Loading...
HomeMy WebLinkAboutA10-0116TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2135 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ALARM PERMIT Job Address: 174 E GORE CREEK DR VAIL Location.....: COMMON ELEMENT Parcel No...: 210108221001 Project No OWNER LODGE PROPERTIES INC C/O THE LODGE AT VAIL 174 E GORE CREEK DR VAIL CO 81657 APPLICANT SIMPLEX GRINNELL 6240 SMITH RD DENVER CO 80216 License: 903 -S CONTRACTOR SIMPLEX GRINNELL 6240 SMITH RD DENVER CO 80216 License: 903 -S 12/21/2010 Permit #: A10 -0116 Status ...: ISSUED Applied..: 12/21/2010 Issued. .: 12/23/2010 Expires. .: 06/21/2011 12/21/2010 Phone: 303 - 355 -0500 12/21/2010 Phone: 303 - 355 -0500 Desciption: ADD FIRE ALARM DEVICES FOR THE NEW ELEVATOR CONTROL SYSTEM ON THE CONDO SIDE (NORTH) ELEVATOR. Valuation: $5,500.00 * sr***■ a*** a********** s***:*.* s * * + * * * * * * * * * *r + + * *•r + +r * * * * *► ** FEE SUMMARY ***** sa********►** * * * * * * + * * * * + *s * * * * * * * * + *r * «• * *a Electrical --------- > $0.00 Total Calculated Fees - -> $494.25 DRB Fee --------- > $0.00 Additional Fees ---------- > ($278.25) Investigation ---- > $0.00 Total Permit Fee--- - - - - -> $216.00 Will Call --------- > $0.00 Payments ------------------ > $216.00 TOTAL FEES --> $494.25 BALANCE DUE--- - - - - -> $0.00 Approvals: Item: 05600 FIRE DEPARTMENT 12/22/2010 mvaughan Action: AP CONDITIONS OF APPROVAL DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town appjjjcahle thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN IRANNGE BY TFLEP#ONKAT 97"79-2252 FROM 8:00 AM - 5 PM. SIGNATURE OF OWNER OR CONTRACTOR F - TI'I 4SELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: R100002047 Amount: $216.00 12/23/201008:10 AM Payment Method:Credit Crd Init: LC Notation: credit card from james g williamson, simplexgrinnel ----------------------------------------------------------------------------- Permit No: A10 -0116 Type: ALARM PERMIT Parcel No: 2101 - 082 - 2100 -1 Site Address: 174 E GORE CREEK DR VAIL Location: COMMON ELEMENT Total Fees: $216.00 This Payment: $216.00 Total ALL Pmts: $216.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 216.00 4 FIRE ALARM PERMIT Commercial and Residential Fire Alarm shop drawings are required at the time of application submittal and must included information listed on the 2nd page of this form. Application will not be accepted without this information. �ftfZ f�G r Project Street Address: (Number) (Street) (Suite #) Building /Complex Name: A 6c 14-1 441z- Contractor Infor ation: n Company: /�1iPGf?�(� ?x,�1NcYc Company Address: 61,P- ( �,77t I City: 6 F State: t 4 Zip: g Contact Name: 4) *c0ek Y Contact Phone: p �3� E- Mail (� Town of V ' ontra for Registra ' o.: X Contractor rig (required) Property Information Parcel #: (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or visit vwvw.eaglecounty.us/patie) Tenant Name: Owner Name: Office Use: Project #: PRS i o - oR iU Building Permit #: Alarm Permit #: 10 p I I Lot #: Block # Subdivision: Detailed Scope and Location of Work: OF (use additional sheet if necessary) Does a Monitored Fire Alarm Exist? Yes (?c) No ( ) Does a Sprinkler System Exist? Yes (V) No ( ) Work Class: New ( ) Addition ( ) Remodel ( ) Repair ( ) Retro -Fit (y) Other ( ) Type of Building: Single - Family ( ) Duplex ( ) Multi - Family Commercial * Restaurant Other (;)6}- Date Received: Complete Valuation for Fire Alarm Permit: Fire Alarm $: �� IE D RE D� 212010 TOWN OF VAIL O1- Feb -10 • Fire Department Process For Commercial & Residential Fire Alarm Systems Commercial and Residential Fire Alarm shop drawing requirements at the time of submittal must include the following: A Colorado Registered Engineer's stamp A — Device locations on reflected ceiling plans 1 Reflected Ceiling Plans (RCP) Ai A Typical device wiring diagrams _�_ Battery calculations /old Battery calculations lye — A list of specific device model numbers N Li Equipment cut sheets of each type of device �1 Information indicating monitoring method and monitoring agency This check list has been provided to ensure that our review process may be handled in a timely manner. I have read and understand the above listed submittal