHEAT TAPE EXISTING T.O, BLAB EL. qq' - 4" (85g6' - 4'9 REMOVE PORTION OF STONE WALL - SEE FIRST FLOOR PLAN NEW TIMBER COLUMN 4 BEAM AT NEW ENTRY ROOF NEW STONE SITE WALL TO MATCH AND TIE INTO EXISTING - SEE PLAN REMOVE STONE VENEER - PREP WALL AS NECE55ARY FOR NEW SIDING TO MATCH EXI5TIN6 AII\l170A SCHrMULP NO. LOCATION OPERATION MFR. NO, OR CUSTOM SIZE R.O. WIDTH R.O. HEIGHT HEAD HEIGHT GLASS REMARKS NO. EXISTING WINDOWS TO BE REPLACED 1 EXISTING LIVING ROOM FRENCH OUT5WIN6 005WT3068 V -2 3/4' b" -10 7/8" 6' - 10 7 /8" TEMP qU I 2 NEW STAIR AWNING OCA2424 -21 4` -O 5/4" 2 .0 TEMP * HEAD HEIGHT TO ALIGN w/HEAD i INTERIOR DOORS 2 5 NEW STAIR FIXED AWNING CCA2424 -21 4'-O 3/4" 2' -0 3/4" 5' -q 3 /4 "t * TEMP * T.O. ROUGH OPENING TO EQUAL B.O. STRUGT HEADER T.O. R.O. FROM 5ECOND LEVEL 5TRUCT DECK 5 4 NEW STAIR FIXED AWNING GGA2424 -21 4`-0 3/4" 2 V -q 3 /4't * * T.O. ROUGH OPENING TO EQUAL B.O. 5TRUCT HEADER T.O. R.O. FROM 5EGOND LEVEL 5TRUCT DECK 4 5 NEW STAIR LANDING CASEMENT CCC5060 -2 5'-O 3/4" 5 1' -0 I /2" * TEMP * HEAD HEIGHT FROM LANDING 5TRUCT DECK 5 6 NEW STAIR LANDING AWNING GCA2424 -21 4 3f4 2' -0 3f4" 5'-q 3/4 "t * * T.O. ROUGH OPENING TO EQUAL B.O. 5TR1CT HEADER T.O. R.O. FROM SECOND LEVEL 5TRUCT DECK 6 7 EX15T HALL 2 AWNING CGA2424 2'-0 3/4" 2' -0 3/4" 5' -q 5/4't * 'Z3 0 * T.O. ROUGH OPENING TO EQUAL B.O. 5TRUGT HEADER 7 $ EXIST HALL 2 FIXED CUSTOM TRIANGLE CCA2430 2'-Cl 3/4" 1' -q 5/8 "t* 2 6 3/4" ALIGN 51LL w/WIND #7 ' *PITCH TO MATCH ROOF PITCH VERIFY HEAD HEIGHT IN FIELD BEFORE ORDERING 8 FIXED AWNING q EX15T HALL 2 AWNING 0CA2424 2 2 V -q 5/4 0 t * OUw >ar U * T.O. ROUGH OPENING TO EQUAL B.O. 5TRUCT HEADER q rC d? xr W Fz�rjp� oaZ, O ZUir rw w Jln W - W <z u1'U r�ry 1 <O WzzaY I. ALL WINDOW MANUFACTURER'S NUMBERS ARE FOR "JELD -WEN WINDOW5 $ DOORS" WOOD WINDOWS AS MANUFACTURED BY JELD -WEN, INC. OREGON, UNLESS OTHERWISE NOTED. - IF ANOTHER MANUFACTURER 15 USED COORDINATE ALL R.O. W/ARCHITECT 4 GENERAL CONTRACTOR BEFORE FRAMING. 2. WINDOW HEAD HEIGHTS ARE FROM TOP OF STRUCTURAL FLOOR 5HEATHING DIRECTLY BELOW WINDOW UNLE55 NOTED OTHERWISE. 5. SEE BUILDING ELEVATIONS FOR VENTING OPERATION. 4. ALL VENTED UNITS TO BE PROVIDED WITH SCREENS. 5. WINDOW SUPPLIER TO VERIFY TEMPERING REQUIREMENTS BEFORE ORDERING. 6. ALL WINDOWS TO HAVE JAMB EXTENDER-5 FOR 2x6, UNLESS NOTED OTHERWISE. 7. ALL WINDOWS ARE TO BE GLAD, UNLE55 OTHERWISE NOTED - COLOR TO MATCH EXISTING. 8. GENERAL CONTRACTOR AND SUPPLIER TO OR055 REFERENCE PLANS AND ELEVATIONS FOR WINDOW QUANTITIE5, 51ZE5 AND LOCATIONS. q. WINDOW 5UPPLIER TO ADVISE GENERAL CONTRACTOR/ARCHITECT IF ADDITIONAL REINFORCEMENT 15 REQUIRED AND GHAN6E5 TO R.O. FRAMING. 10. VERIFY PROFILE BETWEEN PRODUCT TYPES ARE SIMILAR. VERIFY PROFILE OF ALL UNITS W /ARCHITECT BEFORE ORDERING. 