LION SQUARE LODGE - NORTH
Town of Vail, Colorado
PROJECT MANUAL - VOLUME I
Construction Documents
F EBRUARY 16, 2007
MELICK ASSOCIATES, INC.
Architecture - Interiors - Planning
355 Teller Street, Suite 370, Lakewood, Colorado 80226
Prepared by Dwight Stone
S PEC �y" design
,aY \l��P
1 r.
;®
AA
i
0
�'dWau�a�r�
LION SQUARE LODGE NORTH
Vail, Colorado
PROJECT DIRECTORY
PROJECT
Lion Square Lodge North
660 W.Lionshead Place
Vail, Colorado
OWNER
Lion Square Lodge North
660 W. Lionshead Place
Vail, CO 81657
(970) 477 -4432 Fax (970)
DEVELOPER
Viele Development, LLC
1000 S. Frontage Road
Vail, CO 81657
GENERAL CONTRACTOR
Viele Construction, LLC
1000 S_ Frontage Road
Vail, CO 81657
ARCHITECT
Melick Associates, Inc.
355 S. Teller Street, Suite 370
Lakewood, Colorado 80226
(303) 534 -1930 Fax (303) 534 -1931
CIVIL ENGINEER
Peak Land Consulting
North Frontage Road
Vail, Colorado 81657
(970)
STRUCTURAL ENGINEER
Monroe & Newell
1701 Wynkoop, Suite 200
Denver, Colorado 80202
(303) 6234927 Fax (303) 623 -6602
SOILS INVESTIGATION
Koechlein Consulting
Lakewood, CO
MECHANICAL /ELECTRICAL
Architectural Engineering Consultants (AEC)
ENGINEER
P.O. Box 8489
Avon, Colorado 81620
970 - 748 -8520
FIRE PROTECTION ENGINEER
Shaner Life Safety
LANDSCAPE ARCHITECTURE
Neils Luneeford
Silverthorne, Colorado
PROJECT DIRECTORY I
LION SQUARE LoDcE NORTH
Vail, Colorado
'
TABLE OF CONTENTS - VOLUME I
Supplementary Conditions of the Contract
DIVISION I - GENERAL REQUIREMENTS
01 100 Summary
01210 Allowances
01230 Alternates
01250 Contract Modification Procedures
01290 Payment Procedures
01310 Project Management and Coordination
01310 Form Request for Interpretation Form (RFI)
01320 Construction Progress Documentation
01330 Submittal Procedures
01400 Quality Requirements
01420 References
01500 Temporary Facilities and Controls
01524 Construction Waste Management
01600 Product Requirements
01600 Form Substitution Request Form
01700 Execution Requirements
01731 Cutting and Patching
01732 Selective Demolition
01770 Closeout Procedures
'
01781 Project Record Documents
01782 Operation and Maintenance Data
DIVISION 2 - SITE CONSTRUCTION
1
02080 Utility Materials
02085 Interceptors
02260 Excavation Support and Protection
02300 Earthwork
02370 Slope Protection and Erosion Control
02510 Water Distribution
02530 Sanitary Sewer System
02552 Ground -Loop Heat Pump Piping
02620 Subdrainage
02630 Storm Drainage
02732 Roadway Base
02751 Cement Concrete Pavement
02764 Pavement Joint Sealants
02768 Decorative Cement Concrete Pavement
02780 Unit Pavers
02832 Segmental Retaining Walls
02900 Landscaping
DIVISION 3 — CONCRETE
�
o
03300 Cast -In -Place Concrete
®
03410 Plant- Precast Structural Concrete
03542 Cement -Based Underlayment
o
DIVISION 4 — MASONRY
'
04810 Unit Masonry Assemblies
04860 Stone Masonry
TABLE OF CONTENTS — VOLUME I
TOC - 1
LION SQUARE LODGE NORTH
Vail, Colorado
DIVISION 5 — METALS
05120
Structural Steel
05310
Steel Deck
05400
Cold- Formed Metal Framing
05500
Metal Fabrications
05511
Metal Stairs
05521
Pipe and Tube Railings
05530
Gratings
DIVISION 6 - WOOD AND PLASTICS
06100
Rough Carpentry
06105
Miscellaneous Carpentry
06130
Heavy Timber Construction
06160
Sheathing
06201
Exterior Finish Carpentry
06402
Interior Architectural Woodwork
06415
Stone Countertops
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07141
Cold Fluid - Applied Waterproofing
07210
Building Insulation
07311
Asphalt Shingles
07411
Metal Roof Panels
07460
Siding
07540
Thermoplastic Membrane Roofing
07551
APP - Modified Bituminous Membrane Roofing
07620
Sheet Metal Flashing and Trim
07720
Snow Retention System
07811
Sprayed Fire - Resistive Materials
07841
Through - Penetration Firestop Systems
07842
Fire- Resistive Joint Systems
07920
Joint Sealants
DIVISION 8 - DOORS AND WINDOWS
08110
Steel Doors and Frames
08212
Stile and Rail Wood Doors
08213
Metal Clad Doors
08305
Access Doors and Frames
08331
Overhead Coiling Doors
08332
Insulated Overhead Coiling Doors
08334
Overhead Coiling Grilles
08361
Sectional Overhead Doors
08460
Automatic Entrance Doors
08550
Aluminum Clad Wood Windows
08710
Door Hardware
08800
Glazing
DIVISION 9 - FINISHES
09220
Portland Cement Plaster
09250
Gypsum Board
09265
Gypsum Board Shaft -Wall Assemblies
09310
Floor and Wall Tile
09385
Dimension Stone "file
09511
Acoustical Panel Ceilings
09653
Resilient Wall Base and Accessories
09680
Carpet
TABLE OF CONTENTS
— VOLUME
eo ��a���ti�� re �
41, 1
lb
0
m � arm
TOC -2
1
1
1
t
L
Lj
�
I
1
t
t
l�
09720
09900
t
t
t
1
r
1
t
I_l
Wall Coverings
Painting
DIVISION 10 —SPECIALTIES
10155
Toilet Compartments
10200
Louvers and Vents (Chimney Cap)
10265
Impact- Resistant Wall Protection
10300
Prefabricated Fireplaces
10425
Signage
10506
Wood Lockers
10520
Fire Protection Specialties
10801
Toilet and Bathroom Accessories
DIVISION II— EQUIPMENT
11015 Rope Descent System
l 1 150 Parking Control Equipment
DIVISION 12 —FURNISHINGS
DIVISION 13 —SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING SYSTEMS
14240 Roped Hydraulic Elevators
CONTINUED IN VOLUME 11
TABLE OF CONTENTS — VOLUME
LION SQUARE LODGE NORTH
Vail, Colorado
o
® r
4
qb
,
c i
40 ��ae�a�
TOC - 3
1
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
SUPPLEMENTARY CONDITIONS
The Supplementary Conditions change and amend the General Conditions of the Contract for Construction,
AIA Document A201, 1987 Edition, of the American Institute of Architects. Where any part of the
General Conditions is modified by these Supplementary Conditions or by Division 1 requirements, the
unaltered provisions shall remain in effect.
ARTICLE 1 — GENERAL PROVISIONS
Al the end of this clause add the following sentences and subelauses:
Revise Subparagraph 3.18.1 to read:
3.18.3 The obligations of the Contractor under this paragraph 3.18 shall not extend to the liability of (lie
Architect, the Architect's consultants, and agents and employees of any of them arising out of (1) The
preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or
specifications, or (2) The giving of or failure to give directions or instructions by the Architect, the
Architect's consultants, and agents and employees of any of them provided such giving or failure to give is
the primary cause of the injury or damage, and is required under the terms of this Agreement.
SUPPLEMENTARY CONDITIONS
1.2.3.1 Addenda and Architect's Supplemental Instructions take precedence over original construction
documents.
1.2.3.2 Should there be conflict within Specifications, on Drawings or between the Specifications and
Drawings, Developer /Contractor shall notify Architect before proceeding and Architect shall decide which
1
stipulation will provide best installation and his decision shall be final.
1.2.3.3 In drawings, the precedence shall be drawings of larger scale over those of smaller scale, figured
dimensions over scaled dimensions, and noted materials over graphic indications.
ARTICLE 3 — CONTRACTOR
Revise the following Subparagraph(s) as indicated:
3.3.1 The contractor shall supervise and direct the Work, using the Contractor's best skill and
attention. The Contractor shall be solely responsible for and have control over construction means,
methods, techniques, sequences and procedures, for providing and maintaining a safe place to work, for
coordinating all portions of the Work under the Contract and (1) to review any specified construction or
installation procedure, including those recommended by the manufacturers; (2) to advise the Architect (a) if
the specified procedure deviates from good construction practice, (b) if following the procedure will affect
any warranties, including the Contractor's general warranty, or (c) of any objections the Contractor may
have to the procedure; and (3) to propose any alternative procedure which the Contractor will wan
3.4 Labor and materials:
Add the following Subparagraph 3.4.3 to 3.4
3.4.3 After the Contract has been executed, the Owner and the Architect will consider a formal
request for substitution of products in place of those specified with full disclosure by the Contractor of
functional, material, cost, and other differences between the products.
Paragraph 3.18
Revise Subparagraph 3.18.1 to read:
3.18.3 The obligations of the Contractor under this paragraph 3.18 shall not extend to the liability of (lie
Architect, the Architect's consultants, and agents and employees of any of them arising out of (1) The
preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or
specifications, or (2) The giving of or failure to give directions or instructions by the Architect, the
Architect's consultants, and agents and employees of any of them provided such giving or failure to give is
the primary cause of the injury or damage, and is required under the terms of this Agreement.
SUPPLEMENTARY CONDITIONS
1
LION SQUARE LODGE NORTH
Vail, Colorado
ARTICLE 4 — ADMINISTRATION
Paragraph 4.1 i
Revise Subparagraph 4. l.2 to read:
4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the
Contract Documents shall not be modified or extended without written consent of the Owner, Contractor
and Architect. Consent shall not be unreasonably withheld. In the event the Architect is not contractually
obligated to provide some or all services during the construction phase, and unless otherwise provided for
in the Contract Documents, the Owner shall be responsible, and hold the Architect harmless, for those
construction related services stipulated throughout this document or as may otherwise be required_
Paragraph 4.2
Revise Subparagraph 4.2.2 to read:
4.2.2 The Architect will visit the site at intervals appropriate to the stage of construction to
become generally familiar with the progress and quality of the completed Work as permanent
improvements and to determine in general if the Work is being performed in a manner indicating that the
Work, when completed, will be in accordance with the Contract Documents. However, the Architect will
not be required to make exhaustive or continuous on -site inspections to check quality or quantity of the
Work. On the basis of on -site observations as an Architect, the Architect will keep the Owner informed of
(lie progress of the Work for the existing building.
Revise Subparagraph 4.2.8 to read:
4.2.8 The Architect may prepare ASI's and may authorize minor changes in the Work as
provided in Paragraph 7.4.
ARTICLE 5 — SUBCONTRACTORS
5.3.1 Add the following Clause:
5.3.2 Before doing any work, each subcontractor shall verify measurements at (lie job -site
pertaining to his work and shall be responsible for correctness of same, Any variations in actual and drawn
dimensions shall be submitted to Architect for consideration before proceeding with work.
ARTICLE 7 — CHANGES IN THE WORK
The Owner and General Contractor shall agree to procedures for changes, and the Owner may make such t
changes without invalidating the Contract. Reasonable charges for Contractor's overhead and profit and
subcontractor mark shall be agreed to by the Owner and General Contractor prior to execution of a
Change Order.
ARTICLE I 1 — INSURANCE AND BONDS
1 1. L 1 In the 2 nd line after the words "in a company or companies" DELETE the words "lawfully
authorized to do business in the jurisdiction in which the Project is located' and in that place INSERT the
words "licensed to do business in the State of Colorado with the Owner, Architect and his Consultants as
nanted insureds;"
Revise Subparagraph H. to read:
1 1.1.2 The insurance required by Subparagraph 1 1.1.1 of AIA A201 shall be written for not less than
limits of liability stipulated by the Owner or required by law, whichever coverage is greater.
SUPPLEMENTARY CONDITIONS 2
LION SQUARE LODGE NORTH
Vail, Colorado
ARTICLE 12 — UNCOVERING AND CORRECTION OF WORK
122.2 ADD: "General Contractor shall, in case of work performed by his subcontractors and where
guarantees are required, secure warranties from subcontractors and deliver same to Owner upon completion
of work. Should any defects develop in aforesaid work within specified periods due to faults in materials
or workmanship, contractor(s) shall make repairs and do necessary work to correct defective work in
accordance with the Contract Documents. Repairs and corrective work, including costs of making good
other work damaged by or otherwise affected by making of repairs or corrective work, shall be
accomplished without cost to Owner and at entire cost and expense of contractor(s) within mutually agreed
upon time frame and after written notice from Owner. Nothing herein intends to imply that guaranty shall
apply to work which has been abused or neglected by Owner of successor(s) in interest.
SUPPLEMENTARY CONDITIONS 3
LION SQUARE LOI)ctE NORTH
Vail, Colorado
SECTION 01100- SUMMARY
PARTI- GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Project consists of selective demolition, addition and renovation of the existing
hotel condominium units at Lion Square Lodge North, in Vail, Colorado. Additions to include the
construction of two (2) core and shell towers to be six (6) stories tall.
B. Owner and Lot Location: Lion Square Lodge North, 600 West Lionshead Place, Vail, Colorado
C. Developer: Viele Development, LLC, 1000 South Frontage Road, Vail, Colorado
D. General Contractor: Viele Construction, LLC, 1000 South Frontage Road, Vail, Colorado
E_ Architect: Melick Associates, Inc., 355 Teller Street, Suite 370, Lakewood, Colorado.
F. Geotechnieal Report: Obtain copy from Owner or Architect.
1.2 SCOPE OF WORK
A. The work consists of the construction of additions to all four sides of the existing building, the addition of
a parking structure, the addition of a six story west tower, and the addition of a six story east tower.
B. The scope of work is a core and shell package and does not inelude the interiors of the new
condominiums in the two six story towers or the remodels of the interiors of the existing units.
C. The construction type is III -B at the existing units. V -B at the existing one story structure remaining
between the north property line and setback line. and IB at the new lowers.
D. The occupancy type is R -2.
E. The stnuctural frame is wood at the existing building and structural steel at the new towers and parking
structure.
F. The major systems in the building include architectural. structural, plumbing, fire protection, mechanical
and electrical systems.
G. The scope of the project is further defined as:
I . Bedroom additions
2. Deck additions including adjacent living room and loft expansions
3. Multi -level parking structure
4. Locker rooms. workout room, one gunnite hot lub
5. Owner boot room
6. Replace north and south decks'balconics
7. West end unit extensions (4' deep) at ov, ?ner's direct expense
g. Developer responsible for unforeseen conditions
9. Developer to protect existing units and use during construction
10. Remove_ store and reinstall all owner furnishings
11. 3 hour lire walls (or as required by code) between existing building and new buildings
SUMMARY 01100 - 1
1
LION SQUARE LODGE NORTH
Vail, Colorado
12. Two hour rated egress stair enclosures
13. Provide fire proofing between units as required by state and local codes
14. New Condo Units
15. Construction type I B for occupancy and height building code requirements
16. Building permit, plan check, planning and DRB fees
H. Scope of work not included:
1. Existing unit fireplaces replacements
2. Existing unit interior design or remodel
3. South end unit living room expansion to south
Summary of Code Restrictions: All codes and regulations in effect at the site as of Febmary 16, 2007
shall apply.
Summary of fees:
I . The Developer will pay for all permits and utility construction fees, including development fees.
2. If required, the Developer will pay for utility service company capital cost development fees
and /or plant investment fees and relocation of public utilities.
3. The Developer is to provide Builder's Risk Insurance coverage including deductibles.
K. Summary of items not covered by the Project Manual: The following list covers items of work not
provided for under the specification manual. This is not a complete list and is intended only to indicate
some of the major items that will not be included. These costs should be covered by the Developer under
a separate budget for soft or indirect costs for the project.
1. Architect fees
2. Special consulting fees
3. Land survey
4. Utility development fees - tap fees
5. "testing and inspections
6. Builders Risk Insurance
7, Dewatering
8. Soils report
9. Telephone
10. Payment and performance bond (available if requested)
11. Models or renderings
13 TYPE OF CONTRACT
A. Project will be constructed tinder a single prime contract between Developer and General Contractor.
General Conditions of the Contract for Construction to be AIA Document A201 except as amended or
supplemented by the Supplementary General Conditions. These General and Supplementary Conditions
shall apply to all work of the Project and all sections of these specifications.
1.4 WORK UNDER OTHER CONTRACTS
A. General: Cooperate Fully with separate contractors so work on those contracts may be carried out
smoothly. without interfering with or delaying work tinder this Contract. Coordinate the Work of this
Contract with work performed under separate contracts.
SUMMARY 01100-2
1
1
t
1
1
J
L
t
t
t
t
[I
1
1
1
1
1.5 USE OF PREMISES
LION SQUARE LODGE NORTH
Vail, Colorado
A. General: Contractor shall have frill use of premises for construction operations, including use of Project
site, during construction period. Contractor's use of premises is limited only by Owners right to perform
work or to retain other contractors on portions of Project.
1.6 WORK RESTRICTIONS
A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others
unless permitted under the following conditions and then only after arranging to provide temporary utility
services according to requirements indicated:
1. Notify Owner's Representative not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's Representative's written permission.
1 1.7 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Formal: The Specifications are organized into Divisions and Sections using the 16- division
format and CSI /CSC's "MasterFormat" numbering system.
I. Section Identification: The Specifications use Section numbers and titles to help cross - referencing
in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the
sequence is incomplete because all available Section numbers are not used. Consult the table of
contents at the beginning of the Project Manual to determine numbers and names of Sections in
the Contract Documents.
2. Division 1: Sections in Division I govern clue execution of the Wort: of all Sections in the
Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the
intended meaning of certain terms, words. and phrases when used in particular situations. These
conventions areas follows:
I _ Abbreviated Language: Language used in the Specifications and other Contract Documents is
abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not
staled, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and
plural words shall be interpreted as singular where applicable as the context of the Contract
Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications. Requirements
expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative
or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that
must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall." "shall be." or "shall comply with," depending on the context, are
implied where a colon (:) is used within a sentence or phrase.
' PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 100
SUMMARY 01100-3
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01210 - ALLOWANCES
PART l - GENERAL
I.f SUMMARY
A. This Section includes administrative and procedural requirements goveming the following:
I. Lump -sum allowances.
2. Unit -cost allowances.
3. Quantity allowances.
4. Contingency allowances.
5. Testing and inspecting allowances.
B. See Division I Section "Unit Prices" for procedures for using unit prices.
C. See Division I Section "Quality Requirements" for procedures goveming the use of allowances for
testing and inspecting.
1.2 SELECTION AND PURCHASE
A. Al the earliest practical date after award of the Contract, advise Architect of the date when final selection
and purchase of each product or system described by an allowance must be completed to avoid delaying
the Work.
B. At Architect's request, obtain proposals for each allowance for use in making final selections_ Include
recommendalions that are relevant to perforating the Work.
C. Purchase products and systems selected by Architect from the designated supplier.
1.3 SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form specified for
Change Orders.
B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in
fulfillment of each allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.
1.4 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate
installation.
ALLOWANCES 01210- 1
Llov SQUARE LODGE NORTH
Vail, Colorado
1.5 ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner under
allowance and shall include taxes, freight, and delivery to Project site.
B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor,
installation, overhead and profit, and similar costs related to products and materials ordered by Owner
tinder allowance shall be included as part of the Contract Sum and not part of the allowance.
1.6 CONTINGENCY ALLOWANCES
A. Use the contingency allowance only as directed by Architect for Owner's purposes and only by Change
Orders that indicate amounts to be charged to the allowance_
B. Contractor's overhead, profit, and related costs for products and equipment ordered by Owner under the
contingency allowance are included in the allowance and are not part of the Contract Sum. These costs
include delivery, installation, taxes, insurance, equipment rental, and similar costs.
C. Change Orders authorizing use of funds from the contingency allowance will include Contractor's related
costs and reasonable overhead and profit margins.
D. At Project closeout, credit unused amounts remaining in the contingency allowance to Owner by Change
Order.
1.7 TESTING AND INSPECTING ALLOWANCES
A. Testing and inspecting allowances include the cost of Contractor engaging testing agencies, actual tests
and inspections, and reporting results.
13 . The allowance does not include incidental labor required to assist the testing agency or costs for retesting
if previous tests and inspections result in failure. The cost for incidental labor to assist the testing agency
shall be included in the Contract Sum.
C. Costs ol'services not required by the Contract Documents are not included in the allowance.
D. At Project closeout, credit unused amounts remaining in (lie testing and inspecting allowance to Owner
by Change Order.
1.3 UNUSED MATERIALS
A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner,
after installation has been completed and accepted.
I. If requested by Architect, prepare unused material for storage by Owner when it is not
economically practical to return the material for credit. If directed by Architect, deliver unused
material to Owner's storage space. Otherwise, disposal of unused material is Contractor's
responsibility.
ALLONVANCES 01210-2
LION SQUARE LODGE NORTH
Vail, Colorado
PART 2 - PRODUCTS (No( Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged
or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to
ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCES
I. Allowance Nl: S45.00 per square yard for new floor finish installed in each residential
unit. Allowance is for the complete installed system.
END OF SECTION 01210
ALLOWANCES 01210-3
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01230 -ALTERNATES
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the
Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to
accept a corresponding change either in the amount of construction to be completed or in the products,
materials, equipment, systems, or installation methods described in the Contract Documents.
I. The cost or credit for each alternate is the net addition to or deduction from the Contract Stum to
incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the
alternate into Project.
I. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items
incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the
status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later
consideration. Include a complete description of negotiated modifications to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections
referenced in schedule contain requirements for materials necessary to achieve the work described under
each alternate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE- OF ALTERNATES
A. See Drawings for a complete list of alternates for the project.
END OF SECTION 01230
ALTERNATES
01230- 1
I
1
r
I
t
1
r
r
L7
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01250 - CONTRACT MODIFICATION PROCEDURES
PART I - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements for handling and processing Contract
modifications.
B. Related Sections: Division I Section "Product Requirements" for administrative procedures for handling
requests for substitutions made after Contract award.
1.2 MINOR CHANGES IN THE WORK
A. Architect will issue supplemental instructions authorizing Minor Changes in the Work, not involving
adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's
Supplemental Instructions."
1.3 PROPOSAL REQUESTS
A_ Owner- Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the
Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the
description will include supplemental or revised Drawings and Specifications.
Proposal Requests issued by Architect are for information only. Do not consider them instructions
either to stop work in progress or to execute the proposed change.
Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation
estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the
change.
a. Include a list of quantities of products required or eliminated and unit costs, with total
amount of purchases and credits to be made. If requested, furnish survey data to
substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
discounts.
C, Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractors Construction Schedule that indicates the effect of the
change, including, but not limited to, changes in activity duration, start and finish times,
and activity relationship. Use available total float before requesting an extension of the
Contract Time.
B. Contractor - Initialed Proposals: If latent or unforeseen conditions require modifications to the Contract,
Contractor may propose changes by submitting a request for a change to Architect.
I. Include a statement outlining reasons for the change and the effect of the change on the Work.
Provide a complete description of the proposed change. Indicate the effect of the proposed change
on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of
purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts_
4. Include costs of labor and supervision directly attributable to the change.
CONTRACT MODIFICATION PROCEDURES
01250- 1
Fl
J
LION SQUARE LODGE NORTH
Vail, Colorado
5. Include an updated Contractor's Construction Schedule that indicates the effect of the change,
including, but not limited to, changes in activity duration, start and finish times, and activity
relationship. Use available total float before requesting an extension of the Contract Time.
6. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change
requires substitution of one product or system for product or system specified.
C. Proposal Request Form: Use AIA Document G709 for Proposal Requests or forms provided by Owner.
1.4 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures of Owner
and Contractor on AIA Document 6701.
1.5 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Architect may issue a Construction Change Directive on
AIA Document G714_ Construction Change Directive instructs Contractor to proceed with a change in
the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also
designates method to be followed to determine change in the Contract Sum or the Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the
Construction Change Directive.
I. After completion of change, submit an itemized account and supporting data necessary to
substantiate cost and time adjustments to the Contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01250
CONTRACT MODIFICATION PROCEDURES 01250-2
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01290 - PAYMENT PROCEDURES
PARTI - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and process
Applications for Payment.
B. Related Sections include the following:
1. Division I Section "Contract Modification Procedures" for administrative procedures for handling
changes to the Contract.
2. Division I Section "Construction Progress Documentation" for administrative requirements
governing preparation and submittal of Contractor's Construction Schedule and Submittals
Schedule.
1.2 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to
various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.
1.3 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's
Construction Schedule. Cost - loaded CPM Schedule may serve to satisfy requirements for the Schedule
of Values.
I. Correlate line items in the Schedule of Values with other required administrative fonns and
schedules, including the following:
a. Application for Payment forms with Continuation Sheets.
b_ Submittals Schedule.
C. Contractors Construction Schedule_
2. Submit the Schedule of Values to Architect at earliest possible date but no later than seven days
before the date scheduled for submittal of initial Applications for Payment.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the
Schedule of Values. Provide at least one line item for each Specification Section.
I. Identification: Include the following Project identification on the Schedule of Values:
a. Project name and location.
b. Name of Architect.
c. Architect's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Submit draft of AIA Document G703 Continuation Sheets.
3. Arrange the Schedule of Values in tabular form with separate columns to indicate the followin"
for each itcm listed:
PAYMENT PROCEDURES 01290-1
LION SQUARE LODGE NORTH
Vail, Colorado
a. Related Specification Section or Division.
b. Description of the Work.
C. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Dollar value.
I) Percentage of the Contract Sum to nearest one - hundredth percent, adjusted to total
100 percent.
4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of
Applications for Payment and progress reports. Coordinate with the Project Manual table of
contents. Provide several line items for principal subcontract amounts, where
appropriate. Include separate line items tinder required principal subcontracts for operation and
maintenance manuals, punch list activities, Project Record Documents, and demonstration and
training in flue amount of 5 percent of the Contract Sum.
5. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
6. Provide a separate line item in the Schedule of Values for each part of the Work where
Applications for Payment may include materials or equipment purchased or fabricated and stored,
but not yet installed.
a. Differentiate between items stored on -site and items stored off -site. If specified, include
evidence of insurance or bonded warehousing.
7. Provide separate line items in the Schedule of Values for initial cost of materials, for each
subsequent stage of completion, and for total installed value of that part of the Work.
8. Each item in the Schedule of Values and Applications for Payment shall be complete_ Include
total cost and proportionate share of general overhead and profit for each item.
Temporary facilities and other major cost items that are not direct cost of actual work -in-
place may be shown either as separate line items in the Schedule of Values or distributed as
general overhead expense, at Contractor's option.
Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for
Payment when Change Orders or Construction Change Directives result in a change in the
Contract Sum_
1.4 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as certified by
Architect and Owner's Representative and paid for by Owner.
Initial Application for Payment, Application for Payment at time of Substantial Completion, and
Final Application for Payment involve additional requirements.
13. Payment Application Times: The date for each progress payment is indicated in the Agreement between
Owner and Contractor. The period of construction Work covered by each Application for Payment is the
period indicated in the Agreement.
C. Payment Application Forms: Use AIA Docwnent G702 and AIA Document 6703 Continuation Sheets
or fornu provided by the Owners Representative as form for Applications for Payment.
D. Application Preparation:
sign legal documents on
action.
Complete every entry on form. Notarize and execute by a person authorized to
behalf of Contractor. Architect will return incomplete applications without
PAYMENT PROCEDURES 01290-2
t
t
F1
i i
t
1
J
1
1
5
�J
LION SQUARE LODGE NORTH
Vail, Colorado
I . Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use
updated schedules if revisions were made.
2. Include amounts of Change Orders and Construction Change Directives issued before last day of
construction period covered by application.
E. Transmittal: Submit 3 signed and notarized original copies of each Application for Payment to Architect
by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar
attachments if required.
Transmit each copy with a transmittal form listing attachments and recording appropriate
information about application.
r
1
1
1
r
F. Waivers of Mechanic's Lien: Refer to Exhibit of Agreement between Owner and Contractor.
G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide
with submittal of first Application for Payment include the following:
I . List of subcontractors.
2. Schedule of Values.
3. Contractor's Construction Schedule (preliminary if not final).
4. Products list.
5. Schedule of unit prices.
6. Submittals Schedule (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the
Work-
11. Initial progress report.
12. Report of preconstruction conference.
13. Certificates of insurance and insurance policies.
14. Performance and payment bonds.
15. Data needed to acquire Owner's insurance.
16. Initial settlement survey and damage report if required.
H_ Application for Payment at Substantial Completion: After issuing the Certificate of Substantial
Completion, submit an Application for Payment showing 100 percent completion for portion of the Work
claimed as substantially complete.
Include documentation supporting claim that the Work is substantially complete and a statement
showing an accounting of changes to the Contract Sum.
This application shall reflect Certificates of Partial Substantial Completion issued previously for
Owner occupancy of designated portions of the Work.
Final Payment Application: Submit final Application for Payment with releases and supporting
documentation not previously submitted and accepted, including, but not limited, to the following:
I. Evidence of completion of Project closeout requirements.
2. Insurance certificates for products and completed operations where required and proof that taxes,
fees, and similar obligations were paid.
3. Updated final statement. accountine for final chances to the Contract Sum.
4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."
5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."
6. Evidence that claims have been settled.
7. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of
Substantial Completion or when Owner look possession of and assumed responsibility for
corresponding elements of the Work.
PAYMENT PROCEDURES
01290-3
LION SQUARE LODGE NORTH
Vail, Colorado
8. Final, liquidated damages settlement statement.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01290
PAYMENT PROCEDURES 01290-4
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
Jl ti r1�H �i�I 5f:7•�iA
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project
including, but not limited to, the following:
1. Coordination Drawings.
2. Administrative and supervisory personnel.
3. Project meetings.
4. Requests for Interpretation (RFIs).
B. Related Sections include the following:
1. Division I Section "Construction Progress Documentation" for preparing and submitting
Contractor's Construction Schedule,
2. Division 1 Section "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents.
1.3 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to
ensure efficient and orderly installation of each part of the Work. Coordinate construction operations,
included in different Sections, that depend on each other for proper installation, connection, and
operation.
I _ Schedule construction operations in sequence required to obtain the best results where installation
of one pan of (fie Work depends on installation of other components, before or after its own
installation.
2. Coordinate installation of different components with other contractors to ensue maximum
accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure
maximum performance and accessibility for required maintenance, service, and repair of all
components, including mechanical and electrical.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for
coordination. Include such items as required notices, reports, and list of attendees at meetings.
I. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is
required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with
other construction activities and activities of' other contractors to avoid conflicts and to ensure orderly
progress of the Work_ Stich administrative activities include, but are not limited to, the following:
PROJECT IVIANACEMENT AND COORDINATION
01310-1
L
LION SQUARE LODGE NORTH
Vail, Colorado
1.4
I . Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5_ Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
9. Project closeout activities.
SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates
maximum utilization of space for efficient installation of different components or if coordination is
required for installation of products and materials fabricated by separate entities.
Content: Project - specific information, drawn accurately to scale. Do not base Coordination
Drawings on reproductions of the Contract Documents or standard printed data. Include the
following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural,
civil, mechanical, and electrical systems.
b. Indicate required installation sequences.
C. Indicate dimensions shown on the Contract Drawings and make specific note of
dimensions that appear to be in conflict with submitted equipment and minimum clearance
requirements. Provide alternate sketches to Architect for resolution of such conflicts.
Minor dimension changes and difficult installations will not be considered changes to the
Contract.
2. Sheet Size: At least 8 -1/2 by I I inches (2 15 by 280 mm) but no larger than 30 by 40 inches (750
by 1000 mm).
3. Number of Copies: Submit two opaque copies of each submittal. Architect, through will return
one copy.
a. Submit five copies where Coordination Drawings are required for operation and
maintenance manuals. Architect will retain two copies; remainder will be returned. Mark
tip and retain one returned copy as a Project Record Drawing.
4. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.
B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel
assignments, including superintendent and other personnel in attendance at Project site. Identify
individuals and their duties and responsibilities; list addresses and telephone numbers, including home
and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned
as standbys in the absence of individuals assigned to Project.
1.5
A
General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
Attendees: Inform participants and others involved, and individuals whose presence is required,
of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and
times.
PROJECT MANAGENIFNT AND COORDINATION
PROJECT MEETINGS
01310-2
1
1
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
2, Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting
minutes to everyone concerned, including Owner and Architect, within three days of the meeting.
B. Preconstruction Conference: Schedule a preconstr►etion conference before starting construction, at a
time convenient to Owner, and Architect, but no later than 15 days after execution of the Agreement.
Hold the conference at Project site or another convenient location. Conduct the meeting to review
responsibilities and personnel assignments.
I. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and
its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the
conference_ Ail participants at the conference shall be familiar with Project and authorized to
conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each constntction
activity that requires coordination with other construction.
I. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected
by the installation and its coordination or integration with other materials and installations that
have preceded or will follow, shall attend the meeling. Advise Architect of scheduled meeting
dates.
2. Agenda: Review progress of other construction activities and preparations for the particular
activity tinder consideration, including requirements for the following:
a. The Contract Documents.
b. Options.
C. Related RFIs.
d. Related Change Orders_
e. Purchases.
PROJECT MANAGEMENT AND COORDINATION 01310-3
a_
Tentative construction schedule.
b.
Phasing.
C.
Critical work sequencing and long -lead items.
d.
Designation of key personnel and their duties.
e.
Procedures for processing field decisions and Change Orders.
f.
Procedures for RFIs.
g.
Procedures for testing and inspecting.
h.
Procedures for processing Applications for Payment.
i.
Distribution of the Contract Documents.
j.
Submittal procedures.
k.
Preparation of Record Documents.
1.
Use of the premises and existing building.
m.
Work restrictions.
n.
Owner's occupancy requirements.
o.
Responsibility for temporary facilities and controls.
p.
Construction waste management and recycling.
q.
Parking availability.
r.
Office, work, and storage areas.
S.
Equipment deliveries and priorities.
t.
First aid.
u.
Security.
v.
Progress cleaning.
W.
Working hours.
3. Minutes: Record and distribute meeting minutes.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each constntction
activity that requires coordination with other construction.
I. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected
by the installation and its coordination or integration with other materials and installations that
have preceded or will follow, shall attend the meeling. Advise Architect of scheduled meeting
dates.
2. Agenda: Review progress of other construction activities and preparations for the particular
activity tinder consideration, including requirements for the following:
a. The Contract Documents.
b. Options.
C. Related RFIs.
d. Related Change Orders_
e. Purchases.
PROJECT MANAGEMENT AND COORDINATION 01310-3
LION SQUARE LODGE NORTH
Vail, Colorado
F. Deliveries.
g_ Submittals.
h. Review of mockups.
i. Possible conflicts.
j. Compatibility problems.
k. Time schedules.
I. Weather limitations.
m. Manufacturer's written recommendations.
n. Warranty requirements.
o. Compatibility of materials.
p. Acceptability of substrates.
q. Temporary facilities and controls.
r. Space and access limitations.
S. Regulations of authorities having jurisdiction_
t. Testing and inspecting requirements.
U. Installation procedures.
V. Coordination with other work.
W. Required performance results.
X. Protection of adjacent work.
Y. Protection of construction and personnel.
91
3. Record significant conference discussions, agreements, and disagreements, including required
corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have
been present.
5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate
whatever actions are necessary to resolve impediments to performance of the Work and reconvene
the conference at earliest feasible date.
Progress Meetings: Conduct progress meetings at weekly or regular intervals as indicated in Agreement.
Coordinate dales of meetings with preparation of payment requests.
1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor,
supplier, and other entity concerned with current progress or involved in planning, coordination,
or performance of f Lure activities shall be represented at these meetings. All participants at the
conference sliall be familiar with Project and authorized to conclude Matters relating to the Work.
?. Agenda: Review and correct or approve minutes of previous progress meeting_ Review other
items of significance that could affect progress. Include topics for discussion as appropriate to
status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting. Determine
whether each activity is on time, ahead of schedule, or behind schedule, in relation to
Contractor's Construction Schedule. Determine how constntction behind schedule will be
expedited; secure commitments from parties involved to do so. Discuss whether schedule
revisions are required to ensure that current and subsequent activities will be completed
within the Contract Time.
) Review schedule for next period_
b. Review present and future needs of each entity present, including the following:
I ) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off -site fabrication.
PROJECT MANAGEMENT AND COORDINATION
01310-4
i F I
Ll
L'
LION SQUARE LODGE, NORTH
Vail, Colorado
6) Access.
3. Minutes: Record the meeting minutes.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have
been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress
meeting where revisions to the schedule have been made or recognized. Issue revised
schedule concurrently with the report of each meeting.
E. Coordination Meetings: Conduct Project coordination meetings at regular intervals. Project coordination
meetings are in addition to specific meetings held for other purposes, such as progress meetings and
preinstallation conferences.
1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor,
supplier, and other entity concerned with current progress or involved in planning, coordination,
or performance of future activities shall be represented at these meetings. All participants at the
conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of the previous coordination meeting. Review
other items of significance that could affect progress. Include topics for discussion as appropriate
to status of Project.
a. Combined Contractor's Construction Schedule: Review progress since the last
coordination meeting. Determine whether each contract is on time, ahead of schedule, or
behind schedule, in relation to Combined Contractor's Construction Schedule. Determine
how construction behind schedule will be expedited; secure commitments from parties
involved to do so. Discuss whether schedule revisions are required to ensure that current
and subsequent activities will be completed within the Contract Time.
b. Schedule Updating: Revise Combined Contractor's Construction Schedule after each
coordination meeting where revisions to the schedule have been made or recognized. Issue
revised schedule concurrently with report of each meeting.
C. Review present and Imure needs of each contractor present, including the following:
) Interface requirements.
2) Sequence of operations.
3) Stairs of submittals.
4) Deliveries.
5) Off -site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
PROJECT MANAGEMENT AND COORDINATION _ 5
01310 _
7)
Site utilization.
8)
Temporary facilities and controls.
9)
Work hours.
10)
Hazards and risks.
1 1)
Progress cleaning.
12)
Quality and work standards.
13)
Status of correction of deficient items.
14)
15)
Field observations.
RFls.
16)
Status of proposal requests.
17)
Pending changes.
18)
Status of Change Orders.
'
19)
Pending claims and disputes.
20)
Documentation of infon»ation for payment requests.
3. Minutes: Record the meeting minutes.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have
been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress
meeting where revisions to the schedule have been made or recognized. Issue revised
schedule concurrently with the report of each meeting.
E. Coordination Meetings: Conduct Project coordination meetings at regular intervals. Project coordination
meetings are in addition to specific meetings held for other purposes, such as progress meetings and
preinstallation conferences.
1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor,
supplier, and other entity concerned with current progress or involved in planning, coordination,
or performance of future activities shall be represented at these meetings. All participants at the
conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of the previous coordination meeting. Review
other items of significance that could affect progress. Include topics for discussion as appropriate
to status of Project.
a. Combined Contractor's Construction Schedule: Review progress since the last
coordination meeting. Determine whether each contract is on time, ahead of schedule, or
behind schedule, in relation to Combined Contractor's Construction Schedule. Determine
how construction behind schedule will be expedited; secure commitments from parties
involved to do so. Discuss whether schedule revisions are required to ensure that current
and subsequent activities will be completed within the Contract Time.
b. Schedule Updating: Revise Combined Contractor's Construction Schedule after each
coordination meeting where revisions to the schedule have been made or recognized. Issue
revised schedule concurrently with report of each meeting.
C. Review present and Imure needs of each contractor present, including the following:
) Interface requirements.
2) Sequence of operations.
3) Stairs of submittals.
4) Deliveries.
5) Off -site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
PROJECT MANAGEMENT AND COORDINATION _ 5
01310 _
LION SQUARE LODGE NORTH
Vail, Colorado
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Change Orders.
3. Reporting: Record meeting results and distribute copies to everyone in attendance and to others
affected by decisions or actions resulting from each meeting.
1.6 REQUESTS FOR INTERPRETATION (RFIs)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not
possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be
returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or
work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the
following:
1. Project name.
2. Date.
s
3. Name of Contractor.
�
4. Name of Architect.
I
5. RFI number, numbered sequentially.
6. Specification Section number and title and related paragraphs, as appropriate.
7. Drawing number and detail references, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the
Contract Sum, Contractor shall state impact in the RFI.
10. Contractor's signature.
11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop
Drawings, and other information necessary to filly describe items needing interpretation.
a. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses,
strucntral grid references, and details of affected materials, assemblies. and attachments.
C. Hard -Copy RFIs: CSI Form 132A Contractor Form.
or approved standard
i
1. Identify each page of attachments with the RFI number and sequential page number.
s
t
y
D. Software- Generated RFIs: Software- generated form with substantially [lie same content as indicated
�
above.
l _ Attachments shall be electronic files in Adobe Acrobat PDF format.
r
S
E. Architect's Action: Architect will review each RFI, determine action required, and return it. Allow seven
}
working days for Architect's response for each RFI_ RFIs received atler 1:00 p.m. will be considered as
received the following working day.
I
I. The following RFIs will be returned without action:
a. Requests for approval of submittals.
PROJECT MANAGEMENT AND COORDINATION 01310-6
1
'
t
LION SQUARE LODGE NORTH
Vail, Colorado
b. Requests for approval of substitutions_
c. Requests for coordination information already indicated in the Contract Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum.
e. Requests for interpretation of Architect's actions on submittals.
f. Incomplete RFIs or RFIs with numerous errors.
2. Architect's action may include a request for additional information, in which case Architect's time
for response will start again.
3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum
may be eligible for Contractor to submit Change Proposal according to Division 1 Section
"Contract Modification Procedures."
a. If Contractor believes the RFI response warrants change in the Contract Time or the
Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.
F. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to
affected parties. Review response and notify Architect within seven days if Contractor disagrees with
response.
G. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log
weekly. Include the following=
1. Project name.
2. Name and address of Contractor.
3. Name and address of Architect.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date Architect's response was received.
3. Identification of related Minor Change in the Work, Cons(ruction Change Directive, and Proposal
Request, as appropriate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 0 13 10
PROJECT MANAGEMENT AND COORDINATION 01310-7
Re uest or Interpretation (RFI)
PROJECT: RFI No:
Initiated By:
Contractor:
Subcontractor:
SUBJECT:
Description:
PROPOSED SOLUTION (By Contractor)
By:
Date:
Description:
DATE:
Contract M
Log Date:
Log By:
REPLY BY:
Spec or Dwg M
Anticipated Cost Change? ❑ Yes ❑ No
Anticipated Time Change? ❑ Yes ❑ No
RESPONSE (By Architect or Consultant)
By:
Date:
Description:
Anticipated Cost Change? ❑ Yes ❑ No
Anticipated Time Change? ❑ Yes ❑ No
ACCEPTANCE (By Contractor)
Note: If there is a cost or time change, subsequent project documents must be issued.
By: Accepted w/o Cost Change? ❑ Yes ❑ No
Date: Accepted w/o Time ❑ Yes ❑ No
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION
PART 1- GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for documenting the progress of
construction during performance of the Work, including the following:
1. Preliminary Construction Schedule.
2. Contractor's Construction Schedule.
3. Submittals Schedule_
4. Daily construction log.
5. Material location reports.
6. Field condition reports.
7. Special reports.
B. Related Sections include the following:
. Division 1 Section "Payment Procedures" for submitting the Schedule of Values.
2. Division I Section "Project Management and Coordination" for submitting and distributing
meeting and conference minutes.
3. Division I Section "Submittal Procedures" for submitting schedules and reports.
4. Division 1 Section "Quality Requirements" for submitting a schedule of tests and inspections.
1.2 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and
controlling the construction project. Activities included in a construction schedule consume time and
resources.
I. Critical activities are activities on the critical path_ They must start and finish on the planned early
start and finish times.
2. Predecessor Activity: An activity that precedes another activity in the network.
3. Successor Activity: An activity that follows another activity in the network.
Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled.
The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by
Architect.
� I
I I
C. CPM: Critical path method, which is a method of planning and scheduling a constriction project where
activities are arranged based on activity relationships. Network calculations determine when activities
can be performed and the critical path of Project_
D. Critical Path: The longest connected chain of interdependent activities through the network schedule that
establishes the nminimum overall Project duration and contains no float.
E. Event: The starting or ending point of an activity.
' F. Float: The measure of leeway in starting and completing an activity.
I . Float time belongs to Owner.
I CONSTRUCTION PROGRESS DOCUMENTATION
01320-1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Free float is the amount of time an activity can be delayed without adversely affecting the early
start of the successor activity.
3. Total float is the measure of leeway in starting or completing an activity without adversely
affecting the planned Project completion date.
G. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater
detail.
H. Major Area: A story of construction, a separate building, or a similar significant construction element.
L Milestone: A key or critical point in time for reference or measurement.
J. Network Diagram: A graphic diagram of a network schedule, showing activities and activity
relationships.
K. Resource Loading: The allocation of manpower and equipment necessary for the completion of an
activity as scheduled.
1.3 SUBMITTALS
A. Qualification Data: For scheduling consultant.
B. Submittals Schedule: Submit three copies of schedule.. Arrange the following information in a tabular
format:
l . Scheduled date for first submittal.
2. Specification Section number and title.
3. Submittal category (action or informational).
4. Name of subcontractor.
5. Description of the Work covered.
6. Scheduled date for Architect's final release or approval.
C. Preliminary Construction Schedule: Submit two opaque copies.
I. Approval of cost - loaded preliminary construction schedule will not constitute approval of
Schedule of Values for cost - loaded activities.
D. Preliminary Network Diagram: Submit two opaque copies, large enough to show entire network for
entire construction period. Show logic ties for activities.
E. Contractor's Construction Schedule: Submit two opaque copies of initial schedule, large enough to show
entire schedule for entire construction period.
f . Submit an electronic copy of schedule, using software indicated, on CD -R. and labeled to comply
with requirements for submittals. Include type ofschedule (Initial or Updated) and date on label.
F. CPM Reports: Concurrent with CPM schedule, submit three copies of each of the following computer -
generated reports. Format for each activity in reports shall contain activity number, activity description,
cost and resource loading, original duration, remaining duration, early start date, early finish date, late
start date, late finish date, and total float in calendar days.
I. Activity Report: List of all activities sorted by activity number and then early start date, or actual
start date if known.
CONSTRUCTION PROGRESS DOCUMENTA'T'ION 01320-2
LION SQUARE LODGE NORTH
Vail, Colorado
2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending
order by activity number and then early start date, or actual start date if known.
3. Total Float Report: List of all activities sorted in ascending order of total Float.
4. Earnings Report: Compilation of Contractor's total earnings from commencement of the Work or
the Notice to Proceed until most recent Application for Payment.
G. Daily Constntction Log: Submit upon request.
H. Material Location Reports: Submit upon request.
Field Condition Reports: Submit upon request or at time of discovery of differing conditions_
J. Special Reports: Submit upon request at time of unusual event.
1.4
QUALITY ASSURANCE
A. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting, with
capability of producing CPM reports and diagrams within 24 hours of Architect's request.
B_ Prescheduling Conference: Conduct conference at Project site to comply with requirements in Division 1
Section "Project Management and Coordination." Review methods and procedures related to the
Preliminary Construction Schedule and Contractor's Construction Schedule, including, but not limited to,
the following:
I . Review software limitations and content and format for reports.
2. Verify availability of qualified personnel needed to develop and update schedule.
3. Discuss constraints, including work stages, area separations, and interim milestones..
4. Review delivery dates for Owner- tiunished products.
5. Review schedule for work of Owner's separate contracts.
6. Review time required for review of submittals and resubinittals.
7. Review requirements for tests and inspections by independent testing and inspecting agencies.
8. Review time required for completion and startup procedures_
9. Review and finalize list of constriction activities to be included in schedule.
10. Review submittal requirements and procedures.
IL _ Review procedures for updating schedule.
1.5
A
B
COORDINATION
Coordinate preparation and processing of schedules and reports with performance of construction
activities and with scheduling and reporting of separate contractors.
Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts,
Submittals Schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the Work from parties involved.
2. Coordinate each constriction activity in the network with other activities and schedule them in
proper sequence.
I I CONSTRUCTION PROGRESS DOCUMENTATION
01320-3
1
u
PART 2 - PRODUCTS
2.1
A
SUBMITTALS SCHEDULE
LION SQUARE LODGE NORTH
Vail, Colorado
Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by
construction schedule. Include time required for review, resubmittal, ordering, manufacturing,
fabrication, and delivery when establishing dates.
Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's
Construction Schedule.
Initial Submittal: Submit concurrently with preliminary bar -chart schedule or network diagram.
Include submittals required during the first 60 days of constntclion. List those required to
maintain orderly progress of the Work and those required early because of long lead time for
manufacture or fabrication.
Final Submittal: Submit concurrently with the first complete submittal of Contractor's
Construction Schedule.
2.2
CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Procedures: Comply with procedures contained in AGC's "Construction Planning & Scheduling."
C
A
Time Frame: Extend schedule from date established for commencement of the Work or the Notice to
Proceed to date of Substantial Completion.
I. Contract completion date shall not be changed by submission of a schedule that shows an early
completion date, unless specifically authorized by Change Order.
Activities: Treat each story or separate area as a separate numbered activity for each principal element of
the Work. Comply with the following:
1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically
allowed by Architect.
2. Submittal Review Time: Include review and resubmittal times indicated in Division I Section
"Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's
Construction Schedule with Submittals Schedule-
3. Startup and Testing Time: Include not less than seven days for startup and testing.
4. Substantial Completion: Indicate completion in advance of date established for Substantial
Completion, and allow time for Architect's administrative procedures necessary for certification of
Substantial Completion.
Constraints: Include constraints and work restrictions indicated in the Contract Documents and as
follows in schedule, and show how the sequence of the Work is affected.
1. Work under More Than One Contract: Include a separate activity for each contract.
2. Work by Owner: Include a separate activity for each portion of the Work performed by Owner.
3. Products Ordered in Advance: Include a separate activity for each product. Include delivery date
indicated in Division I Section "Summary." Delivery dates indicated stipulate the earliest possible
delivery date.
4. Owner- Furnished Products: Include a separate activity for each product. Include delivery date
indicated in Division I Section "Summary." Delivery dates indicated stipulate the earliest possible
delivery date.
S. Work Restrictions: Show the effect of the following items on the schedule:
CONSTRUCTION PROGRESS DOCUMENTATION
013211-4
r
C
Y
i
LdON SQUARE LODGE NORTH
Vail, Colorado
a. Coordination with existing construction.
' b. Limitations of continued occupancies.
C. Uninterruptible services.
d. Partial occupancy before Substantial Completion.
e. Use of premises restrictions.
' f. Provisions for future construction.
g. Seasonal variations.
h. Environmental control.
' b. Work Stages: Indicate important stages of construction for each major portion of the Work,
including, but not limited to, the following:
a. Subcontract awards.
b. Submittals.
C. Purchases.
d. Mockups.
' e. Fabrication.
f. Sample testing.
g. Deliveries_
' h. Installation.
►. Tests and inspections.
j. Adjusting.
k. Curing.
1. Startup and placement into final use and operation.
7. Area Separations: Identify each major area of construction for each major portion of the Work.
Indicate where each construction activity within a major area must be sequenced or integrated with
other construction activities to provide for the following:
a. Structural completion.
' b. Permanent space enclosure.
C. Completion of mechanical installation_
d. Completion of electrical installation.
e. Substantial Completion.
' 8. Other Constraints: <Insert additional constraints not indicated elsewhere.>
E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not
limited to, the Notice to Proceed, Substantial Completion, and Final Completion.
F. Cost Correlation: At the head of schedule, provide a cost correlation tine, indicating planned and actual
costs. On the line, show dollar volume of the Work performed as of dates used for preparation of
payment requests.
I . Refer to Division I Section "Payment Procedures" for cost reporting and payment procedures.
' 2. Contractor shall assign cost to construction activities on the CPM schedule. Costs shall not be
assigned to submittal activities unless specified otherwise but may, with Architect's approval, be
assigned to fabrication and delivery activities. Costs shall be under required principal subcontracts
for testing and commissioning activities, operation and maintenance manuals, punch list activities,
' Project Record Documents, and demonstration and training (if applicable), in the amount of 5
percent of the Contract Sum_
3. Each activity cost shall reflect an accurate value subject to approval by Architect.
' 4. Total cost assigned to activities shall equal the total Contract Sum.
I CONSTRUCTION PROGRESS DOCUMENTATION 01320-5
LION SQUARE LODGE NORTH
Vail, Colorado
G.
H.
2.3
A.
Contract Modifications: For each proposed contract modification and concurrent with its submission,
prepare a time - impact analysis using fragnets to demonstrate the effect of the proposed change on the
overall project schedule.
Computer Software: Prepare schedules using a program that has been developed specifically to manage
construction schedules.
PRELIMINARY CONSTRUCTION SCHEDULE
Bar -Chart Schedule: Submit preliminary horizontal bar -chart -type construction schedule within seven
days of date established for commencement of the Work, the Notice to Proceed or Notice of Award.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each
week with a continuous vertical line. Outline significant construction activities for first 60 days of
construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction
based on indicated activities.
2.4
CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)
A. Gantt -Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt - chart-type,
Contractor's Construction Schedule within 30 days of date established for commencement of the Work,
the Notice to Proceed or the Notice of Award. Base schedule on the Preliminary Construction Schedule
and whatever updating and feedback was received since the start of Project.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each
week with a continuous vertical line.
For construction activities that require 3 months or longer to complete, indicate an estimated
completion percentage in 10 percent increments within time bar.
OW
CONTRAC'TOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE)
A. General: Prepare network diagrams using AON (ac(ivity-on -node) format.
B. Preliminary Network Diagram: Submit diagram within 14 days of date established for commencement of
the Work, the Notice to Proceed or the Notice of Award. Outline significant construction activities for
the first 60 days of construction. Include skeleton diagram for the remainder of the Work and a cash
requirement prediction based on indicated activities.
C_ CPM Schedule: Prepare Contractor's Construction Schedule using a computerized, time - scaled CPM
network analysis diagram for the Work.
Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use
no later than 30 days after date established for commencement of the Work, the Notice to Proceed
or the Notice of Award.
a. Failure to include any work item required for performance of this Contract shall not excuse
Contractor from completing all work within applicable completion dates, regardless of
Archilect's approval of the schedule.
1
1
I
ri
C�
CONSTRUCTION PROGRESS DOCUMENTATION
01320-6
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Conduct educational workshops to train and inform key Project personnel, including
subcontractors' personnel, in proper methods of providing data and using CPM schedule
information.
3. Establish procedures for monitoring and updating CPM schedule and for reporting progress.
Coordinate procedures with progress meeting and payment request dates.
4. Use "one workday" as the unit of time. Include list of nonworking days and holidays incorporated
into the schedule.
D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the
preliminary network diagram, prepare a skeleton network to identify probable critical paths.
1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each
activity in relation to other activities. Include estimated time frames for the following activities:
a. Preparation and processing of submittals.
b. Mobilization and demobilization.
'
C. Purchase of materials.
d. Delivery.
C. Fabrication.
f. Utility interruptions.
g. Installation.
Ii. Work by Owner that may affecl or be affected by Contractor's activities.
i. Testing and commissioning.
2. Critical Path Activities: Identify critical path activities, including those for interim completion
dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.
3. Processing: Process data to produce output data on a computer - drawn, time - scaled network.
Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the
CPM schedule within the limitations of the Contract Time.
4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with
most float near the edges.
a. Subnetworks on separate sheets are permissible for activities clearly off the critical path.
E. Initial Issue of Schedule: Prepare initial network diagram from a list of straight "early start-total float"
sort. Identify critical activities. Prepare tabulated reports showing the following:
I . Contractor or subcontractor and the Work or activity.
2. Description of activity_
3. Principal events of activity.
4. Immediate preceding and succeeding activities.
5. Early and late start dates.
6. Early and late finish dates.
7. Activity duration in workdays_
8. Total float or slack time.
9. Average size of workforce.
10. Dollar value ofactivity (coordinated with the Schedule of Values).
F. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the
following:
1. Identification of activities that have changed.
2. Changes in early and late start dates.
3. Changes in early and late finish dates.
4. Changes in activity durations in workdays.
CONSTRUCTION PROGRESS DOCUMENTATION 01320-7
1
LI ON SQUARE LODGE NORTH
Vail, Colorado
5. Changes in the critical path.
6. Changes in total Float or slack time.
7. Changes in the Contract Time.
G. Value Summaries: Prepare two cumulative value lists, sorted by finish dates.
I . In first list, tabulate activity number, early finish date, dollar value, and cumulative dollar value.
2. in second list, tabulate activity number, late finish date, dollar value, and cumulative dollar value.
3. In subsequent issues of both lists, substitute actual finish dates for activities completed as of list
date.
4. Prepare list for ease of comparison with payment requests; coordinate timing with progress
meetings.
a. Submit value summary printouts one week before each regularly scheduled progress
meeting.
2.6
REPORTS
A. Daily Construction Logs: Prepare a daily construction logs recording the following information
concerning events at Project site, but not limited to:
. List of subcontractors at Project site.
2. List of separate contractors at Project site.
3. Approximate count of personnel at Project site.
4. Equipment at Project site.
5. Material deliveries.
6. High and low temperatures and general weather conditions.
7. Accidents.
8. Meetings and significant decisions.
9. Unusual events (refer to special reports).
16. Stoppages, delays, shortages, and losses.
H - Meter readings and similar recordings.
12. Emergency procedures.
13. Orders and requests of authorities having jurisdiction.
14. Change Orders received and implemented.
15. Construction Change Directives received and implemented.
16. Services connected and disconnected.
17. Equipment or system tests and startups.
18. Partial Completions and occupancies.
19. Substantial Completions authorized.
B. Material Location Reports: At weekly intervals, prepare and submit a comprehensive list of materials
delivered to and stored at Project site_ Lis[ shall be cumulative, showing materials previously reported
plus items recently delivered. Include with list a statement of progress on and delivery dates for materials
or items of equipment fabricated or stored away from Project site.
C. Field Condition Reports: Immediately on discovery of a difference between field conditions and the
Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation.
Include a detailed description of the differing conditions, together with recommendations for changing
the Contract Documents.
n
r�
1
C�
C
CONSTRUCTION PROGRESS DOCUMENTATION
01320-8
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3 - EXECUTION
3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Scheduling Consultant: Engage a consultant to provide planning, evaluation, and reporting using CPM
scheduling.
1. In -House Option: Owner may waive the requirement to retain a consultant if Contractor employs
skilled personnel with experience in CPM scheduling and reporting techniques. Submit
qualifications.
2. Meetings: Scheduling consultant shall attend all meetings related to Project progress, alleged
delays, and time impact.
B. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual
construction progress and activities. Issue schedule one week before each regularly scheduled progress
meeting.
I. Revise schedule immediately after each meeting or other activity where revisions have been
recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to,
changes in logic, durations, actual starts and finishes, and activity durations.
3. As the Work progresses, indicate Actual Completion percentage for each activity.
C. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing
and inspecting agencies, and other parties identified by Contractor with a need -to -know schedule
responsibility.
I . Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the same
locations. Delete parties from distribution when they have completed their assigned portion of the
Work and are no longer involved in performance of construction activities.
END OF SECTION 01320
CONSTRUCTION PROGRESS DOCUMENTATION 01320-9
PART I - GENERAL
SECTION 01330 - SUBMITTAL PROCEDURES
I I LI SUMMARY
LION SQUARE LODGE NORTH
Vail, Colorado
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product
Data, Samples, and other submittals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Architect's responsive action.
B. Informational Submittals: Written information that does not require Architect's responsive action.
Submittals may be rejected for not complying with requirements.
1.3 SUBMITTAL PROCEDURES
' A. General: Electronic copies of CAD Drawings of the Contract Drawings will not be provided by Architect
for Contractor's use in preparing submittals.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction
activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and
related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing
will not be delayed because of need to review submittals concurrently for coordination.
a. Architect reserves the right to withhold action on a submittal requiring coordination with
other submittals until related submittals are received.
C. Submittals Schedule: Comply with requirements in Division I Section "Construction Progress
Documentation" for list of submittals and time requirements for scheduled performance of related
construction activities.
D. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time
will be authorized because of railure to transmit submittals enough in advance of the Work to permit
processing, including resubmittals.
I . Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time
if coordination with subsequent submittals is required. Architect will advise Contractor when a
submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial
submittal.
3. Resubmittal Review: Allow 10 working days for review of each resubmittal.
4. Sequential Review: Where sequential review of submittals by Architect's consultants, Owner, or
other parties is indicated, allow 20 working days for initial review of each submittal_
5. Concurrent Consultant Review: Where the Contract Documents indicate that submittals may be
transmitted simultaneously to Architect and to Architect's consultants, allow 10 working days for
I SUBMITTAL PROCEDURES
01330- 1
LION SQUARE LODGE NORTH
Vail, Colorado
review of each submittal. Submittal will be returned to Architect before being returned to
Contractor.
E. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches (150 by 200 mm) on label or beside title block to
record Contractor's review and approval markings and action taken by Architect.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
C. Name and address of Architect.
d. Name and address of Contractor.
C. Name and address of subcontractor.
f Name and address of supplier.
g. Name of manufacturer.
h. Submittal number or other unique identifier, including revision identifier.
1) Submittal number shall use Specification Section number followed by a decimal
point and then a sequential number (e.g., 06100.01). Resubmitials shall include an
alphabetic suffix after another decimal point (e.g., 06100.01 .A).
i. Number and title of appropriate Specification Section.
j. Drawing number and detail references, as appropriate.
k. Location(s) where product is to be installed, as appropriate.
1_ Other necessary identification.
F. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract
Documents on submittals.
G. Additional Copies: Unless additional copies are required for final submittal, and unless Architect
observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final
submittal.
I . Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to
Architect.
2. Additional copies submitted for maintenance manuals will be marked with action taken and will
be returned.
H. Transmittal: Package each submittal individually and appropriately for transmittal and handling.
Transmit each submittal using a transmittal form. Architect will return submittals, without review,
received from sources other than Contractor.
L Transmittal Form: Provide locations on form for the following information:
a. Project name.
b. Dale.
C- Destination (To:).
d. Source (From:).
C- Names of subcontractor, manufacturer, and supplier.
f. Category and type of submittal.
g. Submittal purpose and description.
h. Specification Section number and title.
i. Drawing number and detail references, as appropriate.
SUBMITTAL PROCEDURES 01330-2
t
t
t
r_
P
LION SQUARE LODGE NORTH
Vail, Colorado
j. Transmittal number, numbered consecutively.
k. Submittal and transmittal distribution record.
1. Remarks.
m. Signature of transmitter.
2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information,
requests for data, revisions other than those requested by Architect on previous submittals, and
deviations from requirements in the Contract Documents, including minor variations and
limitations. Include same label information as related submittal.
1. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
I . Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Resubmit submittals until they are marked approved from Architect's action stamp.
J. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators,
installers, authorities having jurisdiction, and others as necessary for performance of construction
activities. Show distribution on transmittal forms.
K. Use for Construction: Use only final submittals with mark indicating approval from Architect's action
stamp.
PART 2- PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Acl ion Submittals required by individual Specification Sections.
B. Product Data: Collect information into a single submittal for each element of construction and type of
product or equipment.
I. If information must be specially prepared for submittal because standard printed data are not
suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Standard color charts.
C. Manufacturer's catalog cuts.
f Wiring diagrams showing lactory- installed wiring.
g. Printed performance curves.
h. Operational ranee diagrams.
i. Mill reports.
' j. Standard product operation and maintenance manuals.
k. Compliance with specified referenced standards.
I. Testing by recognized testing agency.
nm_ Application of testing agency labels and seals.
n. Notation of coordination requirements.
4. Submit Product Data before or concurrent with Samples_
SUBMITTAL PROCEDURES 01330-3
n
LION SQUARE LODGE NORTH
Vail, Colorado
Number of Copies: Submit three copies of Product Data, unless otherwise indicated. Architect
will return two copies. Mark up and retain one returned copy as a Project Record Document.
C
Shop Drawings: Prepare Project - specific information, drawn accurately to scale. Do not base Shop
Drawings on reproductions of the Contract Documents or standard printed data.
Preparation: Fully illustrate requirements in the Contract Documents. Include the following
information, as applicable:
a. Dimensions.
b. Identification of products.
C. Fabrication and installation drawings.
d. Roughing -in and setting diagrams.
e. Wiring diagrams showing field - installed wiring, including power, signal, and control
wiring.
f. Shopwork manufacturing instructions.
g. Templates and patterns.
h. Schedules.
i. Design calculations.
j. Compliance with specified standards.
k. Notation of coordination requirements.
I. Notation of dimensions established by field measurement.
m. Relationship to adjoining construction clearly indicated.
n. Seal and signature of professional engineer if specified.
o. Wiring Diagrams: Differentiate between manufacturer- installed and field- installed wiring.
Sheet Size: Except for templates, patterns, and similar full -size drawings, submit Shop Drawings
on sheets at least 8 -1/2 by I I inches (215 by 280 mm) but no larger than 30 by 40 inches (750 by
1000 mm).
Number of Copies: Submit three opaque copies of each submittal, unless copies are required for
operation and maintenance manuals. Submit five copies where copies are required for operation
and maintenance manuals. Architect will retain two copies; remainder will be returned. Mark tip
and retain one returned copy as a Proiect Record Drawing.
1
Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these
characteristics with other elements and for a comparison of these characteristics between submittal and
actual component as delivered and installed.
Transmit Samples that contain multiple, related components such as accessories together in one
submittal package.
Identification: Attach label on unexposed side of Samples that includes the following:
a. Generic description of Sample.
b. Product name and name of manufacturer.
c. Sample source.
d. Number and title of appropriate Specification Section.
Disposition: Maintain sets of approved Samples at Proiect site, available for quality - control
comparisons throughout the course of construction activity. Sample sets may be used to detennine
Final acceptance of construction associated with each set.
a. Samples that may be incorporated into the Work are indicated in individual Specification
Sections. Such Samples must be in an undamaged condition at time of use.
SUMINUTTAL PROCEDURES
01330-4
n
1
n
r
I
t
t
t
J
1
1
1
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
4. Samples for Selection: Submit manufacturer's color charts consisting of units or sections of units
showing the full range of colors, textures, and patterns available.
a. Number of Samples: Submit one full set(s) of available choices where color, pattern,
texture, or similar characteristics are required to be selected from manufacturer's product
line. Architect will return submittal with options selected.
5. Samples for Verification: Submit full -size units or Samples of size indicated, prepared from same
material to be used for the Work, cured and finished in manner specified, and physically identical
with material or product proposed for use, and that show full range of color and texture variations
expected. Samples include, but are not limited to, the following: partial sections of manufactured
or fabricated components; small cuts or containers of materials; complete units of repetitively used
materials; swatches showing color, texture, and pattem; color range sets; and components used for
independent testing and inspection.
a. Number of Samples: Submit three sets of Samples. Architect will retain two Sample sets;
remainder will be returned_ Mark up and retain one rettumed Sample set as a Project Record
Sample.
1) Submit a single Sample where assembly details, workmanship, fabrication
techniques, connections, operation, and other similar characteristics are to be
demonstrated.
2) If variation in color, pattern, texture, or other characteristic is inherent in material or
product represented by a Sample, submit at least three sets of paired units that show
approximate limits of variations.
E. Product Schedule or List: As required in individual Specification Sections, prepare a written summary
indicating types of products required for the Work and their intended location. Include the following
information in tabular form:
1. Type of product. Include unique identifier for each product.
2. Number and name of room or space.
3. Location within room or space_
4. Number of Copies: Submit three copies of product schedule or list, unless otherwise indicated.
Architect will return two copies.
a. Mark up and retain one returned copy as a Project Record Document.
F. Contractor's Constntction Schedule: Comply with requirements specified in Division 1 Section
"Construction Progress Documentation" for Owner's action.
G. Submittals Schedule: Comply with requirements specified in Division I Section "Construction Progress
Documentation."
H. Application for Payment Comply with requirements specified in Division I Section "Payment
Procedures."
I. Schedule of Values: Comply with requirements specified in Division I Section "Payment Procedures."
1. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion
of the Work, including those who are to furnish products or equipment fabricated to a special design_
Include the following information in tabular form:
I . Name, address, and telephone number of entity performing subcontract or supplying products.
2. Number and title of related Specification Sections) covered by subcontract.
SUBMITTAL PROCEDURES 01330-5
LION SQUARE LODGE NORTH
Vail, Colorado
3. Drawing number and detail references, as appropriate, covered by subcontract.
4. Number of Copies: Submit three copies of subcontractor list, unless otherwise indicated.
Architect will return two copies.
a. Mark up and retain one returned copy as a Project Record Document.
2.2
INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
I. Number of Copies: Submit three copies of each submittal, unless otherwise indicated.
Architect will not return copies.
2. Certificates and Certifications: Provide a notarized statement that includes signature of entity
responsible for preparing certification. Certificates and certifications shall be signed by an officer
or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements specified in Division I Section "Quality
Requirements."
B. Coordination Drawings: Comply with requirements specified in Division I Section "Project Management
and Coordination."
C. Contractor's Construction Schedule: Comply with requirements specified in Division I Section
"Construction Progress Documentation."
D. Qualification Data: Prepare written information that demonstrates capabilities and experience of fine or
person. Include lists of completed projects with project names and addresses, names and addresses of
architects and owners, and other information specified.
E. Welding Certificates: Prepare written certification that welding procedures and personnel comply with
requirements in the Contract Documents. Submit record of Welding Procedure Specification (WPS) and
Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified.
F. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer
complies with requirements in the Contract Documents and, where required, is authorized by
manufacturer for this specific Project.
G. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that
manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing
experience where required.
H_ Product Certificates: Prepare written statements on manufacturers letterhead certifying that product
complies with requirements in the Contract Documents.
Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material
complies with requirements in the Contract Documents.
Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard
form, indicating and interpreting test results of material for compliance with requirements in the Contract
Documents,
K. Product Test Reports: Prepare written reports indicating current product produced by manufacturer
complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by
manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a
qualified testing agency.
SUBIVII "rTAL PROCEDURES
01330-6
1
t
I
F1
LION SQUARE LODGE NORTH
Vail, Colorado
L. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to
' authorities having jurisdiction, that product complies with building code in effect for Project. Include the
following information:
I. Name of evaluation organization.
2. Date of evaluation.
3. Time period when report is in effect.
4. Product and manufacturers' names.
5. Description of product.
6. Test procedures and results.
7. Limitations of use.
M. Schedule of Tests and Inspections: Comply with requirements specified in Division 1 Section "Quality
Requirements."
N. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's
standard form, indicating and interpreting results of tests performed before installation of product, for
compliance with performance requirements in the Contract Documents.
0. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's
standard form, indicating and interpreting results of compatibility tests performed before installation of
product. Include written recommendations for primers and substrate preparation needed for adhesion.
Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard
form, indicating and interpreting results of field tests performed either during installation of product or
after product is installed in its final location, for compliance with requirements in the Contract
Documents.
I a
Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal
maintenance of products and equipment. Comply with requirements specified in Division l Section
"Operation and Maintenance Data."
R. Design Data: Prepare written and graphic information, including, but not limited to, performance and
design criteria, fist of applicable codes and regulations, and calculations. Include list of assumptions and
other performance and design criteria and a summary of loads. Include load diagrams if applicable.
Provide name and version of sof ware, if any, used for calculations. Include page members.
S. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's
recommendations, guidelines, and procedures for installing or operating a product or equipment. Include
name of product and name, address, and telephone number of manufacturer. Include the following, as
applicable:
T_ Manufacturer's Field Reports: Prepare written information documenting factory- authorized service
representative's tests and inspections. Include the following, as applicable:
1. Name, address, and telephone number of li ctory- authorized service representative making report.
2. Statement on condition of substrates and their acceptability for installation of product.
1 Statement that products at Project site comply with requirements.
SUBMITTAL PROCEDURES
01330-7
I _
Preparation of substrates.
2.
Required substrate tolerances.
3.
Sequence of installation or erection.
4.
Required installation tolerances.
5.
Required adjustments.
6.
Reconmmendations for cleaning and protection.
T_ Manufacturer's Field Reports: Prepare written information documenting factory- authorized service
representative's tests and inspections. Include the following, as applicable:
1. Name, address, and telephone number of li ctory- authorized service representative making report.
2. Statement on condition of substrates and their acceptability for installation of product.
1 Statement that products at Project site comply with requirements.
SUBMITTAL PROCEDURES
01330-7
I
LION SQUARE LODGE NORTH
Vail, Colorado
4. Summary of installation procedures being followed, whether they comply with requirements and,
if not, what corrective action was taken.
S. Results of operational and other tests and a statement of whether observed performance complies
with requirements_
6. Statement whether conditions, products, and installation will affect warranty.
7. Other required items indicated in individual Specification Sections.
U. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or
bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of
deductibles, if any, and term of the coverage.
2.3 DELEGATED DESIGN
A. Performance and Design Criteria_ Where professional design services or certifications by a design
professional are specifically required of Contractor by the Contract Documents, provide products and
systems complying with specific performance and design criteria indicated.
If criteria indicated are not sufficient to perform services or certification required, submit a written
request for additional information to Architect.
B. Delegated - Design Submittal: In addition to Shop Drawings, Product Data, and other required submittals,
submit three copies of a statement, signed and sealed by the responsible design professional, for each
product and system specifically assigned to Contractor to be designed or certified by a design
professional.
Indicate that products and systems comply with performance and design criteria in time Contract
Documents. Include list of codes, loads, and other factors used in perfonning these services.
PART 3 - EXECUTION
OF
CONTRACTOR'S REVIEW
A_ Review each submittal and check for coordination with other Work of the Contract and for compliance
with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before
submitting to Architect.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and
location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's
approval, and statement certifying that submittal has been reviewed, checked, and approved for
compliance with the Contract Documents.
3.2
ARCHITECT'S /ACTION
A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return
them without action.
B. Action Submittals_ Architect will review each submittal, nmake marks to indicate corrections or
modifications required, and return it. Architect will stamp each submittal with an action stamp and will
mark stamp appropriately to indicate action taken, as follows:
SUBMITTAL PROCEDURES
01330-8
t
1
1
[l
1
t
I �
�J
1
I
ii
I 1
u
LION SQUARE LODGE NORTH
Vail, Colorado
1. "No Exception Taken ": When the Architect marks this action, the Work covered by the submittal
may proceed provided it complies with requirements of the Contract Documents. Final payment
depends on that compliance.
