HomeMy WebLinkAboutASB07-0016c9t"
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED)g_1 �` , "I l ,
Project #:
7 Building Permit #: 7
*ViAl Asbestos Permit #:
TO WW TOWN OF VAIL ASBESTQS ABATEMENT PERMIT APPLICATION
Required per Ordinance No. 19, Series of 1998
75 S. Frontage Rd. Permit application will not be accepted without the following:
Vail, Colorado 81657 1. Copies of General Abatement Certificate and State of Colorado Certification
2. A copy of written arrangements with the facility operators for any temporary disabling of the
air handling systems, fire sprinkler system, and alarm systems with the names and contact
phone numbers of these individuals.
3. Site plan with details addressing: waste container storage location. waste load out area
location, entry and exiting details of abatement area. details of entry and exiting plans for the
occupants of the stmicture in unaffected areas.
CONTRACTOR INFORMATION
On Site Abatement Contractor: Town of Vail Reg. No.: Contact and Phone #'s:
MOP, Cor eVt&i0►1 L/717 -.S 303-Y57 -656;2 Si rlbo .�
E -Mail Address: /11 Rm ARZVSi\J GR aff ii t
Contractor Signature:
COMPLETE VALUATION FOR ASBESTOS ABATEMENT PERMIT (Labor & Materials)
Asbestos Abatement: $ 113 c1 7c%
Contact Eagle CountyAssessors tae at 970-328-8640 or visit www ea /e -coup com nor P /
arse
2/0/ 07 /Dr, 00/ bra 2 1o/ o7 1,d6 02
Job Name: N l ne Va d koad Job Address: 6% tJ0 i (
Uai' ( co 8157
Legal Description Lot: fU, A. Block: /tJ. A- Filing: N, A Subdivision: N,n Ua I i2d,
Owners Name: A✓' Ssau- 4 a Address: q ✓a ; l Rd . Phone: 9� 76 - 9.7'7 - G 335
ProjectManager: /� Address: /� oI E, 33 �, -,. Phone:
2�ss Pe- r'on rorr4 a goo /e 303-3�/�- 7
Project Designer: puss Pe rro vt Address: ;1S61 G• 33 W- A,�e., u �; * c Phone:
�iurora co O O 363 - 3vp - .67 g
Air Monitoring Specialist: Address; ri Boi E, 3.7 -0- AJe•, u.�rtC Phone:
Q�ss errors Avro co 900 303 -3 y0 - 578
Detailed description of work: ��
Qev►�o�e °P -cove c��l"n� sPraY_ov�. /'�f �lvC,C
Start Date: ,,70 0 7 End Date: =0/,o 0 , Start Time: 7,poo Quit Time:
Amount of Asbestos: Linear Feet: Square Feet: C' 30 55 /Gal Drums:
Work Class: New () Addition( ) Remodel (fir) Repair ( ) Demo ( ) Other( )
Work Type: Interior (jC) Exterior ( ) Both( )
T X22 of Bldg.: Sin le -fami Two-family Mutd -fami Commerdal Restaurant Other
Does a Fire Alarm Exist: Yes C <) No( ) I Does a Fire Sprinkler Exist: yes( ) No Gr )
��System
* : * * # * * *ert *,r *�► : * * * *,v * *� * * * «* *FOR OFFICE U*tl, +lil.:
DW,* RTAW
A it JUN 2 ) 2007
*.� *�� *f * * * * * * *�►
TOWN OF VAIL
S5 Perngs re s4b)estos�enn_10-19-061=
10/19/06
Date: June 18, 2007
To: Town of Vail
75 South Frontage Rd.
Vail, Colorado 81657
From: MDR Corporation
10650 Irma Drive, Unit #15
Northglenn, Colorado 80233
(303) 457 -0502
Re: Attachment to asbestos abatement permit application
Job Address: Nine Vail Road Building, 9 Vail Rd., Vail, CO
Item #1: Attached is a copy of the General Abatement Certificate & State of Colorado
Certification.
Item #2: Contact Information
Onsite project manager: Nick Gonzales
Cell phone: 720 -581 -4643
Backup project manager: Marvin Shelbourn
Cell phone: 720 -581 -4641
MDR Corporation office phone: 303 - 457 -0502
Item #3: Start Date: 06/20/07 End Date: 07/20/07
Item #4: Disabling the air handling system and fire sprinkler system are not
applicable to this project. The fire alarm system has been put on heat
detect only.
