HomeMy WebLinkAbout2004 Submittal Applications & Materials - WithdrawnSolaris (Crossroads)
Special Development District No. 39
2004 Submittal Applications and Materials
SDD, CUP, & Design Review Applications
Withdrawn Action Forms
PEC04 -0060 & 0066
DRB04 -0396 & 0621
For Historic Reference on the applications that
were withdrawn.
� C
1l
Mauriello Planning Group
August 9, 2005
Warren Campbell, AICP
5enior Planner
Town of Vail
75 South Frontage Road
Vail, Colorado 81 G57
Re: Withdrawal of 5pecial Development District Application for Crossroads
Dear Warren:
It 15 with regret and sadness that I deliver this letter to the Town of Vail today.
The Crossroads redevelopment team has deeded to withdraw the application for
a Special Development D15trict for the Crossroads property in Vail. The
application to the Town was made originally in August of 2004 and the team
worked tirele551y through the Town'5 review process for over 12 months. The
redevelopment plan was modified repeatedly to address 155ue5 raised by Staff,
the Planning and Environmental Commission, and the Town Council. The project
ultimately received Town staff support and unanimous Planning and Environmental
Commission approval.
We appreciate the efforts of the Town staff, the Town's consultants, and the
Planning and Environmental Commission in helping u5 craft and develop the
Crossroads project. We worked diligently to address concerns raised by the
Town Council during the process but now find ourselves confused and
d5appointed in not bung able to reach a consensus with the Town Council. In
light of this uncertainty we feel we have no choice but to withdraw the
Crossroads Redevelopment project. We can assure you that this deci5ion was
made after careful thought and consideration.
Thank you for the time you spent working with us.
51 er ,
Dom is "o
President
AN
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970 - 479 -2138
March 31, 2005
FAX 970 - 479 -2452
www.vailgov.com
Peter Knobel
143 E. Meadow Drive
Vail, CO 81657
Re: Status of Crossroads Demolition Permit- 143 E. Meadow Drive /Lot P, Block 5D, Vail Village Filing 1
Mr. Knobel,
This letter is being sent to inform you of the status of a demolition permit for the existing Crossroads
structure and parking areas.
As you are aware on January 20, 2005, the Town of Vail Community Development Department
approved your Design Review application, with conditions, for the demolition of the existing Crossroads
structure and parking area. In its place, the development plan for a graded and revegatated "park -like"
site was granted. The Design Review application number for this plan approval is DRB04 -0621. Your
entitlements for this site currently are for the creation of a "park -like" site. Your Design Review
approval is valid for 365 days from January 20, 2005.
The next step in this process is to submit a demolition permit application to the Town of Vail Building
Department which addresses the conditions of the Design Review approval. If all conditions are
satisfactorily addressed your permit will be issued in approximately three to four weeks. Demolition can
begin immediately upon the issuance of the demolition permit from the Town of Vail Building
Department.
If you have any questions regarding this letter please contact me at 970 - 479 -2148.
wit regards,
D arren Campbell, AI P
Senior Planner
Town of Vail
Cc: File
RECYCLED PAPER
Project Description:
Participants:
Application for demolition of existing structures, regrading, and revegitation of the site.
OWNER CROSSROADS EAST ONE LLC 12/17/2004 Phone: 401 -0042
329 MILL CREEK CIR
VAIL
CO 81657
License:
APPLICANT English & Associates Ltd., L12/17/2004 Phone: 479 -7500
12 Vail Road
Suite700
Vail, Colorado 81657
License: 689 -B
CONTRACTOR English & Associates Ltd., L12/17/2004 Phone: 479 -7500
12 Vail Road
Suite700
Vail, Colorado 81657
License: 689 -B
Project Address: 143 E MEADOW DR VAIL Location:
141 & 143 E. MEADOW DRIVE
Legal Description: Lot: P Block: 5 -D Subdivision: VAIL VILLAGE FILING 1
Parcel Number: 210108201001
Comments: See Conditions
BOARD /STAFF ACTION
Motion By: Action: STAFFAPR
Second By:
Vote: Date of Approval: 01/20/2005
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0006873
The applicant shall provide a stamped engineered erosion control plan in conjunction
with the demolition permit for review and approval by staff.
Cond: CON0006874
The applicant shall provide evidence of having a stormwater discharge permit in
conjunction with the submital of a demolition permit.
Cond: CON0006875
The applicant shall put in place during demolition, a limits of
disturbance /construction fence (comprised of concrete barriers with green fence on
top) around the perimeter of the site until final grading and revegetation has
occured.
Cond: CON0006876
The applicant shall provide a detailed construction and demolition phasing plan in
conjunction with the submittal for a demolition permit.
Cond: CON0006877
The submitted traffic control plan may need to be altered by the applicant
thrpoughout the demolition process depending on the start date of the demoliton and
the impacts to other projects, special events, and future construction projects in
the area.
Cond: CON0006878
The applicant shall provide an approved staging plan in conjunction with the
submittal for a demolition permit for review and approval by staff.
Cond: CON0006879
The applicant and contractor shall review and understand the Vail Village /Lionshead
Village construction hours handout.
Cond: CON0006880
The applicant shall provide an excavation plan depicting the excavation depths along
all portions of the exisitng buildings. If shoring is necessary a shoring plan shall
be submitted as well in conjunction with the demolition plan.
Cond: CON0006881
The existing sidewalk shall remain and a plan for connecting the exisitng portions
of sidewalk shall be submitted in conjunction with the demolition permit for review
and approval by staff.
Cond: CON0006882
The applicant shall provide a plan for incorporation of a drainage swale or storm
sewer pipe to convey drainage from the exisitng Frontage Road culvert to the to the
existing inlet on East Meadow Drive in conjunction with the demolition permit.
Cond: CON0006883
The bus stop adjacent to the Crossroads site must remain open and in operation
during and after demolition of the structure.
Cond: CON0006884
Approval of this application and demolition permit does not include any utility work
with the exception of capping of existing utilites servicing the site.
Cond: CON0006885
The applicant shall revegitate the site within 30 days of the final grading being
completed on the site.
Planner: Warren Campbell DRB Fee Paid: $250.00
Application for Design Review REC5'b
Department of Community Development �. .
�75 South Frontage Road, Vail, Colorado 81657 C E C 1 5 u TOt W tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us i TOV _D® M .DEV.
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and /or the Planning and Environmental Commission.
Design review approval lapses unless a building permit is issued and construction commences within
one year of the approval.
Description of the Request: D"
r�
Location of the Proposal: Lot: Block: � u
Physical Address:
Parcel No.: 2 (DJ12 1 1 ( Contact Eagle Co. Assessor at 970 -328 -8640 for parcel no.)
Zoning:
2 /olo8 CSC
Name(s) of Owner(s):
Mailing Address:
Owner(s) Signature(s):
Name of Applicant:
Mailing Address:
\ + . 1 / _"
E -mail
VXa - k_
Type of Review and Fee:
•
Signs
•
Conceptual Review
❑
New Construction
❑
Addition
Minor Alteration
(multi- family /commercial)
❑ Minor Alteration
(single - family /duplex)
❑ Changes to Approved Plans
❑ Separation Request
W
Phone:
•os
$50 Plus $1.00 per square foot of total sign area.
No Fee
$650 For construction of a new building or demo /rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
$250 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
No Fee
For Office Use Only: L4 3 � By. 1 L - F - �Sd
Fee Paid: Check NN_ .:
ApplicatiM Date Z - 11- 0.5 DRB No.:
Planner: L't Project No.:
PROPOSED LANDSCAPING
Botanical Name Common Name Ouanti Size
PROPOSED TREES
AND SHRUBS
EXISTING TREES
TO BE REMOVED
Minimum Requirements for Landscaping: Deciduous Trees — 2" Caliper
Coniferous Trees — 6' in height
Shrubs — 5 Gal.