2. "Make Corrections Noted ": When the Architect marks this action, the Work covered by the
submittal may proceed provided it complies with notations or corrections on the submittal and
requirements of the Contract Documents. Final payment depends on that compliance_
3. "Rejected ": When the Architect marks this action, do not proceed with Work covered by the
submittal, including purchasing, fabrication, delivery, or other activity. Revise or prepare a new
submittal according to the notations; resubmit without delay. Repeat if necessary to obtain
different action mark.
4. "Revise and Resubmit ": When the Architect marks a submittal "Revise and Resubmit," do not
proceed with Work covered by the submittal, including purchasing, fabrication, delivery, or other
M activity. Revise or prepare a new submittal according to the notations; resubmit without delay.
Repeat if necessary to obtain different action mark.
a. Do not use, or allow others to use, submittals marked "Not Approved, Revise and
Resubmit" at the Project Site or elsewhere where Work is in progress.
S. "Submit Specific Item ": For unspecified submittals the Architect will return submittals to the
sender and request specific submittals as specified or mark this action with one of the two actions
above.
C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it
does not comply with requirements. Architect will forward each submittal to appropriate party.
D. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without
review.
' E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
END OF SECTION 01330
1
n
SUBMITTAL PROCEDURES
01330-9
t
1
SECTION 01400 - QUALITY REQUIREMENTS
PART I -GENERAL
I.I SUMMARY
LION SQUARE LODGE NORTH
Vail, Colorado
A. This Section includes administrative and procedural requirements for quality assurance and quality
control.
B. Testing and inspecting services are required to verify compliance with requirements specified or
indicated. These services do not relieve Contractor of responsibility for compliance with the Contract
Document requirements.
' I. Specific quality- assurance and - control requirements for individual construction activities are
specified in the Sections that specify those activities. Requirements in those Sections may also
cover production of standard products.
2. Specified tests, inspections, and related actions do not limit Contractor's other quality- assurance
and - control procedures that facilitate compliance with the Contract Document requirements.
3. Requirements for Contractor to provide quality- assurance and - control services required by
Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.
C. Related Sections include the following:
1. Division I Section "Construction Progress Documentation" for developing a schedule of required
tests and inspections.
2. Division 1 Section "Cutting and Patching" for repair and restoration of construction disturbed by
testing and inspecting activities.
3. Divisions 2 through 16 Sections for specific test and inspection requirements.
1.2 DEFINITIONS
A. Quality- Assurance Services: Activities, actions, and procedures performed before and during execution
of the Work to guard against defects and deficiencies and substantiate that proposed construction will
comply with requirements.
B. Quality- Control Services: Tests, inspections, procedures, and related actions during and after execution
of the Work to evaluate that actual products incorporated into the Work and completed construction
comply with requirements. Services do not include contract enforcement activities performed by
Architect.
C. Mockups: Full -size, physical assemblies that are constructed on -site. Mockups are used to verify
selections made under sample submittals, to demonstrate aesthetic effects and, where indicated, qualities
of materials and execution, and to review construction, coordination, testing, or operation; they are not
Samples. Approved mockups establish the standard by which the Work will be judged.
D. Laboratory Mockups: Full -size, physical assemblies that are constricted at testing facility to verify
performance characteristics.
E. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before
products and materials are incorporated into the Work to verify performance or compliance with specified
criteria.
QUALITY REQUIREMENTS
01400-1
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
F. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency
qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product
performance and compliance with industry standards.
G. Source Quality- Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill,
factory, or shop.
H. Field Quality- Control Testing: Tests and inspections that are performed on -site for installation of the
Work and for completed Work.
Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory
shall mean the same as testing agency.
Installer /Applicator /Erector: Contractor or another entity engaged by Contractor as an employee,
Subcontractor, or Sub - subcontractor, to perform a particular construction operation, including
installation, erection, application, and similar operations.
Using a term such as "carpentry" does not imply that certain construction activities must be
performed by accredited or unionized individuals of a corresponding generic name, such as
"carpenter." It also does not imply that requirements specified apply exclusively to tradespeople
of the corresponding generic name.
K. Experienced: When used with an entity, "experienced" means having successfully completed a minimum
of five previous projects similar in size and scope to this Project; being familiar with special requirements
indicated; and having complied with requirements of authorities having jurisdiction.
CONFLICTING REQUIREMENTS
1.3
A. General: If compliance with two or more standards is specified and the standards establish different or
conflicting requiremen(s for minimum quantities or quality levels, comply with the most stringent
requirement. Refer uncertain(ies and requirements that are different, but apparently equal, (o Architect
for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the
minimum provided or performed. The actual installation may comply exactly with the minimum quantity
or quality specified, or it may exceed the minimum within reasonable limits. To comply with these
requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of
requirements. Refer uncertainties to Architect for a decision before proceeding.
1.4 SUBMITTALS
A
I .
Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their
capabilities and experience_ Include proof of qualifications in the form of' a recent report on the
inspection of the testing agency by a recognized authority.
Schedule of Tests and Inspections: Prepare in tabular form and include the following:
L Specification Section number and title.
2_ Description of test and inspection.
3. Identification of applicable standards.
4. Identification of test and inspection methods.
5. Number of tests and inspections required.
6_ Time schedule or time span for tests and inspections.
7. Entity responsible for performing tests and inspections.
S. Requirements for obtaining samples.
QUALITY REQUIREMENTS
01400-2
t
it
t
J
t
1
1
1 - 1
1
1
1
1
[7
1
Ll
Requirement for specialists shall not supersede building codes and regulations governing the
Work.
Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience
and capability to conduct testing and inspecting indicated, as documenled according to ASTM E 548; and
QUALITY REQUIREMENTS
01400-3
1
LION SQUARE LODGE NORTH
'
Vail, Colorado
9. Unique characteristics of each quality- control service.
C.
Reports: Prepare and submit certified written reports that include the following:
. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
l t . Comments or professional opinion on whether tested or inspected Work complies with the
Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
D.
Permits, Licenses, and Certificates: For Owner's. records, submit copies of permits, licenses,
certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee
payments,
judgments, correspondence, records, and similar documents, established for compliance with standards
and regulations bearing on performance of the Work.
1.5
UALITY ASSURANCE
SURANCE
'
A.
General: Qualifications paragraphs in this Article establish the minimum qualification levels required;
individual Specification Sections specify additional requirements.
B.
Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work
similar in material, design, and extent to that indicated for this Project, whose work has in
resulted
construction with a record of successful in- service performance.
C.
Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those
indicated for this Project and with a record of successful in- service performance, as well as sufficient
production capacity to produce required units.
D_
Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this
Project and with a record of successfiil in- service performance, as well as sufficient production capacity
to produce required units.
E.
Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in
jurisdiction where Project is located and who is experienced in providing engineering services of the kind
indicated. Engineering services are defined as those performed for installations of the system, assembly,
or product that are similar to those indicated for this Project in material, design, and extent.
F.
Specialists: Certain sections of the Specifications require that specific construction activities shall be
performed by entities who are recognized experts in those operations. Specialists shall satisfy
qualification requirements indicated and shall be engaged for the activities indicated.
Ll
Requirement for specialists shall not supersede building codes and regulations governing the
Work.
Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience
and capability to conduct testing and inspecting indicated, as documenled according to ASTM E 548; and
QUALITY REQUIREMENTS
01400-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
with additional qualifications specified in individual Sections; and where required by authorities having
jurisdiction, that is acceptable to authorities.
1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.
2_ NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory
Accreditation Program.
H. Factory- Authorized Service Representative Qualifications: An authorized representative of manufacturer
who is trained and approved by manufacturer to inspect installation of manufacturer's products that are
similar in material, design, and extent to those indicated for this Project.
Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for
compliance with specified requirements for performance and test methods, comply with the following:
Contractor responsibilities include the following:
a. Provide test specimens representative of proposed products and construction.
b. Submit specimens in a timely manner with sufficient time for testing and analyzing results
to prevent delaying the Work.
C. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to
adequately demonstrate capability of products to comply with performance requirements.
d. Build laboratory mockups at testing facility using personnel, products, and methods of
construction indicated for the completed Work.
C. When testing is complete, remove lest specimens, assemblies, mockups, and laboratory
mockups; do not reuse products on Project.
Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and
similar quality- assurance service to Architect, with copy to Contractor_ Interpret tests and
inspections and state in each report whether tested and inspected work complies with or deviates
from the Contract Documents.
Mockups: Belore installing portions of the Work requiring mockups, build mockups for each form of
construction and finish required to comply with the following requirements, using materials indicated for
the completed Work:
Build mockups in location and of size indicated or, if not indicated, as directed by Architect.
Notify Architect seven days in advance of dates and times when mockups will be constructed.
Demonstrate the proposed range of aesthetic effects and workmanship.
Obtain Architect's approval of mockups before starting work, fabrication, or construction.
Allow seven days for initial review and each re- review of each mockup.
5. Maintain mockups during construction in an undisturbed condition as a standard for judging the
completed Work.
6. Demolish and remove mockups when directed, unless otherwise indicated.
K. Laboratory Mockups: Comply with requirements of preconstr uction testing and those specified in
individual Sections in Divisions 2 through 16.
QUALITY CONTROL
1.6
A. Owner Responsibilities: Where quality - control services are indicated as Owner's responsibility, Owner
will engage a qualified testing agency to perform these services.
1. Owner will hirish Contractor with names, addresses, and telephone numbers of testing agencies
engaged and a description of types of testing and inspecting they are engaged to perform_
QUALITY REQUIREMENTS
01400-4
t
t�J
t
L�
fi
1
1
n
f
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed
to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will
be adjusted by Change Order.
B. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless otherwise
indicated, provide quality- control services specified and those required by authorities having jurisdiction.
Perform quality- control services required of Contractor by authorities having jurisdiction, whether
specified or not.
I. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to
perform these quality- control services.
a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by
Owner.
' 2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or
inspecting will be performed.
3. Where quality- control services are indicated as Contractor's responsibility, submit a certified
written report, in duplicate, of each quality- control service.
4. Testing and inspecting requested by Contractor and not required by the Contract Documents are
Contractor's responsibility.
S. Submit additional copies of each written report directly to authorities having jurisdiction, when
they so direct.
t C. Manufacturer's Field Services: Where indicated, engage a factory- authorized service representative to
inspect field- assembled components and equipment installation, including service connections. Report
results in writing as specified in Division I Section "Submittal Procedures."
D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's
responsibility, provide quality- control services, including retesting and reinspecting, for constriction that
replaced Work that failed to comply with the Contract Documents.
E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties_
Provide qualified personnel to perform required tests and inspections.
I
1
t
t
i. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work
during performance of its services.
2. Determine the location from which test samples will be taken and in which in -situ tests are
conducted.
3. Conduct and interpret tests and inspections and state in each report whether tested and inspected
work complies with or deviates from requirements.
4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality- control
service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or
accept any portion of the Work.
6. Do not perform any duties of Contractor.
Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-
control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in
advance of operations to permit assignment of personnel. Provide the following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspecting.
Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5_ Delivery of samples to testing agencies_
QUALITY REQUIREMENTS
01400-5
1
L�
LION SQUARE LODGE NORTH
Vail, Colorado
6. Preliminary design mix proposed for use for material mixes that require control by testing agency.
7. Security and protection for samples and for testing and inspecting equipment at Project site.
G. Coordination: Coordinate sequence of activities to accommodate required quality- assurance and - control
services with a minimum of delay and to avoid necessity of removing and replacing construction to
accommodate testing and inspecting.
I . Schedule times for tests, inspections, obtaining samples, and similar activities.
H. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality- control
services required by the Contract Documents. Submit schedule within 30 days of date established for
commencement of the Work or the Notice to Proceed.
Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party involved in
performance of portions of the Work where tests and inspections are required.
1.7 SPECIAL TESTS AND INSPECTIONS
A. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and
inspections required by authorities having jurisdiction as the responsibility of Owner, and as follows:
1. Verifying that manufacturer maintains detailed fabrication and quality- control procedures and
reviewing the completeness and adequacy of those procedures to perform the Work.
2. Notifying Architect and Contractor promptly of irregularities and deficiencies observed in the
Work during performance of its services_
3. Submitting a certified written report of each test, inspection, and similar quality- control service to
Architect with copy to Contractor and to authorities having jurisdiction.
4. Submitting a final report of special tests and inspections at Substantial Completion, which
includes a list of unresolved deficiencies.
5. Interpreting tests and inspections and slating in each report whetter tested and inspected work
complies with or deviates from the Contract Documents.
6. Retesting and reinspecting corrected work.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 TEST AND INSPECTION LOG
A. Prepare a record of tests and inspections_ Include the following:
I . Date test or inspection was conducted.
2. Description of the Work tested or inspected.
3. Date test or inspection results were transmitted to Architect.
4. Identification of testing agency or special inspector conducting test or inspection.
B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and
inspection log for Architect's reference during normal working hours.
QUALITY REQUIREMENTS 01400-6
t
1
1
t
L
r
n
t
1
t
w
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged
construction and restore substrates and finishes.
I. Provide materials and comply with installation requirements specified in other Specification
Sections. Restore patched areas and extend restoration into adjoining areas with durable seams
that are as invisible as possible.
2. Comply with the Contract Document requirements for Division 1 Section "Cutting and Patching."
B. Protect construction exposed by or for quality- control service activities.
C. Repair and protection are Contractors responsibility, regardless of the assignment of responsibility for
quality- control services.
END OF SECTION 01400
QUALITY REQUIREMENTS 01400-7
LEON SQUARE LODGE NORTH
Vail, Colorado
SECTION 01420 - REFERENCES
PART I - GENERAL
1.1 DEFINITIONS
A. General: Basic Contract definitions are included in the Conditions of the Contract.
B. "Approved ": When used to convey Architect's action on Contractor's submittals, applications, and
requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the
Contract.
C. "Directed ": A command or instruction by Architect. Other terms including "requested," "authorized,"
"selected," "approved," "required," and "permitted" have the same meaning as "directed."
D. "Indicated ": Requirements expressed by graphic representations or in written form on Drawings, in
Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled,"
and "specified" have the same meaning as "indicated."
E. "Regulations ": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction,
and rules, conventions, and agreements within the constriction industry that control performance of the
Work.
F. "Famish ": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and
similar operations.
G. "Install ": Operations at Project site including unloading, temporarily storing, unpacking, assembling,
erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and
similar operations.
H. "Provide ": Famish and install, complete and ready for the intended use_
1. "Project Site ": Space available for performing construction activities. The extent of Project site is shown
on Drawings and may or may not be identical with the description of the land on which Project is to be
built.
1 1.2 INDUSTRY STANDARDS
A. Applicability of Standards: Unless the Contract Documents include more stringent requirements,
applicable construction industry standards have the same force and effect as if bound or copied directly
into the Contract Documents to the extent referenced. Such standards are made a part of the Contract
Documents by reference.
B. Publication Dates: Comply with standards in effect as of date of the Contract Documents, unless
otherwise indicated.
C. Copies of Standards: Each entity engaged in constriction on Project should be familiar with industry
standards applicable to its constriction activity. Copies of applicable standards are not bound with the
Contract Documents.
1. Where copies of standards are needed to perform a required construction activity, obtain copies
directly from publication source.
' REFERENCES -
O]420 1
A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract
Documents, they shall mean the recognized name of the entities indicated in Gale Research's
REFERENCES 01420-2
f�
LION SQUARE LODGE NORTH
Vail, Colorado
D.
Abbreviations and Acronyms for Standards and Regulations:
Where abbreviations and acronyms are
used in Specifications or other Contract Documents, they shall
mean the recognized name of the
standards and regulations in the following list. Names, telephone numbers, and Web -site addresses are
subject to change and are believed to be accurate and up -to -date
as of the date of the Contract Documents.
ADAAG Americans with Disabilities Act (ADA)
(800) 872 -2253
Architectural Barriers Act (ABA)
Accessibility Guidelines for Buildings and Facilities
(202) 272 -0080
Available from Access Board
www.acccss- board.gov
(
CFR
Code of Federal Regulations
(888) 293 -6498
Available from Government Printing Office
(202) 512 -1530
www .gpoacctxs.gov /crr /indcx.fitmi
CRD
Handbook for Concrete and Cement
(601) 634.2355
'
Available from Army Corps of Engineers
t
Waterways Experiment Station
www.wcs.army.mil
DOD
Department cf Defense Military Specifications and Standards
(215) 697 -6257
t
Available from Department of Defense Single Stock Point
www.dodssp.daps.mil
DSCC
Defense Supply Center Columbus
L
(Sec FS)
'
1=ED -STD Federal Standard
(Sec E'S)
FS
Federal Specification
(215) 697 -6257
Available from Department orDelcnsc Single Stock Point
w%vw.dod ssp.daps. mil
Available from Gcneral Services Administration
(202) 501. 1021
W %%' \v. f5s.8s3. gov
Available front National Institute of Building Sciences
www.nibs.org
(202) 289 -7800
FTMS
Federal 'test Method Standard
(See FS)
ICC -ES
]CC Evaluation SCrViee. Inc.
(800) 423-0587
ww'w.icc- cs.org
(562) 699 -0543
t
MIL
(See MILSPEC)
MIL -STD
(See MILSPEC)
'
MILSPF;C Military Specification and Standards
(215) 697 -6257
Available from Department of Defense Single Stock Point
www.dodssp.daps.mil
s,
(
Nf_S
(Formerly: National Evaluation Service)
(See ICC -1:S)
I
UFAS
Uniform Federal Accessibility Standards
Available from Access Board
(800) 872 -2253
T
(202) 272 -0080
.v w w. acce ss -boa rd.gn v
1.3
ABBREVIATIONS AND ACRONYMS
A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract
Documents, they shall mean the recognized name of the entities indicated in Gale Research's
REFERENCES 01420-2
f�
LION SQUARE LODGE NORTH
Vail, Colorado
"Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of
REFERENCES 01420-3
the U.S."
B.
Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract
Documents, they shall mean the recognized name of the entities in the following list.
Names, telephone
numbers, and Web -site addresses are subject to change and are believed to be accurate and up -to -date as
of the date of the Contract Documents.
AA
Aluminum Association, Inc. (The)
(202) 862 -5100
www.aluminum.org
AAADM American Association of Automatic Door Manufacturers
(216) 241 -7333
www.aaadnt.com
AABC
Associated Air Balance Council
(202) 737 -0202
ww•w.aabchq.com
AAMA
American Architectural Manufacturers Association
(847) 303 -5664
ww "'Aarttanct.rnne
AASHTO American Association of State Highway and
(202) 624 -5800
Transportation 0111cials
www.transportation.org
AA'FCC
American Association ol'Testile Chemists and Colorists (The)
(Of 9) 549 -8141
www.aatcc.or
ABMA
American Bearing Manufacturers Association
(202) 367-1155
www•.abnta- dc.or,
ACI
ACl International
(248) 848 -3700
(American Concrete Institute)
w w•w•.ac i- int.org
ACPA
American Concrete Pipe Association
(972) 506 -7216
www.concre te- pipc.org
AE-IC
Association of Edison Illuminating Companies. Inc. (The)
(205) 257 -2530
www•.acic.orc
AF&PA
American forest & Paper Association
(800) 878 -8878
w•teta.afandpa.or g
(202) 463 -2700
AGA
American Gas Assnefa iOtt
( 202) 824 -7000
w�cw•.a�'a.orc
AGC
Associated Gencrtl Contractors of America (The)
(703) 148-3118
w ww.aec.org
AHA
American Hardboard Association
(Now part of CPA)
AHAM
Association of Home Appliance Manulacturets
(202) 872 -5955
ww w.ahalomrg
AI
Asphalt Institute
(859) 288 -4960
wtvw.asphahinst itulr.org
AIA
American Institute ol'Architects (The)
(800) 242 -3537
www .a ia.nrg
( 202) 626-7300
AISC
American Institute ul'Stccl Construction
(800) 644 -2400
wwtr.a i sc.orl -'
( 312) 670 - 2400
AISI
American Iron and Steel Institute
(202) 45 -7100
ww•tr.steel.or!_1
AITC
American Institute of Timber Construction
(303) 792-9 i S9
REFERENCES 01420-3
LION SQUARE LODGE NORTH
Vail, Colorado
www.aitc- glulam_org
ALCA
Associated Landscape Contractors of America
(800) 395 -2522
www.alce.org
(703) 736 -9666
ALSC
American Lumber Standard Committee, Incorporated
(301) 972 -1700
www.aisc.org
AMCA
Air Movement and Control Association International. Inc.
(847) 394 -0150
www.ainca.org
ANSI
American National Standards Institutc
(202) 293 -8020
www.ansi.org
AOSA
Association of Official Seed Analysts
(505) 522 -1437
www.aosaseed.com
APA
APA - The Engineered Wood Association
(253) 565 -6600
www.apawood.org
APA
Architectural Precast Association
(239) 454 -6989
www.urchprecast.org
API
American PC1r01Cant Institute
(202) 682 -8000
www.api.org
ARI
Air - Conditioning & Refrigeration Institwc
(703) 524 -8800
www.ari.org
ARMA
Asphalt Roofing Manufacturers Association
(202) 207 -0917
www.asphallroofing.org
ASCE
American Society of Civil Engineer
(800) 548.2723
tvww.ascc.org
(703) 295 -6300
ASHRAE
American Society of Heating. Refrigerating and
(800) 5274723
Air - Conditioning rrrgincers
www.aslirac.org
(404) 636 -8400
ASME
ASME International
(800) 843 -2763
(The American Society of mechanical En-ginecrs International)
(212) 591 -7722
www.asme.org
ASSE
American Society of Sanitary Engineering
(440) 835 -3040
www.asse- plumbing.org
ASTM
AS'fM International
(610) 832 -9585
(American Society for Tc.un_ and Materials International)
www.aslimore
A WC)
AWCI International
(703) 534-8300
(Association ofthe Wall and Ceiline Industries International)
wwtv.awci.org
AWCMA
American Window Covering Manulodurcr Association
(Now WCSC)
AW1
Architectural Woodwork Institute
(800) 449.8511
net. ore
(703) 733 -0600
AWPA
American Wood - Preserver,' Association
(334) 874 -9800
tv%vw.a%vpasom
A WS
American Welding Socicty
(800) 44-9
www.aws.org
(305) 443 -9353
A\\ WA
American Water Works Association
(800) 926 -7337
wAvw.awwa.org
(303) 794 -7711
BHMA
Guilder Hnrdwarc Mantlaclincr Association
(212) 297 -2122
REFERENCES
01420-4
LION SQUARE LODGE NORTH
Vail, Colorado
www.buildershardware.com
RIA
Brick Industry Association (The)
(703) 620 -0010
www.bia,org
BICSI
BICSI
(813) 979.1991
www.bicsi.org
BIFMA
BIFMA International
(616) 285 -3963
(Business and Institutional Furniture Manufacturers
Association International)
www.bifma.com
BISSC
Baking Industry Sanitation Standards Committee
(773) 761 -4100
www.bissc,org
Cast Stone Institute
(770) 972 -3011
www.caststone.org
CCC
Carpet Cushion Council
(203) 637.1312
www.carpe(cushion.org
CDA
Copper Development Association Inc.
(800) 232 -3282
www.copper.org
(212) 251 -7200
CL•A
Canadian Electricity Association
(61 3) 230 -9263
www.canclect.ca/connections
CFFA
Chemical Fabrics & Film Association, Inc.
(216) 241 -7333
wwtv.chctnica I fabricsand fi I m.com
CGA
Compressed Gas Association
(703) 788 -2700
www.cg2ne1.com
CGSB
Canadian General Standards Board
(800) 665 -2472
W3.pwgsc.gc.ca/cgsb
(819) 956 -0425
LIMA
Cellulose Insulation Manufacturers Association
(888) 881 -2462
www.ccltulose.org
(937) 222 -2462
CISCA
Ceilings& Interior Systems Construction Association
(630) 584 -1919
www.cisca.org
CISPI
Cast Iron Soil Pipe Institute
(433) 892 -0137
www.cispi.org
CLFMI
Chain Link Fence Manufacturers Institute
(301)596.2583
www.chainlinkinro.org
CPA
Composite Panel Association
( 301) 670 -0604
www.pbmdf.com
CPPA
Convgated Polyethylene Pipe Association
(800) 510 -2772
www.cpp.i- info.org
( 202) 462 -9607
CRI
Carpet & Rug Institute (Thc)
(800) 882 -8846
www.carpet- rug.com
( 706) 278 -3176
CRSI
Concrete Reinforcing Steel institute
(847) 517 -1200
ww'w.crsi.org
CSA
CSA International
(800) 463 -6727
(Formerly: IAS - International Approval Services)
(416) 747 -4000
o'wu'.csa- internationa I,org
C'S1
Construction Specilications Institute (The)
(800) 689 -2900
www- csinet.org
(703) 684 -0300
CSSB
Cedar Shake & Shingle Bureau
(604) 820 -7700
www.cedarburean.org
REFERENCES
01420-5
LION SQUARE LODGE NORTH
Vail, Colorado
CTI
Cooling Technology Institute
(281) 583A087
(Formerly: Cooling Tower institute)
.vww.cti.org
DHI
Door and Hardware Institute
(703) 222 -2010
www.dlii.org
EIA
Electronic Industries Alliance
(703) 907 -7500
www.cia.org
EIMA
EIFS Industry Members Association
(800) 294 -3462
www.eima.com
(770) 968 -7945
EJCDC
Engineers Joint Contract Documents Committee
(800) 548 -2723
www.asce.org
(703) 295 -6300
EIMA
Expansion Joint Manufacturers Association, Inc.
(914) 332 -0040
wtvw ejma.org
ESD
ESD Association
(315) 339 -6937
www.csda.0rg
FCI
Fluid Controls Institute
(216) 241 -7333
www.fluidcontrolsinstitutc.org
FIBA
Federation Internationale de Basketball Amateur
41 22 545 00 00
(The International Basketball Federation)
www.(iba.cont
FIVB
Federation Internationale de Volleyball
41 21 345 35 35
(The International Volleyball Federation)
www.livb.ch
FM
Factory Mutual System
(Now FMG)
FMG
FM Global
(401) 275 -3000
(Formerly: FM - Factory Mutual System)
www.fntclobal.com
I'RSA
Florida Rooline. Sheet Metal S Air Conditioning Contractors Association. Inc_
(407) 671 -3772
www.11oridarool . com
FSA
Fluid Scaline Association
(6 10) 971 -1850
waw. fluff dsealine.cum
FSC
Forest Stewardship Council
52 951 5146905
GA
Gypsum Association
(202) 289 -5440
www.gypsum.org
GANA
Glass Association of North America
(785) 271 -0208
www.glasswebsite.com
GKl
(Now GSI)
GS
Green Seal
(202) 872 -6400
www.erccuscal.or_
GS1
Geosynthetic Institute
(610) 522 -8440
%% ww.eeosym he[ ic- institute.orL
HI
Hydraulic Institute
(888) 786 -7744
www.pumps•orc
(973) 267 -9700
HI
Hydronics htstitute
(908) 464 -8200
www.eamanct.orc
REFERENCES 01420-6
LION SQUARE LODGE NORTH
Vail, Colorado
HMMA
Hollow Metal Manufacturers Association
(Part of NAAMM)
HPVA
Hardwood Plywood & Veneer Association
(703) 435 -2900
www.hpva.org
HPW
H. P. White Laboratory_ Inc.
(410) 838 -6550
www.hpwhitc.com
IAS
International Approval Services
(Now CSA International)
IBF
International Badminton Federation
441 -24 223 -4904
www.intbadfed.org
ICEA
Insulated Cable Engineers Association, Inc.
(770) 830.0369
www.icea.net
ICRI
International Concrete Repair Institute, Inc.
(847) 827 -0830
www•.icri.org
IEC
International Electroiechnicei Commission
4122 919 02 11
ww•w.iec.ch
IEEE
Institute of Electrical and Electronics Engineers. Inc. (The)
(212) 419.7900
www.ieee.org
IESNA
Illuminating Engineering Society of North America
(212) 248 -5000
ww•w•.icsna.org
IGCC
Insulaline.Glass Certification Council
(315) 646 -2234
ww•wJgcc.org
IGMA
Insulating Glass Manufacturers Alliance (The)
(613) 233 -1510
www.iginaonline.org
ILI
Indiana Limestone Institute of Amcrica. Inc.
(812) 275 -0426
www.iliai.aont
ISO
International Organization for Standardization
41 22 749 01 11
ww w•. iso.ch
ISSFA
International Solid Surface Fabricators Association
(702) 567 -8150
www.i55111.ne1
ITS
lonenek
(800) 345 -3851
w•w w•.intcrtck.cum
(607) 753-6711
ITU
International Telecommunication Union
41 22 730 51 11
w•w•w.ilu.int/homc
KCMA
Kitchen Cabinet Manufacturers Association
(703) 264 -1690
ww•w.kcma.org
LMA
Laminating Materials Association
(Now pan of CPA)
LP1
Lightning Protection Institute
(800) 488 -6864
ww•w.li_hntinL_.org
(847) 577 -7200
M13MA
Metal Building M:muractorcrs Association
(216) 241 -7333
www.ntbnto.cont
MFMA
Maple Flooring Manufacturers Association
(847)480'7138
www•.maplcl7aor.org
MFMA
Metal Framing Manufacturers Association
(312) 644-6610
ww•w•.ntctal frauinamfg.org
MH
Material Handling
REFERENCES
01420-7
LION SQUARE LODGE NORTH
Vail, Colorado
(Now MHIA)
MHIA
Material Handling Industry ofAmerica
(800) 345 -1815
www.mhia.org
(704) 676-1190
MIA
Marble Institute of America
(440) 250.9222
www.marble -insti tute.com
MPl
Master Painters Institute
(888) 674 -8937
www.paintinfo.com
MSS
Manufacturers Standardisation Society of The Valve and
(703) 281 -6613
Fillings Industry Inc.
www.mss- hq.com
NAAMM
National Association of Architectural Metal Manufacturers
(3 12) 332 -0405
www.naamni.org
NACE
NACE International
(281) 228 -6200
(National Association of Corrosion Engineers International)
www.nacc.org
NADCA
National Air Duct Cleaners Association
(202) 737 -2926
www.nadca.com
NAGWS
National Association for Girls and Women in Sport
(800) 213 -7193, ext.
453
www.aahperd.orglnagwst
NAIMA
North American Insulation Manufacturers Association (The)
(703) 684 -0064
www.naima.org
NBGQA
National Building Granite Quarries Association, Inc.
(800) 557 -2848
www.nbgga.com
NCAA
National Collegiate Athletic Association (The)
(3 17) 917 -6222
www.ncaa.org
NCMA
National Concrete Masonry Association
(703) 713 -1900
w'ww'.ncomorg
NCPI
National Clay Pipe Institute
(262) 248 -9094
tvww.ncpi.ora
NCTA
National Cable & Telecommunications Association
(202) 775 -3550
wwwmclaxom
NEBB
National Environmental Balancing Bureau
(301 ) 977 -3698
www.nebb.ora
NECA
National Electrical Contractors Association
( 301) 057-3110
wwwmecanet.org
NCLMA
Northeastern Lumber Manufacturers' Association
(207) 829.6901
www.nehma.org
NEMA
National Electrical Manufacturers Association
(703) 541 -3200
wwwmema.org
NETA
InicrNational Electrical Testing Association
(30;) 697 -5441
w ww.netaworld.org
NFHS
National Federation of State High School Associations
(317) 972 -6900
www•.n Ihs.ore
NFPA
NFPA
(800) 344 -3555
(National Fire Protection Association)
(617) 770 -3000
www
NFRC
National Fenestration Rating Council
(301) 589 -1776
REFERENCES
01420-8
LION SQUARE LODGE NORTH
Vail, Colorado
wtv.r.n frc.org
NGA
Nationat Glass Association
(703) 442 -4890
www.glass.org
NNLA
National hardwood Lumber Association
(800) 933 -0318
wwwmadhardwood.org
(901) 377 -1818
NLGA
National Lumber Grades Authority
(604) 524 -2393
www.nlga.org
NOFMA
National Oak Flooring Manufacturers Association
(901) 526 -5016
ww•w.nornta.org
NRCA
National Roofing Contractors Association
(800) 323 -9545
www.nrcamel
(847) 299 -9070
NRMCA
National Ready Mixed Concrete Association
(888) 846 -7622
www.nnnco.org
(301) 587 -1400
NSF
NSF International
(800) 673 -6275
(National Sanitation Foundation International)
(734) 769.8010
www.nsforg
NSSGA
National Stone. Sand & Gravel Association
(800) 342 -1415
tvwtv.nssga.org
(703) 525 -8788
NTMA
National Terrazzo& Mosaic Association. Inc.
(800) 323 -9736
www.ntma.com
(540) 751 -0930
NTRMA
National Tile Roofing Manufacturers Association
(Now TRI)
NW %VDA
National Wood Window and Door Association
(Now WDMA)
0I
Omega Point Labonlnrics. Inc.
(800) 966 -5253
m- %%'w.opl.con1
(210) 635.8100
PC]
Precast /Prestressed Concrete Institute
(312) 786 -0300
www
PDCA
I'aimine & Decorating Contractors nl'Amcrica
(800) 332 -7322
wwWTdca.com
(314) 514 -7322
PDI
Plumbing & Drainage Institute
(800) 589 -8956
www.pdiontinc.org
(978) 557 -0720
1'6I
PVC Gcomembtane Institute
(2 17) 333 -3929
h11P://pgi-1P.CeAJhic.edu
PTI
Post - Tensioning Institute
(602) 870 -7540
www.post-tensioning.org
RCSC
Research Council on Su nctural Connections
(800) 644 -2400
www.bollcouncil.org
(3 R) 670 -2400
RFCI
Resilient Floor Covering Institute
(301) 340 -8530
www.rrei.com
RIS
Redwood Inspection Service
(888) 225 -7339
www.calredwood.ore
(415) 382 -0662
RT1
(formerly: NTRMA - National Tile Roofing Mmudacnuer5 Association)
(Now TRI)
SAG
SAE International
(724) 776 -4841
ww".S;tc.org
SDI
Steel Deck Institute
(847) 462 -1930
RFFFRENCES
01420-9
LION SQUARE LODGE NOR7
Vail, Colorado
www.sdi.org
SDI
Steel Door Institute
(440) 899.0010
wwwsteeldoonorg
SEFA
Scientific Equipment and Furniture Association
(516) 294 -5424
www.scralabs.coni
SEI
Structural Engineering Institute
(800) 548 -2723
www.seinstitute.cotn
(703) 295 -6195
SGCC
Safety Glazing Certification Council
(315) 646 -2234
www.sgcc.org
SIA
Security Industry Association
(703)683.2075
www.siaonJine.org
SIGMA
Sealed Insulating Glass Manufacturers Association
(Now IGMA)
Sil
Steel Joist Institute
(843) 626 -1995
www.stccljoist.org
SMA
Screen Manufacturers Association
(561) 533.0991
www.smacentral.org
SMACNA
Sheet Metal and Air Conditioning Conti-actors'
(703) 803 -2980
National Association
www.snnacna.org
SMPTE
Society of Motion Picture and Television Engineers
(914) 761-1100
www.smpte.org
SPFA
Spray Polyurethane Foam Alliance
(800) 523 -6154
(Formerly: SPI /SPED - The Society of the Plastics
Industry. Inc.: Spray Polyurethane Foam Division)
www.sprayfoam.org
SPIB
Southern Pinc Inspection Bureau (The)
(850) 434 -2611
www.spib.org
SPI /SPED
Society of the Plastics Industry. Inc. (The)
Spray P0lyure1h1nc Foam Division
(Now SPFA)
SPRI
SPRI
(781) 647 -7026
(Single Ply Roofing Institute)
tvww.spri.org
SSINA
Specialty Steel Industry of North America
(800) 982 -0355
www.ssina.cutn
(202) 342 -8630
SSPC
SS PC: The Society for Protective Coatings
(877) 281 -7772
www.sspc.org
(412) 281.2331
STI
Steel Tank Institute
(847) 438.8265
www.steeltank.com
SWI
Steel Window Institute
(216)241.7333
www.swulwindows.com
SWRI
Sealant. Waterproofing. C Restoration Institute
(816)472.7974
www.swrionlinc.om
TCA
Tile Council of America. Inc.
(864) 646 -8453
www.tilcusa.com
TIA /EIA
TeICCmmm Lin icalions Indusuy Assoc iation/FILcironic
(703) 907 -7700
Industries Alliance
www.tiaonline. ore
REFERENCES
01420- 10
LION SQUARE LODGE NORTH
Vail, Colorado
TMS
The Masonry Society
(303) 939 -9700
www.masonrysocicty.org
TPI
Truss Plate Institute, Inc.
(608) 833 -5900
www.tpinst.org
TPI
Turfgrass Producers International
(800) 405 -8873
www.turfgrasssod.org
(847) 705.9898
TRI
Tile Roofing Institute
( 312) 670 -4177
(Formerly: RTI - Roof Tile Institute)
www.lileroofing.org
UL
Underwriters Laboratories Inc.
(800) 285 -4476
www.ul.com
(847) 272 -8800
UNI
Uni -Bell PVC Pipe Association
(972) 243 -3902
www.uni- bell.org
USAV
USA Volleyball
(888) 786 -5539
www.usavolicyball.org
(719) 228 -6800
USGBC
U.S. Green Building Council
(202) 828 -7422
tvww.usgbc.org
USITT
United States Institute for Theatre Technology. Inc.
(800) 938 -7488
www.usiu.org
(31 S) 463 -6463
WASTEC Waste Equipment Technology Association
(300) 424 -2869
www.wastec.org
(202) 2444700
WCLIB
West Coast Lumber Inspection Bureau
(800) 283 -1486
www.wclib.org
(503) 634 -0651
WCMA
Window Covering Manufacturers Association
(Now WCSC)
\VCSC
Window Covering Safety Council
(800) 506 -4636
(Formerly: WCMA - Window Covering Manufacturers
(2 12) 661 -4261
Association)
www.windowcoverings.org
WDMA
Window & Door Manufacturers Association
(800)'' -23 -2301
(Formerly: NWWDA - National Wood Window and
(847) 299.5200
Door Association)
www.wdma.com
Wl
Woodwork Institute (Formerly: WIC - Wrx,dwork InSlitHIC of California)
(916) 372 -9943
www.wicno.org
WIC
Woodwork Institute ofCalifomia
(Now WI)
WMMPA Wood Moulding & Millwork Produces Association
(800) 550 -7889
www.wmrmpa.com
(5 30) 661.9591
WSRCA
Western States Rool+ng Contractors Association
1800) 725-03
www.wsrea -corn
(650) 548 -0112
WWPA
Western Wood Products Association
(503) 224 -3930
www.wwpa.ore
C
Code Agencies: Where abbreviations and acronyms are used in Specifications
or other Contract
Documents, they shall mean the recognized name of the entities in the following list.
Names, telephone
numbers, and Web -site addresses are subject to change and are believed to be accurate
and updo -date as
of the date of the Contract Documents.
REFERENCES 01420-11
LION SQUARE LODGE NORTH
Vail, Colorado
BOCA BOCA International, Inc
REFERENCES 01420- 12
(See ]CC)
CABO Council of American Building Officials
(See ]CC)
IAPMO
International Association of Plumbing and Mechanical Officials
(909) 472 -4100
www.iapmo.org
ICBO
Intemational Conference of Building Officials
(See ICC)
ICBO
ES ICBO Evaluation Service, Inc.
(See )CC -ES)
ICC
International Code Council
(703) 931 -4533
(Formerly: CABO - Council of American Building Officials)
www.iccsafe.org
]CC -ES
]CC Evaluation Service, Inc.
(800) 423 -6587
www.ice- es.org
(562) 699 -0543
NES
National Evaluation Service
(See ]CC -ES)
SBCC]
Southern Building Code Congress International, Inc.
(See ICC)
D.
Federal Government Agencies: Where abbreviations and acronyms are used
in Specifications or other
Contract Documents, they shall mean the recognized name of the entities in the following list. Names,
telephone numbers, and Web -site addresses are subject to change and are believed to be accurate and up-
to -date as of the date of the Contract Documents.
CE
Arnly Corps of Engineers
www.usace.arnly. mil
CPSC
Consumer Product safety Commission
(800) 633 -2772
(301) 504 -6816
DOC
Depanorem of Commerce
(202) 482 -2000
w'w' \\'.l'mt111le rCe, In \'
DOD
Depanment of Delcnse
(215) 697 -6257
w\vw'.dodssp.daps. m it
DOE
Depanment of Encrgy
(202) 586 -9220
\e\\'\v.crcn.doc.gov
EPA
Enviromnental Protection Agency
`
(202) 272 -0167
\\' \l'\\'. cpa, go\'
FAA
Federal A, iation Administration
(202) 3664000
w\v\v.faa.goc
FCC
Federal Colnntunications C'onnnissian
(888) 225-5322
FDA
Food anti Drug Administration
(888) 463 -6332
n'\vw•.fda.euv
GSA
General Scr\'iccs Adminwiation
(800) 488.3111
\v\vw'.esa.eoc
(202) 501 -1N88
REFERENCES 01420- 12
LION SQUARE LODGE NORTH
Vail, Colorado
HUD
Department of Housing and Urban Development
(202) 708-1112
www.hud.gov
LBL
Lawrence Berkeley National Laboratory
(510) 486-4000
www.lbl.gov
NCHRP
National Cooperative Highway Research Program
(See TRB)
NIST
National Institute of Standards and Technology
(301) 975.6478
www.nist.gov
OSHA
Occupational Safety & Health Administration
(800) 321 -6742
www.osha.gov
(202) 693 -1999
PBS
Public Building Service
(See GSA)
PHS
Officc of Public Health and Science
(202) 690.7694
hitp: /Iphs.os.dhhs.gov
RUS
Rural Utilities Service
(202) 720 -9540
(See USDA)
SD
State Department
(202) 647 -4000
www.statc.gov
TRB
Transportation Research Board
(202) 334 -2934
www.nas.edtMrb
USDA
Department of Agriculture
(202) 720 -2791
www.usda.gov
USPS
Postal Service
(202) 268 -2000
www.usps.com
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (No( Used)
END OF SECTION 01420
REFERENCES 01420-13
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS
PARTI - GENERAL
t .l SUMMARY
A. This Section includes requirements for temporary utilities, support facilities, and security and protection
facilities.
B. Related Sections include the following:
1. Division I Section "Summary" for limitations on utility interruptions and other work restrictions.
2. Division 1 Section "Submittal Procedures" for procedures for submitting copies of implementation
and termination schedule and utility reports.
3_ Division I Section "Execution Requirements" for progress cleaning requirements.
4. Divisions 2 through 16 Sections for temporary heat, ventilation, and humidity requirements for
products in those Sections.
1.2 DEFINITIONS
A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete,
insulated, and weathertight exterior walls are insulated and weathertight; and all openings are closed with
permanent construction or substantial temporary closures.
1.3 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. Allow other
entities to use temporary services and facilities without cost, including, but not limited to,
Architect, occupants of Project, testing agencies, and authorities having jurisdiction.
B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction operations.
C. Water Service: Pay water service use charges for water used by all entities for construction operations.
D. Electric Power Service: Pay electric power service use charges for electricity used by all entities for
construction operations.
E. Water Service: Water from Owners existing water system is available for use without metering and
without payment of use charges. Provide connections and extensions of services as required for
constriction operations.
F. Electric Power Service: Electric power from Owner's existing system is available for use without
metering and without payment of use charges. Provide connections and extensions of services as
required for constriction operations.
1.4 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for constriction
personnel.
I TEMPORARY FACILITIES AND CONTROLS
01500-1
� I
LION SQUARE LODGE NORTH
Vail, Colorado
1.5 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric
service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary
utility before use. Obtain required certifications and permits.
1.6 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility
for operation, maintenance, and protection of each permanent service during its use as a construction
facility before Owner's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1
MATERIALS
A. Pavement: Comply with Division 2 pavement Sections.
B. Chain -Link Fencing: Minimum 2 -inch (50 -mm), 0.148 -inch- (3.76 -mm -) thick, galvanized steel, chain -
link fabric fencing: minimum 6 feel (1.8 m) high with galvanized steel pipe posts; minimum 2- 3 /8 -inch-
(60 -mnr -) OD line posts and 2 -7/8 -inch- (73 -mm -) OD corner and pull posts, with 1 -5/8 -inch- (42 -mm -)
OD top rails.
C. Portable Chain -Link Fencing: Minimum 2 -inch (50 -nun), 9 -gage, galvanized steel, chain -link fabric
fencing; minimum 6 feet (1.8 in) high with galvanized steel pipe posts; minimum 2 -3/8 -inch- (60 -mm -)
OD line posts and 2 -7/8 -inch- (73 -mm -) OD corner and pull posts, with 1 -5/8 -inch- (42 -mm -) OD top and
bottom rails. Provide concrete bases for supporting posts.
D. Lumber and Plywood: Comply with requirements in Division 6 Section "Miscellaneous Carpentry."
E. Gypsum Board; Minimum 1/2 inch (12.7 nun) thick by 48 inches (1219 mm) wide by maximum
available lengths: regular -type panels with tapered edges. Comply with ASTM C 36/C 36M.
F. Insulation: Unlaced mineral -fiber blanket, manufactured from glass, slag wool, or rock wool; with
maximum flame- spread and smoke- developed indexes of 25 and 50, respectively.
G. Paint: Comply with requirements in Division 9 painting Sections.
22
TEMPORARY FACILITIES
A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and
foundations adequate for normal loading.
B. Common -Use Field Office: Of sufficient size to accommodate needs of construction personnel. Keep
office clean and orderly. Fumish and equip offices as follows:
I. Furniture required for Project -site documents including file cabinets, plan tables, plan racks, and
bookcases.
TEMPORARY FACILITIES AND CONTROLS
01500-2
1`
i
i
r
LION SQUARE LODGE NORTH
Vail, Colorado
2. Conference room of sufficient size to accommodate meetings of 10 individuals_ Provide electrical
power service and 120 -V ac duplex receptacles, with not less than I receptacle on each wall.
Furnish room with conference table, chairs, and 4 -foot- (1.2 -m -) square tack board_
3. Drinking water and private toilet.
4. Coffee machine and supplies.
5. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72
deg F (20 to 22 deg C).
6. Lighting fixtures capable of maintaining average illumination of 20 fc (215 Ix) at desk height.
C. Storage and Fabrication Sheds: Provide sheds sized, famished, and equipped to accommodate materials
and equipment for construction operations.
1. Store combustible materials apart from building.
2.3 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and
classes of fire exposures.
B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, self -
contained, liquid- propane -gas or ftiel -oil heaters with individual space thermostatic control-
1. Use of gasoline - buming space heaters, open -flame heaters, or salamander -type heating units is
prohibited.
2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable
to authorities having jurisdiction, and marked for intended use.
3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary
use during construction, provide filter with MERV of 8 at each return air grille in system and
remove at end of construction.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequalely and result in minimum interference with
performance of the Work. Relocate and modify facilities as required by progress of the Work.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no
longer needed or are replaced by aulhorized use of completed permanent facilities.
3.2 TEMPORARY UTILITY INSTALLATION
i A. General: Install temporary service or connect to existing service_
I . Arrange with utility company. Owner, and existing users for time when service can be interripted,
if necessary, to make connections for temporary services.
B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.
I . Connect temporary sewers to municipal system as directed by authorities having jurisdiction.
TEMPORARY FACILITIES AND CONTROLS 01500-3
LION SQUARE LODGE NORTH
Vail, Colorado
C. Water Service: Use of Owner's existing water service facilities will be permitted, as long as facilities are
cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these
facilities to condition existing before initial use.
D. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction
personnel. Comply with authorities having jurisdiction for type, number, location, operation, and
maintenance of fixtures and facilities.
E. Heating and Cooling: Provide temporary heating and cooling required by construction activities for
curing or drying of completed installations or for protecting installed construction from adverse effects of
low temperatures or high humidity. Select equipment that will not have a harmful effect on completed
installations or elements being installed.
F. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for
curing or drying of completed installations or for protecting installed construction from adverse effects of
high humidity. Select equipment that will not have a harmful effect on completed installations or
elements being installed. Coordinate ventilation requirements to produce ambient condition required and
minimize energy consumption.
G
H
Electric Power Service: Use of Owner's existing electric power service will be permitted, as long as
equipment is maintained in a condition acceptable to Owner.
Lighting: Provide temporary lighting with local switching that provides adequate illumination for
construction operations, observations, inspections, and traffic conditions.
1. Install and operate temporary lighting that fulfills security and protection requirements without
operating entire system.
2_ Install lighting for Project identification sign.
Telephone Service: Provide temporary telephone service in common -use facilities for use by all
construction personnel. Install one telephone line(s) for each field office.
At each telephone, post a list of important telephone members.
a. Police and fire departments.
b. Ambulance service.
c. Contractor's home office.
d. Architect's office.
e. Engineers' offices.
f Owner's office.
g. Principal subcontractors' field and home offices.
1
2. Provide superintendent with cellular telephone or portable two -way radio for use when away from
field office_
Electronic Communication Service: Provide temporary electronic communication service, including
electronic mail, in common -use facilities.
Provide DSL in primary field office.
3.3
I"
SUPPORT FACILITIES INSTALLATION
General: Comply with the following:
TEMPORARY FACILITIES AND CONTROLS
01500-4
u
1
r
t
1
e
1
1
i
LION SQUARE LODGE NORTH
Vail, Colorado
1. Provide incombustible construction for offices, shops, and sheds located within construction area
or within 30 feet (9 m) of building lines_ Comply with NFPA 241.
2. Maintain support facilities until near Substantial Completion. Remove before Substantial
Completion. Personnel remaining after Substantial Completion will be permitted to use
permanent facilities, under conditions acceptable to Owner.
Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate
for construction operations. Locate temporary roads and paved areas within construction limits as
approved.
f
Provide dust - control treatment that is nonpolluting and nontracking. Reapply treatment as
required to minimize dust.
1
I J
Traffic Controls: Comply with requirements of authorities having jurisdiction
1. Protect existing site improvements to remain including curbs, pavement, and utilities_
2. Maintain access for fire- fighting equipment and access to fire hydrants.
Parking: Provide temporary parking areas for construction personnel.
Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain
Project site, excavations, and construction free of water.
1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining
properlies nor endanger permanent Work or temporary facilities.
2. Remove snow and ice as required to minimize accumulations.
Project Identification and Temporary Signs: Provide Project identification and other signs. Install signs
where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not
permitted.
. Provide temporary, directional signs for construction personnel and visitors.
2_ Maintain and touchup signs so they are legible at all times.
Waste Disposal Facilities: Provide waste - collection containers in sizes adequate to handle waste from
construction operations. Comply with requirements of authorities having jurisdiction. Comply with
Division I Section "Execution Requirements" for progress cleaning requirements.
H. Lifts and Floists: Provide facilities necessary for hoisting materials and personnel.
Truck cranes and similar devices used for hoisting materials are considered "tools and equipment"
and not temporary facilities.
Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders are not
adequate.
Temporary Use of Permanent Stairs: Cover finished, permanent stairs with protective covering of
plywood or similar material so finishes will be undamaged at time of acceptance.
1 3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct constriction in
ways and by methods that comply with environnmental regulations and that minimize possible air,
waterway, and subsoil contamination or pollution or other undesirable effects_
TEMPORARY FACILITIES AND CONTROLS 01500-5
C.
D.
1
E.
1
1
F
1
1
G.
1
I J
Traffic Controls: Comply with requirements of authorities having jurisdiction
1. Protect existing site improvements to remain including curbs, pavement, and utilities_
2. Maintain access for fire- fighting equipment and access to fire hydrants.
Parking: Provide temporary parking areas for construction personnel.
Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain
Project site, excavations, and construction free of water.
1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining
properlies nor endanger permanent Work or temporary facilities.
2. Remove snow and ice as required to minimize accumulations.
Project Identification and Temporary Signs: Provide Project identification and other signs. Install signs
where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not
permitted.
. Provide temporary, directional signs for construction personnel and visitors.
2_ Maintain and touchup signs so they are legible at all times.
Waste Disposal Facilities: Provide waste - collection containers in sizes adequate to handle waste from
construction operations. Comply with requirements of authorities having jurisdiction. Comply with
Division I Section "Execution Requirements" for progress cleaning requirements.
H. Lifts and Floists: Provide facilities necessary for hoisting materials and personnel.
Truck cranes and similar devices used for hoisting materials are considered "tools and equipment"
and not temporary facilities.
Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders are not
adequate.
Temporary Use of Permanent Stairs: Cover finished, permanent stairs with protective covering of
plywood or similar material so finishes will be undamaged at time of acceptance.
1 3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct constriction in
ways and by methods that comply with environnmental regulations and that minimize possible air,
waterway, and subsoil contamination or pollution or other undesirable effects_
TEMPORARY FACILITIES AND CONTROLS 01500-5
LION SQUARE LODGE NORTH
Vail, Colorado
1. Comply with work restrictions specified in Division 1 Section "Summary."
B. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge
of soil- bearing water runoff and airborne dust to adjacent properties and walkways, according to
requirements of authorities having jurisdiction.
1. Inspect, repair, and maintain erosion- and sedimentation- control measures during construction
until permanent vegetation has been established.
C. Stormwater Control: Comply with authorities having jurisdiction. Provide barriers in and around
excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.
D. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees
to protect vegetation from damage from construction operations. Protect tree root systems from damage,
flooding, and erosion.
Pest Control: Engage pest - control service to recommend practices to minimize attraction and harboring
of rodents, roaches, and other pests and to perform extermination and control procedures at regular
intervals so Project will be free of pests and their residues at Substantial Completion. Obtain extended
warranty for Owner. Perform control operations lawfully, using environmentally safe materials.
Site Enclosure Fence: Before construction operations begin furnish and install site enclosure fence in a
manner that will prevent people and animals from easily entering site except by entrance gates.
I. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to t
accommodate construction operations.
2. Maintain security by limiting number of keys and restricting distribution to authorized
personnel. Provide Owner with one set of keys.
G. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas
of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and
similar violations of security.
H. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for
erecting structurally adequate barricades, including warning signs and lighting.
Covered Walkway: Erect structurally adequate, protective, covered walkway for passage of individuals
along adjacent public street(s). Coordinate with entrance gates, other facilities, and obstructions.
Comply with regulations ofauthorilies having jurisdiction.
I _ Construct covered walkways using scaffold or shoring framing.
2. Provide wood -plank overhead decking, protective plywood enclosure walls, handrails, barricades,
warning signs, lights, safe and well - drained walkways, and similar provisions for protection and
safe passage.
3. Extend back wall beyond the structure to complete enclosure fence.
4. Paint and maintain in a manner approved by Owner and Architect.
Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and
completed, from exposure, foul weather, other constriction operations, and similar activities. Provide
temporary weathertight enclosure for building exterior.
1. Where heating or cooling is needed and permanent enclosure is not complete, insulale temporary
enclosures.
TEMPORARY FACILITIES AND CONTROLS 01500-6
u
LION SQUARE LODGE NORTH
Vail, Colorado
K. Temporary Fire Protection: Install and maintain temporary fire- protection facilities of types needed to
protect against reasonably predictable and controllable fire losses. Comply with NFPA 241.
1. Prohibit smoking in hazardous fire- exposure areas.
2. Supervise welding operations, combustion -type temporary heating units, and similar sources of
fire ignition according to requirements of authorities having jurisdiction.
3. Develop and supervise an overall fire- prevention and - protection program for personnel at Project
site. Review needs with local fire department and establish procedures to be followed. Instruct
personnel in methods and procedures. Post warnings and information.
4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign
stating that hoses are for fire- protection purposes only and are not to be removed. Match hose size
with outlet size and equip with suitable nozzles.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit
availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and
similar facilities on a 24 -hour basis where required to achieve indicated results and to avoid
possibility of damage.
C. Operate Project - identification -sign lighting daily from dusk until 12:00 midnight.
D. Temporary Facility Changeover: Do not change over from using temporary security and protection
facilities to permanent facilities until Substantial Completion_
E. Termination and Removal: Remove each temporary facility when need for its service has ended, when it
has been replaced by authorized use of a permanent facility, or no later than Substantial Completion.
Complete or, if necessary, restore permanent constriction that may have been delayed because of
interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace
construction that cannot be satisfactorily repaired.
1. Materials and facilities that constitute temporary facilities are property of Contractor. Owner
' reserves right to take possession of Project identification signs.
2 Remove temporary paving not intended for or acceptable for integration into permanent paving.
Where area is intended for landscape development, remove soil and aggregate till that do not
comply with requirements for fill or subsoil_ Remove materials contaminated with road oil,
asphalt and other petrochemical compounds, and other substances that might impair growth of
plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary
entrances, as required by authorities having jurisdiction.
3. At Substantial Completion, clean and renovate permanent facilities used during constriction
period. Comply with final cleaning requirements specified in Division I Section "Closeout
Procedures."
I END OF SECTION 01 500
I TEMPORARY FACILITIES AND CONTROLS
01500-7
J
LION SQUARE LODGE NORTH
Vail, Colorado
B. Waste Management Conference: Conduct conference at Project site to comply with requirements in
Division 1 Section "Project Management and Coordination." Review methods and procedures related to
waste management including, but not limited to, the following:
1. Review and discuss waste management plan including responsibilities of Waste Management
Coordinator.
2. Review requirements for documenting quantities of each type of waste and its disposition.
3. Review and finalize procedures for materials separation and verify availability of containers and
bins needed to avoid delays.
4. Review procedures for periodic waste collection and transportation to recycling and disposal
facilities.
5. Review waste management requirements for each trade.
1.5 WASTE MANAGEMENT PLAN I
A. General: Develop plan consisting of waste identification, waste reduction work plan, and cost/revenue
analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste
management plan.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION I.
3.1 PLAN IMPLEMENTATION I
A_ General: Implement waste management plan as approved by Owner. Provide handling, containers,
storage, signage, transportation, and other items as required to implement waste management plan during
the entire duration of the Contract.
1. Comply with Division I Section "Temporary f=acilities and Controls' for operation, termination,
and removal requirements.
B. Waste Management Coordinator: Engage a wasle management coordinator to be responsible for
implementing, monitoring, and reporting status of waste management work plan. Coordinator shall be
present at Project site full time for duration of Project.
C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as
appropriate for the Work occurring at Project site.
I . Distribute waste management plan to everyone concerned within three days of submittal return.
2. Distribute waste management plan to entities when they first begin work on -site. Review plan
procedures and locations established for salvage, recycling, and disposal.
D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum
interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities_
I . Designate and label specific areas on Project site necessary for separating materials that are to be
salvaged, recycled, reused, donated, and sold.
2. Comply with Division 1 Section "Temporary Facilities and Controls" for controlling dust and dirt,
environmental protection, and noise control.
CONSTRUCTION WASTE MANAGEMENT 01524-2 1
LION SQUARE LODGE NORTH
Vail, Colorado
3.2 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste
materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities
having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate
on -site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials.
C. Disposal: Transport waste materials off Owner's property and legally dispose of them.
END OF SECTION 01524
CONSTRUCTION WASTE MANACEMENT 01524-3
w
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01600 - PRODUCT REQUIREMENTS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for selection of products for use in
Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special
warranties; product substitutions; and comparable products.
B. Related Sections include the following:
I. Division 1 Section "References" for applicable industry standards for products specified.
2. Division I Section "Closeout Procedures" for submitting warranties for Contract closeout.
3. Divisions 2 through 16 Sections for specific requirements for warranties on products and
installations specified to be warranted.
1 1.2
I
t
I
1,
DEFINITIONS
A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from
previously purchased stock. The term "product" includes the terms "material," "equipment," "system,"
and terms of similar intent.
I. Named Products: Items identified by manufacturer's product name, including make or model
number or other designation shown or listed in manufacturer's published product literature, that is
current as of date of the Contract Documents.
2. New Products: Items that have not previously been incorporated into another project or facility_
Products salvaged or recycled from other projects are not considered new products.
3. Comparable Product: Product that is demonstrated and approved through submittal process, or
where indicated as a product substitution, to have the indicated qualities related to type, function,
dimension, in- service performance, physical properties, appearance, and other characteristics that
equal or exceed those of specified product.
B. Substitutions: Changes in products, materials, equipment, and methods of construction from those
required by the Contract Documents and proposed by Contractor.
C. Basis-of-Design Product Specification: Where a specific manufacturers product is named and
accompanied by the words "Basis -of- Design," including make or model number or other designation, to
establish the significant qualities related to type, fiunction, dimension, in- service performance, physical
properties, appearance, and other characteristics for purposes of evaluating comparable products of other
named manufacturers.
1.3 SUBMITTALS
A. Product List: Submit a list, in tabular from, showing specified products. Include generic names of
products required. Include manufacturer's name and proprietary product names for each product.
1. Coordinate product list with Contractors Construction Schedule and the Submittals Schedule.
2. Form: Tabulate information for each product under the following column headings:
a. Specification Section number and title.
I
PRODUCT REQUIREMENTS
01600-1
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
b. Generic name used in the Contract Documents.
C, Proprietary name, model number, and similar designations.
d. Manufacturer's name and address.
e. Supplier's name and address.
f. Installer's name and address.
g. Projected delivery date or time span of delivery period.
h_ Identification of items that require early submittal approval for scheduled delivery date.
3. initial Submittal: Within 30 days after date of commencement of the Work, submit 3 copies of
initial product list. Include a written explanation for omissions of data and for variations from
Contract requirements_
At Contractor's option, initial submittal may be limited to product selections and
designations that must be established early in Contract period.
Completed List: Within 60 days after date of commencement of the Work, submit 3 copies of
completed product list. Include a written explanation for omissions of data and for variations from
Contract requirements.
Architect's Action: Architect will respond in writing to Contractor within 15 days of receipt of
completed product list. Architect's response will include a list of unacceptable product selections
and a brief explanation of reasons for this action. Architect's response, or lack of response, does
not constitute a waiver of requirement to comply with the Contract Documents.
tt
Substitution Requests: Submit three copies of each request for consideration. Identify product or
fabrication or installation method to be replaced. Include Specification Section number and title and
Drawing numbers and titles.
I . Substitution Request Fonn: Use facsimile of form provided at end of Section.
2. Documentation: Show compliance with requirements for substitutions and the following, as
applicable:
a. Statement indicating why specified material or product cannot be provided.
b. Coordination information, including a list of changes or modifications needed to other parts
of the Work and to construction performed by Owner and separate contractors, that will be
necessary to accommodate proposed substitution.
C. Detailed comparison of significant qualities of proposed substitution with those of the
Work specified. Significant qualities may include attributes such as performance, weight,
size, durability, visual effect, and specific features and requirements indicated.
d. Product Data, including drawings and descriptions of products and fabrication and
installation procedures.
e. Samples, where applicable or requested.
f. List of similar installations for completed projects with project names and addresses and
names and addresses of architects and owners.
g. Material test reports from a qualified testing agency indicating and interpreting test results
for compliance with requirements indicated.
h. Research /evaluation reports evidencing compliance with building code in effect for Project,
from a model code organization acceptable to authorities having jurisdiction.
L Detailed comparison of Contractor's Construction Schedule using proposed substitution
with products specified for the Work, including effect on the overall Contract Time. If
specified product or method of construction cannot be provided within the Contract Time,
include letter from manufacturer, on manufacturer's letterhead, stating lack of availability
or delays in delivery.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Contractor's certification that proposed substitution complies with requirements in the
Contract Documents and is appropriate for applications indicated.
PRODUCT REQUIREMENTS
0600 - 2
U
t
LJ
t
t
I
[I
Ll
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
Contractors waiver of rights to additional payment or time that may subsequently become
necessary because of failure of proposed substitution to produce indicated results.
3. Architect's Action: If necessary, Architect will request additional information or documentation
for evaluation within 7 days of receipt of a request for substitution. Architect will notify
Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request,
or 7 days of receipt of additional information or documentation, whichever is later.
a. Form of Acceptance: Change Order.
b. Use product specified if Architect cannot make a decision on use of a proposed substitution
within time allocated.
C. Comparable Product Requests: Submit three copies of each request for consideration. Identify product
or fabrication or installation method to be replaced. Include Specification Section number and title and
Drawing numbers and titles.
Architect's Action: If necessary, Architect will request additional information or documentation
for evaluation within one week of receipt of a comparable product request. Architect will notify
Contractor of approval or rejection of proposed comparable product request within 15 days of
receipt of request, or 7 days of receipt of additional information or documentation, whichever is
later.
a. Form of Approval: As specified in Division 1 Section "Submittal Procedures."
b. Use product specified if Architect cannot make a decision on use of a comparable product
request within time allocated.
D. Basis -of- Design Product Specification Submittal: Comply with requirements in Division I Section
"Submittal Procedures." Show compliance with requirements.
1.4 QUALITY ASSURANCE
A. Compatibility of Options: If Contractor is given option of selecting between two or more products for
use on Project, product selected shall be compatible with products previously selected, even if previously
selected products were also options.
1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and
loss, including theft. Comply with manufacturer's written instructions.
B. Delivery and Handling:
1. Schedule delivery to minimize long -term storage at Project site and to prevent overcrowding of
construction spaces.
2. Coordinate delivery with installation time to ensure minimum holding time for items that are
flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.
3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed
container or other packaging system, complete with labels and instnictions for handling, storing,
unpacking, protecting, and installing.
4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that
products are undamaged and properly protected.
I
PRODUCT REQUIREMENTS
01600-3
1
LION SQUARE LODGE NOR'T'H
Vail, Colorado
14
1.6
A
Storage:
I . Store products to allow for inspection and measurement of quantity or counting of units.
2. Store materials in a manner that will not endanger Project structure.
3. Store products that are subject to damage by the elements, under cover in a weathertight enclosure
above ground, with ventilation adequate to prevent condensation.
4. Store cementitious products and materials on elevated platforms.
5. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation
and concealment.
6. Comply with product manufacturers written instructions for temperature, humidity, ventilation,
and weather - protection requirements for storage.
7. Protect stored products from damage and liquids from freezing.
S. Provide a secure location and enclosure at Project site for storage of materials and equipment by
Owner's construction forces. Coordinate location with Owner.
PRODUCT WARRANTIES
Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties
required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties
do not relieve Contractor of obligations under requirements of the Contract Documents.
Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a
particular product and specifically endorsed by manufacturer to Owner.
Special Warranty: Written warranty required by or incorporated into the Contract Documents,
either to extend time limit provided by manufacturer's warranty or to provide more rights for
Owner.
0
Special Warranties: Prepare a written document that contains appropriate terms and identification, ready
for execution. Submit a draft for approval before final execution.
Manufacturer's Standard Form: Modified to include Project - specific information and properly
executed.
Specified Form: When specified forms are included with the Specifications, prepare a written
document using appropriate form properly executed.
Refer to Divisions 2 through 16 Sections for specific content requirements and particular
requirements for submitting special warranties.
Flt
Submittal Time: Comply with requirements in Division I Section "Closeout Procedures."
PART 2 - PRODUCTS
2.1
A
PRODUCT SELECTION PROCEDURES
General Product Requirements: Provide products that comply with the Contract Documents, that are
undamaged and, unless otherwise indicated, that are new at time of installation_
Provide products complete with accessories, trim, finish, fasteners, and other items needed for a
complete installation and indicated use and effect.
Standard Products: If available, and unless custom products or nonstandard options are specified,
provide standard products of types that have been produced and used successfully in similar
situations on other projects.
PRODUCT REQUIREMENTS
01600-4
n
11
t
t
r
s
I
f
t
r
n
I
,q
� 1,
LION SQUARE LODGE NORTH
Vail, Colorado
3. Owner reserves the right to limit selection to products with warranties not in conflict with
requirements of the Contract Documents.
4. Where products are accompanied by the term "as selected," Architect will make selection.
5. Where products are accompanied by the term "match sample," sample to be matched is
Architect's.
6. Descriptive, performance, and reference standard requirements in the Specifications establish
"salient characteristics" of products.
7. Where products are specified by name and accompanied by the term "Basis -of- Design" or "or
equal" or "or approved equal" or "or approved similar" or "or approved," comply with provisions
in Part 2 "Comparable Products" Article to obtain approval for use of an unnamed product.
B. Product Selection Procedures:
1. Product: Where Specifications name a single product and manufacturer, provide the named
product that complies with requirements.
2. Manufacturer /Source: Where Specifications name a single manufacturer or source, provide a
product by the named manufacturer or source that complies with requirements.
3. Products: Where Specifications include a list of names of both products and manufacturers,
provide one of the products listed that complies with requirements.
4. Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by
one of the manufacturers listed that complies with requirements.
5. Available Products: Where Specifications include a list of names of both products and
manufacturers, provide one of the products listed, or an unnamed product, that complies with
requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration
of an unnamed product.
6. Available M anti facturers: Where Specifications include a list of manufacturers, provide a product
by one of the manufacturers listed, or an unnamed manufacturer, that complies with requirements.
Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed
product.
7. Product Options: Where Specifications indicate that sizes, profiles, and dimensional requirements
on Drawings are based on a specific product or system, provide the specified product or system.
Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed
product or system.
S. Basis -of- Design Product: Where Specifications name a product and include a list of
manufacturers, provide the specified product or a comparable product by one of the other named
manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other
characteristics that are based on the product named. Comply with provisions in Part 2
"Comparable Products" Article for consideration of an unnamed product by the other named
manufacturers.
9. Visual Matching Specification: Where Specifications require matching an established Sample,
select a product that complies with requirements and matches Architect's sample. Architect's
decision will be final on whether a proposed product matches.
a. If no product available within specified category matches and complies with other specified
requirements, comply with provisions in Part 2 "Product Substitutions" Article for proposal
of product.
10. Visual Selection Specification: Where Specifications include the phrase "as selected from
manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with
other specified requirements.
a. Standard Range: Where Specifications include the phrase "standard range of colors,
patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture
From manufacturer's product line that does not include premium items.
b. Full Range: Where Specifications include the phrase "full range of colors, patterns,
textures" or similar phrase. Architect will select color, pattern, density, or texture from
manufacturer's product line that includes both standard and premium items_
PRODUCT REQUIREMENTS 01600-5
!1
LION SQUARE LODGE NORTH
Vail, Colorado
2.2 PRODUCT SUBSTITUTIONS
A. Timing: Architect will consider requests for substitution if received within 60 days after commencement
of the Work, the Notice to Proceed, or the Notice of Award. Requests received after that time may be
considered or rejected at discretion of Architect.
B. Conditions: Architect will consider Contractor's request for substitution when the following conditions
are satisfied. If the following conditions are not satisfied, Architect will return requests without action,
except to record noncompliance with these requirements:
I.
Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or
other considerations, after deducting additional responsibilities Owner must assume. Owner's
additional responsibilities may include compensation to Architect for redesign and evaluation
services, increased cost of other construction by Owner, and similar considerations.
2.
Requested substitution does not require extensive revisions to the Contract Documents.
3.
Requested substitution is consistent with the Contract Documents and will produce indicated
results.
4.
Substitution request is fully documented and properly submitted.
5.
Requested substitution will not adversely affect Contractor's Construction Schedule.
6.
Requested substitution has received necessary approvals of authorities having jurisdiction.
7.
Requested substitution is compatible with other portions of the Work.
8.
Requested substitution has been coordinated with other portions of the Work.
9_
Requested substitution provides specified warranty.
10.
If requested substitution involves more than one contractor, requested substitution has been
coordinated with other portions of the Work, is uniform and consistent, is compatible with other
products, and is acceptable to all contractors involved.
2.3 COMPARABLE PRODUCTS
A. Conditions: Architect will consider Contractor's request for comparable product when the following
conditions are satisfied. If the following conditions are not satisfied, Architect will return requests
without action, except to record noncompliance with these requirements:
I. Evidence that the proposed product does not require extensive revisions to the Contract
Documents, that it is consistent with the Contract Documents and will produce the indicated
results, and that it is compatible with other portions of the Work.
2. Detailed comparison of significant qualities of proposed product with those named in the
Specifications_ Significant qualities include attributes such as performance, weight, size,
durability, visual effect, and specific features and requirements indicated.
3. Evidence that proposed product provides specified warranty.
4. List of similar installations for completed projects with project names and addresses and names
and addresses of architects and owners, if requested.
5. Samples, if requested.
PART 3 - EXECUTION (Not Used)
END OF SECTION 01600
I
PRODUCT REQUIREMENTS 01600-6
ii
t
I r--1
u
Ll
e
e
SUBSTITUTION REQUEST
TO:
PROJECT:
SPECIFIED ITEM:
Section Page Paragraph Description
The undersigned requests consideration of the following:
PROPOSED SUBSTITUTION:
Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of
the request, applicable portions of the data are clearly identified.
Attached data also includes a detailed description of changes to the Contract Documents which the proposed substitution will require for
its proper installation.
The undersigned certifies that the following paragraphs, unless modified by attachments, are correct:
1. The proposed substitution does not affect dimensions shown on Drawings.
2. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs
caused by the requested substitution.
3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty
requirements.
4. Maintenance and service parts will be locally available for the proposed substitution.
The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the
specified item.
Submitted by:
Signature For Use by the design consultant
Firm [ ] Accepted [ ] Accepted as noted
Address [ ] Not Accepted [ ] Received too late
Dale _
Telephone
Allachments:
Date
Remarks
e
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01700 - EXECUTION REQUIREMENTS
PART I - GENERAL
1.1 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but
not limited to, the following:
I. Construction layout.
2. General installation of products.
3. Coordination of Owner - installed products.
4. Progress cleaning.
5. Starting and adjusting.
b. Protection of installed construction.
7. Correction of the Work.
B_ Related Sections include the following:
1. Division t Section "Project Management and Coordination" for procedures for coordinating field
engineering with other construction activities.
2. Division I Section "Submittal Procedures" for submitting surveys.
3. Division I Section "Cutting and Patching" for procedural requirements for cutting and patching
necessary for the installation or performance of other components of the Work.
4. Division 1 Section "Closeout Procedures' for submitting final property survey with Project Record
Documents, recording of Owner - accepted deviations from indicated lines and levels, and final
cleaning.
1.2 SUBMITTALS
A. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous
materials, for hazardous waste disposal.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other construction
indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and
location ofinechanical and electrical systems and other construction affecting the Work.
_ Before construction, verify the location and points of connection of utility services.
B. Existing Utilities: The existence and location of underground and other utilities and construction
indicated as existing are not guaranteed_ Before beginning sitework, investigate and verify the existence
and location of underground utilities and other construction affecting the Work.
EXECUTION REQUIREMENTS 01700-1
LION SQUARE LODGE NORTH '
Vail, Colorado
Before construction, verify the location and invert elevation at points of connection of sanitary
sewer, storm sewer, and water- service piping; and underground electrical services. '
Furnish location data for work related to Project that must be performed by public utilities serving
Project site.
C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present
where indicated, for compliance with requirements for installation
PREPARATION
tolerances and other conditions
A.
affecting performance. Record observations.
