HomeMy WebLinkAboutM11-0028 .
07-11-2012 Inspection Request Re orting Page 25
Requested Inspect Date: Thursday,Ju�ly 12 2012
Site Address: 395 E LIVNSHEAd CIR VAIL
ADJACENT TO LIONSHEAD PARKING STRUCTURE
A/P/D Information
Activity: M11-0 28 Type: B-MECH Sub Type: ACOM Status: ISSUED
Const Type: Occupancy: Use: Insp Area:
Owner: TOWN OF VAIL
Contractor: TOWN OF VAIL Phone: 970-479-2100
Description: SNOW ELT, MECHANICAL AND AIR CONDITIONING FOR THE AUXILLARY BUILDING ADJACENT TO
LIONS EAD PARKING STRUCTURE; LIONSHEAD TRANSIT CENTER-PHASE II:TRANSIT WELCOME
CENT R
Re uested Ins ection
Item: 390 MECH-Final Requested Time: 10:15 AM
Requestor: �%" Phone:
Comments: 970 45-0229
Assigned To: JM NDRAGON � . Entered By: JMONDRAGON K
Action: Time Exp:
Comment: . ain approval on all items ansd com��i items Work incomplete
2. L bel all equipment and piping
3. P ovide state boiler certifications
4.Ai balancin report from engineer of record
5. D ct in womends bathroom fo be installed per smacna
6. R pair duct in mechnical room
7.Ai handlers missing overflow drains for pans
8. In tall pipie insulation through out ;
9. FI e pipe missing straps.in 6oiler room and screws for attachment
10. eal pipng at wall of boiler room
11. ontrof system and sensors to be completely installed
12. rovide isolators for condensing units
13. liminate vibration at air handlers in contact with duct
14. ove piping in contact with duct
Comment: Brin copy of rough in r
Pro ded state boiler cert.just need state boiler stickers on boilers °
Air lance report with engineer of record stamp F:
Nort boiler b-vent is leaking at elbow Provide fix or letter b-vent is installed correct. Due to the leaking it
is pr bably not correct.
Comment: prov de engineer letter that make up air is adequate for the operation of both type 1 hood and the HVac
syst m
;�
Inspection Historv
Item: 200 MECH-R ugh
07/11/ 1 Inspector: sgremmer Action: NR NOT READY FOR INSPECTION
Comme t:
09/01/ 1 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comme t: 1 st floor duct work pressure test heat lines and snow melt
10/05/ 1 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comme t: future mains on� r
Item: 310 MECH-H ating Approved`*
06/15/ 1 fnspector: mdenney- -- - Action: PI PARTIAL INSPECTION �
- - -- Comme t: (2,5"snowmelt lines,approx.20`thru wall at north side at the mid point of the garage.
fI�lSULATED.
07/15/ 1 Inspector: Martin Action: PI PARTIAL INSPECTION
Comme t: Air test of main snow melt piping
08/22/ 1 Inspector: JRM Action: PI PARTIAL INSPECTION
REPT131 Run Id: 14621
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.•
�owxo�vnQ. �
Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT Permit #: M11-0028
ACOM Project #: PRJ10-0695
Job Address: 395 S FRONTAGE RD W VAIL Status. . . : ISSUED
Location.....: ADJACENT TO LIONSHEAD PARKING STRUCTURE Applied . . : 02/23/2011
Parcel No...: 210106407012 Issued. . . 05/10/2011
Expires. .: 11lO6/2011
OWNER TOWN OF VAIL 02/23/2011
C/O FINANCE DEPT
75 S FRONTAGE RD
VAI L
CO 81657
APPLICANT TOWN OF VAIL 02/23/2011
C/O FINANCE DEPT
75 S FRONTAGE RD
VAI L
CO 81657
CONTRACTOR TOWN OF VAIL 02/23/2011 Phone:970-479-2100
75 S FRONTAGE RD
VAI L
CO 81657
License:463-B
Desciption: SNOWMELT,MECHANICAL AND AIR CONDITIONING FOR THE AUXILLARY
BUILDING ADJACENT TO LIONSHEAD PARKING STRUCTURE
Valuation: $561,085.00
�...�.,......«..�........�,�.,t.«...»....�...,..,..�....,...��..,...,.�..*,«......«..FEE SUMMARY...,t,......�...�....+.......�.*......,�..�......,�+....*.�.�*.�....-..�.....,..��.»..�..<.
