HomeMy WebLinkAboutB11-0004NOTE: THIS PERM/T MUST BE POSTED ON JOBSITE AT ALL TIMES
:
��vn� �
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT MF BUILD PERMIT Permit #: B11-0004
Job Address: 4506 SPRUCE WAY VAIL
Location......: SOUTH ELEVATION - UNIT 18
Parcel No....: 210112304018
OWNER KLEID, SUSAN M. 01/12/2011
2321 JASMINE ST
DENVER
CO 80207
APPLICANT BLUEPRINTCONSTRUCTIONLLC 01/12/2011
PO BOX 4350
193 SODA CREEK COURT
DILLON
CO 80435
License: 861-B
Phone: 970-333-1119
CONTRACTOR BLUEPRINT CONSTRUCTION LLC 01/12/2011 Phone: 970-333-1119
PO BOX 4350
193 SODA CREEK COURT
DILLON
CO 80435
License: 861-B
ARCHITECT K.H. WEBBARCHITECTS PC 01/12/2011 Phone: 970-477-2990
710 WEST LIONSHEAD CIR, UNIT A
VAIL
CO 81657
License: C000001627
Description:
ADD ONE SET OF STAIRS TO ACCESS LOFT AREA. ADD TWO NEW
WINDOWS (SOUTH ELEVATION)
Project #:
Status . . :
Applied . . :
Issued . .. :
Expires . ..:
PRJ10-0436
ISSUED
01 /12/2011
06/08/2017
08/23/2011
Occupancy: R2 Valuation: $17,000.00
Type Construction:ll-B Total Sq Ft Added: 0
....,.« .....................«...........,,,,,,.......,,......,........,........,. FEE SUMMARY ...,..............,.............,...«,....,...,...,..
Building Permit Fee---> $279.25 Will Cal Fee--------------------> $5.00 Total Calculated Fees------------>
Plan Check------ -> $181.51 Use Tax Fee------------------> $140.00 Additional Fees-------------->
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review----> $0.00 TOTAL PERMIT FEES---------->
Investigation-- > $0.00 Recreation Fee----------> $0.00
$605.76
$0.00
E605.76
Payments-------__ _____> 5605.76
Total Calculated Fees-------> $605.76 BALANCE DUE-----------> 50.00
rr:�w:w�ee�w,e,eR+e::eiNH��»�,r�w���:r.��xa+rw�+.xwv.���,vwxxrwkx�►:+ww+ww:�4:::�+wwww���:+�+x�w:�waw+aw��wwwxx�xxww:wexxx:ww::rwwe:�e�s.ri:rwxwvx�rww:r�rri�ww:,rxx,r�rw�xw��x�rirrs.xw��rrrrr
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
Signature of Owner or Contractor
Print Name
bld_alt_construction�erm it_041908
�'G'2d�1
Date
�n.twl.:�xxrr�w+vrn`+wx��.,':r:r,ere��e+►►:::�.,'wiir�rr+rwx,v�w�w,ti.x:xxwxvrxre�::x,e:n+w+w�xwx►wrnwrw:::x+w�xsn.iw,rxiwww�we���wtrr,rr.►�x�:::����::ewrw�v�xxww::,e,rnrrtrxx,r��++�+�:���,w.����+x���w,ri��
Permit #: 611-0004
APPROVALS
as of 06-08-2011
Status: ISSUED
w�:�t�ti�H�rree�xwww���xwtx�xxx►r:iirrxsx►+�++�w�w+��►::►��x�ixw:r��:ix��ww�+�wi+w�www+��rRxw�,r::w�v�xxxxxx,v+��,rrrw+���xwwwwkwr�xwxxxxxxi�ww�r�w�rr�s,r,r��,a��w�x„��w�as.xtxxw�.xxr�wr�:
Item: 05100 BUILDING DEPARTMENT
01/24/2011 JRM Action: CR THE FOLLOWING
ITEMS REQUIRE CORRECTIONS
1. INSULATION R-VALUE OF R49 REQUIRED, R30 CALLED OUT ON
PLANS (PAGE A101)
2. SPECIAL INSPECTION REQUIRED, (EPDXY STEEL)
3. EGRESS WINDOWS DO NOT MEET SILL HEIGHT REQUIREMET(44
INCHES) PLEASE PROVIDE INFORMATION AS TO WHY 2 NEW
WINDOWS CANNOT CONFORM TO 44 INCHES FROM FLOOR
4. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS MUST BE
SHOWN ON PLANS.
5. PLEASE PROVIDE ALL M,E,P DRAWINGS (3 SETS) FOR PLAN
REVIEW.
02/21/2011 JRM Action: AP
06/06/2011 JRM Action: AP
Item: 05110 ELECTRICAL REVIEW
02/21/2011 JRM Action: NO
REVIEW ( NOT INCLUDED)
Item: 05120 MECHANICAL REVIEW
02/21/2011 JRM Action: NO
REVIEW
Item: 05130 PLUMBING REVIEW
02/21/2011 JRM Action: NO
REVIEW
Item: 05400 PLANNING DEPARTMENT
01/14/2011 RFD Action: AP
02/23/2011 RFD Action: AP
NOT PART OF THIS
NOT INCLUDED IN
NOT INCLUDED IN
Item: 05600 FIRE DEPARTMENT
01/25/2011 McGee Action: AP Fire Dept approval
requires compliance with Bldg Dept comments.
Item: 05101 BUILDING DEPT REVISION
06/06/2011 JRM Action: AP
rxexwwxRxxr�:xiiwwriier»i�rw»�wi��wr�xwwwx��+��r�ttwrrrww�r��:�w�«�w:�:+.,r�+w�r�t:::�:�w�����+xxw�+R.xwxww��e..www:R.x�w::w.:wxw�.sn.exwwws.es.xrs.,ewws.xx,ex»�xsn.xwwwvxws..xxxxxxw�.xxxes.r
See the Conditions section of this Document for any that may apply.
bld_alt_construction�erm it_041908
iwrww�:��w,e►�wr�w�w�:wrx���er�wxxy.ww+xxx���r►t��:�www�+��w�+::�:��xttt�r��xi++��r�rrwwx►�*�ew�rrw�xx�::�xxwww::,+,r�wrww�wxr�wR�+�::��::�xs.�:::xxixx:x�xxx+x+xie�rw�ww�ii�::ewMKx�+rw�w
CONDITIONS OF APPROVAL
Permit #: B11-0004 as of 06-08-2011 Status: ISSUED
...............................................................................................,....,...,........,........,....,,..,,......,.,...,,........,.,.,.,...,,...,,..,......»