11. ALL GLAZING SHALL BE INSULATED GLA55 (5/8" AIRSPACE MINIMUM) SUITABLE FOR INSTALLATION ABOVE 8,000' (ALTITUDE) AND TEMPERED WHERE REQUIRED BY CODE, 12. ALL WINDOWS TO HAVE A MINIMUM U- FACTOR OF 2 13. WINDOW SYMBOLS ON PLANS AND ELEVATIONS ARE OWN AS 0 i 0 i TO mi 0 uj c) i i L) 0 i cl) M ULJ W% > uj i• Lij i 0 i uj J UJ -Z > � ii um i 0 i co 0 r + 0 a On m Fm •i - 1 00 •i („ � o rn • N 1�- Lu • o ED • , • # • • •♦ qU 0 # •• cr- uj CL .0 U s .. • t!a C 00 c cu 00 0 C "t -0 cy 'Z3 0 0 1a Q b M ' W LL > aZO � O a U W U5 w z U Q Q d Z u x a_ m J w w OUw >ar U W�aUn�.O }ti rC d? xr W Fz�rjp� oaZ, O ZUir rw w Jln W - W <z u1'U r�ry 1 <O WzzaY (? ptC 00`�O, -aa z ,-- < z�z�� � UOU�F�x m WzzgwzO Q 2w<Q C7 } 0006, u w v>O Ww 0 < WOOwa w?n I-- - �wwowU00 - womwz � Q>- U 0 O U xwL rmcna�rav, z Of aowaasa s a - x r 0 i 0 i TO mi 0 uj c) i i L) 0 i cl) M ULJ W% > uj i• Lij i 0 i uj J UJ -Z > � ii um i 0 i co 0 r + 0 a On m Fm •i - 1 00 •i • • Lu • o ED • , • # • • •♦ qU 1 # •• cr- uj CL PORTION OF EXISTING ROOF TO 13 BE REPAIRED EXIS MA I N T RI 06E J_ T.O. SHEATHING y Y E A4.0 EXIST ROOF NEW ROOF TYP NEW ROOF GON5T - N.1p OVERFRAME AT EX(STIN6 12.12 PITCH MATCH PITCH (5ARA(5E ROOF REMOVE EXISTING UNERDFRAME @ INTERIOR OF STAIR TOWER EX15TINC7 DORMER (TO MATCH EXISTING ADJACENT ROOF) ..... ..... VERIFY NEPi CSHINOLE5 A H PORTION OF EXISTING { } ° P I. REMOVE WINDOW, FASCIA, ROOF TO BE REPAIR OVERHANG AND EX15TIN6 WALL @ REPAIRED GARAGE RE: FLOOR PLANS A ......._. , EXISTING ROOF,5TRUGTURE AT GARAGE To REMAIN 13EAM a EXISTING GARAGE WALL PLATE HE16HT RE: 5TRUGT I TREA05 0 11' (9 METAL HAND GRIP @ STAIRS EXIST j HALL I STAIR To OFFICE EXISTING, IL I t . .- J SECOND FLOOR W NEV45EGOND FLOOR T.O. PLYWOOD T.O. PLYWOOD T.Q. EL. 105'-Il 118" EL. 106-11 0 a IYy — 1 T (VERIFY TO MATCH EXISTING) STAIR NEW BEAM a NEW LANDING NEW DOOR TO NEW ELEVATION RE: 5TRUCT LINEN GL05ET NEW LANDING, t 5 I T.O. PLYWOOD T FX15T EL, 104'-5 5/5' L FOYER EXISTING EXTERIOR WALL 6ARA(5E EXISTINC5 It 1 FIRST FLOOR NEW FIRST FLOOR T.O. PLYWOOD L 1 k T.O. PLYWOOD T EL. 100'-0 (53b EL. 100'-0" (858_7 (TO MATCH EXISTING) NEW DOOR To MUD CRANI-5PACE TYP 5/6" W DRYWALL AT WALLS __ ROOM q AND CEILING OF UNDER STAIR FROM EAST STORAGE EXTERIOR WALL OF HOME RE; PLAINI T* NEW FLOOR GON5T (TYP @ ALL NEW FLOOR5) I �W + I TREAD5 9 11 1 - e- TYP NEW GRAV41-51PAGE CON5T 15U1L1:)1Nc' SECTION A SCALE: 1/4" = 1'-0" TYPICAL GON5TRUGTION NOTES TYPICAL NEW ROOF GON5TRUGTION STANDING SEAM COPPER ROOFING ON 30# FELT OVER H16H TEMPERATURE FULL GOVERA(5F SELF ADHESIVE WATERPROOF MEMBRANE, WITH SECOND LAYER LAID PERPENDICULAR TO FIRST AT ALL VALLEYS, OVER ROOF SHEATHING ON ROOF FRAMING (SEE 5TRUC,T) vi/R4q BLOWN IN INSULATION. 