Mechanical Permit Fee---> $11,240.00 Will Call------------> $5.00 Total Calculated Fees---> $14,055.00
Plan Check-------------------> $2,810.00 Use Tax Fee------> $0.00 Additional Fees-----------> 14,055.00)
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $0.00
Total Calculated Fees--> $14,055.00 Payments----------------> $0.00
BALANCE DUE---------> $0.00
..,......,..*................�..��......�.«..�.....�..,�,�...,�.<*�.*�..,......�....*...�...«.............>....�.�.�*..,��.....>......�..�.....<.............�....��....«..,*«*....,...........
APPROVALS
Item:05100 BUILDING DEPARTMENT
03/10/2011 Martin Action:CR See B11-0017
05/06/2011 Martin Action:AP
Item:05600 FIRE DEPARTMENT
«�.��...,�.«.«........:...,t.«..�.....,�..,....�.��......,.�...�......,.....»..,....,.,�..«««................K.......,..........»....��.,...........,......,...,..�....�....«.�.,.,...,....,.�.,....�....
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond:42
(BLDG 2009)CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
..........�...........�........«....�.........«......�..«.«.....«.�......�..................«...�.......,.........,,.».....�.....................,..............«............«»».........�.
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure
according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
�'-1
REQUESTS FOR,xNSPECTION S ALL6E MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:Oi
AM-4 PM. r
���t��
Signature of Owner or Contractor Date
d
m e c h c a n i c a I_p e rm it_04190 8
_..
. . _ . - - _ _. : _
� �.
� .'��� `�`' - , �,� „ �,;i�#�� �� Department of Community Development�`
-• �����4 , � �� ��`� __ _ 7 South Frontage Road
: �. - �a., _
- - � � = �� _�;� �. �. . ��
� ,- -t .� �,.,_
.. -,�� °� t . ' ._ <; ."��:;-, ' ,;C,Qlarada� 8�6� ,
. _ �> � � V�
. t
. , II ,
� � �' �
�� � � - . � �� � _. ; } 9 �,`�Tei�9�0=479 2�,�2��.
� _ '�, # � �:' ' '� = W��S.,'��'�'�Ct�t����,COitl
� � "���.� � ,����µ�- ��'�`_ Develo�p�ien�.Re�ne�'oordS�afo•j.
�, e n
,E ��-� . �y; ���' �,,,, _ �
�lf.�����.�,�� ���� `"���?��`,:s ` ,� , � �����'x�,�+ �. .��, �`� � �
W � ,J4
�
.� _.. , �k�k..... �+
-- - --- - a>..��:' .....