I. Written Report: Where a written report listing conditions detrimental to performance of the Work
existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected
is required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates.
'
c_ List of unacceptable installation tolerances.
d. Recommended corrections.
2. Verify
construction, verify dimensions of other constriction by field measurements before fabrication.
compatibility with and suitability of substrates, including compatibility with existing
finishes or primers.
3. Examine roughing -in for mechanical and electrical systems to verify actual locations of
Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on
connections before equipment and fixture installation.
4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be
installed.
Review of Contract Documents and Field Conditions: Immediately on discovery of the need for
5. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding
with the Work indicates acceptance of surfaces and conditions.'
3.2
PREPARATION
A.
Existing Utility Information: Furnish information to Owner that is necessary to adjust, move, or relocate
existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected
by constriction. Coordinate with authorities having jurisdiction.
B.
Field Measurements: Take field measurements as required to fit the Work properly. Recheck
measurements before installing each product. Where portions of the Work are indicated to fit to other
construction, verify dimensions of other constriction by field measurements before fabrication.
Coordinate fabrication schedule with construction progress to avoid delaying the Work.
C.
Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on
Drawings.
D.
Review of Contract Documents and Field Conditions: Immediately on discovery of the need for
clarification of the Contract Documents, submit a request for information to Architect. Include a detailed
description of problem encountered, together with recommendations for changing the Contract
Documents.
3.3
CONSTRUCTION LAYOUT
A.
Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in
relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect
promptly.
B.
Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil
placement, utility slopes, and invert elevations.
EXECUTION REQUIREMENTS
01700-2
EXECUTION REQUIREMENT'S
01700-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
C.
Building Lines and Levels: Locate and lay out control lines and levels for structures, building
foundations, column grids, and floor levels, including those required for mechanical and electrical work.
Transfer survey markings and elevations for use with control lines and levels. Level foundations and
piers from two or more locations.
'
D.
Record Log: Maintain a log of layout control work. Record deviations from required lines and levels.
Include beginning and ending dates and times of surveys, weather conditions, name and duty of each
survey party member, and types of instruments and tapes used. Make the log available for reference by
'
Architect.
3.4
INSTALLATION
A.
General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as
indicated.
'
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease
of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.
'
4. Maintain minimum headroom clearance of 8 feet (2.4 m) in spaces without a suspended ceiling.
B.
Comply with manufacturer's written instructions and recommendations for installing products in
'
applications indicated.
C.
Install products at the time and under conditions that will ensure the best possible results. Maintain
conditions required for product performance until Substantial Completion.
D.
Conduct construction operations so no part of the Work is subjected to damaging operations or loading in
excess of that expected during normal conditions of occupancy.
'
E.
Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
F.
Templates: Obtain and distribute to the parties involved templates for work specified to be factory
prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are
made for locating and installing products to comply with indicated requirements.
G.
Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in
place, accurately located and aligned with other portions of the Work.
I. Mounting Heights: Where mounting heights are not indicated, mount components at heights
directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for
installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral
'
anchors, that are to be embedded in concrete or masonry_ Deliver such items to Project site in
time for installation.
H.
Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange
joints for the best visual effect. Fit exposed connections together to form hairline joints.
1.
Hazardous Materials: Use products, cleaners, and installation materials that are not considered
hazardous.
EXECUTION REQUIREMENT'S
01700-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
3.5 OWNER- INSTALLED PRODUCTS
A. Site Access: Provide access to Project site for Owner's construction forces.
B. Coordination: Coordinate construction and operations of the Work with work performed by Owner's
construction forces_ '
Construction Schedule: Inform Owner of Contractor's preferred construction schedule for Owner's
portion of the Work. Adjust construction schedule based on a mutually agreeable timetable.
Notify Owner if changes to schedule are required due to differences in actual construction '
progress.
2. Preinstallation Conferences: Include Owner's construction forces at preinstallation conferences
covering portions of the Work that are to receive Owner's work. Attend preinstallation
conferences conducted by Owner's construction forces if portions of the Work depend on Owner's
constntction.
3.6 PROGRESS CLEANING 1
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning I
for joint -use areas where more than one installer has worked. Enforce requirements strictly. Dispose of
materials lawfiilly.
1 _ Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. '
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is
expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark
containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas .-here work is in progress to the level of cleanliness necessary for proper '
execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom -clean or vacumn the entire work
,
area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of
manufacturer or fabricator of product installed, using only cleaning materials specifically recommended.
If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to
health or property and that will not damage exposed surfaces.
E. Concealed
Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom
from damage and deterioration at time of Substantial Completion_
,
G. Waste Disposal: Burying or burning waste materials on -site will not be permitted. Washing waste
materials down sewers or into xvater�vays will not be permitted.
H. During handling and installation, clean and protect constriction in progress and adjoining materials
already in place. Apply protective covering where required to ensure protection from damage or
deterioration at Substantial Completion.
EXECUTION REQUIREMENTS 01700-4 ,
r
LION SQUARE LODGE NORTH
Vail, Colorado
1. Clean and provide maintenance on completed construction as frequently as necessary through the
remainder of the construction period. Adjust and lubricate operable components to ensure operability
without damaging effects.
J. Limiting Exposures: Supervise constriction operations to assure that no part of the construction,
completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure
during the construction period.
3.7 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units,
replace with new units, and retest.
B. Adjust operating components for proper operation without binding. Adjust equipment for proper
operation.
C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace
damaged and malfunctioning controls and equipment.
D. Manufacturer's Field Service: if a factory- authorized service representative is required to inspect field -
assembled components and equipment installation, comply with qualification requirements in Division I
Section "Quality Requirements."
3.8 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or
deterioration at time of Substantial Completion.
B. Comply with manufacturer's written instructions for temperature and relative humidity.
3.9 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes_ Comply
with requirements in Division I Section "Cutting and Patching."
I. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with
matching materials, and properly adjusting operating equipment.
B. Restore permanent facilities used during construction to their specified condition.
C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without
visible evidence of repair_
D. Repair components that do not operate properly. Remove and replace operating components that cannot
be repaired.
E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
END OF SECTION 01700
EXECUTION REQUIREMENTS 01700-5
� I
� I
� I
I I
� I
� I
� I
� I
�1
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01731 - CUTTING AND PATCHING
PART I - GENERAL
1.1 SUMMARY
A. This Section includes procedural requirements for cutting and patching.
B_ Related Sections include the following:
I. Divisions 2 through 16 Sections for specific requirements and limitations applicable to cutting and
patching individual parts of the Work.
2. Division 7 Section "Through- Penetration Firestop Systems" for patching fire -rated construction_
1.2 DEFINITIONS
A. Cutting: Removal of in -place construction necessary to permit installation or performance of other Work.
B. Patching: Fitting and repair work required to restore surfaces to original conditions after installation of
other Work.
1.3 SUBMITTALS
A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 10 days before the time
cutting and patching will be performed, requesting approval to proceed. Include the following
information:
1. Extent: Describe cutting and patching, show how they will be performed, and indicate why they
cannot be avoided.
2. Changes to In -Place Construction: Describe anticipated results. Include changes to structural
elements and operating components as well as changes in building's appearance and other
significant visual elements.
3. Products: List products to be used and firms or entities that will perform the Work.
4. Dates: Indicate when cutting and patching will be performed.
5. Utility Services and Mechanical /Electrical Systems: List services /systems that cutting and
patching procedures will disturb or affect. List services /systems that will be relocated and those
that will be temporarily out of service. Indicate how long services /systems will be disrupted.
6. Structural Elements: Where cutting and patching involve adding reinforcement to structural
elements, submit details and engineering calculations showing integration of reinforcement with
original stricture.
7. Architect's Approval: Obtain approval of culling and patching proposal before cutting and
patching. Approval does not waive right to later require removal and replacement of
unsatisfactory work.
1.4 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load -
carrying capacity or load- deflection ratio.
CUTTING AND PATCHING 01731 - 1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Operational Elements: Do not cut and patch operating elements and related components in a manner that
results in reducing their capacity to perform as intended or that results in increased maintenance or
decreased operational life or safety. Operating elements include the following:
1. Primary operational systems and equipment.
2. Air or smoke barriers.
3. Fire - suppression systems.
4. Mechanical systems piping and ducts.
5. Control systems.
6. Communication systems.
7_ Conveying systems.
8. Electrical wiring systems.
9. Operating systems of special construction in Division 13 Sections.
C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a
manner that could change their load-carrying capacity, that results in reducing their capacity to perform
as intended, or that results in increased maintenance or decreased operational life or
safety. Miscellaneous elements include the following:
I. Water, moisture, or vapor barriers.
2. Membranes and flashings.
3_ Exterior curtain -wall construction.
4. Equipment supports.
5. Piping, ductwork, vessels, and equipment.
6. Noise- and vibration- control elements and systems.
D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of
cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in
a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace
constriction that has been cut and patched in a visually unsatisfactory manner.
W
WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during
cutting and patching operations, by melhods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 MATERIALS
A
91
General: Comply with requirements specified in other Sections.
In -Place Materials: Use materials identical to in -place materials. For exposed surfaces, use materials that
visually match in -place adjacent surfaces to the fullest extent possible.
If identical materials are unavailable or cannot be used, use materials that, when installed, will
match the visual and functional performance of in -place materials.
t
C!
r.
0
7
J
CUTTING AND PATCHING
01731 -2
1_1
1
J
F1
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be
performed.
I. Compatibility: Before patching, verify compatibility with and suitability of substrates, including
compatibility with in -place finishes or primers.
2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.
B. Protection: Protect in -place construction during cutting and patching to prevent damage. Provide
protection from adverse weather conditions for portions of Project that might be exposed during cutting
and patching operations.
C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to
adjoining areas.
3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at
the earliest feasible time, and complete without delay.
Cut in -place construction to provide for installation of other components or performance of other
construction, and subsequently patch as required to restore surfaces to their original condition.
B. Cutting: Cut in -place constriction by sawing, drilling, breaking, chipping, grinding, and similar
operations, including excavation, using methods least likely to damage elements retained or adjoining
constriction. if possible, review proposed procedures with original Installer; comply with original
Installer's written recommendations.
' I. In general, use hand or small power tools designed for sawing and grinding, not hammering and
chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum
disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond -core
drill.
' 4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections where
required by cutting and patching operations.
5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed.
Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture
' or other foreign mater after cutting.
G. Proceed with patching after construction operations requiring cutting are complete.
C. Patching: Patch constniction by filling, repairing, refinishing, closing tip, and similar operations
following performance of other Work. Patch with durable seams that are as invisible as possible.
Provide materials and comply with installation requirements specified in other Sections.
CUTTING AND PATCHING 01731 -3
LION SQUARE LODGE NORTH
Vail, Colorado
1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate
integrity of installation.
2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into
retained adjoining construction in a manner that will eliminate evidence of patching and
refinishing.
a_ Clean piping, conduit, and similar features before applying paint or other finishing
materials.
b. Restore damaged pipe covering to its original condition.
3. Floors and Walls: Where walls or partitions that are removed extend one finished area into
another, patch and repair floor and wall surfaces in the new space. Provide an even surface of
uniform finish, color, texture, and appearance. Remove in -place floor and wall coverings and
replace with new materials, if necessary, to achieve uniform color and appearance.
a. Where patching occurs in a painted surface, apply primer and intermediate paint coats over
the patch and apply final paint coat over entire unbroken surface containing the patch.
Provide additional coats until patch blends with adjacent surfaces_
4. Ceilings: Patch, repair, or rehang in -place ceilings as necessary to provide an even -plane surface
of uniform appearance.
5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a
weathertight condition.
D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint,
mortar, oils, putty, and similar materials.
END OF SECTION 01731
CUTTING AND PATCHING 01731 -4
i�
1
I�
1
1
11
1
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01770 - CLOSEOUT PROCEDURES
PART I -GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not
limited to, the following:
1. Inspection procedures.
2. Warranties.
3. Final cleaning.
B. Related Sections include the following:
1. Division I Section "Payment Procedures" for requirements for Applications for Payment for
Substantial and Final Completion.
2. Division 1 Section "Execution Requirements" for progress cleaning of Project site.
3. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record
Specifications, and Record Product Data.
4. Division 1 Section "Operation and Maintenance Data" for operation and maintenance manual
requirements.
5. Division I Section "Demonstration and Training" for requirements for instructing Owner's
personnel.
6. Divisions 2 through lb Sections for specific closeout and special cleaning requirements for the
Work in those Sections.
1.2 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion,
complete the following. List items below that are incomplete in request.
1, Prepare a list of items to be completed and corrected (punch list), the value of items on the list,
and reasons why the Work is not complete.
2. Advise Owner of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, maintenance service agreements, final
certifications, and similar documents.
4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services
and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final
Completion constriction photographs, damage or settlement surveys, property surveys, and
similar final record information_
6_ Deliver tools, spare parts, extra materials, and similar items to location designated by Owner.
Label with manufacturer's name and model number where applicable.
7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel
ofchangeover in security provisions.
8_ Complete slartup testing of systems.
9_ Submit test /adjust balance records.
10. Terminate and remove temporary facilities from Project site, along with mockups, construction
tools, and similar elements.
11. Advise Owner of changeover in heat and other utilities.
12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.
CLOSEOUT PROCEDURES
01770-1
1
LION SQUARE LODGE NORTH
Vail, Colorado
13. Complete final cleaning requirements, including touchup painting_
14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
B. Inspection: Submit a written request for inspection for Substantial Completion_ On receipt of request,
Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect
will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items,
either on Contractor's list or additional items identified by Architect, that must be completed or corrected
before certificate will be issued.
I. Reinspection: Request reinspection when the Work identified in previous inspections as
incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
1.3
FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion,
complete the following:
1. Submit a final Application for Payment according to Division I Section "Payment Procedures."
2. Submit certified copy of Architect's Substantial Completion inspection list of items to be
completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list
shall state that each item has been completed or otherwise resolved for acceptance.
3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
4. Submit pest - control final inspection report and warranty.
5. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and
systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect
will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will
prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must
be completed or corrected before certificate will be issued.
I. Reinspection_ Request reinspection when the Work identified in previous inspections as
incomplete is completed or corrected.
1.4
LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected
by construction operations for incomplete items and items needing correction including, if necessary,
areas disturbed by Contractor that are outside the limits of construction.
I. Organize list of spaces in sequential order, starting with exterior areas first and proceeding from
lowest floor to highest floor.
2. Organize items applying to each space by major element, including categories for ceiling,
individual watts, floors, equipment, and building systems_
3. Include the following information at the top of each page:
a. Project name_
b. Date.
c. Name of Architect.
d. Name of Contractor.
e. Page number.
CLOSEOUT PROCEDURES 01770-2
t
t
11
II
' 2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the
surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or
that might damage finished surfaces.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste - removal operations to comply with local
laws and ordinances and Federal and local environmental and antipollution regulations_
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or
unit to condition expected in an average commercial building cleaning and maintenance program.
Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification of
Substantial Completion for entire Project or for a portion of Project:
' a_ Clean Project site, yard, and grounds, in areas disturbed by construction activities,
including landscape development areas, of rubbish, waste material, litter, and other foreign
substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign
deposits.
C. Rake grounds that are neither planted nor paved to a smooth, even - textured surface.
CLOSEOUT PROCEDURES 01770-3
LION SQUARE LODGE NORTH
Vail, Colorado
I S
WARRANTIES
A.
Submittal Time: Submit written warranties on request of Architect for designated portions of the Work
where commencement of warranties other than date of Substantial Completion is indicated.
B.
Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated
portions of the Work that are completed and occupied or used by Owner during construction period by
separate agreement with Contractor.
'
C.
Organize warranty documents into an orderly sequence based on the table of contents of the Project
Manual.
1. Bind warranties and bonds in heavy -duty, 3 -ring, vinyl- covered, loose -leaf binders, thickness as
necessary to accommodate contents, and sized to receive 8- 1 /2 -by -1l -inch (215 -by- 280 -mm)
paper.
2. Provide heavy paper dividers with plastic- covered tabs for each separate warranty. Mark tab to
identify the product or installation. Provide a typed description of the product or installation,
including the name of the product and the name, address, and telephone number of Installer.
3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES,"
Project name, and name of Contractor.
D.
Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 -
PRODUCTS
' 2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the
surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or
that might damage finished surfaces.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste - removal operations to comply with local
laws and ordinances and Federal and local environmental and antipollution regulations_
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or
unit to condition expected in an average commercial building cleaning and maintenance program.
Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification of
Substantial Completion for entire Project or for a portion of Project:
' a_ Clean Project site, yard, and grounds, in areas disturbed by construction activities,
including landscape development areas, of rubbish, waste material, litter, and other foreign
substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign
deposits.
C. Rake grounds that are neither planted nor paved to a smooth, even - textured surface.
CLOSEOUT PROCEDURES 01770-3
F��
LION SQUARE LODGE NORTH
Vail, Colorado
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Remove snow and ice to provide safe access to building.
f. Clean exposed exterior and interior hard - surfaced finishes to a dirt -free condition, free of
stains, films, and similar foreign substances. Avoid disturbing natural weathering of
exterior surfaces. Restore reflective surfaces to their original condition.
g. Remove debris and surface dust from limited access spaces, including roofs, plenums,
shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
h. Sweep concrete floors broom clean in unoccupied spaces.
i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if
visible soil or stains remain.
j. Clean transparent materials, including mirrors and glass in doors and windows. Remove
glazing compounds and other noticeable, vision - obscuring materials. Replace chipped or
broken glass and other damaged transparent materials. Polish mirrors and glass, taking
care not to scratch surfaces.
k. Remove labels that are not permanent.
1. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace
finishes and surfaces that cannot be satisfactorily repaired or restored or that already show
evidence of repair or restoration.
I) Do not paint over "UL" and similar labels, including mechanical and electrical
nameplates.
m. Wipe surfaces of mechanical and electrical equipment, elevator equipment, and similar
equipment. Remove excess lubrication, paint and mortar droppings, and other foreign
substances.
n. Replace parts subject to unusual operating conditions.
o_ Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting
from water exposure.
p. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of
diffusers, registers, and grills.
q. Clean ducts, blowers, and coils if units were operated without filters during construction.
r. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace
burned -out bulbs, and those noticeably dimmed by hours of use, and defective and noisy
starters in fluorescent and mercury vapor fixtures to comply with requirements for new
fixtures.
S. Leave Project clean and ready for occupancy.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess
materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage
systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 01770
CLOSEOUT PROCEDURES 01770-4
t
� I
t
iJ
t
t
t
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 01781 - PROJECT RECORD DOCUMENTS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for Project Record Documents,
including the following:
I. Record Drawings.
2. Record Specifications.
3. Record Product Data.
B. Related Sections include the following:
I . Division I Section "Closeout Procedures" for general closeout procedures.
2. Division I Section "Operation and Maintenance Data" for operation and maintenance manual
requirements.
3. Divisions 2 through 16 Sections for specific requirements for Project Record Documents of the
Work in those Sections.
1.2 SUBMITTALS
A. Record Drawings: Comply with the following:
I . Number of Copies: Submit one set(s) of marked -up Record Prints.
B. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract
modifications.
C. Record Product Data: Submit one copy of each Product Data submittal.
1. Where Record Product Data is required as part of operation and maintenance manuals, submit
marked -up Product Data as an insert in manual instead of submittal as Record Product Data.
PART 2- PRODUCTS
2.1 RECORD DRAWINGS
A. Record Prints: Maintain one set of blue- or black -line white prints of the Contract Drawings and Shop
Drawings.
1. Preparation: Mark Record Prints to show the actual installation where installation varies from that
shown originally. Require individual or entity who obtained record data, whether individual or
entity is Installer, subcontractor, or similar entity, to prepare the marked -up Record Prints.
a. Give particular attention to information on concealed elements that would be difficult to
identify or measure and record later_
b. Accurately record information in an understandable drawing technique.
PROJECT RECORD DOCUMENTS 01781-1
t
LION SQUARE LODGE NORTH
Vail, Colorado
C. Record data as soon as possible after obtaining it. Record and check the markup before
enclosing concealed installations.
2_ Content: Types of items requiring marking include, but are not limited to, the following:
a. Dimensional changes to Drawings.
b. Revisions to details shown on Drawings.
C. Depths of foundations below first floor.
d. Locations and depths of underground utilities.
e. Revisions to routing of piping and conduits_
f. Revisions to electrical circuitry.
g. Actual equipment locations.
h. Duct size and routing.
i. Locations of concealed internal utilities.
j. Changes made by Change Order or Construction Change Directive.
k. Changes made following Architect's written orders.
I. Details not on the original Contract Drawings.
nt. Field records for variable and concealed conditions.
n. Record information on the Work that is shown only schematically.
3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual
physical conditions, completely and accurately. If Shop Drawings are marked, show cross -
reference on the Contract Drawings.
4. Mark record sets with erasable, red - colored pencil. Use other colors to distinguish between
changes for different categories of the Work at same location.
5. Mark important additional information that was either shown schematically or omitted from
original Drawings.
6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and
similar identification, where applicable.
B. Format: Identify and date each Record Drawing, include the designation "PROJECT RECORD
DRAWING" in a prominent location.
1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable
sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.
2. Record Transparencies: Organize into unbound sets matching Record Prints_ Place transparencies
in durable tube -type drawing containers with end caps. Mark end cap of each container with
identification. If container does not include a complete set, identify Drawings included.
3. Record CAD Drawings: Organize CAD information into separate electronic files that correspond
to each sheet of the Contract Drawings. Name each file with the sheet identification. Include
identification in each CAD file.
4_ Identification: As follows:
a. Project name_
b. Date.
C. Designation "PROJECT RECORD DRAWINGS."
d_ Name of Architect.
C. Name of Contractor_
2.2 RECORD SPECIFICATIONS
A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from
that indicated in Specifications, addenda, and contract modifications.
PROJECT RECORD DOCUMENTS 01781 -2
1
t
11
u
fj
LION SQUARE LODGE NORTH
Vail, Colorado
1. Give particular attention to information on concealed products and installations that cannot be
readily identified and recorded later.
2. For each principal product, indicate whether Record Product Data has been submitted in operation
and maintenance manuals instead of submitted as Record Product Data.
3. Note related Change Orders and Record Drawings where applicable.
2.3 RECORD PRODUCT DATA
A. Preparation: Mark Product Data to indicate the actual product installation where installation varies
substantially from that indicated in Product Data submittal.
I. Give particular attention to information on concealed products and installations that cannot be
readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in manufacturer's
written instructions for installation.
3. Note related Change Orders, Record Specifications, and Record Drawings where applicable.
2.4 MISCELLANEOUS RECORD SUBMITTALS
A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record
keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous
records and identify each, ready For continued use and reference.
PART 3 - EXECUTION
3.1 RECORDING AND MAINTENANCE
A. Recording: Maintain one copy of each submittal during the construction period for Project Record
Document purposes. Post changes and modifications to Project Record Documents as they occur; do not
wait until the end of Project.
B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field
office apart from the Contract Documents used for construction. Do not use Project Record Documents
for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible
condition, protected from deterioration and loss. Provide access to Project Record Documents for
Architect's reference during nonnal working hours.
END OF SECTION 01781
PROJECT RECORD DOCUMENTS 01781 -3
I
SECTION 01782 - OPERATION AND MAINTENANCE DATA
PART 1- GENERAL
1
1 "
LION SQUARE LODGE NORTH
Vail, Colorado
SUMMARY
This Section includes administrative and procedural requirements for preparing operation and
maintenance manuals, including the following:
I. Emergency manuals.
2. Operation manuals for systems, subsystems, and equipment.
3. Maintenance manuals for the care and maintenance of products, materials, and finishes, systems
and equipment.
Related Sections include the following:
I. Division I Section "Submittal Procedures" for submitting copies of submittals for operation and
maintenance manuals.
2. Division I Section "Closeout Procedures" for submitting operation and maintenance manuals.
3. Division I Section "Project Record Documents" for preparing Record Drawings for operation and
maintenance manuals.
4. Divisions 2 through 16 Sections for specific operation and maintenance manual requirements for
the Work in those Sections.
1.2 DEFINITIONS
A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.
B. Subsystem: A portion of a system with characteristics similar to a system.
1.3 SUBMITTALS
A. Initial Submittal: Submit 2 draft copies of each manual at least 15 days before requesting inspection for
Substantial Completion. Include a complete operation and maintenance directory. Architect will return
one copy of draft and mark whether general scope and content of manual are acceptable.
B. Final Submittal: Submit one copy of each manual in final form at least 15 days before final inspection.
Architect will return copy with comments within 15 days after final inspection.
1. Correct or modify each manual to comply with Architect's comments. Submit 3 copies of each
corrected manual within 15 days of receipt of Architect's comments.
1.4 COORDINATION
A_ Where operation and maintenance documentation includes information on installations by more than one
factory- authorized service representative, assemble and coordinate information famished by
representatives and prepare manuals.
OPERATION AND MAINTENANCE DATA 01782-1
1
LION SQUARE LODGE NORTH
Vail, Colorado
PART 2- PRODUCTS
2.1 MANUALS, GENERAL
A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system
and subsystem, and a separate section for each piece of equipment not part of a system. Each manual
shall contain the following materials, in the order listed:
. Title page.
2. Table of contents.
3. Manual contents.
B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:
1. Subject matter included in manual.
2. Name and address of Project.
3. Name and address of Owner.
4. Date of submittal.
5. Name, address, and telephone number of Contractor.
6. Name and address of Architect.
7. Cross - reference to related systems in other operation and maintenance manuals.
C. Table of Contents: List each product included in manual, identified by product name, indexed to the
content of the volume, and cross - referenced to Specification Section number in Project Manual.
1. If operation or maintenance documentation requires more than one volume to accommodate data,
include comprehensive table of contents for all volumes in each volume of the set.
D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system,
subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and
components of one system into a single binder.
Binders: Heavy -duty, 3 -ring, vinyl- covered, loose -leaf binders, in thickness necessary to
accommodate contents, sized to hold 8- 1 /2 -by -I [-inch (215 -by- 280 -mm) paper; with clear plastic
sleeve on spine to hold label describing contents and with pockets inside covers to hold folded
oversize sheets.
a. If two or more binders are necessary to accommodate data of a system, organize data in
each binder into groupings by subsystem and related components. Cross- reference other
binders if necessary to provide essential information for proper operation or maintenance of
equipment or system.
b. Identify each binder on front and spine, with printed title "OPERATION AND
MAINTENANCE MANUAL," Project title or name, and subject matter of contents.
Indicate volume number for multiple- volume sets.
2. Dividers: Heavy -paper dividers with plastic- covered tabs for each section. Mark each tab to
indicate contents. Include typed list of products and major components of equipment included in
the section on each divider, cross - referenced to Specification Section number and title of Project
Manual.
3. Protective PIastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software
diskettes for computerized electronic equipment.
4. Supplementary Text: Prepared on 8- 1 /2 -by -I 1 -inch (215 -by- 280 -nmm) white bond paper.
5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
OPERATION AND MAINTENANCE DATA 01782-2
t
F1
1
t
1
1
n
LION SQUARE LODGE NORTH
Vail, Colorado
a. If oversize drawings are necessary, fold drawings to same size as text pages and use as
foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled
envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert
typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.
2.2 EMERGENCY MANUALS
A. Content: Organize manual into a separate section for each of the following:
1. Type of emergency.
2. Emergency instructions.
3. Emergency procedures.
B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions
and procedures for each system, subsystem, piece of equipment, and component:
I. Fire.
2. Flood.
3. Gas leak.
4. Water leak.
5. Power failure.
6_ Water outage.
71 System, subsystem, or equipment failure.
S. Chemical release or spill.
C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar
codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer,
supplier, and manufacturer to maintain warranties.
D. Emergency Procedures: Include the following, as applicable:
I . Instructions on stopping.
2. Shutdown instructions for each type of emergency.
3. Operating instructions for conditions outside normal operating limits.
4. Required sequences for electric or electronic systems.
5. Special operating instructions and procedures.
2.3 OPERATION MANUALS
A. Content: In addition to requirements in this Section, include operation data required in individual
Specification Sections and the following information:
I . System, subsystem, and equipment descriptions.
2. Performance and design criteria if Contractor is delegated design responsibility.
3. Operating standards.
4. Operating procedures.
5. Operating logs_
6. Wiring diagrams.
7. Control diagrams.
8. Piped system diagrams.
9. Precautions against improper use.
10. License requirements including inspection and renewal dates_
OPERATION AND MAINTENANCE DATA 01782-3
t
L ION SQUARE LODGE NORTH
Vail, Colorado
B. Descriptions: Include the following:
1. Product name and model number.
2. Manufacturer's name.
3. Equipment identification with serial number of each component.
4. Equipment function.
5. Operating characteristics.
6. Limiting conditions.
7. Performance curves.
8. Engineering data and tests.
9_ Complete nomenclature and number of replacement parts.
C. Operating Procedures: Include the following, as applicable:
1. Startup procedures.
2. Equipment or system break -in procedures.
3. Routine and normal operating instructions.
4. Regulation and control procedures.
5. Instructions on stopping.
6. Normal shutdown instructions.
7. Seasonal and weekend operating instructions.
8. Required sequences for electric or electronic systems.
9. Special operating instructions and procedures.
D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.
E. Piped Systems: Diagram piping as installed, and identify color - coding where required for identification.
2.4
PRODUCT MAINTENANCE MANUAL
A. Content: Organize manual into a separate section for each product, material, and finish. Include source
information, product information, maintenance procedures, repair materials and sources, and warranties
and bonds, as described below.
B. Source Information: List each product included in manual, identified by product name and arranged to
match manual's table of contents. For each product, list name, address, and telephone number of Installer
or supplier and maintenance service agent, and cross - reference Specification Section number and title in
Project Manual.
C.
Product Information: Include the following, as applicable:
I. Product name and model number_
2. Manufacturer's name.
3. Color, pattern, and texture.
4. Material and chemical composition.
5. Reordering information for specially manufactured products.
Maintenance Procedures: Include manufacturer's written recommendations and the following:
I. Inspection procedures.
2. Types of cleaning agents to be used and methods of cleaning.
3. List of cleaning agents and methods of cleaning detrimental to product.
4. Schedule for routine cleaning and maintenance.
5. Repair instructions.
OPERATION AND MAINTENANCE DATA
01782-4
t
[1
1
I
Ll
u
t
�J_
t
t
t
11
1
I
1
1
1
r
J
1
s
1
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
E. Repair Materials and Sources: Include lists of materials and local sources of materials and related
services_
F. Warranties and Bonds: include copies of warranties and bonds and lists of circumstances and conditions
that would affect validity of warranties or bonds.
I . Include procedures to follow and required notifications for warranty claims.
2.5 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL
A. Content: For each system, subsystem, and piece of equipment not part of a system, include source
information, manufacturers' maintenance documentation, maintenance procedures, maintenance and
service schedules, spare parts list and source information, maintenance service contracts, and warranty
and bond information, as described below.
B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified
by product name and arranged to match manual's table of contents. For each product, list name, address,
and telephone number of Installer or supplier and maintenance service agent, and cross - reference
Specification Section number and title in Project Manual.
C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the
following information for each component part or piece of equipment:
1. Standard printed maintenance instructions and bulletins.
2. Drawings, diagrams, and instructions required for maintenance, including disassembly and
component removal, replacement, and assembly.
3. Identification and nomenclature of parts and components.
4_ List of items recommended to be stocked as spare parts.
D. Maintenance Procedures: Include the following information and items that detail essential maintenance
procedures:
I. Test and inspection instructions.
2. Troubleshooting guide.
3. Precautions against improper maintenance.
4. Disassembly; component removal, repair, and replacement; and reassembly instructions.
5. Aligning, adjusting, and checking instructions.
6. Demonstration and training videotape, if available.
E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required
lubricants for equipment, and separate schedules for preventive and routine maintenance and service with
standard lime allotment.
I. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly,
semiannual, and annual frequencies.
2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.
F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts
identified and cross - referenced to manufacturers' maintenance documentation and Iocal sources of
maintenance materials and related services.
G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone
number of service agent.
I
OPERATION AND MAINTENANCE DATA
01782-5
LION SQUARE LODGE NORTH
Vail, Colorado
H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions
that would affect validity of warranties or bonds.
Include procedures to follow and required notifications for warranty claims.
PART 3 - EXECUTION
3.1 MANUAL PREPARATION
A. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by
emergency personnel and by Owner's operating personnel for types of emergencies indicated.
B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and
maintenance of each product, material, and finish incorporated into the Work.
C. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data
indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a
system.
1. Engage a factory- authorized service representative to assemble and prepare information for each
system, subsystem, and piece of equipment not part of a system_
2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual
for use by Owner's operating personnel.
D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets
pertinent to product or component installed. Mark each sheet to identify each product or component
incorporated into the Work. If data include more than one item in a tabular format, identify each item
using appropriate references from the Contract Documents. Identify data applicable to the Work and
delete references to information not applicable.
Prepare supplementary text if manufacturers' standard printed data are not available and where the
information is necessary for proper operation and maintenance of equipment or systems.
E. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of
component parts of equipment and systems and to illustrate control sequence and flow diagrams.
Coordinate these drawings with information contained in Record Drawings to ensure correct illustration
of completed installation.
1. Do not use original Project Record Documents as part of operation and maintenance manuals.
2. Comply with requirements of newly prepared Record Drawings in Division I Section "Project
Record Documments."
F. Comply with Division I Section "Closeout Procedures" for schedule for submitting operation and
maintenance docunmentation.
END OF SECTION 01782
OPERATION AND MAINTENANCE DATA 01782-6
1
t
t
t
t
LJ
J
t
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02080 - UTILITY MATERIALS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes the following utility materials and methods to complement other Division 2
Sections:
I. Piping materials and installation instructions common to most piping systems_
2. Concrete base construction requirements.
3. Equipment nameplate data requirements.
4. Nonshrink grout for equipment installations.
5. Field - fabricated metal and wood equipment supports.
6. Utility piping demolition.
7. Cutting and patching.
8. Touchup painting and finishing.
B. Pipe and pipe fitting materials are specified in Division 2 piping Sections.
1.2 PERFORMANCE REQUIREMENTS
A. Materials used should meet or exceed the requirements of the individual utility provider and the town of
Vail, Colorado. In case of conflict, the most restrictive requirements shall govern.
1.3 DEFINITIONS
A. Exposed Installations: Exposed to view outdoors, or subject to outdoor ambient temperatures and
weather conditions.
B. Concealed Installations: Concealed from view and protected from weather conditions and physical
contact by building occupants, but subject to outdoor ambient temperatures. Examples include
installations within unheated shelters.
C. The following are industry abbreviations for plastic materials:
1. ABS: Acrylonitrile- butadiene - styrene.
2. CPVC: Chlorinated polyvinyl chloride.
3. PE: Polyethylene.
4. PVC: Polyvinyl chloride.
1.4 SUBMITTALS
A. Product Data: For identification materials and devices.
B. Samples of color, lettering style, and other graphic representation required for each identification material
and device.
C. Shop Drawings: Detail fabrication and installation for metal and wood supports, and anchorage for utility
piping materials and equipment.
UTILITY MATERIALS 02080-1
1
LION SQUARE LODGE NORTH
Vail, Colorado
D. Coordination Drawings: Detail major elements, components, and systems of utility equipment and
materials in relation to other systems, installations, and building components. Show space requirements
for installation and access. Indicate whether sequence and coordination of installations are important to
efficient flow of the Work. Include the following:
1. Planned piping layout, including valve and specialty locations and valve -stem movement.
2. Clearances for installing and maintaining insulation.
3. Clearances for servicing and maintaining equipment, accessories, and specialties, including space
for disassembly required for periodic maintenance.
4. Equipment and accessory service connections and support details.
5. Building, exterior wall, and foundation penetrations.
6. Sizes and location of required concrete bases.
7. Scheduling, sequencing, movement, and positioning of large equipment during construction.
8. Floor plans, elevations, and details to indicate penetrations in floors and walls, and their
relationship to other penetrations and installations.
E. Welding Certificates: Copies of certificates indicating compliance of welding procedures and personnel
with requirements specified in the "Quality Assurance" Article of this Section.
QUALITY ASSURANCE
1.5
A. Qualify welding processes and operators for structural steel according to AWS DI.I, "Structural Welding
Code -- Steel."
B. Qualify welding processes and operators for piping according to the ASME Boiler and Pressure Vessel
Code: Section IX, "Welding and Brazing Qualifications."
1. Comply with provisions of ASME B31 Series, "Code for Pressure Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and
that certification is current.
C. Comply with ASME A13.1 for lettering size, length of color field, colors, and viewing angles of
identification devices.
D. Equipment Selection: Equipment of greater or larger power, dimensions, capacities, and ratings may be
fiimished provided such proposed equipment is approved in writing and connecting mechanical and
electrical services, circuit breakers, conduit, motors, bases, and equipment spaces are increased. If larger
equipment is approved, no additional costs will be approved for these increases. If minimum energy
ratings or efficiencies of equipment are specified, equipment must meet design requirements and
commissioning requirements.
1.6
DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory- applied end caps. Maintain end caps through shipping, storage, and
handling to prevent pipe -end damage and entrance of dirt, debris, and moisture.
B. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. Do not exceed structural
capacity of floor, if stored inside.
C. Protect flanges, fittings, and piping specialties from moisture and dirt.
D. Store plastic pipes protected from direct sunlight_ Support to prevent sagging and bending.
UTILITY MATERIALS 02080-2
F�
i1
1
G'
t
Ci
t
L!
1�
t
t
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
1.7 SEQUENCING AND SCHEDULING
A. Coordinate equipment installation with other components.
B_ Coordinate installation of required supporting devices and set sleeves in poured -in -place concrete and
other structural components as they are constructed.
C. Sequence, coordinate, and integrate installations of materials and equipment for efficient flow of the
Work.
D. Coordinate connection of piping systems with other exterior underground and overhead utilities and
services. Comply with requirements of authorities having jurisdiction, franchised service companies, and
controlling agencies.
E. Coordinate installation of identifying devices after completing covering and painting, if devices are
applied to surfaces.
PART 2- PRODUCTS
2.1 PIPE AND PIPE FITTINGS
A. Refer to individual Division 2 Sections for pipe and fitting materials and joining methods.
B. Pipe Threads: ASME B 1.20.1 for factory- threaded pipe and pipe fittings.
2.2 JOINING MATERIALS
A. Refer to individual Division 2 piping Sections for special joining materials not listed below.
B. Pipe- Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
I. ASME B1621, nonmetallic, flat, asbestos free, 1/8 -inch (32 -mm) maximum thickness, unless
otherwise indicated.
a. Full -Face Type: For flat -face, Class 125 cast -iron and cast - bronze flanges_
b. Narrow -Face Type: For raised -face, Class 250 cast -iron and steel flanges.
2. AWWA Cl 10, rubber, flat face, 1/8 inch (3.2 mm) thick, unless otherwise indicated; and full -face
or ring type, unless otherwise indicated.
C. Flange Bolts and Nuts: ASME B 18.2.1, carbon steel, unless otherwise indicated.
D. Plastic Pipe - Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system
manufacturer, unless otherwise indicated.
E. Solder Filler Metal: ASTM B 32.
1. Alloy Sn95 or Alloy Sn94: Approximately 95 percent [in and 5 percent silver, with 0.10 percent
lead content.
2. Alloy E: Approximately 95 percent [in and 5 percent copper, with 0.10 percent maximum lead
content.
3_ Alloy HA: Tin - antimony - silver- copper zinc, with 0.10 percent maximum lead content_
UTILITY MATERIALS 02080-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
F
G
H
3
K.
2.3
A
4. Alloy HB: Tin - antimony - silver- copper nickel, with 0.10 percent maximum lead content.
5. Alloy Sb5: 95 percent tin and 5 percent antimony, with 0.20 percent maximum lead content.
Brazing Filler Metals: AWS A5.8.
1. BCuP Series: Copper - phosphorus alloys.
2_ BAgI: Silveralloy.
Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness
and chemical analysis of steel pipe being welded.
Solvent Cements: Manufacturers standard solvent cements for the following:
I. ABS Plastic Piping: ASTM D 2235.
2. CPVC Plastic Piping: ASTM F 493.
3_ PVC Plastic Piping: ASTM D 2564. Include primer according to ASTM F 656.
4. ABS to PVC Plastic Piping Transition: ASTM D 3138.
Plastic Pipe Seals: ASTM F 477, elastomeric gasket.
Flanged, Ductile -Iron -Pipe Gaskets, Bolts, and Nuts: AWWA Cl 10, rubber gasket, carbon -steel bolts
and nuts.
Couplings: Iron -body sleeve assembly, fabricated to match OD of plain -end, pressure pipes.
I. Sleeve: ASTM A 126, Class B, gray iron.
2. Followers: ASTM A 47 (ASTM A 47M) malleable iron or ASTM A 536 ductile iron.
3. Gaskets: Rubber.
4. Bolts and Nuts: AWWA CI If.
5. Finish: Enamel paint.
PIPING SPECIALTIES
Dielectric Fittings: Assembly or fitting with insulating material isolating joined dissimilar metals, to
prevent galvanic action and to stop corrosion.
1. Description: Combination of copper alloy and ferrous; threaded, solder, plain, and weld neck end
types; and matching piping system materials.
2. Insulating Material. Suitable for system fluid, pressure, and temperature.
3. Dielectric Unions: Factory- fabricated union assembly, for 250 -psig (1725 -kPa) minimum
working pressure at 180 deg F (82 deg C).
4. Dielectric Flanges: Factory- fabricated, companion -flange assembly, for 150- or 300 -psig (1035 -
or 2070 -kPa) minimum working pressure as required to suit system pressures.
5. Dielectric - Flange Insulation Kits: Field- assembled, companion -flange assembly; full -face or ring
type. Components include neoprene or phenolic gasket, phenolic or PE bolt sleeves, phenolic
washers, and steel backing washers.
a. Provide separate companion flanges and steel bolts and nuts for 150- or 300 -psig (1035- or
2070 -kPa) minimum working pressure as required to suit system pressures.
6. Dielectric Couplings: Galvanized -steel coupling; with inert and noncorrosive, thermoplastic
lining; threaded ends; and 300 -psig (2070 -kPa) minimum working pressure at 225 deg F
(107 deg C).
UTILITY MATERIALS
02080-4
t
1
t
1
fl
Ll
1
t
r `
F.
Pressure - Sensitive Pipe Markers: Manufacturer's standard preprinted, permanent- adhesive, color- coded,
pressure - sensitive vinyl, complying with ASME A 13.1.
Plastic Duct Markers
following color - codes:
Green: Cold air.
I UTILITY MATERIALS
Manufacturer's standard color -coded laminated plastic. Comply with the
112080-5
LION SQUARE LODGE NORTH
Vail, Colorado
7. Dielectric Nipples: Electroplated steel nipple; with inert and noncorrosive, thermoplastic lining;
plain, threaded, or grooved ends; and 300 -psig (2070 -kPa) minimum working pressure at 225
deg F (107 deg C).
B.
Mechanical sleeve seals for pipe penetrations through exterior building walls are specified in Division 15
Section "Basic Mechanical Materials and Methods."
C.
Sleeves: The following materials are for wall, floor, slab, and roof penetrations:
1. Steel Sheet Metal: 0.0239 -inch (0.6 -mm) minimum thickness, galvanized, round tube closed with
welded longitudinal joint_
2. Steel Pipe: ASTM A 53, Type E, Grade A, Schedule 40, galvanized, plain ends.
3. Cast Iron: Cast or fabricated wall pipe equivalent to ductile -iron pressure pipe, with plain ends
and integral water stop, unless otherwise indicated.
4_ PVC Plastic: Manufactured, permanent, with nailing flange for attaching to wooden forms.
5. PVC Plastic Pipe: ASTM D 1785, Schedule 40.
6. PE Plastic: Manufactured, reusable, tapered, cup - shaped, smooth outer surface; with nailing
flange for attaching to wooden forms.
2.4
IDENTIFYING DEVICES AND LABELS
A.
General: Manufacturer's standard products of categories and types required for each application as
referenced in other Division 2 Sections. If more than one type is specified for application, selection is
Installer's option, but provide one selection for each product category.
B.
Equipment Nameplates: Metal nameplate with operational data engraved or stamped; permanently
fastened to equipment.
1. Data: Manufacturer, product name, model number, serial number, capacity, operating and power
characteristics, labels of tested compliances, and similar essential data.
2. Location: An accessible and visible location.
C.
Stencils: Standard stencils, prepared for required applications with letter sizes complying with
recommendations of ASME A13.1 for piping and similar applications, but at least I -1/4 -inch- (30 -mm -)
high letters for ductwork and at least 3/4 -inch- (19 -min -) high letters for access door signs and similar
operational instructions.
I. Material: Fiberboard.
2. Material: Brass.
3. Stencil Paint: Standard exterior -type stenciling enamel; black, unless otherwise indicated; either
brushing grade or pressurized spray -can form and grade.
4. Identification Paint: Standard identification enamel of colors indicated or, if not otherwise
indicated for piping systems, comply with ASME A 13.1 for colors.
D.
Snap -On Plastic Pipe Markers: Manufacturer's standard preprinted, semirigid, snap on, color- coded,
complying with ASME A 13.1.
r `
F.
Pressure - Sensitive Pipe Markers: Manufacturer's standard preprinted, permanent- adhesive, color- coded,
pressure - sensitive vinyl, complying with ASME A 13.1.
Plastic Duct Markers
following color - codes:
Green: Cold air.
I UTILITY MATERIALS
Manufacturer's standard color -coded laminated plastic. Comply with the
112080-5
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Yellow: Hot air.
3. Yellow /Green or Green: Supply air.
4. Blue: Exhaust, outside, return, and mixed air.
5. For hazardous exhausts, use colors and designs recommended by ASME A13.1.
6. Nomenclature: Include the following:
a. Direction of airflow.
b. Duct service.
C. Duct origin.
d. Duct destination.
e. Design cubic feet/minute (Liters /second).
G.
faq
Engraved Plastic- Laminate Signs: ASTM D 709, Type 1, cellulose, paper -base, phenolic- resin - laminate
engraving stock; Grade ES -2, black surface, black phenolic core, with white melamine subcore, unless
otherwise indicated.
I . Fabricate in sizes required for message.
2. Engraved with engraver's standard letter style, of sizes and with wording to match equipment
identification.
3. Punch for mechanical fastening.
4. Thickness: 1/16 inch (1.6 mm), unless otherwise indicated.
5. Thickness: 1/8 inch (3.2 mm), unless otherwise indicated.
6. Thickness: 1/16 inch (1.6 mm), for units up to 20 sq. in. (130 sq. em) or 8 inches (200 mm) long;
1/8 inch (3.2 mm) for larger units.
7. Fasteners: Self- tapping stainless -steel screws or contact -type permanent adhesive.
Plastic Equipment Markers: Color -coded laminated plastic. Comply with the following color- codes:
I . Green: Cooling equipment and components.
2. Yellow: Heating equipment and components.
3. Yellow /Green: Combination cooling and heating equipment and components.
4. Brown: Energy reclamation equipment and components.
5. Blue: Equipment and components that do not meet any criteria above.
6. For hazardous equipment, use colors and designs recommended by ASME A 13.1.
7. Nomenclature: Include the following, matching terminology on schedules as closely as possible:
a. Name and plan number.
b. Equipment service.
C. Design capacity.
d. Other design parameters such as pressure drop, entering and leaving conditions, and
revolutions /minute.
8. Size: Approximate 2 -1/2 by 4 inches (65 by 100 mm) for control devices, dampers, and valves;
and 4-1/2 by 6 inches (1 15 by 150 nvn) for equipment.
Lettering and Graphics: Coordinate names, abbreviations, and other designations used in mechanical
identification with corresponding designations indicated. Use numbers, lettering, and wording indicated
for proper identification and operation /maintenance of mechanical systems and equipment.
Multiple Systems: If multiple systems of same generic name are indicated, provide identification
that indicates individual system number and service.
2.5
GROUT
UTILITY MATERIALS
02080-6
1
1
r
it
1
1
t
t
t
t
LION SQUARE LODGE NORTH
Vail, Colorado
A. Nonshrink, Nonmetallic Grout: ASTM C 1107, Grade B.
1. Characteristics: Post - hardening, volume- adjusting, dry, hydraulic - cement grout; nonstaining;
noncorrosive; nongaseous; and recommended for interior and exterior applications.
2. Design Mix: 5000 prig (34.5 MPa), 28 -day compressive strength.
3. Packaging: Premixed and factory packaged.
PART 3 - EXECUTION
3.1 PIPING SYSTEMS - COMMON REQUIREMENTS
A. General: Install piping as described below, unless piping Sections specify otherwise. Individual
Division 2 piping Sections specify unique piping installation requirements.
B. General Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location
and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and
calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as
indicated, unless deviations to layout are approved on Coordination Drawings.
C_ Install piping at indicated slopes.
D. Install components with pressure rating equal to or greater than system operating pressure.
E. Install piping free ofsags and bends.
F. Install exposed interior and exterior piping at right angles or parallel to building walls. Diagonal nuns are
prohibited, unless otherwise indicated.
G. Locate groups of pipes parallel to each other, spaced to pennit valve servicing.
H. Install fittings for changes in direction and branch connections.
1. Install couplings according to manufacturer's written instructions.
J. Sleeves are not required for core drilled holes.
K. Permanent sleeves are not required for holes formed by PE plastic removable sleeves.
L. Verify final equipment locations for roughing -in.
M. Refer to equipment specifications in other Division 2 Sections for roughing -in requirements.
N. Piping Joint Construction: Join pipe and fittings as follows and as specifically required in individual
piping Sections:
L Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
2. Remove scale, slag, dirt, and debris from inside and outside pipe and fittings before assembly.
3. Soldered Joints: Construct joints according to AWS's "Soldering Manual," Chapter "The
Soldering of Pipe and Tube "; or CDA's "Copper Tube Handbook."
4. Soldered Joints: Constnuct joints according to AWS's "Soldering Manual," Chapter "The
Soldering of Pipe and Tube."
5. Soldered Joints: Construct joints according to CDA's "Copper Tube Handbook."
UTILITY MATERIALS
02080-7
1
LION SQUARE LODGE NORTH
Vail, Colorado
6. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," Chapter "Pipe and
Tube."
7. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B 1.20.1. Cut threads
full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full 1D. Join
pipe fittings and valves as follows:
a. Note internal length of threads in fittings or valve ends, and proximity of internal seat or
wall, to determine how far pipe should be threaded into joint.
b. Apply appropriate tape or thread compound to external pipe threads, unless dry seal
threading is specified.
C. Align threads at point of assembly.
d. Tighten joint with wrench. Apply wrench to valve end into which pipe is being threaded.
e. Damaged Threads: Do not use pipe or pipe fittings with corroded or damaged threads. Do
not use pipe sections that have cracked or open welds.
8. Welded Joints: Construct joints according to AWS D10.12, "Recommended Practices and
Procedures for Welding Low Carbon Steel Pipe," using qualified processes and welding operators
according to "Quality Assurance" Article.
9. Flanged Joints: Align flange surfaces parallel. Select appropriate gasket material, size, type, and
thickness for service application. Install gasket concentrically positioned. Assemble joints by
sequencing bolt tightening to make initial contact of flanges and gaskets as flat and parallel as
possible. Use suitable lubricants on bolt threads. Tighten bolts gradually and uniformly using
torque wrench.
10. Plastic Piping Solvent- Cement Joints: Clean and dry joining surfaces by wiping with clean cloth
or paper towels. Join pipe and fittings according to the following:
a. Comply with ASTM F 402 for safe - handling practice of cleaners, primers, and solvent
cements.
b. ABS Plastic Piping: ASTM D 2235 and ASTM D 2661.
C. CPVC Plastic Piping: ASTM D 2846 and ASTM F 493.
d. PVC Plastic, Pressure Piping: ASTM D 2672.
C. PVC Plastic, Nonpressure Piping: ASTM D 2855.
f ABS to PVC Plastic, Nonpressure Transition Fittings: Procedure and solvent cement
according to ASTM D 3138.
ME
It. Plastic Piping Heat - Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or
paper towels. Join according to ASTM D2657 procedures and manufacturer's written
instructions.
a. Plain -End Pipe and Fittings: Use butt fusion.
b. Plain -End Pipe and Socket Fittings: Use socket fusion.
Piping Connections: Make connections according to the following, unless otherwise indicated:
I. Install unions, in piping 2 -inch NPS (DN50) and smaller, adjacent to each valve and at final
connection to each piece of equipment with 2 -inch NPS (DN50) or smaller threaded pipe
connection.
2. Install flanges, in piping 2 -1/2 -inch NPS (DN65) and larger, adjacent to flanged valves and at final
connection to each piece of equipment with flanged pipe connection.
3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar
metals.
4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of
dissimilar metals.
UTILITY MATERIALS
02080-8
1
n
Ll
1
1
t
t
t
t
1�
I
P_j
1
s
3.2 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
LION SQUARE LODGE NORTH
Vail, Colorado
A. Install equipment according to approved submittal data. Portions of the Work are shown only in
diagrammatic form. Refer conflicts to Owner's Representative.
B. Install equipment level and plumb.
C. Install equipment to facilitate service, maintenance, and repair or replacement of equipment components.
Connect equipment for ease of disconnecting, with minimum interference with other installations.
Extend grease fittings to an accessible location.
D. Install equipment giving right of way to piping systems installed at required slope.
3.3 LABELING AND IDENTIFYING
A. Piping Systems: Install pipe markers on each system. Include arrows showing normal direction of flow.
1. Stenciled Markers: According to ASME A13.1.
2. Plastic markers, with application systems. Install on insulation segment if required for hot
noninsulated piping.
3. Locate pipe markers on exposed piping according to the following:
a. Near each valve and control device.
b. ' Near each branch, excluding short takeoffs for equipment and terminal units. Mark each
pipe at branch if flow pattern is not obvious.
C. Near locations if pipes pass through walls or floors, or enter inaccessible enclosures.
d. At manholes and similar access points that permit view of concealed piping.
e. Near major equipment items and other points of origination and termination.
B. Equipment: Install engraved plastic - laminate sign or equipment marker on or near each major item of
equipment.
I . Lettering Size: Minimum 1/4 -inch- (6.35 -mm -) high lettering for name of unit if viewing distance
is less than 24 inches (610 mm), 1/2 inch (12.7 mm) high for distances up to 72 inches (1800 mm),
and proportionately larger lettering for greater distances. Provide secondary lettering two- thirds to
three - fourths of size of principal lettering.
2. Text of Signs: Provide name of identified unit. Include text to distinguish between multiple units,
inform user of operational requirements, indicate safety and emergency precautions, and warn of
hazards and improper operations.
C. Adjusting: Relocate identifying devices that become visually blocked by work of this or other Divisions.
3.4 PAINTING AND FINISHING
A. Refer to Division 9 Section "Painting" for paint materials, surface preparation, and application of paint.
B. Apply paint to exposed piping according to the following, unless otherwise indicated:
I . Ferrous Piping: Use semigloss, acrylic - enamel finish. Include 2 finish coats over rust- inhibitive
metal primer.
2. Galvanized -Steel Piping: Use semigloss, acrylic - enamel finish. Include 2 finish coats over
galvanized metal primer.
I
UTILITY MATERIALS
02080-9
LION SQUARE LODGE NORTH
Vail, Colorado
3. Ferrous Supports: Use semigloss, acrylic - enamel finish. Include 2 finish coats over rust -
inhibitive metal primer.
C. Do not paint piping specialties with factory- applied finish.
D. Damage and Touchup: Repair marred and damaged factory- painted finishes with materials and
procedures to match original factory finish.
3.5 CONCRETE BASES
A. Construct concrete bases of dimensions indicated, but not less than 4 inches (150 mm) larger in both
directions than supported unit. Follow supported equipment manufacturer's setting templates for anchor
bolt and tie locations. Use 3000 psig (20.7 MPa), 28 -day compressive strength concrete and
reinforcement as specified in Division 3 Section, "Cast -in -Place Concrete."
3.6 ERECTION OF METAL SUPPORTS AND ANCHORAGE
A. Cut, fit, and place miscellaneous metal supports in location, alignment, and elevation to support and
anchor utility piping materials and equipment.
B. Field Welding: Comply with AWS D1.1, "Structural Welding Code -- Steel."
3.7 ERECTION OF WOOD SUPPORTS AND ANCHORAGE
A. Cut, fit, and place wood grounds, nailers, blocking, and anchorage to support and anchor utility materials
and equipment.
B. Select fastener sizes that will not penetrate members if opposite side will be exposed to view or will
receive finish materials. Make tight connections between members. Install fasteners without splitting
wood members.
C. Attach to substrates as required to support applied loads.
3.8 DEMOLITION
A_ Disconnect, demolish, and remove work specified in Division 2 Sections.
B. If pipe, insulation, or equipment to remain is damaged or disturbed, remove damaged portions and install
new products of equal capacity and quality.
C. Accessible Work: Remove indicated exposed pipe in its entirety_
D. Work Abandoned in Place: Cut and remove underground pipe a minimum of 2 inches (50 mm) beyond
face of adjacent construction. Cap and patch surface to match existing finish.
E. Removal: Remove indicated equipment from Project site.
F_ Temporary Disconnection: Remove, store, clean, reinstall, reconnect, and make operational equipment
indicated for relocation.
UTILITi MATERIALS 02080-10
LION SQUARE LODGE NORTH
Vail, Colorado
3.9 CUTTING AND PATCHING
A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces necessary for utility
piping installations. Perform cutting by skilled mechanics of trades involved.
B. Repair cut surfaces to match adjacent surfaces.
3.10 GROUTING
A. Install nonmetallic, nonshrink grout for equipment- support bearing surfaces, pump and other equipment
support plates, and anchors. Mix grout according to manufacturer's written instructions_
B. Clean surfaces that will come into contact with grout.
C. Provide forms as required for placement of grout.
D. Avoid air entrapment during placing of grout.
E. Place grout on concrete bases to provide smooth bearing surface for equipment.
F. Place grout around anchors.
G. Cure placed grout according to manufacturer's written instructions.
END OF SECTION 02080
UTILITY MATERIALS 02080- 11
LION SQUARE LODGE NORTH
Vail, Colorado
1
t
1
SECTION 02085 - INTERCEPTORS
PART I - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. [Authority having jurisdiction's standard] [Cast -in- place] concrete grease
interceptors.
2. Cast -iron or steel oil interceptors.
3. [Authority having jurisdiction's standard] [Cast -in- place] concrete sediment
interceptors.
1.2 SUBMITTALS
A_ Product Data: For each type of metal [oil] [and] [sediment] interceptor indicated. Include
materials of fabrication, dimensions, rated capacities, retention capacities, operating
characteristics, size and location of each pipe connection, furnished specialties, and accessories.
B. Shop Drawings: For each type and size of precast concrete interceptor indicated. Include
materials of construction, dimensions, rated capacities, retention capacities, location and size of
each pipe connection, furnished specialties, and accessories.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to
product selection:
I. Available Manufacturers: Subject to compliance with requirements, manufacturers
offering products that may be incorporated into the Work include, but are not limited to,
manufacturers specified.
2. Manufacturers: Subject to compliance with requirements, provide products by one of the
manufacturers specified.
GREASEINTERCEPTORS
A. Grease Interceptors: Cast -in- place- concrete or precast concrete structure complying with
requirements of <lnsert authority title >.
B. Grease Interceptors: Precast concrete complying with ASTM C 913. Include rubber - gasketed
joints. [vent connections, ]manholes, compartments or baffles, and piping or openings to retain
grease and to permit wastewater flow.
INTERCEPTORS
02085- 1
1
LION SQUARE LODGE NORTH
Vail, Colorado
Structural Design Loads:
a. Light- Traffic Load: Comply with ASTM C 890, A -8 (ASSHTO HS 10- 44).
b. Medium -Traffic Load: Comply with ASTM C 890, A -12 (ASSHTO HS15 -44).
C. Heavy - Traffic Load: Comply with ASTM C 890, A -16 (ASSHTO HS20 -44).
d. Walkway Load: Comply with ASTM C 890, A -03.
2. Resilient Pipe Connectors: AS I ( 023 (ASTM C 9231.1), cast or fitted into interceptor
walls, for each pipe connection.
3. Steps: Individual FRP steps, FRP ladder, or ASTM A 615/A 6I5M, deformed, I r2 2 -inch
t 13 -rnm ) steel reinforcing rods encased in ASTM D 4101, PP, wide enough to allow
worker to place both feet on I step and designed to prevent lateral slippage off of step.
Cast or anchor steps into sidewalls at 12- to 16 -inch (300- to 400 -nnr) intervals. Omit
steps if total depth frotn floor of interceptor to finished grade is less than [6(I inches
(1500 mm)] <Insert other >.
4. Grade Rings: Reinforced- concrete rings, 6- to 9 -inch (150- to 225-min) total thickness,
to snatch diameter of manhole frame and cover.
5. Manhole Frames and Covers: Ferrous; 24 -inch (610 -mm) ID by it) 9 -inch (175- to
225 -mm) riser with ( 100 -mm -) minimum width flange and 26-inch- (660 -mm -)
diameter cover.
a. Ductile Iron: ASTM A 536, Grade 6040 -18, unless otherwise indicated.
b. Gray Iron: ASTM A 48, Class 35, unless otherwise indicated.
C. Include indented top design with lettering cast into cover, using wording
equivalent to "[INTERCEPTOR] [GREASE INTERCEPTOR] [SANITARY
SEWER] <Insert other >."
C
Grease Interceptor Capacity and Characteristics:
I. Length by Width by Depth: <Insert values.>
2. Number of Compartments: [One] [Two] <Insert other >_
3. Retention Capacity: <Insert value.>
4. [Inlet and ]Outlet Pipe Size: <Insert value.>
a. Centerline of Inlet to Floor: <Insert value.>
b_ Centerline of Outlet to Floor: <Insert value.>
2.3
A
5. Trapped Outlet Required: [Integral] [No] [Yes].
6. Vent Pipe Size: [Not required] <Insert value >.
7. Installation Position: [Top flush with grade] [Underground with manhole riser to
grade] <Insert other >.
OIL INTERCEPTORS
Oil Interceptors: Factory - fabricated, cast -iron or steel body; with removable sediment bucket or
strainer, baffles, vents, and flow - control fitting on inlet.
[Available ]Manufacturers:
a. Enpoco Div.; Watts Industries, Inc.
INTERCEPTORS
02085-2
fl
t
Ll
1
fl
1
1
t
l
n
t
1
r
LION SQUARE LODGE NORTH
Vail, Colorado
b. Josam Company.
C. MIFAB Manufacturing Inc.
d. Rockford Sanitary Systems, Inc.
e. Schier Products Company_
f. Smith, Jay R. Mfg. Co.
g. Wade Div.; Tyler Pipe.
h. Waterlink, Inc.
i. Watts Industries, Inc.
j. Zum Specification Drainage Products; Zurn Plumbing Products Group.
k. <Insert manufacturer's name.>
2. Inlet, Outlet, Vent, and Waste -Oil Outlet Piping Connections: Hub, hubless, or threaded,
unless otherwise indicated.
3. Extension: Cast -iron or steel shroud, full size of interceptor, extending from top of
interceptor to grade.
4. Cover: Cast iron or steel, with steel reinforcement to provide ASTM C 890, [A -03,
walkway] <Insert other> load.
5. Waste -oil storage tank and piping are specified in Division 2 Section "Fuel Oil
Distribution."
B. Oil Interceptors: Plastic body; with removable sediment bucket or strainer, baffles, vents, and
flow - control fitting on inlet.
I . [Available ]Manufacturers for FRP Units:
a. Proceptor Div.; Green Turtle Technologies, Ltd.
b. Waterlink, Inc.
C. <Insert manufacturer's name.>
d. [Available ]Manufacturers for PE or HDPE Units:
1) Schier Products Company.
2) Town & Country Plastics, Inc.
3) <Insert manufacturer's name.>
2. Inlet, Outlet, Vent, and Waste -Oil Outlet Piping Connections: Hub, hubless, or threaded,
unless otherwise indicated.
3. Extension: Plastic shroud, full size of interceptor, extending fi top of interceptor to
grade.
4. Cover: Plastic[ with steel reinforcement to provide ASTM C 890,] [A -03, walkway]
<Insertother> load.
5_ Waste -oil storage tank and piping are specified in Division 2 Section "Fuel Oil
Distribution."
C. Oil Interceptor Capacity and Characteristics:
I. Capacity: [Not applicable] <Insert value.>
2. Overall Dimensions: <Insert values.>
3. Inlet and Outlet Pipe Size: <Insert value.>
a. Centerline of Inlet to Floor: <Insert value.>
b. Centerline of Outlet to Floor: <Insert value.>
INTERCEPTORS 02085-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
4. Waste -Oil- Outlet Pipe Size: <Insert value.>
a. Centerline of Outlet to Floor: <Insert value.> i
5. Trapped Outlet Required: [Integral] [No] [Yes].
6. Vent Pipe Size: <Insert value.>
7. Installation Position: [Top flush with grade) [Underground with extension to grade).
8. Waste -Oil Storage Tank: [Not required] <Insert value >.
2.4 SEDIMENT INTERCEPTORS
A. Sediment Interceptors: Cast -in- place- concrete or precast concrete structure complying with
requirements of <Insert authority title.
B. Sediment Interceptors: Precast concrete comply with ASTM C 913. Include rubber- gasketed
joints, vent connections, manholes, compartments or baffles, and piping or openings to retain
grease and to permit wastewater flow.
1. Structural Design Loads: j
a. Light - Traffic Load: Comply with ASTM C 890, A -8 (ASSHTO HS 10- 44).
b. Medium - Traffic Load: Comply with ASTM C 890, A -12 (ASSHTO HS 15-44).
C. Heavy Traffic Load. Comply with ASTM C 890, A -] 6 (ASSHTO HS20 -44).
d. Walkway Load: Comply with ASTM C 890, A -03.
2. Resilient Pipe Connectors:
;SST \ 1 CO2 (ASTM (.' 923VI), cast or fitted into interceptor
sidewalls, for each pipe connection.
3. Steps: Individual FRP steps, FRP ladder, or ASTM A 615/A 6I5M, defonned, i
113 -mtn steel reinforcing rods encased in ASTM D 4101, PP, wide enough to allow
worker to place both feet on I step and designed to prevent lateral slippage off of step.
Cast or anchor steps into sidewalls at 12- to I(1 -inch (00- to =100 -rim) intervals. Omit
if
steps total depth from floor of interceptor to finished grade is less than [60 inchc'
(14 mm)] <Insert other >_
4. Grade Rings: Reinforced - concrete rings, O- to �;(t- to ?15 - mm) total thickness,
to match diameter of manhole frame and cover.
5. Manhole Frames and Covers: Ferrous; 24 -inch (610 -min) ID by 7- to 9 -inc'a ( 175- to
'2� -m;nl riser with 4 - inch - ( 100 -mm -) minimum width flange and 2()-inch- (6n0 -mm -1
diameter cover.
a. Ductile Iron: ASTM A 536, Grade 60- 40 -18, unless otherwise indicated.
b. Gray Iron: ASTM A 48, Class 35, unless otherwise indicated.
C. Include indented top design with lettering cast into cover, using wording
equivalent to the following:
I} Sediment Interceptors in Sanitary Sewerage System: "[INTERCEPTOR]
[SEDIMENT INTERCEPTOR] [SANITARY SEWER] <Insert other >."
2) Sediment Interceptors in Storm Drainage System: "[INTERCEPTOR]
[SEDIMENT INTERCEPTOR] [STORM SEWER] <Insert other >."
INTERCEPTORS
02085 -4
2.5 PRECAST CONCRETE MANHOLE RISERS
A. Precast Concrete Manhole Risers: :'.ti 1 `,i ( .T" > (AST14 C =178)4), with rubber - gasket joints.
B. Precast Concrete Manhole Risers: ASTM C 913, [30 - iuch (915 -mur)] <Insert other> ID.
Include rubber - gasketed joints.
I . Structural Design Loads:
a. Light - Traffic Load: Comply with ASTM C 890, A -8 (ASSHTO HS10- 44).
b. Medium -Traffic Load: Comply with ASTM C 890, A -12 (ASSHTO HS15 -44).
C. Heavy - Traffic Load: Comply with ASTM C 890, A -16 (ASSHTO HS20 -44).
d. Walkway Load: Comply with ASTM C 890, A -03.
2. Length: From top of underground concrete structure to grade.
3. Riser Sections: � ;,;c : C-� mm i minimum thickness and (915 -min)] <Insert
other> diameter.
4. Top Section: Eccentric cone, unless otherwise indicated. Include top of cone to match
grade ring size.
5. Gaskets: ',. i":i (_ X13 (1STNI ('443M), rubber.
6. Steps: Individual FRP steps, FRP ladder, or ASTM A 615/A 615M, deformed,
t 1 1 -mmi steel reinforcing rods encased in ASTM D 4101, PP, wide enough to allow
INTERCEPTORS
02085-5
I I
L ION SQUA LODGE NORTH
Vail, Colorado
6.
Cast Ferrous Gratings: Frame and [flat grate with small- square or short slotted
drainage openings] <Insert other >.
a. Ductile Iron: ASTM A 536, Grade 60-40 -18, unless otherwise indicated.
b. Gray Iron: ASTM A 48, Class 35, unless otherwise indicated.
C. Minimum Size: [24 l.nv 24 inches (610 by 61.0 uun)] <Insert other >, unless
otherwise indicated.
d. Free Area: Approximately [50] <Insert other> percent, unless otherwise
indicated.
7.
Steel Gratings: Steel frame and welded heavy -duty steel grating with galvanized finish.
Refer to Division 5 Section "Gratings."
C. Sediment Interceptor Capacity and Characteristics:
1.
Length by Width by Depth: <Insert values.>
2.
Number of Compartments: [One] [Two] <Insert other >.
3.
Retention Capacity: <Insert value.>
4.
[Inlet and ]Outlet Pipe Size: <Insert value.>
a. Centerline of Inlet to Floor: [Not required] <Insert value.>
b. Centerline of Outlet to Floor: <Insert value.>
I
C. Trapped Outlet Required: [Integral] [No] [Yes].
5_
6.
Vent Pipe Size: [Not required] <Insert value >.
Installation Position: [Top flush with grade] [Underground with extension to grade]
[Underground with manhole riser to grade] <Insert other >.
2.5 PRECAST CONCRETE MANHOLE RISERS
A. Precast Concrete Manhole Risers: :'.ti 1 `,i ( .T" > (AST14 C =178)4), with rubber - gasket joints.
B. Precast Concrete Manhole Risers: ASTM C 913, [30 - iuch (915 -mur)] <Insert other> ID.
Include rubber - gasketed joints.
I . Structural Design Loads:
a. Light - Traffic Load: Comply with ASTM C 890, A -8 (ASSHTO HS10- 44).
b. Medium -Traffic Load: Comply with ASTM C 890, A -12 (ASSHTO HS15 -44).
C. Heavy - Traffic Load: Comply with ASTM C 890, A -16 (ASSHTO HS20 -44).
d. Walkway Load: Comply with ASTM C 890, A -03.
2. Length: From top of underground concrete structure to grade.
3. Riser Sections: � ;,;c : C-� mm i minimum thickness and (915 -min)] <Insert
other> diameter.
4. Top Section: Eccentric cone, unless otherwise indicated. Include top of cone to match
grade ring size.
5. Gaskets: ',. i":i (_ X13 (1STNI ('443M), rubber.
6. Steps: Individual FRP steps, FRP ladder, or ASTM A 615/A 615M, deformed,
t 1 1 -mmi steel reinforcing rods encased in ASTM D 4101, PP, wide enough to allow
INTERCEPTORS
02085-5
I I
t
LION SQUARE LODGE NORTH
Vail, Colorado
worker to place both feet on 1 step and designed to prevent lateral slippage off of step.
Cast or anchor steps into sidewalls at 12- to 16 -inch (300- to 400 - mm) intervals. Omit
steps if total depth from floor of interceptor to finished grade is less than [60 inches
(1500 nun)] <Insert other >.
C.
Q
Grade Rings: Reinforced - concrete rings, 6- to 9 -inch (ISo - to 225 - mm) total thickness, to
match diameter of manhole frame and cover.
Manhole Frames and Covers: Ferrous; 24 -inch (610 -mm) ID by 7- to 9 -inch (175- to 225 - mm)
riser with 4 -inch- (]O0 - mm -) minimum width flange and 26 -inch- (660 -nun -) diameter cover.
1. Ductile Iron: ASTM A 536, Grade 6040 -18, unless otherwise indicated.
2. Gray Iron: ASTM A 48, Class 35, unless otherwise indicated.
3. Include indented top design with lettering cast into cover, using wording equivalent to the
following:
a. Grease Interceptors in Sanitary Sewerage System: "[INTERCEPTOR]
[GREASE INTERCEPTOR] [SANITARY SEWER] <Insert other >."
b. Oil Interceptors in Sanitary Sewerage System: "[INTERCEPTOR] [OIL
INTERCEPTOR] [SANITARY SEWER] <Insert other >."
C. Sediment Interceptors in Sanitary Sewerage System: "[INTERCEPTOR]
[SEDIMENT INTERCEPTOR] [SANITARY SEWER] <Insert other >."
d. Sediment Interceptors in Storm Drainage - System: "[INTERCEPTOR]
[SEDIMENT INTERCEPTOR] [STORM SEWER] <Insert other >_"
PART 3 - EXECUTION
3.1 EARTHWORK
W
3.2
A
R
C.
D.
E.
F.
G.
Excavating, trenching, and backfilling are specified in Division 2 Section "Earthwork."
INSTALLATION
Install interceptor inlets and outlets at elevations indicated.
Install precast concrete interceptors according to ASTM C 891. Set level and plumb.
Install manhole risers fi•otn top of underground concrete interceptors to manholes and gratings
at finished grade.
Set tops of manhole frames and covers flush with finished surface in pavements. Set tops [:
.nChQS (75 mm)] <Insert other> above finish surface elsewhere, unless otherwise indicated.
Set tops of grating frames and grates flush with finished surface.
Set [metal] [metal and plastic] [plastic] interceptors level and plumb.
Set tops of metal interceptor covers flush with finished surface in pavements. Set tops [ 7 Z ieitc�
(75 nun)] <Insert other> above finish surface elsewhere, unless otherwise indicated.
INTERCEPTORS
02085-6
J
t
fl
1
1
r
t
w
LION SQUARE LODGE NORTH
Vail, Colorado
H. Install piping and oil storage tanks according to Division 2 Section "Fuel Oil Distribution."
I. Piping installation requirements are specified in other Division 2 Sections. Drawings indicate
general arrangement of piping, fittings, and specialties.
J. Make piping connections between interceptors and piping systems.
K. Identification materials and installation are specified in Division 2 Section "Earthwork."
Arrange for installation of green warning tapes directly over piping and at outside edges of
underground interceptors.
