Loading...
HomeMy WebLinkAboutM11-0028 . 07-11-2012 Inspection Request Re orting Page 25 Requested Inspect Date: Thursday,Ju�ly 12 2012 Site Address: 395 E LIVNSHEAd CIR VAIL ADJACENT TO LIONSHEAD PARKING STRUCTURE A/P/D Information Activity: M11-0 28 Type: B-MECH Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: TOWN OF VAIL Contractor: TOWN OF VAIL Phone: 970-479-2100 Description: SNOW ELT, MECHANICAL AND AIR CONDITIONING FOR THE AUXILLARY BUILDING ADJACENT TO LIONS EAD PARKING STRUCTURE; LIONSHEAD TRANSIT CENTER-PHASE II:TRANSIT WELCOME CENT R Re uested Ins ection Item: 390 MECH-Final Requested Time: 10:15 AM Requestor: �%" Phone: Comments: 970 45-0229 Assigned To: JM NDRAGON � . Entered By: JMONDRAGON K Action: Time Exp: Comment: . ain approval on all items ansd com��i items Work incomplete 2. L bel all equipment and piping 3. P ovide state boiler certifications 4.Ai balancin report from engineer of record 5. D ct in womends bathroom fo be installed per smacna 6. R pair duct in mechnical room 7.Ai handlers missing overflow drains for pans 8. In tall pipie insulation through out ; 9. FI e pipe missing straps.in 6oiler room and screws for attachment 10. eal pipng at wall of boiler room 11. ontrof system and sensors to be completely installed 12. rovide isolators for condensing units 13. liminate vibration at air handlers in contact with duct 14. ove piping in contact with duct Comment: Brin copy of rough in r Pro ded state boiler cert.just need state boiler stickers on boilers ° Air lance report with engineer of record stamp F: Nort boiler b-vent is leaking at elbow Provide fix or letter b-vent is installed correct. Due to the leaking it is pr bably not correct. Comment: prov de engineer letter that make up air is adequate for the operation of both type 1 hood and the HVac syst m ;� Inspection Historv Item: 200 MECH-R ugh 07/11/ 1 Inspector: sgremmer Action: NR NOT READY FOR INSPECTION Comme t: 09/01/ 1 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comme t: 1 st floor duct work pressure test heat lines and snow melt 10/05/ 1 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comme t: future mains on� r Item: 310 MECH-H ating Approved`* 06/15/ 1 fnspector: mdenney- -- - Action: PI PARTIAL INSPECTION � - - -- Comme t: (2,5"snowmelt lines,approx.20`thru wall at north side at the mid point of the garage. fI�lSULATED. 07/15/ 1 Inspector: Martin Action: PI PARTIAL INSPECTION Comme t: Air test of main snow melt piping 08/22/ 1 Inspector: JRM Action: PI PARTIAL INSPECTION REPT131 Run Id: 14621 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .• �owxo�vnQ. � Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT Permit #: M11-0028 ACOM Project #: PRJ10-0695 Job Address: 395 S FRONTAGE RD W VAIL Status. . . : ISSUED Location.....: ADJACENT TO LIONSHEAD PARKING STRUCTURE Applied . . : 02/23/2011 Parcel No...: 210106407012 Issued. . . 05/10/2011 Expires. .: 11lO6/2011 OWNER TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAI L CO 81657 APPLICANT TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAI L CO 81657 CONTRACTOR TOWN OF VAIL 02/23/2011 Phone:970-479-2100 75 S FRONTAGE RD VAI L CO 81657 License:463-B Desciption: SNOWMELT,MECHANICAL AND AIR CONDITIONING FOR THE AUXILLARY BUILDING ADJACENT TO LIONSHEAD PARKING STRUCTURE Valuation: $561,085.00 �...�.,......«..�........�,�.,t.«...»....�...,..,..�....,...��..,...,.�..*,«......«..FEE SUMMARY...,t,......�...�....+.......�.*......,�..�......,�+....*.�.�*.�....-..�.....,..��.»..�..<. Mechanical Permit Fee---> $11,240.00 Will Call------------> $5.00 Total Calculated Fees---> $14,055.00 Plan Check-------------------> $2,810.00 Use Tax Fee------> $0.00 Additional Fees-----------> 14,055.00) Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $0.00 Total Calculated Fees--> $14,055.00 Payments----------------> $0.00 BALANCE DUE---------> $0.00 ..,......,..*................�..��......�.«..�.....�..,�,�...,�.<*�.*�..,......�....*...�...«.............>....