GROUND COVER
SOD
SEED
IRRIGATION
TYPE OF EROSION CONTROL
Tvpe
A�
Square Footage
Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
Page 7 of 12/02/07/02
`' Survey /Site Plan Review Checklist
Department of Community Development
i j� 75 South Frontage Road, Vail, Colorado 81657
TOVA'1 I OT I,AIL tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
*This check list must be submitted prior to Public Works review of a proposec
Owners /Project Name:
Project Address:
r. / 1
� Cc.S �QV`e �
r
Applicant: n �'t �Q VX� Phone Number: 6
Submittal J
❑ Stamped survey of property )�t Landscape plan
❑ Civil /Site plans ❑ Title Report (Section B)
Survey Requirements:
❑ Surveyor's wet stamp and signature
❑ Date of survey
❑ North arrow
❑ Proper scale (1 " =10' or 1 " =20')
❑ Legal description
❑ Basis of bearings / Benchmark
❑ Spot Elevations
❑ Labeled right of way and property lines;
including bearings, distances and curve
information.
❑ Lot Size
❑ Buildable Area (excludes red hazard
avalanche, slopes greater than 40 %, and
floodplain)
Site Plan Requirements:
❑ Environmental Hazards (ie. rockfall, debris
flow, avalanche, wetlands, floodplain, soils)
❑ Watercourse setbacks (if applicable)
❑ Trees
❑ Labeled easements (i.e. drainage, utility,
pedestrian, etc...)
❑ Topography
❑ Utility locations
❑ Adjacent roadways labeled and edge of
asphalt for both sides of the roadway shown
for a minimum of 250' in either direction
from property.
I. Access (check all)
❑ Driveway type and finished surface are shown on the site plan.
❑ Unheated ❑ Heated (portion in ROW in a separate zone)
❑ Snow storage areas are shown on the site plan within property boundaries (30% of driveway area if
unheated; 10% of driveway area if heated)
All driveway grades, dimensions, radii are clearly noted on the site plan and conform to Development
Standards, p. 11. Steepest Section Driveway Grade (not the average grade):
❑ Parking spaces and turning radii are noted on site plan and conform to Development Standards,
pp. 12&14
II. Construction Site (check all)
❑ Location of all utilities and meter pits are shown on the site plan.
❑ Limits of disturbance construction fencing is shown on the site plan.
❑ I am aware that approved Staging and Construction Traffic Control Plans, as per the Manual of
Uniform Traffic Control Devices, will be necessary prior to construction.
❑ I am aware that a Revocable Right of Way Permit will be required prior to construction.
development.
Page 11 of 12/02/07/02
Crossroads Addresses
Address Parcel #
143 E Meadow Dr. Unit: Vail- 210108201001- Crossroads East One,LLC
141 E Meadow Dr. Unit: CRV Vail - 210108202023- Crossroads West One,LLC
Owner; Crossroads C4- D4- D3,LLC
141 E Meadow Dr. Unit: C4 Vail- 2101082022012
141 E Meadow Dr. Unit: D3 Vail- 210108202015
141 E Meadow Dr. Unit: D4 Vail - 210108202016
Owner; Spraddle Creek LLC
141 E Meadow Dr. Unit: C2 Vail - 210108202010
141 E Meadow Dr. Unit: A5 Vail - 210108202005
Owner; Crossroad
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
141 E Meadow Dr.
s 2E L
Unit:
Unit.
Unit:
Unit:
Unit:
Unit:
Unit:
Unit.
Unit:
Unit:
Unit:
Unit:
LC
D2
C3
D1
E1
E2
Cl
B2
E3
A2
A4
Al
B1
Vail - 210108202014
Vail - 210108202011
Vail- 210108202013
Vail - 210108202017
Vail- 210108202018
Vail - 210108202009
Vail- 210108202008
Vail- 210108202019
Vail - 210108202002
Vail- 210108202004
Vail- 210108202001
Vail - 210108202007
it Owner; John S. McDonald Co
141 E Meadow Dr. Unit: A6 Vail - 210108202006
Owner; Garvey LTD
141 E Meadow Dr. Unit: E4 Vail - 210108202020
Owner; Smith, Robert P. & Ardella M.
141 E Meadow Dr. Unit: E5 Vail- 210108202021
Owner; 5 Smiths LP/ C/o H. William Smith, Jr.
141 E Meadow Dr. Unit: E6 Vail- 210108202022
Owner; Anderson, Charles H.- Sheilds, Frances A.& Michael W.
141 E. Meadow Dr. Unit: A3 Vail - 210108202003
LJ
TOWN OF VAIL, COLORADO Statement
Statement Number: R040007272 Amount: $250.00 12/17/200410:00 AM
Payment Method: Check Init: JS
Notation: #4356 /ENGLISH &
ASSOC
-----------------------------------------------------------------------------
Permit No:
DRB040621 Type:
DRB -Minor A1t,Comm/Multi
Parcel No:
210108201001
Site Address:
143 E MEADOW DR VAIL
Location:
141 & 143 E. MEADOW DRIVE
Total Fees:
$250.00
This Payment:
$250.00
Total ALL Pmts:
$250.00
Balance:
$0.00
ACCOUNT ITEM LIST:
Account Code
Description
Current Pmts
DR 00100003112200
DESIGN REVIEW FEES
250.00
COMMUNITY DEVELOPMENT ROUTING FORM
r
Routed To:
Leonard Sandoval, PW
Date Routed:
01/05/05
Routed By:
Planner
Date Due:
Project Name: Crossroads Demolition
Project #: PRJ04 -0300
Activity #: DRB04 -0621
Description of work:
Demolition of Crossroads
Address:
141 and 143 East Meadow Drive
Legal:
Lot: I P I Block: I 5D Subdivision: I Vail Village Filing 1
Status:
❑ Approved
❑ Approved with conditions ® Denied
Comments: Date Reviewed: 1 -11 -05
❑ Fire Department Issues. Need additional review by Fire Department.
Provide stamped engineered erosion control plan, prior to Demo Permit submittal
Submit and Provide Stormwater discharge permit, prior to Demo Permit submittal
Limits of distrubance /construction fence along E. Meadow Drive and Village Center Chute will
require concrete barriers with green fence on top of it. Show on site plan.
Provide certified stamped approved traffic control plan.
Provide Construction and Demo schedule in detail, including demolition phasing. Traffic control
plan may require to be changed or altered due to current construction projects, special events
and new proposed construction projects.
Provide approved staging plan prior to Demo permit approval.
Review and understand the Vail Villa e /Lionshead Village Construction Hours Handout.
Provide Excavation depths along all portions of existing building and provide a shoring plan if
necessary. All excavation slopes during demolition shall meet OSHA standards.
Existing sidewalk to remain, as well as a continuation of a sidewalk from the existing along E.
Meadow Drive to the Western most property line.
Provide drainage swale and /or storm sewer pipe to convey storm drainage from Frontage Rd.
culvert to existing inlet.
Theoperation of the bus stop must be maintained during and after demolition.
The demolition plan shall not include any untility work excet for capping exisitng service.