6 MIL VAPOR BARRIER ON C7 BOARD AT INTERIOR UNLESS OTHERWISE NOTED. TYPIGAL NEW EXTERIOR WALL GON5TRUGTION SIDING MATERIAL TO MATCH EX15TIN6 ON BUILDING WRAP ON WA 5HEATHIN6 ON 2X FRAMIN6 (SEE 5TRUCT) WR=21 BLOWN -IN INSULATION. GYP BOARD ON & MIL VAPOR BARRIER AT INTERIOR. TYPICAL NEW FLOOR GON5TRUCTION FIN15H FLOOR MATERIAL ON FLOOR 5HEATHIN6 ON FLOOR FRAMING (5EE STRUCT)5EE FINISH SCHEDULE FOR FLOOR MATERIAL. TYPICAL NEW FOUNDATION WALL DRAINAGE MAT /INSULATION BOARD ON FDTN WATERPROOFING ON CONCRETE FOUNDATION HALL. CARRY WATERPROOFING 12" ABOVE GRADE WHERE POSSIBLE. TYPICAL NEW CRANL5PAGE GON5TRUGTION 10 MIL VAPOR BARRIER ON 4" 6RAVEL (PEA GRAVEL OR LARGER) ON GRADE (5EE STRUCTURE). AT VAPOR BARRIER OVERLAP 12", TAPE AND SEAL ALL PENETRATION AND ED6E5. VENT PER CODE. UNERDFRAME a INTERIOR OF EX15TIN6 DORMER (TO MATCH EXISTING ADJACENT ROOF) - VERIFY 3 1/2' FRAME W lit 5/4' 5/4' W�V EXISTING GARAGE ROOF CON5T TO REMAIN (DORMER NOT SHOWN FOR CLARITY) BEAM a EX15TIN(5 GARAGE WALL PLATE Hr=lCvHT RE: 5TRUCT > j. TYP NEW FLOOR GON5T- NEW SEE TYP GON5T NOTES WINE 5T0RA6r= I TREADS a 11" = (0 1 - 5 11 31/2" EL. 152'-6 5/5" (84lq'-6 5/15") I1 NEW RIDGE r. �e T.O. SHEATHING, • EL. EL. 125'-q 5/8" (5412'- cl 518) (`VERIFY WROOF PITCH) PLATE HEIGHT DETERMINED BY FASCIA HEIGHT (ALIGN Pq1'EXI5TIN6) AND ROOF CONSTRUCTION - NEW ROOF CON5T DOES NOT MATCH EX15TIW--,, 50 PLATE WILL BE HIGHER NEW T.O. OBL PLATE EL. 115-7 1/5" (VERIFY N/FA5GIA HEIGHT 4 ROOF CONSTRUCTION) VERIFY ROOF PITGH P4/ BEAM BEARING (AL16N Pq/50FFIT) AND 12" OFFSET FROM EX15TIN6 WINDOW SILL SET TOP OF LOW ROOF STRUCTURE 12" BELOW EX15TIN6 WINDOW SILL NEW SECOND FLOOR O L T.O. PLYWOOD T EL. 106-11 Ilb" (VERIFY - TO MATCH EX15TINW SET BOTTOM OF BEAM FLUSH TO BOTTOM OF SOFFIT BEYOND TIMBER COLUMN IN FOREGROUND - TAKE COLUMN TO NEW FDTN WALL RE- 5TRUGTUIRE NEW FIRST FLOOR T•O. PLYWOOD ti EL. 100'-0" 6535T) .......... (TO MATCH EXISTING) STONE 517E WALL TO TIE INTO AND MATCH EXISTING 1RE.51TE PLAN NEW MUD SET FLAGSTONE ON GONG SLAB WSNOWELT ON 4" GRAVEL ON STRUCTURAL FILL RE: 5TRUCT A A4.0 VELUX "V5 106 VENTILATING SKYLIGHT WELECTRIG OPERATER (2 THUS) GENTERLINE OF 5KYLI6HT5 AND CENTERLINE OF STAIRWELL EQ Ea tr .... ........... --------- ---- 12 a \ A L GURVED A WALL EN TO .......... ALL OND A EXIST XIST RAE 2" ALL 7 12 , 12 4 1/2± r RE-FRAME EX15T LANDING IN 5-1/2" WALL TO 5-1/2" _ FOREGROUND IF NEC FOR NA5H/DRY �j CLEARENGE-5 NEY.4 NEW STORAGE UNDER 12 1 STAIR STO R AGE STAIRS TO OFFICE IN FOREGROUND / 7 _j .... ........ ..... ........ ....... ..... . ......... CRAV4LSPACI= .......... . ............. ... * ........ ...... 5/8" TYPE W DRYWALL AT PROVIDE BLOWN -IN R-21 INSULATION KALL5 AND GFILINC5 OF AT WALL BETWEEN 5TORA6F AND UNVER5TAIR 5TORA6E MECHANICAL ROOMS AND NEW MUD L ROOM TYP CONST SEE NEW EXT WALL TYP CON5T NOTES 5UILI:) IN 6 SECTION C EP EL. 108'-I1 1/87" �' — NEW LANDING T.O. PLYWOOD T EL. 104'-5 5/5" >_ EXISTING FLOOR NEW FIRST FLOOR T.O. PLYWOOD T EL. 100'-0" (83879 (TO MATCH EXISTING) 5/5" TYPE W DRYWALL AT WALLS AND CEILING OF NEW NINE 5TORA&E BUILLO"O/'IN6 