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
bld alt_construction�ermit_041908
TRANSMlTTAL FORM
Revision Submittals:
'I. "Field SeY' of approved pians MUST accompany revisions.
2_ No further inspections wiii be performed until the revisions are approved & the permit is re-issued. ;
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance_
s Permii #(s) information applies to:
�13-I ( Oo0 �(
project Street Address=
(Number) {Sfreet)
Buifding/Comptex Name:
Aitention: (�Revisions I
( } Respanse to -Correction Leiter
atiached copy of correction fetEer
( ) Deferred Submittai ,
( ) Other ,
(SuitE #)
� Confact lnform�tion:
' Company: 1��� � � li�✓ � Ol��� �� � "
�/ i
• Company Address_ � y� SCCr� ��i �e(c Ca�vz (
Ci'ry: �'r�(,pv✓ State: �U Zip: �d �
` Contact name: //" � � ��
; Contact Phone: ( �v � � � � � !
' E-Mai� W1�k�- �L+��-l�l�-��'I'Cc�J� °�f1v�f �
Cv,.�cv(� I', vv (
Revised ADDITIONAL Vaivations (Labor � Maferials}
i(DO NOT include original valuafion)
: Building:
� Plumbing
' Electncal
Mechanical:
Tetal:
Description / List of Changes:
,.�. i ,�� � �� i �
(use additional sheet ii necessary)
Date Received=
� C C� [� [l �!1
� MAY 2 6 �C�li
TOWN OF VA
NOTE: TH/S PERM/T MUST BE POSTED ON JOBS/TE AT ALL T/MES
.�
�ow�oFVn� �
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT MF BUILD PERMIT Permit #: B11-0004
Job Address: 4506 SPRUCE WAY VAIL
Location......: SOUTH ELEVATION - UNIT 18
Parcel No....: 210112304018
OWNER KLEID, SUSAN M. 01/12/2011
2321 JASMINE ST
DENVER
CO 80207
APPLICANT BLUEPRINT CONSTRUCTION LLC 01/12/2011
PO BOX 4350
193 SODA CREEK COURT
DILLON
CO 80435
License: 861-B
Phone: 970-333-1119
CONTRACTOR BLUEPRINT CONSTRUCTION LLC 01/12/2011 Phone: 970-333-1119
PO BOX 4350
193 SODA CREEK COURT
DILLON
CO 80435
License: 861-B
ARCHITECT K.H. WEBB ARCHITECTS PC 01/12/2011 Phone: 970-477-2990
710 WEST LIONSHEAD CIR, UNIT A
VAIL
CO 81657
License: C000001627
Description:
ADD ONE SET OF STAIRS TO ACCESS LOFT AREA. ADD TWO NEW
WINDOWS (SOUTH ELEVATION)
Occupancy: R2
Type Construction:ll-B
Project #:
Status . . :
Applied . . :
Issued . .. :
Expires . ..:
PRJ 10-0436
ISSUED
01 /12/2011
02/24/2011
08/23/2011
Valuation: $17,000.00
Total Sq Ft Added: 0
..............«..»...,.................,....................�.............,.,..,+ FEE SUMMARY ..,..,....,.....,...«...,......................................................
Building Permit Fee------> $279.25 Wili Cal Fee---------------------> $5.00 Total Calculated Fees-------------> $605.76
Plan Check--------------------> $181.51 Use Tax Fee---------------------> $140.00 Additional Fees-----------------------> $0.00
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES------------->
Investi ation-----------------> $605.76
g $0.00 Recreation Fee-----------------> $0.00
Payments------------------------------> $605.76
Total Calculated Fees--------> $605.76 BALANCE DUE-----------------------> $0.00
...............,...,......,,........,....,,...,._.,...,..........,..,......_,,................................�.............,,.........,,....,..................,.,.,..�.............,,.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
L - a j�'2011i
Signature of Owner Contractor Date
/vi- l (�'� �o rk `� `�l
Print Name
b I d_a It_co n st r u ct i o n_pe rm it_041908
...............<,.,.............,.........................,.,.,,,...................,,,............,,......�,......,..,.................�,.,......,........,,..,..........,...,,.,..,
Permit #: 611-0004
APPROVALS
as of 02-24-2011
Status: ISSUED
.............x....,.,.,.,...,....,..,...............,..,,.......................,..........,.,................,..»............,»..,..,...»,.,...,.,........,......,...............,,
Item: 05100 BUILDING DEPARTMENT
01/24/2011 JRM Action: CR THE FOLLOWING
ITEMS REQUIRE CORRECTIONS
1. INSULATION R-VALUE OF R49 REQUIRED, R30 CALLED OUT ON
PLANS (PAGE A101)
2. SPECIAL INSPECTION REQUIRED, (EPDXY STEEL)
3. EGRESS WINDOWS DO NOT MEET SILL HEIGHT REQUIREMET(44
INCHES) PLEASE PROVIDE INFORMATION AS TO WHY 2 NEW
WINDOWS CANNOT CONFORM TO 44 INCHES FROM FLOOR
4. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS MUST BE
SHOWN ON PLANS.
5. PLEASE PROVIDE ALL M,E,P DRAWINGS (3 SETS) FOR PLAN
REVIEW.
02/21/2011 JRM Action: AP
Item: 05110 ELECTRICAL REVIEW
02/21/2011 JRM Action: NO
REVIEW ( NOT INCLUDED)
Item: 05120 MECHANICAL REVIEW
02/21/2011 JRM Action: NO
REVIEW
Item: 05130 PLUMBING REVIEW
02/21/2011 JRM Action: NO
REVIEW
Item: 05400 PLANNING DEPARTMENT
01/14/2011 RFD Action: AP
02/23/2011 RFD Action: AP
NOT PART OF THIS
NOT INCLUDED IN
NOTINCLUDEDIN
Item: 05600 FIRE DEPARTMENT
01/25/2011 McGee Action: AP Fire Dept approval
requires compliance with Bldg Dept comments.
..................�...,,......,..,....,............,..,.,.,....�.,,.,..,..........................x.....,,>.�............,,.,,.«......�........,,,..,,..,..�. ��...............,......
