Loading...
HomeMy WebLinkAboutF10-0100 ��� � FIRE PROTECTION LETTER OF TRANSMITTAL TO: Department of Community Development JoB NAIvtE: West Vail Fire Station #3 75 South Frontage Road 2399 North Frontage Road Vail, CO 80657 West Vail, CO 81657 DaTE: 5/28/11 JoB No. We are sending herewith: ❑ Plans ❑ For Approval ❑ Returned for Conection ❑ Specifications ❑ Approved as Noted ❑ For Distribution ❑ Shop Drawings ❑ Approved ❑ For Coordination ❑ Hydraulic Calculations ❑ Resubmit ❑ As Requested � Material&Test Cert. � For Information ❑ No.of Test Copies Date Title 1 4/5/11 Contractor's Material and Test Certificate for Aboveground Piping Remarks: Return NA copies of eacll drawing. Return NA sets of hydraulic calculations. If enclosures received are not as listed above, please notify us at once. FRONT RANGE FIRE PROTECTION, 1NC. BY: Margie Lewis 4007 South Lincoln Avenue■Suite 460■Loveland,Colorado 80537■Phone 970-663-3310■FAX 970-663-7331 -�/aasD NATIONAL Contractors Material and Test Certificate for boveground Piping ��,,,,�,�R A.Prceedure Upon completion of work,inspection and tests shall be made by th�contractor's representative and °'�OGU77ON'�"` witnessed by an owner's representative. All defects shall be corrected and system feft in service before contractor's personnel finally leave the job.A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure ro comply with approving authority's requirements or local ordinances. All "No"answers shall be explained in the Comments portion of this form. Property Name:\�u'; i �re+��n-rrcz�r„ Address: Z�`�� i1/ ,-f'- ' •�- - Date: Se-rJ�c�s 3 O. ests B.Plans � 1. All piping hydros[a[ically tested atw2r� psi for�_hours 1.Accepted by Approving Authorities(Names):V q� i �;�. 2. Dry piping pneumatically tested �Yes ❑No 2.Address: '� ( �.�;j��r;�c.�. 3.Equipment operates properly �Yes ❑No 3. Installation conforms to accepted plans es ❑No 4. Do you certify as the sprinkler contractor that additives and 4.Equipment used is approved ��Yes ❑No corrosive chemicals,sodium silicate or derivatives of sodium C.Instructions silicate,brine,or other corrosive chemicals were not used for 1.Has person in charge of fire equipment been testing systems or stopping leaks? �Yes O No instructed as to location of control valves and care and main[enance of this new equipment Ie�Yes ❑No 5. Drain Test: 2.Have copies of the following been left on the premises: a.Static pressure reading of gage a.System components instructions �Yes o No located near water supply connection ��psi. b.Residual pressure with b.Care and maintenance instructions dYes o No valve in test connection open wide �^ psi. c.NFPA 25 ❑Yes ❑No 6.Underground mains and lead in connections to D.Locatioo of system-Supplies building(s): p,�{-;ce bc1;Ic�rn�, risers flushed before connection made to sprinkler E.S rinklers piping and verified by copy of form No. 13-U ❑Yes O No Make Model Year Made Orifice uantity Temperature �.Flushed by installer of underground piping ❑Yes O No V�c+e�G 1I`7D .�•Io j�.�� �sJ 8. If powder driven fasteners are used in concrete, ��`��� ��� 2 �s-S- has representative sample tes[ing been satisfactorily completed? ❑Yes ❑No �/��v►� s(p s� �,3 /S� z v C) P.Blank Testing Gaskets 1. Number used: ��� V L7/D � �D �� ��S.S 2.Locations: � i c.o (3 t3� J�• (o // z!'Z 3. Number removed: �( Q.Welded Piping-If welded piping was used in the system, F.Pipe and Fittings complete the following: 1.Type of Pipe: SC�ec�vlr ��1 l.As[he sprinkler contractor,were welding procedures in 2.Type of Fittings t)L I,s-�cd -i-�ir•cd rd� �fv(�f a�� ��c{,en�rrl compliance with the requirements of at least AWS B2.1, G.Alarm Valve or Flow Indicator ASME Section IX or other required standards m Yes O No 2.Was welding performed by welders qualified in �1•l�'� ���(�e, �f . h��!� compliance with[he requirements of at least AWS B2.1, �t� �<<�5�,� i Eps jV ASME Section IX or other required standards �Yes ❑No H.Dry, -Pipe Valve � 3. Do you certify[hat welding was carried out in compliance Make,Model and Serial Number: '�����b��. /'��c�c� la with a documented quality control procedure to insure that I.Quick Opening Device(Q.O.D.) all discs are retrieved,openings in pipe are smooth,slag and Make,Model and Serial Number: /�/.�. other welding residue are removed,the intemal diameters of J.Dry-Pipe System Operating Test Without Q.O.D. p�p�ng are not penetrated,completed welds are free from cracks, 1.Time to trip through test connection*: incomplete fusion,surface porosity greater than 1/16 inch in 2.Water pressure psi. Air pressure psi. diameter,undercut deeper than the lesser of 25%of the wall 3.Trip poin[air pressure / ? psi. thickness or 1/32 inch,and the completed circumferential 4.Time wa[er reached[est oudet*: butt weld reinforcemen[does not exceed 3/32 inch?