Design Review Board
ACTION FORM
TOWN OF Via
C',rhT,fJ 41 Y GENEL4PMENr
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: CROSSROADS REDEVELOPMENT DRB Number: DRB040396
Project Description:
Participants:
REDEVELOPMENT OF CROSSROADS
OWNER CROSSROADS EAST ONE LLC 08/09/2004 Phone: 401 -0042
329 MILL CREEK CIR
VAIL
CO 81657
APPLICANT MAURIELLO PLANNING GROUP, LL08/09/2004 Phone: 970 - 748 -0920
PO BOX 1127
AVON
CO 81620
Project Address: 143 E MEADOW DR VAIL
143 E. MEADOW DRIVE
Location:
Legal Description: Lot: P Block: 5 -D Subdivision: VAIL VILLAGE FILING 1
Parcel Number: 2101- 082 - 0100 -1
Comments:
BOARD /STAFF ACTION
Motion By: Action: WITHDRWN
Second By:
Vote: Date of Approval:
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Planner: Warren Campbell DRB Fee Paid: $650.00
Planning and Environmental Commisson
ACTION FORM
VT, 11,
cr rr [XVELCPWW
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: CROSSROADS REDEVELOPMENT PEC Number: PEC040060
Project Description:
SPECIAL DEVELOPMENT DISTRICT- REDEVELOPMENT OF CROSSROADS
Participants:
OWNER CROSSROADS EAST ONE LLC 08/09/2004 Phone: 401 -0042
329 MILL CREEK CIR
VAIL
CO 81657
APPLICANT MAURIELLO PLANNING GROUP, LL08/09/2004 Phone: 970 - 748 -0920
PO BOX 1127
AVON
CO 81620
Project Address: 143 E MEADOW DR VAIL
143 E. MEADOW DRIVE
Location:
Legal Description: Lot: P Block: 5 -D Subdivision: VAIL VILLAGE FILING 1
Parcel Number: 2101 - 082- 0100 -1
Comments:
BOARD /STAFF ACTION
Motion By: Action: WITHDRWN
Second By:
Vote: Date of Approval:
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Planner: Warren Campbell PEC Fee Paid: $6,000.00
Planning and Environmental Commisson
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
TO OF Aff tel: 970.479.2139 fax: 970.479.2452
OCAMAzvDEWLOPVEW web: www.vailgov.com
Project Name: PEC Number: PEC040066
PEC Type: CROSSROADS CUP
Project Description:
Participants:
REDEVELOPMENT OF CROSSROADS
OWNER CROSSROADS EAST ONE LLC 08/26/2004 Phone: 401 -0042
329 MILL CREEK CIR
VAIL
CO 81657
APPLICANT MAURIELLO PLANNING GROUP, LL08/26/2004 Phone: 970 - 748 -0920
PO BOX 1127
AVON
CO 81620
Project Address: 143 E MEADOW DR VAIL
143 E. MEADOW DRIVE
Location:
Legal Description: Lot: P Block: 5 -D Subdivision: VAIL VILLAGE FILING 1 Parcel Number: 2101- 082 - 0100 -1
Comments:
BOARD /STAFF ACTION
Motion By: Action: WITHDRWN
Second By:
Vote: Date of Approval:
Meeting Date: 08/09/2005
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 300
PEC approval shall not be not become valid for 20 days following the date of
approval.
Planner: Warren Campbell PEC Fee Paid: $650.00
AUU y '1
Application for Review by the
® Planning and Environmental Commission
TOWN OF 17AIL Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
General Information:
All projects requiring Planning and Environmental Commission review must receive approval prior to submitting a
building permit application. Please refer to the submittal requirements for the particular approval that is requested.
An application for Planning and Environmental Commission review cannot be accepted until all required information
is received by the Community Development Department. The project may also need to be reviewed by the Town
Council and /or the Design Review Board.
Type of Application and Fee:
❑ Rezoning
$1300
E� Conditional Use Permit
$650
❑ Major Subdivision
$1500
❑
Floodplain Modification
$400
• Minor Subdivision
$650
❑
Minor Exterior Alteration
$650
• Exemption Plat
$650
❑
Major Exterior Alteration
$800
❑ Minor Amendment to an SDD
$1000
❑
Development Plan
$1500
x New Special Development District
$6000
❑
Amendment to a Development Plan
$250
❑ Major Amendment to an SDD
$6000
❑
Zoning Code Amendment
$1300
❑ Major Amendment to an SDD
$1250
❑
Variance
$500
(no exterior modifications)
❑
Sign Variance
$200
Description of the Request: Special Development District— Crossroads Redevelopment lJ = �ae✓v�� f 5 -
Location of the Proposal: Lot: P Block 5D Subdivision: Vail Village Filing 1
Physical Address: 143E Meadow Drive (Crossroads at Vail)
Parcel No.: 210108201001 ( Eagle Co. Assessor at 970- 328 -8640 for parcel no.)
Zoning: Commercial Service Center (CSC)
Name(s) of Owner(s): Crossroads East One LLC and Crossroads West One, LLC
Mailing Address: 143 East Meadow Drive Vail CO 81657
Owner(s) Signature(s):
Name of Applicant:
Phone: 401 -0042
Mailing Address: PO Box 1127 Avon CO 81620
Phone: 748 -0920
E -mail Address mauriello @comcast.net Fax: 748 -0377
For Office Use Only: 41 Q�C
Fee Paid: Check No.: 2 (O By: LU
Applicatio Date: _ . 13• y S` PEC No.:
Planner: Project No.:
Nd 61-
07/29/04
July 27, 2004
Town of Vail
Community Development Department
75 S. Frontage Road
Vail, CO 81657
Re: Crossroads Condominium Association Approval
To Whom It May Concern:
The Crossroad Condominium Association has reviewed and approved the proposed
redevelopment plans for Crossroads.
Sincerely,
TOWN OF VAIL, COLORADO Statement
Statement Number: R040006380 Amount: $6,000.00 08/09/200402:34 PM
Payment Method: Check Init: JS
Notation:
#2169 /CROSSROADS WEST ONE, LLC
-----------------------------------------------------------------------------
Permit No: PEC040060 Type: PEC - New SDD
Parcel No: 210108201001
Site Address: 143 E MEADOW DR VAIL
Location: 143 E. MEADOW DRIVE
Total Fees: $6,000.00
This Payment: $6,000.00 Total ALL Pmts: $6,000.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PV 00100003112500 PEC APPLICATION FEES 6.000.00
----------------------------------------------------------------------- - - - - --
0
i
IR
.� Application for Review by the
OVA Planning and Environmental Commission -
TOR / AN Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
General Information:
All projects requiring Planning and Environmental Commission review must receive approval prior to submitting a
building permit application. Please refer to the submittal requirements for the particular approval that is requested.
An application for Planning and Environmental Commission review cannot be accepted until all required information
is received by the Community Development Department. The project may also need to be reviewed by the Town
Council and /or the Design Review Board.
Type of Application and Fee:
❑ Rezoning
$1300
/Conditional Use Permit
1650
❑ Major Subdivision
$1500
❑
Floodplain Modification
$400
❑ Minor Subdivision
$650
❑
Minor Exterior Alteration
$650
❑ Exemption Plat
$650
❑
Major Exterior Alteration
$800
❑ Minor Amendment to an SDD
$1000
❑
Development Plan
$1500
x New Special Development District
$6000
❑
Amendment to a Development Plan
$250
❑ Major Amendment to an SDD
$6000
❑
Zoning Code Amendment
$1300
❑ Major Amendment to an SDD
$1250
❑
Variance
$500
(no exterior modifications)
❑
Sign Variance
$200
Description of the Request: Special Development District— Crossroads Redevelopment L a�c��� ate. VS_ 6 ✓W, f S
Location of the Proposal: Lot: P Block 5D Subdivision: Vail Village Filing 1
Physical Address: 143 E. Meadow Drive (Crossroads at Vail)
Parcel No.: 210108201001 ( Eagle Co. Assessor at 970 - 328 -8640 for parcel no.)
Zoning: Commercial Service Center (CSC)
Name(s) of Owner(s): Crossroads East One. LLC and Crossroads West One LLC
Mailing Address: 143 East Meadow Drive, Vail, CO 81657
Phone: 401 -0042
Owner(s) Signature(s):
Name of Applicant: Represent6d by Mauriello Planning Group, LLC
Mailing Address: PO Box 1127 Avon CO 81620
_ Phone: 748 -0920 /+� VE
D
E -mail Address :maurielloCacomcast.net Fax: 748 -0377 BUG 1 5 Z(1(4
i I DC'S
For Office s Only: 2
Fee Paid: Check No.:_ -- — --
Y•
/ � Applicatt6n Date: . v
PEC No.: C O (o
Planner: Project No.: — ?7?;;34T
07/29/04
TOWN OF VAIL, COLORADO
Statement
Statement Number: R040006509 Amount:
$650.00 08/26/200411:11
AM
Payment Method: Check
Init: JS
Notation:
#1065 /MAURIELLO PLANNING GROUP, LLC
-----------------------------------------------------------------------------
Permit No: PEC040066 Type:
PEC - Conditional Use
Parcel No: 210108201001
Site Address: 143 E MEADOW DR VAIL
Location: 143 E. MEADOW DRIVE
Total Fees:
$650.00
This Payment: $650.00
Total ALL Pmts:
$650.00
Balance:
$0.00
ACCOUNT ITEM LIST:
Account Code Description
Current Pmts
PV 00100003112500 PEC APPLICATION FEES
-----------------------------------------------------------------------
650.00
- - - - --
Application for Design Review RECEIVED
it Department of Community Development U 9 It_
" At 75 South Frontage Road, Vail, Colorado 81657
TRW d OF UA iL tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and /or the Planning and Environmental Commission.