See the Conditions section of this Document for any that may apply.
bld_a It_construction_permit_041908
+�+������+rxxxxxxxxxx..w+wwwww��wf��s�xx�:+xx.x�xw��x.ww.w+w••�w�+���+x�x�x�x�xx�x�xxx�wwxwww+�w.w�we������x�xr�x�xw����wx�ew�•+•ww�e�.wwwew.ewwwwww.•.w�.ww�ww�w��rx.w�+xwwr•.w��.xx
CONDITIONS OF APPROVAL
Permit #: 611-0004 as of 02-24-2011 Status: ISSUED
.................x,.............,....,,.,..,.........,,,,...,..,...........�.........,.......,..,,.,....,,..�..,...........,......,.,,,,,..,.............,...........................
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
b Id_a It_co n st ru ct i o n_pe rm i t_041908
***********************+************************************************�*******************
TOWN OF VAIL, COLORADO Statement
*****************+*******++**+*+*+*************�****************�**************************�
Statement Number: R110000130 Amount: $605.76 02/24/201112:36 PM
Payment Method: Check Init: LC
Notation: #3169 /
BLUEPRINT CONSTRUCTION CO LLC
-----------------------------------------------------------------------------
Permit No: B11-0004 Type: ADD/ALT MF BUILD PERMIT
Parcel No: 2101-123-0401-8
Site Address: 4506 SPRUCE WAY VAIL
Location: SOUTH ELEVATION - UNIT 18
Total Fees: $605.76
This Payment: $605.76 Total ALL Pmts: $605.76
Balance: $0.00
**************�**********************************************************+******************
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
PF 00100003112300
UT 11000003106000
WC 00100003112800
Description Current Pmts
------------------------------ ------------
BUILDING PERMIT FEES 279.25
PLAN CHECK FEES 181.51
USE TAX 4% 140.00
WILL CALL INSPECTION FEE 5.00
,
� � .,.
�� ..�:
!`
��� �1. ��,' .
�
Department of Community Development
�:. �; , 75 South Frontage Road
� �� 4�;;:��' ��.�.'� . .'�. . . ' Vail, Colorado 81657
5 - ~r. � , � -: . ;�'� Tel: 970-479-2128
+� . �` � ����� ' ' .�`.�' � Web: www.vaiigov.com
'�� �' ��,'� �`: � ° �"�� Development Review Coordinator
�: . �
, �` -' " ' �`
•� • _ ...�.�_
' �� '�� � ,,_,.�,
CONSTRUCTION PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address:
�� �x���� G��1-�'J ��
(Number) (Street) (Suite #)
Building/Complex Name: % i�✓!d�� 5��— ��
T� �..,v Jb.ti � S
Project #:
DRB #: ; L)�C� I L� a`��D�
Building Permit #: � � � � ��D y
Lot #: Block # Subdivision:
Contractor Information I ,
Business Name: ��LL1/LD/�/�� (�Ot�Sif7vci7�� u.C. Work Class:
Business Address: �93 SGX�i" �l�'�K ��� Type of Building:
City �Z G U�� State: L o Zip: $bY3� Single-Family O Duplex O Multi-Family O
�� K � Commercial (i�Other ( )
Contact Name:
Contact Pnone: 970 ` 3 3 3'/� �� wor�c Type:
Contact E-Mail: ��(�s�fzt,��i�l�'�f'1t"('cY�ik�.GTI�N (� � ���'
Contractor Registration Number: �� l_ ll -
Electrical
New ( ) Addition ( ) Alteration ( �/
X
OwnedOwner's Representative ignature (Required)
Project Information �
Owner Name: �U�/i�ll ��.�i � �
Parcel #: � � ���- � 0 3— ��^ � l
(For Parcel #, contact Eagle County Assessors Offlce at (970-328-8640 or vislt
www.eaglecounty.uslpatie)
Mechanical
Plumbing
Building
Interior (�xterior ( ) Both ( )
Wor{c Included
( )No
( )No
( )No
( )No
Valuation of
Plans Included Work
( )Yes ( No d0 O
( )Yes (� �BO U (
( )Yes ( No ae G
( )Yes ( )No ��>1aa
Value of all work being performed: $/%, OD U
(value based on IBC Section 109.3 & IRC Section 108.3�
Building Area (per IBC):
Detailed Scope and Location of Work: //��l% � Ser a� S���'L-j "�'O �CLC°S S Lel��
l4�2c�4 . 1�i�0 Z vr/ct,v t,.�; wr�v w-s
(USe additional sheet if necessary)
For Office Use Only:
Fee Paid:
Received From:
Cash Check #_
CC: Visa / MC Last 4 CC #
Auth #
exp date:
���Q'P, �l�05.'1l�
G� ��
/
Date Received:
� ���o��
JAN 1 1 ZQ11
TOV1l l� O F\�A I L
��
[ � {��
L .
State of Colorado
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testina reauired?
ANY building projects disturbing more than these threshold levels of buitding materials require asbestos testing:
One- and Two-Family Dwellings: 32 square feet
All Others (commerciat spaces, hotel rooms, etc): 160 square feet
Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including
multi-family/condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The
air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My proj falls into the category checked below:
Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (1 copies of test results included)
� Tested positive at more than 1%, requires abatement (1 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos-containing materials, so buildings of � age require testing.
• The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take efFect." - CDPHE
Asbestos test results should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO3 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 5 Frontage Rd
Fire inspectors@vailgov.com
970-479-2252
www, va i I g ov. co m
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303-692-3158
asbestos@state.co. us
www. cd p h e. state. co. u s
O1-Jan-1 I
�
-_Foothills
Environmentat, Inc.
Indust�ial Hyqiene, Safety & Environmental Services
January 5, 2011
Mr. Michael Rookey
Blueprint Construction Company
193 Soda Creek Court
Dillon, Colorado 80425
Re: Limited Asbestos Inspection at 4506 Spruce Way #18 in Vail, Colorado.
FEI Project No. AS11003
Mr. Rookey,
At your request, Foothills Environmental Inc. (FEI) conducted a limited asbestos inspection
of suspect asbestos materials that may be impacted during a proposed building renovation
at 4506 Spruce Way Unit #18 in Vail, Colorado. The limited inspection was conducted on
January 3, 2011. Mr. Derek D'Avignon, an asbestos inspector certified by the Colorado
Department of Public Health & Environment, conducted the limited asbestos inspection.
Aerobiology Laboratory, an independent laboratory accredited by the National Voluntary
Accreditation Program (NVLAP) and the American Industrial Hygiene Association
(AIHA) analyzed the samples utilizing Polarized Light Microscopy (PLM).