Item #5: Site Plan (see drawings)
Note: Building will be vacant during the work.
Item #6: Note: Negative air machines are serviced on a regular basis. This is usually
done at the time when the HEPA filters are due for replacement. Most have been
serviced in the last six months depending on the hours they were in use. The age of the
machines range from three to six years.
Arm
� Per�oh�i �PC�+N
NcI4 -kioe .46- flkt hAe-
ICI Wyk l.oado ✓t
lei W�s� ,r,ct�l,er u;ill % Qq sl4<
rs
UNII x'.2
VNITM
1
UNIT 016
i
----------- - - - - -- is � � �
x
- L-------- - - - - --
along
we r In AD
--valloulair
X
;
j..e..
row �sesrw
AV
�ba-to- Mery SI h` PkI
N. ne licti 1
Q oat ( 2o2d
I
41/1-7/0 i I
�(1 erect i
' - Ab,,kme^k �N
� Persohei
j�A� Nty4 -*A' -J t
xxx ]FvJry, .9x;t 4 W tj fc 2oL.iv-
F;re exfi'vl3 u-fHrr
! ] Wc+k I- oado ✓i-
!i( WAS W- *mt' %per Will % 09 SI4<
exc -ef* fav joach"V.
lose oleo �60 lim
M\ 94 A\111;�Ml� -T 40
t
i
i
t
i
�1
UNIT 01.2
SAN
=.0= rl
lZNII H,, I" II � "!,T�
' 2od
� err «i
�_� -� o 1 Q U a 2
i �
UaCl CO
�LJ p�'rsctle.� V*�Cdn
1 Ay4 - ?.Je AI1I /1�ach�nc
xxx EhAry /
0 Fi•e
Q] Wl cL5 it L ecd o.j f
exert 4�je' (oad +•tp .
�I
UNIT MCI
0
UNIT «2s
RE
x
KALL Orr DO(m
IN NM.LK&Y
2 i"'T "I,
1 �
t
J S�COitd Plod
]11 +_ ' � _� I
Aba-- 4
ice(' Uai I toad
i UCL
I
i
b.e-i cmd
LL1.J PE'p Sc►1 r. ( Deco,
c}�
)cxx En-4 .ry/ J�:xt'f 14 Waff e
0 Fire £x�I�t,uiihe�
0 1.t31a5it Le"a cof
Note'.. Wacte 7rcu(Cr be o4f yffe
Im
UNIT 02 5
G)
M �mm,
1
o" om $e eo:td F ioc3':
f}brne Si
r
Nrn 11�i I 2oo-4
Un r 120 d
• f
uca �� Cd
1,7/op
i
i
SYSTEM
. �l
07/16/2007 11:22 FAX 3034570506 MDR CORPORATION
D'dR r MDR CORPORATION
10650 Ir ■a Drive, Unit 15
Northglenn. CO 80233
(303) 457 -0502
Fax (303) 457 -0506
14001/001
Date 7/— _� - Time, _S► 'Pm
Number of pages transmitted: 0e- S.__(1nc1udinR this cover page)
To fax number:- 97o
Please deliver all transmitted pages to:
Persona
Address:
City, State, Z x p - -- -- - -- -------- ._ - - -- _-
These pages 'are from:, M42r„��,
Remarks
- -, _ - - - - -- r - - - -1 j_fe�drl__,�.- - - - -,_ ----- - - - - -- - - - - -- -
06/14/2007 10:13 FAX 3034570506
'08/14/2007 09:20 3033405782
mw�
y =Cnml 4ccialists
MDR CORPORATION
ZYBERTRON TECHNOLOGI
fa 013/013
P4GE 01-
Phone (303) 34.0 5781
Fax (303) 34q-57-82
I r
i
ASBESTOS ABATEMENT VISUAL INSPECTION CERTIFY! ATJE
CONTRACTOR, MDR CORP
PROJECT LOCATION: 9 VAIL ROAD, FIRST FLOOR SOUTH MAIN
ENTRANCE AREA, HALL AND RENLAMILNG ROOM S AND ITNIT 16
VISUAL INSPECTION CONDUCTED ON: AUGUST 50 2007
CERTERED AIR MONITORING SPECIALIST: RUSSELL J. PERRON, 441
JOHN TAYLOR 23421
THE ABOVE CONTRACTOR. COMPLETED THE FINAL CLEAN PROCEDURE IN
THE ABATEMENT AREA AND PASSED THE FINAL VISUAL INSP TMON
AS REQT,. MED IN COLORADO DEPARTMENT OF PUBLIC HEALTH AND.