1. Use warning tapes or detectable warning tape over ferrous piping.
L. Use detectable warning tape over nonferrous piping and over edges of underground structures.
END OF SECTION 02085
INTERCEPTORS 02085-7
1
I
SECTION 02260 - EXCAVATION SUPPORT AND PROTECTION
LION SQUARE LODGE NORTH
Vail, Colorado
PARTI - GENERAL
1.01 SUMMARY
A. This Section includes excavation support and protection systems.
B. Related Section: Division 2 Section "Earthwork" for excavating and backfmlling.
1.02 PERFORMANCE REQUIREMENTS
A. Design, provide, monitor, and maintain an anchored and braced excavation support and protection system
capable of resisting soil and hydrostatic pressure and supporting sidewalls of excavations.
Work includes removing excavation support and protection systems when no longer needed.
Prevent surface water from entering excavations by grading, dikes, or other means.
Install excavation support and protection systems without damaging existing buildings, pave-
ments, and other improvements adjacent to excavation.
1.03 SUBMITTALS
A. Submittals not required for typical open -cut excavations, provided that these excavations meet require-
ments of authority having jurisdiction.
Shop Drawings: Prepared by or tinder the supervision of a qualified professional engineer for ex-
cavation support and protection systems_ System design and calculations must be acceptable to
authorities having jurisdiction.
Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate
their capabilities and experience. Include lists of completed projects with project names and ad-
dresses, names and addresses of architects and owners, and other information specified.
Photographs or videotape, sufficiently detailed, of existing conditions of adjoining constriction
and site improvements that might be misconstrued as damage caused by excavation support and
protection systems.
1.04 QUALITY ASSURANCE
A. Installer Qualifications: Engage an experienced installer to assume engineering responsibility and per-
form work of this Section who has specialized in installing excavation support and protection systems
similar to those required for this Project and with a record of successful in- service performance.
B. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in the
jurisdiction where the Project is located and who is experienced in providing engineering services for de-
signing excavation support and protection systems that are similar to those indicated for this Project in
material, design, and extent.
Engineering Responsibility: Engage a qualified professional engineer to prepare or supervise the
preparation of data for the excavation support and protection system including drawings and com-
prehensive engineering analysis that shows the system's compliance with specified requirements.
1.05 PROJECT CONDITIONS
A. Existing Utilities: Do not intefftupt utilities serving facilities occupied by the Owner or others unless
permitted in writing by the Owner's Representative and then only after arranging to provide temporary
utility services according to requirements indicated.
EXCAVATION SUPPORT AND PROTECTION
02260-1
t
3.01 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement,
lateral movement, undermining, washout, and other hazards that could develop during excavation support
and protection system operations.
I. Shore, support, and protect utilities encountered.
B. Install excavation support and protection systems to ensure minimum interference with roads, streets,
walks, and other adjacent occupied and used facilities. f
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without per-
mission from Owner's Representative and authorities having jurisdiction. Provide alternate routes
around closed or obstructed traffic ways if required by governing regulations.
C. Locate excavation support and protection systems clear of permanent construction and to permit forming
and finishing of concrete surfaces.
D. Monitor excavation support and protection systems daily during excavation progress and for as long as
excavation remains open_ Promptly correct bulges, breakage, or other evidence of movement to ensure
excavation support and protection systems remain stable.
E. Promptly repair damages to adjacent facilities caused by installing excavation support and protection sys-
tems.
EXCAVATION SUPPORT AND PROTECTION 02260-2
LION SQUARE LODGE NORTH
Vail, Colorado
B.
Project Site Information: A geotechnical report has been prepared for this Project and is available for in-
formation only. The report is not part of the Contract Documents. The opinions expressed in this report
are those of the geotechnical engineer and represent interpretations of the subsoil conditions, tests, and re-
sults of analyses conducted by the geotechnical engineer. Owner will not be responsible for interpreta-
tions or conclusions drawn from this data by Contractor.
1. Make additional test borings and conduct other exploratory operations as necessary.
2. The geotechnical report is included elsewhere in the Project Manual.
C.
Survey adjacent structures and improvements, employing a qualified professional engineer or surveyor;
establish exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record
existing elevations.
1. During installation of excavation support and protection systems, regularly resurvey benchmarks,
,
maintaining an accurate log of surveyed elevations for comparison with original elevations.
Promptly notify Owner's Representative if changes in elevations occur or if cracks, sags, or other
damage is evident in adjacent construction.
PART 2-
PRODUCTS
2.01
MATERIALS
A.
Materials need not be new but must be in serviceable condition.
B.
Structural Steel: ASTM A 36 (ASTM A 36M).
t
C.
D.
Steel Sheet Piling: ASTM A 328 (ASTM A 328M) or ASTM A 572 (ASTM A 572M)
Wood Lagging:
Lumber, mixed hardwood, nominal rough thickness of 3 inches (75 mm).
PART 3
- EXECUTION
,
3.01 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement,
lateral movement, undermining, washout, and other hazards that could develop during excavation support
and protection system operations.
I. Shore, support, and protect utilities encountered.
B. Install excavation support and protection systems to ensure minimum interference with roads, streets,
walks, and other adjacent occupied and used facilities. f
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without per-
mission from Owner's Representative and authorities having jurisdiction. Provide alternate routes
around closed or obstructed traffic ways if required by governing regulations.
C. Locate excavation support and protection systems clear of permanent construction and to permit forming
and finishing of concrete surfaces.
D. Monitor excavation support and protection systems daily during excavation progress and for as long as
excavation remains open_ Promptly correct bulges, breakage, or other evidence of movement to ensure
excavation support and protection systems remain stable.
E. Promptly repair damages to adjacent facilities caused by installing excavation support and protection sys-
tems.
EXCAVATION SUPPORT AND PROTECTION 02260-2
LION SQUARE LODGE NORTH
Vail, Colorado
3.02 SOLDIER BEAMS AND LAGGING
A. Install steel soldier piles before stating excavation. Space soldier piles at intervals indicated. Accurately
align exposed faces of flanges to vary not more than 2 inches (50 mm) from a horizontal line and not
more than 1:120 out of vertical alignment.
B. Install wood lagging within flanges of soldier piles as excavation proceeds. Trim excavation as required
to install lagging. Fill voids behind lagging with soil, and compact.
C. Install wales horizontally at centers indicated and secure to soldier piles.
3.03 SHEET PILING
A. Install one -piece sheet piling and tightly interlock to form a continuous barrier. Accurately align exposed
faces of sheet piling to vary not more than 2 inches (50 mm) from a horizontal line and not more than
I : 120 out of vertical alignment. Cut tops of sheet piling to uniform elevation at top of excavation.
3.04 TIEBACKS
A. Tiebacks: Drill for, install, tension, and grout tiebacks into position. Test load- carrying capacity of each
tieback and replace and retest deficient tiebacks.
3.05 BRACING
A. Bracing: Locate bracing to clear columns, floor framing construction, and other permanent work. if nec-
essary to move a brace, install new bracing before removing original brace.
I. Do not place bracing where it will be cast into or included in permanent concrete work, unless
otherwise approved by Owner's Representative.
2_ Install internal bracing, if required, to prevent spreading or distortion of braced frames.
3. Maintain bracing until structural elements are supported by other bracing or until penuanent con -
struction is able to withstand lateral earth and hydrostatic pressures.
3.06 REMOVAL AND REPAIRS
A. Remove excavation support and protection systems when construction has progressed sufficiently to sup-
port excavation and bear soil and hydrostatic pressures. Remove in stages to avoid disturbing underlying
soils and damaging structures, pavements, facilities, and utilities.
I. Remove excavation support and protection systems to a minimum depth as recommended by the
Civil Engineer below overlying construction and abandon remainder.
2. Repair or replace, as approved by Owner's Representative, adjacent work damaged or displaced
by removing excavation support and protection systems.
END OF SECTION 02260
EXCAVATION SUPPORT AND PROTECTION 02260-3
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02300 - EARTHWORK
PART 1-GENERAL
I.1 SUMMARY
A. This Section includes the following:
1. Preparing subgrades for slabs -on- grade, walks, pavements, lawns, and plantings.
2. Excavating and backfilling for buildings and structures.
3. Drainage course for slabs -on- grade.
4. Subsurface drainage backfill for walls and trenches.
5. Excavating and backfilling trenches within building lines.
6. Excavating and backfilling trenches for buried mechanical and electrical utilities and pits for
buried utility strictures.
7. Rock excavation.
1.2 DEFINITIONS
A. Backfill: Soil materials used to fill an excavation.
I. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support
sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Bedding Course: Layer placed over the excavated subgrade in a trench before laying pipe.
C. Borrow: Satisfactory soil imported from off -site for use as fill or backfill.
D. Drainage Course: Layer supporting slab -on -grade used to minimize capillary flow of pore water.
E. Excavation: Removal of material encountered above subgrade elevations_
1. Additional Excavation: Excavation below subgrade elevations as directed by Architect.
Additional excavation and replacement material will be paid for according to Contract provisions
for changes in the Work.
2. Bulk Excavation: Excavations more than 10 feet in width and pits more than 30 feet in either
length or width.
3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated dimensions
without direction by Architect. Unauthorized excavation, as well as remedial work directed by
Architect, shall be without additional compensation_
F. Fill: Soil materials used to raise existing grades.
G. Rock: Rock material in beds, ledges, unstratitied masses, and conglomerate deposits and boulders of
rock material exceeding I cu_ yd. for bulk excavation or 3/4 cu. yd. for footing, trench, and pit excavation
that cannot in Architect's opinion be removed by rock excavating equipment equivalent to the following
in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting, when
permitted:
1. Excavation of Footings, Trenches, and Pits: Late - model, track - mounted hydraulic excavator;
equipped with a 42 -inch- wide, short -lip- radius rock bucket: rated at not less than 120 -hp
EARTHWORK
02300-1
LION SQUARE LODGE NORTH
Vail, Colorado
flywheel power with bucket - curling force of not less than 25,000 lbf and stick -crowd force of not
less than 18,700 lbf; measured according to SAE J -1179.
2. Bulk Excavation: Late - model, track - mounted loader; rated at not less than 210 -hp flywheel power
and developing a minimum of 45,000 -lbf breakout force; measured according to SAE J -732,
H. Rock: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of
rock material 3/4 cu. yd. or more in volume that when tested by an independent geotechnical testing
agency, according to ASTM D 1586, exceeds a standard penetration resistance of 100 blows /2 inches.
I. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and
electrical appurtenances, or other man -made stationary features constructed above or below the ground
surface.
1. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill
immediately below subbase, drainage fill, or topsoil materials.
K. Utilities include on -site underground pipes, conduits, ducts, and cables, as well as underground services
within buildings.
1.3 SUBMITTALS
A. Product Data: For the following:
I . Each type of plastic warning tape.
2. Drainage fabric.
3. Separation fabric.
B. Samples: For the following:
1. 30 -lb samples, sealed in airtight containers, of each proposed soil material from on -site or borrow
sources_
2. 12 -by -12 -inch sample of drainage fabric_
3. 12 -by -12 -inch sample of separation fabric.
C. Material Test Reports: From a qualified testing agency indicating and interpreting test results for
compliance of the following with requirements indicated:
I . Classification according to ASTM D 2487 of each on -site or borrow soil material proposed for fill
and backfill.
2. Laboratory compaction curve according to ASTM D 698 for each on -site or borrow soil material
proposed for fill and backfill.
3. Laboratory compaction curve according to ASTM D 1557 for each on -site or borrow soil material
proposed for fill and backfill.
1.4 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: An independent testing agency qualified according to
ASTM E 329 to conduct soil materials and rock - definition testing, as documented according to
ASTM D 3740 and ASTM E 548.
B. Pre - excavation Conference: Conduct conference at Project site to comply with requirements in
Division 1 Section "Project Meetings."
EARTHWORK 02300-2
LION SQUARE LODGE NORTH
Vail, Colorado
1.5 PROJECT CONDITIONS
A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless
permitted in writing by Architect and then only after arranging to provide temporary utility services
according to requirements indicated:
I . Notify Architect not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Architect's written permission.
3. Contact utility- locator service for area where Project is located before excavating.
B. Demolish and completely remove from site existing underground utilities indicated to be removed.
Coordinate with utility companies to shut off services if lines are active.
PART 2 - PRODUCTS
r
SOIL MATERIALS
2.1
General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from
excavations.
B. Satisfactory Soils: As approved by the Soil's Engineer for intended use and specifically for the required
location or purpose, reference the Geotechnical report prepared by MFG Telluride on November
2005 per ASTM D 698.
C. Foundation Wall Backfill: On site soil materials as approved by the Soil's Engineer.
D. Over - excavation and Recommendation Zone: As specified for structural fill
E. Drainage Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone,
reasonably uniform size, with maximum size of 1.5 inches and not more than 5% passing a No. 200 sieve,
as acceptable to the Soils Engineer.
F. Bedding: The pipe shall be carefully bedded as shown in the bedding details. Provide Class "B" minimum
bedding for PVC sanitary sewer pipe Class "C' minimum bedding for all other pipe except for ductile
iron water pipe
1. Class B Bedding (Granular Foundation): Defined as the method of bedding in which the pipe is set
on compacted granular material supporting the lower %z of the pipe barrel.
a. Compacted Granular Material: Shall be a well graded gravelly material meeting the
following requirements and compacted to 95% of the maximum dry density as determined
by ASTM D698
EARTHWORK
U.S. Standard Sieve
Size
Percent Weight by
passing Type l
Square Mesh Sieves
Type 11
3"
-
90-100
1.5"
-
-
0.75"
-
20 -90
0.375"
100
-
#4
95 -100
0 -20
#16
45 -80
-
#50
10 -30
-
#100
2 -10
02300-3
LION SQUARE LODGE NORTH
Vail, Colorado
1_ #200 1 0 -2 1 0 -3-
2. Class C Bedding (Granular Foundation): Defined as the method of bedding in which the pipe is set
on compacted granular material supporting the lower quadrant of the pipe barrel using uniform
graded material as specified below
U.S. Standard Sieve
Size
Percent Weight by
passing Type l
Square Mesh Sieves
Type II
3 "
-
90 -100
1.5"
-
-
0.75"
-
20 -90
0.375'
100
-
#4
95 -100
0 -20
#l6
45 -80
-
#50
10 -30
#100
2 -10
-
#200
0 -2
0 -3
3. Ductile Iron Pipe Bedding: Provide either well graded sand as specified below or squeegee sand as
specified below
a. Well Graded Sand
U.S. Standard Sieve
Size
Total Passing Weight
by Percent
3/8"
100
No 4
70 -100
No 8
36 -93
No 16
20 -80
No. 30
8 -65
No. 50
2 -30
No. 100
1 -10
No. 200
0 -3
b. Well Graded Sand
U.S. Standard Sieve
Size
Total Passing Weight
by Percent
3/8"
100
No. 200
0 -3
2.2 ACCESSORIES
A. Detectable Warning Tape: Acid- and alkali- resistant polyethylene film warning tape manufactured for
marking and identifying underground utilities, minimum 6 inches wide and 4 mils thick, continuously
inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion
protection, detectable by metal detector when tape is buried up to 30 inches deep; colored as follows:
I. Red: Electric.
2. Yellow: Gas, oil, steam, and dangerous materials.
3. Orange: Telephone and other communications.
EARTHWORK 02300-4
LION SQUARE LODGE NORTH
Vail, Colorado
4. Blue: Water systems.
5. Green: Sewer systems.
B. Geotextile Fabric: As shown on drawings.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement,
lateral movement, undermining, washout, and other hazards created by earthwork operations.
B. Protect subgrades and foundation soils against freezing temperatures or frost. Provide protective
insulating materials as necessary.
C. Provide erosion - control measures to prevent erosion or displacement of soils and discharge of soil -
bearing water runoff or airborne dust to adjacent properties and walkways.
3.2 DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades,
and from flooding Project site and surrounding area.
B_ Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.
I. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in
excavations. Do not use excavated trenches as temporary drainage ditches.
2. Install a dewatering system to keep subgrades dry and convey ground water away from
excavations. Maintain until dewatering is no longer required.
3.3 EXPLOSIVES
A. Explosives: Do not use explosives.
B. Unclassified Excavation: All excavation is to be considered "unclassified" when using heavy duty earth -
moving equipment except where rock is encountered at utility trenches (either inside or outside of
building line)
C. Classified Excavation: Excavation to subgrade elevations classified as rock excavation.
I. Intermittent drilling or ripping performed to increase production and not necessary to permit
excavation of material encountered will classified as unclassified excavation.
D. Rock Payment lines are limited to the following:.
1. In pipe trenches, 6' below invert elevation of pipe and 2' wider than inside perimeter of pipe but
not less than 3' minimum trench width.
2. Assume no rock excavation is required for the work. If rock excavation is required at utility
trenches, such work will be paid in accordance with provisions relative to changes in the work and
will paid on the basis of bid unit prices.
3.4 EXCAVATION FOR STRUCTURES
I EARTHWORK
02300-5
LION SQUARE LODGE NORTH
Vail, Colorado
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch. Extend
excavations a sufficient distance from structures for placing and removing concrete formwork, for
installing services and other construction, and for inspections.
I. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by
hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and
grades to leave solid base to receive other work_
2. Excavation for Underground Tanks, Basins, and Mechanical or Electrical Utility Structures:
Excavate to elevations and dimensions indicated within a tolerance of plus or minus I inch. Do
not disturb bottom of excavations intended for bearing surface.
3. Over excavation and Recompaction Zone: Over - excavate existing soils from all areas of the over
excavation and replacement zone as defined in subsection 2. IC, for the interior and exterior slabs -
on- grades, ramps and accessible walks adjacent to the building, to a minimum depth of 4' below
bottom elevations of the slabs -on- grade. Moisture condition and recompact per the requirements
of this sections.
3.5 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated cross sections, elevations, and grades.
3.6 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.
I . Beyond building perimeter, excavate trenches to allow installation of top of pipe below frost line.
B. Excavate trenches to uniform widths to provide a working clearance on each side of pipe or conduit.
Excavate trench walls vertically from trench bottom to 12 inches higher than top of pipe or conduit,
unless otherwise indicated.
I . Clearance: 12 inches on each side of pipe or conduit or as shown on drawings.
C. Trench Bottoms: Excavate trenches 6 inches deeper than bottom of pipe elevation to allow for bedding
course. Hand excavate for bell of pipe.
I. Excavate trenches 6 inches deeper than elevation required in rock or other unyielding bearing
material to allow for bedding course.
3.7 APPROVAL OF SUBGRADE
A. Notify Architect when excavations have reached required subgrade.
B. If Architect determines that unsatisfactory soil is present, continue excavation and replace with
compacted backfill or fill material as directed.
1. Additional excavation and replacement material will be paid for according to Contract provisions
for changes in the Work.
C. Proof roll subgrade with heavy pneumatic -tired equipment to identify soft pockets and areas of excess
yielding. Do not proof roll wet or saturated subgrades.
EARTHWORK 02300-6
1
t
11
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
D. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction
activities, as directed by Architect.
3.8 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of
concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill
may be used when approved by Architect.
I . Fill unauthorized excavations under other construction or utility pipe as directed by Architect.
3.9 STORAGE OF SOIL MATERIALS
A. Stockpile borrow materials and satisfactory excavated soil materials. Stockpile soil materials without
intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Stockpile soil materials away from edge of excavations. Do not store within drip line of
remaining trees.
3.10 BACKFILL
A. Place and compact backfill in excavations promptly, but not before completing the following:
1. Construction below finish grade including, where applicable, dampproofing, waterproofing, and
perimeter insulation.
2. Surveying locations of underground utilities for record documents.
3. Inspecting and testing underground utilities.
4. Removing concrete formwork.
5. Removing trash and debris_
6. Removing temporary shoring and bracing, and sheeting.
7. Installing permanent or temporary horizontal bracing on horizontally supported walls.
B. Backfill Placement:
I. At areas not subject to stnictural loads, provide unclassified backfill around structures beyond 5'
from foundation wall and for embankments and landscape areas with top 6" being topsoil
stockpiled on site
2. For Foundation wall backfill within 5' of the building line, use over - excavated moisture
conditioned and recompacted soil_
3. Under walks, steps and pavements beyond 5' from the building line, use unclassified backfill or
borrow material where additional fill is required. Under walks, steps and pavements within 5' of
building line, use over - excavated moisture conditioned and recompacted soil.
3.11 UTILITY TRENCH BACKFILL
A. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to
provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of
conduits.
B. Backfll trenches excavated under footings and within 18 inches of bottom of footings; fill with concrete
to elevation of bottom of footings.
I I EARTHWORK
02300-7
LION SQUARE LODGE NORTH
Vail, Colorado
C. Place and compact initial backfill of subbase material, free of particles larger than I inch or bedding
material as shown on the details and required by the Owner, to a height of 12 inches over the utility pipe
or conduit.
1. Carefully compact material under pipe haunches and bring backfill evenly up on both sides and
along the full length of utility piping or conduit to avoid damage or displacement of utility system.
D. Coordinate backfilling with utilities testing.
E. Fill voids with approved backfill materials while shoring and bracing, and as sheeting is removed.
F. Place and compact final backfill of satisfactory soil material to final subgrade.
G. Install warning tape directly above utilities, 12 inches below finished grade, except 6 inches below
subgrade tinder pavements and slabs.
3.12 FILL
A. Place and compact fill material in layers to required elevations as follows:
1. Construction below finish grade including, where applicable, subdrainage, dampproofing,
waterproofing, and perimeter insulation.
2. Surveying locations of underground utilities for Record Documents.
3. Testing and inspecting underground utilities.
4. Removing concrete formwork.
5. Removing trash and debris.
6. Removing temporary shoring and bracing, and sheeting.
7. Installing permanent or temporary horizontal bracing on horizontally supported walls.
B. Place backfill on subgrades free of mud, frost, snow, or ice.
3.13 MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill layer before compaction to
within optimum as determined by ASTM D698 as follows:
Over- excavation/Recompaction Zone
+2 to +4
a. Under interior slabs -on- grades
b Under exterior slab -on -grade ADA
ramp and accessible walks
immediately adjacent east and south
of the buildin .
Upto 5' Beyond Building under
-1 to +3
pavements, Walks, Steps and Strutures
not included in the Over - Excavation and
Replacement Zones_
Foundation Backfill: Non- Strctural
-3 to +3
Areas
I . Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
2. Remove and replace, or scarify and air -dry, otherwise satisfactory soil material that exceeds
optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.
EARTHWORK 02300-8
LION SQUARE LODGE NORTH
Vail, Colorado
3.14 COMPACTION OF BACKFILLS AND FILLS
A. Place backfill and fill materials in layers not more than 8 inches in loose depth for material compacted by
heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by
hand - operated tampers.
B. Place backfill and fill materials evenly on all sides of structures to required elevations, and uniformly
along the full length of each structure.
C. Compact soil to not less than the following percentages of maximum dry unit weight according to
ASTM D 1557:
D_ Compact soil to not less than the following percentages of Standard Proctor density according to
ASTM D 698:
1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches (300
mm) of existing subgrade and each layer of backfill or fill soil material at 95 percent.
2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each
layer of backfill or fill soil material at 92 percent.
3. Under lawn or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and
compact each layer of backfill or fill soil material at 85 percent.
4. For utility trenches, compact each layer of initial and final backfill soil material at 85 percent.
3.15• GRADING
A. General: Uniformly grade areas to a smooth surface, free from irregular surface changes. Comply with
compaction requirements and grade to cross sections, lines, and elevations indicated.
1. Provide a smooth transition between adjacent existing grades and new grades.
2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.
B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish
subgrades to required elevations within the following tolerances:
I . Lawn or Unpaved Areas: Plus or minus I inch.
2. Walks: Plus or minus I inch to % inch.
3. Pavements: Plus or minus 1/2 inch.
C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10 -foot
straightedge.
3.16 DRAINAGE COURSE
A. Under slabs -on- grade, place drainage course on prepared subgrade and as follows:
1. Compact drainage course to required cross sections and thickness to not less than 95 percent of
maximum dry unit weight according to ASTM D 698.
2. When compacted thickness of drainage course is 6 inches or less, place materials in a single layer.
3. When compacted thickness of drainage course exceeds 6 inches, place materials in equal layers,
with no layer more than 6 inches thick or less than 3 inches thick when compacted.
3.17 FIELD QUALITY CONTROL
i EARTHWORK
02300-9
t
LION SQUARE LODGE NORTH
Vail, Colorado
A. Testing Agency_ Owner will engage a qualified independent geotechnical engineering testing agency to
perform field quality - control testing.
B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with
subsequent earthwork only after test results for previously completed work comply with requirements.
C. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify
design bearing capacities. Subsequent verification and approval of other footing subgrades may be based
on a visual comparison of subgrade with tested subgrade when approved by Architect.
D. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167,
ASTM D 2922, and ASTM D 2937, ASTM D 1557, ASTM D698, as applicable. Tests will be performed
at the following locations and frequencies:
1, Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, at least
one test for every 2000 sq. ft. or less of paved area or building slab, but in no case fewer than three
tests.
2. Foundation Wall Backfll: At each compacted backfill layer, at least one test for each 100 feet or
less of wall length, but no fewer than two tests.
3_ Trench Backfill: At each compacted initial and final backfill layer and every 2' above top of pipe,
at least one test for each 150 feet or less of trench length, but no fewer than two tests.
E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction
specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and
retest until specified compaction is obtained.
3.18 PROTECTION
A
L:'
Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of
trash and debris.
Repair and reestablish grades to specified tolerances where completed or partially completed surfaces
become eroded, ranted, settled, or where they lose compaction due to subsequent construction operations
or weather conditions.
Scarify or remove and replace soil material to depth as directed by Architect; reshape and
recompact.
C
Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with
additional soil material, compact, and reconstruct surfacing.
Restore appearance, quality, and condition of finished surfacing to match adjacent work, and
eliminate evidence of restoration to the greatest extent possible.
3.19
A.
I:
DISPOSAL OF SURPLUS AND WASTE MATERIALS
Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and
debris, and legally dispose of it off Owner's property_
Disposal: Transport surplus satisfactory soil to designated storage areas on Owner's property. Stockpile
or spread soil as directed by Architect.
EARTHWORK
02300-10
1
a
u
t
r
LION SQUARE LODGE NORTH
Vail, Colorado
I. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it
off Owner's property.
END OF SECTION 02300
EARTHWORK 02300-11
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02370 - SLOPE PROTECTION AND EROSION CONTROL
PART I GENERAL
1.01 DESCRIPTION
A. Temporary measures needed to control erosion and water pollution by use of berms,
dikes, dams, sediment basins and/or traps, geotextiles, stone checks, hay bales, silt
fences, surface roughing, mats and nets, aggregate, mulch, grasses, slope drains, and
other approved measures at the locations necessary to control erosion and water
pollution.
Coordinate temporary pollution controls with the permanent erosion control features
specified and with Stormwater Management Plan provided by the Owner.
B. Related Work:
1. Site Clearing: Section 02110
2. Drainage Structures, Pipes, and Fittings: Section 02430
3. Earthwork: Section 02200
1.02 SUBMITTALS
A. Test Reports: If requested, furnish copies of tests from certified and acceptable testing
laboratory
1. Silt Fence
2. Jute Netting
PART PRODUCTS
2.01 SILT FENCE
A. Silt Fence Fabric: The fabric shall meet the following specifications:
Fabric Properties Minimum Acceptable Value Test Method
Grab Tensile Strength (Ibs) 90 ASTM D1682
Elongation at Failure ( %) 50 ASTM D1682
Mullen Burst Strength (PSI) 190 ASTM D3786
Puncture Strength (Ibs) 40 ASTM D751 (modified)
Slurry Flow Rate (gal /min /so 0.3
Equivalent Opening Size 40 -80 US Sieve CW -02215
Ultraviolet Radiation Stability ( %) 90 ASTM -G -26
B. Fence Posts (for fabricated units): The length shall be a minimum of 36 inches long.
Wood posts will be of sound quality hardwood with a minimum cross sectional area of
3.0 square inches. Steel posts will be standard "r and U section weighing not less than
1.00 per linear foot_
C. Wire Fence (for fabricated units): Wire fencing shall be a minimum 14 -1 /4 gage with a
maximum 6" mesh opening, or as approved.
SLOPE PROTECTION AND EROSION CONTROL
02370-1
s
LION SQUARE LODGE NORTH
Vail, Colorado
D. Prefabricated Units: Envirofence or approved equal may be used in lieu of the above
method providing the unit is installed per manufacturer's instructions.
2.02 JUTE NETTING
A. Heavy -woven jute mesh of a rugged construction. Made of undyed and unbleached,
twisted jute fibers, having smolder resistant treatment. Provide in rolls 225' by 4' wide
containing 100 square yards weighing approximately 90 pounds.
2.03 VEHICLE TRACKING GRAVEL
A. Provide gravel (2" crushed screened rock) suitable for controlling dirt and debris from
leaving the site at locations as shown on the drawings.
PART 3 EXECUTION
3.01 WATER BARS /INTERCEPTOR TRENCHES
Construct ditch in accordance with drawings. Flow line of water bar not steeper than I%.
Discharge on existing vegetated slope alternately to avoid erosion.
3.02 STRAW BALE SEDIMENT BARRIER
Use straw bale barriers at storm drain inlets, across minor swales and ditches, and other
applications where barrier is of temporary nature. Bind straw bales with nylon or bailing wire, not
twine. Anchor bales to ground with two posts per bale. _
3.03 JUTE NETTING
Start jute roll at top of slope or channel and unroll down grade. Lay second strip parallel to first
and allow 2" overlap. Bury top end of roll in trench, minimum 4" deep. Anchor jute roll to earth
surface with stakes of 8 gauge steel, 8" long, approximately 12" apart. Staple outside edges 4' to #
10' apart and along overlap edges. Overlap end rolls by 4" and anchor securely.
3.04 VEHICLE TRACKING GRAVEL
t.
Install 2" crushed screened rock to not less than 6" in depth over the area indicated for access to
the site with length and width as required, length not less than 50 feet. Filter cloth shall be placed
over the entire area prior to placement of stone.
3.05 CHECK DAMS
Install bottom of check dam at least 6" below depth of newly graded channel. Extend to 6" above
maximum design water depth. Install materials in accordance with drawings.
3.06 FILTER BERMS /SEDIMENT POND
f
Field construct berms as directed by Engineer. Place washed I" to 1 -1 /2° aggregate with 2' top
and 3:1 side slopes extending to bottom of channel. Berm to retain sediments by retarding and
filtering runoff. Place sand on face of berm for fiiture replacement of filter material. Construct in
accordance with drawings.
3.07 SILT FENCE
Install silt fence in accordance with drawings.
SLOPE PROTECTION AND EROSION CONTROL
02370-2
1
LION SQUARE LODGE NORTH
Vail, Colorado
3.08 MAINTENANCE
Maintain, repair, and supplement all slope protection and erosion control measures as stated in all
applicable permits and as directed by the Owner.
END SECTION 02370
SLOPE PROTECTION AND EROSION CONTROL 02370-3
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02510 - WATER DISTRIBUTION
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes water - distribution piping and specialties outside the building for the following:
I . Water services.
2. Fire- service mains.
3. Combined water service and fire- service mains.
4. Aboveground water piping for applications other than water - service piping.
B. Utility- fitmished products include water meters that will be furnished to the site, ready for installation.
C. Related Sections
1. Division 2 Section "Earthwork."
2. Division 2 Section "Concrete Paving."
3. Division 3 Section "Cast -in -Place Concrete."
4. Division 15 Section "Plumbing Systems."
1.2 PERFORMANCE REQUIREMENTS
A. Materials and methods used should meet or exceed the requirements of the Eagle River Water and
Sanitation District and the town of Vail, Colorado. In case of conflict, the more restrictive
requirements shall govern.
1.3 DEFINITIONS
A. Fire - Service Main: Exterior fire- suppression -water piping.
B. Fire - Suppression -Water Piping: Interior fire- suppression -water piping.
C. Water - Distribution Piping: Interior domestic -water piping.
D. Water Service: Exterior domestic -water piping.
E. The following are industry abbreviations for plastic materials:
1. PA: Polyamide (nylon) plastic_
2. PE: Polyethylene plastic.
3. PEX: Crosslinked polyethylene plastic.
4. PP: Polypropylene plastic.
5. PVC: Polyvinyl chloride plastic.
G. RTRF: Reinforced thennosetting resin (fiberglass) fittings.
7. RTRF: Reinforced thermosetting resin (fiberglass) pipe.
1.4 SUBMITTALS
WATER DISTRIBUTION 02510-1
LION SQUARE LODGE NORTH
Vail, Colorado
A. Product Data: For the following:
1. Piping specialties.
B. Coordination Drawings: For piping and specialties including relation to other services in same area.
Show piping and specialty sizes and valves, meter and specialty locations, and elevations.
C. Field Quality- Control Test Reports: From Contractor. Submit pressure and leakage reports, from
chlorination and bacteriologic acceptance tests
D. Operation and Maintenance Data: For specialties to include in emergency, operation, and maintenance
manuals. In addition to items specified in Division 1 Section "Closeout Procedures," include the
following:
I. Valves.
2. Backflow preventers.
3. Protective enclosures.
4. Drinking fountains.
E. Record drawings: At project closeout, submit record drawings of installed water system piping and
production in accordance w/ Division l requirements.
1.5 QUALITY ASSURANCE
A. Installer's qualifications: Firm with at least 3 years of successful installation experience on projects with
waterworks similar to that required for project.
B. Product Options: Drawings indicate size, profiles, and dimensional requirements of piping and
specialties and are based on the specific system indicated. Refer to Division I Section "Product
Requirements."
C. Regulatory Requirements:
I. Comply with requirements of utility company supplying water. Include tapping of water mains
and backflow prevention.
2. Comply with standards of authorities having jurisdiction for potable- water - service piping,
including materials, installation, testing, and disinfection.
3. Comply with standards of authorities having jurisdiction for fire- suppression water- service piping,
including materials, hose threads, installation, and testing.
D. Piping materials shall bear label, stamp, or other markings of specified testing agency.
E. Comply with FM's "Approval Guide" or UL's "Fire Protection Equipment Directory" for fire- service-
main products.
F. NFPA Compliance: Comply with NFPA 24 for materials, installations, tests, flushing, and valve
supervision for fire- service -main piping for fire suppression.
G. NSF Compliance:
I . Comply with NSF 61 for materials for water- service piping and specialties for domestic water.
1.6 DELIVERY, STORAGE, AND }-HANDLING
A. Preparation for Transport: Prepare valves, according to the following:
WATER DISTRIBUTION 02510-2
LION SQUARE LODGE NORTH
Vail, Colorado
1. Ensure that valves are dry and internally protected against rust and corrosion-
2. Protect valves against damage to threaded ends and flange faces.
3. Set valves in best position for handling. Set valves closed to prevent rattling_
B. During Storage: Use precautions for valves, according to the following:
. Do not remove end protectors unless necessary for inspection; then reinstall for storage.
2. Protect from weather. Store indoors and maintain temperature higher than ambient dew -point
temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is
necessary.
C. Handling: Use sling to handle valves if size requires handling by crane or lift. Rig valves to avoid
damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.
D. Deliver piping with factory- applied end caps. Maintain end caps through shipping, storage, and handling
to prevent pipe -end damage and to prevent entrance of dirt, debris, and moisture.
E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of
floor when storing inside.
F. Protect flanges, fittings, and specialties from moisture and dirt.
G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.
1.7 PROJECT CONDITIONS
A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless
permitted under the following conditions and then only after arranging to provide temporary utility
services according to requirements indicated:
I . Notify Architect not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Architect's written permission.
1.8 COORDINATION
A. Coordinate connection to water main with Eagle River Water and Sanitation District.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
' A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply
for product selection:
I _ Manufacturers: Subject to compliance with requirements, provide products by the manufacturers
specified.
a_ American Cast iron Pipe
b. Griffen Pipe Products Company
C. Pacific States
d. U.S. Pipe and Foundry Co.
WATER DISTRIBUTION 02510-3
LION SQUARE LODGE NORTH '
Vail, Colorado
2.2 PIPING MATERIALS
A. Refer to Part 3 "Piping Applications" Article for applications of pipe, tube, fitting, and joining materials. '
2.3 DUCTILE -IRON PIPE AND FITTINGS I
A. Push -on- Joint, Ductile -Iron Pipe: AWWA CIS1, working pressure 150psi, Class 50, minimum wall
thickness of 0.25, cement mortar lining, seal casted AWWA C104,with push-on-joint, bell- and plain- '
spigot end unless grooved or flanged ends are indicated.
1. Push -on- Joint, Ductile -Iron Fittings: AWWA CI 10, ductile- or gray -iron standard pattern or
AWWA CI53, ductile -iron compact pattern.
a. Gaskets: AWWA C111, rubber.
B. Ductile -Iron Flexible Expansion Joints: Compound, ductile -iron fitting with combination of flanged and
mechanical joint ends complying with AWWA C110 or AWWA C153. Include two gasketed ball -joint
sections and one or more gasketed sleeve sections. Assemble components for offset and expansion
indicated. Include AWWA C111, ductile -iron glands, rubber gaskets, and steel bolts.
C. Ductile -Iron or Cast -iron Deflection Fittings: Compound, ductile -iron or cast -iron fitting complying with
AWWA CI 10 or AWWA CI53. Include AWWA CI 11, ductile -iron glands, rubber gaskets, and steel
bolts. All fittings cement mortar lined, AWWA C104. Bituminous outside coating one mil thick. Rating
of 250psi with mechanical or push joint.
2.4 COPPER TUBE AND FITTINGS I
A. Soft Copper Tube: ASTM B 88, Type K, water tube, annealed temper, with flared connections.
1. Copper Fittings: ASME B 16.18, cast - copper -alloy or ASME B 16.22, wrought - copper, solder- '
joint pressure type. Furnish only wrought - copper fittings if indicated.
B. Bronze Flanges: ASME B16.24, Class 150, with solder -joint end. Furnish Class 300 flanges if required
to match piping.
C. Copper Unions: MSS SP -123, cast - copper - alloy, hexagonal -stock body with ball - and - socket, metal -to-
metal seating surfaces, and solder -joint or threaded ends.
2.5 JOINING MATERIALS ,
A. Refer to Division 2 Section "Utility Materials" for commonly used joining materials.
B. Transition Couplings: ,
1. Underground Piping, NPS 2 (DN 50) and Larger. AWWA C219, metal, sleeve -type coupling
same size as, with pressure rating at least equal to and ends compatible with, piping to be joined.
2. Aboveground Piping: Pipe fitting same size as, with pressure rating at least equal to and ends '
compatible with, piping to be joined.
C. Soldering Flux: ASTM B 813, water- flushable type.
D. Solder Filler Metal ASTM B 32, lead -free type with 0.20 percent maximum lead content.
WATER DISTRIBUTION 02510 -4 t+
(
LION SQUARE LODGE NORTH
Vail, Colorado
2.6 PIPING SPECIALTIES
A. Flexible Connectors:
1. Nonferrous -Metal Piping: Bronze hose covered with bronze wire braid; with copper - tube,
pressure -type, solder joint ends or bronze flanged ends brazed to hose.
2. Ferrous Piping: Stainless -steel hose covered with stainless -steel wire braid; with ASME B 1.20.1,
threaded steel pipe nipples or ASME B 16.5, steel pipe flanges welded to hose.
2.7 CORROSION - PROTECTION ENCASEMENT FOR PIPING
A. Encasement for Underground Metal Piping: AWWA C105, PE film, 0.008 -inch minimum thickness,
tube.
2.8 HOSE - CONNECTION, BACKFLOW - PREVENTION DEVICES
A. General: ASSE standard, nonremovable -type, backflow- prevention devices with ASME B 1.20.7, garden -
hose threads on outlet_
B. Hose - Connection Vacuum Breakers: ASSE 1011, nickel plated, with manual drain feature. Units
attached to rough- bronze -finish hose connections may be rough bronze.
C_ Hose - Connec(ion Backflow Preventers: ASSE 1052, suitable for at least 3 -gpm flow and applications
with up to 10 -foot head of water back pressure. Include two check valves and intennediate atmospheric
vent.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Refer to Division 2 Section "Earthwork" for excavating, trenching, and backfilling.
3.2 PIPING APPLICATIONS
A. General: Use pipe, fittings, and joining methods for piping systems according to the following
applications.
B. Transition couplings and special fittings with pressure ratings at least equal to piping pressure rating may
be used in applications below, unless otherwise indicated.
C. Do not use flanges, unions, or keyed couplings for underground piping.
D. Flanges, anions, keyed couplings, and special fittings may be used, instead of joints indicated, on
aboveground piping and piping in vaults.
E. Underground Water - Service Piping: Use any of the following piping materials for each size range:
I . NPS 3/4 to NPS 2: Soft copper tube, Type K; wrought - copper fittings; and soldered joints.
2. NPS 5 and NPS 6): Use NPS 6 (DN I50) ductile -iron, push-on-joint pipe; ductile -iron, push -on-
joint fittings; and -asketed joints_
WATER DISTRIBUTION 02510-5
LION SQUARE LODGE NORTH
Vail, Colorado
3.3 JOINT CONSTRUCTION
A. See Division 2 Section "Utility Materials" for basic piping joint construction.
B. Make pipe joints according to the following:
I . Ductile -Iron Piping, Gasketed Joints for Water - Service Piping: AWWA C600 and AWWA M41.
2. Ductile -Iron Piping, Gasketed Joints for Fire- Service -Main Piping: UL 194.
3. Dissimilar Materials Piping Joints: Use adapters compatible with both piping materials, with OD,
and with system working pressure. Refer to Division 2 Section "Utility Materials" for joining
piping of dissimilar metals.
3.4 PIPING SYSTEMS - COMMON REQUIREMENTS
A. See Division 2 Section "Utility Materials" for piping- system common requirements.
3.5 PIPING INSTALLATION
A. Water -Main Connection: Arrange with utility company for tap of size and in location indicated in water
main.
B. Comply with NFPA 24 for fire- service -main piping materials and installation.
I _ Install PE corrosion- protection encasement according to ASTM A 674 or AWWA C105.
C. Install copper tube and fittings according to CDA's "Copper Tube Handbook."
D. Bury piping with depth of cover over top at least 54 inches.
E. Extend water- service piping and connect to water - supply source and building water piping systems at
outside face of building wall in locations and pipe sizes indicated.
L Terminate water - service piping at building wall until building water piping systems are installed.
Terminate piping with caps, plugs, or flanges as required for piping material. Make connections
to building water piping systems when those systems are installed.
F. Install underground piping with restrained joints at horizontal and vertical changes in direction. Use
restrained -joint piping, thrust blocks, anchors, tie -rods and clamps, and other supports.
G. Anchor service -entry piping to building wall.
H. See Division 15 Section "Domestic Water Piping" for potable - water piping inside the building.
L See Division 13 Sections for fire - suppression water piping inside the building.
J. Install trap below frost line on drain outlet of each drinking fountain.
3.6 ANCHORAGE INSTALLATION
A. Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches. Include
anchorages for the following piping systems:
WATER DISTRIBUTION 02510-6
I I e
11 3.7
LION SQUARE LODGE NORTH
Vail, Colorado
Apply full coat of asphalt or other acceptable corrosion- resistant material to surfaces of installed ferrous
anchorage devices.
CONNECTIONS
A. Piping installation requirements are specified in other Division 2 Sections. Drawings indicate general
arrangement of piping and specialties. Pothole ahead of work to Electrician exact horizontal and vertical
location of existing utilities at planned connections points. Notify Engineer of conflicts.
B. Connect water - distribution piping to existing water service and new fire service line per Eagle River
Water and Sanitation District requirements.
C. Connect water - distribution piping to interior domestic -water and fire- suppression piping.
3.8 FIELD QUALITY CONTROL
A. Piping Tests: Conduct piping tests before joints are covered and after thrust blocks have hardened
sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only
potable water.
B. Hydrostatic Tests: Test at not less than 1 -1 /2 times working pressure for 2 hours_
1. Increase pressure in 50 -psig increments and inspect each joint between increments. Hold at test
pressure for I hour; decrease to 0 psig. Slowly increase again to test pressure and hold for I more
' hour. Maximum allowable leakage is 2 quarts per hour per 100 joints. Remake leaking joints
with new materials and repeat test until leakage is within allowed limits.
' C. Prepare reports of testing activities.
3.9 IDENTIFICATION
A. Install continuous underground detectable warning tape during backfilling of trench for underground
water- service piping. Locate below finished grade, directly over piping. See Division 2 Section
"Earthwork" for underground warning tapes.
3.10 CLEANING
A. Clean and disinfect water- distribution piping as follows:
1. Purge new water - distribution piping systems and parts of existing systems that have been altered,
extended, or repaired before use.
2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method
is not prescribed by authorities having jurisdiction, use procedure described in NFPA 24 for
flushing of fire service line piping. Flush piping system with clean, potable water until dirty water
does not appear at points of outlet.
WATER DISTRIBUTION
02510-7
LION SQUARE LODGE NORTH
Vail, Colorado
1 Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method
is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or as
described below:
a. Fill system or part of system with water /chlorine solution containing at least 50 ppm of
chlorine; isolate and allow to stand for 24 hours.
b. Drain system or part of system of previous solution and refill with water /chlorine solution
containing at least 200 ppm of chlorine; isolate and allow to stand for 3 hours.
C. After standing time, flush system with clean, potable water until no chlorine remains in
water coming from system.
d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedure
if biological examination shows evidence of contamination.
B. Prepare reports of purging and disinfecting activities.
C. After completing drinking fountain installation, inspect unit. Remove paint splatters and other spots, dirt,
and debris. Repair damaged finish to match original finish.
END OF SECTION 02510
WATER DISTRIBUTION 02510 - 8
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02530 - SANITARY SEWER SYSTEM
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes sanitary sewerage outside the building.
B. Related Sections
I. Division 2 Section "Excavation Support and Protection"
2. Division 2 Section "Earthwork."
3. Division 2 Section "Concrete Paving."
4. Division 15 Section "Plumbing Systems_"
1.2 DEFINITIONS
A. EPDM: Ethylene- propylene - diene- monomer rubber.
B. PVC: Polyvinyl chloride plastic.
1.3 PERFORMANCE REQUIREMENTS
A. Gravity -Flow, Nonpressure- Piping Pressure Ratings: At least equal to system test pressure. Materials
and methods used should meet or exceed the requirements of the Eagle River Water and Sanitation
District and the town of Vail, Colorado. In case of conflict, the more restrictive requirements shall
govern.
1.4 SUBMITTALS
A. Product Data: For the following:
I . Sewer System materials and products
B. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.
C. Record Drawings- At project closeout submit record drawings of installed sanitary sewer piping and
products, in accordance with Division I requirements_
1.5 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic structures, pipe, and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
C. Handle precast concrete manholes and other structures according to manufacturer's written rigging
instructions.
I.6 PROJECT CONDITIONS
SANITARY SEWER SYSTEM 02530- 1
LION SQUARE LODGE NORTH ,
Vail, Colorado
A. Site Information: Perform site survey, research public utility records, and verify existing utility locations. x
Posthole ahead of planned crossing and connections to determine exact horizontal and vertical location of '
existing utilities. Notify Engineer of conflict.
B. Locate existing structures and piping to be closed and abandoned.
C. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless '
permitted under the following conditions and then only after arranging to provide temporary utility r
services according to requirements indicated:
1. Notify Architect not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Architect's written permission.
S
PART 2- PRODUCTS '
2.1 PIPING MATERIALS
A. Refer to Part 3 "Piping Applications" Article for applications of pipe and fitting materials.
2.2 PIPES AND FITTINGS.
A. PVC Sewer Pipe and Fittings: According to the following:
I. PVC Sewer Pipe and Fittings, NPS 15 (DN375) and Smaller: ASTM D 3034, SDR 35, for
gasketed joints.
a. Gaskets: ASTM F 477, elastomeric seals.
2.3 MANHOLES
A. Normal- Traffic Precast Concrete Manholes: ASTM C 478 (ASTM C 478M), precast, reinforced
concrete, of depth indicated, with provision for robber gasketed joints.
1. Diameter: 48 inches) minimum, unless otherwise indicated.
2. Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required
to prevent flotation.
3. Base Section: 8 -inch minimum thickness for floor slab and 5 -inch minimum thickness for walls
and base riser section, and having separate base slab or base section with integral floor.
4. Riser Sections: 5 -inch minimum thickness and lengths to provide depth indicated.
5. Top Section: Eccentric -cone type, unless concentric -cone or flat - slab -top type is indicated. Top
of cone of size that matches grade rings.
6. Gaskets: ASTM C 443 (ASTM C 443M), rubber.
7. Grade Rings: Include two or three reinforced- concrete rings, of 6- to 9 -inch total thickness, that
match 24 -inch- diameter frame and cover.
8. Steps: ASTM C 478, individual steps or ladder. Omit steps for manholes less than 60 inches
deep.
9. Pipe Connectors: ASTM C 923, resilient, of size required, for each pipe connecting to base
section.
B. Manhole Frames and Covers: ASTM A 536, Grade 60- 40 -18, ductile -iron castings designed for heavy- ■
duty service. Include 24 -inch ID by 7- to 9 -inch riser with 4 -inch minimum width flange, and 26 -inch-
(660-mm-) diameter cover. Include indented top design with lettering "SANITARY SEWER" cast into
cover. '
SANITARY SEWER SYSTEM 02530-2
t
LION SQUARE LODGE NORTH
Vail, Colorado
2.4 CONCRETE
A. General: Cast -in -place concrete according to ACI 318, ACI 350R, and the following:
I . Cement: ASTM C 150, Type II.
2. Fine Aggregate: ASTM C 33, sand.
3. Coarse Aggregate: ASTM C 33, crushed gravel.
4. Water: Potable.
B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water - cementitious materials
ratio.
1. Reinforcement Bars: ASTM A 615, Grade 60, deformed steel.
C. Structure Channels and Benches: Factory or field formed from concrete. Portland cement design mix,
4000 psi minimum, with 0.45 maximum water - cementitious materials ratio. Include channels and
benches in manholes.
1. Channels: Concrete invert, formed to same width as connected piping, with height of vertical
sides to three - fourths of pipe diameter. Form curved channels with smooth, uniform radius and
slope.
a. Invert Slope: minimum 2 percent through manhole.
2. Benches: Concrete, sloped to drain into channel.
a. Slope: 4 percent.
D. Ballast and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water -
cementitious materials ratio.
1. Reinforcement Bars: ASTM A 615/A 615M, Grade 60 (Grade 400), deformed steel.
2.5 PROTECTIVE COATINGS
A. Description: One- or two-coat, coal -tar epoxy; 15 -mil minimum thickness, unless otherwise indicated;
factory or field applied to the following surfaces:
1. Concrete Manholes: On interior surface.
2. Concrete Manholes: On exterior surface.
3. Concrete Manholes: On exterior and interior surfaces.
4. Manhole Frames and Covers: On entire surfaces.
5. Manhole Frames and Covers: On surfaces that will be exposed to sewer gases.
2.6 BACKWATER VALVES
A. Gray -iron Backwater Valves: ASME A 1 12.14.1, gray -iron body and bolted cover, with bronze seat.
I. Horizontal Type: With swing check valve and hub- and - spigot ends.
2. Combination Horizontal and Manual Gate -Valve Type: With swing check valve, integral gate
valve, and hub- and - spigot ends.
3. Terminal Type: With bronze seat, swing check valve, and hub inlet.
B. PVC Backwater Valves: Similar to ASME Al 12.14.1, horizontal type; with PVC body, PVC removable
cover, and PVC swing check valve_
I I SANITARY SEWER SYSTEM
02S30-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
2.7 CLEANOUTS
A. Provide as indicated, pipe extension to grade with ferrule and countersunk cleanout plug. Provide round
cast -iron access frame and cover with heavy duty secured scoriated cover with lifting device.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavating, trenching, and backfilling are specified in Division 2 Section "Earthwork."
3.2 IDENTIFICATION
A. Materials and their installation are specified in Division 2 Section "Earthwork." Arrange for installing
green warning tapes directly over piping and at outside edges of underground structures.
. Use detectable warning tape over nonferrous piping and over edges of underground structures.
3.3 PIPING APPLICATIONS
A. General: Include watertight joints.
B. Refer to Part 2 of this Section for detailed specifications for pipe and fitting products listed below. Use
pipe, fittings, and joining methods according to applications indicated.
C. Gravity -Flow Piping: Use the following:
1. NPS 4 and NPS 6: PVC sewer pipe and fittings gaskets and gasketed joints.
2. NPS 8 and NPS 10: PVC sewer pipe and fittings gaskets and gasketed joints.
3.4 SPECIAL PIPE COUPLING AND FITTING APPLICATIONS
A. Special Pipe Couplings: Use where required to join piping and no other appropriate method is specified.
Do not use instead of specified joining methods.
I. Use the following pipe couplings for nonpressure applications:
a. Sleeve type to join piping, of same size, or with small difference in OD.
b. Increaser /reducer- pattern, sleeve type to join piping of different sizes.
3.5 INSTALLATION, GENERAL
A. General Locations and Arrangements: Drawing plans and details indicate general location and
arrangement of underground sanitary sewerage piping_ Location and arrangement of piping layout take
design considerations into account. Install piping as indicated, to extent practical.
B. Install piping beginning at low point, tnie to grades and alignment indicated with unbroken continuity of
invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according
to manufacturer's written instructions for using lubricants, cements, and other installation requirements_
Maintain swab or drag in line, and pull past each joint as it is completed.
C_ Use manholes for changes in direction, unless cleanouts are indicated. Use fittings for branch
connections, unless direct tap into existing sewer is indicated.
SANITARY SEWER SYSTEM 02530-4
1
1
LJ
LION SQUARE LODGE NORTH
Vail, Colorado
D. Use proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings
are connected. Reducing size of piping in direction of flow is prohibited.
E. Install gravity -flow piping, of sizes and in locations indicated.
1. Install piping pitched down in direction of flow, at minimum slope of 2 percent, for 4" diameter
service line and minimum of 1.0% for 6" diameter service line. Terminate 5' from building line
shown on drawings. Place 2x4 wood marker painted green, at terminus extending form sewer
invert to 2' above finishing grade. Place water tight plug in end of each service line.
2. Install piping with 54 -inch (1372 -mm) minimum cover.
3.6 PIPE JOINT CONSTRUCTION AND INSTALLATION
A. General: Join and install pipe and fittings according to installations indicated.
B. Refer to Division 2 Section "Utility Materials" for basic piping joint construction and installation.
C. PVC Sewer Pipe and Fittings: As follows:
1. Join pipe and gasketed fittings with gaskets according to ASTM D 2321.
2. Join profile sewer pipe fittings with gaskets according to ASTM D 2321 and manufacturer's
written instructions.
3. Install according to ASTM D 2321.
3.7 MANHOLE INSTALLATION
A. General: Install manholes, complete with appurtenances and accessories indicated.
B. Form continuous concrete channels and benches between inlets and outlet.
C. Set tops of frames and covers flush with finished surface of manholes that occur in pavements.
D. Install precast concrete manhole sections with gaskets according to ASTM C 891.
3.8 CONCRETE PLACEMENT
A. Place cast -in -place concrete according to ACI 318 and ACI 350R.
3.9 CLEANOUT INSTALLATION
' A. Install cleanouts and riser extension from sewer pipe to cleanout at grade. Install piping so cleanouts
open in direction of flow in sewer pipe.
B. Set cleanout frames and covers in earth in cast -in -place concrete block, as shown on drawings deep. Set
' with tops I inch above surrounding grade.
C. Set cleanout frames and covers in concrete pavement with tops flush with pavement surface.
SANITARY SEWER SYSTEM
02530-5
II
LION SQUARE LODGE NORTH
Vail, Colorado
3.10 CLOSING ABANDONED SANITARY SEWERAGE SYSTEMS
A. Abandoned Piping: Close open ends of abandoned underground piping indicated to remain in place.
Include closures strong enough to withstand hydrostatic and earth pressures that may result after ends of
abandoned piping have been closed. Use either procedure below:
1. Close open ends of piping with at least 8 -inch- (200 -mm -) thick, brick masonry bulkheads.
2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods
suitable for size and type of material being closed. Do not use wood plugs.
3. Fill all abandoned piping with slurry mixture designed to fill holes and breaks. "Flow -till'
or approved equal.
B. Abandoned Structures: Excavate around structure as required and use one procedure below:
. Remove structure and close open ends of remaining piping.
2. Remove top of structure down to at least 36 inches (1000 mm) below final grade. Fill to within 12
inches (300 mm) of top with stone, rubble, gravel, or compacted dirt. Fill to top with concrete.
3. Backfill to grade according to Division 2 Section "Earthwork."
3-11 FIELD QUALITY CONTROL
A. Clear interior of piping and structures of dirt and superfluous material as work progresses. Maintain swab
or drag in•piping, and pull past each joint as it is completed.
I . Place plug in end of incomplete piping at end of day and when work stops.
2. Flush piping between manholes and other structures to remove collected debris, if required by
authorities having jurisdiction.
B. Inspect interior of piping to determine whether line displacement or other damage has occurred_ Inspect
after approximately 24 inches (600 mm) of backfill is in place, and again at completion of Project.
Submit separate reports for each system inspection.
Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size
not less than 92.5 percent of piping diameter_
c. Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
3. Replace defective piping using new materials, and repeat inspections until defects are within
allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
5. Manholes: Perform hydraulic test according to ASTM C 969 (ASTM C 969M).
6. Leaks and loss in test pressure constitute defects that must be repaired.
END OF SECTION 02530
SANITARY SEWER SYSTEM 02530-6
1
t
t
t
L
El
t
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02552 - GROUND -LOOP, HEAT -PUMP PIPING
PART I - GENERAL
1-1 SUMMARY
A. This Section includes piping for horizontal, direct - buried, ground -loop, heat -pump systems that operate
between 23 and 104 deg F (minus 5 and plus 40 deg C).
1.2 PERFORMANCE REQUIREMENTS
A. Components and installation shall be capable of withstanding the following minimum working pressure,
unless otherwise indicated:
1. Ground -Loop, Heat -Pump Piping: 200 psig (1380 kPa).
13 SUBMITTALS
A. Product Data: For the following:
1. Pipe and fittings.
2. Joining method and equipment.
3. Propylene glycol solution,
B. Field quality- control test reports.
PART 2- PRODUCTS
2.1 PIPES AND FITTINGS
A. PE Pipe: ASTM D 2239, SIDR Numbers 5.3, 7, 9, or 11.5; with PE compound number required to
achieve required system working pressure.
1. Molded PE Fittings: ASTM D 2683 or ASTM D 3261, PE resin, socket- or butt - fusion type, made
to match PE pipe dimensions and class.
B. U -Bend Assembly: Factory fabricated with embossed depth stamp every 24 inches (600 mm) from U-
bend.
2.2 ANTIFREEZE SOLUTION
A. Propylene Glycol: Minimum 99 percent propylene glycol with corrosion inhibitors and environmental
stabilizer additives to be mixed with water to protect the piping circuit and connected equipment from
physical damage from freezing or corrosion_
B. Quantity: Sufficient solution for initial system startup and for preventive maintenance for one year from
date of Substantial Completion.
GROUND -LOOP, HEAT -PUMP PIPING 02552-1
LION SQUARE LODGE NORTH
Vail, Colorado
C. Dilution Water: Chloride content shall be less than 25 ppm, sulfate less than 25 ppm, and hardness less
than 100 ppm.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavating, trenching, warning tape, and backfilling are specified in Division 2 Section "Earthwork."
3.2 HORIZONTAL PIPING INSTALLATION
A. Separate trenches by 10 feet (3 m) minimum, unless otherwise indicated. Remove rocks in trenches that
could contact pipe.
B_ Backfill to 24 inches (600 mm) above pipe with mud developed from excavated rock -free soil or with
sand, pea gravel, or fly ash. Backfill from slurry level to grade with excavated soil, compacting as
specified for pipe burial in Division 2 Section "Earthwork."
C. Install PE piping in trenches according to ASTM D 2774 or ASTM F 645.
1. Clean PE pipe and fittings and make heat - fusion joints according to ASTM D 2657. Minimize
number of joints.
D. Purge, flush, and pressure test piping before backfilling trenches.
E. Install continuous detectable warning tape for underground piping. Locate tape a minimum of 24 inches
(600 mm) below finished grade, directly over piping_ Underground warning tapes are specified in
Division 2 Section "Earthwork."
F. Common piping installation requirements are specified in Division 2 Section "Piped Utilities - Basic
Materials and Methods."
3.3 ANTIFREEZE SOLUTION FILL
A. Fill system with required quantity of propylene glycol and water to provide minus 30 deg F (minus 23
deg C) freezing temperature.
3.4 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.
3.5 FIELD QUALITY CONTROL
A. Piping Tests: Fill piping 24 hours before testing and apply test pressure to stabilize piping. Use potable
water only.
B. Hydrostatic Tests: Test at not less than 1 -1/2 times the pipe working- pressure rating.
GROUND -LOOP, HEAT -PUMP PIPING 02552-2
LION SQUARE LODGE NORTH
Vail, Colorado
I. Increase pressure in 50 -psig (345 -kPa) increments and inspect each joint between increments.
Hold at test pressure for 30 minutes. Slowly increase to next test pressure increment and hold for
30 minutes. After testing at maximum test pressure, reduce pressure to 30 psig (207 kPa). Hold
for 90 minutes, and measure pressure at 30- minute intervals. Repair leaks and retest until no leaks
exist.
C. Prepare reports of testing activity.
END OF SECTION 02552
GROUND -LOOP, HEAT -PUMP PIPING 02552-3
L10N SQUARE LODGE NORTH
Vail, Colorado
SECTION 02620 - SUBDRAINAGE
PART]- GENERAL
1.1 SUMMARY
A. This Section includes subdrainage systems for the following:
1. Foundations,
2. Underslab areas.
3. Retaining walls.
4. Landscaped areas.
1.2 DEFINITIONS
A. ABS: Acrylonitrile- butadiene - styrene.
B. HDPE: High - density polyethylene.
C. PE: Polyethylene_
D. PP: Polypropylene.
E. PS: Polystyrene.
F. PVC: Polyvinyl chloride.
1.3 SUBMITTALS
A. Product Data: For drainage conduit, drainage panels, and geotextile fabrics.
I. Perforated pipe.
2. Solid pipe.
3. Pipe with open joints.
4. Drainage conduits_
5. Drainage panels.
6. Geotextile fabrics.
1.4 COORDINATION
A. Drainage panel materials and installation shall be compatible with dampproofing and waterproofing of
walls below grade.
SUBDR 02620-1
LION SQUARE LODGE NORTH
Vail, Colorado
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply
for product selection:
I. Available Manufacturers: Subject to compliance with requirements, manufacturers offering
products that may be incorporated into the Work include, but are not limited to, the manufacturers
specified.
2.2 PIPING MATERIALS
A_ Refer to various application articles in Part 3 for applications of pipe, tube, fitting, and joining materials.
2.3 UNDERSLAB HEADERS
A. ABS Sewer Pipe and Fittings: ASTM D 2751.
1. Solvent Cement: ASTM D 2235.
2. Gaskets: ASTM F 477, elastomeric seal.
B. Cast -Iron Soil Pipe and Fittings: ASTM A 74, Service and Extra -Heavy classes, hub -and- spigot ends,
gray, for gasketed joints.
. Gaskets: ASTM C 564, rubber, of thickness matching class of pipe.
C. PE Drainage Tubing and Fittings: AASHTO M 252, Type S, corrugated, with smooth waterway, for
coupled joints.
1. Couplings: AASHTO M 252, corrugated, band type, matching tubing and fittings.
D. PE Pipe and Fittings: AASHTO M 294, Type S, cornugated, with smooth waterway, for coupled joints.
I . Couplings: AASHTO M 294, corrugated, band type, matching tubing and fittings.
E. PVC Sewer Pipe and Fittings: ASTM D 3034, SDR 35, bell - and - spigot ends, for gasketed joints.
1. Gaskets: ASTM F 477, elastomeric seal.
2.4 DRAINAGE PIPES AND FITTINGS
A. Perforated, PE Pipe and Fittings: ASTM F 405, corrugated, for coupled joints.
I. Couplings: Manufacturer's standard, band type.
B. Perforated, PE Pipe and Fittings: ASTM F 667, corrugated, for coupled joints.
I . Couplings: Manufacturer's standard, band type.
C. Perforated, PVC Sewer Pipe and Fittings: ASTM D 2729, bell- and - spigot ends, for loose joints.
SUBDRAINAGE 02620-2
LION SQUARE LODGE ]NORTH
Vail, Colorado
D. Perforated, Clay Pipe and Fittings: ASTM C 700, Standard - Strength and Extra - Strength classes,
unglazed, socket - and - spigot ends, for closed joints.
1. Gaskets: ASTM C 425, rubber.
E. Perforated, Concrete Pipe and Fittings: ASTM C 444/C 444M, Type 1, and applicable requirements of
ASTM C 14 /C 14M, Class 2, socket - and - spigot fittings.
I. Gaskets: ASTM C 443/C 443M, rubber.
F. Clay Drain Tile: ASTM C 4; Standard, Extra - Quality, and Heavy -Duty classes, for open joints.
G. Concrete Drain Tile: ASTM C 412/C 412M; Standard - Quality; Extra- Quality; and Heavy -Duty, Extra -
Quality classes, for open joints.
1.1. Open -Joint Screening: ASTM D 226, Type I, asphalt - saturated roofing felt.
1. Open -Joint Screening: ASTM D 227, coal- tar - saturated roofing felt.
J. Open -Joint Screening: Copper -mesh screening.
K. Open -Joint Screening: Corrosion - resistant metal clips made for this application.
L. Open -Joint Screening: Woven geotextile filter fabric, for a minimum total weight of 3 oz. /sq. yd. (0.10
kg /sq. m).
2.5 SPECIAL PIPE COUPLINGS
A. Description: ASTM C 1173. Rubber or elastomeric sleeve and band assembly fabricated to match
outside diameters of pipes to be joined.
2.6 CLEANOUTS
A. Cast -Iron Pipe: ASME AI 12.36.2M; with round - flanged, cast -iron housing; and secured, scoriated,
Medium -Duty Loading class, cast -iron cover. Include cast -iron female and countersunk, brass cleanout
' plug.
B. PVC Pipe: ASTM D 3034, PVC cleanout threaded plug and threaded pipe hub.
' 2.7 DRAINAGE CONDUIT
A. Pipe and Fittings: Perforated and corrugated, molded from HDPE complying with ASTM D 3350, with
fittings and geotextile filter fabric jacket.
I. Size: 12 inches (305 mm) high by approximately 3/4 inch (19 mm) thick with a minimum flow
rate of 30 gpm per foot (62 L/s per 1000 mm).
2. Size: 18 inches (457 mm) high by approximately 3/4 inch (19 nun) thick with a minimum flow
rate of 45 gpm per foot (93 L/s per 1000 mm) when tested according to ASTM D 4716.
3. Fittings: HDPE with combination NPS 4 and NPS 6 (DN 100 and DN 150) outlet connection.
' 4_ Couplings: Corrugated HDPE band.
I I SUBDRAINACE
02620-3
t
LION SQUARE LODGE NORTH
Vail, Colorado
C.
2.8
A
W
C
IIn
E.
F
Pipe and Fittings: Perforated, molded from HDPE complying with ASTM D 1248 into shape of
interconnected corrugated pipes, with fittings and geotextile filter fabric jacket.
I . Size: 6 inches (152 mm) high by approximately 11- 114 inches (31 mm) thick with a flow rate of 15
gpm per foot (3.1 Us per 1000 mm) when tested according to ASTM D 4716.
2. Size: 12 inches (305 mm) high by approximately 2 -1/2 inches (64 mm) thick with a flow rate of
30 gpm per foot (6.2 L/s per 1000 mm) when tested according to ASTM D 4716.
3. Size: 18 inches (457 mm) high by approximately 3 -3/4 inches (95 mm) thick with a flow rate of
45 gpm per foot (9.3 Us per 1000 mm) when tested according to ASTM D 4716,
4. Fittings: HDPE with combination NPS 4 and NPS 6 (DN 100 and DN 150) outlet connection.
5. Couplings: HDPE.
Pipe and Fittings: Perforated, smooth PVC complying with ASTM D 4216 and ASTM D 2729,
Size: 8 inches (203 mm) high by approximately 2 -1/4 inches (57 mm) thick with a minimum flow
rate equal to NPS 4 (DN 100) pipe.
2. Fittings: PVC with NPS 4 (DN 100) outlet connection.
3. Couplings: PVC.
MOLDED -SHEET DRAINAGE PANELS
Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
1. American Wick Drain Corporation.
2. Grace, W. R. & Co.; Construction Products Div.
3. GREENSTREAK/Westem Textile Products.
4. Ling Industrial Fabrics, Inc_
5. TC Mirafi.
Molded -sheet drainage panels are specified in various Division 7 waterproofing Sections.
Description: Prefabricated, composite panels, 36 to 60 inches (915 to 1525 mm) wide, and manufactured
with geotextile facing laminated to molded- plastic drainage core.
Drainage Core: Three - dimensional, nonbiodegradable, molded PP or PS.
I_ Minimum Compressive Strength: 15,000 Ibf /sq. ft. (718 kPa)] [18,000 Ibf /sq. ft. (862 kPa) when
tested according to ASTM D 1621.
2. Minimum Flow Rate: 7 gpm per foot (87 L /min. per m) at hydraulic gradient of 0.1 and
compressive stress of 25 psig (172 kPa) when tested according to ASTM D 4716.
Geotextile: Nonwoven needle- punched geotextile, manufactured for subsurface drainage, made from
polyoletins or polyesters: with elongation greater than 50 percent; complying with the following
properties determined according to AASHTO M 288:
I. Survivability: Class 2.
2. Apparent Opening Size: No. 60 (0.25 - mm) sieve, maximum_
3. Permittivity: 0.2 per second, minimum.
Geotextile: Woven geotextile fabric, manufactured for subsurface drainage, made from polyoletins or
polyesters; with elongation less than 50 percent; complying with the following properties determined
according to AASHTO M 288:
SUBDRAINAGE
02620-4
J
t
I
t
1
F
t
Ll
L
�1
LION SQUARE LODGE NORTH
Vail, Colorado
1. Survivability: Class 2.
2. Apparent Opening Size: No. 60 (0.25 -mm) sieve, maximum.
3. Permittivity: 0.2 per second, minimum.
G. Film Backing: Polymeric film bonded to drainage core surface.
2.9 FABRIC DRAINAGE PANELS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
1. Akzo Nobel Geosynthetics Co.
2. GSE Lining Technology, Inc.
3. JDR Enterprises, Inc.
4. Strata Systems, Inc.
5. Tensar Earth Technologies, Inc.
B. Description: Prefabricated, composite drainage panels, made with drainage core and filter fabric, for use
as part of foundation, and retaining -wall drainage system.
C. Drainage Core: Open- constntction, resilient, 0.8 -inch- (20 -mm -) thick, nylon - filament mesh.
1. Minimum Flow Rate: 2.4 gpm per foot (30 Umin. per m) at hydraulic gradient of 1.0 and normal
pressure of 3600 prig (172 kPa) when tested according to ASTM D 4716_
D. Drainage Core: 3- dimensional, PE strand, 0.25 -inch- (6.3 -mm -) thick, nonwoven net.
I. Minimum Flow Rate: 5 gpm per foot (62 Umin. per m) at hydraulic gradient of 1.0 and normal
pressure of 3600 psig (172 kPa) when tested according to ASTM D 4716.
E. Filter Fabric: Nonwoven geotextile filter fabric of PP or polyester fibers, or combination of both. Flow
rates range from 120 to 200 gpm per sq. ft. (81 to 136 Us per sq. m) when tested according to
ASTM D 4491.
2.10 INSULATION DRAINAGE PANELS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
I. Diversifoam Products.
2. Dow Chemical Company (The).
3. Owens Corning.
4. Tenneco Building Products.
C. Insulation drainage panels are specified in various Division 7 waterproofing Sections_
D. Description: Extnided- polystyrene board insulation complying with ASTM C 578, fabricated with
shiplap or tongue- and - groove edges and with one side having grooved drainage channels, faced with
manufacturer's standard, nonwoven geotextile filter fabric.
SUBDRAINAGE 02620-5
LION SQUARE LODGE NORTH
Vail, Colorado
!.
Type IV, 1.6-lb/cu. ft. (26-kg/cu- m) minimum density and 25 -psig (173 -kPa) minimum
compressive strength.
2.11 SOIL MATERIALS
A. Impervious Fill: Clay, gravel, and sand mixture.
B. Drainage Fill: Washed, evenly graded mixture of crushed stone, or crushed or uncrushed gravel,
ASTM D 448, coarse aggregate, Size No. 57, with 100 percent passing I -1/2 -inch (37.5 -mm) sieve and
not more than 5 percent passing No. 8 (2.36 -mm) sieve.
2.12 ROOFING FELTS
A. ASTM D 226, Type I, asphalt- saturated roofing felt.
B. ASTM D 227, coal- tar - saturated roofing felt.
2.13 GEOTEXTILE FILTER FABRICS
A. Woven or nonwoven geotextile filter fabric of PP or polyester fibers, or combination of both. Flow rates
range from 110 to 330 gpm per sq. ft. (4480 to 13 440 L /min. per sq. m) when tested according to
ASTM D 4491. Available styles are flat and sock.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces and areas for suitable conditions where subdrainage systems are to be installed.
B. If subdrainage is required for landscaping, locate and mark existing utilities, underground structures, and
aboveground obstructions before beginning installation and avoid disruption and damage of services.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 EARTHWORK
A. Excavating, trenching, and backftlling are specified in Division 2 Section "Earthwork."
3.3 SUBDRAINAGE SYSTEM APPLICATIONS
A. NPS 4 (DN 100) Piping:
I . Perforated, PE pipe and fittings, couplings, and coupled joints.
2. Perforated, PVC sewer pipe and fittings for loose, bell -and- spigot joints.
3. Perforated, clay pipe and fittings, Extra - Strength class, gaskets; and gasketed joints.
4. Clay drain tile, Extra - Quality class; and open joints.
5. Concrete drain tile, Extra - Quality class; and open joints.
SUBDRAINAGE 02620-6
LION SQUARE LODGE NORTH
Vail, Colorado
B. NPS 6 (DN 150) Piping:
I . Perforated, PE pipe and fittings, couplings, and coupled joints.
2. Perforated, clay pipe and fittings, Extra - Strength class; gaskets; and gasketed joints.
3. Clay drain tile, Extra - Quality class; and open joints.
4. Concrete drain tile, Extra - Quality class; and open joints.
C. NPS 8 and NPS 10 (DN 200 and DN 250) Piping:
I . Perforated, clay pipe and fittings, Extra - Strength class; gaskets; and gasketed joints.