A limited bulk sampling of suspect acoustical ceiling texture was conducted to identify any
Asbestos Containing Material (ACM) that may be impacted by a planned renovation. An
ACM is defined by the EPA as a material with an asbestos content of greater than one
percent (1 %) by volume.
FEI did not inspect outside of the proposed scope of work, underground conduit, electrical
panels instruments or other appurtenances.
Foothills Environmental, Ina 1320 Simms Street, Suite 102, Golden, CO 80401 (303) 232-2660
I
DESCRIPTION
The building is a three story unit in a multi-family complex. The exact date of construction
is unknown.
BULK SAMPLE INSPECTION SUMMARY
Suspect Materials
At your request, only the acoustical ceiling texture on concrete was sampled for this
project.
Asbestos Containing Materials (ACM) Greater than 1%
• The acoustical ceiling texture on concrete contains 7% chrysotile asbestos.
The followin table summarizes the sam le results of the materials collected for this ro'ect:
Sample Material Description Sample Location Analytical
Number Results
4506-0 l
4506-02
4506-03
' = Multiple
Layers
Acoustical ceiling texture on concrete Top of stairwell 7% chrysotile
Acoustical ceiling texture on concrete Top of stairwell 7% chrysotile
Acoustical ceiling texture on concrete Top of stairwell 7% chrysotile
Copies of analytical results are attached to this report for your reference.
ND = None Detected
Note:
There may be additional suspect asbestos containing materials located under/behind
building materials that were not sampled as part of this limited inspection. If additional
suspect materials are discovered they should be presumed to be asbestos until sampling and
analysis proves otherwise.
CONCLUSIONS and RECOMMENDATIONS:
Removal, in accordance with the Colorado Department of Public Health and
Environment's (CDPHE) Regulation No. 8, is required of materials with an asbestos
content of greater than one percent (1 %) by volume that are friable or will be made friable
during renovation or demolition activities. Friable means that the material, when dry may
be crumbled, pulverized, or reduced to powder by hand pressure.
The one percent cut off is consistent with the definition of an Asbestos containing Material
(ACM) under the asbestos National Emission Standards for Hazardous Air Pollutants
(NESHAP). However, the OSHA standard has a definition for both "asbestos" and
"asbestos-containing materials." The (OSHA) definition of asbestos does not have a one
percent cut off, therefore, asbestos that is present in percentages less than one percent
Foothills Environmental, [nc. 1320 Simms Street, Suite 102, Golden, CO 80401 (303) 232-2660
2
continues to be covered by the OSHA Construction Standard, 29 CFR 1926.1101. A work
operation conducted in areas where the asbestos or asbestos product is below one percent is
an "unclassified" operation. The employer still must follow the requirements in paragraphs
(g)(1) [except (g)(1)(i)], (g)(2) and (g)(3) that describe engineering and work practice
controls operation.
Acoustical spray-on materials are classified as friable. These materials can be easily
damaged due to their lightweight physical consistencies. Abrasive or disruptive actions
such as drilling, and mounting of equipment, should not be employed due to the potential
for the generation of airborne asbestos iibers. Alterations to or the removal of these
materials requires adherence to all applicable local, state, and federal regulations
concerning asbestos removal and disposal.
LIMITATIONS
This document is not intended to be used as a bid document for the removal, repair,
encapsulation, enclosure, or Operations and Maintenance (O&M) of asbestos containing
materials. Foothills Environmental, Inc. can prepare asbestos abatement specifications,
scope of work, project design, and bid documents for this project at the client's request.
This document describes the locations and conditions of ACM identified in the facility
during the inspection. This report is limited to the scope of work identified in this report
and should not be construed to represent anything outside the scope of work.
This report should not be used as a bid document or Project Design as it does not include
components of the design requirements set forth in Colorado Regulation No. 8, Section
III.C.3
Please do not hesitate to contact me at (303) 232-2660 if you have any questions regarding
this report.
Best regards,
`~��- �
�
Derek D'Avignon,
Asbestos Inspector # 10177
Foothills Environmental, Inc. 1320 Simms Street, Suite 102, Golden, CO 80401 (303) 232-2660
3
�� �.
A�rxc>k�ic�lr�c:�y Lnk�c.�rxna���ry
ASSdC1ATCS, IhiCORPORATED
�s
Certiticate of Analysis
13949 W. Colfax Ave •
Suite 205
Lakewood, CO 80401
303232.3746
www.aerobioloav.net
ClientName Foott�ills Environmental, [nc_ ������� DateCollected: Ol/03/11
Street address 1320 Simrns St t.102 � Date Received: Ol/04/11
City, State ZIP Ciolden, CO 80401 Date Analyzed: Ol/04/i l
Attn: Derel: U'Avignon NVLAP Lab Code 200860-o Date Reported: O1/OS/11
Client Project Name: �S 11003 Spruce Way Project ID: 110081
Job ID:
Tesc Requesced: 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
Homo- Non-Asbestos Non-Fibrous Matrix
Sample Identification Layer
Physical Description of Sample/Layer geneous Asbestos Detected Asbestos Percentage Fiber Material Material
Client Lab Sam le Number Y� Percentage Percen e Percenta e Com osition
4506 110081-1 White Foamy Texture N 100% CHRY 7 93 C
4506 110081-2 PROGESSIVE
4506 110081-3 PROGESSIVE
,�'��'=�-,�; �',�.�..
— Fau�appe
Laboratory Analyst
4 �% � �.,. _._....�___
�: ; - _ ._ _- -__. .
i ��
am ump reys
Asbestos Laboratory Supervisor
A= Amosite cl = cluartz r= renrce
AC = Actinolite C= Carbonates B= Binder
AN = Anthophyllite G= Gypsum D=Diatoms
CHRY�hrysotile M = Mica
CR = Crocidolite T = Tar
TR = Tremolite NTR = Non-Asbestiform TR
Trac�Less Than 1% NAC = Non-Asbestiform AC
ND=None Detected
Page 1 of 2 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
�����
AFacabioloc�y Lahc�rra�<arty
A.SS(;IC;IAT Fi,. INC.:(.)t21�OIt41�F1:)
� �
Foothills F.n��ronmeutal. lu�
1320 Simms St. #102
Golden, CO 80401
Derek D'Avignon
Client Project Name: AS 1100. Spivice Way
Certificate of Analysis
<N
c�� Q�
NVLAP Lab Code 200860-0
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303232.3746
wv✓v+.aerobiok�ov. net
Date Collected: 01/03/11
Date Received: Ol/04/11
Date Analyzed: O1/04/11
Date Reported: Ol /OS/I 1
Project ID: 110081
Job ID
General Notes
• Negative indicates no asbestos was detected; the method detection limit is 1%.