SECTION E 50A -E: 1/4" = 1'-0* 5e,'A&F: 1/4" = 1'-0" EX15TIN6 HALLS, GEILIN6 AND DOOR a OFFICE TO REMAIN t BUILTL-IN BOOKCASE vq/yiOOD SIDES, SHELVES AND BACK ALL DIMENSIONS 0 BUILT-IN BOOKSHELF FINISH DIMEN51ON5 U.N.O. MTL HAND GRIP IN FOREGROUND EX15TIN(3 SECOND FLOOR T.O. PLYWOOD TYP NEW ROOF CON5T OVER EX15TIN6 HALL AND ADDITION - SEE ROOF PLAN REMOVE EX15TIN6 ROOF AND DORMER 9 EX15TIN6 HALL REBUILD EX15TIN(5 DORMER TO TIE INTO NEW ROOF RE: STRUCTURAL OUTLINE OF 6ARA(5E IN FOREGROUND NEW CLAD V41NDON5 To MATCH EXISTING (TYPICAL) VERIFY ROOF PITCH - T.0 ROOF TO BE 12' BELOW V41NOOV4 SILL NEN T.O. PBL PLATE r 74 T EL. 115'- 115" (VERIFY Pq/FA501A HEIGHT ROOF CONSTRUCTION) TYP NEW ROOF CONSTRUCTION 5EE TYP GON5T NOTES EX15TIN(5 SEGOND FLOOR T.0, PLYWOOD EL. 108'-Il Ilb" T.O. DBL PLATE T EL. 101'-cl" TYP NEW FLOOR CONST- SEE TYP GON5T NOTE-5 EX15TINO FIRST FLOOR T.0, PLYWOOD ....... ..... 11- T - EL. 10`0'-0 ..... ............. .......I..... ... .... .. ... NEW 1 I N6 TO MATCH EX15TIN6 OVER NEW DECK FRAMING RE- 5TRUCT TYP NEW FDTN WALL SEE TYP CON5T NOTE5 PERIMETER DRAIN PER SOILS ENGINEER (TYPICAL) TYP NEW CRAV41_5PACE CON5T d ( — D 0 • N Nt c � 111 Q0 co 6 x 0) LL ( 22 c: • 0 r co • LO cu oo C) 0 C • x 0 • • 03 0 • C d .- M > a - . � 0 - O iL t (.9 Lu W Z �2 @, 0,41 M z i ,gN wr"W9 HM w T, f Ws g 0 3 1 WX_'� Wl D 3: . ,6z oR (9 9 o w w W" 2 L W -i LL x w Ld wz Z<Wz Zo< O LLZ co 'l 2 U)g 0 w z 0: c a W O b� w ZO ww o CLO�xtzw W ( �: W � ¢ 1 1 : 1: 0 0. o W 0 T W t LL Wo CL LO Z W w 0 0 :c l WOTEZ z >ZW ow 0 �_ 0 w WW z 0 cl) 0 W > 0 no 0 0 W% E >= W cj) W z z W W 0 (m) 0 u W o W > LIJ W • AWL A 0 W UJ Z > LL cf) U 0 Z L) 0 00 0 r. �e • z 0 cl) 0 W > 0 no 0 0 W% E >= W cj) W z z W W 0 (m) 0 u W o W > LIJ W • AWL A 0 W UJ Z > LL cf) U 0 Z L) 0 00 0 • STRUCTURAL SPECIFICATIONS I ) Foundation design based upon "Soil and Foundation Invcsfigatio-C as prepared by 7) Struvwrtil steel shall Iv, AS1 Aml A36 or better except Wide flatig shall be A992 14) Construct Ivalls m lb llo�vs- CHEN AND ASi3,00ATE'S, Job No, 24,892 daled FOiroriry 7, 083, histalkition or bettor " pipe colu'rilas (noted on plans as pipe, in manual as II SS r(3und) w -", d hich -I:1x(erior-6, 16" oc. rains and site irrig ,ption to co m w nforithsoils repott, field test drains shall contorm to ASTM A500. Gradv B (Fyzz;42 ksi) or better, tubc steel columms - Imerior - 2x4 1 6" oc. (1111cm noted othenvise, 1xibre backfilfiq� All (botings are to boar upon natural undisturixul soil or (noted Oil plans zis Ts, ill manua I as HSS rectatiguilar or square)which shal I be IS) Ail beams, joiqsi, and rafters are to [ upon �valls or beamsi, or Ix. hun with coo pact s4ructural fill as, �Ipproved t�y thesoils engineer. Soils origineell to A500 (irado B (Fyz!A6 ksi) or better, anchor bolts and botts $hall IV A307 or SIMI's(W Stri'm Tie hant approve equals. 