Loading...
HomeMy WebLinkAboutB11-0014 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .� TOWN OF YAIb ' Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD/ALT MF BUILD PERMIT Permit #: B11-0014 Project #: PRJ11-0037 Job Address: 1881 LIONS RIDGE LP VAIL Status. . : ISSUED Location......: VAIL POINT UNIT 9-D Applied . . : 02/16/2011 Parcel No....: 210312207026 Issued. .. : 09/21/2011 Expires. ..: OS/28/2011 OWNER DAVIDSON, PHILIP HAL SIMS 02/16/2011 434 RIDGE RD GOLDEN CO 80403-1594 APPLICANT NETT DESIGN CONSTRUCTION 02/16/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B CONTRACTOR NETT DESIGN CONSTRUCTION 02/16/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER.WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Occupancy: Valuation: $8,800.00 Type Construction: Total Sq Ft Added: 0 ......,...._..,,,................>,......._................,,>.......,,..�,,.,..,....,.., FEE SUMMARY ...........................,.,......,,.........,............,.........,.....«,,. Building Permit Fee------> $167.25 Will Cal Fee---------------------> $5.00 Total Calculated Fees-------------> $500.96 Plan Check--------------------> $108.71 Use Tax Fee---------------------> $0.00 Additional Fees-----------------------> $0.00 Add'I Plan Check Hours-> $220.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES-------------> $500.96 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments------------------------------> $500.96 Total Calculated Fees--------> $500.96 BALANCE DUE-----------------------> $0.00 ..,,+................................�......._...,........._._.._........<........,.._.._..>.....«,.........................,........,,,,,,,.,......,,........_._.,...__..,.........,.+..... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 PM. ^ /�� ' r Z� � Signature o Owner or Contract r Date �+ l ��/� ` � � J � sy( �/7/ t�S � / Print Name b I d_a It_co n st ru ct i o n_pe rm it_041908 ...........................................................................x.,....,............,.......,,,..,.,.,.,.,,,,...,,...........,.,..............,.................,......... APPROVALS Permit#: B11-0014 as of 09-21-2011 Status: ISSUED ........................................................................�.��........................�.................,...........,.....,..,........,,............,.................. Item: 05100 BUILDING DEPARTMENT 02/28/2011 Martin Action: CR See electrical comments 02/28/2011 Martin Action: AP 04/18/2011 JRM Action: AP APPROVED REVISIONS ADDED 2 BATHROOM UPGRADES TO SCOPE OF WORK Item: 05110 ELECTRICAL REVIEW 02/28/2011 Martin Action: CR Please provide load calculations for the existing electrical panel showing code compliance for the additional loads added. 02/28/2011 Martin Action: AP Item: 05120 MECHANICAL REVIEW 02/28/2011 Martin Action: NA Item: 05130 PLUMBING REVIEW 02/28/2011 Martin Action: AP Item: 05600 FIRE DEPARTMENT 02/17/2011 mvaughan Action: AP change of scope requires approval by fire department. Item: 05101 BUILDING DEPT REVISION 05/05/2011 JRM Action: AP APPROVED REVISION TO ADD AC. Item: 05401 PLANNING DEPT REVISION 04/26/2011 Warren Action: AP The air conditions condensor unit has been approved with conditions as identified on the Design Review Approval. 09/21/2011 bgibson Action: AP New deck revisions approved by Planning. Plans routed to JR. Item: 05601 FIRE DEPT REVISION 04/22/2011 mvaughan Action: AP .................................................................................x...,x....,...................,x........,,,..,.....,..,.....,......,,.......,,,................,,... See the Conditions section of this Document for any that may apply. bld_a It_construction_permit_041908 �/w��wwf�f�wwx�RwwwwNwww�wN+wRwwwwwwwwfwwwww#rtwwwwwwfrtw#wfY#Ykkw##11ff�/*Mlwwwwk�twwwwwwwYwlw�#kf#��tf*�f�M�*�**�f��4wffrtf�wf�rtwwwwwwwwwwfffwfwwwwwf4ww#RwNxxNRwwf****R�Rt�*fff*#�Rf• CONDITIONS OF APPROVAL Permit#: B11-0014 as of 09-21-2011 Status: ISSUED ....................................................................................................�....,........,.x,,,,.,.,,,.,.......,.,,.........,.,.....,............,....,,.... Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: CON0012176 The new deck shall match the style, materials, and colors of the existing Vail Point decks. b Id_a It_co nstruction_perm it_041908 ****************+++**++**********++********************************************+++********** TOWN OF VAIL, COLORADO Statement ++***+**********+****************************++********************+***+*******�************ Statement Number: R110001278 Amount: $133.10 09/21/201104:50 PM Payment Method: Cash Init: SAB Notation: CASH - TED SIMONETT ----------------------------------------------------------------------------- Permit No: B11-0014 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-122-0702-6 Site Address: 1881 LIONS RIDGE LP VAIL Location: VAIL POINT UNIT 9-D Total Fees: $500. 96 This Payment: $133 .10 Total ALL Pmts: $500. 