♦ Trece or "<1" indicates asbestos was identified in the sample, but the concrntrarion is less than the method detection limit of 1%.
• All regulated asbestos minerals (i.e. chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite) were sought in every layer of each sample, but only those asbestos
minerals detected are listed. Amosite is [he common name for the asbestiform variety of the minerals cummingtonite and grunterite. Crocidolite is the common name used for the
asbestiform variety of the mineral reibekite.
♦ Tile, vinyl, Foam, plastic, and fine powder samples may contain asbesros fibers of such small diameter (< 0.25 microns in diameter) that these fibers cannot be dMected by PLM. For
such samples, more sensitive analytical methods (e.g. TEM, SEM, and XRD) aze recommended if greater certainty about asbestos content is required. Semi-quantitative bulk TEM floor
tile analysis is accepted under the NESHAPS regulations.
• These results are submitted pursuant [o Aerobiology Laboratory Associates, Inc.'s current terms and conditions oF sale, including the company's standazd warranty and limitation of
liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted.
♦ Unless notified in writing to return the samples covered by [his report, Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty (30) days
before discarding. A shipping and handling chazge will be assessed for the return of any samples.
Notes Reauired bv NVLAP
♦ This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Govemment.
♦ This rest report relates only to the items tested or calibrated.
• This report is not valid unless it beazs the name of a NVLAP-approved signatory.
• Any reproduction of this document must include the rntire document in order for the report to be valid. �
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.2323746
, a . /,
�
� REI�STRUCTURAL
STRUCTURAL CALCULATIONS
FOR
KLEID RESIDENCE
STAIR TO LOFT REMODEL
Ridgeview Sq. Townhouses #18
Vail, Colorado
�p REG S�.
�'� e��RF�' ���
o m��: �
c.y . �I 3 �• �,
:�� v .��,���
� • . � ��
; ..., ���,�:
. ���)/1��A1 '�r .. .
Prepared By:
REISTRUCTURAL
1801 Broadway, Suite 250
Denver, CO 80202
303-575-9510
August 23, 2010
700 17th SL•eet : Suite 1500 j Denver, CO 80202 ;.-4 303.575.95Y0 ;_':� 303.575.9515
0150 East Beaver Creek Blvd. ; Unit 204A, PO Box 8009 € Avon, CO 81620 t-'; 970.748.0711 ,�': 570.748.0722
AGE
� �p� �- �`�,'
NI�D ����j
�.
�
TY WALL T`
SEPARATiON)
0
m
. � i!; y �
�"; :
� 6��, R ��
` �
< <P , , �
• • ( � � � < � �
, _ . _
, Q-
6�_8�� H AD
HT. REQ IRED
�Q
1
� ��
u
�
-PRECAST
B LO
� _ � >>
i �Id
�
�
N
IS RS @ 7.31 "
� r� � � � r. »
f STORAGE CLOSET
�����
EXISTING SPACE AND CONSTRUCTION -
WILL NOT ALLOW A REDUCTION IN
���
�
�
�
36" HANDI
PER IBI
PARTY WI
(I HOUR SEPA
�
Job Title: �-' `.- ' ° _ _ _ .__ � � ;�� _
Job no.: Sheet of
Subject: By: _ �- Date: � �� / o
,� '�„_ - ._...• 7 � %' {� ,, h.i`.1 D e i.l �: %
��/; J —``. �r E: � � � �� {' T '_ .
.
c. `� � a
� .: ��r-�( '?C..--- '� � , � r'�_.� , - �
,r c?�� �'>
�I � � �N G •� G�'J �?,. F
'_ .: �.r ,�j! ..(-� - � - f� L'
'.
� � -�
_ �` 'r�r� ` • . -�>� W , J r �
���' .. . � ?� � , � ,�:-, � . � � „ ..
i ` Y, /. � �-.+ ✓
n � � `t
--= � • � ` ''/ ��� �
_� I 3 4
,, �,�, ,
� �� �� -
, �
'��.,� ��
I--7 � i �
�.v.__.,. ,
� ,
'Ijoo f� . �,�,.� �,_r-i� f,!- �z, noT G�
��'�-nr�`� ,�.�-'�f'— 1 'J F �
. . ��_ ,_,__�`';, = O'�— (_i4�--'.D f� S �
` � i= 9� ,/,c� = /, s�s�� = a3 r��r=
��-r_-�:�_.:' ` 7S!� .=�._- �-�F
?-�z--t. � .-� L f %.� `; �
�-��--s�� ; ! - s. �5� � � -7 s-�n_ � �� �� -���_,-� �./ -�
. %U3 �-F.
� 3� �� � 1¢ ('-1 ��� �
'1 rI -
,,
._._ � . � �� - �.
Job Title:
-*t,i I � et�� ,- �
�.��.,�J:., .�.` �
,,�r�s
;�J = _ -, � �-�- - - r
�, � �.� � � � r
'" � f . . �r-a ;';.; .
—.-,-------
---- �=
r---
��
�;�; . / :
,; n
r c� �; /i
s;�n.c . <
�-+��� � ?f'^ �'a,:'`�!°. ..
\ j;
i
i
�
/
Job no.: Sheet of
�f C � .�"' L
/ I �-:.� .; n �! (
✓Vf V � �!�'=� . �; . `"ti,. � � f.��, if�, �— .y;-"� F.aI.. . _ '
� � � � �):, a��'f ..�
�- ' . , ~ �'�k>
� � _ �,
� � ,_ � _ .
� - � -, ._. � ' :
Date:
2� 5�. - .
II Job Title: Job no.: Sheet of �I
i
� Subject: By: Date:
� / �= `:- (G
� -_ `_ ..�r �
. •, 1 1 f: �_� (,_„ , .J ' :
J "?� • �'"' '
J ° •:�� . _
)<<y , ' :r , ""' r .; , ��
C.
I.� . ' � ' •° � ,- -
'�' i �"c
I �
i � W
�
��V
� �1
��� C
� � .. '�-
, �� �` � . . - �: . .
� a r� ,� f�.. ,�:
��r: e - . `CT�!.1 �,�� .