4ers ot jil-t"Pect hqsement areas for radon gas. Install radon g pissy"itom b•lleath conerete better. All structural steel is to 1% eielailo(f> . fabricated. painted and crected it) 16 All structural members are shown in their final positions projxr�y b•aecd and stall accordance wit h #11C S11 E 1, COINS'I'IUICTIONN NIANU AL, 2005 and CODE supportcd during constnuclion it Inay tv mcessary to tomporaril} shore portions ?S , Z) All fomidation around pQrimetcr ofstrocture shall have protection OFSTANDART) 1 All woldim� ortified wel ,_ to be performed by a c der of thestructure while Other portioms are beil%$ constroeted, Contact the engincer of 49" to bottom of fboting. All.foundaticin walls andimItimas to 1w centered on and conforri to AJ SC and AWS STIUK" rUIRAL W'I"ILDIING CODE, 2000,all lbr consultation as recitured, conerete roolings unless sbowtn olberwise on plans, electmides to bi� EE-70XX , Grout betienth all base plates and bo-ain be-aring, 17) General Contractor is rcsponsiblekir allpon-specified coutioctiors', comact 3) All cast in place concrete tntist be vild't with Portland cemeni: and attain pfiam, shwl be non-silvirkepoxy Willi Inirlimum 28 day compressive streqqlb of CrIgineer for deadis as rcquirod. "rho cogineer is toapprovo Ali stractural minimum compressive strength of 3000 psi after 2S days (Irlinhillim coinpmssive 5000 psi. All Trubolt NVedge Anchors to IV., illstalled according to Inanuthetilrer's substinition"'. strongth of 4000 psi after 28 days for concrote ttscd iasfabs). Design based upon spmificatiom� -arid dotails, I 8 Floor framing mid concrete base-mef it slabs Illust be comilloic ai. in plzrce prior to 131 11-DING CODE, FOR RE'INFORCIA) CONCRE11lACI 8) Vcr�akimzs are as manufacturcd by BOISE, CASCA.DE C(.3iUORATf(1N, backfillingy ev red Rmildialion walls, unless Wet'luate I-Cruporary sho> ing! is in placc, 318). 1999. •Concrete placement to ➢ confimn with Requiretrunits" as sho-pi drawings arid mantifiActurers siandard tictaik All btiilt-tit) Vemudain 19) General Contractor is to Coordinate all diaphragili penctrationi (i.e., chlmmys. de Food i ii ACI 118, ;ill conerete stubs oy I grade m ust Ix provided contro I (scored !X. glue'd with 1 and nailed with 2 mws of 16d spikes 9" plumbing- se"vers, etc,) tbrougAi lloors', walls. roots and lbundaiionwalls with or cut) inaccordanee. witlisoil report, All e\posed edge,,q ofconereteshall have Versakims deeper than 11 W8" must be bolted together with 2 rows of 5, appropri'liv sub-contracto"s. Gencral C.ontractor is resporsible fcir tile mcans, t Conerefe, work ,,hall 11c it have any horizorlial Co Id joi nvi unless methods. techniquos, sequences, procedum,, workmanshi . scoasonal sclwdu ling p Field coordinate all vertiozil cold joints, tNi(h strocuiral lit all diaphragm- ,ill All alternates, to be- reviewed and approved •by tile, erg�ineor. aild job­,ite with this prqjecc The General Contractor i's to Id oh its. 9) Sheath floors u-th 1'and G plywo veril�� ill, dimensiom and elevations Willi the irchitectural drzmfirtgs� Notif� "Ineen use Continuous wrtioal L' ter qtopat all eo. j ,W with mini unt slian rating of 4000 or 4) Reinf !,� AS 114 Grade 40 for " or 4'5 bars�. 