96 Balance: $0.00 ************+*+***************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 14 .00 PF 00100003112300 PLAN CHECK FEES 119.10 ----------------------------------------------------------------------------- ;, A ;; � r� . �`� ��,'.-, Department of`Community;DeYetopinen�° ' �'�'� '� `� , `'� '���a ��„ '�5 Suuth Frantage"�o�ci � x , � R; �J ��.�C'""!� z u�::a �f 'u,�� �4:�� � � �w k�t�s , ... ��'«t � Y a�'j'\r�}d�.� Y. �i�` �r. �"'�y. .. � . . > �`+`�� ��' 9�'�,` , ' k -' ,�#��.� .�'��a�} Y � � .a� t�� �,.rr.u� ��e . �.F . .J� ✓�ifi�i t� K.. . .. �r. . a x '�`s �. t JI � �� � . . s . ��.•i. k +�" . . , e`{, . . �.� :,�� � D e���e�,�, ..g'+ �j ��"r,,ii:�'�t?��`.. . •'{ i' , i.� TRANSMITTAL FORM Revision Submittals: •----1i-. "Fieid SeY'of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance. 'Permit#(s)information applies to: ���M�����MAttention;�����_.__._._______.....__(�Revisions �����vf�V ; ( )Response to Correction Letter ; � If -- �i� / �f attached copy of correction letter /� ( )Deferred Submittal E ��i�,` V� ��— ( )Other � i , i ` � ...�..,...�.��,�.,�,�........,,.re_.o,,,,.s�,..�...�,�..w..�..-,..���.,�,..._,a....._..,.,,�...._..�.�...,�..:...�..�..Y..,:..�..,..�..�....�.�..._..,._.��.��.��,.,�.-�m�.�.�.,.......�.,�,..,��.,�....� �,..W.....� R . `Project Street Address: � � '� �-,�oti,y,��,OC6.. 4'G C� �g £ Description/List of Changes: ; z � �(Number) (Street) (Suite#) _ ��'�;��c�T �+.�' �t7 L1�Cjl�r7 i F �;� [ : �BuildinglComplex Name: ��� � r'�%�+''+— _ ���- � �' ������'� ��''c��-- �� ' 5 E = [ t � . �._._ —�,.,M»,,,a,,,�,.a,M�,a..b::,�..,.x,.b ,�..,,��,�,.s_. < �fi 1�2 �J f-�- t-�rt/� ► �C-u� 4✓ � ;Contact Informafaon: �,�,�..x.����.�.� _,_��..��,A..�,..,�, ,.�.�.:; k Com an ��,]__7" �E�/Giv'S �rv�;.2�c= i,a rL' s � I S T n%C' (.�PPe�� ,�-Z'� p y: „ n � �Company Address: u�K -Zr 7� ? j 9 : ;City: �/�'r �- State: �O Zip: �'S"16.5� ° i . i -�-'�� # ! e � �i ryc.L`.t1 E %� � � �Contact Name: '` � 4 ' £ � 'Contact Phone: �"f/�4 � ��4 —��S y3 � i � �3 � (E-Mail 1i1� T'T !� ���,n c'�tS i : •�1/��'7- � � E � � � ; � _, _ ,�._,�.,...�,.<-�,,�..,,,.��.�...w,��,.�»�..,..�-„a....�:e=;.�,�..:.:..,.,.--�.>,��:..:.,�,..��:v,.,...n=�,_..,:r.,._,:�,�,�_,,_,.�,� 4 � �Revised ADDITiONAL Valuations(Labor&Materials) � � �(DO NOT include originai valuation) � x ; E � F �Building: $ �� �d (use additional sheet"rf necessary) ; . ...._.. _ _._. _._._._. _ _...._.._.. _..._...___ _._.__. � _... . ___.__. .. _. i ;Plumbing: � �'`��� ' � �Date Received: , .� i �Electrical: $ � � ((� �jJ ;Mechanical: � �� i D � v � � v � , ; I Total: $ �rSfL�G � .CJ .�� ; �Gr 1 Jr 2��� ; TOWN OF VAIL O1-Jan-10 � � _ _ �- ^ _- 1 � ;� ��' _- __ _ = = _�._ -� � - _ _ _. _ � _--T _ __ _ -- - _---,-�-�- --, __^ J �- i .i' - , i '- �..., ' - _ .-�-1-"" „� .��'r r- ��� vr ���� �� t� ��__� -�� �+� ����� ��l �-_ �� ``_� --� �� � �� __ �� ��� �� ��_- �1 V_ 1 I �� .�� �� � �� � -�� �� �� � � i�l ��./` l <I' �_ __!� ' _ ' ./' / _• 1 � � -•-� �r� � � � .� w � �� �. �• � w• �� �� -`. _ - i � .�-. �� � -` �_ - l!, _�� -- �� ��. �-�- _� i � �� �' �- �� �� _�� + __ �:'.� .�� � �` �� ^ _' � .--� � _ .�� � � - .� � - __�, ! � �� �.. _� ��� �• - \ __,----- � �� � ,,,,_ �. �- - _� ��r���� ..��- ,� _...__ - _a --�� �,�.�'-� � - �, ,_ � 7 � �. 8���„ ,� --- - �- � �� � j� !^ / -r �� 1.r• � �� SE MAN � 4�-�--•�-_ - — 142 0 � r i- ' � � `RIM =53135� � � �- ' -- � _... -� _ ! _ f '�"., , - 1 � T� - �r � / 4 V ,�� ,�\ f i- \ - ' �- � _ �/ _ � ` Z� r �-� �.�� _ � ' _ �.�/\� / f I � _ � � " ` ' �AB ( � - 2-r;o���� _ � , � ..�- r ` i- � � 2 9 8� f� - �-°� , �,' .� �^ I - � ..�� _ � � / 6� C�/ ^R A D � .`�' � 812 7 5�'V �' ' � ��' p\• � X ��'► � f � / �� - � ,�\ , �r1-0!'t-_ � � r \ �� � �j��p__ � , ' \(� , i J , r r � , I �b i� t �' ! R9 �� � .b �,$,�2 5 � �� - o ' _� rD � � �� � _ , � / � i, �ii� � ' � � � ' ' �� ,� � � i -w � ` // ' , � � r� J � � / _ / - X 8121 3`i� �.� �� i� I� � ���( =�r ` ►3 �-� _ 9�.�g� � � �� � � _ �I�D ' � /� Ik - � �/ / �� _ � � � �� � / ;\ \ ��, � _ ! • ,�r, �� 81193�� i7 `` � ` a ��,0 / ; 0 I ' -3 s �\��� � ^�1���!lT v _ � 302 8 4�1 4 i T �' g� ,� \ \\�� � -� ������ \� � ` _ = ��G�!`��� �� ��`�o�' l I � - � � , 7 1 � \\\� `\\ �_ -�1V�+�� O / / � � - �1�G� �\\� \\ ��\ E J� �'i'•D u'' / �0�� L+�'-���-�','�3��01 . � \ . � �\ � ISTING ROA a �SEWER pG �1'��p ' � ��a�� N� a�}a�4� � � � ` \�\� . 1� OACHMEN r � �1'� ~ ►-YSr���Y' �g 4 / �� �\ `�'�� _ �1-13��� i ` , w 7j M , I 9 _ \ �� ' \ f 47 y `j _ ����� / w "� 7 / � �� �� ����.� � � 7 �/ . �� ��� � ,�' � \� ` �� � � / J �� f �� ,�. . � ` \\� ��_ ,3�„� ,�� , ^ � �''�^��� r„ -I ' , ' r ��.� ��� _ � r ', / �-��` � �' �v �,�•C� ---�`- / � � •. ' ' ' � � \ �3 � � , � � , ! , � � , = 54°C �'� ! � � R - 177. � _ _ J � �r NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES 1� TOWNOF YAII. ' Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD/ALT MF BUILD PERMIT Permit #: B11-0014 Project #: PRJ11-0037 Job Address: 1881 LIONS RIDGE LP VAIL Status. . : ISSUED Location......: VAIL POINT UNIT 9-D Applied . . : 02/16/2011 Parcel No....: 210312207026 Issued... : 03/01/2011 Expires. ..: 08/28/2011 OWNER DAVIDSON, PHILIP HAL SIMS 02/16/2011 434 RIDGE RD GOLDEN CO 80403-1594 APPLICANT NETT DESIGN CONSTRUCTION 02/16/2011 Phone:970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B CONTRACTOR NETT DESIGN CONSTRUCTION 02/16/2011 Phone:970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER.WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Occupancy: Valuation: $7,300.00 Type Construction: Total Sq Ft Added: 0 .......,,....