BUILDlNG PERMIT APPLICATION
(Separate applications are required for alarm &sprinkler) 1 U L — O 00
Project Street Address: Project#: QRS �D ` ��0�5
"��S �� Ljc�s1i�c� (.irGl� DRI3 1 D 05�3
(Number) (Street) (Suite#) DRB#:
Buildin Complex Name: � x r� ��ldrh Building Permit#: � � � — OO` �
� j � l 5
ti�����7 LH Tr�n.��r Q/Cc�+7-i� C�y��e� Lot#: Block# Subdivision:
Contractor Information
Business Name: ���1� Work Class: New( ) Addition (�) Alteration( )
Business Address: Type of Building:
City State: Zip: Single-Family( ) Duplex( ) Multi-Family( )
Commercial (� Other( )
Contact Name:
Contact Phone: Work Type: Interior( ) Exterior( ) Both(x)
Contact E-Mail: Valuation of
Work Included Plans Included Work
Contractor Registration Nu ber:
Electrical ( )Yes ( )No (X)Yes ( )No xg '-�
/
X � Mechanica� ( )Yes ( )No (x)Yes ( )No (a� (��
Owr�er/Owner's Repres tative S+gnature(Required) Plumbing ( )Yes ( )No (x)Yes ( )No O�'-�
Project Information ,7,d�� � Building ( )Yes ( )No (x)Yes ( )No 5 U�322
Owner Name: �/I�-!L
Value of all work being performed: $ 'J�,�'�12,3 22
Parcel#: x%Gl Clo�lC�7C/2 (value based on IBC Section 109.3&IRC Section 108.3�
(For Parcel#,contact Eagle County Assessors Office at(970-32&8640 or visit
www.eaglecounty.uslpatle) Electncal Square Footage !Ci, v $� S F
�
Oetailed Scope and Location of Work: �FMD U 7IOK/ Of �t'ISnN lfj u�/�j2/��/rL/,rl C-I/�y
$t,ll�D���i �D r�D D i n ck/ a F � ,t�E-cv 77L�J S'T c�-EZ co►�E
C�1 T� • .UF�J �/rc-r� �,cl¢ �S 3 S�.�-� F'S �o ca,u�/Fzrs ra
EX1 Sn�tr G G/tic.�a�E' o.cl h-u ��oo�'.
(use additional sheet if necessary) E �I— �O� 3 ,�j �(p q�.50
•�••..� m��_ o o as * 511�4�.� � � �
�� ooi
�.
For O�ce Use Only: Date Received: � � _��.,' � � �
Fee Paid: D
Received From: ��� � �j Z011
Cash Check #
CC: Visa/ MC Last 4 CC # exp date: i ������! �y �/�{!�
Auth #
01-Jan-t 1
•
.
A �� V� �
/v v � � �
B�u�iN �
SHOP D WING REVIEW GANZE
consulting engineers, inc.
Corrections or comments made on the shop
.T�$: I,HwC drawings during this review do not relieve the
contracror from compliance with the requirements
of the drawings and specifications. This check is
JOB NO: gg2g. 4 only for review of general conformance with the
design concept of the project and general
compliance with the information given in the
DATE RECEI D: �2.2�.12 contract documents. The contractor is responsible
for.confirming and correlating all quantities and
dimensions;selecting fabrication processes and
DATE RETU ED: 02.2�.12 techniques of construction,coordinating their
work with that of all other trades and performing
his work in a satisfactory manner.
REV-Reviewed
R&R-Revise an Resubmit Date: 02.20.12 By:ELP
REJ-Rejected Beaudin Ganze Consulting Engineers,Inc.
F.A.C.-Furnish s Corrected(resubmittal not required,u.n.o.)
ITEM ACTION REMARKS
REV R&R REJ F.A.C.
EWT/LWT and EAT/LAT at heat transfer coils and boilers are not provided as noted
in Section 230593. This information is valuable if a performance issue occurs in
General Notes the future.
Exhaust fans EF-1 thru EF-4 information not provided.
E ui ment and outlets not listed below are reviewed without comment.
Majority of terminal outlets balanced to well above
10%tolerance as indicated in Section 230593. As
unit total is over 2,000 CFM, code would require a
FG 1 X smoke detector. Design intent is for system to be
under 2,000 CFM. Rebalance system for terminal
outlets to be within 10% range.
Similarly, OSA CFM is above tolerance and should be
rebalanced to be within tolerance ran e.
Outlets 6, 7 and 8 appear to be obstructed or without
FC-4 X balancing means based on provided airflows. These
outlets and associated branches are to be reviewed
in the field b the installin ductwork Contractor.