Design review approval lapses unless a building permit is issued and construction commences within
one year of the approval.
Description of the Request: Redevelopment of Crossroads
Location of the Proposal: Lot: P Block: 5d Subdivision: Vail Village First Filing
Physical Address: 143 E. Meadow Drive
Parcel No 210108201001 ( Eagle Co. Assessor at 970 - 328 -8640 for parcel no.)
Zoning Commercial Service Center
Name(s) of Owner(s): Crossroads East One LLC and Crossroads West One, LLC
Mailing Address:
Owner(s) Signature(s):
Name of Applicant:
Phone: 401 -0042
LLC
Mailing Address: PO Box 1127 Avon CO 81620
Phone: 748 -0920
E -mail Address: mauriello comcast.net Fax: 748 -0377
Type of Review and Fee:
❑ ;0no i s
• ep tual Review
New Construction
❑ Addition
❑ Minor Alteration
(multi - family /commercial)
❑ Minor Alteration
(single - family /duplex)
❑ Changes to Approved Plans
$50 Plus $1.00 per square foot of total sign area.
No Fee
$650 For construction of a new building or demo /rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
$250 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
❑ Separation Request No Fee
For Office "I y:
Fee Paid: Check No.: ZlG y By: ��s�rQO`NS,; �2, �.L
Application Date: ' l" DR No.:�
Planner: WIr Project No.:
PROPOSED MATERIALS
Building Materials
Type of Material
Color
Roof
Zinc Standing Seam
Pre - Painted
Siding ..
Cut Sandstone & Rough Stone Base
Other Wall Materials ..
Zinc Panels, Wood Siding, Cedar Logs
Fascia ..
Wood
TBD
Soffits ..
Wood
TBD
Windows..
Aluminum Clad
TBD
Window Trim..
Wood
TBD
Doors ..
Aluminum Clad
TBD
Door Trim ..
Wood
TBD
Hand or Deck Rails ..
Painted Ironwork
TBD
Flues ..
Inside Stone Veneer Enclosure
Flashing ..
Zinc
Pre - Painted
Chimneys.
Stone Enclosures
Trash Enclosures ..
None on the exterior of building
Greenhouses..
None
Retaining Walls ..
Rough Stone to match building base
Exterior Lighting ..
Zinc & Copper Fixtures
TBD
Other
Notes:
Please specify the manufacturer's name, the color name and number and attach a color chip.
TOWN OF VAIL, COLORADO
Statement
Statement Number: R040006381 Amount:
$650.00 08/09/200402:37 PM
Payment Method: Check
Init: JS
Notation:
#2169 /CROSSROADS WEST ONE, LLC
Permit No: DRB040396 Type:
DRB - New Construction
Parcel No: 210108201001
Site Address: 143 E MEADOW DR VAIL
Location: 143 E. MEADOW DRIVE
Total Fees: $650.00
This Payment: $650.00
Total ALL Pmts: $650.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description
Current Pmts
DR 00100003112200 DESIGN REVIEW FEES
650.00
Oct 19 2004 10:31AM MAURIELLO PLANNING GROUP, 970 - 748 -0377
P.1
RECEIVED
Mauriello Planning Group
C1 OCT 1 y �uu�
TOV
October 19, 2004
Warren Campbell, AICP
5enior Planner
Town of Vail
75 South Frontage Road
Vail, CO 81 620
Re: Crossroads Redevelopment - Retail Study
Dear Warren:
Attached 15 a retail analy515 prepared for the Cr055road5 Redevelopment project
by Martin Burger of The Related Companies. I have also attached a page taken
from the Retail Positioning and Strategy Study prepared by Thomas Consultants
for the Lion5head Core Site project. I believe this Section of the Lion5head
report 15 also relevant to the retail layout on the Crossroads Redevelopment
Project.
I hope this report will aid you and the Planning and Environmental Commission in
your review of the Crossroads project.
If you have any questions, please do not hesitate to call me.
Sincerely,
i
Dominic F. Mauriello, AICP
Principal
PO Box 1127 CO 81620.Office: 970 - 748 - 0920 ■Fax: 970-748-0377 -Cell: 970 - 376- 3318•mauriello @comcast.net
Oct 19 2004 10:31AM MAURIELLO PLANNING GROUP, 970 - 748 -0377
Oct-10 -04 04:11 Pm From - Palladium Company
1 2 The Related Companies, L.P.
625 Madison Avenue
- 1 212 21 -5333 Fax 2125
12125835792 T-TIT P 002/004 F -421
Martin s. B urger
Executive V c ; President
October 18, 2004
Mr. Warren Campbell, AICP
Senior Planner
Town of Vail
75 South Frontage Road West
Vail, Colorado 81657
Re: Retail Analysis for Crossroads Sbopping and Entertainment, Vail a
Dear Mr, Campbell:
I have been asked by Peter Knobel to prepare this report on the viability of lie proposed
retail and restaurant uses and spaces being proposed on the plans for thy': Crossroads
Redevelopment. We have been consulting with Mr. Knobel on the Cross: dads project
over the last year and are very familiar with the proposed project and its cc RLext in Vail
along East Meadow Drive.
We have extensive experience in the planning and layout of retail space:; in urban,
suburban, and resort settings. The Related Companies, L.P. has been invo ced with the
development of many mixed -use projects where the "engine" of the overall rcoject is the
retail at the base. It is the retail /restaurant component that becomes the pub] i experience
and draws people to the development. This format has been accomplished aoth in urban
vertical projects such as our Time Warner Center building in New York City, znd in more
suburban and resort locations such as our CityPlace project in West Palm BEa,:h, Florida.
We have again reviewed tthhe e revised plans memorandum �subm submitted to b
Tow t
Town and have review n by Je T Winston n of
Winston Associates.
In the planning and development of retail areas and town centers, there ar Several very
important factors to be considered: visibility of retail spaces to poteri 6-al shoppers
accessibility of retail spaces to shoppers; the adequacy of retail spaces and ;�orefronts for
potential retailers; the activity and flow going on around the retail shops: end the right
tenant mix.
Retail shops and restaurants need visibility from the primary flow of ped e:.tnan traffic.
In the case of the Crossroads project, visibility from the main flow of peg I. :stxian traffic
p.2
Oc 19 2004 10:31AM MAURIELLO PLANNING GROUP, 970 - 748 -0377 p.3
Oct-18-04 04:11pre From-Palladium Company
12125835M T -T17 P.003/004 F -421
along East Meadow Drive is very important. The retail and restaurant areas : hown on the
proposed Crossroads plans are laid out on an arc around the proposed plaza spice and ice
skating facility. This is appropriate as all of the retail spaces are visible to t it street and
to the plaza space therefore eliminating or preventing hidden retail store fronts. The
memorandum from Winton Associates suggests that the retail shops should b a discovered
and that there should be intrigue to draw one in. Successful retail facilities in malls and
Town Centers have one thing in common; visibility to potential customers. III our view,
the Crossroads project will be one retail experience within a greater retail cxperience of
Vail Village. The existing streets of Vail Village act as a mall where poter.tnal shoppers
meander and discover what Vail has to offer. We believe the retail approach on
Crossroads has been well planned to maximize the retail success of the prt. As we
have experienced a our
d need to be discovered stores that are
he lowest s r ales c I rme and th
flow of the project e
highest turnover rate.