>........................................,,..�....,................,.., FEE SUMMARY .�...>...,.....,....,�,x.......�,.,,..�...,.....,.,..........,......�..,......... Building Permit Fee------> $153.25 Will Cal Fee---------------------> $5.00 Total Calculated Fees-------------> $367.86 Plan Check--------------------> $99.61 Use Tax Fee---------------------> $0.00 Additional Fees-----------------------> $0.00 Add'I Plan Check Hours-> $110.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES-------------> $367.86 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments------------------------------> $367.86 Total Calculated Fees--------> $367.86 BALANCE DUE-----------------------> $0.00 **44**f!!dfi*1`k41`****4R*M*M'kff}*f"kw'*kfFk+t'k#'k'k'k'k'k�Yfw'fffff#**#*******4#*ftr**1lt`fif****1r*R**tMw**f�r*N'k'k'k4'k4**'k*1`**k****k*'kw'f'k'k'd'k'kR'k'kff'kR'khiPh'kR*#Yr/*/*�RxMkirlr*fi*!fit(***1fi4�'k4'k'k'ki1"kT"kfi'kiPi1'fiww#**** DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECT N SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4� 0 PM. , ` Signature of Owner or Contractor Date Print Name b I d_a It_co n st ru ct i o n_pe rm it_041908 x����������wx�rwwww�wwww�r���ee���xxxw�xxxx�x�xx:��w�xw�ww+wwww+ww+w«xxx�����+�+++�wwwww+w»���exe�+��+����������w+www�wxx����xxxx��+�++w�w+��w�xx��+��w«wwww��+�xxx��+w�wwww+K�+�++++ APPROVALS Permit#: B11-0014 as of 05-05-2011 Status: ISSUED ..............�.......,......>.....�...,..,................,,.........,.....,,.........,..,...............,......,..«.....,,,,,,...,..........».....,..................x,,..,.......,, Item: 05100 BUILDING DEPARTMENT 02/28/2011 Martin Action: CR See electrical comments 02/28/2011 Martin Action: AP 04/18/2011 JRM Action: AP APPROVED REVISIONS ADDED 2 BATHROOM UPGRADES TO SCOPE OF WORK Item: 05110 ELECTRICAL REVIEW 02/28/2011 Martin Action: CR Please provide load calculations for the existing electrical panel showing code compliance for the additional loads added. 02/28/2011 Martin Action: AP Item: 05120 MECHANICAL REVIEW 02/28/2011 Martin Action: NA Item: 05130 PLUMBING REVIEW 02/28/2011 Martin Action: AP Item: 05600 FIRE DEPARTMENT 02/17/2011 mvaughan Action: AP change of scope requires approval by fire department. Item: 05101 BUILDING DEPT REVISION 05/05/2011 JRM Action: AP APPROVED REVISION TO ADD AC. Item: 05401 PLANNING DEPT REVISION 04/26/2011 Warren Action: AP The air conditions condensor unit has been approved with conditions as identified on the Design Review Approval. Item: 05601 FIRE DEPT REVISION 04l22/2011 mvaughan Action: AP ».............................x.,.x,...,,...........,.,,,,..............x..,...x.......,......,....,».....,...,,.�.,.,>,x......�.....x.,................,...�....,.................,, See the Conditions section of this Document for any that may apply. bld_alt_construction_perm it_041908 .............................................�...<......,.<.,..,.,............,..........«,....,...,....,.................,>....,,>,....,.............,...,.....,.�.....,..,....,,... CONDITIONS OF APPROVAL Permit#: B11-0014 as of 05-05-2011 Status: ISSUED .....»............................>.,,..,.,..................,.�......,...,�.,.........................�.....,.......�.x......,...,,..............,........R........».,.......,...... Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. bld_a It_co nstru ction_pe rm it_041908 ******************************+***********************************************************+* TOWN OF VAIL, COLORADO Statement *********************************************+*+******************************************** Statement Number: R110000405 Amount: $115.50 05/05/201108 :52 AM Payment Method: Cash Init: SAB Notation: CASH-TED SIMONETT ----------------------------------------------------------------------------- Permit No: B11-0014 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-122-0702-6 Site Address: 1881 LIONS RIDGE LP VAIL Location: VAIL POINT UNIT 9-D Total Fees: $367.86 This Payment: $115.50 Total ALL Pmts: $367.86 Balance: $0. 00 **********+***************************************+++*****+********�************************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 70.00 PF 00100003112300 PLAN CHECK FEES 45.50 ----------------------------------------------------------------------------- _ _ _ � ; �� ¢ '`-' Department,of Communi#y Development. ' '� �, '_.�, � ���� :�� , ��� � � - �� �'�, '� � " ��, � ��� � ��:s� � � ; 75 South Frontage Ro�c1 �� �.�., =f - R�� �,; x�� ,z��T � - . Vail, Colorado�-8�65�`�" �, �--__ �� � � �� .�,�� ���- aTei". 97A��79 2'�� '� -�. . y � �; �� �." �,�. ; �_ �. � p � =, � � a`��� (� (� q�7��{ � ,�h`��t . "Sk:a :. ' _�� .. . r a.r ,f'� �� ��X.'