4'6 . . ridgreater to tv Grade tvttor ami glue with JIL400, Nail plywood i,.Vah I Od 6" oc to all joists, field engilver of all Conflicts and o.mis between - Iarious elementt, of tile kvorkirkv g 00. All ,-velded wire f4bric imust conforin lo.AIST3�1'i A 18 5, Reh I force mem Coordinate scrow option. Covet docks with 20 Rechkood with 2 scroNXN per drawings and tile. existiqg Conditions prior to �0111 that portion of tile placement shall collrbrIn to MANNUAL OF STANDARD PRACTICt', 2001 as bearif Ig point, pro�jisct. General conlractor is to inspect mmodel projects aml verifi� prior ukie arid propureJ b�y CR84. All lklpsplicez,� to be mininturn 36 bar dimmewrs. all horizontal 10)SIleati) rooS with 5/8" plytvood with minimunispan ratingof 40.1 orbe-tter. proper di'�,posal of exim-hig materials (Le'. 4sbesto5. etc.) as required by oode. reinforcement to he contii.,iouq around coi neri and ,it wall Intersections. Nail plykvood udth 8d kQ. 6" oc at panel edgios and I- oc tit Identity ol'all existing b;dden structurtu plans basiod olxm plans by ThcTrout minimurl reinfolcoment protection- members, Creck Collaboxative and Boyle Fogincering, jnt dated 12 July 1933. -conerete poured against earth 11) Sheath till exterior wlws with Ile, pkywood with miniamispatirating o1`24,10 or if j, All materials exposedmi exterio. and ormoisure conditionsshall IV treated for -conerele poured in - forinti 2" beucr, Nall Willi 8d C' oc to till studs. those conditions (i.e., chemicall pairinm daml )otiu& t � g m. -con eretio slabs 12),I. ivic loads usod for desig ji- membranes, llash;n& Qtc.) as required by code. All materials to he treawd €t)#' firo 5) All lombersluill N Doug-Fir PQ S4S or N all ,volmanizee hImber shall -Roof-80 PA'sliow. rosktaxict as rquirod by code. I-1cm-Fir #2 S4S or btaler(all hijnberwithin 18" tai finisli gyade must be -Ftoor-50 psf residential. 2 1) Furnish one set cit'shop mid eiveeion drawings fear rein!broirig steel, structural w ool Provide solid blookingat 8%0 oti center in all c9aalxllrtxS €alp. Ali -l: Deck- 100 r-st. %wel, plant f4bricated Wood joists and gitied-laminated thiiber to the engineer for Columns to be colitimous ,> x' to foundation. colklinns'speciffed Oil pialls are. -Wind-90 inph (3second gust), Exposore B, review and arproval� prior lo.�abrlcatlom wherl 'Shop dm-,ving,� wre prepared by the provide otw i<Jng said for opening to 6 and 2 Ling studs for -Earthquake-Zone C-1130. of pfi)inciatte. stll)ci) #7t€klt trail oponiq6's over 6%0". 