'�� -� �4op.r-
r�. r
� �� 7i7o � i�..��?;(�,�
� ' i 2. . k-
X
_ _ ^:r _
--X-
i
I
, l�� � I�
��, � �.,�,,, � '�
L/
/
�
T i -- .,� d �; ,
� ,�
I!/ 4�i/� �J
� � I �, �
' � -� � � � � �v_ o�
' ��S% l�i¢k14� ���
�v /'�-- �L �r � -
�
�
Job Title:
I r/ __
�-? �
L-- ;z'
/ ' y r=
:�.� �. �
� �vr-' [� . {,_ �C `. -� %J
!! ' �a
� ._ :
!�..) -� � Z,S��%��� � � �� �'_r_
�t
�� �v ��
I � ! '
� •� � � s '
�
� �
� ! I ---�
� "' -� �%' � � ,, • . : �
Job no.: Sheet
'�� � ,. � ��
�/� � ; ,,%j ti�
��� � - I a �
G�x�. �
Date:
m
� � � Title : Job #
Dsgnr: Date: 5:12PM, 16 AUG 10
Description :
Scope :
User KW-0602563, Ver5.8.0, 1SJun-2007 Steel Beam Design Page 1
�(c)1983-2007 ENERCALC Engineering Software kleid stair ec,wCalculations �
Description Edge Beam 8
�enerai intormation
Steel Section : C6X8.2
Center Span 12.00 ft
Left Cant. 0.00 ft
Right Cant 0.00 ft
Lu : Unbraced Length 0.00 ft
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
rY 50.00 ksi
Pinned-Pinned Load Duration Factor 1.00
Bm Wt. Added to Loads Elastic Modulus 29,0OO.Oksi
LL 8� ST Act Together
Distributed Loads Note! Short Term Loads Are WIND Loads. �
#1 #2 #3 #4 #5 #6 #7
DL 0.260 0.183 0.100 ��
LL
ST
Start Location 3.500 5.500
End Location 3.500 5.500 12.000
Using: C6X8.2 section, Span = 12.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Actuai Allowable
Moment 2.889 k-ft 11.962 k-ft
fb : Bending Stress 7.970 ksi 33.000 ksi
fb / Fb 0.242 : 1
Shear 1.231 k 24.000 k
fv : Shear Stress 1.026 ksi 20.000 ksi
fv / Fv 0.051 : 1
k/ft
k/ft
ft
ft
Beam OK
Static Load Case Govems Stress
Max. Deflection -0.195 in
Length/DL Defl 736.8 : 1
Length/(DL+LL Defl) 736.8 : 1
; Force � Stress Summary i
«- These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Onlv Center Center Cants Cants
Max. M+ 2.89 k-ft 2.89 k-ft
Max. M - k-ft
Max. M @ Left k-ft
Max. M @ Right k_�
Shear @ Left 1.23 k 1.23 k
Shear @ Right 0.79 k 0.79 k
Center Defl. -0.195 �� -0.195
Left Cant Defl 0.000 in 0.000
Right Cant Defl 0.000 in 0.000
...Query Defl @ 0.000 ft 0.000
Reaction @ Left 1.23 1.23
Reaction @ Rt 0.79 0.79
Fa calc'd per Eq. E2-1, K'Ur < Cc
I Beam Passes Table B5.1, Fb per Eq. F1-1, Fb = 0.66 Fv
0.000 -0.195
0.000 0.000
0.000 0.000
0.000 0.000
1.23
0.79
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
k
k
A
,�,0
E
WALL
PARATII
/ �
5 �o
��� �<- �"c�w���S �
9�tt2 DF� N6. 1 �- (!o
F�2 Q
�r
O • c' •
36" HA
PER
PARTY
OUR SI
��) �� ���►'�i
Z�cz ��c �• t � �G �
r
Forte MEMBER REPORT Level, (E) RoofJoist
software 1 piece(s) 2 x 12 Douglas Fir-Larch No. 1@ 16" OC
Overall Length: 12' 7'
+
0 �
12 � _
0� �
�, 12' i.:.:
n
All Dimensions are Horizontal; Drawing is Conceptual
Design Resuits Actuaf � Location Allowed Result LDF
Member Reaction (ibs) 965 @ 2 1/2" 2231 Passed (43%) --
Shear (Ibs) 776 @ 1' 2 3/4" 2025 Passed (38%) 1.00
Moment (Ft-Ibs) 2837 @ 6' 3 1/2" 3032 Passed (94%) 1.00
Live Load Defl. (in) 0.217 @ 6' 3 1/2" 0.406 Passed (U672) --
Total Load Defl. (in) 0.250 @ 6' 3 12" 0.608 Passed (U584) --
u
System : Roof
Member Type : Joist
Building Use : Residential
Building Code : IBC
Design Methodology : ASD
Membe� Pitch: ON2
PASSED
• uenecuon cn[ena: u(u3so) antl TL (v240).
• Design results assume a fully braced condition where sheathing is properiy nailed to all compression edges at the top of the joist and that the compression edges at the
bottom of the joist are properly braced to provide lateral stability.
• Bracing (Lu): All compression edges (top and bottom) must be braced at 3' 2 7/8" o/c unless detailed othenvise. Proper attachment and positioning of lateral bracing is
required to achieve member stability.
• A 15% increase in the moment capacity has been added to account for repetitive member usage.
• Dimension lumber analysis is in accordance with 2005 NDS methodology.
Supports Total Availa6le Required Support Reactions (Ibs)
Bearing Bearing Bearing Dead t Floor / Roof / Snow Accessories
1- Stud wall - Spruce Pine Fir 3.50" 3.50" 1.51" 126 / 839 / 0/ 0 Blocking
2- Stud wall - Spruce Pine Fir 3.50" 3.50" 1.51" 126 / 839 / 0/ 0 Blocking
• Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Floor Roof
L08dS Location Spacing Dead Live Live Snow Wind Seismic Comments
(0.90) (1.00) (nonsnow:1.25) (1.15) (1.60) (1.60)
1- Uniform(PSF) 0 to 12' 7" 16" 15.0 100.0 0.0 0.0 0.0 0.0 Snow
iLEVEL� Notes
iLevel�warrants that the sizing of its products will be in accordance with iLevel� product design criteria and published design values.
iLevel� e�ressly disclaims any other warranties related to the software. Refer to current iLevel� literature for installation detaits.
(www.iLevel.com) Accessories (Rim Board, Blocking Panels and Squash Blocksj are not designed by this software. Use of this software is
not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record,
builder or framer is responsible to assure that this calculatio� is compatible with the overall project iLevel� products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards.