ENVIRONMENT, APCD REGULATION 8. GUIDELINES.
a
. � Lk
VA
8y:
o0p
11801 East 33rd Ave Unit C
Aurora, Colorado- 80010
www.zybertxor,corn
4/2007 10:13 FAX 3034570506 MDR CORPORATION 0012/013
- 00/14/2007 09:25 3033405782 ZYBERTRON TECHNOLOGI pgGg 02
ASBESTOS & ENVIRONMENTAL, MONITORING INC.
P.O. BOX 119
WHEAT'RIDGE, COLORADO -0179
(303) 458 -0264
Phase Contrast Microscope
Reporting Date- 08/5i2007
Client: MDR, CORD
Client Project location: 9 VAIL ROAD FIRST FLOOR SOUTH MAIN ENTRANCE
AREA, HALL AND REMAINING ROOMS AND �NIT 16/
NEDBO CONSTRUCTION
Project Description. ASBESTOS ABATEMENT SECOND HALF SOUTH OF FIRST
FLOOR
DATE ANALYZED . 8/5/2007
SAMPLE NUMBER LOCATION /DESCRIPTION
FQ1
IN HALL AREA NEXT TO WASTE LOAD OUT UNIT
F02
IN HALL. NEXT TO DECON UNIT
F03
IN UNIT 16 LIVING ROOM CENTER
F04
IN BED ROOM CENTER
F05
IN KITCHEN AREA NEXT TO DOOR
FINAL CLEARENCE AIR SAMPLES
SAMPLE
SAMPLE
SAMPLI✓
AIR
FIBERS/
FIBERS /;
FIBERS/
NUMBER
DATE
TYPE
VOL(L)
FIELDS
SQ MM
PER CC
F01
8/5/2007
FINAL
1275
18
22.9
0,Q07
F02
815/2007
FINAL
1275
19
24.2
0.007
F03
8/5/2007
FINAL
1275
15
19.1
0.006
F04
8i5i2007
FINAL
1275
15
19.1
0
F05
8/5/2007
FINAL
1275
14
17.8
-006
0,005
Only fibers greater than or equal to 5um with an aspect ratio of 3 -1 or greater ire
counted. A fiber count of 100 fields is considered by NIOSH to be a practical limit of
detection. Therefore, samples Aith less than 10 fibers per 100 fields are reported as less
Than (<) the value of the minimum reliable detection limit the d rata' e
FIASJ (F demple {P5} Excursion (EX) 4rea (area during
} ,�y�,
Flnal (F) _���iii �C
Analyst i
Note: Final air samples must "less than 0.01 fibers per cc of air" All air samples taken
were in compliance with the regulations. Lab (102109)
08/14/2007 10:13 FAX 3034570506
08/02/2067 10:53 3033405782
Pnvltbwhen - spocwists
MDR CORPORATION
ZYBERTRON TECHNOLOGI
la 011/013
PAGE 01
Phone(303)340 ; 5781
Fax (303) 340.57$2
AS13E'STOS ARATEMNT WSOAL INSPEMON CERTI ATE .
