ADD /ALT MF BUILD PERMIT Permit #: B11 -0013
Project #: PRJ11 -0036
Job Address: 1 WILLOW BRIDGE RD VAIL
Status .. :
ISSUED
Location......: ONE WILLOW BRIDGE UNITS 22 AND 32
Applied..:
02/15/2011
Parcel No....: 210108284004
Issued...:
02116/2011
Expires ...:
08/15/2011
OWNER VAIL DOVER ASSOCIATES LLC 02/15/2011
4148 N ACADIA DR
PHOENIX
AZ 85018
APPLICANT VAIL VALLEY CUSTOM BUILDERS, 02/15/2011 Phone: 970 - 926 -8771
P.O. BOX 2809
0429 EDWARDS ACCESS ROAD, A207
EDWARDS
CO 81632
License: 283 -A
CONTRACTOR VAIL VALLEY CUSTOM BUILDERS, 02/15/2011 Phone: 970 - 926 -8771
P.O. BOX 2809
0429 EDWARDS ACCESS ROAD, A207
EDWARDS
CO 81632
License: 283 -A
Description:
FLOOD REPAIR AT AREAS THAT WERE DAMAGED DUE TO WATER DAMAGE
AND DRYING REQUIREMENTS. WORK TO INCLUDE REPLACING
INSULATION AND DRYWALL AT EXTERIOR WALLS IN UNITS 22 AND 32
(APPROX 200 SQ FT). REPLACE INSULATION AND DRYWALL IN
STAIRWELL AT FLOOD CUT LOCATIONS. FINISH AND PAINT.
Occupancy: R2
Valuation:
$30,000.00
Type Construction: Total Sq Ft Added:
0
................................*__............... ... ».........................,, FEE SUMMARY ......,........................,........._..
.,.,_,_,_,..__.................
Building Permit Fee ------ > $441.75 Will Cal Fee --------------------- > $5.00
Total Calculated Fees
------------- > $1,133.89
Plan Check--------------- - - - - -> $287.14 Use Tax Fee --------------------- > $400.00
Additional Fees------------------ - - - - -> $0.00
Add'I Plan Check Hours- $0.00 Restuarant Plan Review - - - - -> $0.00
TOTAL PERMIT FEES --- ---------- > $1,133.89
Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00
Payments -- ---------------------------- > $1,133.89
Total Calculated Fees--- - - - - -> $1,133.89
BALANCE DUE------------------ - - - - -> $0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior
as required is correct. 1 agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS OR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 A750 PM.
Signature of Owner or Contractor Date
Print Name
bld_alt_constru ction_perm it_041908
APPROVALS
Permit #: 611 -0013 as of 02 -16 -2011 Status: ISSUED
Item: 05100 BUILDING DEPARTMENT
02/16/2011 JRM Action: AP
See the Conditions section of this Document for any that may apply.
bid_a It_co nstruction_pe rm it_041908
CONDITIONS OF APPROVAL
Permit #: 611 -0013 as of 02 -16 -2011 Status: ISSUED
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
bld_a It_construction_permit_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADOCopy Reprinted on 01 -04 -2013 at 09:21:25 01/04/2013
Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R110000109 Amount: $1,133.89 02/16/201101:37 PM
Payment Method:Credit Crd Init: DR
Notation: VISA BENNO
-----------------------------------------------------------------------------
Permit No: Bll -0013 Type: ADD /ALT MF BUILD PERMIT
Parcel No: 2101 - 082 - 8400 -2
2101- 082 - 8400 -3
2101 - 082 - 8400 -4
2101 - 082 - 8400 -5
2101 - 082 - 8400 -6
2101- 082 - 8400 -7
2101 - 082 - 8400 -9
2101 - 082 - 8401 -0
2101 - 082 - 8401 -1
2101- 082 - 8401 -2
2101- 082 - 8401 -3
2101- 082 - 8401 -4
2101- 082 - 8401 -5
2101 - 082 - 8401 -6
2101 - 082 - 8401 -7
2101 - 082 - 8401 -8
2101- 082 - 8401 -9
2101- 082 - 8402 -0
2101 - 082 - 8402 -1
2101- 082 - 8402 -2
2101 - 082 - 8402 -3
2101- 082 - 8402 -7
Site Address: 1 WILLOW BRIDGE RD VAIL
Location: ONE WILLOW BRIDGE UNITS 22 AND 32
Total Fees: $1,133.89
This Payment: $1,133.89 Total ALL Pmts: $1,133.89
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
BP 00100003111100 BUILDING PERMIT FEES 441.75
PF 00100003112300 PLAN CHECK FEES 287.14
UT 11000003106000 USE TAX 4% 400.00
WC 00100003112800 WILL CALL INSPECTION FEE 5.00
Department of Community Development
75 South Frontage Road
Vaili.Co.lorado 81 657