Accessibility of retail shops is extremely important in any shopping envir )rrnent. The
easier the approach for a pedestrian, the more successful the commercial space. That
said, commercial projects have spaces that will be more successful than r thers. The
second retail level of this project is obviously not as accessible as the f Xi3t level and
therefore will likely result in lower rents. The second level retail on th project has
several qualities that will allow it to perform well. The spaces are located fit] an arc and
visible to the public street and the plaza. With all of the excitement being ;i,ated within
the project (e.g., the public plaza, the ice skating rink, the movie theater., the bowling
alleys, and the other recreational opportunities) pedestrians will take notice of the second
level of retail and engage it. Given the wide walkway on the second level. we believe
this level will be sought after as a viewing spot to the activities below and thus resulting
in more exposure for the retail spaces. Any retail space that is not on th(. ,,round level
needs to have an anchor or draw to gel people up in the project, and needs to be easily
accessible. As planned, the visibility and view will draw people up, and its various points
of entry will allow for easy access.
It has been suggested in the memorandum from Winston Associates that. if the second
level retail were laid out more like the lobby level of the building, it wo a d be a more
successful approach to retail due to the irregular footprint and facade, little (: )urtyards for
discovery and variety, and better transparency. We disagree with this u.oneept. By
creating these "courtyard" spaces and by framing the retail facade, dead sl_ a-'es are being
created. Only those spaces that would be "out in front" would be succe::;sful and the
remaining hidden storefronts would be at an extreme disadvantage and tn operate as
well. This idea would also move the retail front further away from tl c: activity and
excitement of the plaza area which will again reduce its appeal to the cor'ourner. If you
think about the last time you were in a well planned shopping mall, how »uch attention
dad you pay to those retail spaces located in the nooks and crannies of - lye mall? The
experience nationwide in the design of malls and town centers is that thos.: spaces should
be minimized or avoided whenever possible. Like our Time Warner Center retail
component and our CityPlaee project, we are not trying to emulate the ina.I experience in
Vail — but we need the retail tenants to be viable.
Oct 19 2004 10:31AM MAURIELLO PLANNING GROUP, 970 -748 -0377 p•4
Oct -16-04 04:11 Pm From - Palladium Company 12125835782 T-717 P.004/004 F-421
Given the context of the second level, its exp osure will b he p
s ss�lt, ind multiple
points of access we believe the project as pla ned
ou would find in Vail are typically looking
Boutique retailers as y
for a ;I -ace that is
roughly retailers
sq. It. (20' storefront and 60' internal depth). That was the ad a given by
us to the developer and designers numbe C rossroads
of potential retail store projec .o
store frortt:� Resta m
storefront exposure and maximize t1 e P
spaces require more frontage due to th3 �r Leo po required ven the "retai quality
on an
restaurant and to maximize the table with of the retail spaces are somewhi .t deeper than
arc" layout of the Crossroads project, many
60'. Tlus additional space will likely not generate the same rents as the firs t 60' but will
provide additional storage o pportunities to
be well planned this project�Ge of
storefronts and the transparency of the storefronts
As stated previously, one of the other key factors in the success of retai .,hops is the
activity that is going on around it. The Crossroads project includes publ'C plaza space
that is energized with an ice rink or fountains in the summer and the c:ntertainment
facilities being provided below grade which will act as attractors to thr: site and the
vicinity. Any time there is an attraction within a shopping area, retailers ajjacent to that
activity will benefit enormously.
The tenant mix and location within a project is extremely important to the (.verall success
of the retail environment. The developer plans to control all of the retail sl a, -e under one
ownership in order to provide the type of tenant mix necessary to ereat : a synergistic
environment on both the ground level and second level of the project. Wr: will continue
to work with the developer to create the best possible retail mix for this pro sect.
We understand that there has been some criticism of the "consistent fa"de" of the retail
and that it should be, more individualized. We like the consistent natu a of the retail
facade in this project. One must remember the scale in which we are opert.ting. This is
one commercial fagade within the greater context of the Vail Vi?I:�ge shopping
experience. We believe the consistent facade will create an identity for tl.e. project and a
notion of quality to the consumer. The actual glazing and store fionts can be
individualized within the stone fa,ade of the building much the w*)r it has been
approached with architecturally significant structures in large cities Cr in historic
European towns.
We hope that you will find this information useful.
Since ly,
arty Burger
Oct 1 2004 10: 32AM MAURIELLO PLANNING GROUP, 970 -748 -0377
Z
J
d
H
Q
J
Z
70
Q
V
W
O
F
V
W
N
0
d �
m
- 1 5 - 1
�'
�
-&.-
_
—°'
CL O
0
T
V >
W
«
y a
.O
CL m
od
CL
O N
C7 a
L >
v
C
L
�' '
>
a
O
O
o
=
a
0 t .�
Q
0
o
�c9
CL
3 a
w
W o
a
a
dS a8
° Q a
o v
W
N
d7 O
a
> T
m
c
N
E c
°
O
0
O
E
m
R
:
Q Q
t
C LL
v
a
L
u 0 v ,
o
t
(�
v
O
a
m
> ;
` m
O
nt
o
u
x
E o'
o
O
c C
c ,c s
V
CL 0
Q
Q
CD
Q
o d
3
o `�
v
°
E
o a
c o 0 E
0
k^ }
C
N
o
N
O
N
} 0 L
`
O _O
O
.F
c 8
W
s
.
O
N
y
L C
O y
9
d
-2
u
CL
`�
0
0 E
c N
_
m
c
O
od
m
0 L16
O
O
'c 0 V
a
�
W
c
.a
m
y O
`� a
ix
y
o v
o
°
Ca
a
+
a
° Y
u
�«'-
4!
a
o.
O
c
r
0 3
0
° rn
a
u d
3 °
c
u
b
=
O c a d
m
O
CL
y "'
3 �•-
o
.n
w
c
° rn o
— 0
O
}
0 0
_a
a
°v
.
O=
u
o
C L
V
O
N
O
L
O
y
O
c a
`7
L
}-0
o
C
O c
G) a c>
c
L
.O
C
w
c EL 0 4
W
t
CA
y
V
-O
m x= O
N
«.
a
v
E
o
o
0
0
,.
6 . y
a
a
E
V O
W
_m
.Q
•°
O
V
G) - O o
• c
C 0
a
�
a s
C
Cl
D
Co O r
O
o
o a
o'
O v
o
��
a
E
I--
►°-' 0.
o f
aD o `c 'a E
H w o > E
0 0 0 j
o °
-0 a a d _ E E
CL
F ° ° m ° a 0
Q
= n c v C4 d
C7 c =•-_ w
.:� 0 am ° 4 E o
o
V W V L a V O
o y
_ E 4° .r
O
LL O E >, C + y-
_ :_. O O O
z 4) u J 0
c
z c 0 v Q c 0 8
U v 10,
>
F- 'O " > 0 v
CL
o o
O c' E a a a s
a - m
d a w 0. 4) c
X K v +. E a
L
c Cr c a Y p
J C t/7 a S V
Q W p '> C V
1 — > c d F O O s
W Lu 3
CSI w s a �' c
C 0
O N a
.N E O
F — :� 0 t) 0
C
m
o o
�'
�
-&.-
—°'
°'
0
0
V >
>
W
\
CL m
od
=
C7 a
C
v
3
o
O
>
a
O
oc
=
�'
C r
o
Q
0
o
�c9
CL
3 a
w
W o
a
a
dS a8
° Q a
o v
� C r
N
m
a
> T
m
c
N
H
O
0
O
m
:
Q Q
o c 0
C LL
v
0
L
u 0 v ,
o
t
(�
v
N
lL y
m
` m
O
nt
o
u
H
E o'
o
O
c C
O
a^
Q
Q
CD
C
8
3
v
V
o a
0
k^ }
C
o
o
°
e
`
O _O
O
.F
c 8
W
s
.
O
N
y
L C
O y
9
d
-2
u
} N 41
`�
\
O
�.
m
od
m
0 L16
o"
Q
0 O
�
W
EO
V)
0
ix
y
° Q
°
Ca
N
a
O 0
a
s �
�«'-
4!
a
o.