I
CONTRACTOR: Wll, C,ORP
i
I
PROJECT LOCATION: P VAIL ROAD, FIRST FLOOR SOUTH END
'VISUAL WSPEC110N CONDUCTED ON: JULY 31,200
CERTIFIED AIR MONITORING SPECIALIST: RUSSELL J. P RRONa 441
. t
THE ABOVE CO, N-TRACTOR COMPLETED THE FINAL CLEAN PROCEDURE IN
,TEE ABATEMENT AkEA AND PASSED THE FYNAL visUA.L I NSP4CTION
i
AS REQUIRED 1N COLORADO DEPARTMENT OF PUBLIC HEALTH A�D
ENVIRONMENT, APCD REGULATION 8. GUIDELINES. i
Authorized Sigdature
I
i
,I
I 1 801 East 33rd Ave Unit C
.Avzora, Colorado 80010 I
www.zybertron.com
1412007 1 1'- FAi+; 3034570506
06/0212007 10:53 303340579
MDR CORPORATION
ZYBERTRON TECHNOLOG7
ASBESTOS 5 LrNVIRObnONTAL MONITORING INC
P.O. BOX 179
WERATRIDGE, COLORADO -0179
(303) 458 -0264
PHASE CONTRAST MICROSCOPY
REPORTING DATE: 7/31/2007
Z0 10 /013
PAGE 04
CLIENT: MDR, CORP
PROTECT LOCATION:9 VAIL ROAD, VTAIL COLORADO
NEDBO CONSTRUCTION i
PROJECT DESCRIPTION: ASBESTOS ABATEMENT, FIRST FLOOR SOUTH END
DATE AKALY,ZED: JULY 31, 2007 j
SAMPLE
NUbMR
LOCATION/ DESCRIPTION
FO1
IN HALL
AREA NEAR D$CON
F02
IN HALL
ARRA NEXT TO
X47 AWR OUT
F03
IN NWLTH
EAST STAIRS
UNIT
F04
IN WEST
AREA UNIT
F05
IN END AREA
UNIT
Final
C16arenom
AIR SAMPLES
SAMPLE
NUMBER
rIBZRS
FIFI.DS
F /mm2
VOLUM
F /00
FOl
FINAL
14
100
17.8
1275
0.005
In HALF
area next to decon.
H'02
FINAL
16
100
24.3
i
1275
0.006
In HALL next to
waste OUt,
F03
FINAL
22
100
26.0
1275 i
0.006
Iii NORTH EAST stai=n unit .
F04
FINAL
14
100
17.8
1275 �
0.005
In WEST
unit.
F05
FINAL
16
100
22.9
1275 I
0.007
In END unit.
i
Analysis teas using Phase Contrast Microscopy under ti.e guidelines
of NIOSH methQd 07400 Revision #3, A minimum of ten fibers per
100 fields is naadad far reliable quantification . •gaEiplee with
less than 10 fibers per 100 fields are ,reported as 1 as than (LT)
the quantification limit.
(B) Baokground. (A) AxQa. (F) Final. (9X) Exaus�idri
(P) Breathing zone Personal (P.E.L.) 0.1
(bAiAL) 0.01 F /ca
Analysed by: C�
08/14/2007 10:13
FAX
3034570506
MDR CORPORATION
09/02/2007
10:53
3033405782
ZYBERTRON TECHN❑LOGI
f
Envuvamw SQ«ia'hsc5
fa 009/013
PAGE e2
Phone (303) 3,40 5781
fax (3 0) 3405782
t
C
ASBESTOS ABATEMENT VISUAL JNSPECTYON 'CERTIF�CATE
CONTRACTOR, MDR, CORP
i
PROTECT LOCATIONT: 9. VAIL ROAD, SECOND FLOOR
VISUAL INSFECTION CONDUCTED ON: JULY 14, 200.'7,
CERTIFIED AIR NIONITOR NG SPECIALIST- RUSSELL J. PERRON, �'44I-
1
THE ABOVE CONTRACTOR COMPLETED THE FINAL CLEAN PROCEbURE N .
THE ABATEMENT AREA AND PASSED THE FINAL VISUAL I NSPTCTION
AS REQUIRED IN COLORADO DEPARTMENT OF PUBLIC HEALTH AND
ENVIRONMENT, A.PGD REGULATION S. GUIDELINES. �
i
J'
orize Si a e
11 901 East 333rd Ave Unit C
Aurora, Colorado 80010
www.zybertron•aom t
CIO/14/20 i 10:13 FAQ' 3034570506
98!02;'2007 10:53 3033405782
MDR CORPORATION
ZYBERTRON TECHNOLOGI
ASBESTOS & ENVZRONMRNTAL MONITORING INC
P.O. BOX 179
WFKATRIDGM , COLOIUWQ-017 9
(303) 458 -0264
PHASE CONTRAST KICROSCOPY
REPORTING DATE: 7114/2007
CLIENT; MDR, CORP
PROJECT LOCATIONI :9 VAIL ROAD, VAIL COLORADO
NEDBO CONSTRUCTION
PROJECT DESCRIPTION: ASBESTOS ABAT NT, SECOND FLOOR'
DATE ANALYZED: JULY 14, 2007
SAMPLE
N( MISER
LOCATION/ DESCRIPTION
Fol
IN HALL CENTER AREA
F02
IN NORTH EAST
UNIT
V03
IN SOUTH UNIT
F04
IN NORTH WEST
STAIRS
ROB
IN NORTH WEST
UNIT 1
Final
Clearence
AYR SAMPLES
SAMPLE
NUMER
FIBERS FIELDS F /mm2
VOLtam
Vol
FINAL
18 100
22.9
1275
In HALT, center area,
F02
FzNA.L
18 100
22.9
1275
In NORTH EAST unit.