970 -479 -2128;
6 1 W.vallgov,cc,m
Development _Review Coordinator,
r
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address: Project #: Pizi—J I "
Number treet
DR #:
(Number) ( ) / �' / (Suite #)
Building /Complex Name: LAL W rL/oa 1 af, 16 Building Permit #: op
Lot #: Block #Subdivision: VAIL DILL FL 1
Contractor Information VA t- VALLEY WSro(n BUILD& S
r4Kl+ r
Business Name: ��� Work Class: New ( ) Addition ( ) Alteration ( )
Business Address:� Type of Building:
City State: 0 _ Zip: Single- Family ( ) Duplex ( ) Multi - Family (�
Contact Name:
Commercial( ) Other(
)
d ear
Contact Phone: 0-- — 30 Work Type: Interior (VI) Exterior ( ) Both ( )
Contact E -Mail: ?261114Q6f� 0411C&56 1107," —
Valuation of
Work Include Plans Included Work
Contractor Registration Number:
Electrical ( )Yes (VI) o ( )Yes ( )
Mechanical ( )Yes (Zo ( )Yes (8/ ) Po
Owner /Owner's Representative Signature (Required) Plumbing ( ) es ( ( )Y (v )No
Project Irmation
Ow ner Name: 6j y v&, K "Am,1 ✓
Parcel #:
(For Parcel #, contact Eagle County Assesybrs Office at (970- 328 -8640 or visit
www.eaglecounty.us/patie)
Building (/)Yes ( )No (/)Yes ( )No
Value of all work being performed: $ 50 OBO .,Po
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage
Detailed Scope and Location of Work: fip4Gt
2 �-�Qi3
!/144- 7 /Ze!/tlli'�S. �r
ih8�
orS1j ,I
� - �1l� �n�
u.��Ar as 3z
4ex. 6 s. P
G
Inc k,wli, -A f'1 Sp7U�
T [D'0/C U✓/ �o LaTGO
KIS j7�1/i1
(use additional sheet if nece sary)
D
For Office Use Only:
Date Received:
Fee Paid:
FEB 15
2011
Received From:
Cash Check #
TOWN OF VAIL
CC: Visa / MC Last 4 CC # exp date:
Auth #
FN
State of Colorado
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two - Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including
multi - family /condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State- certified abatement contractor. The
clearance letter must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
ill not disturb more than the threshold limits identified above.
Tested negative, or at 1% or below (1 copies of test results included)
Tested positive at more than 1 %, requires abatement (1 copies of test results included)
Tips & Facts:
Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing.
The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos - containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 S Frontage Rd
Fire—inspectors@vailgov.com
970 - 479 -2252
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303 - 692 -3158
asbestos @state.co.us
www.cdphe.state.co.us
01- Jan -11
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: One Willow Bridge, Units 22 and 32, Vail, CO
Asbestos Sampling Report — Page 1 of 2
February 9, 2011
Raj Manikam
Matt Monica
SteamMaster
On February 6, Quentin Danziger conducted an asbestos inspection of the suspect materials that
have been affected by a water incident. Asbestos was NOT found, as described below.
Homogenous
Area
Description
Number of
Samples
% Asbestos
Square
Feet
Type/Friable
01
Texture Unit 32
3
Negative
02
Texture Unit 22
3
Negative
03
Sheetrock/JC Bottom Layer
3
Negative
04
1 Sheetrock Top Layer
1 3
1 Negative
BACKGROUND:
A water incident occurred. Indoor Environmental Services was requested to conduct an asbestos
inspection of the suspect materials that have been affected, as determined by the drying
contractor.
This inspection includes only suspect materials that are visible to the inspector. If other suspect
materials become visible during demolition, they must be sampled before they are disturbed.
Examples of suspect materials include but are not limited to: linoleum, floor tile, ceiling tile,
mastic, sheetrock, joint compound, roofing materials, etc. There are over 3000 known asbestos
containing materials.