�.�.�*..,��.....>......�..�.....<.............�....��....«..,*«*....,........... APPROVALS Item:05100 BUILDING DEPARTMENT 03/10/2011 Martin Action:CR See B11-0017 05/06/2011 Martin Action:AP Item:05600 FIRE DEPARTMENT «�.��...,�.«.«........:...,t.«..�.....,�..,....�.��......,.�...�......,.....»..,....,.,�..«««................K.......,..........»....��.,...........,......,...,..�....�....«.�.,.,...,....,.�.,....�.... CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:42 (BLDG 2009)CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 ..........�...........�........«....�.........«......�..«.«.....«.�......�..................«...�.......,.........,,.».....�.....................,..............«............«»».........�. DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. �'-1 REQUESTS FOR,xNSPECTION S ALL6E MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:Oi AM-4 PM. r ���t�� Signature of Owner or Contractor Date d m e c h c a n i c a I_p e rm it_04190 8 _.. . . _ . - - _ _. : _ � �. � .'��� `�`' - , �,� „ �,;i�#�� �� Department of Community Development�` -• �����4 , � �� ��`� __ _ 7 South Frontage Road : �. - �a., _ - - � � = �� _�;� �. �. . �� � ,- -t .� �,.,_ .. -,�� °� t . ' ._ <; ."��:;-, ' ,;C,Qlarada� 8�6� , . _ �> � � V� . t . , II , � � �' � �� � � - . � �� � _. ; } 9 �,`�Tei�9�0=479 2�,�2��. � _ '�, # � �:' ' '� = W��S.,'��'�'�Ct�t����,COitl � � "���.� � ,����µ�- ��'�`_ Develo�p�ien�.Re�ne�'oordS�afo•j. �, e n ,E ��-� . �y; ���' �,,,, _ � �lf.�����.�,�� ���� `"���?��`,:s ` ,� , � �����'x�,�+ �. .��, �`� � � W � ,J4 � .� _.. , �k�k..... �+ -- - --- - a>..��:' ..... BUILDlNG PERMIT APPLICATION (Separate applications are required for alarm &sprinkler) 1 U L — O 00 Project Street Address: Project#: QRS �D ` ��0�5 "��S �� Ljc�s1i�c� (.irGl� DRI3 1 D 05�3 (Number) (Street) (Suite#) DRB#: Buildin Complex Name: � x r� ��ldrh Building Permit#: � � � — OO` � � j � l 5 ti�����7 LH Tr�n.��r Q/Cc�+7-i� C�y��e� Lot#: Block# Subdivision: Contractor Information Business Name: ���1� Work Class: New( ) Addition (�) Alteration( ) Business Address: Type of Building: City State: Zip: Single-Family( ) Duplex( ) Multi-Family( ) Commercial (� Other( ) Contact Name: Contact Phone: Work Type: Interior( ) Exterior( ) Both(x) Contact E-Mail: Valuation of Work Included Plans Included Work Contractor Registration Nu ber: Electrical ( )Yes ( )No (X)Yes ( )No xg '-� / X � Mechanica� ( )Yes ( )No (x)Yes ( )No (a� (�� Owr�er/Owner's Repres tative S+gnature(Required) Plumbing ( )Yes ( )No (x)Yes ( )No O�'-� Project Information ,7,d�� � Building ( )Yes ( )No (x)Yes ( )No 5 U�322 Owner Name: �/I�-!L Value of all work being performed: $ 'J�,�'�12,3 22 Parcel#: x%Gl Clo�lC�7C/2 (value based on IBC Section 109.3&IRC Section 108.3� (For Parcel#,contact Eagle County Assessors Office at(970-32&8640 or visit www.eaglecounty.uslpatle) Electncal Square Footage !Ci, v $� S F � Oetailed Scope and Location of Work: �FMD U 7IOK/ Of �t'ISnN lfj u�/�j2/��/rL/,rl C-I/�y $t,ll�D���i �D r�D D i n ck/ a F � ,t�E-cv 77L�J S'T c�-EZ co►�E C�1 T� • .UF�J �/rc-r� �,cl¢ �S 3 S�.�-� F'S �o ca,u�/Fzrs ra EX1 Sn�tr G G/tic.�a�E' o.cl h-u ��oo�'. (use additional sheet if necessary) E �I— �O� 3 ,�j �(p q�.50 •�••..� m��_ o o as * 511�4�.� � � � �� ooi �. For O�ce Use Only: Date Received: � � _��.,' � � � Fee Paid: D Received From: ��� � �j Z011 Cash Check # CC: Visa/ MC Last 4 CC # exp date: i ������! �y �/�{!� Auth # 01-Jan-t 1 • . A �� V� � /v v � � � B�u�iN � SHOP D WING REVIEW GANZE consulting engineers, inc. Corrections or comments made on the shop .T�$: I,HwC drawings during this review do not relieve the contracror from compliance with the requirements of the drawings and specifications. This check is JOB NO: gg2g. 4 only for review of general conformance with the design concept of the project and general compliance with the information given in the DATE RECEI D: �2.2�.12 contract documents. The contractor is responsible for.confirming and correlating all quantities and dimensions;selecting fabrication processes and DATE RETU ED: 02.2�.12 techniques of construction,coordinating their work with that of all other trades and performing his work in a satisfactory manner. REV-Reviewed R&R-Revise an Resubmit Date: 02.20.12 By:ELP REJ-Rejected Beaudin Ganze Consulting Engineers,Inc. F.A.C.