F03
FINAL
22 100
28.0
1275
In SOUTH un1t .
PO4
FINAL
14 100
17,8
1275
In NORTH WEST stairs.
F05
FINAL
16 100
20.3
1275
In NORTH WEST unit 1.
C� 008/013
PAGE 05
F /ae
0,007
0.007
0.008
0.005
0.006
Analysis was using Phase Contrast Mi,croscoPy under tie guidelines
of NYOSH method #7400 Revision #3, A minimum of ton fibers per
100 fields is needed for rel.iablfs quantification. Samples with
less than 10 fibers per 100 fields are reported as leas than (LT)
the quantification lin it.
(B) background., (A) Arma. (F) Final. (EX) Exaurdi.an
(P) Breathing Zone Personal (P.E.L.) 0.1 F/ca.
(bMAL) 0.01 F /cc
by-
77
Analyzed Anal {J
y
AIHA Lab ID #102109
08/14/2007 1012 FAX 3034570506
ZB/02/2007 10:53 3033405782
Y A
r.N
ppviid�SM[21 Sp[aisl{et9
MDR CORPORATION
ZYBERTRON TECHNOLOGI
la 007/013
PAGE 03
Phone (303) 340 5781
Fax (303) 340 -5782
ASIRESTOS ABATEMENT VISUAL INSPECTION CERTIFICATE
E ,
CONTRACTOR: MDR, CORP
PROJECT LOCATION•: 9 VAIL ROAD; SECOND FLOOR
VISUAL INSPECTION CONDUCTED ON: JULY 07, 2007.
CBRTIPIED AIR MONITORING SPECIALIST: RUSSELL J. PERRON, 441
THE ABOVE CONTRACTOR COMPLE'T'ED TBE FINAL CLEAN PROCEPURE IN
THE ABATEMENT AREA AND PASSED TIM FINAL VISUAL INSPECTION
AS REQUIRED IN COLORADO DEPARTMENT OF PUBLIC HEALTH Ar
ENVIRONMENT, 'APCD REGULATION 8. GUIDELINES.
i
4Autl�onzed S a ure
1801 East 33rd Ave Unit C
Aurora, Colorado 800I0
, vv w zybertron.com
08/14/2007 10:11 FAX 3034570506 MDR CORPORATION
Fax to: Town of Vail 970 - 479 -2452
Fax to: Vail Fire Department 970 -479 -2176
Date: ��-3 fd 7
Permit Number: j�,.j_a_d 7 - 64 j6
To: Town of Vail
75 South Frontage Rd.
Vail, Colorado 81657
From: MDR Corporation
10550 Irma Drive, Unit #15
NorthglenrL Colorado 80233
(303) 457 -0502
Re: Asbestos Abatement Completion Certification Letter
Dear Town of Vail:
The asbestos abatement has been completed at /UL,r e- ,fie,,'
n
• , Vail, Colorado,
If there are any questions please feel free to call.