.7�L`�t 712��� �� "�t�,I� `�,�M°"�� ����_ _�Web� ww`�►r vai�2�ov�d��,, � � De�e"�opment.R�vtev�r�oardfn�t` �` , � _ , a .,a , : , ' ��f F���}(�� 4t��; : . � � - r �.r' �, . � �. ,z �� � .�, « .. - ��- , � �-, .,... ' . + `` . � a , � � �, + , �� ' , n ..' . ,� ,� �� i � «c�','r,�.�. .� ._.�....a '�' _ . t 4 . . � .. ,...... ._ . ;'��"' .: ,. .._.,..�.�..�....,..�i�`��'ar.�',���..,°r�- TRANSMITTAL FORM Revision Submittals: 1. "Field Set"of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum), and are due upon issuance. ____ �_ ___W___� .�.�.__.�_m_________..____� Permit#(s)information applies to: ��� �� Attention: ��� �( Revisions � � ! � �/ _ QD /�/ ( ) Response to Correction Letter ; / attached copy of correction letter � ( ) Deferred Submittal �ti�� ��3`1 ( ) other ,..T.la.�����... _,m�. .�� �..��,,.�.rv.. Project Street Address. � � �� m�qY� �M�����V,µ� � �� ' � L���Is2�p G e� �Q P -� ��� Description/List of Changes. ; ;� � � a(Number) (Street) (Suite#) ; �i►/S j�-[� �/L �/✓D/ T Oi✓o�- � �Building/Complex Name: V/}I t- /°��% _�'�aJ��.�fZ- i.�/ ��P"!L O�"- ' ' �.�.��. _�.���„� KK��. (,iJi T A-�✓D /�:iz �or��o�T a�.�/�' �Contact Information: l � n `Company: �6� 1/��l�oNS �(Jn�S j!Z✓c.°T eN !��✓J�T /� H�/�G �OOHI - ,Company Address: �o�c ,�l 7 � ( � /' � f City: ��/�/� State: � Zip: 16,� � ( �- � `Contact Name: � � D � �t C N 6 ! / ; �� - �� � �Contact Phone: / �� '� 3 ! 3 � � ;E-Mail /✓6�� � � �/'''��-�S�i• /1/�� � � � ��,��,���,�.�...._.,�,,�,.�,�,.,,,,.�.�,,� .�„�,.....�,�,�,.,�_._�.....,�m�,��,..�....�,,�r��y,.�_ ..� � � ?Valuations(Labor&Material)) � E Building: $ �Plumbing: $ �(use additional sheet if necessary) � ; „ ____ _.. __._ _.._ ____ __. __._.__ _, ;Electrical: $ � 30� � � (N I� � C1/1 (� V � ` ;Date Received: � �•� V LS � � �000 � D €Mechanical: $ ' � APR 2 0 ZQ�1 ;Total: $ �3 DO 3 _ _ ._ _ -- __ _ __ __ __ _ _ T01NN OFVAIL 1-Sep-09 Design Revi�w Board . ACTI4N Ft?RM - � aepar�tment of Community Deveiopment ��j��/�� �J� ` 75 South Frontaqe Road, Vail, CokoradQ 81657 R�� t! Y tel: 970.47'9.2139 fax: 970.47g.2452 vv°."�'�'��'YC��.E�'���E+�- web: www.vailgov.tom Project Name: DAVIDSON AC CONDENSOR INSTALL DRB Number: DRB110092 Project Description: INSTALL AIR CONDITIONER CONDENSOR ON REAR OF UNIT ON LOWER LEVEL Participants: OWNER DAVIDSON, PHILIP HAL SIMS 04/12/2011 434 RIDGE RD GOLDEN CO 80403-1594 APPLICANT NETf DESIGN CONSTRUCTION 04/12/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License: 290-B Project Address: 1881 LIONS RIDGE LP VAIL Location: VAIL POINT 9D Legal Description: Lot: 9D Block: 3 Subdivision: VAIL POINT TOWNHOMES Parcel Number: 2103-122-0702-6 Comments: See conditions BOARD/STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 04/12/2011 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail stafF and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0011864 The applicant shall paint the air conditioner condensor and all assocaited rnnduit PO HOX 2>S5 DILLON CD. 80435 {970)46&02a9(OFFICE} ` � ' (970)468-8149(FAX) • To: `�,�^�'�� From: BRUCE CAMPBELL FA�: �7�f �'-s,5'/ P� � P� o��: �1~f� �1/ �: cc: ❑Urgen! �For Review �Pl�ase Cemment 0 Please Reply ❑Please Recycle •Commenta: �/�� � p� � `� i,5'7D �� ,rt� x 3 - �7/� Gl�vr���y �5'av �5 rw/� .tp�f ,3�� �, 9 Z�o �s�' 3a�� ,��,�� x- 3s a��y .f'-�b� 76"G� ,�ry� �s"�o •�o�t�;O,►.saw..s�,.. �� �„� �o mic rz� 1 z a�v �rc,*�c� o� iQ G a r ��'fi—�G ",�'G�C� ��a��' �z�vo .= `�7���Zs i�i'd ISSS9Lb0L6-a1 6bT8 89b 0L6 �Ibl�3-13 �i�tJki�:wo�� 8t��L0 SjOZ-60-2ldki �U1 7 t t��.}ZyP FS21 L'8vtClSpn 3u3-277-i 7(YL � R.5 # � R�'iC 1 8 � �Ccnex�-, aneC�.; ! � � / � /�R[A O% QSPkA�T l r1{82° 2�QQ'�E � �C.�� '" � � �?tia � O .,' i F3[�r��. !$T O Z � � � „r----' � O N � � a' Etv;P'r t,+ �' uECK �T1 $ ,�r� � - `� � �r+''i'f �wC �*�R� w��t;D �/ , � FReM� -�yy�,�ii0ii� w `" (���G.. m �2 �:f'ERi�Y L+N€ Ft):IvWS p Lafl� � CAR7Y _ NM�: ;/►�� ` �\ _ uCk"r�ati. c�= (/ ��ti C�•;O�Sy���- �� C C�T 90 �,.- ���°,`,^' ., --- —' o.�a ;�a?E � 33 '� 3�x t3�� �^�''� �` / fn � �.fi � Q � f����a�x; ,�. � � `^ �'EAM�4Vf: C' -� CECF _ e_ �� �� _____-,--- n '��-� S��°l���`(V �_�, �.a TRACT B � ' :.DMAA(i�,; i�RCE_ ; � NOTE: THIS PERM/T MUST BE POSTED ON JOBS/TE AT ALL T/MES .� �owxoFVr� ' Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f.970.479.2452, inpsections 970.479.2149 ADD/ALT MF BUILD PERMIT Permit #: B11-0014 Project #: PRJ11-0037 Job Address: 1881 LIONS RIDGE LP VAIL Status. . : ISSUED Location......: VAIL POINT UNIT 9-D Applied . . : 02/16/2011 Parcel No....: 210312207026 Issued... : 03/01/2011 Expires. ..: 08/28/2011 OWNER DAVIDSON,PHILIP HAL SIMS 02/16/2011 434 RIDGE RD GOLDEN CO 80403-1594 APPLICANT NETT DESIGN CONSTRUCTION 02/16/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B CONTRACTOR NETT DESIGN CONSTRUCTION 02/16/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER.WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Occupancy: � Valuation: $3,000.00 Type Construction: Total Sq Ft Added: 0 x,...,.,.....,.....,.,,,..........,,..,,.....................�,.,.......,.....«.......... FEE SUMMARY ......,,...,,................,.......,..,....................................