-Furnish s Corrected(resubmittal not required,u.n.o.) ITEM ACTION REMARKS REV R&R REJ F.A.C. EWT/LWT and EAT/LAT at heat transfer coils and boilers are not provided as noted in Section 230593. This information is valuable if a performance issue occurs in General Notes the future. Exhaust fans EF-1 thru EF-4 information not provided. E ui ment and outlets not listed below are reviewed without comment. Majority of terminal outlets balanced to well above 10%tolerance as indicated in Section 230593. As unit total is over 2,000 CFM, code would require a FG 1 X smoke detector. Design intent is for system to be under 2,000 CFM. Rebalance system for terminal outlets to be within 10% range. Similarly, OSA CFM is above tolerance and should be rebalanced to be within tolerance ran e. Outlets 6, 7 and 8 appear to be obstructed or without FC-4 X balancing means based on provided airflows. These outlets and associated branches are to be reviewed in the field b the installin ductwork Contractor. Components to balance DHW injection pump do not P-7 X appear installed. Installing Contractor to review installation to allow for balancin of s stem. Components to balance DHW recirc pump do not P-3 X appear installed. Installing Contractor to review installation to allow for balancing of system and to confirm s stem o eration. Snowmelt X ' Pressure difference not provided for one of the pumps. � �r�l' __ � 7 i F ' _ . .. � VAIL ALBL'QUERQUE DEAIVER FORT COLLINS LAKE TAHOE SACRAMENTO VAfL . ' Lionshead Welc me Center Shop Drawing eview 02.20.12 Page 2 of 2 ITEM ACTION REMARKS REV R&R REJ F.A.C. I � Boiler Circ Confirm value. Pump `P-5' (P- in revised documents Balance information not provided on majority of zones due to circuit setter being inaccessible or potential Snowmelt being too large for the flow. Installing Contractor to Zones X review as this information is needed for full review of system. Zones 5 and 6 revised in RFI 161; review and update as needed in the field. Numerous unit heaters are greater than 10%below design flow rate. Adjust building heating water circulation pumps to increase flow to these units as UHs and CUHs X needed. Four cabinet unit heaters are noted to have no circuit setter as shown on 3/M500 or an inaccessible circuit setter. Installing Contractor to field confirm balancin com onents are installed and accessible. ; \\bece-projects\data�BGRujects\88 8.00 Liunshead Transit Center Stud}�8828.04 Auxiliary Building\CCA\Submittal Reviews\8828p4SD23EP tab.doc i � ; � " -�� � • �} t �.�:,w TE T, ADJUST AND BALANCE REPORT SUBMITTAL RE IEW �NOEXCEPTIONSTAKEN ❑EXCEPTIONSASNOTED Contractor's review is for gener (conformance pQREVIEWED FOR ❑RETAINED FOR RECORD with the Contract Documents.S bcontractor or INFORMATION ONLY ❑SEE Supplier are responsible for verify ng all field IF CHECKED ABOVE FABRICATION MAY BE UNDERTAKEN.THlS DOES NOT dimensions, fabrication and con truction means, AUTHORIZECHANGESTOCONTRARSUMORTIMEUNLESSSTATEDINCHANGE methods,sequences and coordin tion with affected PROJECT ��E� trades.This review does not alter,supersede IFCHECKEDBELOWFABRICATIONMAYNOTBEUNDERTAKEN.RESUBMR or replace the requirements of th Subcontract CORRECTEDCOVIES. Agreement or Purchase Agreem nt.This review ❑REVISE AND RESUBMIT does notrelievethe G.C.,Archite t,and/or REVIEWINGISONLYFORCONFORMANCEWRHTHEDESIGNCONCEPTOFiHE Engineersoftheircontractualres o�s�b���t�es. LIONSHEAD TRAN� PROIECTANDCOMPLIANCEWITHTHEINFORMATIONGNENINTHECONTRACf DOCUMENTS.THE CONTRACTOR IS RESPONSIBLE f-0R DIMENSION5T0 BE � CONFIRMED AND CORRELATED ATTHE SRE;FOR INFORMATION7HAT �REVIEWED❑MAKE CORRE TIONS NOTED 