requirements: Project /Street Address: Contractor Signature: Date Signed: 01- feb -10 /,:� - 2 ( - 9-f The number of each type of device Information indicating the specific zones _ ) Circuit diagrams Point to point wiring diagram Wiring type, size and number of conductors The source of AC power circuits Fire alarm panel locations Knox Box location �1 Information indicating monitoring method and monitoring agency This check list has been provided to ensure that our review process may be handled in a timely manner. I have read and understand the above listed submittal requirements: Project /Street Address: Contractor Signature: Date Signed: 01- feb -10 /,:� - 2 ( - 9-f Fire Department Guidelines For Preventing Non - Emergency Fire Alarms In order to prevent a non - emergency response from the Vail Fire Department Suppression crews to the con- struction location you may be working on, we ask that you perform the following tasks: Determine what kind of fire alarm system exists within the structure you are working in with the owner or the manager of the property involved or by contact- L .,3 e ing the Vail Fire Department. Determine with the owner or manager of the property, which alarm company JF services the system for them Become familiar with the different components that are associated with the fire J c alarm system and how they operate before the DEMO begins. �^ Never paint a smoke detector, thermal detector, or any other component of the V fire alarm system and never paint a sprinkler head /cover plate. For larger projects, please contact the Vail Fire Department so that we can work with you in determining what needs to be done to alter or "Zone Out' spe- CK cific areas of the alarm system for the structure. Please contact the Vail Fire Department at 479 -2252. I have read and understand the above listed submittal requirements: Project/Street Address: Contractor Signature: Date Signed: / / / IcIy M O1- R3g -10 4 BUILDING INFORMATION: Building Name: Street Address & Phone #: Knox Box Location: Fire Department Guidelines Pre -Plan Information Sheet Lopc,6,7-� l/x Alarm Panel Location: Z�C&& 7 Vail Fire & Emergency Services Alarm Silence & Rest Codes: RPS': Names & Phone Numbers (Work & Home) Owner: Property Manager: Property Maintenance Mgr: Alarm Service Company: BUILDING UTILITIES: Gas: Main Location: Other Locations: Electric: Main Location: Other Locations: Water: Main Valve Location: Main Fire Valve Location: Secondary Fire Valve Loc: 01- Feb -10 tyco Fire & Security Simp/exGrinne// Mike Vaughan Town of Vail Fire Marshal Vail Fire & Emergency Services 42 West Meadow Drive Vail, Colorado 81657 Re: Elevator Controls 12 2010 at The Lodge at Vail Mike, 6240 Smith Road Denver, Co 80216 Tel: (303) 355 -0500 Fax: (303) 355 -0615 Scone of Work: We have been contracted by Lodge at Vail — Rock Resorts to add FA devices for the new elevator control system on the Condo Side (North) elevator to the existing SimplexGrinnell FACP located at the Lodge at Vail, 174 E. Gore Creek Dr. Vail Co. 81657 This letter is our request for a permit to be issued for the following work: 1. Add one monitor module and 120vac isolation relay in the elevator mechanical room to supervise the elevator power. 2. Add one heat detector in the elevator mechanical room to provide shunt trip sequence of operations. 3. Add one relay and 120vac isolation relay in the elevator mechanical room to the shunt breaker for shunt trip operation. 4. Add one relay in the elevator mechanical room for the Fireman Hat sequence of operation. 5. 18 /2tsp fplp wire back to the garage FACP Node 2 for IDNET purposes only. It will be run in newly installed conduit in the garage. 6. 14/2 fplp may be wired back to the FACP for 24vdc. It will be run in newly installed conduit in the garage. 7. The FACP network program will be updated, backed up, and archived. 8. The system will be tested prior to calling for a TofV Fire Department inspection. Please let us know if we can furnish any other information to aid in your review process. If you should have any questions please contact me at 970 -556 -7796. Thank you, Glen Williamson Mountain Area Sales NICET III (pending) SimplexGrinnell 970 556 7796