2. Clay drain tile, Extra - Quality class; and open joints.
3. Concrete drain tile, Extra- Quality class; and open joints.
3.4 UNDERSLAB DRAINAGE SYSTEM APPLICATIONS
A_ NPS 4 (DN 100) Piping:
1. Perforated, PE pipe and fittings, couplings, and coupled joints.
2. Perforated, PVC sewer pipe and fittings for loose, bell- and - spigot joints.
3. Perforated, clay pipe and fittings, Extra- Strength class; gaskets; and gasketed joints.
4. Perforated, concrete pipe and fittings, gaskets, and gasketed joints.
B_ NPS 6 (DN 150) Piping:
i . Perforated, PE pipe and fittings, couplings, and coupled joints.
2. Perforated, PVC sewer pipe and fittings for loose, bell- and - spigot joints.
3. Perforated, clay pipe and fittings, Extra- Strength class; gaskets; and gasketed joints.
4. Perforated, concrete pipe and fittings, gaskets, and gasketed joints.
C_ NPS 8 and NPS 10 (DN 200 and DN 250) Piping:
I . Perforated, clay pipe and fittings, Extra - Strength class; gaskets; and gasketed joints.
2. Perforated, concrete pipe and fittings, gaskets, and gasketed joints.
3.5 UNDERSLAB DRAINAGE SYSTEM HEADER APPLICATIONS
A. NPS 4 and NPS 6 (DN 100 and DN 150) Piping:
I. ABS pipe and fittings, couplings, and coupled joints.
2. Cast -iron soil pipe and fittings, Service class; gaskets; and gasketed joints.
3. PE drainage tubing and fittings, couplings, and coupled joints.
4. PVC sewer pipe and fittings, couplings, and coupled joints.
B. NPS 8 and NPS 10 (DN 200 and DN 250) Piping:
1. ABS pipe and fittings, couplings, and coupled joints.
2. Cast -iron soil pipe and fittings, Service class; gaskets; and gasketed joints.
3. PE drainage tubing and fittings, couplings, and coupled joints.
4. PVC sewer pipe and fittings, couplings, and coupled joints.
C. NPS 12 (DN 300) Piping:
I. ABS pipe and Fittings, couplings, and coupled joints.
I SUBDRAINAGE
02620-7
F1
LJ
LION SQUARE LODGE NORTH
Vail, Colorado
2. Cast -iron soil pipe and fittings, Service class; gaskets; and gasketed joints.
3. PE drainage tubing and fittings, couplings, and coupled joints.
4. PVC sewer pipe and fittings, couplings, and coupled joints.
D. NPS 15 (DN 375) Piping:
1. Cast -iron soil pipe and fittings, Service class; gaskets; and gasketed joints.
2. PE drainage tubing and fittings, couplings, and coupled joints.
3. PVC sewer pipe and fittings, couplings, and coupled joints.
3.6
IDENTIFICATION
A. Materials and their installation are specified in Division 2 Section "Earthwork." Arrange for installation
of green warning tapes directly over piping.
I. Install warning tape or detectable warning tape over ferrous piping.
2. Install detectable warning tape over nonferrous piping and over edges of underground structures.
FOUNDATION DRAINAGE INSTALLATION
3.7
A. Bottom Impervious Fill: Place impervious fill material on subgrade adjacent to bottom of footing after
concrete footings have been cured and forms removed. Place and compact impervious fill to dimensions
indicated, but not less than 6 inches (150 mm) deep and 12 inches (300 mm) wide.
B. Drainage Fill: Place supporting layer of drainage fill over compacted subgrade to compacted depth of not
less than 4 inches (100 mm). After installing drainage piping, add drainage fill to width of at least 6
inches (150 mm) on side away from wall and to top of pipe to perform tests_ After satisfactory testing,
cover piping to width of at least 6 inches (150 mm) on side away from footing and above top of pipe to
within 12 inches (300 mm) of finish grade. Place drainage fill in layers not exceeding 3 inches (75 mm)
in loose depth; compact each layer placed.
Before installing drainage fill, lay flat -style geotextile filter fabric in trench and overlap trench
sides. Ater installing drainage fill, wrap top of drainage fill with flat -style geotextile filter fabric.
Encase pipe with sock -style geotextile filter fabric before installing pipe. Connect sock sections
with electrical tape.
After installing drainage fill, place one layer of flat -style geotextile filter fabric over top of
drainage fill, overlapping edges at least 4 inches (100 mm).
C. Install vertical drainage panel as follows:
1. Coordinate placement with other drainage materials.
2. Lay perforated, PE or PVC drainage pipe at base of footing as described elsewhere in this
Specification. Do not install aggregate.
3. Mark horizontal calk line on wall at a point 6 inches (150 mm) less than panel width above footing
bottom. Before marking wall, subtract footing width.
4. Separate 4 inches (100 mm) of fabric at beginning of roll and cut away 4 inches (100 mm) of core.
Wrap fabric around end of remaining core.
5. Wrap bottom of panel around drainage pipe.
6. Attach panel to wall at horizontal mark and at beginning of pipe. Place core side of panel against
wall. Use concrete nails with washers through product cylinders to attach panel to wall. Place
nails from 2 to 6 inches (50 to 150 mm) below top of panel, approximately 48 inches (1200 mm)
apart. Some manufacturers use construction adhesives, metal stick pins, or double -sided tape. Do
not penetrate waterproofing. Before using adhesives, discuss with waterproofing manufacturer.
SUBDRAINAGE 02620-8
t
1
t
t
t
F1
t
r
1
I
1
)(.,ION SQUARE LODGE NORTH
Vail, Colorado
7. If another panel is required on the same row, cut away 4 inches (100 mm) of installed panel core
and wrap fabric over new panel.
8. If additional rows of panel are required, overlap lower panel with 4 inches (100 mm) of fabric.
9. Cut panel as necessary to keep top 12 inches (300 mm) below finish grade.
10. For inside comers, bend panel. For outside comers, cut core to provide 3 inches (75 mm) for
overlap.
11. Do not use drainage panels as protection over waterproof membrane, unless otherwise approved
by waterproofing membrane manufacturer.
D. Fill to Grade: Place native fill material over compacted drainage fill. Place material in loose -depth layers
not exceeding 6 inches (150 mm). Thoroughly compact each layer_ Fill to finish elevations and slope
away from building.
3.8 UNDERSLAB DRAINAGE INSTALLATION
' A. Excavate for underslab drainage system after subgrade material has been compacted, but before drainage
fill has been placed. Include horizontal distance of at least 6 inches (150 mm) between drainage pipe and
trench walls. Grade bottom of trench excavations to required slope and compact to firm, solid bed for
drainage system.
B. Drainage Fill: Place supporting layer of drainage fill over compacted subgrade to compacted depth of not
less than 4 inches (100 mm). After installing drainage piping, add drainage fill to top of pipe to perform
tests. After satisfactory testing, cover piping with drainage fill to elevation of bottom of slab and compact
drainage material.
1. Before installing drainage fill, lay flat -style geotextile filter fabric in trench and overlap trench
sides. After installing drainage fill, wrap top of drainage fill with flat -style geotextile filter fabric.
2. Encase pipe with sock -style geotextile filter fabric before installing pipe. Connect sock sections
with electrical tape.
C. Install horizontal drainage panels as follows:
1. Coordinate placement with other drainage materials.
2. Lay perforated, PE or PVC drainage pipe at inside edge of footings.
3. Place drainage panel over drainage pipe with core side up. Peel back fabric and wrap fabric
around pipe. Locate top of core at bottom elevation of floor slab.
4. Butt additional panels against other installed panels. If panels have plastic flanges, overlap
installed panel with flange.
3.9 RETAINING -WALL DRAINAGE INSTALLATION
A. Drainage Fill: Place supporting layer of drainage fill over compacted subgrade to compacted depth of not
less than 4 inches (100 mm). After installing drainage piping, add drainage fill to width of at least 6
inches (150 mm) on side away from wall and to top of pipe to perform tests. After satisfactory testing,
cover piping to width of at least 6 inches (150 mm) on side away from footing and above top of pipe to
within 12 inches (300 mm) of finish grade. Place drainage fill in layers not exceeding 3 inches (75 mm)
in loose depth; compact each layer placed.
I. Before installing drainage fill, lay flat -style geotextile filter fabric in trench and overlap trench
sides. After installing drainage fill, wrap top of drainage fill with flat -style geotextile filter fabric.
2. Encase pipe with sock -style geotextile filter fabric before installing pipe. Connect sock sections
with electrical tape.
SUBDRAINAGE
02620-9
I �,
LION SQUARE LODGE NORTIi
3.10
Vail, Colorado
3.
After installing drainage fill, place one layer of flat -style geotextile filter fabric over top of
drainage fill, overlapping edges at least 4 inches (100 mm).
B. Install
vertical drainage panels as follows:
1.
Coordinate placement with other drainage materials.
2.
Lay perforated, PE or PVC drainage pipe at base of footing as described elsewhere in this
Specification. Do not install aggregate.
3.
If weep holes are used in lieu of drainage pipe, cut 1/2 -inch- (13 -mm -) diameter holes on core side
at weep -hole locations. Do not cut fabric.
4.
Mark horizontal calk line on wall at a point 6 inches (150 mm) less than panel width above footing
bottom. Before marking wall, subtract footing width.
5.
Separate 4 inches (100 mm) of fabric at beginning of roll and cut away 4 inches (100 mm) of core.
Wrap fabric around end of remaining core.
6.
Wrap bottom of panel around drainage pipe.
7.
Attach panel to wall at horizontal mark and at beginning of wall comer. Place core side of panel
,
against wall. Use concrete nails with washers through product. Use nails from 2 to 6 inches (50
to 150 mm) below top of panel, approximately 48 inches (1200 mm) apart. Do not penetrate
D.
waterproofing. Before using adhesives, discuss with waterproofing manufacturer.
8.
If another panel is required on the same row, cut away 4 inches (100 mm) of installed panel core
and wrap fabric over new panel.
9.
If additional rows of panel are required, overlap lower panel with 4 inches (100 mm) of fabric.
10.
Cut panel as necessary to keep top 12 inches (300 mm) below finish grade.
11.
For inside comers, bend panel. For outside corners, cut core to provide 3 inches (75 mm) for
overlap.
12.
Do not use drainage panels as protection over waterproof membrane, unless otherwise approved
by waterproofing membrane manufacturer.
C. Fill to
Grade: Place fill
native material over compacted drainage fill. Place material in loose -depth layers
not exceeding 6 inches (150 mm). Thoroughly compact each layer. Fill to finish grade.
I �,
3.10
LANDSCAPING DRAINAGE INSTALLATION
A.
Install drainage pipe with a horizontal distance of at least 6 inches (150 mm) between pipe and trench
walls. Grade bottom of trench excavations to required slope and compact to firm, solid bed for drainage
system.
B.
Drainage Fill: Place supporting layer of drainage fill over trench bottom to compacted depth of not less
than 4 inches (100 mm). After installing drainage piping, add drainage fill to top of pipe to perform tests.
After satisfactory testing, cover piping to within 12 inches (300 mm) of finish grade. Place drainage fill
in layers not exceeding 3 inches (75 mm) in loose depth; compact each layer placed.
1. After installing drainage fill, place one layer of flat -style geotextile filter fabric over top of
drainage fill, overlapping edges at least 4 inches (100 mm).
2. Before installing drainage fill, lay flat -style geotextile filter fabric in trench and overlap trench
sides. After installing drainage fill, wrap top of drainage fill with flat -style geotextile filter fabric.
3. Encase pipe with sock -style geotextile filter fabric before installing pipe. Connect sock sections
with electrical tape.
C.
Drainage Conduit: Provide
,
trench width to allow installation of drainage conduit. Grade bottom of
trench excavations to required slope and compact to firm, solid bed for drainage system.
D.
Fill to Grade: Place native fill material over drainage [fill) (conduit). Place material in loose -depth layers
not exceeding 6 inches (150 mm). Thoroughly compact each layer_ Fill to finish grade.
SUBDRAINAGE 02620-10
I �,
1
L��
t
1
it
fl
3.11 PIPING INSTALLATION
LION SQUARE LODGE NORTH
Vail, Colorado
A. Install piping beginning at low points of system, true to grades and alignment indicated, with unbroken
continuity of invert. Bed piping with fiill bearing in filtering material. Install gaskets, seals, sleeves, and
couplings according to manufacturer's written instructions and other requirements indicated.
1. Foundation Subdrainage: Install piping pitched down in direction of flow, at a minimum slope of
0.5 percent and with a minimum cover of 36 inches (915 mm), unless otherwise indicated.
2. Underslab Subdrainage: Install piping pitched down in direction of flow, at a minimum slope of
0.5 percent.
3. Retaining -Wall Subdrainage: When water discharges at end of wall into stormwater piping
system, install piping pitched down in direction of flow, at a minimum slope of 0.5 percent and
with a minimum cover of 36 inches (915 mm), unless otherwise indicated. However, when water
discharges through wall weep holes, pipe may be installed with a minimum slope of zero percent.
4_ Landscaping Subdrainage: Install piping pitched down in direction of flow, at a minimum slope
of 0.5 percent and with a minimum cover of 36 inches (915 mm), unless otherwise indicated.
5. Lay perforated pipe with perforations down.
6. Lay open joint pipe spaced as indicated on Drawings or, if not indicated, with 1/4 -inch (6 -mm)
space between ends. Cover top two- thirds of joint opening with open -joint screening material and
tie with corrosion- resistant wire.
7. Excavate recesses in trench bottom for bell ends of pipe. Lay pipe with bells facing upslope and
with spigot end entered frilly into adjacent bell_
B. Use increasers, reducers, and couplings made for different sizes or materials of pipes and fittings being
connected. Reduction of pipe size in direction of flow is prohibited.
C. Install PE piping according to ASTM D 2321.
D. Install PVC piping according to ASTM D 2321.
E. Install clay piping according to ASTM C 12 and NCPI's "Clay Pipe Engineering Manual."
F. Install concrete piping according to ACPA's "Concrete Pipe Handbook."
3.12 PIPE JOINT CONSTRUCTION
A. Cast -Iron Soil Pipe and Fittings: Hub and spigot, with ntbber compression gaskets according to CISPI's
"Cast Iron Soil Pipe and Fittings Handbook." Use gaskets that match class of pipe and fittings.
B. Join PE pipe, tubing, and fittings with couplings for soillight joints according to AASHTO's "Standard
Specifications for Highway Bridges," Division 11, Section 26.4.2.4, "Joint Properties."
C. Join perforated, PE pipe and fittings with couplings for soillight joints according to AASHTO's "Standard
Specifications for Highway Bridges," Division 11, Section 26.4.2.4, "Joint Properties "; or according to
ASTM D 2321.
D. Join PVC pipe and fittings according to ASTM D 3034 with elastomerie seal gaskets according to
ASTM D 2321 _
E. Join perforated, PVC pipe and fittings according to ASTM D 2729, with loose, bell- and - spigot joints.
F. Join perforated, clay pipe and fittings with gaskets according to ASTM C 425.
G. Lay clay pipe and fittings with open joints and open -joint screening material_
I SUBDRAINAGE
02620- 11
11
LION SQUARE LODGE NORTH
Vail, Colorado
H. Join perforated, concrete pipe and fittings with gaskets according to ASTM C 443/C 443M.
I. Special Pipe Couplings: Join piping made of different materials and dimensions with special couplings
made for this application. Use couplings that are compatible with and that fit both pipe materials and
dimensions.
3.13 FOUNDATION, RETAINING -WALL AND LANDSCAPING SUBDRAINAGE CLEANOUT
INSTALLATION
A. Install cleanouts from subdrainage piping to grade. Locate cleanouts at beginning of piping run and at
changes in direction. Install fittings so cleanouts open in direction of flow in piping_
B. In vehicular- traffic areas, use NPS 4 (DN 100) cast -iron soil pipe and fittings for subdrainage piping
branch fittings and riser extensions to cleanout plug. Set cleanout frames and covers in a cast -in -place
concrete anchor, 18 by 18 by 12 inches (450 by 450 by 300 mm) in depth. Set top of cleanout plug flush
with grade. Cast -iron pipe may also be used for cleanouts in nonvehicular- traffic areas.
C. In nonvehicular - traffic areas, use NPS 4 (DN 100) PVC pipe and fittings for subdrainage piping branch
fittings and riser extensions to cleanout plug. Set cleanout frames and covers in a cast -in -place concrete
anchor, 12 by 12 by 4 inches (300 by 300 by 100 mm) in depth. Set top of cleanout plug I inch (25 mm)
above grade.
3.14 UNDERSLAB SUBDRAINAGE CLEANOUT INSTALLATION
A. Install cleanouts and riser extensions from subdrainage piping to top of slab. Locate cleanouts at
beginning of piping run and at changes in direction. Install fittings so cleanouts open in direction of flow
in piping.
B. Use NPS 4 (DN 100) cast -iron soil pipe and fittings for subdrainage piping branch fittings and riser
extensions to cleanout plug flush with top of slab.
3.15 CONNECTIONS
A. Piping installation requirements are specified in other Division 15 Sections. Drawings indicate general
arrangement of piping, fittings, and specialties.
B. Connect low elevations of subdrainage system to solid building storm drainage system.
C. Where required, connect low elevations of foundation subdrainage to stormwater sump pumps.
3.16 FIELD QUALITY CONTROL
A. Testing: After installing drainage till to top of pipe, test drain piping with water to ensure free flow
before backfilling_ Remove obstructions, replace damaged components, and repeat test until results are
satisfactory_
t
F1
t
1
t
SUBDRAINAGE 02620-12 1
J
LION SQUARE LODGE NORTH
Vail, Colorado
3.17 CLEANING
A. Clear interior of installed piping and structures of dirt and other superfluous material as work progresses.
Maintain swab or drag in piping and pull past each joint as it is completed. Place plugs in ends of
uncompleted pipe at end of each day or when work stops.
END OF SECTION 02620
SUQDRAINAGE 02620- 13
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02630 - STORM DRAINAGE
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes storm drainage outside the building.
B. Related Sections: Division 2 Section "Subdrainage" for foundation drains connecting to storm drainage.
1.2 DEFINITIONS
A. HDPE: High Density Polyethylene plastic.
B. PVC: Polyvinyl chloride plastic.
1.3 PERFORMANCE REQUIREMENTS
A. Gravity-Flow, Nonpressure - Piping Pressure Ratings: At least equal to system test pressure.
B. Materials used should meet or exceed the requirements of the town of Vail, Colorado. In case of conflict,
these requirements shall govern.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Polymer- concrete, channel drainage systems.
2. Stornvater disposal systems.
B. Record Drawings: At project closeout, submit record drawings of installed storm drainage system piping
and products, in accordance with requirements of Divisions 1
C. Design Mix Reports and Calculations_ For each class of cast -in -place concrete.
D. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic structures, pipe, and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
C. Handle precast concrete manholes and other structures according to manufacturer's written rigging
instructions.
1.6 PROJECT CONDITIONS
STORM DRAINAGE 02630-1
LION SQUARE LODGE NORTH
Vail, Colorado
A. Site Information: Perform site survey, research public utility records, and verify existing utility locations.
B. Locate existing structures and piping to be closed and abandoned. Pothole ahead of installation to
determine exact horizontal and vertical location of existing utilities at planned crossings_ Notify Engineer
of conflicts.
C. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless
permitted under the following conditions and then only after arranging to provide temporary utility
services according to requirements indicated:
1. Notify Architect not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Architect's written permission.
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Polymer- Concrete, Channel Drainage Systems:
a. ABT, Inc.
b. ACO Polymer Products, Inc_
2. NyloPlant Area Drains: As Shown on plan
2.2 PIPING MATERIALS
A. Refer to Part 3 "Piping Applications" Article for applications of pipe and fitting materials.
2.3 PIPES AND FITTINGS
A. Corrugated HDPE Drainage Tubing and Fittings: AASHTO M 252, Type S. with smooth waterway for
couplingjoints, G' diameter
1. Silttight Couplings: PE sleeve with ASTM D 1056, Type 2, Class A, Grade 2 gasket material that
mates with tube and fittings to form silttight joints.
B. Corrugated PE Pipe and Fittings: AASHTO M 294, Type S, with smooth waterway for coupling joints,
12" diameter.
I . Silttight Couplings: PE sleeve with ASTM D 1056, Type 2, Class A, Grade 2 gasket material that
mates with pipe and fittings to form silttight joints.
C. Reinforced - Concrete Sewer Pipe and Fittings: ASTM C 76. Class III and V, for gasketed joints.
1. Gaskets: ASTM C 443, ribber.
2.4 MANHOLES
A. Normal- Traffic Precast Concrete Manholes: ASTM C 478 (ASTM C 478M), precast, reinforced
concrete, of depth indicated, with provision for rubber gasketed joints.
STORM DRAINAGE 02630-2
LION SQUARE LODGE NORTH
Vail, Colorado
1. Diameter: 48 inches minimum, unless otherwise indicated.
2. Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required
to prevent flotation.
3. Base Section: 6 -inch minimum thickness for floor slab and 5 -inch (I00 -mm) minimum thickness
for walls and base riser section, and having separate base slab or base section with integral floor.
4. Riser Sections: 5 -inch minimum thickness, and lengths to provide depth indicated.
5. Top Section: Eccentric -cone type, unless concentric -cone or flat -slab -top type is indicated. Top
of cone of size that matches grade rings.
6. Gaskets: ASTM C 443, rubber.
7. Grade Rings: Include two or three reinforced - concrete rings, of 6- to 9 -inch total thickness, that
match 24 -inch- diameter frame and cover.
8. Steps: Fiberglass, individual steps or ladder. Include width that allows worker to place both feet
on one step and is designed to prevent lateral slippage off step. Cast or anchor into base, riser, and
top section sidewalls with steps at 12- to 16 -inch intervals. Omit steps for manholes less than 60
inches deep.
9. Steps: ASTM C 478, individual steps or ladder. Omit steps for manholes less than 60 inches
deep.
10. Pipe Connectors: ASTM C 923, resilient, of size required, for each pipe connecting to base
section.
2.5 CATCH BASINS
A. Normal- Traffic, Catch Basins: as shown on drawings.
B. Frames and Grates: as shown on drawings
2.6 CONCRETE
A. General: Cast -in -place concrete according to ACI 318, ACI 350R, and the following:
. Cement: ASTM C 150, Type 11.
2. Fine Aggregate: ASTM C 33, sand.
3. Coarse Aggregate: ASTM C 33, crushed gravel.
4. Water: Potable.
B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water - cementitious ratio.
I . Reinforcement Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed steel.
C. Structure Channels and Benches: Factory or field formed from concrete. Portland cement design mix,
4000 psi minimum, with 0.45 maximum water - cementitious ratio.
I. Include channels and benches in manholes.
a. Channels: Concrete invert, formed to same width as connected piping, with height of
vertical sides to three - fourths of pipe diameter. Form curved channels with smooth,
uniform radius and slope.
1) Invert Slope: 2 percent through manhole.
b. Benches: Concrete, sloped to drain into channel.
I ) Slope: 4 percent.
D. Ballast and Pipe Supports: Portland cement design mix, 3000 psi (20.7 MPa) minimum, with 0.58
maximum water - cementitious ratio.
STORM DRAINAGE
02630-3
LION SQUARE LODGE NORTH
Vail, Colorado
1. Reinforcement Bars: ASTM A 6151A 615M, Grade 60 (Grade 420), deformed steel.
2.7 POLYMER - CONCRETE, CHANNEL DRAINAGE SYSTEMS
A. General: Modular system of precast, polymer- concrete channel sections, grates, and appurtenances;
designed so grates fit into channel recesses without rocking or rattling. Include number of units required
to form total lengths indicated_
B. Sloped- Invert, Polymer- Concrete Systems: as shown on drawings:
I. Channel Sections: Interlocking - joint, precast, modular units with end caps. Include 4 -inch inside
width and deep, rounded bottom, with built -in invert slope of 0.6 percent and with outlets in
number, sizes, and locations indicated. Include extension sections necessary for required depth.
a. Frame: Include gray -iron or steel frame for grate, as shown on drawings
2. Grates with manufacturer's designation "Heavy Duty," as shown on drawings.
2.8 PIPE OUTLETS
A. Riprap Basins: Broken, irregular size and shape, graded stone, as shown on drawings.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavating, trenching, and backfilling are specified in Division 2 Section "Earthwork."
3.2 IDENTIFICATION
A. Materials and their installation are specified in Division 2 Section "Earthwork." Arrange for installing
green warning tapes directly over piping and at outside edges of underground strictures.
1 _ Use detectable waming tape over nonferrous piping and over edges of underground structures.
3.3 PIPING APPLICATIONS
A. General: Include watertight, silttight, or soiltight joints, unless watertight or silttight joints are indicated.
B. Refer to Part 2 of this Section for detailed specifications for pipe and fitting products listed below, Use
pipe, fittings, and joining methods according to applications indicated.
C. Gravity -Flow Piping: Use the following:
i _ NPS 4 and NPS 6: Corrugated PE drainage tubing and fittings, silttight couplings, and coupled
joints.
2. NPS 8 to NPS 15 (DN200 to DN375): Corrugated PE drainage tubing and fittings, silttight
couplings, and coupled joints in NPS 8 and NPS 10. Use corrugated PE pipe and fittings, silttight
couplings, and coupled joints in NPS 12 and NPS 15.
3. NPS 15 reinforced - concrete sewer pipe and fittings, gaskets, and gasketed joints Class III and V.
Do not use nonreinforced pipe instead of reinforced concrete pipe.
STORM DRAINAGE 02630-4
LION SQUARE LODGE NORTH
Vail, Colorado
3.4 INSTALLATION, GENERAL
A. General Locations and Arrangements: Drawing plans and details indicate general location and
arrangement of underground storm drainage piping. Location and arrangement of piping layout take
design considerations into account. Install piping as indicated, to extent practical.
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of
invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according
to manufacturer's written instructions for use of lubricants, and other installation requirements. Maintain
swab or drag in line, and pull past each joint as it is completed.
C. Use manholes for changes in direction, unless fittings or cleanouts are indicated. Use fittings for branch
connections, unless direct tap into existing sewer is indicated.
D. Use proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings
are connected. Reducing size of piping in direction of flow is prohibited.
E. Install gravity-flow piping and connect to building's storm drains, of sizes and in locations indicated.
Terminate piping as indicated.
F. Extend storm drainage piping and connect to building's storm drains, of sizes and in locations indicated.
3.5 PIPE JOINT CONSTRUCTION AND INSTALLATION
A. General: Join and install pipe and fittings according to installations indicated.
B. Refer to Division 2 Section "Utility Materials" for basic piping joint construction and installation.
C. HDPE Pipe and Fittings: As follows:
1. Join pipe, tubing, and fittings with couplings for soiltight joints according to manufacturer's
written instructions.
2. Install according to ASTM D 2321 and manufacturer's written instntctions.
3. Install corrugated piping according to the Comigated Polyethylene Pipe Association's
' "Recommended Installation Practices for Corrugated Polyethylene Pipe and Fittings_"
D. Concrete Pipe and Fittings: Install according to ACPA's "Concrete Pipe Installation Manual." Use the
following seals:
s l . Round Pipe and Fittings: ASTM C 443 (ASTM C 443M), rubber gaskets.
E. System Piping Joints: Make joints using system manufacturer's couplings, unless otherwise indicated.
F. Join piping made of different materials or dimensions with couplings made for this application. Use
couplings that are compatible with and that fit both systems' materials and dimensions.
3.6 MANHOLE INSTALLATION
A. General: Install manholes, complete with appurtenances and accessories indicated.
B. Form continuous concretc channels and benches between inlets and outlet.
T R 1S O � DRAINAGE 02630-5
LION SQUARE LODGE NORTH
Vail, Colorado
C. Set tops of frames and covers flush with finished grade surface of manholes.
D. Install precast concrete manhole sections with gaskets according to ASTM C 891.
3.7 CATCH -BASIN INSTALLATION
A. Construct catch basins to sizes and shapes indicated.
B. Set frames and grates to elevations indicated.
3.8 STORM DRAINAGE INLET AND OUTLET INSTALLATION
A. Construct riprap of broken stone, as indicated.
B. Install outlets that spill onto grade, with flared end sections that match pipe, where indicated.
3.9 CONCRETE PLACEMENT
A. Place cast -in -place concrete according to ACI 318 and ACI 350R.
3.10 DRAINAGE SYSTEM INSTALLATION
A. Assemble and install components according to manufacturer's written instructions.
B. Install with top surfaces of components, except piping, flush with finished surface_
C. Assemble channel sections to form slope down toward drain outlets. Use sealants, adhesives, fasteners,
and other materials recommended by system manufacturer_
D. Embed channel sections and drainage specialties in 4 -inch minimum concrete around bottom and sides.
E. Fasten grates to channel sections if indicated.
3.11 CLEANOUT INSTALLATION
A. Install cleanouts and riser extension from sewer pipe to cleanout at grade. Install piping so cleanouts
open in direction of flow in sewer pipe.
B. Set cleanout frames and covers in earth in cast -in -place concrete block, as shown on drawings. Set with
tops I inch above surrounding earth grade.
C. Set cleanout frames and covers in concrete pavement with tops flush with pavement surface.
3.12 FIELD QUALITY CONTROL
A. Clear interior of piping and structures of dirt and superfluous material as work progresses. Maintain swab
or drag in piping, and pull past each joint as it is completed_
1. In large, accessible piping, brushes and brooms may be used for cleaning.
STORM DRAINAGE 02630-6
I
I
A
I
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Place plug in end of incomplete piping at end of day and when work stops.
3. Flush piping between manholes and other structures to remove collected debris, if required by
authorities having jurisdiction.
B. Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect
after approximately 24 inches of backfill is in place, and again at completion of Project.
I. Submit separate reports for each system inspection.
2. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size
not less than 92.5 percent of piping diameter.
c. Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
C. Exfiltration: Water leakage from or around piping.
3. Replace defective piping using new materials, and repeat inspections until defects are within
allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
C. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired in
accordance with Vail, Colorado requirements..
I . Do not enclose, cover, or put into service before inspection and approval.
2. Test completed piping systems according to authorities having jurisdiction.
3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance
notice.
4. Submit separate reports for each test.
5. Leaks and loss in test pressure constitute defects that must be repaired.
6. Replace leaking piping using new materials, and repeat testing until leakage is within allowances
specified.
END OF SECTION 02630
STORM DRAINAGE
02630-7
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02732 - ROADWAY BASE
PARTI GENERAL
1.01 DESCRIPTION
A. Work included: Preparing surface of subgrade prior to paving and after utility contractors
have completed installation of all utilities, and furnish and place one or more courses of
aggregate in conformance with lines, grades, and typical sections shown on drawings. All
work shall be in accordance with Town of Vail requirements, Standards and
Specifications.
B. Related Work:
1. Drainage Structures, Pipes, and Fittings: Section 02430
2. Water System: Section 02510
3. Sanitary Sewer System 02530
1.02 SUBMITTALS
A. 'Pest Reports: If requested, fiirnish proposed source of materials and copies of tests from
certified and acceptable testing laboratory:
1. Sieve analysis — ASTM C 136
2. Wear Abrasion — ASTM C131
3. Liquid Limit — AASHTO T89, T90
4. Moisture Density Curves — AASHTO T99
PART2 PRODUCTS
2.01 AGGREGATE
A. Aggregate shall conform to following gradation:
Sieve Percentage by Weight Passing square Mesh Sieves
Size
Class 1 Class 2 Class 4 Class 5 Class 6
4" 100 - -
3" 100 95 -100 - - -
2" 95 -100 - 100 - 1- 1 /2" - 90 -100 - -
I" - - 100 -
3 /a - 50 -90 - 100
No.4 30 -65 - 30 -50 30 -70 30 -65
No. 8 - - - 25 -55
No. 200 3 -15 3 -15 3 -12 3 -15 3 -12
Liquid Limit not greater than 35 for Class 2; 30 for Class 4, 5, or 6.
Plasticity Index not exceeding 6.
B. Requirements for this Project:
Furnish Class 6 aggregate for this Project.
ROADWAY BASE 02732-1
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3 EXECUTION
3.01 PREPARATION
A. Subgrade Preparation: Shape and compact to crown, line, grades, and typical cross
section shown on drawings before placing base material. Compact to 95 %ASTM -698
3.02 MIXING
The Contractor shall mix the aggregate by methods that insure a thorough and homogenous
mixture.
3.03 PLACEMENT
If required compacted depth of aggregate base course exceeds 6 ", construct in two or more layers
of approximately equal thickness. Maximum compacted thickness of any one layer shall not
exceed 6 ". When vibratory or other approved types of special compacting equipment are used,
compacted depth of single layer may be increased to 8" upon approval of Engineer.
3.04 SHAPING AND COMPACTION
Compact each layer to 95% ASTM -698. Maintain surface of each layer during compaction so that
uniform texture is produced and aggregates are firmly keyed. Apply water uniformly during
compaction so moisture content is within 2% of optimum.
END Of SECTION 02732
ROADWAY BASE
02732-2
r
f
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02751 - CEMENT CONCRETE PAVEMENT
PART]- GENERAL
1.1 SUMMARY
A. This Section includes exterior cement concrete pavement for the following:
I . Driveways and roadways on grade
2. Curbs and gutters.
3. Walkways.
4_ Site walks / stairs.
B. Related Sections: Division 3 Section "Cast -in -Place Concrete" for general building applications of
concrete.
1.2 PERFORMANCE REQUIREMENTS
A. Materials and installation methods used should meet or exceed the requirements of the town of
Vail.
1.3 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic
cement, fly ash and other pozzolans, and ground granulated blast - furnace slag.
1.4 SUBMITTALS
A. Product Data: For each type of manufactured material and product indicated_
B. Design Mixtures: For each concrete pavement mixture. Include alternate mixture designs when
characteristics of materials, Project conditions, weather, test results, or other circumstances warrant
adjustments.
C. Qualification Data: For testing agency.
D. Material Test Reports: From a qualified testing agency indicating and interpreting test results for
compliance of the following with requirements indicated, based on comprehensive testing of current
materials:
1. Aggregates.Include service record data indicating absence of deleterious expansion of concrete
due to alkali- aggregate reactivity.
E. Material Certificates: Signed by manufacturers certifying that each of the following materials complies
with requirements:
L Cementitious materials.
2. Steel reinforcement and reinforcement accessories_
3. Fiber reinforcement.
4_ Admixtures.
CEMENT CONCRETE PAVEMENT 02751 - I
[I
LION SQUARE LODGE NORTH
Vail, Colorado
F.
1.5
A.
B.
C.
D.
E.
F
5. Curing compounds.
6. Applied finish materials.
7. Bonding agent or epoxy adhesive.
8. Joint fillers.
Field quality- control test reports.
1. All reports shall be provided to Civil and Geotechnical Engineers.
QUALITY ASSURANCE
Manufacturer Qualifications: Manufacturer of ready -mixed concrete products who complies with
ASTM C 94/C 94M requirements for production facilities and equipment.
1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete
Production Facilities."
Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and
ASTM E 329 for testing indicated, as documented according to ASTM E 548.
1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician,
Grade 1, according to ACI CP -01 or an equivalent certification program.
ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by
requirements in the Contract Documents.
Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation
tests and to design concrete mixtures per requirements specified on Drawings.
Mockups: Cast mockups of full -size sections of concrete pavement to demonstrate typical joints, surface
finish, texture, color, and standard of workmanship.
1. Build mockups in the location and of the size indicated or, if not indicated, as directed by
Architect.
2. Notify Architect seven days in advance of dates and times when mockups will be constructed_
3. Obtain Architect's approval of mockups before starting construction_
4. Maintain approved mock-ups during construction in an undisturbed condition as a standard for
judging the completed pavement.
5. Demolish and remove approved mockups from the site when directed by Architect.
6. Approved mockups may become part of the completed Work if undisturbed at time of Substantial
Completion.
Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1
Section "Project Management and Coordination."
1. Before submitting design mixtures, review concrete pavement mixture design and examine
procedures for ensuring quality of concrete materials and concrete pavement construction
practices. Require representatives, including the following, of each entity directly concerned with
concrete pavement, to attend conference:
a. Contractor's superintendent.
b. Independent testing agency responsible for concrete design mixtures.
C. Ready -mix concrete producer.
d. Concrete pavement subcontractor.
CEMENT CONCRETE PAVEMENT
02751 -2
J
t
i
1
r
I
LION SQUARE LODGE NORTH
Vail, Colorado
I.6 PROJECT CONDITIONS
A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction
activities.
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product
selection:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering
products that may be incorporated into the Work.
2.2 FORMS
A. Form Materials: Plywood, metal, metal - framed plywood, or other approved panel -type materials to
provide full- depth, continuous, straight, smooth exposed surfaces.
I . Use flexible or curved forms for curves with a radius 100 feet (30.5 m) or less.
B. Form - Release Agent: Commercially formulated form- release agent that will not bond with, stain, or
adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
2.3 STEEL REINFORCEMENT
A. Plain -Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as -drawn steel wire into flat
sheets.
B. Deformed -Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.
C. Epoxy - Coated Welded Wire Fabric: ASTM A 884/A 884M, Class A, plain steel.
D. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420); defomned.
E. Galvanized Reinforcing Bars: ASTM A 767/A 767M, Class II zinc coated, hot -dip galvanized after
fabrication and bending; with ASTM A 615/A 615M, Grade 60 (Grade 420) deformed bars.
F. Epoxy- Coated Reinforcing Bars: ASTM A 775/A 775M or ASTM A 934/A 934M; with
ASTM A 615/A 615M, Grade 60 (Grade 420) deformed bars.
G. Steel Bar Mats: ASTM A 184/A 184M; with ASTM A 615/A 615M, Grade 60 (Grade 420), deformed
bars; assembled with clips.
H_ Plain Steel Wire: ASTM A 81
1. Deformed -Steel Wire: ASTM A 496.
J- Epoxy- Coated -Steel Wire: ASTM A 884/A 884M, Class A coated, plain.
CEMENT CONCRETE PAVEMENT 02751 -3
LION SQUARE LODGE NORTH
Vail, Colorado
2.7 RELATED MATERIALS
A_ Expansion- and Isolation- Joint - Filler Strips: ASTM D 1751, asphalt- saturated cellulosic fiber or
ASTM D 1752, cork or self - expanding cork.
B. Slip- Resistive Aggregate Finish: Factory- graded, packaged, rustproof, nonglazing, abrasive aggregate of
fused aluminum -oxide granules or crushed emery with emery aggregate containing not less than 50
percent aluminum oxide and not less than 20 percent ferric oxide; unaffected by freezing, moisture, and
cleaning materials.
C. Bonding Agent: ASTM C 1059, Type II, non - redispersible, acrylic emulsion or styrene butadiene.
D. Epoxy Bonding Adhesive: ASTM C 881, two- component epoxy resin, capable of humid curing and
bonding to damp surfaces, of class suitable for application temperature and of grade to requirements, and
as follows:
1. Types 1V and V, load bearing, for bonding hardened or freshly mixed concrete to hardened
concrete.
2.8 PAVEMENT MARKINGS
A. Pavement- Marking Paint: Alkyd -resin type, lead and chromate free, ready mixed, complying with
FS TT-P -I 15, Type 1 or AASHTO M 248, Type F
I . Color: As indicated..
B_ Pavement- Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying
with FS TT-P -1952, with drying time of less than 45 minutes.
I. Color: As indicated.
C. Glass Beads: AASHTO M 247, Type I.
2.9 WHEEL STOPS
A. Wheel Stops: Precast, air- entrained concrete, 2500 -psi (17.2 -MPa) minimum compressive strength, 4 -1/2
inches (I IS mm) high by 9 inches (225 mm) wide by 72 inches (1820 mm) long. Provide chamfered
corners and drainage slots on underside and holes for anchoring to substrate.
I. Dowels: Galvanized steel, 3/4 -inch (19 -mm) diameter, 10 -inch (254 -mm) minimum length.
B. Wheel Stops: Solid, integrally colored, 96 percent recycled HDPE or commingled postconsumer and
postindustrial recycled plastic; UV stabilized; [4 inches (100 mm) high by 6 inches (150 mm) wide by 72
inches (1820 mm) long. Provide chamfered corners and drainage slots on underside and (toles for
anchoring to substrate_
. Dowels: Galvanized steel, 3/4 -inch (I 9 -nun) diameter, 10 -inch (254 -mm) minimum length.
2.10 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal- weight
concrete determined by either laboratory trial mixes or field experience.
CEMENT CONCRETE PAVEMENT 02751 -6
LION SQUARE LODGE NORTH
Vail, Colorado
I . Use a qualified independent testing agency for preparing and reporting proposed concrete mixture
designs for the trial batch method.
B. Proportion mixtures to provide normal- weight concrete to meet the Colorado Department of
Transportation Class P with the following properties:
I. Compressive Strength (28 Days): 4000 psi.
2. Maximum Water - Cementitious Materials Ratio at Point of Placement: 0.5.
3. Slump Limit: 5 inches (125 mm), plus or minus I inch (25 mm).
C. Limit water - soluble, chloride -ion content in hardened concrete to 0.15 percent by weight of cement.
D. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
I . Use water - reducing admixture in concrete, as required, for placement and workability.
2. Use water - reducing and retarding admixture when required by high temperatures, low humidity, or
other adverse placement conditions.
E. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland
cement according to AC1301 requirements for concrete exposed to deicing chemicals, as follows:
I. Ground Granulated Blast- Furnace Slag: 50 percent.
F. Synthetic Fiber: Uniformly disperse in concrete mix at manufacturer's recommended rate, but not less
than 1.5 lb/cu. yd. (0.90 kg /cu. M).
G. Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions
and to result in hardened concrete color consistent with approved mockup.
2.11 CONCRETE MIXING
A. Ready -Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to
ASTM C 94/C 94M[ and ASTM C 1116]_ Furnish batch certificates for each batch discharged and used
in the Work.
1. When air temperantre is between 85 deg F (30 deg C) and 90 deg F (32 deg C), reduce mixing and
delivery time from 1 -1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C),
reduce mixing and delivery time to 60 minutes.
B. Project -Site Mixing: Measure, batch, and mix concrete materials and concrete according to
ASTM C 94/C 94M. Mix concrete materials in appropriate drum -type batch machine mixer.
I. Provide batch ticket for each batch discharged and used in the Work, indicating Project
identification name and number, date, mixture type, mixing time, quantity, and amount of water
added.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional,
grading, and elevation tolerances.
CEMENT CONCRETE PAVEMENT 02751-7
n
LION SQUARE LODGE NORTH
Vail, Colorado
B. Proof -roll prepared subbase surface below concrete pavements with heavy pneumatic -tired equipment to
identify soft pockets and areas of excess yielding_
1. Completely proof -roll subbase in one direction and repeat in perpendicular direction. Limit
vehicle speed to 3 mph (5 km/h).
2. Proof -roll with a loaded 10 -wheel tandem -axle dump truck weighing not less than 15 tons (13.6
tonnes).
3. Subbase with soft spots and areas of pumping or rutting exceeding depth of 1/2 inch (13 mm)
require correction according to requirements in Division 2 Section "Earthwork."
C. Proceed with concrete pavement operations only after nonconforming conditions have been corrected and
subgrade is ready to receive pavement.
3.2 PREPARATION
A. Remove loose material from compacted subbase surface immediately before placing concrete.
3.3 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge fomu, bulkheads, and intermediate screed guides for pavement to required
lines, grades, and elevations. Install forts to allow continuous progress of work and so forms can remain
in place at least 24 hours after concrete placement.
B. Clean forms after each use and coat with form - release agent to ensure separation from concrete without
damage.
3.4 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting
reinforcement.
B_ Clean reinforcement of loose rust and mill scale, earth, ice, or other bond - reducing materials.
C_ Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete
placement. Maintain minimum cover to reinforcement.
D. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full
mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either
direction.
E. Zinc- Coated Reinforcement: Use galvanized steel wire ties to fasten zinc- coated reinforcement. Repair
cut and damaged zinc coatings with zinc repair material.
F. Epoxy - Coated Reinforcement: Use epoxy- coated steel wire ties to fasten epoxy- coated reinforcement.
Repair cut and damaged epoxy coatings with epoxy repair coating according to ASTM D 3963/D 3963M.
G. Install fabricated bar mats in lengths as long as practicable. Handle units to keep them flat and free of
distortions. Straighten bends, kinks, and other irregularities, or replace units as required before
placement. Set mats for a minimum 2 -inch (50 -ntm) overlap of adjacent mats.
CEMENT CONCRETE PAVEMENT 02751 -8 � �
1
L�
t
e
I I
t
1
3.5 JOINTS
LION SQUARE Lot)CE NORT}I
Vail, Colorado
A. General: Form construction, isolation, and contraction joints and tool edgings true to line with faces
perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline, unless
otherwise indicated.
When joining existing pavement, place transverse joints to align with previously placed joints,
unless otherwise indicated.
B. Construction Joints: Set construction joints at side and end terminations of pavement and at locations
where pavement operations are stopped for more than one -half hour unless pavement terminates at
isolation joints.
1. Continue steel reinforcement across construction joints, unless otherwise indicated. Do not
continue reinforcement through sides of pavement strips, unless otherwise indicated.
2. Provide tie bars at sides of pavement strips where indicated.
3. Butt Joints: Use epoxy bonding adhesive at joint locations where fresh concrete is placed against
hardened or partially hardened concrete surfaces.
4. Keyed Joints: Provide preformed keyway- section forms or bulkhead forms with keys, unless
otherwise indicated. Embed keys at least 1 -1/2 inches (38 mm) into concrete.
5. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or
asphalt -coat one -half of dowel length to prevent concrete bonding to one side of joint.
C. Isolation Joints: Fomi isolation joints of preformed joint - filler strips abutting concrete curbs, catch
basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.
1. Locate expansion joints at intervals of 50 feet (15.25 m), unless otherwise indicated.
2. Extend joint fillers full width and depth of joint.
3. Terminate joint filler not less than 1/2 inch (13 mm) or more than I inch (25 mm) below finished
surface.
4. Place top of joint filler flush with finished concrete surface if joint sealant is not indicated.
5. Furnish joint fillers in one -piece lengths. Where more than one length is required, lace or clip
joint -filler sections together.
6. Protect top edge of joint filler during concrete placement with metal, plastic, or other temporary
preformed cap. Remove protective cap after concrete has been placed on both sides of joint.
D_ Contraction Joints: Form weakened -plane contraction joints, sectioning concrete into areas as indicated.
Construct contraction joints for a depth equal to at least one -fourth of the concrete thickness, as follows to
match jointing of existing adjacent concrete pavement:
I . Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge
of joint with grooving tool to a 3/8 -inch (10 -mm) radius. Repeat grooving of contraction joints
after applying surface finishes. Eliminate groover marks on concrete surfaces.
2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or
diamond - rimmed blades. Cut 1/8 -inch- (3 -mm -) wide joints into concrete when cutting action will
not tear, abrade, or otherwise damage surface and before developing random contraction cracks.
3_ Doweled Contraction Joints: Install dowel bars and support assemblies at joints where indicated.
Lubricate or asphalt coat one -half of dowel length to prevent concrete bonding to one side of joint.
E. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an
edging tool to a 1/4 -inch (6 -mm) radius. Repeat tooling of edges after applying surface finishes.
Eliminate tool marks on concrete surfaces.
I CEMENT CONCRF,TE PAVEMENT
02751 -9
LION SQUARE LODGE NORTH
Vail, Colorado
3.6
A.
B.
C.
D.
E.
F.
G.
H.
CONCRETE PLACEMENT
Inspection: Before placing concrete, inspect and complete formwork installation, steel reinforcement,
and items to be embedded or cast in. Notify other trades (like snowmelt) to permit installation of their
work.
Remove snow, ice, or frost from subbase surface and reinforcement before placing concrete. Do not
place concrete on frozen surfaces. Take every precaution to prevent snow and ice build up on sub -base
surface.
Moisten subbase to provide a uniform dampened condition at time concrete is placed. Do not place
concrete around manholes or other structures until they are at required finish elevation and alignment.
Comply with AC1 301 requirements for measuring, mixing, transporting, and placing concrete.
Do not add water to concrete during delivery or at Project site.
Do not add water to fresh concrete after testing.
Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag
concrete into place or use vibrators to move concrete into place.
Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand
spading, rodding, or tamping.
Consolidate concrete along face of forms and adjacent to transverse joints with an internal
vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only
square -faced shovels for hand spreading and consolidation. Consolidate with care to prevent
dislocating reinforcement, dowels, and joint devices.
Place concrete in two operations; strike off initial pour for entire width of placement and to the required
depth below finish surface. Lay welded wire fabric or fabricated bar mats immediately in final position.
Place lop layer of concrete, strike off, and screed.
Remove and replace concrete that has been placed for more than 15 minutes without being
covered by top layer, or use bonding agent if approved by Architect.
J
Screed pavement surfaces with a straightedge and strike off.
K. Commence initial floating using bull floats or darbies to impart an open textured and uniform surface
plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete
surfaces before beginning finishing operations or spreading surface treatments.
L. Curbs and Gutters: When automatic machine placement is used for curb and gutter placement, submit
revised mix design and laboratory test results that meet or exceed requirements_ Produce curbs and
gutters to required cross section, lines, grades, finish, and jointing as specified for formed concrete. If
results are not approved, remove and replace with formed concrete.
M. Slip -Form Pavers: When automatic machine placement is used for pavement, submit revised mix design
and laboratory test results that meet or exceed requirements. Produce pavement to required thickness,
lines, grades, finish, and jointing as required for formed pavement.
Compact subbase and prepare subgrade of sufficient width to prevent displacement of paver
machine daring operations.
CEMENT CONCRETE PAVEMENT
02751 -10
1
t
s
t
F
t
LION SQUARE LODGE NORTH
Vail, Colorado
N. When adjoining pavement lanes are placed in separate pours, do not operate equipment on concrete until
pavement has attained 85 percent of its 28 -day compressive strength.
O. Cold- Weather Placement: Comply with ACl 306.1 and as follows. Protect concrete work from physical
damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
1. When air temperature has fallen to or is expected to fall below 40 deg F (4.4 deg C), uniformly
heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than
50 deg F (10 deg C) and not more than 80 deg F (27 deg C) at point of placement.
2. Do not use frozen materials or materials containing ice or snow.
3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical
accelerators unless otherwise specified and approved in mix designs.
P. Hot- Weather Placement: Comply with ACl 301 and as follows when hot - weather conditions exist:
1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F (32 deg C) at
time of placement. Chilled mixing water or chopped ice may be used to control temperature,
provided water equivalent of ice is calculated to total amount of mixing water. Using liquid
nitrogen to cool concrete is Contractor's option.
2. Cover steel reinforcement with water- soaked burlap so steel temperature will not exceed ambient
air temperature immediately before embedding in concrete.
3. Fog -spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade
moisture uniform without standing water, soft spots, or dry areas.
3.7 FLOAT FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.
B. Float Finish: Begin the second floating operation when bleed -water sheen has disappeared and concrete
surface has stiffened sufficiently to permit operations. Float surface with power - driven floats, or by hand
floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high
spots and fill low spots. Refloat surface immediately to uniform granular texture.
I. Burlap Finish: Drag a seamless strip of damp burlap across float - finished concrete, perpendicular
to line of traffic, to provide a uniform, gritty texture.
2. Other Traffic Surfaces: Medium -lo- Fine - Textured Broom Finish: Draw a soft bristle broom
across float- finished concrete surface perpendicular to line of traffic to provide a uniform, fine -line
texture.
3. Sidewalks /Walkways: Medium -to- Coarse - Textured Broom Finish: Provide a coarse finish by
striating float - finished concrete surface 1116 to 1/8 inch (1.6 to 3 mm) deep with a stiff - bristled
broom, perpendicular to line of traffic.
3.8 SPECIAL FINISHES
I
A. Seeded Exposed - Aggregate Finish: Immediately after initial floating, spread a single layer of
uniformly on pavement surface. Tamp aggregate into plastic concrete, and float finish to entirely embed
aggregate with mortar cover of 1/16 inch (1.6 mm).
1. Spray -apply chemical surface retarder to pavement according to manufaclurer's written
instructions.
2. Cover pavement surface with plastic sheeting, sealing laps with tape, and remove sheeting when
ready to continue finishing operations.
CEMENT CONCRETE PAVEMENT
02751 - 11
t
LION SQUARE LODGE NORTH
Vail, Colorado
3. Without dislodging aggregate, remove excess mortar by lightly brushing surface with a stiff,
nylon - bristle broom.
4. Fine -spray surface with water and brush. Repeat water flushing and brushing cycle until cement
film is removed from aggregate surfaces to depth required.
B. Slip- Resistive Aggregate Finish: Before final floating, spread slip- resistive aggregate finish on pavement
surface according to manufacturer's written instructions and as follows:
1. Uniformly spread [40 lb /100 sq. ft. (19.5 kg/10 sq. m) dampened slip- resistive aggregate over
pavement surface in 2 applications_ Tamp aggregate flush with surface using a steel trowel, but do
not force below surface.
2. Uniformly distribute approximately two- thirds of slip- resistive aggregate over pavement surface
with mechanical spreader, allow to absorb moisture, and embed by power floating. Follow power
floating with a second slip- resistive aggregate application, uniformly distributing remainder of
material at right angles to first application to ensure uniform coverage, and embed by power
floating.
3. Cure concrete with curing compound recommended by slip - resistive aggregate manufacturer.
Apply curing compound immediately after final finishing.
4. After curing, lightly work surface with a steel wire brush or abrasive stone and water to expose
nonslip aggregate. r
3.9 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. i
B. Comply with ACI 306.1 for cold - weather protection.
C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions
cause moisture loss approaching 0.2 lb/sq. ft. x It (1 kg /sq. m x h) before and during finishing operations.
Apply according to manufacturer's written instructions after placing, screeding, and bull floating or
darbying concrete, but before float finishing.
D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
E. Curing Methods: Cure concrete by moisture curing, moisture- retaining -cover curing, curing compound,
or a combination of these as follows:
1. Moist Curing: Keep surfaces continuously moist for not less than seven days with the following
materials:
a. Water.
b. Continuous water -fog spray.
C. Absorptive cover, water saturated and kept continuously vet. Cover concrete surfaces and
edges with 12 -inch (300 -mm) lap over adjacent absorptive covers.
2. Moisture - Retaining -Cover Curing: Cover concrete surfaces with moisture- retaining cover for
curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches
(300 mm), and sealed by waterproof tape or adhesive. Immediately repair any holes or tears
during curing period using cover material and waterproof tape.
3. Curing Compound (to be used as indicated in soil Engineers report): Apply uniformly in
continuous operation by power spray or roller according to manufacturer's written instructions, at
a minimum rate of I gallon per 150 square feet. Recoat areas subjected to heavy rainfall within
three hours after initial application. Maintain continuity of coating and repair damage during
'
curing period.
CEMENT CONCRETE PAVEMENT 02751 - 12
A. Do not apply pavement - marking paint until layout, colors, and placement have been verified with
Architect and Landscape Architect
B. Allow concrete pavement to cure for 28 days and be dry before starting pavement marking.
C. Sweep and clean surface to eliminate loose material and'dust.
D. Apply paint with mechanical equipment to produce pavement markings of dimensions indicated with
uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film
thickness of 15 mils (0.4 mm).
1. Spread glass beads uniformly into wet pavement markings at a rate of 6 lb/gal. (0.72 kg /L).
3.12 WHEEL STOPS
A. Securely attach wheel stops into pavement with not less than two galvanized steel dowels embedded in
holes drilled or cast into wheel stops at one - quarter to one -third points. Firmly bond each dowel to wheel
stop and to pavement. Securely install dowels into pavement and bond to wheel stop. Recess head of
dowel beneath top of wheel stop.
3.13 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified independent testing and inspecting agency to perform Geld tests and
inspections and prepare test reports.
B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172
shall be performed according to the following requirements:
I . Testing Frequency: Obtain at least I composite sample for each 100 cu. yd. (76 cu. m) or traction
thereof of each concrete mix placed each day.
a. When frequency of testing will provide fewer than five compressive - strength tests for each
concrete mixture, testing shall be conducted from at least five randomly selected batches or
from each batch if fewer than five are used_
CEMENT CONCRETE PAVEMENT 02751-13
LION SQUARE LODGE NORTH
Vail, Colorado
3.10 PAVEMENT TOLERANCES
A. Comply with tolerances of ACI 117 and as follows:
I.
Elevation: 1/4 inch (6 mm).
2.
Thickness: Plus 318 inch (10 mm), minus 1/4 inch (6 mm).
3.
Surface: Gap below 10 -foot- (3 -m -) long, unleveled straightedge not to exceed 1/4 inch (6 mm).
4.
Lateral Alignment and Spacing of Tie Bars and Dowels: I inch (25 mm).
5.
Vertical Alignment of Tie Bars and Dowels: 1/4 inch (6 mm).
6.
Alignment of Tie -Bar End Relative to Line Perpendicular to Pavement Edge: 1/2 inch (13 mm).
7.
Alignment of Dowel -Bar End Relative to Line Perpendicular to Pavement Edge: Length of dowel
1/4 inch per 12 inches (6 mm per 300 mm).
8.
Joint Spacing: 3 inches (75 mm).
9.
Contraction Joint Depth: Plus 1/4 inch (6 mm), no minus.
10.
Joint Width: Plus 1/8 inch (3 mm), no minus.
3.11 PAVEMENT
MARKING
A. Do not apply pavement - marking paint until layout, colors, and placement have been verified with
Architect and Landscape Architect
B. Allow concrete pavement to cure for 28 days and be dry before starting pavement marking.
C. Sweep and clean surface to eliminate loose material and'dust.
D. Apply paint with mechanical equipment to produce pavement markings of dimensions indicated with
uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film
thickness of 15 mils (0.4 mm).
1. Spread glass beads uniformly into wet pavement markings at a rate of 6 lb/gal. (0.72 kg /L).
3.12 WHEEL STOPS
A. Securely attach wheel stops into pavement with not less than two galvanized steel dowels embedded in
holes drilled or cast into wheel stops at one - quarter to one -third points. Firmly bond each dowel to wheel
stop and to pavement. Securely install dowels into pavement and bond to wheel stop. Recess head of
dowel beneath top of wheel stop.
3.13 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified independent testing and inspecting agency to perform Geld tests and
inspections and prepare test reports.
B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172
shall be performed according to the following requirements:
I . Testing Frequency: Obtain at least I composite sample for each 100 cu. yd. (76 cu. m) or traction
thereof of each concrete mix placed each day.
a. When frequency of testing will provide fewer than five compressive - strength tests for each
concrete mixture, testing shall be conducted from at least five randomly selected batches or
from each batch if fewer than five are used_
CEMENT CONCRETE PAVEMENT 02751-13
5.
6.
LION SQUARE LODGE NORTH
Vail, Colorado
Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not
less than one test for each day's pour of each concrete mix. Perform additional tests when
- onerete consistency appears to change.
Air Content: ASTM C 231, pressure method; one test for each composite sample, but not less
Ihan one test for each day's pour of each concrete mix.
- oncrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg F (4.4
deg C) and below and when 80 deg F (27 deg C) and above, and one test for each composite
sample.
Compression Test Specimens: ASTM C 31 /C 31 M; cast and laboratory cure one set of three
standard cylinder specimens for each composite sample.
Compressive- Strength Tests: ASTM C 39/C 39M; test 1 specimen at 7 days and 2 specimens at
28 days.
a. A compressive- strength test shall be the average compressive strength from 2 specimens
obtained from same composite sample and tested at 28 days.
C_ Strength of each concrete mix will be satisfactory if average of any 3 consecutive compressive- strength
tests equals or exceeds specified compressive strength and no compressive - strength test value falls below
specified compressive strength by more than 500 psi (3.4 MPa).
D. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48
hours of testing. Reports of compressive- strength tests shall contain Project identification name and
number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete
batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials,
compressive breaking strength, and type of break for both 7- and 28 -day tests.
E. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by
Architect but will not be used as sole basis for approval or rejection of concrete.
F. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results
indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as
directed by Architect.
G. Remove and replace concrete pavement where test results indicate that it does not comply with specified
requirements.
H. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of
replaced or additional work with specified requirements.
3.14 REPAIRS AND PROTECTION
�1
r
t
J
n
11
t
A. Remove and replace concrete pavement that is broken, damaged, or defective or that does not comply
with requirements in this Section.
B. Drill test cores, where directed by Architect, when necessary to determine magnitude of cracks or
defective areas. Fill drilled core holes in satisfactory pavement areas with portland cement concrete
bonded to pavement with epoxy adhesive.
C. Protect concrete from danmage. Exclude traffic from pavement for at least 14 days after placement. When
construction traffic is permitted, maintain pavement as clean as possible by removing surface stains and
spillage of materials as they occur.
D. Maintain concrete pavement free of stains, discoloration, dirt, and other foreign material. Sweep concrete
pavement not more than two days before date scheduled for Substantial Completion inspections.
CEMENT CONCRETE PAVEMENT 02751 - 14
u
e
END OF SECTION 02751
CEMENT CONCRETE PAVEMENT
LION SQUARE LODGE NORTH
Vail, Colorado
02751-15
' A. Deliver materials to Project site in original unopened containers or bundles with labels indicating
manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing
instructions for multicomponent materials.
' B. Store and handle materials to comply with manufacturer's written instructions to prevent their
deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not proceed with installation of joint sealants under the following
conditions:
I. When ambient and substrate temperature conditions are outside limits permitted by joint sealant
manufacturer.
2_ When joint substrates are vet.
' B. Joint -Width Conditions: Do not proceed with installation of joint sealants where joint widths are less
than that allowed by joint sealant manufacturer for application indicated.
PAVEMENT JOINT SEALANTS 02764-1
LION SQUARE LODGE NORTH
t
Vail, Colorado
SECTION
02764 - PAVEMENT JOINT SEALANTS
PARTI - GENERAL
1.1
SUMMARY
A.
This Section includes the following:
'
l . Expansion and contraction joints within portland cement concrete pavement.
2. Joints between portland cement concrete and asphalt pavement.
'
1.2
SUBMITTALS
A.
Product Data: For each joint- sealant product indicated.
B.
Samples for Verification: If required, for each type and color of joint sealant required. Install joint -
sealant samples in 112 -inch- (13 -mm -) wide joints formed between two 6 -inch- (150 -mm -) long strips of
material matching the appearance of exposed surfaces adjacent to joint sealants.
C.
Product Certificates: Signed by manufacturers of joint sealants certifying that products fiumished comply
with requirements and are suitable for the use indicated.
D.
Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their
capabilities and experience. Include lists of completed projects with project names and addresses, names
and addresses of architects and owners, and other information specified.
1.3
QUALITY ASSURANCE
A.
Installer Qualifications: An experienced installer who has specialized in installing joint sealants similar
in material, design, and extent to those indicated for this Project and whose work has resulted in joint -
'
sealant installations with a record of successfiul in- service performance.
B.
Source Limitations: Obtain each type of joint sealant through one source from a single manufacturer.
1.4
DELIVERY, STORAGE, AND HANDLING
' A. Deliver materials to Project site in original unopened containers or bundles with labels indicating
manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing
instructions for multicomponent materials.
' B. Store and handle materials to comply with manufacturer's written instructions to prevent their
deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not proceed with installation of joint sealants under the following
conditions:
I. When ambient and substrate temperature conditions are outside limits permitted by joint sealant
manufacturer.
2_ When joint substrates are vet.
' B. Joint -Width Conditions: Do not proceed with installation of joint sealants where joint widths are less
than that allowed by joint sealant manufacturer for application indicated.
PAVEMENT JOINT SEALANTS 02764-1
LION SQUARE LODGE NORTH '
Vail, Colorado
C. Joint - Substrate Conditions: Do not proceed with installation of joint sealants until contaminants capable
of interfering with their adhesion are removed from joint substrates.
PART2- PRODUCTS
2.1 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible
with one another and with joint substrates under conditions of service and application, as demonstrated by '
joint sealant manufacturer based on testing and field experience.
B. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range for this
characteristic. '
2.2 COLD - APPLIED JOINT SEALANTS
A. Premoulded joint filler for expansion joints shall meet ASTM D1751 or ASTM D1752. Per City
Standards.
B.
Type NS Silicone Sealant for Concrete: Single- component, low- modulus, neutral- curing, nonsag silicone
sealant complying with ASTM D 5893 for Type NS.
C.
Type SL Silicone Sealant for Concrete and Asphalt: Single- component, low - modulus, neutral - curing,
self - leveling silicone sealant complying with ASTM D 5893 for Type SL.
D.
Multicomponent Low- Modulus Sealant for Concrete and Asphalt: Proprietary formulation consisting of
reactive petropolymer and activator components producing a pourable, self - leveling sealant.
E.
Available Products: Subject to compliance with requirements, cold- applied joint sealants that may be
incorporated into the Work include, but are not limited to, the following:
I. Type NS Silicone Sealant for Concrete:
a. Roadsaver Silicone -SL; Crafco Inc.
b. 888; Dow Corning.
2. Type SL Silicone Sealant for Concrete and Asphalt:
a. 890 -SL; Dow Corning.
t
3. Mullicomponent Low - Modulus Sealant for Concrete and Asphalt:
a. SOF -SEAL; W.R. Meadows, Inc.
'
23
HOT- APPLIED JOINT SEALANTS
A.
Joint ASTM DI 190.
'
sealer shall meet requirements of Per City Standards.
B.
Elastomeric Sealant for Concrete: Single- component formulation complying with ASTM D 3406.
C.
Sealant for Concrete and Asphalt: Single - component formulation complying with ASTM D 3405.
D.
Available Products: Subject to compliance with requirements, hot - applied joint sealants that may be
incorporated into the Work include, but are not limited to, the following:
'
PAVEMENT JOINT SEALANTS 02764-2 '
LION SQUARE LODGE NORTH
Vail, Colorado
1. Elastomeric Sealant for Concrete:
a. Superseal 444/777; Crafco, Inc.
b_ POLY -J ET 3406; W. R. Meadows, Inc.
2. Sealant for Concrete and Asphalt:
a. ROADSAVER 221; Crafco Inc.
b. Product 99005; Koch Materials Company.
C. Product #9030; Koch Materials Company.
d. SEALTIGHT HI -SPEC; W.R. Meadows, Inc.
2.4 JOINT - SEALANT BACKER MATERIALS
A: General: Provide joint - sealant backer materials that are nonstaining; are compatible with joint substrates,
sealants, primers, and other joint fillers; and are approved for applications indicated by joint sealant
manufacturer based on field experience and laboratory testing.
B. Round Backer Rod for Cold- and Hot - Applied Sealants: ASTM D 5249, Type 1, of diameter and density
required to control sealant depths and prevent bottom -side adhesion of sealant.
C. Backer Strips for Cold- and Hot - Applied Sealants: ASTM D 5249; Type 2; of thickness and width
required to control sealant depths, prevent bottom -side adhesion of sealant, and fill remainder of joint
opening under sealant.
D. Round Backer Rods for Cold- Applied Sealants: ASTM D 5249, Type 3, of diameter and density required
to control sealant depths and prevent bottom -side adhesion of sealant.
2.5 PRIMERS
' A. Primers: Product recommended by joint sealant manufacturer where required for adhesion of sealant to
joint substrates indicated, as determined from preconstruction joint- sealant - substrate tests and field tests.
PART 3 - EXECUTION
' 3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with
requirements for joint configuration, installation tolerances, and other conditions affecting joint - sealant
performance_
' B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
' A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with
joint sealant manufacturer's written instructions.
B. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint sealant
manufacturer, based on preconstruction joint- sealant - substrate tests or prior experience_ Apply primer to
comply with joint sealant manufacturer's written instructions. Confine primers to areas of joint - sealant
bond; do not allow spillage or migration onto adjoining surfaces_
I PAVEMENT JOINT SEALANTS
02764-3
I I
LION SQUARE LODGE NORTH
Vail, Colorado
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint sealant manufacturer's written installation instructions applicable to products
and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint sealants
as applicable to materials, applications, and conditions indicated.
C. Install backer materials of type indicated to support sealants during application and at position required to
produce cross - sectional shapes and depths of installed sealants relative to joint widths that allow optimum
sealant movement capability.
I . Do not leave gaps between ends of backer materials.
2_ Do not stretch, twist, puncture, or tear backer materials.
3. Remove absorbent backer materials that have become wet before sealant application and replace
them with dry materials.
D. Install sealants by proven techniques to comply with the following and at the same time backings are
installed:
I . Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses provided for each joint configuration.
3. Produce uniform, cross - sectional shapes and depths relative to joint widths that allow optimum
.sealant movement capability.
E. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins,
tool sealants according to requirements specified below to form smooth, uniform beads of configuration
indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
I . Remove excess sealants from surfaces adjacent to joint.
2_ Use tooling agents that are approved in writing by joint sealant manufacturer and that do not
discolor sealants or adjacent surfaces.
F. Provide joint configuration to comply with joint sealant manufacturer's written instructions, unless
otherwise indicated.
G. Provide recessed joint configuration for silicone sealants of recess depth and at locations indicated.
3.4 CLEANING
A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by methods and with
cleaning materials approved by manufacturers of joint sealants and of products in which joints occur.
3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from
damage resulting from construction operations or other causes so sealants are without deterioration or
damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs,
cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired
areas are indistinguishable from the original work.
END OF SECTION 02764
1
1
J
0
PAVEMENT JOINT SEALANTS 02764-4 '
i
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02768 - DECORATIVE CEMENT CONCRETE PAVEMENT
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes the following:
t. Colored cement concrete pavement.
2. Stamped cement concrete pavement.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design mixtures.
C. Material certificates.
1.3 QUALITY ASSURANCE
A. Ready- Mix- Concrete Producer Qualifications: A firm experienced in manufacturing ready -mixed
concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and
equipment.
B. ACI Publications: Comply with ACl 301, "Specification for Structural Concrete," unless modified by
requirements in the Contract Documents_
C. Mockups: Cast mockups of fill -size sections (minimum 48 "x48 ") of decorative cement concrete
pavement to demonstrate typical pattern, texture, surface finish, color, joints, and standard of
workmanship_
D. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division I
Section "Project Management and Coordination."
PART 2 - PRODUCTS
2.1 FORMS
A. Form Materials: Plywood, metal, metal- framed plywood, or other approved panel -type materials to
provide frill- depth, continuous, straight, and smooth exposed surfaces.
2.2 STEEL REINFORCEMENT
A. Plain -Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as -drawn steel wire into flat
sheets.
DECORATIVE CEMENT CONCRETE PAVEMENT 02768- 1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420); deformed
C. Steel Bar Mats: ASTM A 184/A 184M; with ASTM A 615/A 615M, Grade 60 (Grade 420), deformed
bars; assembled with clips.
D. Plain Steel Wire: ASTM A 82, as drawn.
E. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening
reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to
CRSI's "Manual of Standard Practice."
2.3
CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source,
throughout Project:
1. White Portland Cement: ASTM C 150, Type I.
B. Normal- Weight Aggregates: ASTM C 33, Class 4S, uniformly graded. Provide aggregates from a single
source.
1. Maximum Aggregate Size: 3/4 inch (19 ntm) nominal_
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
C. Water. Potable and complying with ASTM C 94/C 94M.
D. Air - Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other
admixtures and to contain not more than 0.1 percent water- soluble chloride ions by mass of cementitious
material.
L Water - Reducing Admixture: ASTM C 494/C 494M, Type A.
2. Water- Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.
3. Water - Reducing and Accelerating Admixture: ASTM C 494/C 494M, Type E.
F. Synthetic Fiber: Monofilament polypropylene fibers engineered and designed for use in decorative
cement concrete pavement, complying with ASTM C 1116, Type 111, 1/2 to 1-1/2 inches (13 to 38 mm)
long.
COLOR MATERIALS
2.4
A. Color Pigment: ASTM C 979, synthetic mineral -oxide pigments or colored water- reducing admixtures;
color stable, nonfading, and resistant to lime and other alkalis.
B. Pigmented Mineral Dry-Shake Hardener: Factory- packaged dry combination of portland cement, graded
quartz aggregate, coloring pigments, and plasticizing admixture. Use coloring pigments that are finely
ground, nonfading mineral oxides interground with cement.
C. Pigmented - Powder Release Agent: Factory- packaged dry combination of surface - conditioning and
dispersing agents interground with coloring pigments that facilitates release of stamp mats. Use coloring
pigments that are finely ground, nonfading mineral oxides interground with cement.
DECORATIVE CEMENT CONCRETE PAVEMENT 02768-2
i
LION SQUARE LODGE NORTH
Vail, Colorado
D_ Liquid Release Agent: Manufacturer's standard clear, evaporating formulation that facilitates release of
stamp mats and texture rollers.
2.5 IMPRINTING TOOLS
A. Stamp Mats: Semirigid polyurethane mats with projecting textured and ridged underside capable of
imprinting texture and joint patterns on plastic concrete.
B. Stamp Tools: Open -grid, aluminum or rigid plastic stamp tool capable of imprinting joint patterns on
plastic concrete.
C_ Rollers: Manually controlled, water - filled aluminum rollers with projecting ridges on drum capable of
imprinting texture and joint patterns on plastic concrete_
D. Texture Rollers: Manually controlled, abrasion - resistant polyurethane rollers capable of imprinting
texture on plastic concrete.
2.6 STENCIL MATERIALS
A. Stencils: Manufacturer's standard moisture- resistant paper or reusable plastic stencils, designed for use
on plastic concrete.
2.7 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh
concrete.
B. Waterborne, Membrane- Forming Curing Compound: ASTM C 309, Type 1, Class B, specifically
manufactured for colored concrete.
1. For integrally colored concrete, curing compound shall be pigmented type approved by coloring
admixture manufacturer.
2. For concrete indicated to be sealed, curing compound shall be compatible with sealer.
C. Clear Acrylic Sealer: Manufacturer's standard waterbome, membrane - forming, medium - gloss, acrylic
copolymer emulsion solution, specifically manufactured for colored concrete, containing not less than 15
percent solids by volume, nonyellowing, and UV resistant.
D. Slip- Resistant Additive: Manufacturer's standard finely graded aggregate or polymer additive, designed
to be added to clear acrylic sealer, to result in a slip - resistant surface.
2.8 RELATED MATERIALS
A. Expansion- and Isolation- Joint - Filler Strips: ASTM D 1751, asphalt- saturated cellulosic fiber.
2.9 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, to provide normal- weight concrete with the
following properties:
DECORATIVE CEMENT CONCRETE PAVEMENT 02769-3
LION SQUARE LODGE NORTH
Vail, Colorado
1. Compressive Strength (28 Days): per Stnuctural Engineer and Town of Vail, Colorado
requirements.
2. Maximum Water - Cementitious Materials Ratio at Point of Placement: per Structural Engineer
and Town of Vail, Colorado requirements.