SAMPLING PLAN:
Colorado State Requirements - For each homogenous area of less than 1000 square feet, a
minimum of three samples must be collected in random areas. For each homogenous area of
1000 — 5000 square feet, a minimum of five samples must be collected in random areas. Areas
of 5001 square feet or greater require a minimum of 7 samples. These laws are defined by the
EPA (AHERA) and Colorado State Regulation 8.
Determination of homogenous sampling areas — Homogenous Areas are determined by type of
suspect material, texture, color and location.
Determination of random sampling areas — The samples were collected in a random manner.
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: One Willow Bridge, Units 22 and 32, Vail, CO
Asbestos Sampling Report — Page 2 of 2
Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality
consultants. We look forward to working with you in the future.
Quentin Danziger, BS, CIE, ABI — Colorado Asbestos Inspector Certification # 12781
Indoor Environmental Services, Inc.
Dba Q Consulting, Inc.
970 - 390 -0087
QConsultingInc @yahoo.com
RESERVOIRS ENVIRONMENTAL, INC.
NVLAP Lab Code 101896 -0
TDH Licensed Laboratory # 30 -0136
TABLE PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
RES Job Number: RES 207252 -1
Client: Indoor Environmental Services (Vail)
Client Project Number / P.O.: None Given
Client Project Description: One Willow Bridge Rd. #22, 32
Date Samples Received: February 7, 2011
Analysis Type: PLM, Short Report
Turnaround: 2 Hour
Date Analyzed: February 9, 2011
Page 2 of 3
Client
Sample
Lab
ID Number
L
A Sub
Asbestos Content
Non
Asbestos
on-
Fibrous
Number
Y Physical Part
Fibrous
Components
E Description ( %)
Mineral visual
Components
M)
R
Estimate (%
01 -01
EM 694569
A White texture w/ white paint 100
ND
0
100
01 -02
EM 694570
A White texture w/ white paint 100
ND
0
100
01 -03
EM 694571
A White texture w/ white paint 5
ND
0
100
B White texture w/ white paint 95
ND
0
100
02 -01
EM 694572
A White texture w/ white paint 100
ND
0
100
02 -02
EM 694573
A White texture w/ white paint 100
ND
0
100
02 -03
EM 694574
A White texture w/ white paint 10
ND
0
100
B White texture w/ white paint 90
ND
0
100
03 -01
EM 694575
A White tape 5
ND
95
5
B White compound w/ white paint 10
ND
0
100
C White joint compound 10
ND
0
100
D Tan /gray drywall 75
ND
10
90
03 -02
EM 694576
A White compound w/ white paint 15
ND
0
100
B Tan /gray drywall 85
ND
10
90
03 -03
EM 694577
A White compound w/ white paint 10
ND
0
100
B White compound 10
ND
0
100
C Tan /gray drywall 80
ND
10
90
ND =None Detected
TR= Trace, <1% Visual Estimate
Trem - Act= Tremol i to -Act i no I i tc
Note: Further analysis by TEM is recommended for organically bound material (i.e. floor tile)
if PLM results arc <l %.
Data QA
RESERVOIRS ENVIRONMENTAL, INC.
NVLAP Lab Code 101896 -0
TDH Licensed Laboratory # 30 -0136
TABLE PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
RES Job Number:
RES 207252 -1
Client:
Indoor Environmental Services (Vail)
Client Project Number / P.O.:
None Given
Client Project Description:
One Willow Bridge Rd. #22, 32
Date Samples Received:
February 7, 2011
Analysis Type:
PLM, Short Report
Turnaround:
2 Hour
Date Analyzed:
February 9, 2011
Page 3 of 3
Client
Sample
Lab
ID Number
L
A Sub
Asbestos Content
Non
Asbestos
on-
Fibrous
Number
Y Physical Part
Fibrous
Components
E Description ( %)
Mineral visual
Components
( %)
R
Estimate (%
04 -01
EM 694578
A Tan /gray drywall 100
ND
5
95
04 -02
EM 694579
A Tan /white drywall 100
ND
5
95
04 -03
EM 694580
A Tan /white drywall 100
ND
10
90
ND =None Detected
TR= Trace, <1% Visual Estimate
Trem- Act= Trcmol i to -A cti no I i to
Note: Further analysis by TEM is recommended for organically bound material (i.e. floor tile)
if PLM results are<I %.