+... Building Permit Fee------> $83.25 Will Cal Fee---------------------> $5.00 Total Calculated Fees-------------> $252.36 Plan Check--------------------> $54.11 Use Tax Fee---------------------> $0.00 Additional Fees-----------------------> $0.00 Add'I Plan Check Hours-> $110.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES-------------> $252.36 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments------------------------------> $252.36 Total Calculated Fees--------> $252.36 BALANCE DUE-----------------------> $0.00 .........................................,........�..........�.............,...................�...........,.�,.............................,.....................................,,.. DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION ALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY T LEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 PM. � � � /� gnatur o O ner or Contractor Date � t � ` �i �o n1 6` /� Print Name bld_a It_con struction_perm it_041908 x�����xxxxxxxx����xxxw�xxxxx�rt�ww�wxwwwww�w�wwwwwwwww�ww�wwwwwwwwwwwwwwwwwww��wwwwxw��www��w�ww�wwwxxw�w�wwwwwwxwxx���xxx�xxx��x�x������x�x����������x���w���wwwwwwwwxwww�wwx���x�x�� APPROVALS Permit#: B11-0014 as of 04-18-2011 Status: ISSUED x*1rht�t(RMt`Yf�wlratftl�Rfkf*1�41rxx4�.tfwR V#RfrtR#YrNYrtrftrtrFY'RPrRPrhthRtrx###Yr##trfftrflit##wRRYrYrYe�tR#%�whYertYrR>xhxiT44'RlRt(ff*4wf4xxp4liFfifr*1rx#1e**wft`1r#**rt4fe4#rt1`4ffi(i(i(*f#�k#tY`krtwY`�kftrwrt V Yrwe#Yr V YrR'kYrf+Fw�fwwli�wA Item: 05100 BUILDING DEPARTMENT 02/28/2011 Martin Action: CR See electrical comments 02/28/2011 Martin Action: AP 04/18/2011 JRM Action: AP APPROVED REVISIONS ADDED 2 BATHROOM UPGRADES TO SCOPE OF WORK Item: 05110 ELECTRICAL REVIEW 02/28/2011 Martin Action: CR Piease provide load calculations for the existing electrical panel showing code compliance for the additional loads added. 02/28/2011 Martin Action: AP Item: 05120 MECHANICAL REVIEW 02/28/2011 Martin Action: NA Item: 05130 PLUMBING REVIEW 02/28/2011 Martin Action: AP Item: 05600 FIRE DEPARTMENT 02/17/2011 mvaughan Action: AP change of scope requires approvai by fire department. ........................�.....,.,.......,,,,,.......,,,,,...............x......,.,............................,.,«„�,...,......�...,�.......................�.............,.......... See the Conditions section of this Document for any that may apply. b Id_a It_co nst ruction_perm it_041908 �x��ww�w�wwwwwwwwrwwwwwwwwwwwwww.w�w:.w.w.www.wwwwee.w...w•eeww•..w...sxx�xxxxx..ww�x�wxxxxxx�w�xxxx������xxx�•�+�*��*eew...••.xxrxexxx�xx��xx��e����.w.w.•.•+•xxxx.ww����+•�++�••*.+ CONDITIONS OF APPROVAL Permit#: B11-0014 as of 04-18-2011 Status: ISSUED ............................................................................................................................,,......,........,,�...,,.,.........................,...... Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. bld_a It_co nstructio n_pe rm it_041908 ***********************************++***************+*************************************** TOWN OF VAIL, COLORADO Statement ***+******************************************************************************+********* Statement Number: R110000316 Amount: $110.00 04/18/201104 :41 PM Payment Method: Cash Init: SAB Notation: CASH-TED SIMONETT ----------------------------------------------------------------------------- Permit No: B11-0014 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-122-0702-6 Site Address: 1881 LIONS RIDGE LP VAIL Location: VAIL POINT UNIT 9-D Total Fees: $252 .36 This Payment: $110.00 Total ALL Pmts: $252 .36 Balance: $0.00 **�**********************+*************************�**************************************** ACCOUNT ITEM LIST: _ Account Code Description Current Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 110.00 ----------------------------------------------------------------------------- ; < �r ; �, , ; ; : ; ,: , � �. E � ��= i, ^_� _ :� `,, >� ; Departm�nt of Cornmun�ty:Developme'n� � � u=r 7 �: '� � �,� - � _ .75 South Frontage L-�oad � �-�—a... � — � =..,-- . ..., t '� �` � ' "' `�_-�- � :., L � Vail, Ca:lorac�o 8�����` _ +�.-i_���:. " '�.+ �,� _ � - '��.� �' � _ , � - �ei _9����9-�-� � _ � - �� < ,,. � '.r :� � . � ��� ��r �._.,,.�-���1 ; � � � � � - � � � :> � b - � r Fa3c�7�Q t���'�2� � � - -.,, �.�-. '�'� � - ° `�= �- x'� �A�*a- ��r� : . ` ;� f r��= �' ' $ � , �. J " eb' �t� . . -� W wvY�,�a ��c� _�`'°r _ f -�i ���.t-�,��',�., '�'� DEVelo�men�R�te c�-a�`t�t-r�y—i��-5 � �-'�`_�! � 1 �*� q'-�.�a�r.'�-v�.Y's�'�'Y-�.. ,�� 3 _�.: 4.lcSv�1 w���e.sirw 4a°'A-Y�' � # ..' �`` .Y-��_^� �4.�l� �ih-+Y�.N y,�#-s���� ����_�'�r-a, �_�---���h''`��_^,.�r_ ,��- - - �--�.'^.'�,- . - . ,. � ,�."f - , 'z.._3� `�'a �m�..-�` � — TRANSMITTAL FORM Revision Submittais: ' 1. "Field SeY' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved 8�the permit is re-issued. � 3. Fees for reviewing revisions are$55.OQ per hour(2 hour minimum), and are due upon issuance. ' i i ;Permit#(s)information applies to: Attention: ( Revisions ; i � /J` I� O Response to Correction etter � �4 _attached copy of corre tion tetter i ( ) Deferred Submittal ; ; ( }Other I j �_�_�___ �.