Components to balance DHW injection pump do not
P-7 X appear installed. Installing Contractor to review
installation to allow for balancin of s stem.
Components to balance DHW recirc pump do not
P-3 X appear installed. Installing Contractor to review
installation to allow for balancing of system and to
confirm s stem o eration.
Snowmelt X ' Pressure difference not provided for one of the pumps.
� �r�l' __ � 7 i F ' _ . .. � VAIL
ALBL'QUERQUE DEAIVER FORT COLLINS LAKE TAHOE SACRAMENTO VAfL
. '
Lionshead Welc me Center
Shop Drawing eview
02.20.12
Page 2 of 2
ITEM ACTION REMARKS
REV R&R REJ F.A.C.
I
� Boiler Circ Confirm value.
Pump `P-5' (P-
in revised
documents
Balance information not provided on majority of zones
due to circuit setter being inaccessible or potential
Snowmelt being too large for the flow. Installing Contractor to
Zones X review as this information is needed for full review
of system.
Zones 5 and 6 revised in RFI 161; review and update as
needed in the field.
Numerous unit heaters are greater than 10%below
design flow rate. Adjust building heating water
circulation pumps to increase flow to these units as
UHs and CUHs X needed.
Four cabinet unit heaters are noted to have no circuit
setter as shown on 3/M500 or an inaccessible circuit
setter. Installing Contractor to field confirm
balancin com onents are installed and accessible.
;
\\bece-projects\data�BGRujects\88 8.00 Liunshead Transit Center Stud}�8828.04 Auxiliary Building\CCA\Submittal Reviews\8828p4SD23EP tab.doc
i
�
; � " -��
� • �}
t
�.�:,w
TE T, ADJUST AND BALANCE REPORT
SUBMITTAL RE IEW �NOEXCEPTIONSTAKEN ❑EXCEPTIONSASNOTED
Contractor's review is for gener (conformance pQREVIEWED FOR ❑RETAINED FOR RECORD
with the Contract Documents.S bcontractor or INFORMATION ONLY ❑SEE
Supplier are responsible for verify ng all field IF CHECKED ABOVE FABRICATION MAY BE UNDERTAKEN.THlS DOES NOT
dimensions, fabrication and con truction means, AUTHORIZECHANGESTOCONTRARSUMORTIMEUNLESSSTATEDINCHANGE
methods,sequences and coordin tion with affected PROJECT ��E�
trades.This review does not alter,supersede IFCHECKEDBELOWFABRICATIONMAYNOTBEUNDERTAKEN.RESUBMR
or replace the requirements of th Subcontract CORRECTEDCOVIES.
Agreement or Purchase Agreem nt.This review ❑REVISE AND RESUBMIT
does notrelievethe G.C.,Archite t,and/or REVIEWINGISONLYFORCONFORMANCEWRHTHEDESIGNCONCEPTOFiHE
Engineersoftheircontractualres o�s�b���t�es. LIONSHEAD TRAN� PROIECTANDCOMPLIANCEWITHTHEINFORMATIONGNENINTHECONTRACf
DOCUMENTS.THE CONTRACTOR IS RESPONSIBLE f-0R DIMENSION5T0 BE
� CONFIRMED AND CORRELATED ATTHE SRE;FOR INFORMATION7HAT
�REVIEWED❑MAKE CORRE TIONS NOTED 7-� I, PERTAINSSOLELYTOTHEFABRICATIONPROCESSORTOTHEMEANS,
❑REVISEAND RESUBMIT❑ EJECTED R N V 7�2 METHODS,TECHNIQUES,SEQUENGESANDPROCEDURESOFCONSfRUCTION,
1W TTJ ANDFORCOORDINATIONOFTHEWORKOFALLTRADES.
R.A.NELSON 8 ASSOCI TES�INC. ^ O gy BRANDON MIXON `
Reviewed by: John Hallor n �L�
Date: 0 2/17/2 012 REVIEWED BY
Submittal# S23-0593-001
PREPARED FOR oA� 2•21.2012
R&H MECHANICAL COMMENTS
FROM BGCE.