Data QA
sleluul
awll
Olga xsd I1ew3 au04d 968d 130JU00
SWIM
Owll oleo xed Ii" abed 40M000
CIP
slONlul
Owll
also xed Ilew3 ou014d O e loeluoa
Igill
Owll +, Ole xg
Q d Ilew O ed loeluoa
\auoy
:sllnso�
N�
NU
N/,k (oj) •dwal
O�JeQ 1
,� :awlUaleo PON'" 1
.{
III an ILJOj8J0(>)B'�
loelul
paleog
eol up :uolAPUoQ eldwgg
rl 9 �Z :Owll/eleQ
8 Pe4sM u!lA2d
'tisiruaJnt itwou JOwuow uc-L a kv vriflJ .VaO.uu., ,I..uJ.d
in Y GA u.m m .mu.. '.J• .. .....
.. .. - - - -... - - -- -- -- -- �.'....— "-- -- -- -- r— .. - - -- ..- -r •q........ a -y. ryr.l.r "J k. .1.4u .I t& uv Pm/plpul w tltrytut ptittrotJ Joi nlowtt ou"Ps
SW W Ug1111UMt W4 CMOs tMtWtttJdW AutdwooAuglo 0ulU61t Jt8 'titP 100010 .SotJnomul t4i way 6utunsou tuolJtlrculto ul tuoltelwo Jo uout Jot alglcuodsa tq 10u 111M Put PO/490w u0jmWJ0tq uodn pottq tydwet 11m1311 13LON
hu/lm Allm Mai nene 1- nmcu — '— . — rA"-.. n
---- .� . —"— eR 1,)M,.,�,+)'JS�I.; ,; • i!! ���? 1±; 31 �1! I�' fr' EOCx! �'; �Ael' �9�, t! ld.��fi'�,,��..'�!i1N�Q'�u.4.?� iS169::,,
yy ii� ■i� ]4 l ':
ZSZLOZ S32i
,AM Ua I I IM11 I,
:ewil ena
:a ;ea ana
I�
.{
W
110,1
ry '§ , n i �n5cc 1
Y!S ��rl
�{ �4--
�
�•
n
, a�� U0151111,11110110
.�,:
—Z -t G O-'•' 6.
• C'�i r ul .I N
�'�,�.
- I, ro f I' S,5II��,y: GGI
f li�f'6'1 Yl
14 ° ur
'
w.a' N
IY I Af n
d ✓� I�(nJ.
• }"
9
'h'
'I
P
•'I g
I
1. rug
MR.
'!ti
,i�' ,y
1�
1g'.r
�S"
„r:
su
ur ,.Ig i.
I
d! 'x'161
:I �kr4 r �.Ih a, ,, Ir {I`»4Nv lq.l'',f I. ° a'� IrNftif', r 'r, i I k I'!'�i �.. I h . �L��I Ifs
-;il
1'
I 'e',I
•ti •qri '41�i,
'L
n'nR
I, E� 14�ir
I.t
'ps I'I:1'I
:r.
-Y.;
�i
�i� ^.Idh
r
?� Vf. ll'tll'
,il n�1, i ',Ai :�l 11��
IJ pn #.I It r
J 4 n I I { e �.I
'i'� I VN I
TIE n 5iN liJ '6„ hl�
.,! II 5. T ` , A .
Miyyfl 4 :1I
ql. aq '.�J +J.
it
i
.1�Iy, yJ
i 4. >'
6
1
V S t'
[..
Irt` L 1 5 • G
I
J
r F 9
" b •. : -5 1,71 `1 YkY.
-7j F JJF h _..d I Yj
.`r J'.
..N,
K
r•�''1 t
.`;.,
rr
- k. S.IJ;1,'1 rlJr4krl!; iX9slr ras�,ri I., +ti4i y >,;'rli ror �i;G... a. !
g.....
.n .a•; -al �h 4'io-�l' �'.,���� d;i �•' J.l•;i1,;IhC 31;
dm wwAly
MMPAU w
O
yi l
...
i t �!1 �� L s; r Ill R l r A /l 1 .a Y Ff Y 4' �} . I' I , '... . ✓ ... ,a,a 1(7.,
!
E
P000llap
PQIl
POooll00
algo
r
Q;
i
V
y
W I
Ln 7t�T{�
f—
iC
.aioponAsW lgood9
F t k nF 4tgah n, n
M
N �I
! Y.t.. 1 f,l.rr -.r.r Q..r ile Ir pl•'.1'k :4 bk.l. l ,i ,i' il 1 Ir ". I' r r
h�rtliJ�xin:N.ldyrl7 r.� Ag Q 4" Rep £ — '44K-
f4uo 01pow adim POAQUIV010 28113
W1SV«
m
opuo JtWns
p a J°4�
1
O
�
�
+
d1Ql l un8 wnd ma jotipulnbu Aep o l Aep S ' HSna _
t{ U011- OU 10Pd. D+IpIeM p glgYW ! 9 V>liaa
ABC) 9-6— A 6z Hsntl >:nG ! (s)laoW
. . RON, 3 .