Thank you,
MDR Corporation
Marvin Shelbourtx
President
Attachments:
1, Drawing of the area of abatement
2. Final Air Sample Results
3. Certification of Visual Inspection
P.S. Originals to be mailed today,
0001/013
kelend;
— — — Able 614 &e k
�] Per'ronel OecoK
x kx -Cr.try., Ek i 4 Wea �c f2ass �c
Fore acfemj uiihvr
l�llcs fc L oe d cal-,
i
. 1
an
000
`
GI
n
MIA
�
FT A
I�
�EIyL� V�ti�
I�
�EIyL� V�ti�
LES]
bl17/64
_
4e-jend
— - -
Abckme4 Are,
��'ronC� QP1 orti
X XX
FrAVY + :Zetr4L
t
S}2 �Mra�ti+lf L tit be G JIJZ
ekCW-VL+ fdv �04drkq,
'WAA
Fm 3cull-
w��t
xx
4540
L
me m
up 4m
T
cam*
r,
�litte V��l �
-
r0
Nz
1-.e� rKd
. 1
��s'T"+C 1}t�1' lr+QCsgrNC
U�oS�t Lid eat
E
'ice t
7
♦ \� \ \ \, \ \� \•�� \ \ \, \i \\
\ \� \\ \,111, \ \' 1\ \tt\ 1�
\ ti ti
-�f
N
p
V
I
r.i
'ice t
7
a
W
O
W
A
LYI
U'I
� � o
1
m
0
0
0
Olt
a
a
co
♦ \� \ \ \, \ \� \•�� \ \ \, \i \\
\ \� \\ \,111, \ \' 1\ \tt\ 1�
\ ti ti
MM�
Seca" FlooY
\
►
tv;fl re UR a l Qoa d
I
i
Lk tf CO
4/17
I
a
W
O
W
A
LYI
U'I
� � o
1
m
0
0
0
Olt
a
a
co
08/14/2007 10:12 FPX 3034570506 MDR CORPORATION
R006/013
,08/02,12007 10: 53 3033405782 Z'YEERTRFih TECHHOLCGI PAGE eb
i
ASBESTOS r, EMPA)NMENTAL MONITORIING INC
P.O. BOX 179
WHEATRIDGE, COLORADO -0179
(303) 459 -0264
PHASE CONTPA.ST MICROSCOPY
REPORTING DATE: 7/07/2047
CLIENT: MDR, CORP
PROJECT LOCATION:9 VAIL ROAD, VAIL COLORADO
NE13$0 CONSTRUCTION
PROJECT DESCRIPTION: ASBESTOS ABATEMENT, SECOND FLOOR
DATE ANALYZED: MYLY 07, 2007
SMWLE
NUMBER
LOCATION/ DESCRIPTION
i
M1
IN EAST LIVING ROOD
AREA
F02
IN SOUTH RATLINa UNIT 24
F03
IN NORTH BEDROOM AT
BATHROOM
WIT 27
F04
IN RAILING UNIT 27
F05
IN STARIS RAILING UNIT 26
Final
Clearenao
AIR SAMPLES
SA"LE
NUMBER
FIBERS FIELDS F /mm2
VOLUME
701
r.TwAL
14 100 17.8
1275
0.005
In EAST living roam area.
F02
FINAL
16 100 20..
1275
I 0.006
In SOUTH railing unit 24.
F03
FINAL
18 100 22.9
1275
0.007
In NORTH bedroom at bathroom
unit 27.
F04
FINAL
16 100 20.3
1275
0.006
In railing unit 27,
F05
IrINAL
14 100 17.8
1275
0
In StUira railing unit 26.
-005
bnnlysir was using Phase Contrast MicrCwcapy under the guidelines
Of NIOSH method #7400 Revision #3, A minimum of ten f�bexs per
100 fields is needed i'or r4liAble quantification. SQMP19S with
lane than 10 fibers per 100 field$ are reported as leis than (LT)
tho quantification limit.
(B) Background. (A) Area. (F) Final. (EX) Excurs�on
(P) Breathing Zone Personal (p . E . Z, .) 0.1 F /ca .
(D4AAL) 0.01 F /Qa ,•s
Analyzed by: �'.�' i k& 6
AIRA Lab In
#102109
i
i
A)'!!q-ft, -- .4 +Y• /17ac6-*Lc,
XXX G7wify f £xf'� M UuaLS 1'o�it
a F i .rc x tl��C v i1 r1C r
CIS W fs.s {t Lewd e.rt .
4 Wade- Tool(ar w;U 6c otf S�fie
- QKcrpt fog �oadA.tg, .
0
I - N
�,\� �;,�� >>�;\.��� ±\�•• �- ;. is ,
T
T
V
fecund Floor
}bae Site P?
j�1�r�c Uo�II Qoo..d I
t,?a L
j Q
1
4/17/a O o
. � w