O
c
C
o o
�'
-&.-
—°'
°'
E
>
a
0
N
c
v
c
i
a
°
.o
� C r
i CL
E
'`>
o c 0
L
u 0 v ,
O
O v�
LL a L
Co y
O
o
u
a
E o'
o
O
s
a°
Q
Q
CD
C
8
3
v
0
k^ }
C
m CD
t
a
N O
O _O
O
.F
c 8
s
.
O
N
y
L C
O y
O
O
�'
E
>.
° 'in
C
v.
o"
Q
0 O
�
N O >
0
C)
V Q
` 4)
y
° Q
°
c
O
a
O 0
4-
E
�«'-
4!
a
o.
O
c
a
- o
.a
v —
m
b
a
v
m
N w
O
•- v 3
Q
�'
.
a
a
vp >.
C L
V
O
N
O
X
t
Q w.
0
N
O
c
t
c
CL
0) V
O
"
o
m a
o
E y a,
o
0
• C
W
_m
.Q
•°
O
V
L
• c
C 0
a
C
c
L
Co O r
=°
o
o'
O v
o
��
a
E
€ '
o f
= o
a >
�
r
C
D In
LL
N
W
N
d • N
d >
W
�0
• N
o
a
o
0
0
p.5
0
4
Ci
Mauriello Planning Group
October 15, 2004
Warren Campbell, AICP
Senior Planner
Town of Vail
75 South Frontage Road
Vail, CO 81 620
Re: Crossroads Redevelopment Project
Dear Warren:
Thank you for your letter of October 13, 2004 which describes clarifications that
are needed to the Crossroads plans, additional information to be provided for
future hearings, and staff concerns on the Crossroads project. We are
® encouraged to hear that the planning staff is excited about this redevelopment
project. The majority of the comments provided refer to minor details and errors
within our plans which we have corrected in the revised set of plans provided with
this letter on October 18, 2004. There are a few comments provided by staff
which we have not address with revisions to the plans as we believe the plans
should not be changed.
I am also in receipt today of the Public Works comments. We have not
addressed these comments on the plans due to the late date we are in receipt of
them. Most of those comments relate to technical details that will be worked out
in the final civil plans required prior to building permit.
I have addressed each of your comments as listed below:
The rendering on the cover page should be revised to show changes that
have been made in the project subsequent to the rendering. For example
the architectural feature covering the escalators leading to the
underground retail. The rendering does not appear to accurately depict
the grade changes caused by a portion of the southwest corner of the
building coming out of the ground.
c
PO Box 1127-Avon, CO 81620.Office: 970 - 748- 0920•Fax: 970 - 748- 0377•Cell: 970 - 376- 3318•mauriello @comcast.net
Our Response:
The rendering has been removed from the cover page of the plans.
Complete elevations and simulated views have been provided. A more
detailed 3 -1) model will be presented to the DRB and the PEC.
2. On the site plan please show the 20 -foot setback. Staff has expressed
concerns over the encroachments of the structure to such a great extent
into all setbacks with particular concern along the north and west property
lines. The site plan also depicts in the southwest corner the grade
changes which become a concern for staff as the below grade levels come
partially above grade. Staff would like for the grades to be reworked so
as to not require ramps and steps within the right -of -way. The
improvements should be reworked to be truly below grade. In addition
please show several spot grades around the site as well as top -of -wall and
bottom -of -wall elevations for all walls (for example the planter bed in the
southeast corner of the public plaza).
Our Response:
The 20' setback line is now indicated on the plans. Top and bottom
elevations of walls have also been provided. We understand staff's
concerns regarding the setbacks on the project. The project site is
surrounded by streets on three sides and the Vail Village Plaza on the
west. Most of the setback encroachment on the north side of the project
along the S. Frontage Road is a single -story encroachment generated by
the need to enclose the large loading and delivery facility. The Vail Village
Master Plan recommends this facility be located with access from the S.
Frontage Road and we believe it is important to enclose the entire facility
and eliminate truck maneuvering in front of the building. We believe the
proposed setbacks are consistent with the direction given in the Vail
Village Master Plan and the Urban Design Guide Plan. Additionally, the
proposed encroachments are based on sound design and planning and
have little negative impact to anyone. The proposed setbacks along the
South Frontage Road and the distance to the edge of pavement are
consistent with the Gateway Budding and the Vail Village Inn buildings.
The grading at the south west corner of the building has been modified to
eliminate the ramp condition as requested by staff.
3. Staff has also expressed concern regarding the improvement in the CDOT
Frontage Road right -of -way. Staff understands that fire has request a fire
lane access which is not covered by the port- cochere. Options should be
explored which pull improvements out of the right -of -way and still maintain
the requirements of the Fire Department.
C
-2-
Our Response:
The only improvement located in the CDOT right -of -way is the proposed
fire truck staging area. The location of this fire staging area does not
conflict with the operation of the South Frontage Road. It is not
uncommon for driveways and fire staging areas to be located within the
public right -of -way. A few examples that come to mind are: the first
approval of the Vail Plaza Hotel, the Swiss Chalet (now One Willow Bridge
Road), the Tivoli Lodge, the Vail Village Inn phase 3, the Mountain Haus,
the Vail Mountain Lodge, the Antlers, and the Marriott. We believe the
proposed fire staging area within the CDOT right -of -way is consistent with
the area and makes good planning sense given the location of the edge of
street pavement.
4. Staff has concerns regarding the height of the portion of the building
located in the southwest concern and its impact and relationship to
Meadow Drive and Vail Village Inn Phase III. The Vail Village Master Plan
identifies 3 -4 stories as appropriate. However, you show four stories
with a tall roof feature. Staff believes this area should be examined for
possibilities to reduce the impacts to Meadow Drive and Vail Village Inn
Phase III.
Our Response:
The building in this area steps down to East Meadow Drive as you state
above. The building also includes a 20' pedestrian arcade space for the
first two levels of the building. At the pedestrian level the building reads
as a lower and less abrupt building edge due to the presence of this
arcade. This is also the only portion of the building that comes close to
the street edge due to the large public plaza being provided on the site.
While this portion of the building may be slightly beyond the 4- stories
recommended by the Vail Village Master Plan, from the pedestrian
perspective it provides a landmark feature to draw pedestrians along East
Meadow Drive and from Gore Creek Drive. Additionally, the existing
Crossroads building in this area is at 4- 5torie5.
A portion of the VVI phase three project in this area is developed with
two -story buildings. Given the age of the existing improvements it is likely
that in the next 5 to 10 years this site Will also redevelop into a three or
four -story structure. Over the long -term we believe the height of the
building to be appropriate with the surrounding context.
5. On the Crossroads Public Improvements Plans several of the streetscape
improvements extend onto neighboring private property. Through
conversation it appears you have not worked out all the details with those
property owners and in the case of Vail Village Phase III you have
-3-
expressed that they do not wish to bring people back into the primarily
residential portion of the their project. The plans should be revised to
address the neighbors concerns. Also please detail how your plan would
change if Village Center is not amenable to improvements on their
property.
Our Response:
The streetscape plan and public improvement plan were developed in a
comprehensive fashion to show the extent of public improvements being
proposed and funded by Crossroads. We took liberties at designing
improvements on the adjacent VVI property and in front of the Village
Center building to show how the entire area might be redeveloped. If the
neighbors have no interest in participating or allowing these improvements
then the improvements can be easily removed from the plan. We believe it
was better to "master plan" the area to show how it could redevelop. If
we are unable to coordinate and workout an agreement with the adjacent
property owners after approval of the project, we will return to the Design
Review Board with a revised streetscape plan to modify the improvements
in these areas. Until such time, we will continue to move forward with the
current design as noted on the plans.
G. On the landscape plan please provide details on the plants to be placed in
rw all planter beds. Also please provide information on the depth of soil
placed upon the sub -grade levels of the building. Staff will be concerned
about the depth and its ability to support the growth of evergreens,
Aspens, and other plant life.