� + ;Project Street Address: � � 1 � /�-�� Z��N������ ��,� 9 � Description/List of Changes: C�c�/�l7-ug ; i1S� = ` � s ;(Number) {Street) (Suite#) � 1-!YS i/9���- /✓s�'w !//��✓f3'S 3 �Building/Complex Name: ✓i¢/L �o�N % � Q" �tJ� s .c,� Z � f ` �,c� r-s T �/9-Ti-f(�o o/✓1 5 ;Contacf Information: ; �/ n y---�� i �Company: /Y�� /✓��/Gv�/.S ��>✓�i 2�T; �,.,,-�--'� !Company Add�ess: /�'� v�! 7 � � ��6 5�� � : i City: �i�/L State: �d Zip: � ' ; i �—�-� 3 �Confact Name: / � /� �i�'+-�pitJ Ea-T"� � ; i ; !70 �- 3 �a - ��f3 � : ;Contact Phone: ? ' , s ; I ; E-Mail �1 E TT� � �O/��'�S i���T � i i � 1 � L........�.....�..a._..... --r — � E s � i i �Revised ADDITIONAL Valuations (Labor�Materials] � ; ;(DO NOT include original valuation) ; t 1 ( ` Building: $ ^�" ;(use additional sheet if necessary) ' _._..-------.._..---- -._.....------._._._..� i !Plumbing: � �J�O� • GQ --------- � �_ f Date Received: � _ � a � O r > i Electncal: $ V ! f ;Mechanical: g � � APR 0 � 2011 i Total: � ��GO. �O i ,..pQ ' � TOWN OF VAI NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .� �owxoFV�u � Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD/ALT MF BUILD PERMIT Permit #: B11-0014 Project #: PRJ11-0037 Job Address: 1881 LIONS RIDGE LP VAIL Status. . : ISSUED Location......: VAIL POINT UNIT 9-D Applied . . : 02/16/2011 Parcel No....: 210312207026 Issued. .. : 03/0112011 Expires. ..: 08/28/2011 OWNER DAVIDSON, PHILIP HA�SIMS 02/16/2011 434 RIDGE RD GOLDEN CO 80403-1594 APPLICANT NETT DESIGN CONSTRUCTION 02/16/2011 Phone:970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B CONTRACTOR NETT'DESIGN CONSTRUCTION 02/16/2011 Phone: 970-476-5551 P.O. BOX 2177 VAIL CO 81658 License:290-B Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER.WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Occupancy: Valuation: $3,000.00 Type Eonstruction: Total Sq Ft Added: 0 .,,.......,,,...,,......,...x,........,.,....................................x....... FEE SUMMARY .........,>,.............,,,�......,,.....»............,,........�........,««... Building Permit Fee------> $83.25 Will Cal Fee---------------------> $5.00 Total Calculated Fees-------------> $142.36 Plan Check--------------------> $54.11 Use Tax Fee---------------------> $0.00 Additional Fees-----------------------> $0.00 Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES-------------> $142.36 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments------------------------------> $142.36 Total Calculated Fees--------> $142.36 BALANCE DUE-----------------------> $0.00 .....«.,...�........<........,.,,,........�...............,.......,.....�..........,.,...................�..,........,...,.,.,..........,.,....�............................,....,........ DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-�PM.�O��hti� �1 I � r � � Signature of Owner or Coniractor Date r— �"j'' ti � �i ryl�/t/t{� ( Print Name bld_alt_construction_perm it_041908 .....�................................................................................................................,,...,....,,,�.,,,...,.......................,,,,,.............. APPROVALS Permit#: 611-0014 as of 03-01-2011 Status: ISSUED ......................�...............,.................�......�...........,..............,............�.,,.....,..,...,,....,....,.,....,..................,..............,........� Item: 05100 BUILDING DEPARTMENT 02/28/2011 Martin Action: CR See electrical comments 02/28/2011 Martin Action: AP Item: 05110 ELECTRICAL REVIEW 02/28/2011 Martin Action: CR Please provide load calculations for the existing electrical panel showing code compliance for the additional loads added. 02/28/2011 Martin Action: AP Item: 05120 MECHANICAL REVIEW 02/28/2011 Martin Action: NA Item: 05130 PLUMBING REVIEW 02/28/2011 Martin Action: AP Item: 05600 FIRE DEPARTMENT 02/17/2011 mvaughan Action: AP change of scope requires approval by fire department. .......................................,,....�....................,,.,..,,......,.............,.....�............,..,,.........,..,,.......,,.,.......,.....................,....,..... See the Conditions section of this Document for any that may apply. b Id_a It_con structio n_pe rm it_041908 ...................,.........,,.,,......,x,..,..,......,......,..............�.....,.>......,...................,...................................................................... CONDITIONS OF APPROVAL Permit#: B11-0014 as of 03-01-2011 Status: ISSUED ..........................«...,...,.....,,,.,....................,,,,,....,,...�.,........,...�.,.��....,,...»..,,,,.,.....,.......,..,.,..,...,....,......................,.....,... Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. b Id_a It_co n st ru ct i o n_pe rm i t_041908 •U9-27-2011 Inspection Request Re orting Page 3 4:24 pm Vail, Cp - Citv O Requested Inspect Date: Wednesday, September 28, 2011 Site Address: 1881 LIONS RIDGE LP VAIL VAIL POINT UNIT 9-D A/P/D Information Activity: 611-0014 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: DAVIDSON, PHILIP HAL SIMS Contractor: NETT DESIGN CONSTRUCTION Phone: 970-476-5551 Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER. WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Re uested Ins s Item: 534 PLAN -FINAL C/O Requested Time: 08:00 AM equestor: NETT DESIGN CONSTRUCTION � Phone: -or- 970-390-6543 cell As � Entered By: SBELLM K Acti . ime Exp: em: 90 B� - inP'F al equested Time: 08:00 AM Re estor: NETtF DESIGN CONSTRU ION Phone: -or- 970-390-6543 cell As igned To: JMONDRAGON Entered By: SBELLM K Action: Time Exp: Inspection Historv Item: 120 ELEC-Rough ""Approved `* 05/06/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 190 Item: 200 ECH-Ro h *'Approved "' 05/06/11 Inspector: sgremmer Action: AP APPROVED Item: 390C�i1E�� Item: 30 BLDG-Framing *"Approved" 09/26/11 Inspector: sgremmer Action: AP APPROVED Comment: deck frame Item: 50 BLDG-Insulation Item: 60 BLDG-Sheetrock Nail Item: 70 BLDG-Misc. Item: 534 PLAN- FINAL C/O Item: 90 BLDG-Final Item: 10 BLDG-FOOTING *"Approved"* 09/27/11 Inspector: JRM Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel REPT131 Run Id: 13551 *****************++*++*+**+**+*******************************************+****************** TOWN OF VAIL, COLORADO Statement *********+******************************************++*+**++**+�*******+**+***************** Statement Number: R110000139 Amount: $142.36 03/Ol/201112:25 PM Payment Method:Credit Crd Init: SAB Notation: MC- B.T.SIMONETT ----------------------------------------------------------------------------- Permit No: B11-0014 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-122-0702-6 Site Address: 1881 LIONS RIDGE LP VAIL Location: VAIL POINT UNIT 9-D Total Fees: $142.36 This Payment: $142 .36 Total ALL Pmts: $142.36 Balance: $0. 00 *******************************************+************************************************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 83 .25 PF 00100003112300 PLAN CHECK FEES 54 .11 WC 00100003112800 WILL CALL INSPECTION FEE 5.00 ----------------------------------------------------------------------------- � ��4� _�.�� .� ;"�x��,.y Department,of Community Development � b�� ��,� �� �� '� �#'�_ '� � 75 South Frontage Road �``�� `� , � ' - , ''� �:� _ . � . Vail, CoJorado 816�7: . , _ �_ � � _ . ,>r - : - � ; ,....�,_�� , Y� • �'d ;•� x 0-479 2'�2$:�; �:ri� �,_� �-`- �. �� � a 'mTel 97 � . ,�.�.�� � � .� _ , ° � ,� �� �� �� x� � . �� Web:'' �y�vv�r:vailgbv cQm . � , . �� E �,°�, �.�` �����-� = ,� ��' Develo��nent.Revi�w CoordinatQ�C`-; ; � � � � < ^,:� ,� � " . «, � � � � �� � - . ��w, � ?n ������� _ , ; p �j� , _ ;. ��1 � _��.s�'�r��_ ..,_..... _ . . � ��;:"'s� , "z.....�,ar��a�i�T�i-�..�* *��;�� BUILDING PERMIT APPLICATION � Si�UC��C R�PP � (Separate applications are required for alarm & sprinkler) Project Street Address: Project#: P��� �- ���� /l�/ Li�,✓s ki0�� Lcja G' �� (Number) (Street) (Suite#) DRB#: '— — BuildinglComplex Name: V/�'/L �oi,✓% Building Permit#: � ' ��� V�)c. Poiur Lot#:�Block# Subdivision: 7'o�u IJon��s Contractor Information Business Name: /v6TT� Ye�S/G�✓S �Q�S%Rve Ta,,.� Work Class: New( ) Addition ( ) Alteration (�/) Business Address: P•0 � B o X a�l77 Type of Building: City ���/L State: C� Zip: ��� Single-Family O Duplex O Multi-Family� � S, Commercial ( ) Other( ) Contact Name: ir+2 0,✓6-TT— Contact Phone: �'170 �3�(1 �—C�.��.3 Work Type: Interior(� Exterior( ) Both ( ) Contact E-Mail: /l�6TTl� @ �.K C/f-S'T./va / Valuation of Work Included Plans Included Work Contractor Registration Number: �.9d — � Electrical ( Yes ( )No ( )Yes ( )No C� X �j . f' Mechanical ( )Yes ( )No ( )Yes ( )No Owner/Owner's Representative Signature (Required) Plumbing �Yes ( )No ( �Yes ( )No �`�-�G Project Information Building (1/�es ( )No (�Yes ( )No '��D O G Owner Name: /�f�c- ��!-�!�0 S o /✓ Parcel#: .�� O 3 I Z-Z O 7 O Z� Value of all work being performed: $ 3 OC�c3 (For Parcel#,contact Eagle County Assessors Office at(970-328-8640 or visit �value based on IBC Section 109.3 8 IRC Section 108.3) www.eaglecounty.uslpatie) Electrical Square Footage Z�f D SQ, FT Detailed Scope and Location of Work: �r M.d�`� ��3 �nl ��ST�T'fL /,��I ff q-- Co,./dEt`2 % / v � /�o u/c'2 ,, t.✓r r't� Sd7�d'n.R-i r �j�t C J� 'T �2 �--ft-� /�/Y7— Y— �.B��GA—r¢'D �'_�lZ�✓� �_ Fv�L �lC2oc✓/�'✓� • (use additional sheet if necessary) G � �� s ��P� ;� ��-, � � (1 ��1C� �� -.� For Office Use Only: Date Received: �' � FEB � � 2011 Fee Paid: u� Received From: TOWN OF VAIL Cash Check # CC: Visa / MC Last 4 CC # exp date: P�j" Auth # �1 l- O l-.lan-I I , , State of Colorado Asbestos Testing &Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing reauired? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 3Z square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips& Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of a� age require testing, • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailqov.com www.cdphe.state.co.us O l-J an-1 I � . � .� } F > � ; �x � w a �-- ��� � 1��tx 1�esigns, �nc. 1�.�. Box 2177 'Jail, +�� 81658 � s,�a�� 3 y0 -6.��/3 ��� u9�a���� � ���� ��� �9a ��1 �� � �;�,�R.