3. Slump Limit: per Structural Engineer and Town of Vail, Colorado requirements.
B. Add air - entraining admixture at manufacturer's prescribed rate to result in normal - weight concrete at
point of placement having an air content per Structural Engineer and Town of Vail, Colorado
requirements..
C. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
D. Synthetic Fiber: Uniformly disperse in concrete mix at manufacturer's recommended rate, but not less
than 1.0 lb /cu. yd. (0.60 kg /cu. m)
E. Color Pigment: Add color pigment or colored water - reducing admixture to concrete mixture according to
manufacturer's written instructions and to result in hardened concrete color consistent with approved
mockup.
2.10 CONCRETE MIXING
A. Ready -Mixed Concrete- Measure, batch, and mix concrete materials and concrete according to
ASTM C 94/C 94M and ASTM C 1116. Furnish batch certificates for each batch discharged and used in
the Work.
I. When air temperature is between 85 deg F (30 deg C) and 90 deg F (32 deg C), reduce mixing and
delivery time from 1 -1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C),
reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 PREPARATION
A. Proof -roll prepared subbase surface with heavy pneumatic -tired equipment to identify soft pockets and
areas of excess yielding.
B. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required
lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain
in place at least 24 hours after concrete placement.
C. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting
reinforcement.
3.2 JOINTS
A. Construct construction, isolation, and contraction joints and tool edgings true to line with faces
perpendicular to surface plane of concrete. Constrict transverse joints at right angles to centerline, unless
otherwise indicated.
DECORATIVE CEMENT CONCRETE PAVEMENT 02768-4
n
I
I
1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an
edging tool to a 1/4 -inch (6 -mm) radius. Repeat tooling of edges after applying surface finishes.
Eliminate tool marks on concrete surfaces.
3.3 CONCRETE PLACEMENT
A. Moisten subbase to provide a uniform dampened condition at time concrete is placed.
B. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.
C. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag
concrete into place or use vibrators to move concrete into place.
D. Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand
spading,
E. Screed pavement surfaces with a straightedge and strike off.
Commence initial floating using bull floats or darbies to impart an open textured and uniform surface
plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete
surfaces before beginning finishing operations or spreading surface treatments.
3.4 INTEGRALLY COLORED CONCRETE FINISH
A. Integrally Colored Concrete Finish: After final floating, apply a hand - trowel finish followed by a broom
finish to concrete.
I . Burlap Finish: Drag a seamless strip of damp burlap across float- finished concrete, perpendicular
to line of traffic, to provide a uniform, gritty texture.
2. Other Locations: Medium -to- Fine - Textured Broom Finish: Draw a soft bristle broom across float -
finished concrete surface, perpendicular to line of traffic, to provide a uniform, fine -line texture.
3. Sidewalks/Walkways: Medium -to- Coarse - Textured Broom Finish: Provide a coarse finish by
striating float - finished concrete surface 1/16 to 1/8 inch (1.6 to 3 mm) deep with a stiff bristled
broom, perpendicular to line of traffic.
3.5 PIGMENTED MINERAL DRY -SHAKE HARDENER
A. Pigmented Mineral Dry-Shake Hardener Finish: After initial Floating, apply pigmented mineral dry-
shake materials to pavement surfaces according to manufacturer's written instructions and as follows:
3.6 STAMPING (Patios)
A. Mat Stamping: While initially finished concrete is plastic, accurately align and place stamp mats in
sequence. Unifornily load mats and press into concrete to produce required imprint pattern and depth of
imprint on concrete surface. Remove stamp mats immediately. Hand stamp edges and surfaces unable to
be imprinted by stamp mats.
B. Tool Stamping: While initially finished concrete is plastic, cover surface with polyethylene film, stretch
taut to remove wrinkles, lap sides and ends 3 inches (75 mm), and secure to edge forms. Lightly broom
surface to remove air bubbles. Accurately align and place stamp tools in sequence and tamp into concrete
to produce required imprint pattern and depth of imprint on concrete surface. Remove stamp tools
DECORATIVE CEMENT RE PAVEMENT N -
E ENT CONC TE PA CME T 0_76$ S
LION SQUARE LODGE NORTH
Vail, Colorado
C. Roller Stamping: While initially finished concrete is plastic, cover surface with polyethylene film, stretch
taut to remove wrinkles, lap sides and ends 3 inches (75 mm), and secure to edge forms. Lightly broom
surface to remove air babbles. Accurately align roller and repeat rolling operation to produce required
imprint pattern and depth of imprint on concrete surface. Hand stamp surfaces inaccessible to roller.
Unroll and remove polyethylene film immediately after roller stamping.
3.7
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
B. Comply with ACI 306.1 for cold- weather protection.
C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions
cause moisture loss approaching 0.2 lb/sq. ft. x h (I kg/sq. m x h) before and during finishing operations.
Apply according to manufacturer's written instructions after placing, screeding, and bull floating or
darbying concrete but before float finishing.
D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
E. Curing Compound: Apply curing compound immediately after final finishing. Apply uniformly in
continuous operation by power spray or roller according to manufacturer's written instructions. Recoat
areas that have been subjected to heavy rainfall within three hours after application. Maintain continuity
of coating and repair damage during curing period.
I. Cure integrally colored concrete with a curing compound.
2. Cure concrete finished with pigmented mineral dry-shake hardener with a caring compound.
3.8
immediately. Hand stamp edges and surfaces unable to be imprinted by stamp tools. Unroll and remove
polyethylene film immediately after tool stamping.
CONCRETE PROTECTION AND CURING
SEALER
1
A. Clear Acrylic Sealer: Apply uniformly in two coats in continuous operations according to manufacturer's
written instructions. Allow first coat to dry before applying second coat, at 90- degrees to the direction of
the first coat using same application methods and rates.
1tz-6
A.
. Begin sealing dry surface no sooner than 28 days after concrete placement.
2. Mix slip- resistant additive thoroughly in sealer before application according to manufacturer's
written instructions. Stir sealer occasionally during application to maintain even distribution of
additive.
PAVEMENT TOLERANCES
3.10
Comply with tolerances of ACI 117 and ACI 330.1.
REPAIRS AND PROTECTION
A. Remove and replace decorative cement concrete pavement that is broken, damaged, or does not comply
with requirements in this Section in complete sections from joint to joint, unless otherwise approved by
Architect.
DECORATIVE CEMENT CONCRETE PAVEMENT 02768-6
I
t
[I
END OF SECTION 02768
LION SQUARE LODGE NORTH
Vail, Colorado
I DECORATIVE CEMENT CONCRETE PAVEMENT 02768-7
11
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02780 - UNIT PAVERS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes the following:
I. Pavers set in aggregate setting beds.
2. Aluminum edge restraints.
1.2 RELATED SECTIONS
A. Section 02552 — Ground -Loop Heat Pump Piping.
1.3 SUBMITTALS
A. Product Data: For materials other than water and aggregates.
B. Samples of pavers.
1.4 QUALITY ASSURANCE
A. Mockups: Build mockups for each form and pattern of unit paver.
1. Approved mockups may become part of the completed Work if undisturbed at time of Substantiai
Completion.
1.5 PROJECT CONDITIONS
A. Cold- Weather Protection: Do not use frozen materials or build on frozen subgrade or setting beds.
B. Weather Limitations for Bituminous Setting Bed: Install bituminous setting bed only when ambient
temperature is above 40 deg F (4 deg C) and when base is dry.
C. Cold- Weather Requirements for Mortar and Grout: Heat materials to provide mortar and grout
temperatures between 40 and 120 deg F (4 and 49 deg C). Protect unit paver work against freezing for 24
hours after installation.
PART 2 - PRODUCTS
2.1 UNIT PAVERS
A. Unit Pavers: To be selected by Architect.
UNIT PAVERS 02780-1
1
LION SQUARE LODGE NORTH
Vail, Colorado
2.2
ACCESSORIES
A. Aluminum Edge Restraints: Straight, 118 -inch- (3.2 -mm -) thick by 4 -inch- (100 -mm -) high extruded -
aluminum edging with loops pressed from face to receive stakes at 12 inches (300 mm) o.c., and
aluminum stakes 12 inches (300 mm) long for each loop.
I. Available Manufacturers: Subject to compliance with requirements, manufacturers offering
products that may be incorporated into the Work include, but are not limited to, the following:
a. BRICKSTOP Corporation.
b_ Cury -Rite, Inc.
C. Permaloc Corporation.
d. Sure -Loc Edging Corporation.
B. Cork Joint Filler: Preformed strips complying with ASTM D 1752, Type 11.
C. Compressible Foam Filler: Preformed strips complying with ASTM D 1056, Grade 2A 1.
2.3
AGGREGATE SETTING -BED MATERIALS
A. Graded Aggregate for Base: Sound, crushed stone or gravel complying with ASTM D 448 for Size No.8.
B. Sand for Leveling Course: Sound, sharp, washed, natural sand or crushed stone complying with
gradation requirements in ASTM C 33 for fine aggregate.
C. Sand for Joints: Fine, sharp, washed, natural sand or crushed stone with 100 percent passing No. 16
(I.18 -mm) sieve and no more than 10 percent passing No. 200 (0.075 -mm) sieve.
D. Drainage Geotextile: Nonwoven needle- punched geotextile made from polyolefins or polyesters; with
elongation greater than 50 percent; complying with AASHTO M 288 and the following:
1. Apparent Opening Size: No. 40 (0-425 -mm) sieve, maximum; ASTM D 4751.
2. Permittivity_ 0.5 per second, minimum; ASTM D 4491.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL,
A_ Mix pavers from several pallets or cubes, as they are placed, to produce uniform blend of colors and
textures.
B. Cut unit pavers with motor - driven masonry saw equipment to provide pattern indicated and to fit
adjoining work neatly. Use frill units without cutting where possible.
C. Joint Pattern: Random, with long edges mmning parallel to foot traffic.
D. Tolerances: Do not exceed 1/16 -inch (1.6 -mm) unit -to -unit offset from flash (lippage) nor 1/8 inch in 24
inches (3 mm in 600 mm) and 1/4 inch in 10 feet (6 mm in 3 m) from level, or indicated slope, for
finished surface of paving.
E. Expansion and Control Joints: Provide foam filler as backing for sealant - filled joints. Install joint filler
before setting pavers.
UNIT PAVERS 02780-2
t
r
t
LION SQUARE LODGE NORTH
Vail, Colorado
F. Expansion and Control Joints: Provide joint filler at locations and of widths indicated. Install joint Flier
before setting pavers. Make top of joint filler flush with top of pavers.
G. Provide edge restraints as indicated. Install edge restraints before placing unit pavers or sand in setting
bed.
3.2 AGGREGATE SETTING -BED APPLICATIONS
A. Compact soil subgrade uniformly to at least 95 percent of ASTM D 698 laboratory density.
B. Place aggregate base, compact by tamping with plate vibrator, and screed to depth indicated.
C. Place drainage geotextile over compacted base course, overlapping ends and edges at least 12 inches (300
mm).
D. Place leveling course and screed to a thickness of 1 to 1 -1/2 inches (25 to 38 mm), taking care that
moisture content remains constant and density is loose and constant until pavers are set and compacted.
E. Treat leveling course with herbicide to inhibit growth of grass and weeds.
F. Set pavers with a minimum joint width of 1/16 inch (1.5 mm) and a maximum of 1/8 inch (3 mm), being
careful not to disturb leveling base. If pavers have spacer bars, place pavers hand tight against spacer
bars.
G. Vibrate pavers into leveling course with a low - amplitude plate vibrator capable of a 3500- to 5000 -1bf
(16- to 22 -kN) compaction force at 80 to 90 Hz.
H. Spread dry sand and fill joints immediately after vibrating pavers into leveling course_ Vibrate pavers
and add sand until joints are completely filled, then remove excess sand. Leave a slight surplus of sand
on the surface for joint filling.
END OF SECTION 02780
UNIT PAVERS 02780-3
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02832 - SEGMENTAL RETAINING WALLS
PART I - GENERAL
1.1 SUMMARY
A. This Section includes:
I . Single -depth segmental gravity retaining walls without soil reinforcement.
2. Segmental retaining walls with soil reinforcement.
B. Related Sections include the following:
I. Division 2 Section "Earthwork" for excavation for segmental retaining walls_
2. Division 3 Section "Cast -in -Place Concrete" for retaining wall footings.
1.2 SUBMITTALS
A. Product Data: For each type of segmental retaining wall and other manufactured products specified.
B. Samples for selection of segmental units samples in small -scale form showing the full range of colors and
textures available for each different exposed segmenta; unit required.
C. Preconstntction Test Reports: Indicate and interpret test results for compliance with performance
requirements.
D_ Research /Evaluation Reports: Evidence of system's compliance with building code in effect for Project
from a model code organization acceptable to authorities having jurisdiction.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: Engage an experienced installer who has completed segmental retaining walls
similar in material, design, and extent to that indicated for Project that has resulted in construction with a
record of successfiil in- service performance.
B. Testing Agency Qualifications: An independent testing agency with the experience and capability to
conduct the testing indicated without delaying the Work, as documented according to ASTM E 548_
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
I. Amastone distributed by GeoWestern, Inc._
2. Allan Block Corp.
3. Anchor Wall Systems, Inc.
4_ ICD Corp.
S. Keystone Retaining Wall Systems, Inc.
6. Rockwood Retaining Wall Systems.
SEGMENTAL RETAINING WALLS 02832-1
1
LION SQUARE LODGE NORTH
Vail, Colorado
2.2 RETAINING WALL UNITS
A. Concrete Units: High- strength, regular- weight concrete units, designed for use in segmental retaining
walls, complying with ASTM C 90, except with net -area compressive strength of 3000 psi (20.7 MPa)
for average of 3 units and 2500 psi (172 MPa) for individual unit, maximum water absorption of 8
percent, and variation in height limited to 1/16 inch (1.6 mm).
I. Provide units with tugs, projections, or holes and pins that locate successive courses in relation to
the course below and maintain that alignment as backfilI is placed, and that interlock with units
above and below.
B. Colors: Provide units that result in colors of exposed wall surfaces complying with the following
requirements:
I. Provide Architect's selections from manufacturer's full range of colors for materials and products
of type indicated.
C. Shapes: Basic shapes and dimensions are optional. Provide units with exposed face as follows, of any
basic shape and dimensions that will produce retaining walls of the dimensions and profiles indicated
without interfering with other elements of the Work.
I . Exposed Face: Flat face with rough -split texture.
2. Batter: Provide units that offset from the course below to provide at least I/2 -inch per foot (1:24)
batter.
D. Special Units: Provide comer units, end units, cap units, and other special shapes as necessary to
produce retaining walls of dimensions and profiles indicated and to provide indicated textures on
exposed surfaces.
2.3 INSTALLATION MATERIALS
A. Pins: Product supplied by retaining wall unit manufacturer for use with units provided, made from
nondegrading polymer reinforced with glass fibers.
B. Cap Adhesive: Product supplied or recommended by retaining wall unit manufacturer for adhering cap
units to units below.
C. Base: Gravel or crushed stone complying with ASTM D 448 for Size No_ 57.
E. Drainage Fill: Washed gravel or washed crushed stone complying with ASTM D 448 for Size No_ 57.
F. Filter Fabric: Nonwoven pervious geotextile manufactured from polyester, nylon, or polypropylene
fibers, as follows:
. Apparent Opening Size: No. 100 (0.15 mm) per ASTM D 4751.
2. Permeability: 150 gpm/sq. ft. (100 L/s x sq. m) per ASTM D 4491.
3. Grab Strength: 100 Ibf (445 N) per ASTM D 4632.
G_ Soil Reinforcement: A woven geotextile, specifically manufactured for use as soil reinforcement, made
from polyolefins, polyesters, or polyamides, and with the following properties:
I. Tensile Strength: 4800 Ibf /ft. (70 kN /m) per ASTM D 4595.
2. Elongation: 20 percent per ASTM D 4595.
3. Apparent Opening Size: No_ 50 (0.3 mm) per ASTM D 4751.
SEGMF,NTAL RETAINING WALLS 02832-2
1
t
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
4. Tearing Strength: 300 Ibf (1.3 kN) per ASTM D 4533.
5. Ultraviolet Stability: 80 percent per ASTM D 4355.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas to receive segmental retaining walls and conditions under which walls will be installed,
with Installer present, for compliance with requirements for excavation tolerances, condition of
subgrades, and other conditions affecting performance of retaining walls.
I . Do not proceed with installation until unsatisfactory conditions have been corrected.
3.2 RETAINING WALL INSTALLATION
A. General: Place units according to manufacturer's written instructions. Lay units in running bond,
overlapping half units of course below.
I . Form corners and ends by using special units.
B. Leveling Base: Place and compact base material to thickness indicated and with not less than 95 percent
of maximum dry density according to ASTM D 698.
I. Place and compact in 2 layers, with soil reinforcement placed between layers.
C. Leveling Course: Place unreinforced, lean concrete over base course to thickness indicated; compact and
screed to a smooth, level surface.
D. First Course: Place first course of retaining wall units on leveling base /course for full length of wall.
Place units in firm contact with each other, properly aligned and level.
I . Tamp units into leveling base as necessary to bring tops of units into a level plane.
2. Place and compact fill, either drainage fill or soil fill as indicated, to top of first course_ Place fill
on both sides of wall at same time without disturbing alignment of units. Fill voids between and
within units with drainage fill.
E. Subsequent Courses: Sweep excess fill from tops of course below. Place units in firm contact, properly
aligned, and directly on course below.
1. For units with lugs designed to tit into holes in units of adjacent course, lay units so lugs are
accurately aligned with holes and bedding surfaces are firmly seated on beds of units below.
2. For units with lips at front of units, slide units as far forward as possible for firm contact with lips
of units below.
3. For units with pins, carefitlly align holes in units above with holes below and insert pins according
to manufacturer's written instructions.
4. Place and compact fill as each course is laid. Place fills on both sides of wall at same time, where
both sides are indicated to be filled.
5. Fill voids between and within units with drainage fill.
F. Cap Units: Place cap units and secure with cap adhesive according to manufacturers written instructions.
r
SEGMENTAL RETAINING WALLS 02832-3
LION SQUARE LODGE NORTH
Vail, Colorado
i
3.3 FILL PLACEMENT
A. General: Comply with requirements of Division 2 Section "Earthwork" and retaining wall unit
manufacturer's written instructions.
B. Place, spread, and compact fill in uniform lifts for full width and length of embankment as wall is laid.
Begin at back of wall and place and spread fill toward embankment.
I _ Use only hand - operated compaction equipment within 36 inches (900 mm) of wall.
2. Compact drainage fill to not less than 95 percent maximum dry density according to
ASTM D 698.
C.
Place filter fabric against back of wall and place a layer of drainage fill at least 12 inches (300 mm) deep
behind the filter fabric to within 12 inches (300 mm) of finished grade_ Place another layer of filter
fabric between drainage fill and soil fill.
1. Wrap drainage pipe with filter fabric and place in drainage fill as indicated, sloped 1/4 inch per
t
foot (1:50) to drain.
3.4
2. Place impervious fill over top edge of drainage fill layer.
CONSTRUCTION
TOLERANCES
A.
Variation from Level: For bed -joint lines along walls, do not exceed 1/4 inch in 10 feet (6 mm in 3 m) or
1 inch in 40 feet (24 mm in 12 m) or more.
B.
Variation from Indicated Batter: For slope of face of wall, do not vary from indicated slope by more than
114 inch in 10 feet (6 mm in 3 m).
C.
Variation in Plan Position: For ends and faces of walls in relation to property lines, buildings, and other
objects, do not vary from plan dimensions by more than l inch (25 mm) or from depicted plan
relationship (scaled dimensions) by more than 3 inches (75 nun).
D.
Variation in Linear Wall Line: For walls indicated as straight, do not exceed 1/4 inch in 10 feet (6 mm in
3 m) or I inch in 40 feet (24 mm in 12 m) or more from a straight line.
'
END OF SECTION 02832
F�
L._J
t
SEGMENTAL RETAINING WALLS 02832 -4
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 02900 — LANDSCAPING
PART1- GENERAL
1.4 QUALITY ASSURANCE
A. Installer's Field Supervision: Require Installer to maintain an experienced full -lime supervisor on Project
site when work is in progress.
I . Pesticide Applicator: State licensed, commercial.
LANDSCAPING
02900-1
1.1
RELATED DOCUMENTS
M A.
Drawings and general provisions Af the Contract, including General and Supplementary Conditions and
Division 1 Specifications, apply to this section.
1.2
SUMMARY
A.
Work Included: Provide trees, plants and non -plant materials, labor and equipment required to complete
installation of planting as indicated on the drawings and specified. Provide planting complete, as shown
and specified on the drawings.
1. Balled and burlapped or spade dug trees
2. Contanerized shrubs, perennials, and groundcover
3. Planting soils.
4. Mulches (cobble and wood chip mulches)
5. Sodding
6. Landscape edging
1.3
SUBMITTALS
A.
General: Submit item in this Article to the Conditions of the Contract and Division I Specification
Section.
B.
Delivery tickets for all bulk materials with Owner's Represetnative's approval or acknowledgement that
materials were received in satisfactory condition.
C.
Certification of grass sed vendor for each grass -seed mixture stating the botanical and common name,
percentage by weight of each species, variety, percentage of purity, germination, and weed seed. Include
the year of production and date of packaging
D.
Samples of the following:
I . I cubic foot of mulch for each type required for Project, in labeled plastic bags, boxes, or buckets.
2. Edging materials and accessories
3. All items requested by Contractor for Substitution or as an Approval Equal.
E.
Written warranty stating all items included in the warranty, conditions of the warranty, and beginning and
s
ending of warranty period.
1.4 QUALITY ASSURANCE
A. Installer's Field Supervision: Require Installer to maintain an experienced full -lime supervisor on Project
site when work is in progress.
I . Pesticide Applicator: State licensed, commercial.
LANDSCAPING
02900-1
t
LION SQUARE LODGE NORTH
Vail, Colorado
B. Soil Analysis: For each unamended soil type, furnish soil analysis and a written report by a qualified
soil- testing laboratory.
C. Provide quality, size, genus, species, and variety of plants indicated, complying with applicable
requirements in ANSI Z60.1, and all applicable state and local rules and regulations.
D. Inspection: Landscape Architect may inspect plants either at place of growth or at site before planting, for
compliance with requirements for name, variety, size and quality.
I . The Landscape Architect reserves the right to reject at any time or place prior to final acceptance
all plant materials which, in the Landscape Architect's opinion fail, to meet specifications,
Inspection of materials is primarily for quality, size, and variety, but other requirements are not
waived even though visual inspection results in approval. Rejected material shall be removed from
the site within 24 hours.
2. The Contractor shall schedule inspection of the plants, at either the supplier or on site, to be
completed in one visit. Any further incpsection required due to plants being unavailable or
rejected as not meeting specifications shall be charged to the Contractor at the current hourly rate
for Landscape Architect's personnel performing the inspection.
E. Measurements: Measure trees and shrubs according to ANSI Z60.1 with branches and trunks or canes in
their normal position. Do not prune to obtain required sizes.
F_ Pre - installation Conference: Contractor shall attend a landscape re- installation conference at locations
specified by Owner's Representative.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver bare -root stock plants freshly dug. Immediately after digging up bare -root stock, pack root
system in wet straw, hay, or other suitable material to keep root system moist until planting.
B. Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems froth sun scald,
drying, wind bum, sweating, whipping, and other handling and tying damage. Do not bend or bind -tie
trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of plants
during shipping and delivery. Do not drop plants during delivery and handling.
C. Handle planting stock by root ball
D. Sod: Harvest, deliver, store and handle sod according to the requirements of the American Sod Producers
Associations's (ASPA) "Specifications for Turfgrass Sod Materials and Transplanting/Installing:. Protect
sod from drying and breaking.
E. Deliver plants after preparations for planting have been completed, and install immediately. If planting is
delayed more than six hours after delivery, set plants and trees in their appropriate aspect (sun, filtered
sun, or shade), protect from weather and mechanical damage, and keep roots moist.
1.6 WARRANTY
A_ Special Warranty: Installer agrees to repair or replace plantings and accessories that fail in materials,
workmanship, or growth within specified warranty period.
Failures include, but are not limited to, the following:
Death and unsatisfactory growth, except for defects resulting from abuse, lack of adequate
maintenance, or neglect by Owner, or incidents that are beyond Contractor's control.
LANDSCAPING 02900-2
1
1
Ll
L
t
t
fl
1
t
1
LION SQUARE LODGE NORTH
Vail, Colorado
b. Structural failures including plantings falling or blowing over.
2. Warranty Periods from Date of Planting Completion: Warrant the following living planting
materials for a period of (1) year after date of Final Acceptance, against defects including death
and unsatisfactory growth, except for defects, resulting from lack of adequate maintenance,
neglect, or abuse by Owner, abnormal weather conditions unusual for warranty perios, or incidents
that are beyond Contractor's control.
I PART2- PRODUCTS
2.1 PLANT MATERIAL
A. General: Furnish nursery-grown plants true to genus, species, variety, cultivar, stem form, shearing, and
other features indicated in PIant Schedule or Plant Legend shown on Drawings and complying with
ANSI Z60.1; and with healthy root systems developed by transplanting or root pruning. Provide well-
shaped, fully branched, healthy, vigorous stock, densely foliated when in leaf and free of disease, pests,
eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement.
a.
Trees
b.
Shrubs
C.
Ground Covers and Perennials
d.
Sodded Areas
e.
Seeded Areas
I PART2- PRODUCTS
2.1 PLANT MATERIAL
A. General: Furnish nursery-grown plants true to genus, species, variety, cultivar, stem form, shearing, and
other features indicated in PIant Schedule or Plant Legend shown on Drawings and complying with
ANSI Z60.1; and with healthy root systems developed by transplanting or root pruning. Provide well-
shaped, fully branched, healthy, vigorous stock, densely foliated when in leaf and free of disease, pests,
eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement.
I
LANDSCAPING
02900-3
t
B.
Root -Ball Depth: Furnish trees and shrubs with root balls measured from top of root ball, which shall
begin at root flare according to ANSI Z60.1. Root flare shall be visible before planting.
C_
Grade: Provide trees and shrubs of sizes and grades confirming to ANSI Z60.1 for type of trees and
shrubs required. Provide specimen grade trees. Trees and shrubs of a larger size may be used if acceptable
to Landscape Architect with a proportionate increase in size of roots and balls.
D.
Perennials: Provide healthy, disease -free plants of species and variety shown or listed, with well-
established root systems reaching to sides of the container to maintain a firm ball, but not with excessive
root growth encircling the container. Provide only plants that are acclimated to outdoor conditions before
delivery,
E.
All plants shall be the species designated on the Drawings. No substitutions will be accepted without the
prior written approval of the Landscape Archtitect.
2.2
TREES
A.
Shade Trees: Single stem trees Nvith straight trunk, well balanced crown, and intact leader, of height and
caliper indicated, conforming to ANSI 7_60.1 for type of trees required.
1. Branching Height: 1/3 to 1/2 of tree height.
2. Branching Height: 1/2 of tree height.
B.
Small Trees: Small upright or spreading type, branched or pruned naturally according to species type, and
with relationship to caliper, height, and branching recommendations by ANSI Z60.1, and stem form as
'
designated on drawings.
I
LANDSCAPING
02900-3
t
LION SQUARE LODGE NORTH
Vail, Colorado
C. Evergreen Trees: Specimen quality, well balanced, coniferous evergreens, of type, height, spread, and
shape required conforming to ANSI Z60.1.
D. Provide balled and burlapped trees.
E. Container -grown trees will be acceptable in lieu of balled and burlapped trees subject to meeting ANSI
Z60.1 limitations for container stock.
All deciduous trees of one species used in formal rows or groupings shall exhibit cultural uniformity i.e.
matched in height crown width and shape, height to first branch, and trunk taper. For this reason it is
desired that these trees produced by a single grower.
SHRUBS
2.3
A. Form and Size
I. Deciduous shrubs with not less than the minimum number of canes required and measured
according to ANSI Z60.1, for type, shape and height of shrub. Root development shall be
sufficient to hold the soil in the shape of the container when removed but without visible circling
roots.
1 Normal- quality, well balanced, broadleaf evergreens of type height, spread, and shape required
conforming to ANSI Z60. 1.
B. Provide container grown or balled and burlapped as indicated on plans.
2.4
GROUND COVERS AND PERENNIALS
A_ Provide ground covers and plants established and well rooted in removable container or integral peat pots
and with not less than the minimum number and length of runners required by ANSI Z60.1 for the pot
size indicated.
2.5
SOD
A. Certified turf grass sod complying with ASPA specifications for machine -cut thickness, size, strength
moisture content, and mowed height, free of weeds and undesirable native grasses. Provide visible sod of
uniform density, color, and texture of the following turf grass species, strongly rooted, and capable of
vigorous growth and development when planted.
I. Sod shall be Colorado grown, bluegrass /fescue blend, a mixture of 3 improved bluegrass varieties,
complying with applicable State and Federal codes.
B. Sod which has dried out, or with soil that breaks, tears, or crumbles away will not be accepted. Sod shall
be kept moist, protected from the sun, heat or wind and after delivery. Prior to cutting, the sod shall be
evenly mown for a blade length of at least I - inch but not more than 2- inches.
2.6
TOP SOIL
A. Planting Soil: ASTM D 5268 topsoil, with pH range of 5.5 to 7, a minimum of 2 percent organic material
content. Verify suitability of soil to produce viable planting soil. Clean soil of roots, plants, sod, stones,
clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster,
building debris, and other extraneous materials ham-ifid to plant growth.
LANDSCAPING 02900-4
1
t
1
n
LION SQUARE LODGE NORTH
Vail, Colorado
2.7 SOIL AMENDMENTS /PLANT MIX
A. Litre: ASTM C 602, Class T, agricultural limestone containing a minimum 80 percent calcium carbonate
equivalent, with a minimum 99 percent passing a No.8 sieve and a minimum 75 percent passing a No_ 60
sieve.
1. Provide lime in the form of dolomitic limestone.
B. Aluminum Sulfate: Commercial grade, unadulterated.
C. Aspen Rich Compost as supplied by Southwest Soils, 970 - 323 -6300.
D. A I Organics Premium 3; as supplied by A 1 Organics, Eaton, Colorado, 303 - 454 -3492
2.8 FERTILIZER
A. Superphosphate: Commercial, phosphate mixture, soluble; minimum of 20 percent available phosphoric
acid.
B. Slow - Release Fertilizer: Granular fertilizer consisitng of 50 percent water - insoluble nitrogen, phosphorus,
and potassium in the following composition or equal organic based:
C. Composition: 5 percent nitrogen, 10 percent phosphorous, and 5 percent potassium, by weight in shrub
and flower beds.
D. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight in turf
grass areas.
2.9 MULCHES
A. Compost Mulch: Well- composted, stable, and weed -free organic matter, pH range of 5.5 to 8; moisture
content 35 to 55 percent by weight; 100 percent passing through I -inch (25 -mm) sieve; soluble salt
content of 3 decisiemens /m; not exceeding 0.5 percent inert contaminants and free of substances toxic to
plantings.
B. Materials: Place weed barrier fabric is required under the bark and cobble mulch.
I. Type -1: Basic Shredded Bark Mulch as supplied by Southwest Soils, 970 - 323 -6300 to installed to
tree, shrub and plant beds; or an approved equal.
2. Type -2: Garden Prep as supplied by Garden Wise, 1 -800- 332 -1245 to be installed in groundcover
and perennial beds; or an approved equal.
3. Type -3 Cobble Driplines: %" Local River Rock as supplied by Pioneer Sand Company, Golden,
Co.,303 -279 -4748; or an approved equal.
C. Installation: Place mulch in all plant saucers 3" deep. Place mulch uniformly in all planting beds at 3"
deep. Clean up area of work after installing mulch.
2.10 WEED- CONTROL BARRIERS
A. Nonwoven Geotextile Filter Fabric: Polypropylene or polyester fabric, 3 oz. /sq. yd. (101g /sq. m)
minimum.
' B. Composite Fabric: Woven, needle- punched polypropylene substrate bonded to a nonwoven
polypropylene fabric, 4.8 oz. /sq. yd. (162 g /sq. m).
LANDSCAPING
02900-5
(
LION SQUARE LODGE NORTH
Vail, Colorado
2.11 LANDSCAPE EDGING
A. Materials: Place edging material bordering planting beds as shown on drawings. Edging shall be tacked in
place with I foot edging straps at each 10' section and once in the middle. Distance between straps shall
not exceed 5'.
1. Type: Bend -a -Board 6" edging as supplied by Jensen Sales, 303 -791 -4250; or an approved equal.
B. Installation: Trench along the border of planting beds 6" deep and place edging. The top of the edging
shall be l " above grade so as to retain mulch and provide edge for grass.
PART 3 - EXECUTION
3.1 PLANTING AREA ESTABLISHMENT
A. Tillable Soil: Loosen subgrade of planting areas to a minimum depth of 6 inches prior to placing top soil
and soil amendments. Remove stones larger than I inch (25 mm) in any dimension and sticks, roots,
rubbish, and other extraneous matter and legally dispose of them off Owner's property.
B. Positive Surface Drainage: Finish and fine grade the project area to establish an even and well matched
gradient over the entire surface. Provide postitive surface drainage, with no depressions, settling, or
irregularites in the finished grade.
C. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine
texture_ Roll and rake, remove ridges, and fill depressions to meet finish grades.
3.2 EXCAVATION FOR TREES AND SHRUBS
A. Planting Pits and Trenches: Excavate circular planting pits with sides sloping inward at a 45- degree r
angle. Excavations with vertical sides are not acceptable. Trim perimeter of bottom leaving center area
of bottom raised slightly to support root ball and assist in drainage away from center. Do not further
disturb base. Ensure that root ball will sit on undisturbed base soil to prevent settling. Scarify sides of
planting pit smeared or smoothed during excavation.
1. Excavate approximately three times as wide as ball diameter.
2. Excavate at least 12 inches (300 mm) wider than root spread and deep enough to accommodate
vertical roots for bare -root stock.
3. Do not excavate deeper than depth of tine root ball, measured from the root flare to the bottom of
the root ball.
B. Subsoil and topsoil removed from excavations may be used as planting soil if approved by Landscape
Architect.
3.3 TREE AND SHRUB PLANTING
A. Before planting, verify that root flare is visible at top of root ball according to ANSI Z60. I . I
B. Remove stein girdling roots and kinked roots. Remove injured roots by cutting cleanly; do not break.
C. Set stock plumb and in center of planting pit or trench with root flare 2 inches (50 mm) above adjacent ,
finish grades.
LANDSCAPING 02900-6
LION SQUARE LODGE NORTH
Vail, Colorado
1. Use planting soil for backfill.
2. Balled and Burlapped: After placing some backfill around root ball to stabilize plant, carefully cut
and remove burlap, rope, and wire baskets from tops of root balls and from sides, but do not
remove from under root balls. Remove pallets, if any, before setting. Do not use planting stock if
root ball is cracked or broken before or during planting operation.
3. Balled and Potted or Container - Grown: Carefully remove root ball from container without
damaging root ball or plant.
4. Fabric Bag -Grown Stock: Carefully remove root ball from fabric bag without damaging root ball
or plant. Do not use planting stock if root ball is cracked or broken before or during planting
operation.
5. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets.
When planting pit is approximately one -half filled, water thoroughly before placing remainder of
backfill. Repeat watering until no more water is absorbed.
6. Continue backfilling process. Water again after placing and tamping final layer of soil.
D. Bare -Root Stock: Set and support bare -root stock in center of planting pit or trench with root flare 2
inches (50 mm) above adjacent finish grade_
1. Use planting soil for backfill.
2. Spread roots without tangling or turning toward surface, and carefully work backfill around roots
by hand. Puddle with water until backfill layers are completely saturated. Plumb before
backfilling, and maintain plumb while working backfill around roots and placing layers above
roots.
3. Place planting tablets in each planting pit when pit is approximately one -half filled; in amounts
recommended in soil reports from soil- testing laboratory. Place tablets beside soil - covered roots
about 1 inch (25 mm) from root tips; do not place tablets in bottom of the hole or touching the
roots.
4. Continue backfilling process. Water again after placing and tamping final layer of soil_
E_ When planting on slopes, set the plant so the root flare on the uphill side is flush with the surrounding soil
on the slope; the edge of the root ball on the downhill side will be above the surrounding soil. Apply
enough soil to cover the downhill side of the root ball.
3.4 TREE AND SHRUB PRUNING
A. Remove only dead, dying, or broken branches. Do not prune for shape.
B. Prune, thin, and shape trees, shrubs, and vines according to standard professional horticultural and
arboricultural practices. Unless otherwise indicated by Architect, do not cut tree leaders; remove only
injured, dying, or dead branches from trees and shrubs; and prune to retain natural character.
3.5 GROUND COVER, PERENNIAL AND PLANT PLANTING
A. Set out and space ground cover and plants other than trees, shrubs, and vines as indicated in even rows
with triangular spacing.
B. Use planting soil for backfill-
C. Dig holes large enough to allow spreading of roots.
D. Work soil around roots to eliminate air pockets and leave a slight saucer indentation around plants to hold
water.
I LANDSCAPING
t C
02900-7
1
LION SQUARE LODGE NORTH
Vail, Colorado
E. Water thoroughly after planting, taking care not to cover plant crowns with wet soil.
Protect plants from hot sun and wind; remove protection if plants show evidence of recovery from
transplanting shock.
3.6 PLANTING AREA MULCHING
A. Install weed- control barriers before mulching according to manufacturer's written instructions.
Completely cover area to be mulched, overlapping edges a minimum of 6 inches (150 mm) secure seams
with galvanized pins.
B. Mulch: Apply the following average thickness of mulch and finish level with adjacent finish grades. Do
not place mulsh against trunks and stems.
I . Thickness: 2- inches deep in ground cover and perennial bed areas.
2. Thickness: 3- inches deep in shrub and bed areas.
C. Mulch tree rings in turf out to dripline with 3 -inch depth specified organic mulch.
33 PLANT MAINTENANCE
A. Maintain plantings by pruning, cultivating, watering, weeding, fertilizing, mulching, restoring planting
saucers, resetting to proper grades or vertical position, and performing other operations as required to
establish healthy, viable plantings. Spray or treat as required to keep trees and shrubs free of insects and
disease. Maintain trees, shrubs, groundcovers and perennials unitl until final acceptance by Owner.
B. Fill in as necessary soil subsidence that may occur because of settling or other processes. Replace mulch
materials damaged or lost in areas of subsidence.
C. Apply treatments as required to keep plant materials, planted areas, and soils free of pests and pathogens
or disease. Use practices to minimize the use of pesticides and reduce hazards.
D. Apply pesticides and other chemical products and biological control agents in accordance with authorities
having jurisdiction and manufacturer's written recommendations. Coordinate applications with Owner's
operations and others in proximity to the Work. Notify Owner before each application is performed.
E. Protect plants from damage due to landscape operations and operations of other contractors and trades.
Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged
plantings.
F. Maintain turf grass immediately after each area is planted and continue until acceptable turf is established
and until final acceptance by Owner.
3.8 CLEANUP AND PROTECTION
A. During landscaping, keep pavements clean and work area in an orderly condition.
B. Protect landscaping from damage due to landscape operations, operations by other contractors and trades,
and trespassers. Maintain protection during installation and maintenance periods. Treat, repair, or replace
damaged landcape work as directed.
END OF SECTION 02900
LANDSCAPING 02900-8
1
t
1
1
1
1�
11
1
J
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 03300 - CAST -IN -PLACE CONCRETE
PARTI - GENERAL
1.1 SUMMARY
A. This Section specifies cast -in place concrete, including formwork, reinforcement, concrete materials, mix
design, placement procedures, and finishes.
B. Related Sections:
I . Division 2 Section "Earthwork" for drainage fill under slabs -on- grade.
2. Division 2 Section "Cement Concrete Pavement" for concrete pavement and walks.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with, fly ash.
1.3 SUBMITTALS
A_ Product Data: For each type of manufactured material and product indicated.
B. Design Mixes: For each concrete mix_ Include alternate mix designs when characteristics of materials,
project conditions, weather, test results, or other circumstances warrant adjustments.
I . Indicate amounts of mix water to be withheld for later addition at Project site_
C. Steel Reinforcement Shop Drawings: Details of fabrication, bending, and placement, prepared according
to ACI 315, "Details and Detailing of Concrete Reinforcement." Include material, grade, bar schedules,
stirrup spacing, bent bar diagrams, arrangement, and supports of concrete reinforcement. Include special
reinforcement required for openings through concrete structures.
D. Welding Certificates: Copies of certificates for welding procedures and personnel.
E. Material Test Reports: From a qualified testing agency indicating and interpreting test results for
compliance of the following with requirements indicated, based on comprehensive testing of current
materials:
F. Material Certificates: Signed by manufacturers certifying that each of the following items complies with
requirements:
I. Cementitious materials and aggregates.
2. Form materials and form- release agents.
3. Steel reinforcement and reinforcement accessories.
4_ Fiber reinforcement.
5. Admixtures.
6. Curing materials.
7. Floor and slab treatments.
S. Bonding agents.
9. Adhesives.
CASTAN -PLACE CONCRETE 03300- 1
LION SQUARE LODGE NORTH
Vail, Colorado
10. Vapor retarders.
11. Epoxy joint filler.
12. Joint- filler strips.
13. Repair materials.
G. Minutes of preinstallation conference.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who has completed concrete Work similar in material,
design, and extent to that indicated for this Project and whose work has resulted in construction with a
record of successful in- service performance.
B. Manufacturer Qualifications: A firm experienced in manufacturing ready -mixed concrete products
complying with ASTM C 94 requirements for production facilities and equipment.
1. Manufacturer must be certified according to the National Ready Mixed Concrete Association's
Certification of Ready Mixed Concrete Production Facilities.
C. Testing Agency Qualifications: An independent testing agency, acceptable to authorities having
jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 to conduct the testing indicated, as
documented according to ASTM E 548.
1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician,
Grade 1, according to ACI CP -I or an equivalent certification program.
D. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same
manufacturer's plant, each aggregate from one source, and each admixture from the same manufacturer.
E. Welding: Qualify procedures and personnel according to AWS D1.4, "Structural Welding Code- -
Reinforcing Steel."
F. ACI Publications: Comply with the following, unless more stringent provisions are indicated:
1. ACI 301, "Specification for Structural Concrete."
2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle steel reinforcement to prevent bending and damage.
PART 2- PRODUCTS
2.1 FORM - FACING MATERIALS
A_ Smooth - Formed Finished Concrete: Form- facing panels that will provide continuous, true, and smooth
concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal, or other approved panel materials.
2. Exterior -grade plywood panels, suitable for concrete forms, complying with DOC PS I, and as
follows:
CAST -IN -PLACE CONCRETE 03300-2
LION SQUARE LODGE NORTH
Vail, Colorado
a. Medium - density overlay, Class I, or better, mill- release agent treated and edge sealed.
B. Rough - Formed Finished Concrete: Plywood, lumber, metal, or another approved material.
Provide lumber dressed on at least two edges and one side for tight fit.
C. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to
support weight of plastic concrete and other superimposed loads.
D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch (19 by 19 mm), unless otherwise
indicated..
E. Form- Release Agent: Commercially formulated form - release agent that will not bond with, stain, or
adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
I. Formulate form - release agent with rust inhibitor for steel form- facing materials.
2. Products: Subject to compliance with requirements; provide the following:
a. US SPEC Ezkote, or US SPEC Slickote, or US SPEC Safekote; US MIX Products Co. 303-
778 -7227 (Or Approved Similar)
F. Form Ties: Factory- fabricated, removable or snap -off metal or glass- fiber- reinforced plastic form ties
designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on
removal.
I. Furnish units that will leave no corrodible metal closer than I inch (25 mm) to the plane of the
exposed concrete surface.
2. Furnish ties that, when removed, will leave holes not larger than 1 inch (25 mm) in diameter in
concrete surface_
STEEL REINFORCEMENT
2.2
A. Epoxy- Coated Reinforcing Bars: [ASTM A 615/A 615M, ::r:!d0 60 (Grade 4211)]
[ASTM A 706 /A 706M], deformed bars, [ASTM A 775/A 775M] [or]
[ASTM A 934/A 934M], epoxy coated, with less than 2 percent damaged coating in each i 2-
;:.:, bar length.
B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.
C. Plain -Steel Wire: ASTM A 82, as drawn.
D_ Plain -Steel Welded Wire Fabric: ASTM A 185, fabricated from as -drawn steel wire into flat sheets.
2.3
REINFORCEMENT ACCESSORIES
A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening
reinforcing bars and welded wire fabric in place. Manufacture bar supports according to CRSI's "Manual
of Standard Practice" from steel wire, plastic, or precast concrete or fiber- reinforced concrete of greater
compressive strength than concrete, and as follows:
I. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI
Class l plastic - protected or CRSI Class 2 stainless -steel bar supports.
CAST -IN -PLACE CONCRETE 03300-3
LION SQUARE LODGE NORTH
Vail, Colorado
B. Joint Dowel Bars: Plain -steel bars, ASTM A 615/A 615M, Grade 60 (Grade 420). Cut bars true to {
length with ends square and free of burrs. *_
2.4 CONCRETE MATERIALS
A. Portland Cement: ASTM C 150, Type If.
1. Fly Ash: ASTM C 618, Class F.
B. Normal - Weight Aggregate: ASTM C 33, uniformly graded, and as Follows:
I. Class: Moderate weathering region, but not less than 3M.
C. Lightweight Aggregate: per ASTM C330, '/4" nominal maximum aggregate size.
D. Water: Potable and complying with ASTM C 94.
2.5 ADMIXTURES
A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water- soluble
chloride ions by mass of cementitious material and to be compatible with other admixtures and
cementitious materials. Do not use admixtures containine calcium chloride.
B. Air- Entraining Admixture: ASTM C 260.
C. Water - Reducing Admixture: ASTM C 494, Type A.
D. High- Range, Water - Reducing Admixture: ASTM C 494, Type F.
E. Water - Reducing and Accelerating Admixture: ASTM C 494, Type E. j
F. Water - Reducing and Retarding Admixture: ASTM C 494, Type D.
2.6 FILL MATERIALS
A_ Fine- Graded Granular Material: Clean mixture of crushed stone, crushed gravel, and manufactured or
natural sand; ASTM D 448, Size 10, with 100 percent passing a No. 4 (4.75 -mm) sieve and 10 to 30
percent passing a No. 100 (0.15 -mm) sieve; meeting deleterious substance limits of ASTM C 33 for fine
aggregates. '
B. Granular Fill: Clean mixture of crushed stone or crushed or uncrushed gravel; ASTM D 448, Size 57,
with 100 percent passing a 1 -1/2 -inch (38 -mm) sieve and 0 to 5 percent passing a No. 8 (2.36 -mm) sieve.
2.7 CURING MATERIALS
A. Evaporation Retarder. Waterborne, monomolecular film Forming, manufactured for application to fresh
concrete.
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing
approximately 9 oz. /sq. yd. (305 g /sq. m) dry-
CAST-IN-PLACE CONCRETE -
0330o a
LION SQUARE LODGE NORTH
Vail, Colorado
C. Moisture- Retaining Cover: ASTM C 171, polyethylene film or white burlap - polyethylene sheet.
D. Water: Potable_
E. Clear, Waterborne, Membrane - Forming Curing and Sealing Compound: ASTM C 1315, Type 1,
Class A.
2.8 RELATED MATERIALS
A. Joint - Filler Strips: ASTM D 1751, asphalt- saturated cellulosic fiber.
B. Bonding Agent: ASTM C 1059, Type II, non - redispersible, acrylic emulsion or styrene butadiene.
C. Epoxy - Bonding Adhesive: ASTM C 881, two- component epoxy resin, capable of humid curing and
bonding to damp surfaces, of class and grade to suit requirements, and as follows:
I . Type 11, non -load bearing, for bonding freshly mixed concrete to hardened concrete.
2_ Types I and 11, non -load bearing, for bonding hardened or freshly mixed concrete to hardened
concrete.
3. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to hardened
concrete.
D. Dovetail Anchor Slots: Hot -dip galvanized steel sheet, not less than 0.0336 inch (0.85 mm) thick, with
bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or
debris.
2.9 REPAIR MATERIALS
A. Repair Underlayment: Cement - based, polymer- modified, self - leveling product that can be applied in
thicknesses from 1/8 inch (3.2 mm) and that can be feathered at edges to match adjacent floor elevations.
I. Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as
defined in ASTM C 219.
2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and
application.
1 Aggregate: Well- graded, washed gravel, 1/8 to 1/4 inch (3 to 6 mm) or coarse sand as
recommended by underlayment manufacturer.
4. Compressive Strength: Not less than 4100 psi (29 MPa) at 28 days when tested according to
ASTM C 109 /C 109M.
B. Repair Topping: Traffic- bearing, cement - based, polymer- modified, self - leveling product that can be
applied in thicknesses from 114 inch (6 mm).
I. Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as
defined in ASTM C 219.
2, Primer: Product of topping manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well- graded, washed gravel, 1/8 to 1/4 inch (3 to 6 mm) or coarse sand as
recommended by topping manufacturer.
4. Compressive Strength: Not less than 5700 psi (39 MPa) at 28 days when tested according to
ASTM C 109 /C 109M.
2.10 CONCRETE MIXES
CAST -IN -PLACE CONCRETE 03300-5
LION SQUARE LODGE NORTH
Vail, Colorado
A. Prepare design mixes for each type and strength of concrete determined by either laboratory trial mix or
field test data bases, as follows:
I . Proportion normal- weight concrete according to ACI 211.1 and ACI 301.
B. Use a qualified independent testing agency for preparing and reporting proposed mix designs for the
laboratory trial mix basis.
C. Proportion light- weight concrete mixes as indicated on structural drawings.
D. Proportion normal- weight concrete mixes as indicated on structural drawings.
E. Cementitious Materials: For concrete exposed to deicers, limit percentage, by weight, of cementitious
materials other than portland cement according to ACI 301 requirements.
F. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland
cement in concrete as follows:
I. Fly Ash: 15 percent.
G. Maximum Water - Cementitious Materials Ratio: as indicated
H. Air Content: Add air - entraining admixture at manufacturer's prescribed rate to result in concrete at point
of placement having an air content as indicated.
L Do not air entrain concrete to trowel - finished interior floor slabs. Do not allow entrapped air content to
exceed 3 percent.
J. Limit water - soluble, chloride -ion content in hardened concrete to 0.15 percent by weight of cement.
K. Synthetic Fiber: Uniformly disperse in concrete mix for exterior concrete flatworkat manufacturer's
recommended rate, but not less than 1.5 lb /cu. yd. (0.90 kg/cu. m).
L. Admixtures: Use admixtures according to manufacturer's written instructions.
I . Use water - reducing and retarding admixture when required by high temperatures, low humidity, or
other adverse placement conditions.
2. Use corrosion - inhibiting admixture in concrete mixes where indicated.
2.11 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
2.12 CONCRETE MIXING
A. Ready -Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94 and
ASTM C 1 l l6, and furnish batch ticket information.
I. When air temperature is between 85 and 90 deg F (30 and 32 deg C), reduce mixing and delivery
time from 1 -1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce
mixing and delivery time to 60 minutes.
CASTAN -PLACE CONCRETE 03300-6
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3 - EXECUTION
3.1
FORMWORK
A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral,
static, and dynamic loads, and construction loads that might be applied, until concrete structure can
support such loads.
B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and
position indicated, within tolerance limits of ACI 117.
C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:
I. Class B, 1/4 inch (6 mm).
D_ Construct forms tight enough to prevent loss of concrete mortar.
E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush
or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined
surfaces steeper than 1.5 horizontal to I vertical. Kerf wood inserts for forming keyways, reglets,
recesses, and the like, for easy removal.
I . Do not use nest- stained steel form - facing material.
F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and
slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike -off
templates or compacting -type screeds.
G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is
inaccessible_ Close openings with panels tightly fitted to forms and securely braced to prevent loss of
concrete mortar. Locate temporary openings in forms at inconspicuous locations.
Fl. Chamfer exterior corners and edges of permanently exposed concrete.
I. Form openings, chases, offsets, linkages, keyways, reglets, blocking, screeds, and bulkheads required in
the Work. Determine sizes and locations from trades providing such items.
J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other
debris just before placing concrete.
I i
I I
I I
K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain
proper alignment.
L. Coat contact surfaces of forms with form- release agent, according to m anti fac turer's written instructions,
before placing reinforcement.
3.2 EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is
attached to or supported by cast -in -place concrete. Use Setting Drawings, templates, diagrams,
instructions, and directions furnished with items to be embedded.
. Install dovetail anchor slots in concrete structures as indicated.
CAST -IN -PLACE CONCRETE
03300-7
LION SQUARE LODGE NORTH
Vail, Colorado
3.3
REMOVING AND REUSING FORMS
A_ General: Formwork, for sides of beams, walls, columns, and similar parts of the Work, that does not
support weight of concrete may be removed after cumulatively curing at not less than 50 deg F (10 deg C)
for 24 hours after placing concrete provided concrete is hard enough to not be damaged by form- removal
operations and provided curing and protection operations are maintained.
B. Leave formwork, for beam soffits, slabs, and other structural elements, that supports weight of concrete in
place until concrete has achieved the following:
1. 28 -day design compressive strength.
2. At least 70 percent of 28 -day design compressive strength.
3. Determine compressive strength of in -place concrete by testing representative field- or laboratory-
cured test specimens according to ACl 301.
4. Remove forms only if shores have been arranged to permit removal'of forms without loosening or
disturbing shores.
C. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise
damaged form- facing material will not be acceptable for exposed surfaces. Apply new form- release
agent.
D. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and
secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved
by Architect.
3.4
VAPOR RETARDERS
A. Fine - Graded Granular Material: Cover vapor retarder with fine- graded granular material, moisten, and
compact with mechanical equipment to elevation tolerances of plus 0 inch (0 mm) or minus 3/4 inch (19
mm).
B. Granular Fill: Cover vapor retarder with granular fill, moisten, and compact with mechanical equipment
to elevation tolerances of plus 0 inch (0 mm) or minus 3/4 inch (19 ntnt).
I . Place and compact a 1/2 -inch- (13 -mm -) thick layer of fine- graded granular material over granular
fill.
STEEL REINFORCEMENT
3.5
A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials.
C. Accurately position, support, and secure reinforcement against displacement. Locate and support
reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing
reinforcing bars.
1. Shop- or Feld -weld reinforcement according to AWS Dl_4, where indicated.
D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
CAST -IN- PLACE CONCRETE 03300-8
V
1
t
a
LION SQUARE LODGE NORTH
Vail, Colorado
E. Install welded wire fabric in longest practicable lengths on bar supports spaced to minimize sagging. Lap
edges and ends of adjoining sheets at least one and one hole mesh spacing. Offset laps of adjoining sheet
widths to prevent continuous laps in either direction. Lace overlaps with wire_
3.6 JOINTS
A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.
B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations
indicated or as approved by Architect.
1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction
joints, unless otherwise indicated. Do not continue reinforcement through sides of strip
placements of floors and slabs.
2. Form from preformed galvanized steel, plastic keyway- section forms, or bulkhead forms with
keys, unless otherwise indicated. Embed keys at least 1 -1/2 inches (38 mm) into concrete.
3. Locate joints for grade beams in the middle third of spans.
4_ Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near
corners, and in concealed locations where possible..
5. Use epoxy - bonding adhesive at locations where fresh concrete is placed against hardened or
partially hardened concrete surfaces_
C. Contraction Joints in Slabs -on- Grade: Fomm weakened -plane contraction joints, sectioning concrete into
areas as indicated. Construct contraction joints for a depth equal to at least one -fourth of concrete
thickness, as follows:
Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or
diamond - rimmed blades. Cut 1/8 -inch- (3 -mm -) wide joints into concrete when cutting action will
not tear, abrade, or otherwise damage surface and before concrete develops random contraction
cracks.
D. Isolation Joints in Slabs -on- Grade: After removing formwork, install joint - filler strips at slab junctions
with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as
indicated.
1. Terminate full -width joint -filler strips not less than 1/2 inch (12 mm) or more than 1 inch (25 mm)
below finished concrete surface where joint sealants, specified in Division 7 Section "Joint
Sealants," are indicated.
2. Install joint - filler strips in lengths as long as practicable. Where more than one length is required,
lace or clip sections together.
E. Dowel Joints: Install dowel sleeves and dowels or dowel bar and support assemblies at joints where
indicated.
Use dowel sleeves or lubricate or asphalt -coat one -half of dowel length to prevent concrete
bonding to one side of joint.
1 3.7 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is
complete and that required inspections have been performed.
CAST -IN- PLACE CONCRETE 03300-9
LION SQUARE LODGE NORTH
Vail, Colorado
B. Do not add water to concrete during delivery, at Project site, or during placement, unless approved by
Architect.
C. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on
concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed
continuously, provide construction joints as specified. Deposit concrete to avoid segregation.
D. Deposit concrete in forms in horizontal layers no deeper than 24 inches (600 mm) and in a manner to
avoid inclined construction joints. Place each layer while preceding layer is still plastic, to avoid cold
joints. Do not drop concrete in forms from a height exceeding 60 inches.
I . Consolidate placed concrete with mechanical vibrating equipment. Use equipment and procedures
for consolidating concrete recommended by ACI 309R.
2. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at
uniformly spaced locations no farther than the visible effectiveness of the vibrator. Place vibrators
to rapidly penetrate placed layer and at least 6 inches (150 mm) into preceding layer_ Do not
insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion,
limit duration of vibration to time necessary to consolidate concrete and complete embedment of
reinforcement and other embedded items without causing mix constituents to segregate.
E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of
construction joints, until placement of a panel or section is complete.
I. Consolidate concrete during placement operations so concrete is thoroughly worked around
reinforcement and other embedded items and into comers.
2. Maintain reinforcement in position on chairs during concrete placement.
3. Screed slab surfaces with a straightedge and strike off to correct elevations.
4. Slope surfaces uniformly to drains where required.
5. Begin initial floating using bull floats or darbies to form a uniform and open - textured surface
plane, free of humps or hollows, before excess moisture or bleedwater appears on the surface. Do
not further disturb slab surfaces before starting finishing operations.
Cold- Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical
damage or reduced strength that could be caused by frost, freezing actions, or low temperatures_
When air temperature has fallen to or is expected to fall below 40 deg F (4.4 deg C), uniformly
heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than
50 deg F (10 deg C) and not more than 80 deg F (27 deg C) at point of placement.
Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen
subgrade or on subgrade containing frozen materials.
Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical
accelerators, unless otherwise specified and approved in mix designs.
G. Hot - Weather Placement: Place concrete according to recommendations in ACI 305R and as follows,
when hot - weather conditions exist:
I. Cool ingredients before mixing to maintain concrete temperature below 90 deg F (32 deg C) at
lime of placement. Chilled mixing water or chopped ice may be used to control temperature,
provided water equivalent of ice is calculated to total amount of mixing water. Using liquid
nitrogen to cool concrete is Contractor's option_
2. Cover steel reinforcement with water- soaked burlap so steel temperature will not exceed ambient
air temperature immediately before embedding in concrete.
3. Fog -spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade
moisture uniform without standing water, soft spots, or dry areas.
CAST -IN -PLACE CONCRETE 03300-10
n
I
1
L_.1
I
LION SQUARE LODGE NORTH
Vail, Colorado
3.8 FINISHING FORMED SURFACES
u
Rough - Formed Finish: As -cast concrete texture imparted by form- facing material with tie holes and
defective areas repaired and patched. Remove fins and other projections exceeding ACI 347R limits for
class of surface specified. For concrete surfaces below ground.
B. Smooth - Formed Finish: As -cast concrete texture imparted by form- facing material, arranged in an
orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defective
areas. Remove fins and other projections exceeding 1/8 inch (3 mm) in height.
1. Apply to concrete surfaces exposed to public view or to be covered with a coating or covering
material applied directly to concrete, such as waterproofing, dampproofing, veneer plaster, or
painting.
2. Do not apply rubbed finish to smooth - formed finish.
C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent
to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces.
Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless
otherwise indicated.
3.9 FINISHING FLOORS AND SLABS
A. General: Comply with recommendations in ACI 302.1 R for screeding, restraightening, and finishing
operations for concrete surfaces_ Do not wet concrete surfaces.
B_ Float Finish: Consolidate surface with power -driven floats or by hand floating if area is small or
inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float
passes and restraightening until surface is left with a uniform, smooth, granular texture. Typical for all
interior slabs.
I. Apply float finish to surfaces indicated, to surfaces to receive trowel finish, and to floor and slab
surfaces to be covered with fluid - applied or sheet waterproofing, built -up or membrane roofing, or
sand -bed terrazzo.
2. Finish and measure surface so gap at any point between concrete surface and an unleveled
freestanding 10 -foot- (3.05 -m -) long straightedge, resting on two high spots and placed anywhere
on the surface, does not exceed the following:
a. 3/16 inch (4.8 mm) Typical interior floors except gymnasium
b. 1/8 inch (3.2 mm) in Gymnasium
C. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as
indicated.
t. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber -
bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect
before application.
D. Trowel and fine broom finish: for locations where the or carpet is to be installed (refer to Room Finish
Schedule).
CAST -IN -PLACE CONCRETE
03300-11
LION SQUARE LODGE NORTH
Vail, Colorado
3.10 MISCELLANEOUS CONCRETE ITEMS
A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of
other trades is in place. Mix, place, and cure concrete, as specified, to blend with in -place construction.
Provide other miscellaneous concrete filling indicated or required to complete Work.
B_ Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by
steel - troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly
rounded.
C. Equipment Bases and Foundations: Provide machine and equipment bases and foundations as
shown on Drawings. Set anchor bolts for machines and equipment at correct elevations,
complying with diagrams or templates of manufacturer furnishing machines and equipment.
1. Provide 6" thick housekeeping pads with welded wire mesh reinforcement at
mechanical equipment. Coordinate sizes and locations with mechanical design.
3.11 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
Comply with ACI 306.1 for cold - weather protection and with recommendations in ACI 305R for hot -
weather protection during curing.
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy
conditions cause moisture loss approaching 0.2 lb /sq. ft. x h (I kg /sq. m x h) before and during finishing
operations. Apply according to manufacturer's written instructions after placing, screeding, and bull
floating or darbying concrete, but before float finishing.
C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and
other similar surfaces_ If forms remain during curing period, moist cure after loosening forms. If
removing forms before end of curing period, continue curing by one or a combination of the following
methods:
D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces,
including floors and slabs, concrete floor toppings, and other surfaces, by one or a combination of the
following methods:
1. Curing Compound: Apply uniformly in continuous operation by power spray or roller according
to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours
after initial application. Maintain continuity of coating and repair damage during curing period.
3.12 LIQUID FLOOR TREATMENTS
A. Penetrating Liquid Floor Treatment: Prepare, apply, and finish penetrating liquid floor treatment
according to manufacturers written instnictions.
I. Remove curing compounds, sealers, oil, dirt, faitance, and other contaminants and complete
surface repairs.
2. Do not apply to concrete that is less than seven days old.
3. Apply liquid until surface is saturated, scrubbing into surface until a gel forms; rewet; and repeat
brooming or scrubbing. Rinse with water; remove excess material until surface is dry. Apply a
second coat in a similar manner if surface is rough or porous.
CAST -IN -PLACE CONCRETE 03300-12
1
t
t
0
L�
'J
1
Ll
1
LION SQUARE LODGE NORTH
Vail, Colorado
B_ Sealing Coat. Uniformly apply a continuous sealing coat of curing and sealing compound to hardened
concrete by power spray or roller according to manufacturer's written instructions.
3.13 CONCRETE SURFACE REPAIRS
A. Defective Concrete: Repair and patch defective areas when approved by Architect. Remove and replace
concrete that cannot be repaired and patched to Architect's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part portland cement to two and one -
half parts fine aggregate passing a No. 16 (1.2 -mm) sieve, using only enough water for handling and
placing.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air
bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other
discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch
(13 mm) in any dimension in solid concrete but not less than I inch (25 mm) in depth. Make
edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush -coat holes
and voids with bonding agent. Fill and compact with patching mortar before bonding agent has
dried. Fill form -tie voids with patching mortar or cone plugs secured in place with bonding agent.
2. Repair defects on surfaces exposed to view by blending white portland cement and standard
portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area
at inconspicuous locations to verify mixture and color match before proceeding with patching.
Compact mortar in place and strike off slightly higher than surrounding surface.
3. Repair defects on concealed formed surfaces that affect concrete's durability and structural
performance as determined by Architect.
D. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify
surface tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain
for trueness of slope and smoothness; use a sloped template.
t
I . Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs,
rock pockets, crazing and cracks in excess of 0.01 inch (0.25 mm) wide or that penetrate to
reinforcement or completely through unreinforced sections regardless of width, and other
objectionable conditions.
2. After concrete has cured at least 14 days, correct high areas by grinding.
3. Correct localized low areas during or immediately after completing surface finishing operations by
cutting out low areas and replacing with patching mortar. Finish repaired areas to blend into
adjacent concrete.
4. Correct other low areas scheduled to receive floor coverings with a repair underlayment. Prepare,
mix, and apply repair underlayment and primer according to manufacturer's written instructions to
produce a smooth, uniform, plane, and level surface. Feather edges to match adjacent floor
elevations.
5. Correct other low areas scheduled to remain exposed with a repair topping. Cut out low areas to
ensure a minimum repair topping depth of 114 inch (6 mm) to match adjacent floor elevations.
Prepare, mix, and apply repair topping and primer according to manufacturers written instructions
to produce a smooth, uniform, plane, and level surface.
6. Repair defective areas, except random cracks and single holes I inch (25 mm) or less in diameter,
by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts
and expose steel reinforcement with at least 3/4 inch (19 mm) clearance all around. Dampen
concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching
concrete of same materials and mix as original concrete except without coarse aggregate. Place,
compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent
concrete.
CAST -IN -PLACE CONCRETE
03300-13
LION SQUARE LODGE NORTH
Vail, Colorado
Repair random cracks and single holes 1 inch (25 mm) or less in diameter with patching mortar.
Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose
particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar
before bonding agent has dried. Compact patching mortar and finish to match adjacent concrete.
Keep patched area continuously moist for at least 72 hours.
E.
F.
3.14
Perform structural repairs of concrete, subject to Architect's approval, using epoxy adhesive and patching
mortar.
Repair materials and installation not specified above may be used, subject to Architect's approval.
FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to sample
materials, perform tests, and submit test reports during concrete placement. Sampling and testing for
quality control may include those specified in this Article.
B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172
shall be performed according to the following requirements:
1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mix
exceeding 5 cu. yd. (4 cu. m),' but less than 25 cu. yd. (19 cu. m), plus one set for each additional
50 cu. yd. (38 cu. m) or fraction thereof.
a. When frequency of testing will provide fewer than five compressive- strength tests for each
concrete mix, testing shall be conducted from at least five randomly selected batches or
from each batch if fewer than five are used.
2. Slump: ASTM C 143; one test at point of placement for each composite sample, but not less than
one test for each day's pour of each concrete mix. Perform additional tests when concrete
consistency appears to change.
3. Air Content: ASTM C 231, pressure method, for normal- weight concrete; ASTM C 173,
volumetric method, for structural lightweight concrete; one test for each composite sample, but not
less than one test for each day's pour of each concrete mix.
4. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg F (4.4
deg C) and below and when 80 deg F (27 deg C) and above, and one test for each composite
sample.
5_ Compression Test Specimens: ASTM C 31 /C 31M; cast and laboratory cure one set of four
standard cylinder specimens for each composite sample.
Cast and field cure one set of four standard cylinder specimens for each composite sample_
6. Compressive - Strength Tests: ASTM C 39; test nvo laboratory-cured specimens at 7 days, one at
28 days, and one specimen will be retained in reserve for later testing if required..
a. A compressive - strength test shall be the average compressive strength from two specimens
obtained from same composite sample and tested at age indicated.
C. When strength of field -cured cylinders is less than 85 percent of companion laboratory-cured cylinders,
Contractor shall evaluate operations and provide corrective procedures for protecting and curing in -place
concrete.
D. Strength of each concrete mix will be satisfactory if every average of any three consecutive compressive -
strength tests equals or exceeds specified compressive strength and no compressive - strength test value
falls below specified compressive strength by more than 500 psi (3.4 MPa).
CAST -IN -PLACE CONCRETE 03300-14
u
u
n
LION SQUARE LODGE NORTH
Vail, Colorado
E. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48
hours of testing. Reports of compressive- strength tests shall contain Project identification name and
number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete
batch in Work, design compressive strength at 28 days, concrete mix proportions and materials,
compressive breaking strength, and type of break for both 7 -and 28 -day tests.
F. Nondestructive Testing: impact hammer, sonoscope, or other nondestructive device may be permitted by
Architect but will not be used as sole basis for approval or rejection of concrete.
G. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results
indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as
directed by Architect. Testing and inspecting agency may conduct tests to determine adequacy of
concrete by cored cylinders complying with ASTM C 42 or by other methods as directed by Architect.
END OF SECTION 03300
' CAST -IN -PLACE CONCRETE
03300-15
I I SECTION 03410 - PLANT - PRECAST STRUCTURAL CONCRETE
LEON SQUARE LODGE NORTH
Vail, Colorado
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
' A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division t Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Precast structural concrete.
2. Precast structural concrete with commercial architectural finish.
B. Related Sections:
I . Division 3 Section "Cast -in -Place Concrete" for concrete topping and placing connection anchors
in concrete.
2. Division 4 Section "Unit Masonry Assemblies" for inserts or anchorages required for precast
concrete slab connections.
3. Division 5 Section "Structural Steel" for furnishing and installing connections attached to
structural -steel framing_
4. Division 5 Section "Metal Fabrications" for kickers and other miscellaneous steel shapes.
5. Division 7 Section "Sheet Metal Flashing and Trim" for flashing receivers and reglets.
6. Division 7 Section "Through- Penetration Firestop Systems" for joint - fuller materials for fire -
resistance -rated construction.
7. Division 7 Section "Joint Sealants" for elaslomeric joint sealants and sealant backings.
13 DEFINITION
A. Design Reference Sample: Sample of approved precast structural concrete color, finish, and texture,
preapproved by Architect.
1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design precast stnuctural concrete, including comprehensive engineering analysis by a
qualified professional engineer, using performance requirements and design criteria indicated.
B. Structural Performance: Precast stntctural concrete units and connections shall withstand design loads
indicated within limits and under conditions indicated.
C. Structural Performance: Provide precast structural concrete units and connections capable of
withstanding the following design loads within limits and tinder conditions indicated on structural
drawings.
1. Design precast structural concrete framing system and connections to maintain clearances at
openings, to allow for fabrication and construction tolerances, to accommodate live -load
I PLANT - PRECAST STRUCTURAL CONCRETE
03410- 1
h
n.
C
1❑
For each type of finish indicated on exposed surfaces of precast structural concrete units with
architectural finish, in sets of 3, illustrating full range of finish, color, and texture variations
expected; approximately 12 by 12 by 2 inches (300 by 300 by 50 ntnt).
a. Where other faces of precast concrete unit are exposed, include Samples illustrating
workmanship, color, and texture of backup concrete as well as facing concrete.
PLANT - PRECAST STRUCTURAL CONCRETE
UON SQUARE LODGE NORTH
Vail, Colorado
deflection, shrinkage and creep of primary building structure, and other building movements.
Maintain precast structural concrete deflections within limits of ACI 318 (ACI 318M).
Thermal Movements: Allow for in -plane thermal movements resulting from annual
ambient temperature changes of minus 30 to plus 110 deg F.
Fire - Resistance Rating: Select material and minimum thicknesses to provide indicated fire rating.
Vehicular Impact Loads: Design spandrel beams acting as vehicular barriers for passenger cars to
resist a single 6000 -lbf (26.7 -kN) service load and 10,000 -lbf (44.5 -kN) ultimate load applied
horizontally in any direction to the spandrel beam, with anchorages or attachments capable of
transferring this load to the structure. Design spandrel beams assuming the load to act at a height
of 18 inches (460 mm) above the floor or ramp surface on an area not to exceed I sq. ft. (0.93
sq. m).
dITTALS
ict Data: For each type of product indicated.
Design Mixtures: For each precast concrete mixture. Include compressive strength and water- absorption
tests.
Shop Drawings: Include member locations, plans, elevations, dimensions, shapes and sections, openings,
support conditions, and types of reinforcement, including special reinforcement. Detail fabrication and
installation of precast structural concrete units.
. Indicate joints, reveals, and extent and location of each surface finish.
2. Indicate separate face and backup mixture locations and thicknesses.
3. Indicate welded connections by AWS standard symbols. Show size, length, and type of each
weld.
4. Detail loose and cast -in hardware, lifting and erection inserts, connections, and joints.
5. Indicate locations, tolerances, and details of anchorage devices to be embedded in or attached to
structure or other construction.
6. Include and locate openings larger than by 10 inches (250 nun).
7. Indicate location of each precast structural concrete unit by same identification mark placed on
panel.
8. Indicate relationship of precast structural concrete units to adjacent materials.
9. Indicate locations and details of brick units, including comer units and special shapes, and joint
treatment.
10_ Indicate estimated camber for precast floor slabs with concrete toppings.
It. Indicate shim sizes and grouting sequence.
12. Design Modifications: if design modifications are proposed to meet performance requirements
and field conditions, submit design calculations and Shop Drawings. Do not adversely affect the
appearance, durability, or strength of units when modifying details or materials and maintain the
general design concept.
Samples:
03410-2
e
e
t
s
I I
I I
11 -
I I
1 1 1.6
LION SQUARE LODGE NORTH
Vail, Colorado
2. Samples for each thin- or half -brick unit required, showing full range of color and texture
expected. Include Samples showing color and texture of joint treatment.
a. Grout Samples for Initial Selection: Color charts consisting of actual sections of grout
showing manufacturer's full range of colors.
b. Grout Samples for Verification: Showing color and texture of joint treatment.
E. Delegated- Design Submittal: For precast structural concrete indicated to comply with performance
requirements and design criteria, including analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
F. Qualification Data: For Installer, fabricator and testing agency.
G. Welding certificates.
H. Material Certificates: For the following, from manufacturer:
1. Cementitious materials.
2. Reinforcing materials and prestressing tendons.
3. Admixtures.
4. Bearing pads.
5_ Structural -steel shapes and hollow structural sections.
I. Material Test Reports: For aggregates.
J. Source quality- control reports.
K. Field quality- control reports.
QUALITY ASSURANCE
A. Fabricator Qualifications: A firm that assumes responsibility for engineering precast structural concrete
units to comply with performance requirements. Responsibility includes preparation of Shop Drawings
and comprehensive engineering analysis by a qualified professional engineer.
B. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing
indicated.