Our Response:
The plans have been updated to show the soil depth. The soil depth will
be adequate to allow the growth and maturation of the trees and other
vegetation proposed.
7. On all Parking Level plans please review the parking layout as several
spaces appear to be blocking access doors and stairs servicing
pedestrian circulation within the structure. In addition please number the
spaces you are counting as it is unclear in some instances whether or not a
space is meant to be counted or blocked out for access to a door within
the structure. Staff counted a total of 538 parking spaces.
Our Response:
The parking spaces have now been clearly numbered. Spaces were
removed where conflicts with other uses occurred. There are now 5 1 1
parking spaces provided.
-4-
® 8. Please provide details on the storage lockers room identified on Parking
Level 2, Plaza and Retail plan. For whom are they for and their usage. The
concern is whether or not it will generate an additional parking
requirement. It also appears you have a parking space in front of the
door.
Our Response:
A note has been placed on the plan indicating that the lockers and storage
is for residential owners within the building. There is no additional parking
required for these lockers.
J. There appears to be a CAD error on the Parking Level 2, Plaza and Retail
plan.
Our Response:
All CAD errors have been cleaned up.
10. Staff requests additional information on the cooling tower lovers and
potential for noise. The concerns are appearance and noise in
relationship to the adjacent Vail Village Phase III development.
Our Response:
The venting required for the subsurface areas within the building will be
provided at grade on the west side of the building. Our mechanical
engineer has indicated that the noise generated by this venting will be
within the limits allowed by the Town Code and IBC as measured at the
property line and no greater. As indicated in the noise study provided in
the EIR for this project, the noise generated by the interstate highway
tends to drown out any potential mechanical noise in this area.
I I . Please provide greater detail on the furnishing for the plaza. For
examples benches, tables, locations, flower pot sizes. Staff will want
details on the year -round activity and viability of the space.
Our Response:
We plan to provide benches, light posts, flower pots, and similar features
within the plaza area. Greater detail for these improvements will be
generated during the DRB review of the project and will occur prior to a
final DRB approval on the project.
12. Staff has concerns regarding the viability of the retail as it pertains to
the arc design. On past projects it has been the desire to create-
interest in facades in terms of stepping back and forth and materials.
r w Please provide information supporting your position that the retail will
-5-
truly function. Staff may consider consulting a retail professional as
well.
Our Response:
We have been working with retail experts in the development of the plans
for Crossroads. Our consultants have indicated that our retail layout and
design will be extremely successful due to the creation of a lively public
plaza in front of the retail and the strong retail edge provided to the plaza
space. The most positive aspect of the layout of the retail space is its
visibility to the flow of pedestrian traffic. People will be able to see each
store front as they travel along East Meadow Drive and will be drawn into
the retail areas. We believe that with exciting windows and store fronts
within a consistent stone facade will make this portion of retail experience
along E. Meadow Drive identifiable as a duality retail experience. We will
be providing a report from a retail expert to address these issues.
I have also reviewed the retail positioning study that was prepared for
Lionshead by Thomas Consultants. With respect to merchandising layout
he recommends:
• "Create a retail trail, which is a line or loop that directs shoppers
on a path to explore that brings the greatest number of stores into
the clearest view.»
• "Blur the line between outdoor and indoor environments through
the articulation of sidewalk cafes, pubs, restaurants and outdoor
seating for restaurants and cafes."
• "Create natural public gathering spaces, as successful retailing is as
much about congregating as it is about merchandising."
The Crossroads project is clearly responsive to this advice.
13. Please provide details on the lines which appear to be framing the ice
ring. Are they a raised seating area a railing?
Our Response:
The detail on the ice rink has been provided on the revised plans.
14. Please verify that all plans have been updated to show all the revisions
that have been to the site. Some plans show the old stairs and entry
to the lower levels.
Our Response:
I:M
4 The plans have been revised to address these issues.
15, It appears there may be CAD errors on the Parking Level I and Retail
plan. In addition there appears to be a column in the drive aisle as you
enter the structure. Staff is also having difficulty understanding the
stairway adjacent to the bank space and where it leads.
Our Response:
The plans have been revised to address these issues.
I G. A sign program should be designed and submitted for the project.
Please keep in mind when designing the feature which will lead to the
below grade spaces that signage will likely be located on it which will
identify the uses below.
Our Response:
A sign program will be provided for the project prior to any tenant
occupying the building.
17. Please provide a written description of how you believe your loading
and delivery will help with the overall loading and delivery goals of the
Town. Staff will be reciuesting that your loading and delivery be a part
of the overall system which will currently be comprised of Vail Resort's
and One Willow Bridge's loading and delivery bays.
Our Response:
The loading and delivery facility at Crossroads will operate as part of the
Town's overall dispersed loading and delivery system.
18. Please provide greater detail on the dwelling units. It appeared to
staff that there were lock -off units because of the double doors onto
hallways. Through conversation it does not appear that you intend for
there to be lock -offs. Also staff only counted 78 condo units not 84
as depicted in the associated documents you submitted. Please
provide enough detail on the plans for staff to verify that there are
truly 84 dwelling units.
Our Response:
The plans have been revised to clearly show that we are proposing 85
dwelling units and no lock -off units.
-7-
19. Please provide details on the proposed private parking club.
Our Response:
Details of the private parking club have already been provided under
separate cover.
20. Please provide a proposed definition for a bowling alley in association
with your text amendment.
Our Response:
The proposed definition for a bowling alley has been provided in the
submittal document for the project.
2 1 . Please revise the elevations to show the material changes that have
been made.
Our Response:
All revisions to building materials have been indicated on the revised
elevations.
22. A materials sample board will be required for the Design Review Board.
Our Response:
A materials sample board will be provided at the appropriate time during
the DRB review process.
23. Please provide elevation of the interior walls to the plaza.
Our Response:
The requested elevations have been provided.
24. Please provide elevations for the feature leading to the below grade
space.
Our Response:
The elevations of the entrance to the entertainment complex have been
included in the revised plans.
25. The south elevation shows multiple stairs on the southwest corner is
this an accurate representation? The site plan does not appear to
show all those stairs.
0
11-M
(W Our Response:
The south elevation has been revised. There are no stairs located in this
area.
2G. Please revise the building height plan to accurately show the changes
made to the encroachments of the roof over the property lines. Also
provide a building height plan over proposed grades.
Our Response:
The building height plan has been revised as requested.
27. Staff has expressed concerns that the architecture, while well done in
isolation, may not be carrying forward the design character and culture
of the Village. Staff believes that changes may need to occur to the
architecture which maintains your projects individuality, but incorporate
more design features consistent with the goals of the Vail Village
Master Plan and Urban Design Guidelines.
Our Response:
It must first be recognized that only a very small portion of the
Crossroads site is located in the area covered by the Urban Design Guide
Plan and is indicated as "periphery" in the Vail Village Master Plan. This
designation was not an accident or an oversight. That said we believe the
project adheres to the urban design principles quite closely. The Urban
Design Guide Plan recognizes the "Vail Village as a small area within the
commercial core of Vail. While the plan does discuss carrying the design
themes beyond Bridge Street and Gore Creek Drive, we believe the plan
was never really intended to extend to the Crossroads site. One of the
reasons Bridge Street and Gore Creek Drive are so successful is the
distinctive character of that small area of Vail. We believe that by trying
to extend that quaint Bavarian character out to outlying areas the Town will
dilute the uniqueness and appeal of the village core. We believe that is
one of the reasons Crossroads was not included in the village core zone.
The planning documents are also clear that it is not the purview of the
Planning and Environmental Commission to evaluate the architectural and
design appropriateness of any building but rather an issue for the Design
Review Board. We understand staff is concerned about the building
materials and design, but we hope this issue is left to the appropriate
forum with the DRB.
-9-
1 hope this letter helps to clarify how we are addressing the issues raised in your
letter. Please share this response letter with the PEC. Feel free to call me
directly if you have any additional questions or comments.