-�� '�._;e� ����` /�'1/��� L�Jn-� � S c��g = � � ii i ` - � � �y - ��x � ���� � 3 R � � `�. t� � � ��• , "' y`� � � � a t � � � ' .� - � � � � � � I� � L� ^ I� L� \V1 (� 1 � �. �� � l�t� 2 � ��1fi �;!��� � ,.; ' � �� ��!l�1�� J� V�41�. � .�.y_.�..�F.��.._.______.�_._.�.�__ �� D���oso�l �265�oa,�� �/g( Lta�J52�Dro6 LZaoP ��J�Y!� PQ,a�r „ 1/�i�-1 �--, � 8"l6s 7 � � � — � � ���,� � ������� � . .. ... ��..,sau o.��..�� .,.��s,.�a,-,.��,a<., . ... � .. .. .»-...na. `�r ( � � �� � � � �6�°: -�-- —� � � � � � � E F � „� �� t � ^ . � � � � � �3 i � � ,� �%tt �esigns, 1`rac� ' P.O. �ox 2177 �ail, CO 81658 � S<��,��-�� ��� _ �y�_ �s-�3 -��a ��`�`�� �pt��2 La✓�� `` p���� �_�- ���� ���� , � � 7'�C'�� k ,, � ,� s���-g %y = � � �V�TI � � �� � � l.. � �/' � � � ���� �4°J�� ':� r D/�✓rosonl IZ�"s���nc c.�- �� g� G-��s�o6� �� �g � j�/}lL �o�NT ��-��.� Ca ��657 _ � ; nv�:snri�:ttt' ►:�.�'t°�tt�i• (��� � FY:.,r.a:rk��ti �uu" ,_J ; t31l,i,(?N ltJ.&t�1?S � � � • l'.�70)�i6R-f�?���>!t?I�FH'l.:1 N �, l,`37011fiR-YiJ�1'J(i��L�1 C � . � u�� `� � ��������.1 1 i l�' ���:��r� ' ' ' ' � i.L_ � �� ��� � � d 70:� �i✓ _ Fax: �-� � 4� "- �,�,��,._ , _._ . . �. ' From: �3f{UC'E CAMPI3LLI ��: �_ � �'— 1 � Re: pages: � CC: ❑Ut�gent �(s.�r Iteview ❑Pls�csz Cptnrrtent �1'l�ax Kc(.�ly I�F'le-a.�;e Krc��1� • • w ♦ • • • a � • NOmB: t�`.�r`t � .a��'.' � � ._-- -__ �' _. . ._ t 5.�.._s�.�-x�3 - -�t 'L1�?__,.�J �►aw�o r � -- .._._.__._._ 1 � �.�. _ , a'i�__ �".r.,n�-�-�r ._!��p_�"�.'�`'4^- __�_...__ ;� _.___. . _� _ , - f �- �� .---=- r1} �f��� . ��-.'.'�. eY�����¢ _,...--" ` �r ��� �_��.._. �Q��,� �� ��; ���.1�a .3G� �,�`�`�����`1��- � __ rt`` _�_ ,,,�tK�- �,S' v�1 �'�,� _._.___. �'���' • Z ?$ -- - .��'�,�" _—.�'�'r�� _ ---_._- -- �a�e. �� ° _ _ _.._ �r�`'=� —��� Od'�° _ _.__ _ �'ca; �.�,.___ ____.�c�--�? _ ---- ---- - �' � � � � �6'J�t ��s� � /UaQ -� 1 a r�'� �t c�,,� r�.ti c.�c� ���� - lv cx� �'`v G� � �� t�u.�t Y�l�� ! � '�'7'�� �; Z_'�C� �'r�� �'� ���� � i ��� � z� �, � q � ,�"'.�►�. . . . . . . . . . . . . . . . . . . . . . , �� ,�,�,1r, ��rr�1�.�� � l -c�� � l � L:Z'd TSSS9Lt�aL6��l 6bti� 89b 0Z6 �I�il���� �ti��lrif�ki:'�'o�+� 6��9I tiZOc-5�-S33-3 L �� �� � �� �-27-2011 Inspection Request Re orting Page 3 4'24 pm Vail, Cp - Citv Requested Inspect Date: Wednesday,September 28, 2011 Site Address: 1881 LIONS RIDGE LP VAIL VAIL POINT UNIT 9-D A/P/D Information Activity: 611-0014 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: DAVIDSON, PHILIP HAL SIMS Contractor: NETT DESIGN CONSTRUCTION Phone: 970-476-5551 Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER. WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Re uested I c ion s Item: 534 PLAN -FINAL C/O Requested Time: 08:00 AM Requestor: NETT DESIGN CONSTRUCTIO Phone: -or- 970-390-6543 cell ssign To: BGIBSON Entered By: SBELLM K Time Exp: Item: 90 BLDG-Final Requested Time: 08:00 AM Requestor: NETf DESIGN CONSTRUCTION Phone: -or- 970-390-6543 cell Assigned To: JMONDRAGON Entered By: SBELLM K Action: Time Exp: C� �'` � �� � � � � < < � ec o � � � �r � . � ��� n � L � � Inspection Historv Item: 120 ELEC-Rough '"Approved "� 05/06/1'f Inspector: sgremmer Action: AP APPROVED Comment: Item: 190 ELEC-Final Item: 200 MECH-Rough '*Approved '"' 05/06/11 Inspector: sgremmer Action: AP APPROVED Comment: Item: 390 MECH-Final Item: 30 BLDG-Framing *"Approved"" 09/26/11 Inspector: sgremmer Action: AP APPROVED Comment: deck frame Item: 50 BLDG-Insulation Item: 60 BLDG-Sheetrock Nail Item: 70 BLDG-Misc. Item: 534 PLAN-FINAL C/O Item: 90 BLDG-Final Item: 10 BLDG-FOOTING "`"Approved"` 09/27/11 Inspector: JRM Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel REPT131 Run Id: 13551 . •09-27-2011 Inspection Request Reporting Page 3 4:24 qm Vail,�p CitTv_Of Requested Inspect Date: Wednesday, September 28, 2011 Site Address: 1881 LIONS RIDGE LP VAIL VAIL POINT UNIT 9-D A/P/D Information Activity: 611-0014 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: DAVIDSON, PHILIP HAL SIMS Contractor: NETT DESIGN CONSTRUCTION Phone: 970-476-5551 Description: REMOVE TUB IN MASTER BATH AND CONVERT TO SHOWER. WIRE SEPARATE CIRCUIT FOR HEAT MAT AND DEDICATED CIRCUIT FOR MICROWAVE. Re uested Ins s Item: 534 PLAN -FINAL C/O Requested Time: 08:00 AM equestor: NETT DESIGN CONSTRUCTION � Phone: -or- 970-390-6543 cell As � Entered By: SBELLM K Acti . ime Exp: em: 90 B� - inal equested Time: 08:00 AM Re estor: NET�F DESIGN CONSTRU ION Phone: -or- 970-390-6543 cell As igned To: JMONDRAGON Entered By: SBELLM K Action: _ Time Exp: Inspection Historv Item: 120 ELEC-Rough **Approved '" 05/06/1 T Inspector: sgremmer Action: AP APPROVED Comment: Item: 190 Item: 200 CH-Ro h **Approved *' 05/06/11 Inspector: sgremmer Action: AP APPROVED Item: 390C n�-�-+-F�n� Item: 30 BLDG-Framing **Approved"" 09/26/11 Inspector: sgremmer Action: AP APPROVED Comment: deck frame Item: 50 BLDG-Insulation Item: 60 BLDG-Sheetrock Nail Item: 70 BLDG-Misc. Item: 534 PLAN- FINAL C/O Item: 90 BLDG-Final Item: 10 BLDG-FOOTING **Approved"" 09/27/11 Inspector: JRM Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel REPT131 Run Id: 13551