C. Design Standards: Comply with ACI 318 (ACI 318M) and design recommendations in PCI MNL 120,
"PCI Design Handbook - Precast and Prestressed Concrete," applicable to types of precast structural
concrete units indicated.
D. Quality - Control Standard: For manufacturing procedures and testing requirements, quality- control
recommendations, and dimensional tolerances for types of units required, comply with PCI MNL 116,
"Manual for Quality Control for Plants and Production of Structural Precast Concrete Products."
E. Welding Qualifications: Qualify procedures and personnel according to the following:
I . AWS D 1.I /D.1.1 M, "Structural Welding Code - Steel."
2. AWS D 1.4, "Structural Welding Code - Reinforcing Steel."
F. Fire- Resistance Calculations- Where indicated, provide precast stnuctural concrete units whose fire
resistance meets the prescriptive requirements of authorities having jurisdiction or has been calculated
PLANT - PRECAST STRUCTURAL CONCRETE
03410-3
LION SQUARE LODGE NORTH
Vail, Colorado
according to PC] MNL 124, "Design for Fire Resistance of Precast Prestressed Concrete," and is
acceptable to authorities having jurisdiction.
G. Mockups: After sample panel approval but before production of precast structural concrete units with
architectural finish, construct fill -sized mockups to verify selections made under sample submittals and
to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Build mockup as indicated on Drawings including sealants and precast structural concrete units
with an architectural finish complete with anchors, connections, flashings, and joint fillers.
2. Approval of mockups does not constitute approval of deviations from the Contract Documents
contained in mockups unless Architect specifically approves such deviations in writing.
3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial
Completion.
DELIVERY, STORAGE, AND HANDLING
1.7
A. Support units during shipment on nonstaining shock- absorbing material in same position as during
storage.
B. Store units with adequate bracing and protect units to prevent contact with soil, to prevent staining, and to
prevent cracking, distortion, warping or other physical damage.
1. Store units with dunnage across full width of each bearing point unless otherwise indicated.
2. Place adequate dunnage of even thickness between each unit.
3. Place stored units so identification marks are clearly visible, and units can be inspected.
C. Handle and transport units in a position consistent with their shape and design in order to avoid excessive
stresses that would cause cracking or damage.
D. Lift and support units only at designated points shown on Shop Drawings.
1.8
COORDINATION
A. Furnish loose connection hardware and anchorage items to be embedded in or attached to other
construction before starting that Work. Provide locations, setting diagrams, templates, instructions, and
directions, as required, [or installation.
PART 2- PRODUCTS
2.1 MOLD MATERIALS
A. Molds: Rigid, dimensionally stable, non - absorptive material, warp and buckle free, that will provide
continuous and true precast concrete surfaces within fabrication tolerances indicated; nonreactive with
concrete and suitable for producing required finishes.
Mold- Release Agent: Commercially produced liquid- release agent that will not bond with, stain
or adversely affect precast concrete surfaces and will not impair subsequent surface or joint
treatments of precast concrete.
PLANT - PRECAST STRUCTURAL CONCRETE 03410-4
u
Li
LION SQUARE LODGE NORTH
Vail, Colorado
2.2
REINFORCING MATERIALS
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.
B. Low -Alloy -Steel Reinforcing Bars: ASTM A 706/A 706M, deformed.
C. Steel Bar Mats: ASTM A 184 /A 184M, fabricated from deformed bars, assembled with clips.
D. Plain -Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as -drawn steel wire into flat
sheets.
E. Deformed -Steel Welded Wire Reinforcement: ASTM A 497/A 497M, flat sheet.
F. Supports: Suspend reinforcement from back of mold or use bolsters, chairs, spacers, and other devices
for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place according
to PCI MNL 116-
2.3
PRESTRESSING TENDONS
A. Pretensioning Strand: Per structural drawings and manufacturer requirements_
B. Unbonded Post - Tensioning Strand: ASTM A 416/A 416M, Grade 270 (Grade 1860), uncoated, 7 -wire,
low- relaxation strand.
I . Coat unbonded post- tensioning strand with post- tensioning coating complying with ACI 423.6 and
sheath with polypropylene tendon sheathing complying with ACI 423.6. Include anchorage
devices and coupler assemblies.
C. Post - Tensioning Bars: ASTM A 722, uncoated high - strength steel bar.
2.4
CONCRETE MATERIALS
A. Portland Cement: ASTM C 150, Type I or Type 111, gray, unless otherwise indicated.
1. For surfaces exposed to view in finished structure, mix gray with white cement, of same type,
brand, and mill source.
B. Supplementary Cementitious Materials:
I. Fly Ash: ASTM C 618, Class C or F, with maximum loss on ignition of 3 percent.
2. Metakaolin Admixture: ASTM C 618, Class N.
3. Silica Fume Admixture: ASTM C 1240, with optional chemical and physical requirement.
4. Ground Granulated Blast - Furnace Slag: ASTM C 989, Grade 100 or 120.
C. Normal- Weight Aggregates: Except as modified by PCI MNL 116, ASTM C 33, with coarse aggregates
complying with Class 5S. Stockpile fine and coarse aggregates for each type of exposed finish from a
single source (pit or quarry) for Project.
1. Face - Mixture- Coarse Aggregates: Selected, hard, and durable; free of material that reacts with
cement or causes staining; to match selected finish sample.
2. Face- Mixture -Fine Aggregates: Selected, natural or manufactured sand of same material as coarse
aggregate unless otherwise approved by Architect.
PLANT- PRECAST STRUCTURAL CONCRETE 03410-5
LION SQUARE LODGE NORTH
Vail, Colorado
D. Coloring Admixture: ASTM C 979, synthetic or natural mineral -oxide pigments or colored water -
reducing admixtures, temperature stable, and nonfading.
E. Water: Potable; free from deleterious material that may affect color stability, setting, or strength of
concrete and complying with chemical limits of PCl MNL 116.
F. Air - Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other required
admixtures.
G. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and to not
contain calcium chloride, or more than 0.15 percent chloride ions or other salts by weight of admixture.
I . Water- Reducing Admixtures: ASTM C 494/C 494M, Type A.
2- Retarding Admixture: ASTM C 494/C 494M, Type B.
3. Water - Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D-
4. Water- Reducing and Accelerating Admixture: ASTM C 494/C 494M, Type E.
5. High- Range, Water - Reducing Admixture: ASTM C 494/C 494M, Type F.
6. High- Range, Water- Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.
7. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M.
H. Corrosion- Inhibiting Admixture: Commercially formulated, anodic inhibitor or mixed cathodic and
anodic inhibitor; capable of forming a protective barrier and minimizing chloride reactions with steel
reinforcement in concrete.
2.5
STEEL CONNECTION MATERIALS
A. Carbon -Steel Shapes and Plates: ASTM A 36/A 36M.
B. Carbon - Steel -l- leaded Studs: ASTM A 108, AISI 1018 through AISI 1020, cold finished,
AWS DI.I /DI.IM, Type A or B, with arc shields and with minimum mechanical properties of
PCI MNL 1 16.
C. Carbon -Steel Plate: ASTM A 283/A 283M.
D. Malleable -Iron Castings: ASTM A 47/A 47M_
E. Carbon -Steel Castings: ASTM A 27/A 27M, Grade 60 -30 (Grade 415 -205).
F. High - Strength, Low -Alloy Structural Steel: ASTM A 572/A 572M.
G. Carbon -Steel Structural Tubing: ASTM A 500, Grade B.
H. Wrought Carbon -Steel Bars: ASTM A 675/A 675M, Grade 65 (Grade 450).
1. Deformed -Steel Wire or Bar Anchors: ASTM A 496 or ASTM A 706/A 706M.
J. Carbon -Steel Bolts and Studs: ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6); carbon -
steel, hex -head bolts and studs; carbon -steel nuts, ASTM A 563 (ASTM A 563M); and flat, unhardened
steel washers, ASTM F 844,
K. High - Strength Bolts and Nuts: ASTM A 325 (ASTM A 325M) or ASTM A 490 (ASTM A 490M),
Type 1, heavy hex steel structural bolts; heavy hex carbon -steel nuts, ASTM A 563 (ASTM A 563M);
and hardened carbon -steel washers, ASTM F 436 (ASTM F 436M).
PLANT- PRECAST STRUCTURAL CONCRETE 03410-6
i
H
C
C
' LION SQUARE LODGE NORTH
Vail, Colorado
1. Do not zinc coat ASTM A 490 (ASTM A 490M) bolts.
L. Zinc - Coated Finish: For exterior steel items, steel in exterior walls, and items indicated for galvanizing,
apply zinc coating by hot -dip process according to ASTM A 123/A 123M or ASTM A 153/A 153M.
' I . For steel shapes, plates, and tubing to be galvanized, limit silicon content of steel to less than 0.03
percent or to between 0.15 and 0.25 percent or limit sum of silicon and 2.5 times phosphorous
content to 0.09 percent.
' 2. Galvanizing Repair Paint: High -zinc- dust - content paint with dry film containing not less than 94
percent zinc dust by weight, and complying with DOD- P- 21035B or SSPC -Paint 20.
M. Shop- Primed Finish: Prepare surfaces of nongalvanized -steel items, except those surfaces to be
' embedded in concrete, according to requirements in SSPC -SP 3, and shop apply lead- and chromate -free,
rust- inhibitive primer, complying with performance requirements in MPI 79 according to SSPC -PA 1.
' N. Welding Electrodes: Comply with AWS standards.
O. Precast Accessories: Provide clips, hangers, plastic or steel shims, and other accessories required to
install precast structural concrete units.
2.6 BEARING PADS
A. Provide one of the following bearing pads for precast structural concrete units as recommended by
precast fabricator for application:
1. Elastomeric Pads: AASHTO M 251, plain, vulcanized, 100 percent polychloroprene (neoprene)
elastomer, molded to size or cut from a molded sheet, 50 to 70 Shore, Type A durometer hardness,
ASTM D 2240; minimum tensile strength 2250 psi (15.5 MPa), ASTM D 412.
2. Random- Oriented, Fiber - Reinforced Elastomeric Pads: Preformed, randomly oriented synthetic
fibers set in elastomer. 70 to 90 Shore, Type A durometer hardness, ASTM D 2240; capable of
supporting a compressive stress of 3000 psi (20.7 MPa) with no cracking, splitting, or
delaminating in the internal portions of pad. Test I specimen for every 200 pads used in Project.
3. Cotton -Duck- Fabric - Reinforced Elastomeric Pads: Preformed, horizontally layered cotton -duck
' fabric bonded to an elastomer; 80 to 100 Shore, Type A durometer hardness, ASTM D 2240;
complying with AASHTO's " AASHTO Load and Resistance Factor Design (LRFD) Bridge
Specifications," Division 11, Section 18.10.2; or with MIL- C -882E.
4_ Frictionless Pads: Tetrafluoroethylene, glass -fiber reinforced, bonded to stainless- or mild -steel
plate, of type required for in- service stress.
5. High- Density Plastic: Multimonomer, nonleaching, plastic strip.
' 2.7 GROUT MATERIALS
A. Sand - Cement Grout: Portland cement, ASTM C 150, Type 1, and clean, natural sand, ASTM C 144 or
'
ASTM C404. Mix at ratio of I part cement to 2 -1/2 parts sand, by volume, with minimum water
required for placement and hydration.
' B. Nonmetallic, Nonshrink Grout: Premixed, nonmetallic, noncorrosive, nonstaining grout containing
selected silica sands, portland cement, shrinkage - compensating agents, plasticizing and water - reducing
agents, complying with ASTM C 1107, Grade A for drypack and Grades B and C for flowable grout and
of consistency suitable for application within a 30- minute working time.
' C. Epoxy -Resin Grout: Two - component, mineral- tilled epoxy resin; ASTM C 881/C 881 M, of type, grade,
and class to suit requirements-
PLANT-PRECAST STRUCTURAL CONCRETE 03410-7
1
LION SQUARE LODGE NORTH
Vail, Colorado
2.8 CONCRETE MIXTURES
A. Prepare design mixtures for each type of precast concrete required.
Limit use of fly ash to 25 percent replacement of portland cement by weight and granulated blast -
furnace slag to 40 percent of portland cement by weight; metakaolin and silica fume to 10 percent
of portland cement by weight.
B. Design mixtures may be prepared by a qualified independent testing agency or by qualified precast plant
personnel at precast structural concrete fabricator's option.
C. Limit water- soluble chloride ions to maximum percentage by weight of cement permitted by ACI 318
(ACI 318M) or PCI MNL 116 when tested according to ASTM C 1218 /C 1218M.
D. Normal- Weight Concrete Mixtures: Proportion face and backup mixture as directed by Structural
Engineer of record by either laboratory trial batch or field test data methods according to ACI 211. 1, with
materials to be used on Project, to provide normal- weight concrete with the following properties:
L Compressive Strength (28 Days): 5000 psi (34.5 MPa).
2. Maximum Water- Cementitious Materials Ratio: 0.45.
E. Water Absorption: 6 percent by weight or 14 percent by volume, tested according to PCI MNL 116.
F. Lightweight Concrete Backup Mixtures: Proportion mixtures by either laboratory trial batch or field test
data methods according to ACI 211.2, with materials to be used on Project, to provide lightweight
concrete with the following properties:
Compressive Strength (28 Days): 5000 psi (34.5 MPa).
Unit Weight: Calculated equilibrium unit weight of 115 lb /cu. ft. (1842 kg /cu. m), plus or minus 3
lb /cu. ft. (48 kg /cu. m), according to ASTM C 567.
G. Add air - entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement
having an air content complying with PCI MNL 116.
H. When included in design mixtures, add other admixtures to concrete mixtures according to manufacturer's
written instructions.
Concrete Mix Adjustments: Concrete mix design adjustments may be proposed if characteristics of
materials, Project conditions, weather, test results, or other circumstances warrant.
2.9 MOLD FABRICATION
A. Molds: Accurately construct molds, mortar tight, of sufficient strength to withstand pressures due to
concrete - placement operations and temperature changes and for prestressing and detensioning operations.
Coat contact surfaces of molds with release agent before reinforcement is placed. Avoid contamination
of reinforcement and prestressing tendons by release agent_
Place form liners accurately to provide finished surface texture indicated. Provide solid backing
and supports to maintain stability of liners during concrete placement. Coat form liner with form -
release agent.
B. Maintain molds to provide completed precast structural concrete units of shapes, lines, and dimensions
indicated, within fabrication tolerances specified.
PLANT- PRECAST STRUCTURAL CONCRETE 03410-8
t
7
H
r,
t
0
I I
LEON SQUARE LODGE NORTH
Vail, Colorado
Form joints are not permitted on faces exposed to view in the finished work.
Edge and Comer Treatment: Uniformly radiused.
2.10 FABRICATION
A. Cast -in Anchors, Inserts, Plates, Angles, and Other Anchorage Hardware: Fabricate anchorage hardware
with sufficient anchorage and embedment to comply with design requirements. Accurately position for
attachment of loose hardware, and secure in place during precasting operations. Locate anchorage
hardware where it does not affect position of main reinforcement or concrete placement.
Weld- headed studs and deformed bar anchors used for anchorage according to AWS D 1.1 /D 1.1 M
and AWS C5.4, "Recommended Practices for Stud Welding."
B. Furnish loose hardware items including steel plates, clip angles, seat angles, anchors, dowels, cramps,
hangers, and other hardware shapes for securing precast structural concrete units to supporting and
adjacent construction.
C. Cast -in reglets, slots, holes, and other accessories in precast structural concrete units as indicated on the
Contract Drawings.
D_ Cast -in openings larger than 10 inches (250 mm) in any dimension_ Do not drill or cut openings or
prestressing strand without Architect's approval.
E. Reinforcement: Comply with recommendations in PCI MNL 116 for fabricating, placing, and supporting
reinforcement.
I _ Clean reinforcement of loose rust and mill scale, earth, and other materials that reduce or destroy
the bond with concrete. When damage to epoxy- coated reinforcement exceeds limits specified,
repair with patching material compatible with coating material and epoxy coat bar ends after
cutting.
2. Accurately position, support, and secure reinforcement against displacement during concrete -
placement and consolidation operations. Completely conceal support devices to prevent exposure
on finished surfaces.
3. Place reinforcement to maintain at least 3/4 -inch (19 -nun) minimum coverage. Increase cover
requirements according to ACI 318 (ACI 318M) when units are exposed to corrosive environment
or severe exposure conditions. Arrange, space, and securely tie bars and bar supports to hold
reinforcement in position while placing concrete. Direct wire tie ends away from finished,
exposed concrete surfaces.
4. Place reinforcing steel and prestressing strand to maintain at least 3/4 -inch (19 -mm) minimum
concrete cover. Increase cover requirements for reinforcing steel to 1 -1/2 inches (38 mm) when
units are exposed to corrosive environment or severe exposure conditions. Arrange, space, and
securely tie bars and bar supports to hold reinforcement in position while placing concrete. Direct
wire tie ends away from finished, exposed concrete surfaces.
5. Install welded wire fabric in lengths as long as practicable. Lap adjoining pieces at least one full
mesh spacing and wire tie laps, where required by design. Offset laps of adjoining widths to
prevent continuous laps in either direction.
f. Reinforce precast structural concrete units to resist handling, transportation, and erection stresses.
G- Prestress tendons for precast structural concrete units by either pretensioning or post - tensioning methods.
Comply with PCI MNL 116-
PLANT - PRECAST STRUCTURAL CONCRETE 03410-9
LION SQUARE LODGE NORTH
Vail, Colorado
1. Delay detensioning or post- tensioning of precast, prestressed structural concrete units until
concrete has reached its indicated minimum design release compressive strength as established by
test cylinders cured under same conditions as concrete.
2. Detension pretensioned tendons either by gradually releasing tensioning jacks or by heat cutting
tendons, using a sequence and pattern to prevent shock or unbalanced loading_
3. If concrete has been heat cured, detension while concrete is still warm and moist to avoid
dimensional changes that may cause cracking or undesirable stresses.
4. Protect strand ends and anchorages with bituminous, zinc -rich, or epoxy paint to avoid corrosion
and possible rust spots.
5. Protect strand ends and anchorages with a minimum of 1 -inch- (25 -mm -) thick, nonmetallic,
nonshrink, grout mortar and sack rub surface. Coat or spray the inside surfaces of pocket with
bonding agent before installing grout.
H. Comply with requirements in PCI MNL 116 and in this Section for measuring, mixing, transporting, and
placing concrete. After concrete batching, no additional water may be added.
I. Place face mixture to a minimum thickness after consolidation of the greater of I inch (25 mm) or 1.5
times the maximum aggregate size, but not less than the minimum reinforcing cover specified.
J. Place concrete in a continuous operation to prevent seams or planes of weakness from forming in precast
concrete units.
Place backup concrete mixture to ensure bond with face - mixture concrete.
K. Thotoughly consolidate placed concrete by internal and external vibration without dislocating or
damaging reinforcement and built -in items, and minimize pour lines, honeycombing, or entrapped air on
surfaces. Use equipment and procedures complying with PCI MNL 116.
Place self - consolidating concrete without vibration according to PCI TR -6, "Interim Guidelines
for the Use of Self- Consolidating Concrete in Precast/Prestressed Concrete Institute Member
Plants."
L. Comply with ACI 306.1 procedures for cold- weather concrete placement_
M. Comply with PCI MNL 116 procedures for hot - weather concrete placement.
N. Identify pickup points of precast structural concrete units and orientation in structure with permanent
markings, complying with markings indicated on Shop Drawings. Imprint or permanently mark casting
date on each precast structural concrete unit on a surface that will not show in finished structure.
O. Cure concrete, according to requirements in PCI MNL 116, by moisture retention without heat or by
accelerated heat curing using low- pressure live steam or radiant heat and moisture. Cure units until
compressive strength is high enough to ensure that stripping does not have an effect on performance or
appearance of final product_
Discard and replace precast structural concrete units that do not comply with requirements, including
structural, manufacturing tolerance, and appearance, unless repairs meet requirements in PCi MNL 116
and meet Architect's approval-
2.11 FABRICATION TOLERANCES
A. Fabricate precast structural concrete units straight and true to size and shape with exposed edges and
comers precise and true so each finished unit complies with PCI MNL 116 product distension tolerances-
PLANT-PRECAST STRUCTURAL CONCRETE 03410- 10
n
t
t
1
1
Ll
2.12 COMMERCIAL FINISHES
LION SQUARE LODGE NORTH
Vail, Colorado
A. Unexposed areas to be Commercial Grade: Remove fins and large protrusions and fill large holes. Rub
or grind ragged edges. Faces must have true, well - defined surfaces. Air holes, water marks, and color
variations are permitted. Limit form joint offsets to 3/16 inch (5 mm).
B. Exposed areas to be Grade B Finish: Fill air pockets and holes larger than 1/4 inch (6 mm) in diameter
with sand- cement paste matching color of adjacent surfaces. Fill air holes greater than 1/8 inch (3 mm) in
width that occur more than once per 2 sq. in. (1300 sq. mm). Grind smooth form offsets or fins larger
than 1/8 inch (3 mm). Repair surface blemishes due to holes or dents in molds. Discoloration at form
joints is permitted.
C. Screed or float finish unformed surfaces. Strike off and consolidate concrete with vibrating screeds to a
uniform finish. Hand screed at projections. Normal color variations, minor indentations, minor chips,
and spalls are permitted. Major imperfections, honeycombing, or defects are not permitted.
D. Apply roughened surface finish according to ACI 318 (ACI 318M) to precast concrete units that will
receive concrete topping after installation.
1 2.13 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate precast structural concrete fabricator's
quality- control and testing methods.
1. Allow testing agency access to material storage areas, concrete production equipment, concrete
placement, and curing facilities. Cooperate with testing agency and provide samples of materials
' and concrete mixtures as may be requested for additional testing and evaluation.
B. Testing: Test and inspect precast structural concrete according to PCI MN 116 requirements_
I. Test and inspect self - consolidating concrete according to PC] TR -6.
C. Strength of precast structural concrete units will be considered deficient if units fail to comply with
ACI 318 (ACI 318M) requirements for concrete strength.
D. If there is evidence that strength of precast concrete units may be deficient or may not comply with
' ACI 318 (ACI 318M) requirements, employ a qualified testing agency to obtain, prepare, and test cores
drilled from hardened concrete to determine compressive strength according to ASTM C 42/C 42M.
1. A minimum of three representative cores will be taken from units of suspect strength, from
locations directed by Architect.
2. Cores will be tested in an air -dry condition or, if units will be wet under service conditions, test
cores after immersion in water in a wet condition.
3. Strength of concrete for each series of 3 cores will be considered satisfactory if average
compressive strength is equal to at least 85 percent of 28 -day design compressive strength and no
single core is less than 75 percent of 28 -day design compressive strength.
4. Test results will be made in writing on same day that tests are performed, with copies to Architect,
Contractor, and precast concrete fabricator. Test reports will include the following:
a. Project identification name and number.
b. Date when tests were performed.
C. Name of precast concrete fabricator.
d. Name of concrete testing agency.
' PLANT - PRECAST STRUCTURAL CONCRETE 03410- 11
t
LION SQUARE LODGE NORTH
Vail, Colorado
e. Identification letter, name, and type of precast concrete unit(s) represented by core tests;
design compressive strength; type of break; compressive strength at breaks, corrected for
length- diameter ratio; and direction of applied load to core in relation to horizontal plane of
concrete as placed.
E. Patching: If core test results are satisfactory and precast structural concrete units comply with
requirements, clean and dampen core holes and solidly fill with same precast concrete mixture that has no
coarse aggregate, and finish to match adjacent precast concrete surfaces.
F. Defective Units: Discard and replace precast structural concrete units that do not comply with
requirements, including strength, manufacturing tolerances, and color and texture range. Chipped,
spalled, or cracked units may be repaired, subject to Architect's approval. Architect reserves the right to
reject precast units that do not match approved samples, sample panels, and mockups.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine supporting structural frame or foundation and conditions for compliance with requirements for
installation tolerances, true and level bearing surfaces, and other conditions affecting performance of the
Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
C. Do not install precast concrete units until supporting, cast -in- place, building structural framing has
attained minimum allowable design compressive strength or until supporting steel or other structure is
complete.
3.2 INSTALLATION
A. Install clips, hangers, bearing pads, and other accessories required for connecting precast structural
concrete units to supporting members and back-tip materials.
B. Erect precast structural concrete level, plumb, and square within specified allowable tolerances. Provide
temporary structural framing, supports, and bracing as required to maintain position, stability, and
alignment of units until permanent connection.
I . Install temporary steel or plastic spacing shims or bearing pads as precast structural concrete units
are being erected. Tack weld steel shims to each other to prevent shims from separating.
2. Maintain horizontal and vertical joint alignment and uniform joint width as erection progresses.
3. Remove projecting lifting devices and grout full voids within recessed lifting devices flush with
surface of adjacent precast surfaces when recess is exposed.
4. For hollow -core slab voids used as electrical raceways or mechanical ducts, align voids between
units and tape butt joint at end of slabs.
C. Connect precast stnuct►ral concrete units in position by bolting, welding, grouting, or as othenvisc
indicated on Shop Drawings. Remove temporary shims, wedges, and spacers as soon as practical after
connecting and grouting are completed.
Do not permit connections to disrupt continuity of roof flashing.
D. Field cutting of precast units is not permitted without approval of the Architect.
t
d
t
t
t
PLANT - PRECAST STRUCTURAL CONCRETE 03410- 12 1
1
1
1
L _,
LtOrt SQUARE LODGE NORTH
Vail, Colorado
E. Fasteners: Do not use drilled or powder - actuated fasteners for attaching accessory items to precast,
prestressed concrete units.
F. Welding: Comply with applicable AWS D1.1/DI.IM and AWS DIA for welding, welding electrodes,
appearance, quality of welds, and methods used in correcting welding work.
1. Protect precast structural concrete units and bearing pads from damage by field welding or cutting
operations, and provide noncombustible shields as required_
2. Clean weld - affected steel surfaces with chipping hammer followed by brushing, and apply a
minimum 4.0 -mil- (0.1 -mm -) thick coat of galvanized repair paint to galvanized surfaces
according to ASTM A 780.
3_ Clean weld- affected steel surfaces with chipping hammer followed by brushing, and reprime
damaged painted surfaces.
4. Remove, reweld, or repair incomplete and defective welds.
G. At bolted connections, use lock washers, tack welding, or other approved means to prevent loosening of
nuts after final adjustment.
Where slotted connections are used, verify bolt position and tightness. For sliding connections,
properly secure bolt but allow bolt to move within connection slot. For friction connections, apply
specified bolt torque and check 25 percent of bolts at random by calibrated torque wrench_
Fl. Grouting: Grout connections and joints and open spaces at keyways, connections, and joints where
required or indicated on Shop Drawings. Retain grout in place until hard enough to support itself. Pack
spaces with stiff grout material, tamping until voids are completely filled.
I . Place grout to finish smooth, level, and plumb with adjacent concrete surfaces.
2. Fill joints completely without seepage to other surfaces.
3. Trowel top of grout joints on roofs smooth and uniform_ Finish transitions between different
surface levels not steeper than 1 to 12.
4. Place grout end cap or dam in voids at ends of hollow -core slabs.
5. Promptly remove grout material from exposed surfaces before it affects finishes or hardens.
6. Keep grouted joints damp for not less than 24 hours after initial set.
3.3 ERECTION TOLERANCES
A. Erect precast structural concrete units level, plumb, square, true, and in alignment without exceeding the
noncumulative erection tolerances of PCI MNL 135.
B. Minimize variations between adjacent slab members by jacking, loading, or other method recommended
by fabricator and approved by Architect.
3.4 FIELD QUALITY CONTROL
A. Special Inspections: Engage a qualified special inspector to perform the following special inspcctions:
Erection of precast stnuctural concrete members.
B. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
C. Field welds will be visually inspected and nondestructive tested according to ASTM E 165 or
ASTM E 709. High- strength bolted connections will be subject to inspections.
I PLANT - PRECAST TR T RAL CONCRETE
S UC U CONC E E
03410- 13
LION SQUARE LODGE NORTH
Vail, Colorado '
D. Testing agency will report test results promptly and in writing to Contractor and Architect.
E. Repair or remove and replace work where tests and inspections indicate that it does not comply with '
specified requirements.
F. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of '
replaced or additional work with specified requirements.
G. Prepare test and inspection reports. '
3.5 REPAIRS
A. Repair precast structural concrete units if permitted by Architect. `
1. Repairs may be pernitted if structural adequacy, serviceability, durability, and appearance of units
has not been impaired. '
B. Mix patching materials and repair units so cured patches blend with color, texture, and uniformity of
adjacent exposed surfaces and show no apparent line of demarcation between original and repaired work, '
when viewed in typical daylight illumination from a distance of 20 feet (6 m).
C. Prepare and repair damaged galvanized coatings with galvanizing repair paint according to ASTM A 780.
D_ Wire brush, clean, and paint damaged prime- painted components with same type of shop primer. '
E_ Remove and replace damaged precast structural concrete units that cannot be repaired or when repairs do
not comply with requirements as determined by Architect.
3.6 CLEANING '
A. Clean mortar, plaster, fireproofing, weld slag, and other deleterious material from concrete surfaces and
adjacent materials immediately.
B. Clean exposed surfaces of precast concrete units after erection and completion of joint treatment to '
remove weld marks, other markings, dirt, and stains.
I. Perform cleaning procedures, if necessary, according to precast concrete fabricator's written
recommendations. Clean soiled precast concrete surfaces with detergent and water, using stiff
fiber brushes and sponges, and rinse with clean water. Protect other work from staining or damage
due to cleaning operations.
2. Do not use cleaning materials or processes that could change the appearance of exposed concrete
finishes or damage adjacent materials_
END OF SECTION 03410 '
PLANT - PRECAST STRUCTURAL CONCRETE 03410- 14 '
i
u
r
s
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 03542 — CEMENT -BASED UNDERLAYMENT
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes cement - based, polymer - modified, self - leveling underlayment for interior finish
flooring repair and patching. Contractor to ensure that patch compounds will bond with existing
underlayment.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: Plans indicating substrates, locations, and average depths of cement -based underlayment
based on survey of substrate conditions.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer (applicator) who is acceptable to manufacturer, who has
completed cement -based underlayment applications similar in material and extent to that required for this
Project, and whose work has resulted in construction with a record of successful in- service performance.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in original packages and containers, with seals unbroken, bearing manufacturer's labels
indicating brand name and directions for storage, mixing with other components, and application.
B. Store materials to comply with manufacturer's written instructions to prevent deterioration from moisture
or other detrimental effects.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Comply with manufacturer's written recommendations for substrate
temperature and moisture content, ambient temperature and humidity, ventilation, and other conditions
affecting underlayment performance.
B. Close areas to traffic during underlayment application and for time period after application recommended
in writing by manufacturer.
1.6 COORDINATION
A. Coordinate cement -based underlayment with requirements of finish flooring products, including
adhesives, specified in Division 9 Sections.
1. Before installing surface sealers recommended by underlayment manufacturer, if any, verify
compatibility with finish flooring installation adhesives.
CEMENT -BASED UNDERLAYMENT 03542-1
I
LION SQUARE LODGE NORTH
Vail, Colorado
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Products: Subject to compliance with requirements, products that may be incorporated into the
'
Work include, but are not limited to, the following:
1. Self - Leveling Underlayment; W. R. Bonsai Company.
2. 300 Premium Underlayment; Burke Group, LLC (The).
3. LeveLayer 1; Dayton Superior Corp.
4. Firm -Fill® 2010, Hacker Industries, Inc.
5. Thoro Underlayment, Self - Leveling; Harris Specialty Chemicals, Inc.
6. Levelex Underlayment; L &M Construction Chemicals, Inc.
7. Ultra/Plan MB; Mapei Corporation.
8. Gyp -Crete 2000; Maxxon Corp.
2.2 PRODUCTS AND MATERIALS
A. Underlayment: Cement - based, polymer- modified, self - leveling product that can be applied in uniform
thicknesses from 118 inch (3 mm) and that can be feathered at edges to match adjacent floor elevations.
I . Cement Binder: ASTM C 150, portland cement, or hydraulic or blended hydraulic cement as
defined by ASTM C 219.
2. Compressive Strength: Not less than 4100 psi (28 MPa) at 28 days when tested according to
ASTM C 109 /C 109M.
3. Underlayment Additive: Resilient- emulsion product of underlayment manufacturer formulated for
use with underlayment when applied to substrate and conditions indicated_
B. Aggregate: Well- graded, washed gravel, 1/8 to 1/4 inch (3 to 6 mm), or coarse sand as recommended by '
underlayment manufacturer.
1. Provide aggregate when recommended in writing by underlayment manufacturer for underlayment
thickness required.
C. Water: Potable and at a temperature of not more than 70 deg F (21 deg Q.
D. Primer: Product of underlayment manufacturer recommended in writing for substrate, conditions, and
application indicated.
PART 3 - EXECUTION I
3.1 EXAMINATION I
A. Examine substrates, with Installer present, for conditions affecting performance of underlayment
including substrate moisture content. Begin underlayment application only after unsatisfactory I
conditions have been corrected.
1
CEMENT -RASED UNDERLAYMENT 1
03542-2
LION SQUARE LODGE NORTH
Vail, Colorado
3.2 PREPARATION
A_ General: Prepare and clean substrate according to manufacturer's written instructions for substrate
indicated. Provide clean, dry, neutral -pH substrate for underlayment application.
I. Treat nonmoving substrate cracks to prevent cracks from telegraphing (reflecting) through
underlayment according to manufacturer's written recommendations.
2. Fill substrate voids to prevent underlayment from leaking.
B. Concrete Substrates. Mechanically remove laitance, glaze, efflorescence, curing compounds, form -
release agents, dust, dirt, grease, oil, and other contaminants that might impair underlayment bond
according to manufacturer's written instructions.
C. Metal Substrates: Mechanically remove rust, foreign matter, and other contaminants that might impair
underlayment bond according to manufacturer's written instructions. Apply corrosion- resistant coating
compatible with underlayment if recommended in writing by underlayment manufacturer.
D. Nonporous Substrates: For ceramic tile, quarry tile, and terrazzo substrates, remove waxes, sealants, and
other contaminants that might impair underlayment bond according to manufacturer's written instructions.
E. Adhesion Tests: After substrate preparation, test substrate for adhesion with underlayment according to
manufacturer's written instructions.
3.3 APPLICATION
A. General: Mix and apply underlayment components according to manufacturer's written instructions.
1. Coordinate application of components to provide optimum underlayment -to- substrate and
intercoat adhesion.
2. At substrate expansion, isolation, and other moving joints, allow joint of same width to continue
through underlayment.
B. Apply primer over prepared substrate at manufacturers recommended spreading rate.
C. Apply underlayment to produce uniform, level surface.
I . Apply a final layer without aggregate if required to produce smooth surface.
2. Feather edges to match adjacent floor elevations.
D. Cure underlayment according to manufacturer's written instructions. Prevent contamination during
application and curing processes.
E. Do not install finish flooring over underlayment until after time period recommended by underlayment
manufacturer.
F. Remove and replace underlayment areas that evidence lack of bond with substrate, including areas that
emit a "hollow" sound when tapped.
3.4 FIELD QUALITY CONTROL
A. Slump Test: If slump testing is recommended in writing by manufacturer, test underlayment for slump as
it is placed for compliance with manufacturer's written recommendations.
CEMENT -BASED UNDERLAYMENT
03542-3
LION SQUARE LODGE NORTH
Vail, Colorado
B. Field Samples: Take at least three molded -cube samples from each underlayment batch. Test samples
according to ASTM C 109 /C 109M for compliance with compressive- strength requirements. When
requested, provide test results to Architect.
3.5 PROTECTION
A. Protect underlayment from concentrated and rolling loads for remainder of construction period
END OF SECTION 03542
CEMENT -BASED UNDERLAVMENT 03542 -4
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 04810 - UNIT MASONRY ASSEMBLIES
PART I - GENERAL
1.01 SUMMARY
A. This Section includes the following:
1. Concrete masonry units (CMUs).
2. Stone trim units.
3. Mortar and grout.
4. Reinforcing steel.
5. Masonry joint reinforcement.
6. Ties and anchors.
7. Embedded flashing.
S. Miscellaneous masonry accessories.
1.02 PERFORMANCE REQUIREMENTS
A. Provide unit masonry that develops the following installed compressive strengths (fm) at 28 days.
I . Refer to Drawings for additional requirements.
1.03 SUBMITTALS
A. Product data for each different masonry unit, accessory, and other manufactured product specified.
B. Shop drawings for reinforcing detailing fabrication, bending, and placement of unit masonry reinforcing
bars. Comply with ACI 315 "Details and Detailing of Concrete Reinforcement" showing bar schedules,
stirrup spacing, diagrams of bent bars, and arrangement of masonry reinforcement.
C. Samples for selection of the following:
1. Colored - masonry mortar samples showing the fill range of colors available.
2. Weep holes /vents in color to match mortar color.
D. Samples for verification of the following:
I. Full -size units for each different exposed masonry unit required showing the full range of
exposed colors, textures, and dimensions to be expected in the completed construction.
E. Material test reports from a qualified independent testing agency, employed and paid by Contractor or
manufacturer, indicating and interpreting test results relative to compliance of the following proposed
masonry materials with requirements indicated:
I . Mortar complying with property requirements of ASTM C 270.
2. Grout mixes. Include description of type and proportions of grout ingredients.
1 Masonry units.
UNIT MASONRY ASSEMBLIES 04810 -1
11
LION SQUARE LODGE NORTH
Vail, Colorado
1.04 QUALITY ASSURANCE
A. Preconstruction Testing: Employ and pay a qualified independent testing agency to perform the
f
following preconstruction testing to establish compliance of proposed materials and construction with
specified requirements:
1. Prism Test: For each type of wall construction indicated, test masonry prisms per ASTM E 447,
Method B.
2. Test mortar properties per test methods of ASTM C 270.
3. Test groat compressive strength per ASTM C 1019.
B. Single- Source Responsibility for Masonry Units: Obtain exposed masonry units of a uniform texture
and color, or a uniform blend within the ranges accepted for these characteristics, from one source and
by a single manufacturer for each different product required.
C. Single- Source Responsibility for Mortar Materials: Obtain mortar ingredients of a uniform quality,
including color for exposed masonry, from one manufacturer for each cementitious component and from
one source or producer for each aggregate.
D. Mockup: Prior to installing unit masonry, construct sample wall panels to verify selections made under
sample submittals and to demonstrate aesthetic effects as well as other qualities of materials and
execution. Build mockups to comply with the following requirements, using materials indicated for
final unit of Work.
'
I . Locate mockups on site in the locations as directed by Architect.
2. Build mockup of typical wall area as shown on Drawings.
a. Include window complying with requirements of Division 8 Section "Aluminum
Windows."
b. Seal perimeter of window complying with requirements of Division 7 Section "Joint
Sealants."
3. Notify Architect one week in advance of the dates and limes when mockups will be constructed.
4. Protect accepted mockups from the elements with weather - resistant membrane.
5. Retain and maintain mockups during construction in an undisturbed condition as a standard for
judging the completed Work.
a. Acceptance of mockups is for color, texture, and blending of masonry units; relationship of
mortar and sealant colors to masonry unit colors; tooling of joints; aesthetic qualities of
workmanship; and other material and construction qualities specifically approved by
Architect in writing.
b_ Acceptance of mockups does not constitute approval of deviations from the Contract
,
Documents contained in mockups, unless such deviations are specifically approved by
Architect in writing.
1.05 PROJECT CONDITIONS
A. Protection of Masonry: During erection, cover tops of walls, projections, and sills with waterproof
sheeting at end of each day's work. Cover partially completed masonry when construction is not in
progress.
I. Extend cover a minimum of 24 inches (600 mm) down both sides and hold cover securely in
place.
UNIT MASONRY ASSEMBLIES 04810 -2
L
LION SQUARE LODGE NORTH
Vail, Colorado
2. Where one wythe of multiwythe masonry walls is completed in advance of other wythes, secure
cover a minimum of 24 inches (600 mm) down face next to unconstructed wythe and hold cover
in place.
B. Do not apply uniform floor or roof loads for at least 12 hours and concentrated loads for at least 3 days
after building masonry walls or columns.
C. Stain Prevention: Prevent grout, mortar, and soil from staining the face of masonry to be left exposed or
painted. Immediately remove grout, mortar, and soil that come in contact with such masonry.
I . Protect base of walls from rain - splashed mud and mortar splatter by coverings spread on ground
and over wall surface.
2. Protect sills, ledges, and projections from mortar droppings.
3. Protect surfaces of window and door frames, as well as similar products with painted and integral
finishes, from mortar droppings.
4. Turn scaffold boards near the wall on edge at the end of each day to prevent rain from splashing
mortar and dirt on completed masonry.
D. Cold- Weather Requirements: Do not use frozen materials or materials mixed or coated with ice or frost.
Do not build on frozen subgrade or setting beds. Remove and replace unit masonry damaged by frost or
freezing conditions. Comply with the following requirements:
I. Cold- Weather Construction: When the ambient temperature is within the limits indicated, use
the following procedures:
a. 40 to 32 deg F (4 to 0 deg C): Heat mixing water or sand to produce mortar temperatures
between 40 and 120 deg F (4 and 49 deg C).
b. 32 to 25 deg F (0 to -4 deg C) Heat mixing water and sand to produce mortar
temperatures between 40 and 120 deg F (4 and 49 deg C). Heat grout materials to produce
grout temperatures between 40 and 120 deg F (4 and 49 deg C). Maintain mortar and
grout above freezing until used in masonry.
C. 25 to 20 deg F (4 to -7 deg C): Fleat mixing water and sand to produce mortar
temperatures between 40 and 120 deg F (4 and 49 deg C). Heat grout materials to produce
grout temperatures between 40 and 120 deg F (4 and 49 deg Q. Maintain mortar and
grout above freezing until used in masonry. Heat masonry units to 40 deg F (4 deg C) if
grouting. Use heat on both sides of walls under construction.
d. 20 deg F ( -7 deg C) and Below: Heat mixing water and sand to produce mortar
temperatures between 40 and 120 deg F (4 and 49 deg C). Heat grout materials to
produce grout temperatures between 40 and 120 deg F (4 and 49 deg C). Maintain mortar
and grout above freezing until used in masonry. Heat masonry units to 40 deg F (4
deg C). Provide enclosures and use heat on both sides of walls under construction to
maintain temperatures above 32 deg F (0 deg C) within the enclosures.
2. Cold- Weather Protection: When the mean daily temperature is within the limits indicated,
provide the following protection:
a_ 40 to 25 deg F (4 to -4 deg C)- Cover masonry with a weather- resistant membrane for 48
hours after construction.
b. 25 to 20 deg F (4 to -7 deg C): Cover masonry with insulating blankets or provide
enclosure and heat for 48 hours aller construction to prevent freezing. Install wind breaks
I when wind velocity exceeds 15 nui./h (25 km/h).
C_ 20 deg F ( -7 deg C) and Below: Provide enclosure and heat to maintain temperatures
above 32 deg F (0 deg C) within the enclosure for 48 hours after construction.
UNIT MASONRY ASSEMBLIES
04810 -3
LION SQUARE LODGE NORTH
Vail, Colorado
3. Cold- Weather Cleaning: Use liquid cleaning methods only when air temperature is 40 deg F (4
deg C) and above and will remain so until masonry has dried out, but not less than 7 days after
completion of cleaning.
E. Hot - Weather Requirements: Protect unit masonry work when temperature and humidity conditions
produce excessive evaporation of water from mortar and grout. Provide artificial shade and wind breaks
and use cooled materials as required. Do not apply mortar to substrates with temperatures of 100 deg F
(38 deg C) and above.
PART 2- PRODUCTS
2.01 MASONRY UNITS, GENERAL
B. Defective Units: Referenced masonry unit standards may allow a certain percentage of units to
exceed tolerances and to contain chips, cracks, or other defects exceeding limits stated in the
standard. Do not uses units where such defects, including dimensions that vary from specified
dimensions by more than stated tolerances, will be exposed in the completed Work or will
impair the quality of completed masonry.
2.02 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products
that may be incorporated in the Work include, but are not limited to, the following:
I . Concrete Masonry Units:
a. Best Block /Keystone.
b. Clalite.Inc.
C. Robinson Block Co.
2.03 CONCRETE MASONRY UNITS
A. General: Provide shapes indicated and as follows for each form of concrete masonry unit required.
I. Provide special shapes for lintels, corners, jambs, sash, control joints, headers, bonding, and
other special conditions.
2. Provide square -edged units for outside corners.
B. Concrete Masonry Units: ASTM C 90 and as follows:
1. Unit Compressive Strength: Provide units with minimum average net -area compressive strength
indicated below:
a. 1900 psi (13.1 MPa).
2. Weight Classification: Lightweight or Normal weight.
3. Provide Type 1, moisture- controlled units.
4. Size: Manufactured to the actual dimensions listed below (within tolerances specified in the
applicable referenced ASTM specification) for the corresponding nominal sizes indicated on
Drawings:
UNIT MASONRY ASSEMBLIES 048104
LION SQUARE LODGE NORTH
Vail, Colorado
a.
4 inch (100 mm) nominal:
3 -5/8 inch (92 mm) actual.
b.
6 inch (150 mm) nominal:
5 -5/8 inch (143 mm) actual.
C.
8 inch (200 mm) nominal:
7 -5/8 inch (194 mm) actual.
d.
10 inch (250 mm) nominal:
9 -5/8 inch (244 mm) actual.
e.
12 inch (300 mm) nominal:
11 -5/8 inch (295 mm) actual.
f.
16 inch (400 mm) nominal:
15 -5/8 inch (397 mm) actual.
5. Exposed Faces: As selected by Architect or indicated on Drawings.
2.04 MORTAR AND GROUT MATERIALS
A. Portland Cement: ASTM C 150, Type I or II, except Type III may be used for cold- weather
construction. Provide natural color or white cement as required to produce mortar color indicated.
B. Hydrated Lime: ASTM C 207, Type S.
C. Portland Cement -Lime Mix: Packaged blend of portland cement complying with ASTM C 150, Type I
or Type III, and hydrated lime complying with ASTM C 207.
1. For pigmented mortars, use colored portland cement -lime mix of formulation required to produce
color indicated, or if not indicated, as selected from manufacturer's standard formulations.
Pigments shall not exceed 10 percent of portland cement by weight for mineral oxides nor 2
percent for carbon black.
D_ Aggregate for Mortar: ASTM C 144; except for joints less than 1/4 inch (6.5 mm), use aggregate
graded with 100 percent passing the No. 16 (1.18 mm) sieve.
E. Aggregate for Grout: ASTM C 404,
F. Mortar Pigments: Natural and synthetic iron oxides and chromium oxides, compounded for use in
mortar mixes. Use only pigments with a record of satisfactory performance in masonry mortars.
G. Water: Potable.
2.05 REINFORCING STEEL
A. Steel Reinforcing Bars: Material and grade as follows:
1. Billet steel complying with ASTM A 615 (ASTM A 615M).
2. Grade 60 (Grade 400).
B. Deformed Reinforcing Wire: ASTM A 496, with ASTM A 153, Class B -2 zinc coating.
C. Welded -Wire Fabric: ASTM A 185.
2.06 JOINT REINFORCEMENT
A. General: Provide joint reinforcement formed from the following:
1. Galvanized carbon -steel wire, coating class as follows:
2. ASTM A 641 (ASTM A 641 M), Class I, for interior walls; and ASTM A 153, Class B -2, for
exterior walls.
3. ASTM A 153, Class B -2, for both interior and exterior walls.
UNIT MASONRY ASSEMBLIES
04810 -5
LION SQUARE LODGE NORTH
Vail, Colorado
B. Description: Welded -wire units prefabricated with deformed continuous side rods and plain cross rods
into straight lengths of not less than 10 feet (3 m), with prefabricated corner and tee units, and
complying with requirements indicated below:
. Wire Diameter for Side Rods: 0.1483 inch (3.8 mm).
2. Wire Diameter for Cross Rods: 0.1483 inch (3.8 mm).
2.07
A.
B.
C.
D.
E.
F.
2.08
A
TIES AND ANCHORS, GENERAL
General: Provide ties and anchors specified in subsequent articles that comply with requirements for
metal and size of this Article, unless otherwise indicated.
Wire: As follows_
I . Galvanized Carbon -Steel Wire: ASTM A 82; with ASTM A 153, Class B -2 coating for wire ties
and anchors in exterior walls.
2. Wire Diameter: 0.1875 inch (4.8 mm).
Steel Sheet: As follows:
1. Galvanized Steel Sheet: ASTM A 526, G 60 (ASTM A 526M, Z 180) (commercial quality),
steel sheet zinc coated by hot -dip process on continuous lines prior to fabrication, for sheet -metal
ties and anchors in interior walls and in exterior walls when completely embedded in mortar.
Galvanized Steel Sheet Thickness: For steel sheet hot -dip galvanized by continuous process prior to
Fabrication:
1. 0.0785 inch (2.0 mm).
Galvanized Heavy- Thickness Steel Sheet: ASTM A 635 (ASTM A 635M) (commercial quality) liot-
rolled, carbon -steel sheet hot -dip galvanized after fabrication to comply with ASTM A 153, Class B -2 or
B -3, as applicable, for rigid anchors fabricated from steel sheet or strip with a thickness of 0.180 inch
(4.6 mm) and greater.
Steel Plates and Bars: ASTM A 36 (ASTM A 36M), hot -dip galvanized to comply with ASTM A 153,
Class B -1, B -2, or B -3, as applicable to size and form indicated.
ADJUSTABLE ANCHORS FOR CONNECTING TO STRUCTURAL FRAME
General: Provide 2 -piece assemblies as described below, allowing vertical or horizontal differential
movement between wall and frame parallel to plane of wall but resisting tension and compression forces
perpendicular to it.
I. For anchorage to concrete, provide manufacturer's standard anchors with dovetail anchor section
formed from sheet metal and triangular - shaped wire tie section sized to extend within f inch (25
mm) of masonry face and as follows:
a. Wire Diameter: 0.1875 inch (4.8 min).
2. For anchorage to steel framing, provide manufacturer's standard anchors with crimped 1 /4 -inch-
(6.4-mm-) diameter wire anchor section for welding to steel and triangular - shaped wire tie
section sized to extend within I inch (25 mm) of masonry face and as follows:
UNIT MASONRY ASSEMBLIES 04810 -6
t
I LION SQUARE LODGE NORTH
Vail, Colorado
a_ Wire Diameter: 0.1875 inch (4.8 mm).
2.09 ADJUSTABLE MASONRY - VENEER ANCHORS
A. General: Provide 2 -piece assemblies allowing vertical or horizontal differential movement between wall
and wall framing parallel to plane of wall but resisting tension and compression forces perpendicular to
it, for attachment over sheathing to metal studs, and with the following structural performance
characteristics:
I . Structural Performance Characteristics: Capable of withstanding a 100 -lbf (445 -N) load in either
tension or compression without deforming over, or developing play in excess of, 0.05 inch (1.3
mm).
B. Screw- Attached, Masonry- Veneer Anchors: Units consisting of a wire tie section and a metal anchor
section complying with the following requirements:
I. W ire Tie Shape: Triangular or rectangular.
2. Wire Tie Length: As required to extend 1 -1/2 inches (38 mm) into masonry wythe of veneer
face.
3. Anchor Section: Rib - stiffened, sheet -metal plate with screw holes top and bottom, 0.0747 inch
(1.9 mm) thick by 2 -3/4 inches (70 mm) wide by 3 inches (75 mm) high; fabricated into tee shape
with 2 projecting tabs, 3/4 inch (19 mm) wide by I inch (25 mm) long; with slotted holes for
connection of vertical legs of triangular or rectangular wire tie specially formed to fit anchor
section.
C. Stainless -Steel Drill Screws for Steel Studs: Proprietary fastener consisting of carbon -steel drill point
and 300 Series stainless -steel shank, complying with ASTM C 954 except manufactured with hex
washer head and neoprene washer; No. 10 (4.8 -mm) diameter by length required to penetrate steel stud
flange by not less than 3 exposed threads.
2.9 MISCELLANEOUS ANCHORS
A. Anchor Bolts: Steel bolts complying with ASTM A 307, Grade A (ASTM F 568, Property Class 4.6);
with ASTM A 563 (ASTM A 563M) hex mats and, where indicated, flat washers; hot -dip galvanized to
comply with ASTM A 153, Class C.
2.10 EMBEDDED FLASHING MATERIALS
A. Sheet -Metal Flashing: Fabricate from the following metal complying with requirements specified in
Division 7 Section "Flashing and Sheet Metal" and below:
t 1. Galvanized steel, 0.0217 inch (0.55 mm) thick.
2. Fabricate through -wall metal flashing embedded in masonry as follows:
a. With ribs formed in dovetail pattern at 3 -inch (75 -nmm) intervals along length of flashing
to provide a 3 -way integral mortar bond and weep -hole drainage.
3. Fabricate metal expansion joint strips from sheet metal indicated above, formed to shape
indicated.
4. Application: Use where flashing is fully or partly concealed in masonry wall.
B_ Rubberized Asphalt Sheet Flashing: Manufacturer's standard composite flashing product consisting of a
pliable and highly adhesive rubberized asphalt compound, 26 mils (0.7 mm) thick, bonded completely
I UNIT MASONRY ASSEMBLIES
04810 -7
r
1
LION SQUARE LODGE NORTH
Vail, Colorado
and integrally to a high - density, cross - laminated polyethylene film, 4 mils (0.1 mm) thick, to produce an
overall thickness of 30 mils (0.8 mm).
I. Primer: Flashing manufacturer's standard product or product recommended by flashing
manufacturer for bonding flashing sheets to masonry and concrete.
2. Rubberized Asphalt Sheet Flashing:
a. Perm -A- Barrier Wall Flashing; Grace: W.R. Grace & Co.
b. Polyguard 300; Polyguard Products, Inc.
2.11 MISCELLANEOUS MASONRY ACCESSORIES
A. Compressible Filler Premolded filler strips complying with ASTM D 1056, Type 2, Class A, Grade 1;
compressible up to 35 percent; of width and thickness indicated; formulated from the following material:
t . Neoprene or urethane.
B. Preformed Control -Joint Gaskets: Material as indicated below, designed to fit standard sash block and to
maintain lateral stability in masonry wall; size and configuration as indicated.
I . Styrene- Butadiene Rubber Compound: ASTM D 2000, Designation M2AA -805_
C. Bond - Breaker Strips: Asphalt - saturated, organic roofing felt complying with ASTM D 226, Type I
(No. 15 asphalt felt).
D. Weep Holes: Provide (lie following:
I. Rectangular Plastic Tubing: Clear butyrate, 3/8 by 1 -1/2 by 3 -1/2 inches (9 by 38 by 89 mm). '
D. Cavity Drainage Material: 1 -inch- (25 -mm -) thick, reticulated, nonabsorbent mesh, made from
polyethylene strands and shaped to maintain drainage at weep holes without being clogged by mortar
droppings.
2.12 WALL VENTS
A. Galvanized Steel Wall Vents: Galvanized steel sheet ASTM A 653/A 653M, G90 (Z275) zinc coating,
mill phosphatized louvers and frames not less than 0.125 inch thick and assembled by welding,
incorporating weep holes.
2.13 MASONRY CLEANERS ,
A. Job -Mixed Detergent Solution: Solution of 1/2 -cup (0.14 -L) dry measure tetrasodium polyphosphate and
1/2 -cup (0.14 -L) dry measure laundry detergent dissolved in I gal. (4 L) of water.
B. Proprietary Acidic Cleaner: Manufacturer's standard - strength, general - purpose cleaner designed for
removing mortar /grout stains, efflorescence, and other new constriction stains from new masonry
surfaces of type indicated below without discoloring or damaging masonry surfaces; expressly approved
for intended use by manufacturer of masonry units being cleaned.
I . For masonry not subject to metallic oxidation stains, use formulation consisting of a concentrated
blend of surface-acting acids, chelating, and wetting agents. '
2. For dark - colored masonry not subject to metallic oxidation stains, use formulation consisting of a
liquid blend of surface - acting acids and special inhibitors. r
UNIT MASONRY ASSEMBLIES O4810 -8
6
I
e
' LION SQUARE LODGE NORTH
Vail, Colorado
3. For masonry subject to metallic oxidation stains, use formulation consisting of a liquid blend of
organic and inorganic acids and special inhibitors.
2.14 MORTAR AND GROUT MIXES
A. General: Do not use admixtures, including pigments, air - entraining agents, accelerators, retarders, water -
repellent agents, antifreeze compounds, or other admixtures, unless otherwise indicated.
1. Do not use calcium chloride in mortar or grout.
B. Mortar for Unit Masonry: Comply with ASTM C 270, Proportion Specification, for types of mortar
indicated below:
I . Limit cementitious materials in mortar to portland cement and lime.
2. For masonry below grade, in contact with earth, and where indicated, use type indicated below:
a. Type: M or S.
3. For reinforced masonry and where indicated, use type indicated below:
a. Type: M or S.
4. For exterior, above - grade, load - bearing and nonload- bearing walls and parapet walls; for interior
load- bearing walls; for interior nonload- bearing partitions, and for other applications where
another type is not indicated, use type indicated below:
a. Type: M or S.
C. Pigmented Mortar: Select and proportion pigments with other ingredients to produce color required.
D. Self- Consolidating Grout for Unit Masonry
I. Proportioned in accordance with ASTM 0476 Table I for coarse grout and conforming to
requirements of ACI 301, ready mixed concrete.
2. Provide self - consolidating grout with slump flow of 22" minimum to 30" maximum.
3. Minimum 28 -day compressive strength of 2000 psi is required, using ASTM C1019 Standard
Sampling Method of Sampling and Testing Grout.
4. Extra Water: Grout shall be delivered to the jobsite within batch tolerances as prescribed
according to ASTM C -94 Standard Specification for Ready Mixed Concrete. Should additional
water or admixture be required at the jobsite to achieve the required minimum slump flow, it
shall be added only at the direction of an authorized ready -mixed concrete supplier representative
and shall be noted as such on the delivery ticket. Slump Flow shall be retested and documented
after water or admixture is added
PART 3 - EXECUTION
3.01 EXAMINATION
A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances
and other conditions affecting performance of unit masonry. Do not proceed with installation until
unsatisfactory conditions have been corrected.
UNIT MASONRY ASSEMBLIES O4810 -9
1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Examine rough -in and built -in construction to verify actual locations of piping connections prior to
installation.
3.02 INSTALLATION, GENERAL
A. Thickness: Build cavity and composite walls and other masonry construction to the full thickness
shown. Build single -wythe walls to the actual thickness of the masonry units, using units of thickness
indicated.
B. Build chases and recesses to accommodate items specified in this and other Sections of the
Specifications.
C. Leave openings for equipment to be installed before completion of masonry. After installing equipment,
complete masonry to match construction immediately adjacent to the opening.
D. Cut masonry units with motor -driven saws to provide clean, sharp, unchipped edges. Cut units as '
required to provide continuous pattern and to fit adjoining construction. Use fiill -size units without
cutting, where possible. Allow units cut with water - cooled saws to dry before placing, unless wetting of
units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.
E. Mix units for exposed unit masonry from several pallets or cubes as they are placed to produce uniform r
blend of colors and textures.
3.03 CONSTRUCTION TOLERANCES I
A. Variation from Plumb: For vertical lines and surfaces of columns, walls, and arrises, do not exceed 1/4
inch in 10 feet (6 mm in 3 m), nor 3/8 inch in 20 feet (10 mm in 6 m), nor 1/2 inch in 40 feet (12 mm in
12 m) or more. For external comers, expansion joints, control joints, and other conspicuous lines, do
not exceed 1/4 inch in 20 feet (6 mm in 6 m), nor 1/2 inch in 40 feet (12 mm in 12 in) or more. For
vertical alignment of head joints, do not exceed plus or minus 1/4 inch in 10 feet (6 mm in 3 nt), nor 1/2
inch (12 mm) maximum.
B. Variation from Level: For bed joints and lines of exposed lintels, sills, parapets, horizontal grooves, and
other conspicuous lines, do not exceed 1/4 inch in 20 feet (6 mm in 6 m), nor 1/2 inch in 40 feet (12 mm
in 12 m) or more. For top surface of bearing walls, do not exceed 1/8 inch (3 mm) in 10 feet (3 in), nor
1/16 inch (1.5 mm) within width of a single unit.
C. Variation of Linear Building Line: For position shown in plats and related portion of columns, walls,
and partitions, do not exceed 1/2 inch in 20 feet (12 mm in 6 m), nor 3/4 inch in 40 feet (19 mm in 12 m)
or more.
D. Variation in Cross - Sectional Dimensions: For columns and thickness of walls, from dimensions shown,
do not exceed minus 1/4 inch (6 mm) nor plus 1/2 inch (12 nnn).
E. Variation in Mortar -Joint Thickness: Do not vary from bed -joint thickness indicated by more than plus
or minus 1/8 inch (3 mm), with a maximum thickness limited to 1/2 inch (12 mm). Do not vary bed -
joint thickness from bed -joint thickness of adjacent course by more than 1/8 inch (3 mm). Do not vary
from head -joint thickness indicated by more than plus or minus 1/8 inch (3 mm). Do not vary head joint
thickness from adjacent head -joint thickness by more than 1/8 inch (3 mm). Do not vary from collar -
joint thickness indicated by more than minus 114 inch (6 mm) or plus 3/8 inch (10 mm)_
3.04 LAYING MASONRY WALLS I
UNIT MASONRY ASSEMBLIES 04810 -10
1
A. Lay hollow concrete masonry units as follows:
I. With full mortar coverage on horizontal and vertical face shells.
2. Bed webs in mortar in starting course on footings and in ail courses of piers, columns, and
pilasters, and where adjacent to cells or cavities to be filled with grout.
3. For starting course on footings where cells are not grouted, spread out fiill mortar bed, including
areas under cells.
4. Maintain joint widths indicated, except for minor variations required to maintain bond alignment.
If not indicated, lay walls with 3/8 -inch (10 -mm) joints.
I UNIT MASONRY ASSEMBLIES
04810 -11
t
LION SQUARE LODGE NORTH
Vail, Colorado
A.
Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint widths and for
accurate locating of openings, movement -type joints, returns, and offsets. Avoid the use of less -than-
half -size units at corners, jambs, and where possible at other locations.
B.
Lay walls to comply with specified construction tolerances, with courses accurately spaced and
coordinated with other construction.
C.
Bond Pattern for Exposed Masonry: Lay exposed masonry in the following bond pattern; do not use
units with less than nominal 4 -inch (100 -mm) horizontal face dimensions at comers or jambs.
I. As indicated on Drawings.
D.
Lay concealed masonry with all units in a wythe in running bond or bonded by lapping not less than 2
inches (50 mm). Bond and interlock each course of each wythe at corners. Do not use units with less
than nominal 4 -inch (100 -mm) horizontal face dimensions at corners or jambs.
'
E.
Stopping and Resuming Work: In each course, rack back 1/2 -unit length for one -half running bond or
1/3 -unit length for one -third running bond; do not tooth. Clean exposed surfaces of set masonry, wet
clay masonry units lightly if required, and remove loose masonry units and mortar prior to laying fresh
masonry.
F.
Built -in Work: As construction progresses, build -in items specified under this and other Sections of the
Specifications. Fill in solidly with masonry around built -in items.
G.
Fill space between hollow metal frames and masonry solidly with mortar, unless otherwise indicated.
I. At exterior frames, insert extruded polystyrene board insulation around perimeter of frame in
thickness indicated, but not less than 3/4 inch (19 mm) to act as a thermal break between frame
and masonry.
H.
Where built -in items are to be embedded in cores of hollow masonry units, place a layer of metal lath in
the joint below and rod mortar or grout into core_
I.
Fill cores in hollow concrete masonry units with grout 24 inches (600 mm) under bearing plates, beams,
lintels, posts, and similar items, unless otherwise indicated.
J.
Build nonload- bearing interior partitions full height of story to underside of solid floor or roof structure
'
above and as follows:
. Install compressible filler in joint between top of partition and underside of structure above.
3.05
MORTAR BEDDING AND JOINTING
A. Lay hollow concrete masonry units as follows:
I. With full mortar coverage on horizontal and vertical face shells.
2. Bed webs in mortar in starting course on footings and in ail courses of piers, columns, and
pilasters, and where adjacent to cells or cavities to be filled with grout.
3. For starting course on footings where cells are not grouted, spread out fiill mortar bed, including
areas under cells.
4. Maintain joint widths indicated, except for minor variations required to maintain bond alignment.
If not indicated, lay walls with 3/8 -inch (10 -mm) joints.
I UNIT MASONRY ASSEMBLIES
04810 -11
t
t
LION SQUARE LODGE NORTH
Vail, Colorado
B. Tool exposed joints slightly concave when thumbprint hard, using a jointer larger than joint thickness,
unless otherwise indicated.
C. Cut joints flush for masonry walls that are to receive plaster or other direct - applied finishes (other than
paint), unless otherwise indicated. '
3.06 CAVITIES
A.
Keep cavities clean of mortar droppings and other materials during construction. Strike joints facing
cavities flush.
I_ Use wood strips temporarily placed in cavity to collect mortar droppings. As work progresses,
remove strips, clean off mortar droppings, and replace in cavity.
B.
Tie exterior wythe to back -up with individual metal ties. Stagger alternate courses.
C.
Tie exterior wythe to back -up with continuous horizontal -joint reinforcing.
'
3.07
HORIZONTAL -JOINT REINFORCEMENT
A.
General: Provide continuous horizontal -joint reinforcement as indicated. Install entire length of
longitudinal side rods in mortar with a minimum cover of 5/8 inch (16 mm) on exterior side of walls, 1/2
inch (13 mm) elsewhere. Lap reinforcing a minimum of 6 inches (150 mm).
1. Space reinforcement not more than 16 inches (406 mm) o.c.
2. Space reinforcement not more than 8 inches (203 mm) o.c. in foundation walls and parapet walls.
3. Provide reinforcement in mortar joint I block course above and below wall openings and
,
extending 12 inches (305 mm) beyond opening.
4. Reinforcement above is in addition to continuous reinforcement.
B.
Cut or interrupt joint reinforcement at control and expansion joints, unless otherwise indicated.
C.
Provide continuity at corners and wall intersections by using prefabricated "L" and "T" sections. Cut
and bend reinforcement units as directed by manufacturer for continuity at returns, offsets, column
fireproofing, pipe enclosures, and other special conditions.
3.08
ANCHORING MASONRY TO STRUCTURAL MEMBERS
A.
Anchor masonry to structural members where masonry abuts or faces structural members to comply with
the following:
I. Provide an open space not less than 1 inch (25 mm) in width between masonry and structural
member, unless otherwise indicated. Keep open space free of mortar or other rigid materials.
2. Anchor masonry to structural members with flexible anchors embedded in masonry joints and
attached to structure.
3. Space anchors as indicated, but not more than 24 inches (610 mm) o.c. vertically and 36 inches
(915 mm) o.c_ horizontally.
3.9
ANCHORING MASONRY VENEERS
A. Anchor masonry veneers to metal studs with masonry- veneer anchors to comply with the following
requirements:
UNIT MASONRY ASSEMBLIES 04810 -12
i
t
LION SQUARE LODGE NORTH
Vail, Colorado
I. Fasten each anchor section through sheathing to metal studs with 2 metal fasteners of type
indicated.
2. Fasten anchors through sheathing to metal studs with metal fasteners of type indicated.
3. Insert anchor section in metal studs as sheathing is installed. Provide one anchor at each stud in
each horizontal joint between sheathing boards.
4. Embed tie section in masonry joints. Provide not less than 2 -inch (50 -mm) air space between
back of masonry veneer and face of sheathing.
5. Locate anchor section relative to course where tie section is embedded to allow maximum vertical
differential movement of tie up and down.
6. Space anchors as indicated, but not more than 18 inches (458 mm) o.c. vertically and 24 inches
(610 mm) o.c. horizontally with not less than 1 anchor for each 2 sq. ft. (0.2 sq. m) of wall area.
Install additional anchors within 12 inches (305 mm) of openings and at intervals around
perimeter not exceeding 8 inches (203 mm).
3.10 CONTROL AND EXPANSION JOINTS
A. General: Install control and expansion joints in unit masonry where indicated. Build -in related items as
the masonry progresses. Do not form a continuous span through movement joints unless provisions are
made to prevent in -plane restraint of wall or partition movement_
B. Form control joints in concrete masonry as follows:
1. Fit bond - breaker strips into hollow contour in ends of block units on one side of control joint. Fill
the resultant core with grout and rake joints in exposed faces.
2. Install preformed control -joint gaskets designed to fit standard sash block.
3. Install interlocking units designed for control joints_ Install bond - breaker strips at joint. Keep
head joints free and clear of mortar or rake joint.
4. Install temporary foam plastic filler in head joints and remove when unit masonry is complete.
C. Build -in horizontal pressure - relieving joints where indicated; construct joints by either leaving an air
space or inserting a compressible filler of width required for installing sealant and backer rod specified
in Division 7 Section "Joint Sealants."
I. Locate horizontal pressure - relieving joints beneath shelf angles supporting masonry veneer and
attached to stnicture behind masonry veneer.
3.11 LINTELS
A. Install steel lintels where indicated.
B. Provide masonry lintels where shown and where openings of more than 12 inches (305 mm) for 24
inches (610 mm) for block size units are shown without structural steel or other supporting lintels.
I . Provide precast lintels made from concrete matching concrete masonry units in color, texture, and
compressive strength and with reinforcement bars indicated or required to support loads
indicated. Cure precast lintels by same method as CMU.
2. Provide prefabricated or built -in -place masonry lintels. Use specially formed bond beam units
with reinforcement bars placed as indicated and fulled with coarse grout. Cure precast lintels
before handling and installing. Temporarily support built -in -place lintels until cured.
3. Provide either of above at Contractors option or provide precast or formed -in -place concrete
lintels complying with requirements of Division 3 Section "Cast -in -Place Concrete."
C. Provide minimum bearing of 8 inches (200 mm) at each jamb, unless otherwise indicated.
I UNIT MASONRY ASSEMBLIES
04810 -13
1
LION SQUARE L ODGE NORTH
Vail, Colorado
4G, WEEP HOLES, AND VENTS
I: Install embedded flashing and weep holes in masonry at shelf angles, lintels, ledges, other
.,��.,.,ctions to the downward flow of water in the wall, and where indicated.
B. Prepare masonry surfaces so they are smooth and free from projections that could puncture flashing.
Place through -wall flashing on sloping bed of mortar and cover with mortar. Seal penetrations in
flashing with adhesive, sealant, or tape as recommended by flashing manufacturer before covering with
mortar.
C. Install flashing as follows:
1. At composite masonry walls, including cavity walls, extend flashing from exterior face of outer
wythe of masonry, through the outer wythe, turned up a minimum of 4 inches (100 mm), and
through the inner wythe to within 1/2 inch (13 mm) of the interior face of the wall in exposed
masonry. Where interior surface of inner wythe is concealed by furring, carry flashing
completely through the inner wythe and turn up approximately 2 inches (50 mm), unless
otherwise indicated.
2. At masonry- veneer walls, extend flashing from exterior face of veneer, through the veneer, up
face of sheathing at least S inches (200 mm), and behind air - infiltration barrier/building paper.
3. At lintels and shelf angles, extend flashing a minimum of 4 inches (100 nun) into masonry at each
end. At heads and sills, extend flashing 4 inches (100 mm) at ends and turn up not less than 2
inches (50 mm) to form a pan.
4_ Cut off flashing flush with face of wall after masonry wall construction is completed.
D. Install weep holes in the head joints in exterior wythes of the first course of masonry immediately above
embedded flashing and as follows:
1. Form weep holes with product specified in Part 2 of this Section.
2. Space weep holes 24 inches (600 mm) o.c.
3. In cavities, place pea gravel to a height equal to height of first course, but not less than 2 inches
(50 mm), immediately above top of flashing embedded in the wall, as masonry construction
progresses, to splatter mortar droppings and to maintain drainage.
4. Place cavity drainage material immediately above flashing in cavities.
E. Install vents in vertical head joints at the top of each continuous cavity. Space vents and close off
cavities vertically and horizontally with blocking in manner indicated.
Install through -wall flashing and weep holes above horizontal blocking.
F. Install reglets and nailers for flashing and other related construction where shown to be built into
masonry.
3 -13 INSTALLATION OF REINFORCED UNIT MASONRY
A_ Temporary Formwork and Shores: Constrict formwork and shores to support reinforced masonry
elements during constriction.
1. Construct formwork to conform to shape, line, and dimensions shown. Make sufficiently tight to
prevent leakage of mortar and grout. Brace, tie, and support forms to maintain position and
shape during construction and curing of reinforced masonry.
2. Do not remove forms and shores until reinforced masonry members have hardened sufficiently to
carry their own weight and other temporary loads that may be placed on them during
construction.
UNIT MASONRY ASSEMBLIES
04810 -14
ii
1
1
1
I!
II
C'
i
LION SQUARE LODGE NORTH
Vail, Colorado
B. Grouting
I. Do not place grout until entire height of masonry to be grouted has attained sufficient strength to
resist grout pressure.
2. Provide cleanout holes at least 3 inches in least dimension for grout pours over 60 inches in
height.
3. Provide cleanout holes at each vertical reinforcing bar.
4. At solid grouted masonry, provide cleanout holes at not more than 32 inches o.c.
5. Place self - consolidating grout within I Y: hours after mix water has been added unless prior
arrangements and mix design adjustments have been made by the ready mix concrete supplier
representative.
6. Do not mechanically vibrate self - consolidating grout.
3.14 CLEANING
A. Remove and replace masonry units that are loose, chipped, broken, stained, or otherwise damaged or if
units do not match adjoining units. Install new units to match adjoining units; install in fresh mortar or
grout, pointed to eliminate evidence of replacement.
B. In- Progress Cleaning: Clean unit masonry as work progresses by dry brushing to remove mortar fins
and smears prior to tooling joints.
C. Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows:
1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or
chisels.
2. Test cleaning methods on sample wall panel; leave one -half of panel uncleaned for comparison
purposes. Obtain Architect's approval of sample cleaning before proceeding with cleaning of
masonry.
3. Protect adjacent stone and nonntasonry surfaces from contact with cleaner by covering them with
liquid strippable masking agent, polyethylene film, or waterproof masking tape.
4_ Wet wall surfaces with water prior to application of cleaners; remove cleaners promptly by rinsing
thoroughly with clear water.
5. Job -mixed detergent solution.
6. Proprietary acidic cleaner, applied in compliance with directions of acidic cleaner manufacturer.
7. Clean concrete masonry by cleaning method indicated in NCMA TEK 8 -2 applicable to type of
stain present on exposed surfaces.
D. Protection: Provide final protection and maintain conditions that ensure unit masonry is without damage
and deterioration at time of Substantial Completion.