7-� I, PERTAINSSOLELYTOTHEFABRICATIONPROCESSORTOTHEMEANS, ❑REVISEAND RESUBMIT❑ EJECTED R N V 7�2 METHODS,TECHNIQUES,SEQUENGESANDPROCEDURESOFCONSfRUCTION, 1W TTJ ANDFORCOORDINATIONOFTHEWORKOFALLTRADES. R.A.NELSON 8 ASSOCI TES�INC. ^ O gy BRANDON MIXON ` Reviewed by: John Hallor n �L� Date: 0 2/17/2 012 REVIEWED BY Submittal# S23-0593-001 PREPARED FOR oA� 2•21.2012 R&H MECHANICAL COMMENTS FROM BGCE. REPORT ISSUE DATE 2/15/2012 PREPARED BY H-VAC� INC. P.O. BOX 5123 VAIL, CO 81658 PHONE: 970-331-1095 FAX: 970-926-0502 E-MAIL: BTOPPING@HVACTAB.NET r . . B�u�IN / SHOP D WING REVIEW GANZE / consulting engineers, inc. Corrections or comments made on the shop .T�B: LHWC drawings during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is JOB NO: 8g2g. 4 only for review of general conformance with the design concept of the project and general compliance with the information given in the DATE RECEI D: �6.27.12 contract documents. The contractor is responsible for:confirming and correlating all quantities and dimensions;selecting fabrication processes and DATE RETU ED: �7.�5.12 techniques of construction,coordinating their work with that of all other trades and performing his work in a satisfactory manner. REV-Reviewed R&R-Revise an Resubmit Date: 07.05.12 By:ELP REJ-Rejected Beaudin Ganze Consulting Engineers,Inc. F.A.C.-Furnish s Corrected(resubmittal not required,u.n.o.) ITEM ACTION REMARKS REV R&R REJ F.A.C. General Notes Systems previously reviewed without comment have not been re-reviewed and are not listed below. P-7 X P-3 X Snowmelt Boiler Circ Pump `P-5' (P-6 X in revised documents Snowmelt Confirm snowmelt zones 5 and 6 were balanced to Zones X revised values shown in RFI 161; update as needed in the field. Resubmittal not re uired. _. . :',t. . . , � _ _ � =� . VAIL ALBUQUERQUE DENVER FORT COLLINS LAKE TAHOE SACRAMENTO VAII BEAUDIN�/,/ GANZE// June 25, 201 consulting engineers,inc. Mr. Brandon ixon J� ^ � U Z� 4240 Archite ture, Inc. �, � 3507 Ringsb Court, Suite 117 Denver, CO 0216 RE: Lion ead Welcome Center- Proje t#8828.04 Dear Brando : The Town of ail(ToV)Building Department has requested a letter from BGCE stating that the makeup air p vided to the second level of the Welcome Center is adequate for both the Type 1 hood eachaust and neral space ventilation requirements. This letter addresses one of the outstanding items on the own's list and is to be provided before they will issue the Certificate of Occupancy. Please issue i the appropriate format. • The g ease exhaust fan was designed for 900 CFM; it was reported to operate at 936 CFM per th Testing, Adjusting, and Balancing (TAB)Report. • 2009 MC, Section 508 requires approximately equal CFM of makeup air be provided to the space Section 403.2.2 of the same code allows air transferred from occupiable spaces to serve s makeup air for exhaust systems in kitchens. • The f n coil units that serve the second level, FG2 and FC-3, have a design total of 1,180 CFM utside air for general space ventilation; they were reported to operate at 1,240 CFM outsi e air per the TAB report. When the grease exhaust fan is not in operation,the relief path r the outside air is via gravity dampers at the exterior of the building. • The s quence of operation for these fan coil units was revised so they operated and therefore provi ed appropriate makeup air whenever the grease exhaust fan is in operation. Per the refere ced code sections, along with the information indicated in the TAB report, BGCE feels the outside ai provided to the fan coil units for space ventilation purposes is adequate for the makeup air requireme ts of the grease exhaust fan. Contact us w' h any questions or comments. Sincerely, ��r Erin Pasold, .E. Engineer Enclosures: F nal List of Outstanding Items from ToV cc: Jeremiah endell, Paul Burbidge—RANA � _ _ -_ � , � -�, -� �_>� vAi� ALBUQUERQUE DENVER FORTCOLLINS LAKETAHOE SACRAMENTO VAtL wuw.bece.cum '_., _ ;. r � �.,� ..I ,. ._ . _ .._ � .. . .� -. . �. � . .