13) All construction ariist coniply •itli the 2003 International Rulklillg Code as 6) Glulum and quality controlshall confirm to STANDARD adopted by the Town of Vail Building Departmentand die "General Condition of SI FOR STRIJ(:TURAL GLUED LAMINX.11"'W11MBER OF the Contract Air conwructiolf � (Alai Document A201). All eoustiuotion inust bc! SOFFWOOD AITC 11 7-2 1 004 aadT IMBEiR CON�STRUCTION completed withill the tolortime", do'scribeel it) the `Residieriflal Construction , MA`N`UAI, (5 its prep amd ti . Sind plespan IN-atus shall be Pc6ormance Gaidclineil' as prepared Ian ebo NA FIONA].. ASSOCIATION OF Symbol 241-114 with no cambr, Conti nuous or cantilevered b �- Shall N Comhination,�cyrnhol 24F-V8 with tit) oamber. Gfulmn columns. be 3. adhesives shall conform to the requiremems &v ivot REPLACE EXISTING TREATED 2x10 LEDGER STONE PER ARCH'LS DECK FRAMING TO w/ 3/4" DIA. x 6 1/2" TWNS MATCH ORIGINAL @ 24" ox. HEATED 5" CONCRETE WALKWAY w/ #4 BARS @ 12" ox. BOTH WAYS EXISTING 99'-8" PLANTER TO REMAIN 99'-4" AT D SIM, 4'-0#' 98'-8" #4 BARS @ 12" o.c. BOTH EXISTING SLAB WAYS DRILLED 6" INTO EXISTING TO REMAIN HEAVY DUTY OR NEW FNDN. AND GROUTED w/ Al NON-SHRINK EPDXY CAULK - 1i1 - 41_1 =` - 111 —1t IT� I Ai " U " SERIES 1 -111 1 � 1 11 _ "" 4 HANGERS #4 DOWELS @ 24" ox. 7 V i 2 , _ 0 „ 2 It A #4 BARS @ 24" o.c. T lt� _Ir H 1 11 T�= 111 = 111 = 111111 11{ _ j1 11 1 1 ' #4 DOWELS @ 24" ox. 2 - 5 BARS CONT. TOP W It �M AND BOTTOM 8 � G 1' -0 "' 0 11 1 94'-1 1/4 SWALE Ilk Ij EXISTING FNDN. EXISTING DRIVEWAY THICKEN EDGE OF TO REMAIN 3 - # 5 BARS CONT. TO REMAIN - FIELD SLAB WHERE EXPOSED CORRDINATE CONNECTION TO 12" x 12" 4" GRAVEL TO HEATED CONCRETE ETAIL E MINIMUM DRIVEWAY D E 8" 8" 8" 4" DIA. PERIMEITERi DRAIN w/ GRAVEL 1 2'4' PER SOILS REPORT 1/2" DIA. ANCHOR FRAMING PER PLAN DETAIL D 1/2" DIA. ANCHOR FRAMING PER PLAN BOLTS @ 36" ox. rD BOLTS @ 36" ox. 2x6 REDWOOD DECKING STONE PER ARCH 'LS 3/411 11-01, TO MATCH EXISTING DECKING OL 99'-9 A3/4 o L 99'-9 3/4" 100 1001-01, Ak 12 WOLMANIZED 2x12 REDWOOD 2x6 99 @ 16" o.c. DECKING TO OL 99 < 1/8 MATCH EXISTING * 99'-4" 99 L T v 7� b 98W 1/4" WOLMANIZED 5" CONCRETE 2x12 @ 16" O.C. 111 1 WALKWAY SLAB w1,:r_-_m LEDGER PER PLAN z PER PLAN LEDGER PER PLAN #4 BARS @ 12" me WOLMANIZED 2-2x12 _M5 co PER PLAN BOTH WAYS DRILLED 2 - ----- ---- \ - 211 6" INTO FNDN. AND 10 -------- GROUTED w/ NON- #4 BARS 24" o.c. LEDGER PER PLAN 1 M11 #4 BARS 24" ox. SIM, SON LC13 SHRINK EPDXY. 'g OR APPROVED i �° 111 - 111 1 1 111 111 EQUAL #4 DOWELS @ 24" o.c. #4 DOWELS @ 24" oc. 12" DIA. PIER 4" DIA. PERIMETER 8" 121-0-1 245 BARS CO 4" DIA. PERIMETER 8" 12'-0" DRAIN w/ GRAVEL DRAIN w/ GRAVEL PER SOILS REPORT PER SOILS REPORT 2 - # 5 BARS CONT. TOP 2 - # 5 BARS CONT. TOP AND BOTTOM 2 - # 5 DOWELS AND BOTTOM 941-1 1/4" 10. 