Sincerely,
Dominic F. Mauriello, AICP
Principal
E&I
MM
TOWN OF NL V
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970 - 479 -2138
FAX 970 - 479 -2452 October 13, 2004
www.vailgov.com
Mauriello Planning Group, LLC
c/o Dominic Mauriello
P.O. Box 1127
Avon, CO 81620
Re: Crossroads Redevelopment located at 141 and 143 Meadow Drive/Lots P, Block 5D Vail Village
Filing 1
Mr. Mauriello,
This letter is to summarize staffs comments regarding your submittal for Planning and Environmental
Commission and Design Review. Many of the following comments have been expressed verbally and
graphically prior to this letter. This letter will serve as record for staff's comments. The comments are as
follows:
• The rendering on the cover page should be revised to show changes that have been made in the
project subsequent to the rendering. For example the architectural feature covering the
escalators leading to the underground retail. The rendering does not appear to accurately depict
the grade changes caused by a portion of the southwest corner of the building coming out of the
ground.
• On the site plan please show the 20 -foot setback. Staff has expressed concerns over the
encroachments of the structure to such a great extent into all setbacks with particular concern
along the north and west property lines. The site plan also depicts in the southwest corner the
grade changes which become a concern for staff as the below grade levels come partially above
grade. Staff Would like for the grades to be reworked so as to not require ramps and steps within
the right -of -way. The improvements should be reworked to be truly below grade. In addition
please show several spot grades around the site as well as top -of -wall and bottom -of -wall
elevations for all walls (for example the planter bed in the southeast corner of the public plaza).
• Staff has also expressed concern regarding the improvement in the CDOT Frontage Road right -
of -way. Staff understands that fire has request a fire lane access which is not covered by the
port- cochere. Options should be explored which pull improvements out of the right -of -way and
still maintain the requirements of the Fire Department.
• Staff has concerns regarding the height o'r the portion of the building located in the southwest
concern and its impact and relationship to Meadow Drive and Vail Village Inn Phase III. The Vail
Village Master Pl2r; identifies 3 -4 stories as appropriate. However, you show four stories with a
tall roof feature. Staff believes this area should be examined for possibilities to reduce the
impacts to Meadow Drive and Vail Village Inn Phase III.
• On the Crossroads Public Improvements Plans several of the streetscape improvements extend
onto neighboring private property. Through conversation it appears you have not worked out all
the details with those property ovv ers and in the case of Vail Village Phase III you have
RECYCLED PAPER
expressed that they do r:ot wish to bring people back into the primarily residential portion of the
their project. The plans should be revised to address the neighbors concerns. Also please detail
how your plan would change if Village Center is not amenable to improvements on their property.
• On the landscape plan please provide details on the plants to be placed in all planter beds. Also
please provide information on the depth of soil pia3ed upon the sub -grace levels of the building.
Staff will be concerned about the depth and its ability to support the growth of evergreens,
Aspens, and other plant life.
• On all Parking Level plans please review the parking layout as several spaces appear to be
blocking access doors and stairs servicing pedestrian circulation within the structure. In addition
please number the spaces you are counting as it is unclear in some instances whether or not a
space is meant to be counted or blocked out for access to a door within the structure. Staff
counted a total of 538 parking spaces.
• Please provide details on the storage lockers room identified on Parking Level 2, Plaza and Retail
plan. For whom are they for and their usage. The concern is whether or not it will generate an
additional parking requirement. It also appears you have a parking space in front of the door.
• There appears to be a CAD error on the Parking Leve 2, Plaza and Retail plan.
• Staff requests additional information on the cooling tower lovers and potential for noise. The
concerns are appearance and noise in relationship to the adjacent Vail Village Phase III
development.
• Please provide greater detail on the furnishing for the plaza. For examples benches, tables,
locations, flower pot sizes. Staff will want details on the year -round activity and viability of the
space.
• Staff has concerns regarding the viability of the retail as it pertains to the arc design. On past
projects it has been the desire to create i^terest in facades in terms of stepping back and forth
and materials. Please provide information supporting your position that the retail will truly
function. Staff may consider consulting a retail professional as well.
• Please provide details on the lines which appear ,o be framing the ice ring. Are they a raised
seating area a railing?
• Please verity that ail plans have been updated to show all the revisions that have been to the site.
Some plar,s show the old stairs and entry to the lower levels.
• It appears there may be CAD errors on the Parking Level I and Retail plan. In addition there
appears to be a column in the drive aisle as you enter the structure. Staff is also having difficulty
understanding the stairwa i adjacent to the bank space and where it leads.
• A sign program should be designed and submitted - or the project. Please keep in mind when
designing the feature which will lead to the below grade spaces that signage will iikely be located
on it which will identify the uses beiow.
• Please pro ide a uuritten description of how you believe your loac'ina and delivery will help with the
overall loading and delivery goals of the _I own. Staff will be requesting that your loading and
delivery be a part of the overall system which will currently be comprised of Vail Resort's and One
Willow Bridges loading and delivery bays.
• Please provide greater detail or: the clNelling Units. It appeared to staff that there were lock -off
units because of the double doors onto hallways. Through conversation it does not appear that
you intend for there to be lock -offs. Also staff only counted 78 undo units not 84 as depicted in
the a3sociated documents you submitted. Please provide enough detail on the plans for staff to
verify that there are truly 84 dweliin, Units.
• Please provide details on the proposed private parking club.
• Please provide a proposed definition filr a bowling 0ey in association with your text amendment.
• Please revise the elevations to show 'the material changes that have been made.
• A materials samole board will be required for the Design Review Board.
• Please provide elevation of the interior walls to the plaza.
• Please provide elevations for the feature leading to the below grade space.
• The south elevation shows multiple stairs on the southwest corner is this an accurate
representation? The site plan does not appear to show all those stairs.
• Please revise the building height pian to accurately show the changes made to the
encroachments of the roof over the property lines. Also provide a building height plan over
proposed grades.
• Staff has expressed concerns that the architecture, while well done in isolation, may not be
carrying forward the design character and culture of the Village. Staff believes that changes may
need to occur to the architecture which maintains your projects individuality, but ijncorporate more
design features consistent with the goals of the Vail Village Master Plan and Urban Design
Guidelines.
Please review these comments and if you have any questions regarding this letter please contact me at
970 - 479 -2148. 1 should shortly have comments from the Public Works in 2ddition to the previous
comments. I will forward them as soon as I have therm. My review is continuing and there may be follow
up questions and concerns.
With regards
G�ti'�QN!
arren Campbell
Senior Planner
Cc: File
4�df}
• • • u 4 4
O
U
U)
U �
�C
LL °
0
7 o
O U
—
�- O
U Q
O �
N G C
E
00
d)
LO
M
O
Cfl
0
Q
O
1-
V—
CL
N
o
go V
LO
L >
0
LO
� o
>
It
o S
r
am
N
°a
00
r
N
L
o
U
N
o
�—
mE0
��°
c
°MU)
O
C: -0
O
U
C
M:3
-0
0
U U
(6
O
CL
O
O
C CB
O
0
O
O (n
O
a
°0
oo
U Q
_.
O
O
' 0
>s (3)
cn
O
0 =
o F
(3)
0
L)
co
V
Co
L
T°
0)
o
LO
0
Z °'
O L O
LL °
c r
N G C
O
00
d)
LO
M
W V .E—
Cfl
O
1-
V—
N
go V
LO
N
It
LO
It
D •�
C9 �m
r
N
r
N
L
U
N
C
L
Qm LO
CY)
co
d! O m
Co
O
co
o
LO
O L O
v
t0 t0
r
00
M
CEO
m
L
r-
� m
O �
� O �
EQ E
. a
U. ° `a
�
o
aQa
cli
Q U) Q
co
N
tm
c�
.�
c ^
mv�
00
co
LL C
N LO
�
U')
CO
o
co'
N
00
co
rl-
(o
ti
• + m +
d•
• >1
•>1
C
N
yy
co
( y D y
•�,
c
r
0
O
U
V
N C
O
U)
D
V
U)�
D
cn M�
M
IL
m
CL
t�
3mm'
tv
LL U)
>_