MM ■ �oleM 9ls9M
MQ a JOl$M UIHUuQ
M a Qdm
S x 110$
d a;uled
Q a lsnQ
g
049 a WI /J4z,* WJd 4sna1
3EIVQNV1S (ABC) ICON) A11HOINd (Ago owe HSna W311 WQd !
8 a INnB
my 17Qk rl
'h'�. I+':rF�l
9
1'
:...
1.,1
...�l�Qi.k, 1
YUf I IJr,.I <[i'IJN h
r. .�r
,v l�F:.,`�r;�il ?115.,�F1'�• N..t �14n:"'S!'.'r'�r
,t,. .kn .15�•' f. Y�i,. a.
X40 937; 'P10 Nl - / YiS1�0
2 Z Z v 77 77) )M ak i D
:uoPeooyuopd140t01otl01d
:ttoJPPV fi%W3 610Jt1y190 W90 ItUIA
:,.atdmto �.atdnito
4'0'd mpua JogwnN MOM
a 1 � u
:tuoyd
g 00 ^^ C ' X10 :tu014d
-";r I k1 :Itwppy
04
%0;31 ��
:tttJPPy
:PMU03
:ioquop
(uedwop
S P
(utdwo0
:NAI I VLAImn
ml I nwi luny
I , „ -,�,., ,
---- .� . —"— eR 1,)M,.,�,+)'JS�I.; ,; • i!! ���? 1±; 31 �1! I�' fr' EOCx! �'; �Ael' �9�, t! ld.��fi'�,,��..'�!i1N�Q'�u.4.?� iS169::,,
yy ii� ■i� ]4 l ':
ZSZLOZ S32i
,AM Ua I I IM11 I,
:ewil ena
:a ;ea ana
I�
_1�7
03- 1322012 Inspection Request Reporting age 2
4'42 pm P Vail CO q- City Of 9 vm- 003(e
Requested Inspect Date: Wednesday, March 14 2012
Site Address: 1 WILLOW BRIDGE Ra VAIL
ONE WILLOW BRIDGE UNITS 22 AND 32
A/P /D Information
Activity: Bl l -0013 Type: A -MF Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: Insp Area:
Owner: VAIL DOVER ASSOCIATES LL
C
Contractor: VAIL VALLEY CUSTOM BUILDERS, LLC Phon . 970- 926 -8771
Description: FLOOD REPAIR AT AREAS THAT WERE DAMAGED DUE TO WATER DAMAGE AND DRYING
REQUIREMENTS. WORK TO INCLUDE REPLACING INSULATION AND DRYWALL AT EXTERIOR
WALLS IN UNITS 22 AND 32 (APPROX 200 SQ FT). REPLACE INSULATION AND DRYWALL IN
STAIRWELL AT FLOOD CUT LOCATIONS. FINISH AND PAINT.
Reauested Inspections
Item:
90 BLDG -Final
Requestor:
Comments:
Expired
Assigned To:
JM ON
Action:
Time Exp:
Inspection Histo
Item: 50 BLDG - Insulation ** A proved "
02/18/11 Inspector: JRMp
Comment:
Item: 60 BLDG - Sheetrock Nail ** Approved
02/18/11 Inspector: JRM
Comment:
02/25/11 Inspector: JRM
Comment: CONTRACTOR CANCELED
02/28/11 Inspector: sgremmer
Comment:
Item: 70 BLDG -Misc.
Item: 90 BLDG -Final
REPT131
Requested Time: 01:00 PM
Phone:
Entered By: MHAEBERLE K
G�1 l aa�l
331 "�I3�
Action: AP APPROVED
Action: AP APPROVED
Action: NO NOTIFIED
Action: AP APPROVED
Run Id: 14232
**
Requested Time: 01:00 PM
Phone:
Entered By: MHAEBERLE K
G�1 l aa�l
331 "�I3�
Action: AP APPROVED
Action: AP APPROVED
Action: NO NOTIFIED
Action: AP APPROVED
Run Id: 14232