The product application, input design loads, dimensions and support information have been provided by Forte SoRware Operator
ForteTM Software Operetor
Jonathan Reid
REI SVuctural
(303) 575-9510 x 13
j reid@rei-structural.com
Job Notes
(Z� SUSTAINABLE FORESfRY INITIATIVE
l
8126/2010 5:03:48 PM
iLevelO ForteTM v1.3, Design Engine: V4.13.0.2
Kleid Stair.4te
Page 1 of 1
�
I�� � FOit@ MEMBER REPORT Level, Roof.• Joisf
ti+�.i�� software 1 piece(s) 2 x 6 Douglas Fir-Larch No. 2@ 24" OC
Overall Length: 5' 7'
+
0 �
12
0�
�, 5' I
n
All Dimensions are Horizontal; Drawing is Conceptual
❑'�
Design Results Actual @ Location Aliowed Result LDF
Member Reaction (Ibs) 575 @ 3 1/2" 5625 Passed (10°/a) --
Shear (Ibs) 470 @ 9" 990 Passed (47%) 1.00
Moment (Ft-ibs) 719 @ 2' 9 1/2" 848 Passed (85%) 1.00
Live Load Defl. (in) 0.085 @ 2' 9 1/2" 0.167 Passed (L/710) --
Total Load Defl. (in) 0.097 @ 2' 9 1/2" 0.250 Passed (U617) --
System : Roof
Member Type : Joist
Buiiding Use : Residential
Building Code : IBC
Design Methodology : ASD
Member Pitch: 0/12
PASSED
• ueneaion cn[ena �� (u36o) antl TL (U240).
• Design results assume a fully braced condition where sheathing is properly nailed to aIl compression edges at the top of the joist and that the compression edges at the
bottom of the joist are properly braced to provide lateral stability.
• Brecing (Lu): All compression edges (top and bottom) must be breced at 5' o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required
to achiere member stability.
• A 15% increase in the moment capacity has been added to account for repetitive member usage.
• Dimension lumber analysis is in accordance with 2005 NDS methodology.
Supports Totai
Bearing
1- 5 1/2" Beam - Spruce Pine Fir 3.50"
2- 5 1/2" Beam - Spruce Pine Fir 3.50"
Connector: Simpson Strong-Tie Connectors
Support
1 - Top Mount Hanger
2 - Top Mount Hanger
Loads
1 - Uniform(PSF)
Model
Connector not found
Connector not found
Location Spacing Dead
Available
Bearing
Hanger
Hanger
Top Nails
N/A
N/A
Floor Roof
Live Live
0 to 5' 7" � 24" � 15.0 � 100.0 � 0.0
Required
Bearing
Hanger
Hanger
Face Nails
N/A
N/A
Snow
(1.�5)
0.0
Support Reactions {Ibs) Accesso�ies
Dead / Floor / Roof / Snow
84/558/0/0 None
84/558/0/0 None
Member Nails Accessories
N/A
N/A
Wind � Seismic I Comments
�� �� �
iLEVEL� Notes
iLevel� warrants that the sizing of its products will be in accordance with iLevel� product design criteria and published design values.
iLevel� e�ressly disclaims any other warranties related to the software. Refer to current iLevel� literature for installation details.
(www.iLevel.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is
not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record,
builder or framer is responsible to assure that this calculation is compatible with the overall project iLevel� products manufactured at
Weyerhaeuser Tacilities are third-party certified to sustainable forestry standards.
The product application, input design loads, dimensions and support information have been provided by Forte Software Ooerator
ForteTM Software Operetor Job Notes
Jonathan Reid
REI SVuctural
(303) 575-9510 x 13
jreid@rei-structural. com
(Z� SUSTAINABLE FORESTRY INITIATIVE
1
8/26/2010 5:02:12 PM
iLevelOO ForteT"' v1.3, Design Engine: V4.13.0.2
Kleid Stair.4te
Page 1 of 1
.
'�, � Forte MEMBER REPORT Level, Header
"��Yr�iii software 1 piece(s) 1 3/4" x 11 1/4" 1.9E MicrollamO LVL
Overall Length: 7' 7"
' +
0 �
- �.
*F, -
12
0�
I. 7' i
i❑
All Dimensions are Horizontal; Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF
Member Reaction (Ibs) 2434 @ 3 1/2" 7875 Passed (31%) --
Shear (Ibs) 1782 @ 1' 2 3/4" 3741 Passed (48%) 1.00
Moment (Ft-Ibs) 4260 @ 3' 9 1/2" 8069 Passed (53%) 1.00
Live Load Defl. (in) 0.105 @ 3' 9 12" 0.233 Passed (U802) --
Total Load Defl. (in) 0.121 @ 3' 9 1/2" 0.350 Passed (U692) --
❑F�
PASSED
System : Roof
Member Type : Flush Beam
Building Use : Residential
Building Code : IBC
Design Methodology : ASD
Member Pitch: ON2
• uenecuon cntena: �� �u3so) and T� (�/240).
• Design results assume a fully braced condition where all compression edges (top and bottom) are properly braced to provide lateral stabifity.
• Bracing (Lu): All compression edges (top and bottom) must be braced at 7' o/c unless detailed othenvise. Proper attachment and positioning of lateral bracing is required
to achieve member stability.
Supports
1- 11 1/4" Beam - Spruce Pine Fir
2- 11 1/4" Beam - Spruce Pine Fir
Total Availabie Required
Bearing Bearing Bearing
3.50" Hanger Hanger
3.50" Hanger Hanger
Support Reactions (Ibs)
Dead / Floor / Roof / Snow
360/2275/0/0
360/2275/0/0
Accessories
None
None
Connector: Simpson Strong-Tie Connectors
Support Model Top Nails Face Nails Member Nails Accessories
1- Top Mount Hanger WPU1.81/11.25 3-16d common 4-16d common 6-10d x 1-1/2
2- Top Mount Hanger WPU1.81/11.25 3-16d common 4-16d common 6-10d x 1-1/2
Tributary Floor Roof
Loads Location Width Dead Live Live Snow Wind Seismic Comments
(D.90) (1.00) (non-snow:1.25) (1.15) (1.6D) (1.60)
1- Unrform(PLF) 0 to 7' 7" N/A 90.0 600.0 0.0 0.0 0.0 0.0 Snow
ILEVEL� NOtBS � �. � , �� . �. � �� (Z� SUSTAINABLE FORESTFn' INITIATIVE
l
iLeoel� warrants that the sizing of its products will be in accordance with iLevel� product design criteria and published design values.
iLevel� e�ressly disclaims any other warranties related to the software. Refer to current iLevel� Iiterature for installation details.