�Yes ❑No 5.Alarm opera[ed properly ❑Yes ❑No R.Cutouts(Disks) .Dry-Pipe System Operating Test With Q.O.D. Do you certify that you have a control feature to 1. 'me ro trip through test connection*: ensure that all cutouts(disks)are retrieved? ❑Yes O No 2.Wa pressure psi. Air pressure psi. S.Hydraulic Data Nameplate Provided O Yes O No 3.Trip po air pressure psi. T.Date left in service(with all control valves open): 4.Time wa[e ached tes[outlet*: U.Signatures Front Rang�Fire Protection 5.Alarm operate operly Yes O No 1. Name of sprinkler contractor: L.Deluge and Preactio Valves 2.Tests witnessed by: ��e 460 1.Make&Model: For propert owner(Signed • � 2.Operation: ❑Pneumatic O ectri Hydraulic Title: �t,'�'f' _.._, _ �a Da e: - !j' -I I For sprinkler contractor(Signed): =�'-�" " 2� 3.Piping and detecting media su ' ed OYes ❑No _,i ��( Title: �i^c,,�n.�„� [e:�L�� � 4.Does valve opera[e from ual trip a or V.Comments(This section is for additional explanation and notes. All remote control s[atio ❑Yes O No "No"answers must be explained here.) 5.Is there an access' e facility in each circuit for te ' g Yes ❑No 6.Does e circuit operate supervision loss alarm ❑Ye O No 7.D s each circuit operate valve release ❑Yes ❑ �.Q�1/8�1 tO GQP1A�C�fItfALkY . aximum time to operate release: �'1 G�pgepll��Qn�lm81'1�'$ M.Pressure Reducing V lve 1.Location and Floor: � sy 5-�"z.n h�+5er 2.Make and ModeL• 7�eo Pk il�� 3.Setting: 11S Static Pressure: Inlet ' si, Outlet �G si 4.Residaal Pressure(Flowing): Inlet �psi, Outlet �l, psi 5.Flow Rate: gpm N.Test Description � �l � Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi for R0119h-I� Date FiP191 � ��� � two hours or 50 psi above static pressure in excess of 150 psi for two �m��2 y�i,nn o �k �-.-���L� hours. Differential dry-pipe valve clappers shall be left open during tesE --�-- t �T'5�����_=� to prevent damage. All aboveground piping leakage shall be stopped. Pneumatic: Establish 40 psi air pressure and measure drop. Test � - --'�-r�� -r-�- pressure tanks at normal water level and air pressure and measure air �� C«-� jJ'�L�'3 �., pressure drop. In both cases,the pressure drop shall not exceed 1'/z psi in 24 hrs. /f�� ��6 *Measured from the time the inspector's test connection is opened ❑Check here if comments continue on the reverse side of this form OO 2007 National Fire Sprinkler Association,40 Jon Barrett Road Patterson,NY 12563(845)878-4200 Form 13-A,Page 1 of 1 TOWN OF VAIL FIRE DEPARTMENI' VAIL FIRE DEPARTMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-213 5 NOTE: TH1S PF,RMIT MUS�C BE POSTED ON JOBS[TE AT ALL TIMES SPRINKLER PERMiT Permit #: F10-0100 Job Address: 2399 N FRONTAGE RD W VAIL Status . . . : ISSUED Location.....: FIRE S"I�ATION #3 Applied . . : l 1/22/2010 Parcel No...: 2103 1 141 5019 Issued . . : O1/04/2011 Project No : Expires . .: OWNER TOWN OF VAIL 11/22/2010 75 S FRONTAGE RD VAIL CO 81657 APPLICANT FRONT RANGE FIRE PROTECTION 11/22/2010 Phone: 970-663-3310 4007 SOUTH LINCOLN AVE, STE. 460 LOVEL�IND CO 80537 License : 962-5 CONTRACTOR FRONT RANGE FIRE PROTECTION 11/22/2010 Phone: 970-663-3310 4007 SOUTH LINCOLN AVE, STE. 460 LOVELAND CO 80537 License: 962-5 Desciption: NEW "WET" AND "DRY" FIRE SPRINKLER SYSTEM WITH "TRAINING STANDPIPE" Valuation: $23,940.00 •*************r**»*rr#**�***s*s*e#*+#r*#ss##**+*+#****s:**##*«*+e##: FEE SU MMA R Y �**w#*a***s�r**�**r+**r***a*r**s****�**�**��******�*+***� Mechanical---> $o.oo Restuarant Plan Review--> $o,oo Total Calculated Fees---> $1,449.45 Plan Check---> $432.oo DRB Fee---------------------> $o.oo Additional Fees-----------> $1,449.45) Investigation-> $0.00 r0"IAL FEES--------------> $1,449.45 Total Permit Fee----------> $0.00 Will Call-----> $0.00 Payments-------------------> $0.00 [3ALANC[:DUG--------> $0.00 **«*..**+�**a***+***�**���+*�+++***s*****�*******�*��**«**�**���*****»***�***+*****�******�****�*s**************+**+**�+*�*�+*:*.*.*+�.**.*** Item: 05600 FIRE DEPARTMENT 12/30/2010 McGee Action: AP Approved on third resubmittal. Electronic : Lasierfische. CONDI"I'ION OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 53 (FIRE 2007) Monitored fire sprinkler system required and shall comply with NFPA 13 (2007) and VFES Standards . �:**�***,:«�*..*+***«««****«*.*.***«*..*,.«*.**,***«**************.*«*#**«*********�**�***�*+*******.**********�*.,.***,:.,�,:*,:*,*»*�*»:*�««**# DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. 1 agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zonin�and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970-479-2252 FROM 8:00 AM-5 PM. , � ��/" � u SI�',r�ATURE OF OWNER O ,CONTRACTOR FOR HIMSELF AND OWNEF