REPORT ISSUE DATE
2/15/2012
PREPARED BY
H-VAC� INC.
P.O. BOX 5123
VAIL, CO 81658
PHONE: 970-331-1095
FAX: 970-926-0502
E-MAIL: BTOPPING@HVACTAB.NET
r
.
.
B�u�IN /
SHOP D WING REVIEW GANZE
/
consulting engineers, inc.
Corrections or comments made on the shop
.T�B: LHWC drawings during this review do not relieve the
contractor from compliance with the requirements
of the drawings and specifications. This check is
JOB NO: 8g2g. 4 only for review of general conformance with the
design concept of the project and general
compliance with the information given in the
DATE RECEI D: �6.27.12 contract documents. The contractor is responsible
for:confirming and correlating all quantities and
dimensions;selecting fabrication processes and
DATE RETU ED: �7.�5.12 techniques of construction,coordinating their
work with that of all other trades and performing
his work in a satisfactory manner.
REV-Reviewed
R&R-Revise an Resubmit Date: 07.05.12 By:ELP
REJ-Rejected Beaudin Ganze Consulting Engineers,Inc.
F.A.C.-Furnish s Corrected(resubmittal not required,u.n.o.)
ITEM ACTION REMARKS
REV R&R REJ F.A.C.
General Notes Systems previously reviewed without comment have not been re-reviewed and are
not listed below.
P-7 X
P-3 X
Snowmelt
Boiler Circ
Pump `P-5' (P-6 X
in revised
documents
Snowmelt Confirm snowmelt zones 5 and 6 were balanced to
Zones X revised values shown in RFI 161; update as needed
in the field. Resubmittal not re uired.
_. . :',t. . . , � _ _ � =� . VAIL
ALBUQUERQUE DENVER FORT COLLINS LAKE TAHOE SACRAMENTO VAII
BEAUDIN�/,/
GANZE//
June 25, 201 consulting engineers,inc.
Mr. Brandon ixon J� ^ � U Z�
4240 Archite ture, Inc. �, �
3507 Ringsb Court, Suite 117
Denver, CO 0216
RE: Lion ead Welcome Center-
Proje t#8828.04
Dear Brando :
The Town of ail(ToV)Building Department has requested a letter from BGCE stating that the
makeup air p vided to the second level of the Welcome Center is adequate for both the Type 1 hood
eachaust and neral space ventilation requirements. This letter addresses one of the outstanding
items on the own's list and is to be provided before they will issue the Certificate of Occupancy.
Please issue i the appropriate format.
• The g ease exhaust fan was designed for 900 CFM; it was reported to operate at 936 CFM
per th Testing, Adjusting, and Balancing (TAB)Report.
• 2009 MC, Section 508 requires approximately equal CFM of makeup air be provided to the
space Section 403.2.2 of the same code allows air transferred from occupiable spaces to
serve s makeup air for exhaust systems in kitchens.
• The f n coil units that serve the second level, FG2 and FC-3, have a design total of 1,180
CFM utside air for general space ventilation; they were reported to operate at 1,240 CFM
outsi e air per the TAB report. When the grease exhaust fan is not in operation,the relief
path r the outside air is via gravity dampers at the exterior of the building.
• The s quence of operation for these fan coil units was revised so they operated and therefore
provi ed appropriate makeup air whenever the grease exhaust fan is in operation.
Per the refere ced code sections, along with the information indicated in the TAB report, BGCE feels
the outside ai provided to the fan coil units for space ventilation purposes is adequate for the makeup
air requireme ts of the grease exhaust fan.
Contact us w' h any questions or comments.
Sincerely,
��r
Erin Pasold, .E.
Engineer
Enclosures: F nal List of Outstanding Items from ToV
cc: Jeremiah endell, Paul Burbidge—RANA