2'-6" 94'-1 1/4" • Ilk _J OIL N 3 - # 5 BARS CONT. 94'-1 1/4 " 3 - # 5 BARS CONT. b , 0 1 0 3 # 5 BARS EACH WAY _ wnwma It I k It 8 8 8 8" 8"_ 8" / ------------- 2'-( _6 6 2 l it Z-0 -.7 DETAIL C DUEL T A 11 LL B A UD ETAI L A S1 3/4' = 1' -0"' 3/4" = 1' -0" S1 3/4-1 1, -0„ FOUNDATION PLAN NORTH NOTE- PROVIDE CRAWLSPACE VENTILATION AS REQ'D BY CODE. 1/4 = 1 1 -0 11 C� C14 1 w c6 4­ • 4" • C/) • •• LO _0 (0 C: T_ o• 0 "t - 0 M • 2 m x • • • • cc) 0 U) • > 6 C: 1`- C 01 i (0 • N ( - I ( 6 co 75 1 E 1­ 0 '14 I'- ' E N S_ se 0 b 7E) C_ O Cu CL > z 0 go Ok V Jq W > cc 0 CO 2 m W z W I 0 ii Z W W W CO > 0 W J UJ a -Z dd IM • • LLJ D C) CO 0) • m ;gmgj N Al- EXISTING PLYWOOD BEAM" TO REMAIN NOTE: 0 DURING DEMOLITION EXPOSE EXISTING PLYWOOD BEAM TO 6 EXPOSE COMPRESSION AND TENSION MEMBERS AT TOP x AND BOTTOM OF PLYWOOD I (0 0 BEAM. COMPLETE STRUCTURAL ttt REVIEW TO SUPPORT NEW u- x ROOF BEAM AND FLOOR BEAM. 4- cl) I , -- DF #1 3x10 LEDGER w/ 2 - 1/2" DIA. x 6" LAG BOLTS @ 16" o.c. INTO STUDS El A A rF DETAIL F SECOND LEVEL AND LOWER ROOF FRAMING MAIN LEVEL FRAMING S 1 1/2 = 1 1 -0 1, 1/4" = 11-011 1/4 = 1 2-LVL 13/4 x 9 1/4 BEAM PER PLAN WAll 01 VAA/nnr) OIL 104'-5 518 T 2-2xlO PER PLAN TOP OF PLYWOOD 104'- 5 5/8" 2x14 LEDGER W/ 8-16d SPIKES @ 16" o.c. STAIRS PER ARCHILS 2-2x 2 EDGE OF ROOF EXTENSION EDGE OF LOWER ROOF 1/4" BENT PLATE 8" TALL W/ 4 - 3/4" DIA. M.B. THRU EACH MEMBER EMgT Ot. ro 1 VED 04 X c*4 04 0 w N z 5 0 3: TOP OF DECKING 99 TOROF EXIST. SLAB 99'-4" 6 ti CO LO Z I C D co 0 0 c:) cu C C) 0 (3) 4-J 0) r- 0 E 11 x 0 a) 0 0 -0 () c- 6 • u- 0 c: Q. 0 r 00 zs tr) CD C T CU oo c 0 0 "t -. 0 cy) cy) 2 my 0 c cu > 6 ti CO LO Z I C D co 0 0 c:) cu C C) 0 E r- 0 E 11 x 0 a) 0 0 -0 () c- 6 =3 z z 0 • 0 .j w > 0 Cal 0 0 W z w z m w W 0 Uo u W a UJ > Oct w•• UJ 0 w j UJ - Z > . a LL 0 Lu :3 z 0 0• 0) • (L m Z 0 0 c:) C C) 0 C Z (D 0) 04 00 E 0 =3 z u- 0 cu UPPER ROOF FRAMING PLAN 0 SHADED AREA DENOTES OVERFRAMING 1 /4 = 1' -phi TOP VIEW I , C) 0 WALL LEGEND WALLS TO BE REMOVED WALLS TO BE ADDED EXISTING WALLS TO REMAIN r L EXISTING HEAL TO REMAIN - THIR D LEVEL FRAMING ll;/� r I `t% co X 04 T- CN "t CD 00 (0(0 0 .j 75) > n u - C C) r- 0 '14- • E X 0 tCS 0 0 A:) 0 W (J) CL > w z D 0- W 0 0 () o 00 W Lf) C.0 CCS 00 C) 0 "t -0 0 M p m W x 0 W 0 0 0 m CL > ti 0c) C\l C\j CD 00 • 0 .j 75) > n 0 E C) r- 0 '14- • E X 0 tCS 0 0 A:) 0 W (J) CL > z 0 • 0 .j w > 0 C) 0 ti W% W (J) z w z D w W 0 () o u W o ii W W 0• > LLJ 0 J w j LLJ l< -Z > UL. 0 CO ui z (* cr o • • • 0' °40' f LOT 1 SU I S ECOND ADDITIO 0 A X 5.9 DECK GARAGE LOFT ?> SPRINKLER VALVE V' 5.2' 15.2' t CONC. PAD DOG RUN 1 s IMPROVEMENT LOCATION CERTIFICATE tu:svTm ;1 m ums g or Duraening any part of saxa parcel, except as slated. APPROX LOCATION M ODERATE HAZARD? AVALANCHE ZONE (SAN OF LINE) Cc Iorado PIS A116 (SEE NOTE 7) Z µ Date: _�� P r y � �p V1 j g 0 tn Us f rt s . i% rt e in rt rlt c rt r Ms k P r y � �p V1