(www.iLevel.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is
not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record,
builder or framer is responsible to assure fhat this calculation is compatible with the overall project iLevel� products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards.
The product application, input design loads, dimensions and support information have been provided bv Forte Soflware Ooerator
ForteTM Software Operdtor Job Notes
Jonathan Reid
REI SVuctural
(303) 575-9510 x 13
j reid@rei-structural.com
8/26/2010 5:02:53 PM
iLevelO ForteT"" v1.3, Design Engine: V4.13.0.2
Kleid Stair.4te
Page 1 of 1
��' � FOit@ MEMBER REPORT Level, Edge Beam
-•+i�i� software 2 piece(s) 1 3/4" x 11 1/4" 1.9E Microllam0 LVL
Overall Length: 12' 7'
+
0
0
12
0�
� 12 i.:
�
All Dimensions are Horizontal; Drawing is Conceptual
��.1
PASSED
Design Results Actual @ Location Ailowed Result LDF System : Roof
Member Reaction (Ibs) 2422 @ 2" 3347 Passed (72%) -- Member Type : Flush Beam
Shear (Ibs) 2281 @ 1' 2 3/4" 7481 Passed (30%) 1.00
Building Use : Residential
Moment (Ft-Ibs) 10718 @ 5' 3 1/2" 16137 Passed 66% 1.00
� � Building Code : IBC
Live Load Defl. (in) 0.301 @ 6' 2 1/16" 0.408 Passed (U489) --
Design Methodology : ASD
Total Load Defl. (in) 0.353 @ 6' 2 1/16" 0.613 Passed (U416) -- Member Pitch: 0/12
• Deflection criteria: LL (U360) and TL (L/240).
• Design results assume a fully braced condition where all compression edges (top and bottom) are properly braced to provide lateral stability.
• Bracing (Lu): All compression edges (top and bottom) must be braced at 12' 4 1/2" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is
required to achieve member stability.
Supports Totat Available Required Support Reactions (Ibs)
Bearing Bearing Bearing Dead I Floor / Roof / Snow
1- Stud wall - Spruce Pine Fir 3.50" 2.25" 1.63" 376 / 2058 / 0/ 0
2- Stud wall - Spruce Pine Fir 3.50" 2.25" 1.60" 372 / 2029 / 0/ 0
• Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed.
Tributary
LOadS Location Width
1- Uniform(PSF) 0 to 12' 7"
2- Uniform(PSF) 5' 3 1/2" to 12'
���
3- Point(Ib) 5' 3 1/2"
�
�
N/A
Floor Roof
Dead Live Live
(0.90} (1.00) (non-snow:7Z5)
15.0 100.0 0.0
15.0 100.0 0.0
315 2100 0
Snow Wind
(1.15) (1.60)
0.0 0.0
0.0 0.0
0 p
Accessories
1 1/4" Rim Board
1 1/4" Rim Board
Seismic � Comments
0.0 Snow
0.0 Snow
0
iLEVEL� Notes
iLevel� warrants that the sizing of its products will be in accordance with iLevel� product design criteria and published design values.
iLevel� e�ressly disclaims any other warranties related to the software. Refer to current iLevel� literature for installation details.
(www.iLevel.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this soflware is
not intended to circumwent the need for a design professional as determined by the authority having jurisdiction. The designer of record,
builder or framer is responsible to assure that this calculation is compatible with the overall project iLevel� products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards.
The product application, input design loads, dimensions and support information have been provided by Forte Software Operator
ForteT"' Software Operator
Jonathan Reid
REI Structural
(303) 575-9510 x 13
j reid@rei-structural.com
Job Notes
(l� SUSTlUNABLE FORESTRY INITIATIVE
l
8/26/2010 5:07:50 PM
iLevelO ForteT"' v1.3, Design Engine: V4.13.0.2
Kleid Stair.4te
Page 1 of 1
��2 �.
�
09-2G-2011
. _ r� r � .v
, � �
Inspection Request Re�orting
• w /1 _ L . /1
Requested Inspect Date: Wednesday, September 21, 2011
Inspection Area: JRM
Site Address: SOU HPELEVATIONV U�NIT 18
.
Nage �
A/PID Information
Activity: B11-0004 Type: A-MF Sub Use: I�I BF Insp Area: jRM ED
Const Type: Occupancy:
Owner: KLEID, SUSAN M.
Contractor: BLUEPRINT CONSTRUCTION LLC Phone: 970-333-1119
Architect: K.H. WEBB ARCHITECTS PC Phone: 970-477-2990
Description: ADD ONE SET OF STAIRS TO ACCESS LOFT AREA. ADD TWO NEW WINDOWS (SOUTH ELEVATION)
Re uested In ction s
�` Requested Time: 08:00 AM
Ite�534 PLAN - FINAL C/O � Phone: 970-333-1119 -or- 970-333-
R ques or: BLUEPRINT CONSTRUCTION LLC 1119
\ �
Comments: 333-1119 Entered By: JMONDRAGON K
Assigned To: BGIBSON Time Ex
Action: p�
Item: 90 BLDG-Final
Requestor: BLUEPRINT CONSTRUCTION LLC
Comments: 333-1119
Assigned To: J GON Time Exp:
Action:
Comment: lanning to s'ign offturned ends
Item: 190 ELEC-Final
Requestor: BLUEPRINT CONSTRUCTION LLC
Comments: 333-111
Assigned To: AGON Time Exp:
Action:
Comment� e ne
�
,���
�
Inspection Historv
Item: 226 FIRE DEPT. NOTIFICATION
Item: 10 BLDG-FOOTING
Item: 20 BLDG-Foundation/Steel
Item: 410 Special Inspect-progress rept
Item: 190 ELEC-Final
09/14/11 Inspector: sgremmer
Comment: Label panel �* A roved ""
Item: 120 ELE���19���hlnspector: sgremmer
Comment: ** A roved ""
Item: 200 ME�C��19%11ghlnspector: sgremmer
Comment:
REPT131
Requested Time: 03:00 PM
Phone: 970-333-1119 -or- 970-333-
1119
Entered By: JMONDRAGON K
Requested Time: 02:30 PM
Phone: 9�0-�333-1119 -or- 970-333-
Entered By: JMONDRAGON K
Action: DN DENIED
Action: AP APPROVED
Action: AP APPROVED
Run Id: 13537