END OF SECTION 04810
UNIT MASONRY ASSEMBLIES
04810 -15
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 04860 — STONE ASSEMBLIES
PART1- GENERAL
Lt t SUMMARY
A. This Section includes exterior stone veneer.
B. Design selections:
I. Provide 5 Telluride Gold stone veneer or equivalent at building base, retaining wall veneers, and
stone arches as shown on plans.
2. Provide stone caps at top of stone walls, stone piers, and window sills. Cap to be Buff Sandstone
or equivalent.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
. For stone varieties proposed for use on Project, include data on physical properties specified.
B. Stone Samples for Verification: For each color, grade, finish, and variety of stone required.
C. Colored Mortar Samples for Verification: For each color required.
D. Qualification Data: For Installer.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: An installer who employs experienced stone masons and stone fitters who are
skilled in installing stone veneer assemblies similar in material, design, and extent to those indicated for
this Project and whose projects have a record of successfid in- service performance.
B. Source Limitations for Stone: Obtain each variety of stone, regardless of finish, from a single
manufacturer with resources to provide materials of consistent quality in appearance and physical
properties.
C. Source Limitations for Mortar Materials: Obtain ingredients of a uniform quality for each mortar
component from a single manufacturer and each aggregate from one source or producer.
D_ Mockups: Build mockups to verify selections made under sample Submittals and to demonstrate
aesthetic effects and qualities of materials and execution.
1. Build mockups for each type of stone veneer assembly in sizes approximately 48 inches (1200
mm) long by 48 inches (1200 mm) high by fiill thickness, including face and backup.
a. Include stone coping at top of mockup.
b. Include through -wall flashing installed for a 24 -inch (600 -mm) length in corner of mockup
approximately 16 inches (400 mm) down from top of mockup, with a 12 -inch (300 -mm)
length of flashing left exposed to view (omit stone veneer above half of flashing).
SCONE ASSEMBLIES 04860-1
LION SQUARE LODGE NORTH
Vail, Colorado
'
2. Protect accepted mockups from the elements with weather - resistant membrane.
3. Approval of mockups is for color, texture, and blending of stone; relationship of mortar and
sealant colors to stone colors; tooling of joints; and aesthetic qualities of workmanship.
a. Approval of mockups is also for other material and construction qualities specifically
approved by Contractor in writing.
b. Approval of mockups does not constitute approval of deviations from the Contract
Documents contained in mockups unless such deviations are specifically approved by
Contractor in writing.
4. Approved mockups may become part of the completed Work if undisturbed at time of Substantial
Completion.
1A PROJECT CONDITIONS
A. Protection of Stone Veneer Assemblies: During construction, cover tops of walls, projections, and sills
with waterproof sheeting at end of each day's work. Cover partially completed stone veneer assemblies
when construction is not in progress.
1. Extend cover a minimum of 24 inches (600 mm) down both sides and hold cover securely in
place.
B. Stain Prevention: Immediately remove mortar and soil to prevent them from staining the face of stone
masonry.
1. Protect base of walls from rain - splashed mud and mortar splatter by coverings spread on the
ground and over the wall surface.
2. Protect sills, ledges, and projections from mortar droppings.
3. Protect surfaces of window and door frames, as well as similar products with painted and integral
finishes, from mortar droppings. '
4. Turn scaffold boards near the wall on edge at end of each day to prevent rain from splashing
mortar and dirt on completed stone masonry.
C. Cold- Weather Requirements: Do not use frozen materials or materials mixed or coated with ice or frost.
Do not build on frozen substrates. Remove and replace stone masonry damaged by frost or freezing
conditions. Comply with cold - weather construction requirements contained in
ACl 530.1 /ASCE 6/TMS 602.
I. Cold- Weather Cleaning: Use liquid cleaning methods only when air temperature is 40 deg f (4
deg C) and above and will remain so until masonry has dried, but not less than 7 days after
completing cleaning.
D. Hot - Weather Requirements: Comply with hot - weather construction requirements contained in
ACI 530.1 /ASCE 6ffMS 602.
PART 2 - PRODUCTS
2.1 STONE
A. Match Architect's samples for variety, color range, finish, and other stone characteristics relating to
aesthetic effects.
STONE ASSEMBLIES 04860-2 1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Design selections:
1. Provide S' Telluride Gold or equivalent at building base, retaining wall veneers, and stone arches
as shown on plans.
2. Provide stone caps at top of stone walls, stone piers, and window sills. Cap to be Buff Sandstone
or equivalent.
2.3 VENEER ANCHORS
A. Materials:
I. Stainless -Steel Wire: ASTM A 580 /A 580M, Type 316.
2. Stainless -Steel Sheet: ASTM A 666, Type 304.
B. Wire Veneer Anchors: Formed Isom W 1.7 or 0.148 -inch- (3.8 -mm -) diameter, stainless -steel wire.
C_ Adjustable, Screw - Attached Veneer Anchors: Units consisting of a wire tie section and a metal anchor
section that allow vertical adjustment but resist tension and compression forces perpendicular to plane of
wall, for attachment over sheathing to wood or metal studs, and as follows:
S'T'ONE ASSEMBLIES 04860-3
2.2
MORTAR MATERIALS
A.
Portland Cement: ASTM C 150, Type I or IL Provide natural color or white cement as required to
produce mortar color indicated.
1. Low - Alkali Cement: Not more than 0.60 percent total alkali when tested according to
ASTM C 114-
I B.
Hydrated Lime: ASTM C 207, Type S.
C.
Portland Cement -Lime Mix: Packaged blend of portland cement complying with ASTM C 150, Type I or
III, and hydrated lime complying with ASTM C 207_
D.
For pigmented mortar, use a colored cement formulation as required to produce color indicated or, if not
indicated, as selected from manufacturer's standard formulations.
C 144 follows:
E.
Aggregate: ASTM and as
I . For pointing mortar, use aggregate graded with 100 percent passing No. 16 (1.18 -mm) sieve.
2. Colored Aggregates: Natural- colored sand or ground marble, granite, or other sound stone; of
color necessary to produce required mortar color.
F.
Mortar Pigments: Natural or synthetic iron oxides, compounded for use in mortar mixes and with a
record of satisfactory performance in stone masonry mortars.
G.
Latex additive (water emulsion) described below, serving as replacement for part of or all gaging water,
of type specifically recommended by latex- additive manufacturer for use with job -mixed portland cement
mortar and not containing a retarder.
I . Latex Additive: Styrene - butadiene ribber or acrylic resin.
H.
Water: Potable.
2.3 VENEER ANCHORS
A. Materials:
I. Stainless -Steel Wire: ASTM A 580 /A 580M, Type 316.
2. Stainless -Steel Sheet: ASTM A 666, Type 304.
B. Wire Veneer Anchors: Formed Isom W 1.7 or 0.148 -inch- (3.8 -mm -) diameter, stainless -steel wire.
C_ Adjustable, Screw - Attached Veneer Anchors: Units consisting of a wire tie section and a metal anchor
section that allow vertical adjustment but resist tension and compression forces perpendicular to plane of
wall, for attachment over sheathing to wood or metal studs, and as follows:
S'T'ONE ASSEMBLIES 04860-3
LEON SQUARE LODGE NORTH
Vail, Colorado
Products: Subject to compliance with requirements, available products that may be incorporated
into the Work include, but are not limited to, the following):
a. Dur -O -WaI, a Dayton Superior Company
b. Heckmann Building Products Inc.
C. Hohmann & Barnard, Inc.
d. Wire -Bond.
2. Structural Performance Characteristics: Capable of withstanding a 100 -lbf (445 -N) load in both
tension and compression without deforming or developing play in excess of 0.05 inch (1.3 mm).
3. Anchor Section: Sheet metal plate, 1 -1/4 inches (32 mm) wide by 6 inches (150 mm) long, with
screw holes top and bottom and with raised rib - stiffened strap, 5/8 inch (16 mm) wide by 5 inches
long, stamped into center to provide a slot between strap and plate for inserting wire tie.
4. Fabricate sheet metal anchor sections and other sheet metal parts from 0.097 -inch- (2.5 -mm -)
thick, steel sheet, galvanized after fabrication.
5. Wire Ties: Triangular -, rectangular -, or T- shaped wire ties fabricated from 025 -inch- (6.4 -mm -)
diameter, hot -dip galvanized -steel wire.
D. Stainless -Steel Drill Screws for Steel Studs: Proprietary fastener consisting of carbon -steel drill point and
300 Series stainless -steel shank, complying with ASTM C 954 except manufactured with hex washer
head and neoprene washer, No. 10 (4.8-min diameter) by length required to penetrate steel stud flange
with not less than three exposed threads.
Products: Subject to compliance with requirements, available products that may be incorporated
into the Work include, but are not limited to, the following:
a. Dur -O -WaI, a Dayton Superior Company; Stainless Steel SX Fastener.
b_ ITW Buildex; Scots Long Life Teks.
2.4 EMBEDDED FLASHING MATERIALS
"Sheet
A. Flashings: As specified in Division 7 Section Metal Flashing and Trim."
2.5 MISCELLANEOUS MASONRY ACCESSORIES
'
A. Compressible Filler Premolded filler strips complying with ASTM D 1056, Grade 2A t ; compressible up
to 35 percent; of width and thickness indicated; formulated from neoprene or PVC_
B. Weep Holes:
I. Rectangular Plastic Tubing: Clear butyrate, 3/8 by 1 -1/2 inches (10 by 38 mm) by thickness of
stone veneer assembly.
2. Plastic Weep Hole /Vent: One- piece, flexible extnrsion made from UV- resistant polypropylene
copolymer, designed to fill head joint with outside face held back 1/8 inch (3 mm) from exterior
face of stone veneer, in color selected from manufacturer's standard.
C. Cavity Drainage Material: Free - draining mesh made from polyethylene strands and shaped to avoid
being clogged by mortar droppings.
SCONE ASSEMBLIES 04860-4
LION SQUARE LODGE NORTH
Vail, Colorado
2.6
MASONRY CLEANERS
A. Job -Mixed Detergent Solution: Solution of 1/2 -cup (0.14 -L) dry- measure tetrasodium polyphosphate and
1/2 -cup (0.14 -L) dry- measure laundry detergent dissolved in l gal. (4 L) of water.
B. Proprietary Acidic Cleaner: Manufacturer's standard - strength cleaner designed for removing
mortar /grout stains, efflorescence, and other new construction stains from stone masonry surfaces
without discoloring or damaging masonry surfaces; expressly approved for intended use by stone
producer.
2.7
STONE FABRICATION
A. General: Fabricate stone in sizes and shapes necessary to comply with requirements indicated, including
details on Drawings.
B. Cut and select stone to produce pieces of thickness, size, and shape indicated and to comply with
fabrication and construction tolerances recommended by applicable stone association or, if none, by stone
source, for faces, edges, beds, and backs.
I . Clean sawed backs of stone to remove rust stains and iron particles.
C. Thickness of Stone Veneer: Provide thickness indicated, but not less than the following:
I. Thickness: 3 -1/2 and 1 -1 /2 inches as indicated on the Drawings phis or minus 1/2 inch.
D. Dress joints (bed and vertical) straight and at right angle to face, unless otherwise indicated.
E. Shape stone for type of masonry (pattern) as indicated on the Drawings.
F. Finish exposed faces and edges of stone to comply with requirements indicated for finish and to match
approved samples and mockups.
G. Carefully inspect stone at quarry or fabrication plant for compliance with requirements for appearance,
material, and fabrication. Replace defective units before shipment.
2.8
MORTAR MIXES
A. General: Do not use admixtures, including pigments, air - entraining agents, accelerators, retarders, water -
repellent agents, antifreeze compounds, or other admixtures, unless otherwise indicated.
B. Mortar for Stone Masonry: Comply with ASTM C 270, Proportion Specification.
I. Mortar for Setting Stone: Type S.
C. Mortar for Scratch Coat over Metal Lath: I part Portland cement, 1/2 part lime, 5 parts loose damp sand,
and enough water to produce a workable consistency.
STONE ASSFMBIAES 04860-5
1
LION SQUARE LODGE NORTH '
Vail, Colorado
PART 3 - EXECUTION
3.1 PREPARATION
A. Accurately mark stud centerlines on face of weather - resistant sheathing paper before beginning stone
installation.
B.
Coat concrete and unit masonry backup with asphalt dampproofing.
inches (300 mm), and behind weather- resistant sheathing paper.
3.2
SETTING OF STONE MASONRY, GENERAL
A.
Perform field cutting trimming as is
r
'
necessary and stone set.
mm) into masonry at each end.
I . Use power saws to cut stone that is fabricated with saw -cut surfaces.
2. Use hammer and chisel to split stone that is fabricated with split surfaces.
4_ At sills, extend flashing not less than 4 inches (100 mm) at ends.
B.
Sort stone before it is placed in wall to remove stone that does not comply with requirements relating to
6. Extend sheet metal flashing 1/2 inch (13 mm) beyond face of masonry at exterior and turn flashing
aesthetic effects, physical properties, or fabrication, or that is otherwise unsuitable for intended use.
down to fomt a drip.
C.
Arrange stones in three- course, random -range ashlar pattern with random course heights, random lengths
obstructions to downward flow of water in wall, and where indicated.
(interrupted coursed), and unifonn joint widths.
D.
Arrange dispersed for blended
stones with color and size variations uniformly an evenly appearance.
E.
Maintain uniform joint widths except for variations due to different stone sizes and where minor
variations are required to maintain bond alignment if any. Lay walls with joints not less than 1/4 inch (6
mm) at narrowest points or more than 1/2 inch (13 mm) at widest points.
F.
Provide sealant joints of widths and at locations indicated.
'
I . Keep sealant joints free of mortar and other rigid materials.
2. Sealing joints is specified in Division 7 Section "Joint Sealants."
r
G.
Sheet metal flashing: Install embedded flashing and weep holes at shelf angles, lintels, ledges, other
obstructions to downward flow of water in wall, and where indicated.
I. At stud - framed walls, extend flashing through stone masonry, up the face of sheathing at least 12
inches (300 mm), and behind weather- resistant sheathing paper.
2. At concrete backing, extend flashing through stone masonry, turned tip a minimum of 6 inches
(150 mm), and insert in reglet. Reglets are specified Division 7 Section "Sheet Metal Flashing and
Trim. "]
'
3. At lintels and shelf angles, extend flashing fiull length of angles but not less than 6 inches (150
mm) into masonry at each end.
4_ At sills, extend flashing not less than 4 inches (100 mm) at ends.
5. At ends of head and sill flashing turn up not less than 2 inches (50 mm) to form end dams.
6. Extend sheet metal flashing 1/2 inch (13 mm) beyond face of masonry at exterior and turn flashing
down to fomt a drip.
r
H. Flexible flashing: Install embedded flashing and weep holes at shelf angles, lintels, ledges, other
obstructions to downward flow of water in wall, and where indicated.
r
STONE ASSEMBLIES 04860-6
r#
f
t LION SQUARE LODGE NORTH
Vail, Colorado
1. Install metal drip edges beneath flexible flashing at exterior face of wall. Stop flexible flashing
' 1/2 inch (13 mm) back from outside face of wall and adhere flexible flashing to top of metal drip
edge.
2. Install metal flashing termination beneath flexible flashing at exterior face of wall. Stop flexible
flashing 1/2 inch (13 mm) back from outside face of wall and adhere flexible flashing to top of
metal flashing termination.
3. Cut flexible flashing flush with face of wall after masonry wall construction is completed.
1. Place weep holes and vents in joints where moisture may accumulate, including at base of cavity walls,
above shelf angles, and at flashing.
1. Use round plastic tubing to form weep holes.
2. Use wicking material to form weep holes above flashing in stone sills. Turn wicking down at lip
of sill to be as inconspicuous as possible.
3. Space weep holes 24 inches (600 mm) o.c.
' 3.3 INSTALLATION OF ANCHORED STONE MASONRY
A. Anchor stone masonry to concrete with corrugated -metal veneer anchors unless otherwise indicated.
Secure anchors by inserting dovetailed ends into dovetail slots in concrete.
B. Anchor stone masonry to stud framing with adjustable, screw- attached veneer anchors unless otherwise
indicated. Fasten anchors through sheathing to framing with two screws.
C. Embed veneer anchors in'mortar joints of stone masonry at least halfway, but not less than 1 -1 /2 incites
(38 mm), through stone masonry and with at least 5/8 -inch (I6 -mm) cover on outside face.
D. Space anchors not more than 16 inches (400 mm) o.c. vertically and 24 inches (600 mm) o.c.
horizontally. Install additional anchors within 12 inches (300 min) of openings, sealant joints, and
perimeter at intervals not exceeding 12 inches (300 mm).
E. Set stone in full bed of mortar with full head joints unless otherwise indicated. Build anchors into mortar
joints as stone is set.
' F. Fill space between back of stone masonry and concrete walls below grade with mortar as stone is set.
G. Provide 1 -inch (25 -mm) cavity between stone masonry and backup construction unless otherwise
indicated. Keep cavity free of mortar droppings and debris.
I. Place mortar spots in cavity at veneer anchors to maintain spacing.
2. Slope beds toward cavity to minimize mortar protrusions into cavity.
3. Rake mortar for a drystack appearance_ Keep joint 3/4" from face of all adjacent stones,
minimum.
3.4 ADJUSTING AND CLEANING
A. In- Progress Cleaning: Clean stone masonry as work progresses. Remove mortar fins and smears before
tooling joints.
B. Final Cleaning: After mortar is thoroughly set and cured, clean stone masonry as follows:
' 1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or
chisels.
� I
STONE ASSEMBLIES
04860 - 7
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Test cleaning methods on mockup; leave one -half of panel uncleaned for comparison purposes_
3. Protect adjacent stone and nonmasonry surfaces from contact with cleaner by covering them with
liquid strippable masking agent, polyethylene film, or waterproof masking tape_
4. Wet wall surfaces with water before applying cleaner; remove cleaner promptly by rinsing
thoroughly with clear water.
5. Clean stone masonry by bucket and brush hand - cleaning method described in BIA Technical Note
No. 20 Revised 11, using job -mixed detergent solution.
6. Clean stone masonry with proprietary acidic cleaner applied according to manufacturer's .written
instructions.
7. Clean limestone masonry to comply with recommendations in 1LI's "Indiana Limestone
Handbook."
3.5 EXCESS MATERIALS AND WASTE
A. Disposal as Fill Material: Dispose of clean masonry waste, including mortar and excess or soil -
contaminated sand, by crushing and mixing with fill material as fill is placed.
1. Do not dispose of masonry waste as fill within 18 inches (450 mm) of finished grade.
END OF SECTION 04860
STONE ASSEMBLIES 04860-8
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05120 - STRUCTURAL STEEL
PARTI- GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Structural steel_
B. Refer to Structural Drawings for additional structural provisions.
C. Related Sections include the following:
I. Division 1 Section "Quality Control" for independent testing agency procedures and
administrative requirements.
2. Division 5 Section "Steel Deck."
3. Division 5 Section "Metal Fabrications" for steel lintels or shelf angles not attached to structural -
steel frame, miscellaneous steel fabrications and other metal items not defined as structural steel.
1.2 DEFINITIONS
A. Structural Steel: Elements of structural -steel frame, as classified by AISC's "Code of Standard Practice
for Steel Buildings and Bridges," that support design loads.
B. Architecturally Exposed Structural Steel: Structural steel designated as architecturally exposed structural
steel in the Contract Documents.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: Show fabrication of structural -steel components.
1. include details of cuts, connections, splices, camber, holes, and other pertinent data.
2. Include embedment drawings.
3. Indicate welds by standard AWS symbols, distinguishing between shop and field welds, and show
size, length, and type of each weld.
4. Indicate type, size, and length of bolts, distinguishing between shop and field bolts. Identify
pretensioned and slip- critical high - strength bolted connections.
5. For structural -steel connections indicated to comply with design loads, include structural analysis
data signed and sealed by the qualified professional engineer responsible for their preparation.
C. Welding certificates.
D_ Qualification Data: For fabricator and professional engineer.
E. Mill Test Reports: Signed by manufacturers certifying that the following products comply with
requirements:
I . Structural steel including chemical and physical properties.
I STRUCTURAL STEEL
05120 - l
u
LION SQUARE L ODGE NORTH
Vail, Colorado
2. Bolts, nuts, and washers including mechanical properties and chemical analysis.
3. Shear stud connectors.
4. Shop primers.
5. Nonshrink grout.
F. Source quality- control test reports.
1.4 QUALITY ASSURANCE
A. Professional Engineer Qualifications: A professional engineer who is legally authorized to practice in the
State of Colorado where Project is located and who is experienced in providing engineering services of
the kind indicated. Engineering services are defined as those performed for projects with structural steel
framing that are similar to that indicated for this Project in material, design, and extent.
B. Shop - Painting Applicators: Qualified according to AISC's Sophisticated Paint Endorsement P I or SSPC-
QP 3, "Standard Procedure for Evaluating Qualifications of Shop Painting Applicators."
C. Welding: Qualify procedures and personnel according to AWS D 1. I, "Structural Welding Code -- Steel."
D. Comply with applicable provisions of the following specifications and documents:
I _ AISC's "Code of Standard Practice for Steel Buildings and Bridges."
2. AISC's "Load and Resistance Factor Design Specification for Stnicturai Steel Buildings."
3. AISC's "Specification for the Design of Steel Hollow Stnuctural Sections."
4. AISC's "Specification for Allowable Stress Design of Single -Angle Members."
5. RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts."
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store materials to permit easy access for inspection and identification. Keep steel members off ground
and spaced by using pallets, dunnage, or other supports and spacers. Protect steel members and packaged
materials from erosion and deterioration.
I. Store fasteners in a protected place. Clean and relubricate bolts and nuts that become dry or nasty
before use.
2. Do not store materials on structure in a manner that might cause distortion, damage, or overload to
members or supporting structures_ Repair or replace damaged materials or structures as directed.
1.6 COORDINATION
A. Furnish anchorage items to be embedded in or attached to other constniction without delaying the Work.
Provide setting diagrams, sheet metal templates, instructions, and directions for installation.
PART 2 - PRODUCTS
2.1 STRUCTURAL -STEEL MATERIALS
A. W- Shapes: ASTM A 992/A 992M, Grade 50 (345).
B. Channels, Angles- Shapes: ASTM A 36/A 36M.
STRUCTURAL STEEL 05120 - 2
I
d
'J
a
r �
J
0
LION SQUARE LODGE NORTH
Vail, Colorado
C. Plate and Bar: ASTM A 36 /A 36M_
D. Cold- Formed Hollow Structural Sections: ASTM A 500, Grade B, structural tubing.
E. Steel Pipe: ASTM A 53/A 53M, Type E or S, Grade B.
I . Weight Class: As indicated on Structural Drawings.
2. Finish: Black, except where indicated to be galvanized.
F. Welding Electrodes: Comply with AWS requirements.
A
In
C
43
E.
F.
BOLTS, CONNECTORS, AND ANCHORS
High- Strength Bolts, Nuts, and Washers: ASTM A 325 (ASTM A 325M), Type 1, heavy hex steel
structural bolts; hardened carbon -steel washers.
1. Finish. Plain.
Shear Connectors: ASTM A 108, Grades 1015 through 1020, headed -stud type, cold - finished carbon
steel; AWS D1.1, Type B.
Unheaded Anchor Rods: Steel grade as indicated on Structural Drawings.
I . Configuration: As indicated on Structural Drawings.
2. Nuts: ASTM A 563 (ASTM A 563M) heavy hex carbon steel.
3. Plate Washers: ASTM A 361A 36M carbon steel.
4. Washers: ASTM F 436 (ASTM F 436M) hardened carbon steel.
5. Finish: Plain.
Threaded Rods: ASTM A 36/A 36M.
1. Nuts: ASTM A 563 (ASTM A 563M) heavy hex carbon steel.
2. Washers: ASTM A 36/A 36M carbon steel.
3. Finish: Plain and hot -dip zinc coating as indicated on Stnuctural Drawings.
Eye Bolts and Nuts: ASTM A 108, Grade 1030, cold - finished carbon steel.
Sleeve Nuts: ASTM A 108, Grade 1018, cold - finished carbon steel.
2.3 PRIMER
A. Surface Preparation: Clean surfaces to be painted. Remove loose rust and mill scale and spatter, slag, or
flux deposits. Prepare surfaces according to the following specifications and standards:
1. Unprimed Non - Exposed Metal Surfaces: SSPC -SP I, "Solvent Cleaning."
2. Primed Non - Exposed Metal Surfaces: SSPC -SP 3, "Power Tool Cleaning."
3. Primed Exposed Metal Surfaces: SSPC -SP 6/NACE No. 3, "Commercial Blast Cleaning."
B_ Primers:
I. Unprimed Non - Exposed Metal Surfaces: SSPC -Paint 25, Type 11, iron oxide, zinc oxide, raw
linseed oil, and alkyd.
STRUCTURALSTEEL
05120-3
1
LION SQUARE LODGE NORTH
Vail, Colorado
2. Primed Non - Exposed Metal Surfaces: Fabricator's standard lead- and chromate -free,
nonasphaltic, rust- inhibiting primer. '
3. Primed Exposed Metal Surfaces: Provide shop primer that complies with Division 9 Section
"Painting."
2.4 GROUT
A. In accordance with Division 3 Section "Grout."
2.5 FABRICATION
A. Structural Steel: Fabricate and assemble in shop to greatest extent possible. Fabricate according to
AISC's "Code of Standard Practice for Steel Buildings and Bridges" and AISC's "Specification for
Structural Steel Buildings -- Allowable Stress Design and Plastic Design."
1. Camber structural steel members where indicated.
2. Identify high - strength structural steel according to ASTM A 6/ A 6M and maintain markings until
structural steel has been erected.
3. Mark and match -mark materials for field assembly.
4. Complete structural -steel assemblies, including welding of units, before starting shop - priming
operations.
B. Thermal Cutting: Perform thermal cutting by machine to greatest extent possible.
1. Plane thermally cut edges to be welded to comply with requirements in AWS D1.1.
C. Bolt Holes: Cut, drill, or punch standard bolt holes perpendicular to metal surfaces.
D. Finishing: Accurately finish ends of columns and other members transmitting bearing loads.
E. Cleaning: Clean and prepare steel surfaces that are to remain unpainted according to SSPC -SP 1,
"Solvent Cleaning."
F. Shear Connectors: Prepare steel surfaces as recommended by manufacturer of shear connectors. Use
automatic end welding of headed -stud shear connectors according to AWS D1.1 and manufacturer's
written instructions. Do not paint surfaces to receive welded stud shear connectors.
G. Steel Wall- Opening Framing: Select true and straight members for fabricating steel wall- opening
framing to be attached to structural steel. Straighten as required to provide uniform, square, and true
members in completed wail framing_
H. Holes: Provide holes required for securing other work to structural steel and for passage of other work
through steel framing members.
1. Cut, drill, or punch holes perpendicular to steel surfaces. Do not thermally cut bolt holes or
enlarge holes by burning.
2. Base -Plate Holes: Cut, drill, mechanically thermal cut, or punch holes perpendicular to steel
surfaces.
3. Weld threaded nuts to framing and other specialty items indicated to receive other work.
STRUCTURAL STEEL
05120-4
STRUCTURAL STEEL
05120-5
LION SQUARE LODGE NORTH
'
Vail, Colorado
2.6
SHOP CONNECTIONS
'
A.
High - Strength Bolts: Shop install high- strength bolts according to RCSC's "Specification for Structural
Joints Using ASTM A 325 or A 490 Bolts" for type of bolt and type of joint specified.
I. Joint Type: Snug tightened, unless indicated otherwise on the Structural Drawings,
B.
Weld Connections: Comply with AWS 131.1 for welding procedure specifications, tolerances,
'
appearance, and quality of welds and for methods used in correcting welding work.
1. Remove backing bars or runoff tabs, back gouge, and grind steel smooth.
2. Assemble and weld built -up sections by methods that will maintain true alignment of axes without
'
exceeding tolerances of A1SC's "Code of Standard Practice for Steel Buildings and Bridges" for
mill material.
3. Verify that weld sizes, fabrication sequence, and equipment used for architecturally exposed
structural steel will limit distortions to allowable tolerances. Prevent weld show - through on
exposed steel surfaces.
a. Grind butt welds flush.
'
b. Grind or 611 exposed fillet welds to smooth profile. Dress exposed welds.
23
SHOP PRIMING
A.
Shop following:
prime steel surfaces except the
1. Surfaces embedded in concrete or mortar. Extend priming of partially embedded members to a
'
depth of 2 inches (50 mm).
2. Surfaces to be field welded.
3. Surfaces to be high - strength boiled with slip- critical connections.
4. Surfaces to receive sprayed fire - resistive materials.
5. Galvanized surfaces.
B.
Surface Preparation: Clean surfaces to be painted. Remove loose rust and mill scale and spatter, slag, or
flux deposits. Prepare surfaces according to the following specifications and standards:
I. Unprimed Non - Exposed Metal Surfaces: SSPC -SP 1, "Solvent Cleaning."
2. Primed Non - Exposed Metal Surfaces: SSPC -SP 3 "Power Tool Cleaning."
3_ Primed Exposed Metal Surfaces: SSPC -SP 6/NACE No. 3, "Commercial Blast Cleaning."
C.
Priming: Immediately after surface preparation, apply primer according to manufacturer's written
instructions and at rate recommended by SSPC to provide a dry film thickness of not less than 1.5 mils
(0.038 mm). Use priming methods that result in fill coverage of joints, corners, edges, and exposed
surfaces.
'
I. Apply Iwo coats of shop paint to inaccessible surfaces after assembly or erection. Change color of
second coat to distinguish it from first.
STRUCTURAL STEEL
05120-5
E. Splice members only where indicated. I
STRUCTURAL STEEL 05120-6 ,
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3
- EXECUTION
,
3.1
EXAMINATION
A.
Verify elevations of concrete- and masonry- bearing surfaces and locations of anchor rods, bearing plates,
'
and other embedments, with steel erector present, for compliance with requirements.
B_
Proceed with installation only after unsatisfactory conditions have been corrected.
'
3.2
PREPARATION
A.
Provide temporary shores, guys, braces, and other supports during erection to keep structural steel secure,
'
plumb, and in alignment against temporary construction loads and loads equal in intensity to design loads.
Remove temporary supports when permanent structural steel, connections, and bracing are in place,
unless otherwise indicated.
'
1. Do not remove temporary shoring supporting construction until cast -in -place concrete has attained
its design compressive strength.
,
3.3
ERECTION
Set in locations to indicated and according to AISC's "Code of
'
A_
structural steel accurately and elevations
Standard Practice for Steel Buildings and Bridges" and "Specification for Structural Steel Buildings- -
Allowable Stress Design and Plastic Design."
'
B.
Base and Bearing Plates: Clean concrete- and masonry- bearing surfaces of bond - reducing materials, and
roughen surfaces prior to setting base and bearing plates. Clean bottom surface of base and bearing
plates.
'
L Set base and bearing plates for structural members on wedges, shims, or setting nuts as required.
2. Weld plate washers to top of base plate.
3. Snug - tighten anchor rods after supported members have been positioned and plumbed. Do not
remove wedges or shims but, if protruding, cut off flush with edge of base or bearing plate before
'
packing with grout.
4. Promptly pack grout solidly between bearing surfaces and base or bearing plates so no voids
remain. Neatly finish exposed surfaces; protect grout and allow to cure.
C.
Maintain erection tolerances of structural steel and architecturally exposed structural steel within AISC's
"Code of Standard Practice for Steel Buildings and Bridges."
D.
Align and adjust various members forming part of complete frame or structure before permanently
fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact
with members. Perform necessary adjustments to compensate for discrepancies in elevations and
alignment.
'
1. Level and plumb individual members of structure.
2. Make allowances for difference between temperature at time of' erection and mean temperature
'
when structure is completed and in service.
E. Splice members only where indicated. I
STRUCTURAL STEEL 05120-6 ,
1
1
FJ
G. Do not use thermal cutting during erection_
LION SQUARE LODGE NORTH
Vail, Colorado
F. Remove erection bolts on welded, architecturally exposed structural steel; fill holes with plug welds; and
grind smooth at exposed surfaces.
H. Do not enlarge unfair holes in members by burning or using drift pins_ Ream holes that must be enlarged
to admit bolts.
1. Shear Connectors: Prepare steel surfaces as recommended by manufacturer of shear connectors. Use
automatic end welding of headed -stud shear connectors according to AWS D1.1 and manufacturer's
written instructions.
3.4 FIELD CONNECTIONS
A. High- Strength Bolts: Install high- strength bolts according to RCSC's "Specification for Structural Joints
Using ASTM A 325 or A 490 Bolts" for type of bolt and type of joint specified.
Joint Type: Snug tightened, unless indicated otherwise on the Structural Drawings.
B. Weld Connections: Comply with AWS DI.I for welding procedure specifications, tolerances,
appearance, and quality of welds and for methods used in correcting welding work.
1. Comply with A1SC's "Code of Standard Practice for Steel Buildings and Bridges" and
"Specification for Structural Steel Buildings -- Allowable Stress Design and Plastic Design" for
bearing, adequacy of temporary connections, alignment, and removal of paint on surfaces adjacent
to field welds.
2. Remove backing bars or runoff tabs, back gouge, and grind steel smooth.
3. Assemble and weld built -up sections by methods that will maintain true alignment of axes without
exceeding tolerances of AISC's "Code of Standard Practice for Steel Buildings and Bridges" for
mill material.
4. Verify that weld sizes, fabrication sequence, and equipment used for architecturally exposed
structural steel will limit distortions to allowable tolerances. Prevent weld show- through on
exposed steel surfaces.
a. Grind bull welds flush.
b. Grind or fill exposed fillet welds to smooth profile. Dress exposed welds.
' 3.5 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to inspect
field welds and high- strength bolted connections.
B. Bolted Connections:
1. Bolt Testing: Test 2 percent of all high strength bolts, nuts, and washers for compliance with all
provisions of specified requirements. Review all certifications and mill test reports.
' 2_ Bolted Connections: Visually inspect all bolted connections to assure all bolts, nuts, and required
washers have been installed and are of proper type, and all faying surfaces have been brought into
snug contact.
3. Standard High Strength Bolts: Inspect tightness of 30 percent of all bolts (minimum of 2),
selected at random in each slip - critical high strength bolted connection of structural steel framing
on Project. If rejeclable bolts are found in any connection, check all remaining bolts in that
connection of tightness. Inspection will conform to "Specification for Structural Joints Using
STRUCTURAL STEEL 05120-7
1
LION SQUARE LODGE NORTH
Vail, Colorado
1
ASTM A325 or A490 Bolts" approved by Research Council on Riveted and Bolted Structural
Joints of the Engineering Foundation.
4. Tension Control (Self - Indicating) Bolts:
1
a. Perform visual inspection of all high strength bolted connections to ensure all torque -off
splines have been sheared.
b. Splines not sheared, verify proper bolt tension has been achieved by the application of a
1
properly calibrated testing torque device or remove and replace all bolts with un- sheared
splines. Contractor will pay cost of additional inspections required.
C. Welded Connections: Agency will perform following on shop and field welds:
'
I . All welds, including wall and shoring connections: 10 percent visual.
2. Full penetration groove welds in transfer elements: 100 percent ultrasonic.
3. Steel decking: 100 percent visual.
D. In addition to visual inspection, test and inspect field- welded shear connectors according to requirements
in AWS D1.1 for stud welding and as follows:
,
1. Perform bend tests if visual inspections reveal either a less -than- continuous 360- degree flash or
welding repairs to any shear connector.
2. Conduct tests on additional shear connectors if weld fracture occurs on shear connectors already
tested, according to requirements in AWS D1.1_
E. Correct deficiencies in Work that test reports and inspections indicate does not comply with the Contract
Documents.
3.6 REPAIRS AND PROTECTION
A. Repair damaged galvanized coatings on galvanized items with galvanized repair paint according to ,
ASTM A 780 and manufacturer's written instructions.
B. Touchup Painting: After installation, promptly clean, prepare, and prime or reprime field connections, '
rust spots, and abraded surfaces of prime - painted joists and accessories, bearing plates, and abutting
structural steel.
1. Clean and prepare surfaces by SSPC -SP 3 power -tool cleaning. 1
2. Apply a compatible primer of same type as shop primer used on adjacent surfaces.
END OF SECTION 05120 1
Ll
1
STRUCTURAL STEEL 05120-8
a
1
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05310 - STEEL DECK
PART I -GENERAL
1.1 SUMMARY
A. This Section includes the following:
I, Composite deck for deck slabs.
2. Refer to Structural Drawings for additional structural provisions.
B. Related Sections include the following:
1. Division I Section "Quality Control" for independent testing agency procedures and
administrative requirements.
2. Division 3 Section "Cast -in -Place Concrete" for concrete fill.
3. Division 5 Section "Structural Steel."
1.2 SUBMITTALS
A. Product Data: For each type of deck, accessory, and product indicated.
B. Shop Drawings: Show layout and types of deck panels, anchorage details, reinforcing channels, pans, cut
deck openings, special jointing, accessories, and attachments to other construction.
C. Product Certificates: For each type of steel deck, signed by product manufacturer.
D. Welding certificates_
1.3 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency qualified according to ASTM E 329 for testing
indicated.
B. Welding: Qualify procedures and personnel according to AWS D 1.3, "Structural Welding Code - Sheet
Steel."
C. Fire- Test - Response Characteristics: Where indicated, provide steel deck units identical to those tested for
fire resistance per ASTM E 119 by a testing and inspecting agency acceptable to authorities having
jurisdiction.
I. Steel deck units shall be identified with appropriate markings of applicable testing and inspecting
agency.
D. AISI Specifications: Comply with calculated structural characteristics of steel deck according to AISI's
"North American Specification for the Design of Cold - Formed Steel Structural Members_"
1.4 DELIVERY, STORAGE, AND HANDLING
A. Protect steel deck from corrosion, deformation, and other damage during delivery, storage, and handling.
STEEL DECK 05310-1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Stack steel deck on platforms or pallets and slope to provide drainage. Protect with a waterproof
covering and ventilate to avoid condensation.
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
I. Steel Deck:
a. ASC Profiles, Inc.
b. Consolidated Systems, Inc.
C. DACS, Inc.
d. Marlyn Steel Decks, Inc.
e. New Millennium Building Systems, LLC.
f Nucor Corp.; Vulcraft Division.
g. Roof Deck, Inc.
h. United Steel Deck, Inc-
i. Verco Manufacturing Co.
2.2 COMPOSITE DECK FOR FLOOR SLABS
A. Composite Steel Deck: Fabricate panels, with integrally embossed or raised pattem ribs and interlocking
side laps, to comply with "SDI Specifications and Commentary for Composite Steel Floor Deck," in SDI
Publication No. 30, with the minimum section properties indicated, and with the following:
I . Galvanized Steel Sheet: ASTM A 653/A 653M, Structural Steel (SS), Grade 40, G60 (Z180) zinc
coating.
2. Profile Depth: As indicated on Structural Drawings.
3. Design Uncoated -Steel Thickness: As indicated on Structural Drawings.
4. Span Condition: As indicated on Structural Drawings.
2.3 ACCESSORIES
A_ General: Provide manufacturer's standard accessory materials for deck that comply with requirements
indicated.
B. Mechanical Fasteners: Corrosion- resistant, low- velocity, power - actuated or pneumatically driven carbon -
steel fasteners; or self - drilling, self-threading screws.
C. Side -Lap Fasteners: Corrosion - resistant, hexagonal washer head; self- drilling, carbon -steel screws,
No. 10 (4.8 -mm) minimum diameter.
D_ Flexible Closure Strips: Vulcanized, closed -cell, synthetic rubber.
E. Miscellaneous Sheet Metal Deck Accessories: Steel sheet, minimum yield strength of 33,000 psi (230
MPa), not less than 0.0359 -inch (0.91 -mm) design uncoated thickness, of same material and finish as
deck; of profile indicated or required for application.
STEEL DECK 05310-2
LION SQUARE LODGE NORTH
Vail, Colorado
F. Pour Stops and Girder Fillers: Steel sheet, minimum yield strength of 33,000 psi (230 MPa), of same
material and finish as deck, and of thickness and profile recommended by SDI Publication No. 30 for
overhang and slab depth.
G. Column Closures, End Closures, Z- Closures, and Cover Plates: Steel sheet, of same material, finish, and
thickness as deck, unless otherwise indicated.
H. Weld Washers: Uncoated steel sheet, shaped to fit deck rib, 0.0747 inch (1.90 mm) thick, with factory-
punched hole of 3/8 -inch (9.5 -mm) minimum diameter.
1. Flat Sump Plate: Single -piece steel sheet, 0.0747 inch (1.90 trim) thick, of same material and finish as
deck. For drains, cut holes in the field-
]. Galvanizing Repair Paint: ASTM A 780.
II PART 3 - EXECUTION
' 3.1 EXAMINATION
A. Examine supporting frame and field conditions for compliance with requirements for installation
tolerances and other conditions affecting performance.
3.2 INSTALLATION, GENERAL
A. Install deck panels and accessories according to applicable specifications and commentary in SDI
Publication No. 30, manufachtrer's written instructions, and requirements in this Section.
'
B.
Install temporary shoring before placing deck panels, if required to meet deflection limitations.
C.
Locate deck bundles to prevent overloading of supporting members.
'
D.
Place deck panels on supporting frame and adjust to final position with ends accurately aligned and
bearing on supporting frame before being permanently fastened. Do not stretch or contract side -lap
interlocks.
'
E.
Place deck panels flat and square and fasten to supporting frame without warp or deflection.
F.
Cut and neatly fit deck panels and accessories around openings and other work projecting through or
adjacent to deck.
G.
Provide additional reinforcement and closure pieces at openings as required for strength, continuity of
deck, and support of other work.
H.
Comply with AWS requirements and procedures for manual shielded metal arc welding, appearance and
quality of welds, and methods used for correcting welding work.
1.
Reinforcement at Openings:
1. Provide additional reinforcement and closure pieces at openings as required for strength,
continuity of deck, and support of other work shown.
2. Miscellaneous openings not shown on Drawings such as those required for vents, risers, conduits,
etc., shall be cut and reinforced by the trade requiring the opening.
'
STEEL
DECK 05310-3
I
-
I
B. Field welds will be subject to inspection.
C. Testing agency will report inspection results promptly and in writing to Contractor and Architect.
D. Remove and replace work that does not comply with specified requirements.
E. Additional inspecting, at Contractor's expense, will be performed to determine compliance of corrected
work with specified requirements. "
i;
3.5 REPAIRS AND PROTECTION
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both surfaces of deck with
galvanized repair pain[ according to ASTM A 780 and manufacturer's written instructions.
B_ Provide final protection and maintain conditions to ensure that steel deck is without damage or '
deterioration at time of Substantial Completion.
STEEL DECK
05310-4
LION SQUARE LODGE NORTH
Vail, Colorado
3.3
DECK INSTALLATION
A.
Fasten deck panels to steel supporting members by arc spot (puddle) welds of the surface diameter
'
indicated or arc seam welds with an equal perimeter that is not less than 1 -1/2 inches (38 mm) long, and
as follows:
I. Weld Diameter: 5/8 inch (I6 mm), nominal.
2. Weld Spacing: As indicated on Structural Drawings.
3. Weld Washers: Install weld washers at each weld location.
B.
Side -Lap and Perimeter Edge Fastening: Fasten side laps and perimeter edges of panels between supports
as indicated on Structural Drawings.
C.
End Bearing: Install deck ends over supporting frame with a minimum end bearing of 1 -1/2 inches (38
I
mm), with end joints as follows:
1. End Joints: Lapped 2 inches (51 mm) minimum.
D.
Flexible Closure Strips: Install flexible closure strips over partitions, walls, and where indicated. Install
with adhesive according to manufacturer's written instructions to ensure complete closure.
E.
Pour Stops and Girder Fillers: Weld steel sheet pour stops and girder fillers to supporting structure
according to SDI recommendations, unless otherwise indicated.
F.
Deck Closures: Weld steel sheet cell closures, and Z- closures to deck according to SDI recommendations
'
to provide tight - fitting closures at open ends of ribs and sides of decking. Weld cover plates at changes in
direction of deck panels, unless otherwise indicated.
G.
Uplifling Loads: Install
and anchor roof units to resist net uplift loading of 30 lbs per square foot at entry
canopy and cave overhangs, design for 45 Ibs per square foot.
'
3.4
FIELD QUALITY CONTROL
A.
Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform
field tests and inspections and prepare test reports.
B. Field welds will be subject to inspection.
C. Testing agency will report inspection results promptly and in writing to Contractor and Architect.
D. Remove and replace work that does not comply with specified requirements.
E. Additional inspecting, at Contractor's expense, will be performed to determine compliance of corrected
work with specified requirements. "
i;
3.5 REPAIRS AND PROTECTION
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both surfaces of deck with
galvanized repair pain[ according to ASTM A 780 and manufacturer's written instructions.
B_ Provide final protection and maintain conditions to ensure that steel deck is without damage or '
deterioration at time of Substantial Completion.
STEEL DECK
05310-4
1
n
1
t
1
I
END OF SECTION 05310
STEED. DECK
LION SQUARE LODGE NORTH
Vail, Colorado
05310-5
t
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05400 - COLD - FORMED METAL FRAMING
PART I - GENERAL
1.1 SUMMARY
A. This Section includes the following:
I. Exterior load- bearing wall framing.
2. Exterior non -load- bearing wall framing_
1.2 PERFORMANCE REQUIREMENTS
A. Structural Performance: Provide cold- formed metal framing capable of withstanding design loads within
limits and under conditions indicated.
1 _ Design Loads: As indicated on Structural Drawings.
2. Deflection Limits: As indicated on Structural Drawings.
1.3 SUBMITTALS
A. Product Data: For each type of product and accessory indicated.
B. Shop Drawings: Show layout, spacings, sizes, thicknesses, and types of cold - formed metal framing;
fabrication; and fastening and anchorage details, including mechanical fasteners.
I. For cold - formed metal framing indicated to comply with design loads, include structural analysis
data signed and sealed by the qualified professional engineer responsible for their preparation.
1.4 QUALITY ASSURANCE
A. Product Tests: Mill certificates or data from a qualified independent testing agency indicating steel sheet
complies with requirements.
B. Welding: Qualify procedures and personnel according to AWS D1.3, "Structural Welding Code - -Sheet
Steel."
C. Fire - Test - Response Characteristics: Where indicated, provide cold - formed metal framing identical to
that of assemblies tested for fire resistance per ASTM E 119 by a testing and inspecting agency
acceptable to authorities having jurisdiction.
D. A1S1 Specifications and Standards: Comply with AISI's "North American Specification for the Design of
Cold - Formed Steel Structural Members" and its "Standard for Cold - Formed Steel Framing - General
Provisions."
1. Comply with AISI's "Standard for Cold - Formed Steel Framing - Truss Design."
2. Comply with AISI's "Standard for Cold- Formed Steel Framing - Header Design."
I COLD - FORMED METAL FRAMING
05400-1
I
LION SQUARE LODGE NORTH
Vail, Colorado
PART 2 - PRODUCTS
2.1 EXTERIOR LOAD - BEARING WALL FRAMING
A. Steel Studs: Manufacturer's standard C- shaped steel studs, of web depths indicated, punched, with '
stiffened flanges, and as follows:
1. Minimum Base -Metal Thickness: As indicated on Structural Drawings,
2. Section Properties: As indicated on Structural Drawings.
B. Steel Track: Manufacturer's standard U- shaped steel track, of web depths indicated, unpunched, with
straight flanges, and same minimum base -metal thickness as steel studs. '
C. Steel Box or Back -to -Back Headers: Manufacturer's standard C- shapes used to form header beams, of
web depths indicated, punched, with stiffened flanges, and as follows:
I. Minimum Base -Metal Thickness: As indicated on Structural Drawings.
2. Flange Width: As indicated on Structural Drawings.
3. Section Properties: As indicated on Structural Drawings.
2.2 EXTERIOR NON - LOAD - BEARING WALL FRAMING
A. Steel Studs: Manufacturer's standard C- shaped steel studs, of web depths indicated, punched, with
stiffened flanges, and as follows:
1. Minimum Base -Metal Thickness: As indicated on Structural Drawings. ,
2. Flange Width: As indicated on Structural Drawings.
3. Section Properties: As indicated on Structural Drawings.
B. Steel Track: Manufacturer's standard U- shaped steel track, of web depths indicated, unpunched, with
unstiffened flanges, and same minimum base -metal thickness as steel studs.
C. Vertical Deflection Clips: Manufacturer's standard clips, capable of accommodating upward and
downward vertical displacement of primary stnictiire through positive mechanical attachment to stud
web.
2.3 FRAMING ACCESSORIES
A. Fabricate steel- framing accessories from steel sheet, ASTM A 1003 1A 1003M, Structural Grade, Type H,
metallic coated, of same grade and coating weight used for framing members, unless otherwise indicated.
B. Steel Shapes and Clips: ASTM A 36/A 36M, zinc coated by hot -dip process according to
ASTM A 123/A 123M_
C. Expansion Anchors: Fabricated from corrosion - resistant materials, with capability to sustain, without
failure, a load equal to 5 times design load, as determincd by testing per ASTM E 488 conducted by a
qualified independent testing agency.
D. Power - Actuated Anchors: Fastener system of type suitable for application indicated, fabricated from
corrosion - resistant materials, with capability to sustain, without failure, a load equal to 10 times design ,
load, as determined by testing per ASTM E 1190 conducted by a qualified independent testing agency.
COLD - FORMED METAL FRAMING 5 x
0_400 - 2
LION SQUARE LODGE NORTH
Vail, Colorado
E. Mechanical Fasteners: ASTM C 1513, corrosion- resistant - coated, self - drilling, self - tapping steel drill
screws.
1. Head Type: Low - profile head beneath sheathing, manufacturer's standard elsewhere.
2.4 MISCELLANEOUS MATERIALS
A. Galvanizing Repair Paint: ASTM A 780.
B. Cement Grout: Portland cement, ASTM C 150, Type 1; and clean, natural sand, ASTM C 404. Mix at
ratio of I part cement to 2 -1/2 parts sand, by volume, with minimum water required for placement and
hydration.
C. Shims: Load bearing, high - density multimonomer plastic, nonleaching.
D. Sealer Gaskets: Closed -cell neoprene foam, 1/4 inch (6.4 mm) thick, selected from manufacturer's
standard widths to match width of bottom track or rim track members.
PART 3 - EXECUTION
3.1 PREPARATION
A. Install toad bearing shims or grout between the underside of wall bottom track or rim track and the top of
foundation wall or slab at stud or joist locations to ensure a uniform bearing surface on supporting
concrete or masonry construction.
B. Install sealer gaskets to isolate the underside of wall bottom track or rim track and the top of foundation
wall or slab at stud or joist locations_
3.2 INSTALLATION, GENERAL
A. Install cold - formed metal framing according to AISI's "Standard for Cold - Formed Steel Framing -
General Provisions" and to manufacturer's written instructions unless more stringent requirements are
indicated.
B. Install cold - formed metal framing and accessories plumb, square, and true to line, and with connections
securely fastened.
C_ Install framing members in one -piece lengths_
D. Install temporary bracing and supports to secure framing and support loads comparable in intensity to
those for which structure was designed. Maintain braces and supports in place, undisturbed, until entire
integrated supporting structure has been completed and permanent connections to framing are secured.
E_ Do not bridge building expansion and control joints with cold- fomted metal framing. Independently
1 ?acne both sides of joints.
F. Install insulation, specified in Division 7 Section "Building Insulation," in built -up exterior framing
members, such as headers, sills, boxed joists, and multiple studs at openings, that are inaccessible on
completion of framing work.
I COLD- FORMED METAL FRAMING
05400-3
LION SQUARE LODGE NORTH
Vail, Colorado
G. Fasten hole reinforcing plate over web penetrations that exceed size of manufacturer's standard punched
openings. '
H. Erection Tolerances: Install cold- foniied metal framing level, plumb, and true to line to a maximum
allowable tolerance variation of 1/8 inch in 10 feet (1:960) and as follows:
I. Space individual framing members no more than plus or minus 1/8 inch (3 mm) from plan
location. Cumulative error shall not exceed minimum fastening requirements of sheathing or
other finishing materials.
3.3 EXTERIOR LOAD - BEARING WALL INSTALLATION
A. Install continuous top and bottom tracks sized to match studs. Align tracks accurately and securely '
anchor at corners and ends, and at spacings as follows:
s
I . Anchor Spacing: As shown on Shop Drawings.
B. Squarely seat studs against top and bottom tracks with gap not exceeding of 1/8 inch (3 mm) between the
end of wall framing member and the web of track. Fasten both flanges of studs to top and bottom tracks.
Space studs as follows:
I. Stud Spacing: As indicated.
C. Set studs plumb, except as needed for diagonal bracing or required for nonplumb walls or warped
r
surfaces and similar configurations.
D. Align studs vertically where floor framing internipts wall- framing continuity. Where studs cannot be '
aligned, continuously reinforce track to transfer toads.
I
1
E. Align floor and roof framing over studs. Where framing cannot be aligned, continuously reinforce track 1
to transfer loads. s
F. Anchor studs abutting structural columns or walls, including masonry walls, to supporting structure as
indicated.
G_ Install headers over wall openings wider (ban stud spacing. Locate headers above openings as indicated.
Fabricate headers of compound shapes indicated or required to transfer load to supporting studs, complete
with clip -angle connectors, web stiffeners, or gusset plates.
1. France wall openings with not less than a double stud at each jamb of frame as indicated on Shop
Drawings. Fasten jamb members together to uniformly distribute loads. N
2. Install runner tracks and jack studs above and below wall openings. Anchor tracks to jamb studs
with clip angles or by welding, and space jack studs same as full - height wall studs. F
I
1-l. Install supplementary framing, blocking, and bracing in stud framing indicated to support fixtures, ,
equipmen(, services, casework, heavy t Nmishings, and similar work requiring attachment to
framing.
I. If type of supplementary support is not indicated, comply with stud manufacturer's written
recommendations and industry standards in each case, considering weight or load resulting from
item supported.
1. Install horizontal bridging in stud system, spaced as indicated. Fasten at each stud intersection. !
COLD - FORMED METAL FRAMING 05400-4
t
LION SQUARE LODGE NORTH
Vail, Colorado
1. Bridging: Cold- rolled steel channel, welded or mechanically fastened to webs of punched studs
' with a minimum of 2 screws into each flange of the clip angle for framing members up to 6 inches
(150 mm) deep.
2. Bridging: Combination of flat, taut, steel sheet straps of width and thickness indicated and stud -
track solid blocking of width and thickness to match studs. Fasten flat straps to stud flanges and
secure solid blocking to stud webs or flanges_
3. Bridging: Proprietary bridging bars installed according to manufacturer's written instructions.
' J. Install steel sheet diagonal bracing straps to both stud flanges, terminate at and fasten to reinforced top
and bottom tracks. Fasten clip -angle connectors to multiple studs at ends of bracing and anchor to
structure_
K. Install miscellaneous framing and connections, including supplementary framing, web stiffeners, clip
angles, continuous angles, anchors, and fasteners, to provide a complete and stable wall- framing system.
3.4 FIELD QUALITY CONTROL
A. Testing: Owner will engage a qualified independent testing and inspecting agency to perform field tests
and inspections and prepare test reports.
B. Field and shop welds will be subject to testing and inspecting.
C. Testing agency will report test results promptly and in writing to Contractor and Architect.
D. Remove and replace work where test results indicate that it does not comply with specified requirements.
E. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of
replaced or additional work with specified requirements.
3.5 REPAIRS AND PROTECTION
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold -
forted metal framing with galvanized repair paint according to ASTM A 780 and manufacturer's written
instructions.
B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer,
that ensure that coId- formed metal framing is without damage or deterioration at time of Substantial
Completion.
END OF SECTION 05400
I COLD - FORMED METAL FRAMING
05400-5
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05500 - METAL FABRICATIONS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes the following:
I . Miscellaneous steel framing and supports.
2. Shelf angles.
3. Loose bearing and leveling plates.
4. Steel weld plates and angles.
5. - Miscellaneous steel trim.
6. Metal bollards.
7. Pipe guards.
B. See Division 5 Section "Metal Stairs" for metal - framed stairs.
C. See Division 5 Section "Pipe and Tube Railings" for metal pipe and tube railings.
D. See Division 5 Section "Gratings" for metal gratings.
1.2 SUBMITTALS
A. Product Data: For the following:
I . Metal nosings and treads.
2. Grout.
B. Shop Drawings: Include plans, elevations, sections, and details of metal fabrications and their
connections. Show anchorage and accessory items.
C. Templates: For anchors and bolts.
PART 2- PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product
selection:
1. Available Products: Subject to compliance with requirements, products that may be incorporated
into the Work include, but are not limited to, products specified.
2. Available Manufacturers: Subject to compliance with requirements, manufacnuers offering
products that may be incorporated into the Work include, but are not limited to, manufacturers
specified.
METAL FABRICATIONS 05500- 1
LION SQUARE LODGE NORTH
Vail, Colorado
2.2 METALS
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces without blemishes.
B. Ferrous Metals:
1. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.
2. Steel Tubing: ASTM A 500, cold - formed steel tubing.
3. Steel Pipe: ASTM A 53/A 53M, standard weight (Schedule 40), unless another weight is
indicated or required by structural loads.
4. Slotted Channel Framing: Cold- formed metal channels complying with MFMA -3, 1-5/8 by 1 -5/8
inches (41 by 41 mm). Channels made from galvanized steel complying with
ASTM A 653/A 653M, structural steel, Grade 33 (Grade 230), with G90 (2275) coating; 0.079 -
inch (2 -mm) nominal thickness.
5. Cast Iron: ASTM A 48/A 48M, Class 30, unless another class is indicated or required by
structural loads.
2.3 FASTENERS
A. Cast -in -Place Anchors in Concrete: Threaded or wedge type; galvanized ferrous castings, either
ASTM A 47/A 47M malleable iron or ASTM A 27/A 27M cast steel. Provide bolts, washers, and shims
as needed, hot -dip galvanized per ASTM A 153/A 153M.
2.4 MISCELLANEOUS MATERIALS
A. Universal Shop Primer: Fast - curing, lead- and chromate -free, universal modified -alkyd primer
complying with MPl 09.
B. Zinc -Rich Primer: Complying with SSPC -Paint 20 or SSPC -Paint 29 and compatible with topcoat.
I. Available Products:
a. Benjamin Moore & Co.; Epoxy Zinc -Rich Primer CM 18/19.
b. Carboline Company; Carbozinc 621.
C. ICI Devoe Coatings; Catha -Coat 313.
d. International Coatings Limited; Interzinc 315 Epoxy Zinc -Rich Primer.
C. PPG Architectural Finishes, Inc.; Aquapon Zinc -Rich Primer 97 -670.
f. Sherwin- Williams Company (The); Corothane I GalvaPac Zinc Primer.
g. Tnemec Company, Inc.; Tneme -Zinc 90 -97.
C. Galvanizing Repair Paint: SSPC -Paint 20, high- zinc -dust- content paint for regalvanizing welds in steel.
D. Nonshrink, Nonmetallic Grout Factory- packaged, nonstaining, noncorrosive, nongaseous grout
complying with ASTM C 1107.
E. Concrete Materials and Properties: Comply with requirements in Division 3 Section "Cast -in -Place
Concrete" for normal- weight, air - entrained, ready -mix concrete with a minimum 28 -day compressive
strength of 3000 psi (20 MPa), unless otherwise indicated.
METAL FABRICATIONS 05500-2
1
I�
1
1
LION SQUARE LODGE NORTH
Vail, Colorado
2.5 FABRICATION
A. General: Preassemble items in the shop to greatest extent possible. Use connections that maintain
structural value of joined pieces_
Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges. Remove sharp
or rough areas on exposed surfaces.
2. Weld comers and seams continuously. Use materials and methods that minimize distortion and
develop strength and corrosion resistance of base metals. Obtain fusion without undercut or
overlap. Remove welding flux immediately. Finish exposed welds smooth and blended.
3. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners where
possible. Locate joints where least conspicuous.
4. Fabricate seams and other connections that will be exposed to weather in a manner to exclude
water. Provide weep holes where water may accumulate.
5. Where units are indicated to be cast into concrete or built into masonry, equip with integrally
welded steel strap anchors, not less than 24 inches (600 mm) o.c.
B. Miscellaneous Framing and Supports: Provide steel framing and supports not specified in other Sections
as needed to complete the Work. Fabricate units from steel shapes, plates, and bars of welded
construction. Cut, drill, and tap units to receive hardware, hangers, and similar items.
I. Fabricate steel girders for wood frame constriction from continuous steel shapes. Where wood
nailers are attached to girders with bolts or lag screws, drill holes at 24 inches (600 mm) o.c.
2. Fabricate steel pipe columns for supporting wood frame construction with steel baseplates and top
plates welded to pipe with fillet welds the same size as pipe wall thickness.
C. Loose Steel Lintels: Fabricate loose steel lintels from steel angles and shapes of size indicated for
openings and recesses in masonry walls and partitions at locations indicated.
Lintels in Exterior Walls: Galvanize.
D. Shelf Angles: Fabricate shelf angles of sizes indicated and for attachment to framing. Fabricate with
horizontally slotted holes to receive 3/4 -inch (19 -mm) bolts, spaced not more than 6 inches (150 mm)
from ends and 24 inches (600 mm) o.c.
1 E.
. Shelf Angles in Exterior Walls: Galvanize.
2. Furnish wedge -type concrete inserts, complete with fasteners, to attach shelf angles to cast -in-
place concrete.
Loose Bearing and Leveling Plates: Provide loose bearing and leveling plates for steel items bearing on
masonry or concrete construction. Drill plates to receive anchor bolts.
F. Miscellaneous Steel Trim: Fabricate units from steel shapes, plates, and bars of profiles shown with
continuously welded joints and smooth exposed edges. Miter comers and use concealed field splices
where possible. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and
installation with other work.
1 _ Exterior Miscellaneous Steel Trim: Galvanize.
G. Metal Bollards: Fabricate from Schedule 40 steel pipe.
1. Cap bollards with 1/4 -inch- (6 -nun -) thick steel plate.
2. Fabricate bollards with 3/8 -inch- (10 -m►n -) thick steel baseplates for bolting to concrete slab.
Drill baseplates at all four comers for 3/4 -inch (19 -mm) anchor bolts.
METAL FABRICATIONS 05500-3
�j
t
LION SQUARE LODGE NORTH
Vail, Colorado
3. Fabricate sleeves for bollard anchorage from steel pipe or tubing with 1/4 -inch- (6 -mm -) thick
steel plate welded to bottom of sleeve.
H. Pipe Guards: Fabricate from 3/8 -inch- (9.5 -mm -) thick by 12 -inch- (300 -mm -) wide steel plate, bent to
fit flat against the wall or column at both ends and to fit around pipe with 2 -inch (50 -mm) clearance
between pipe and pipe guard. Drill each end for two 3/4 -inch (19 -mm) anchor bolts.
2.6
FINISHES
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
recommendations for applying and designating finishes. Finish metal fabrications after assembly.
B. Steel and Iron Finishes:
I . Hot -dip galvanize items as indicated to comply with ASTM A 123 /A 123M or
ASTM A 153/A 153M as applicable.
2. Preparation for Shop Priming: Prepare uncoated ferrous -metal surfaces to comply with
requirements indicated below for environmental exposure conditions of installed metal
fabrications:
a. Exteriors (SSPC Zone 113): SSPC -SP 6/NACE No. 3, "Commercial Blast Cleaning."
b. Interiors (SSPC Zone 1 A): SSPC -SP 3, "Power Tool Cleaning_"
3. Shop Priming: Apply shop primer to uncoated surfaces of metal fabrications, except those with
galvanized finishes and those to be embedded in concrete, sprayed -on fireproofing, or masonry, to
comply with SSPC -PA I, "Paint Application Specification No. 1: Shop, Field, and Maintenance
Painting," for shop painting.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal
fabrications accurately in location, with edges and surfaces level, plumb, and true.
I. Fit exposed connections accurately together. Weld connections that are not to be left as exposed
joints but cannot be shop welded. Do not weld, ctrl, or abrade surfaces of exterior units that have
been hot -dip galvanized after fabrication.
2. Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-
place construction -
3. Provide temporary bracing or anchors in formwork for items that are to be built into concrete,
masonry, or similar construction.
B_ Set bearing and leveling plates on cleaned surfaces using wedges, shims, or leveling nuts. After bearing
members have been positioned and plumbed, tighten anchor bolts and pack solidly with nonshrink,
nonmetallic grout.
C. Bollards:
I . Anchor bollards to existing construction with expansion anchors. Provide four 3/4 -inch (19 -mm)
bolts at each bollard.
METAL. FABRICATIONS 05500-4
1
1
1
[I
t
1
t
LION SQUARE LODGE NORTH
Vail, Colorado
2. Anchor bollards in concrete with pipe sleeves preset and anchored into concrete. Fill annular
space around bollard solidly with nonshrink, nonmetallic grout.
3. Anchor bollards in place with concrete footings. Place concrete and vibrate or tamp for
consolidation. Support and brace bollards in position until concrete has cured.
4. Fill bollards solidly with concrete, mounding top surface to shed water.
' D. Touch up surfaces and finishes after erection.
1. Painted Surfaces: Clean Feld welds, bolted connections, and abraded areas and touch up paint
with the same material as used for shop painting.
2. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair
galvanizing to comply with ASTM A 780.
END OF SECTION 05500
METAL FABRICATIONS 05500-5
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05511 - METAL STAIRS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
I . Preassembled steel stairs with abrasive- coating - finished formed -metal treads.
2. Industrial -type stairs with steel floor plate treads.
3. Steel tube railings attached to metal stairs and to walls adjacent to metal stairs.
B. See Division 5 Section "Pipe and Tube Railings" for pipe and tube railings.
1.2 PERFORMANCE REQUIREMENTS
A. Structural Performance of Stairs: Provide metal stairs capable of withstanding the effects of gravity loads
and the following loads and stresses within limits and under conditions indicated:
1. Uniform Load: 100 lbf /sq. ft. (4.79 kN /sq. m).
2. Concentrated Load: 300 Ibf (1.33 kN) applied on an area of 4 sq. in_ (2580 sq. mm).
3. Uniform and concentrated loads need not be assumed to act concurrently.
4. Stair Framing: Capable of withstanding stresses resulting from railing loads in addition to loads
specified above_
5. Limit deflection of treads, platforms, and framing members to L/240 or 1/4 inch (6.4 mm),
whichever is less_
B. Structural Performance of Railings: Provide railings capable of withstanding the effects of gravity loads
and the following loads and stresses within limits and under conditions indicated:
1. Handrails:
a. Uniform load of 50 Ibf/ ft. (0.73 kN/n) applied in any direction.
b. Concentrated load of 200 lbf (0.89 kN) applied in any direction.
C. Uniform and concentrated loads need not be assumed to act concurrently.
2. Top Rails of Guards:
a. Uniform load of 50 Ibf/ ft. (0.73 kN/rn) applied in any direction.
b. Concentrated load of 200 Ibf (0.89 kN) applied in any direction.
C. Uniform and concentrated loads need not be assumed to act concurrently.
3. Infill of Guards:
a. Concentrated load of 50 Ibf (0.22 kN) applied horizontally on an area of I sq. ft. (0.093 sq.
m).
1.3 SUBMITTALS
A. Product Data: For metal stairs.
I I METAL STAIRS
05511 - 1
LION SQUARE LODGE NORTH
Vail, Colorado
B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
1. Include structural analysis data signed and sealed by the qualified professional engineer
responsible for their preparation.
1.4 COORDINATION
A. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete
inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry.
Deliver such items to Project site in time for installation.
B. Coordinate locations of hanger rods and struts with other work so that they will not encroach on required
stair width and will be within the fire- resistance -rated stair enclosure.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product
selection:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering
products that may be incorporated into the Work include, but are not limited to, manufacturers
specified.
2.2 METALS
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces without blemishes.
B. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.
C. Steel Tubing: ASTM A 500 (cold formed) or ASTM A 513, Type 5 (mandrel drawn).
D. Rolled -Steel Floor Plate: ASTM A 786/A 786M, rolled from plate complying with ASTM A 36/A 36M
or ASTM A 283/A 283M, Grade C or D.
E. Wire Rod for Grating Crossbars: ASTM A 510 (ASTM A 510M).
F. Iron Castings: Either gray iron, ASTM A 48/A 48M, Class 30, or malleable iron, ASTM A 47/A 47M,
unless otherwise indicated.
G. Uncoated, Cold - Rolled Steel Sheet: ASTM A 1008 /A 1008M, either commercial steel, Type B, or
structural steel, Grade 25 (Grade 170)_
H. Uncoated, Hot - Rolled Steel Sheet: ASTM A 1011 /A 1011M, either commercial steel, Type B, or
structural steel, Grade 30 (Grade 205).
I. Expanded Metal, Carbon Steel: ASTM F 1267, Class I (uncoated).
J_ Woven -Wire Mesh: Intermediate- crimp, 2 -inch (50 -mm) woven -wire mesh, made from 0.135 -inch (3.5-
mm) nominal diameter wire complying with ASTM A 510 (ASTM A 510M).
METAL STAIRS 05511 -2
LION SQUARE LODGE NORTH
Vail, Colorado
K. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063 -T6.
2.3 MISCELLANEOUS MATERIALS
A. Cast -Metal Abrasive Nosings: Cast gray iron, Class 20, with an integral abrasive finish.
1. Available Manufacturers:
a. American Safety Tread Co., Inc.
b. Balco Inc.
C. Barry Pattern & Foundry Co., Inc.
d. Granite State Casting Co.
e. Safe -T -Metal Co.
f. Wooster Products Inc.
2. Apply bituminous paint to concealed bottoms, sides, and edges of units set into concrete.
B. Fasteners: Provide zinc - plated fasteners with coating complying with ASTM B 633, Class Fe /Zn 25 for
exterior use, and Class Fe /Zn 5 where built into exterior walls.
C. Universal Shop Primer: Fast - curing, lead- and chromate -free, universal modified -alkyd primer
complying with MPI #79.
D. Concrete Materials and Properties: Comply with requirements in Division 3 Section "Cast -in -Place
Concrete" for normal- weight, air - entrained, ready -mix concrete with a minimum 28 -day compressive
strength of 3000 psi (20 MPa), unless otherwise indicated_
E. Welded Wire Fabric: ASTM A 185, 6 by 6 inches (152 by 152 mm) - -W 1.4 by W 1.4, unless otherwise
indicated.
2.4 FABRICATION
A. Available Manufacturers:
I. Alfab, Inc.
2. American Stair, Inc_
3. Sharon Companies Ltd. (The).
B. Provide complete stair assemblies, including metal framing, hangers, struts, railings, clips, brackets,
bearing plates, and other components necessary to support and anchor stairs and platforms on supporting
structure.
1. loin components by welding, unless Qtherwise indicated. Use materials and methods that
minimize distortion and develop strength and corrosion resistance of base metals. Obtain fusion
without undercut or overlap. Remove welding flux immediately. At exposed connections, finish
exposed welds smooth and blended.
2. Use connections that maintain structural value of joined pieces_
3. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges, unless
otherwise indicated. Remove sharp or rough areas on exposed surfaces.
4. Form bent -metal comers to smallest radius possible without impairing work.
5. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners where
possible. Locate joints Where least conspicuous.
METAL STAIRS 05511 -3
L ION SQUARE LODGE NORTH
Vail, Colorado
C. Stair Framing: Fabricate stringers of steel plates or channels). Construct platforms of steel plate or
channel headers and miscellaneous framing members.
I . If using bolts, fabricate and join so bolts are not exposed on finished surfaces.
2_ Where stairs are enclosed by gypsum -board shaft -wall assemblies, provide hanger rods or struts to
support landings from floor construction above or below.
3. Where masonry walls support metal stairs, provide temporary supporting struts designed for
erecting steel stair components before installing masonry.
D. Abrasive - Coating- Finished, Formed -Metal Stairs: Form risers, treads, and platforms from steel sheet of
thickness needed to comply with performance requirements but not less than 0.0966 inch (2.5 mm).
Finish tread and platform surfaces with manufacturer's standard epoxy - bonded abrasive finish.
E. Metal Floor Plate Stairs: Form treads and platforms from rolled -steel floor plate of thickness needed to
comply with performance requirements but not less than 1/4 inch (6.4 mm). Form treads with integral
nosing and back edge stiffener. Weld steel supporting brackets to stringers and weld treads to brackets.
Steel Tube Railings: Fabricate railings to comply with requirements indicated for design, dimensions,
details, finish, and member sizes, including wall thickness of tube, post spacings, and anchorage, but not
less than that needed to withstand indicated loads.
I. Configuration: 1 -1/2 -inch- (38 -mm -) square top and bottom rails and posts with infill panels
made from woven wire mesh in steel channel frames.
2. Fabricate railings with welded connections. Cope components at connections to provide close fit,
or use fittings designed for this purpose.
3. Form changes in direction of railings by bending or by inserting prefabricated fittings.
4. Form curves by bending members in jigs to produce uniform curvature without buckling.
5. Close exposed ends of railing members with prefabricated end fittings.
6. Provide wall returns at ends of wall - mounted handrails_
7. Provide wall brackets, end closures, flanges, miscellaneous fittings, and anchors for
interconnecting components and for attaching to other work.
8. Connect posts to stair framing by direct welding.
2.5
FINISHES
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
reconnnendations for applying and designating finishes. Finish metal stairs after assembly.
B_ Hot -dip galvanize items indicated to be galvanized. Comply with ASTM A 123/A 123M or
ASTM A 153/A 153M as applicable.
C. Preparation for Shop Priming: Prepare uncoated ferrous -metal surfaces to comply with requirements
indicated below for environmental exposure conditions of installed products:
Exterior Stairs (SSPC Zone 113): SSPC -SP 6/NACE No. 3, "Commercial Blast Cleaning."
Interior Stairs (SSPC Zone [A): SSPC -SP 3, "Power Tool Cleaning."
D. Apply shop primer to uncoated surfaces of metal stair components_ Comply with SSPC -PA 1, "Paint
Application Specification No. 1: Shop, Field, and Maintenance Painting of Steel," for shop painting.
METAL STAIRS 05511 -4
I�
t
t
w
n
Li
'1
1
1
A
I
LION SQUARE LODGE NORTH
Vail, Colorado
PART 3- EXECUTION
3.1 INSTALLATION
A. Perform cutting, drilling, and fitting required for installing metal stairs. Set units accurately in location,
alignment, and elevation, measured from established lines and levels and free of rack.
B. Install metal stairs by welding stair framing to steel structure or to weld plates cast into concrete, unless
otherwise indicated.
C. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be
left as exposed joints. Do not weld, cut, or abrade surfaces of exterior units that have been hot -dip
galvanized after fabrication and are for bolted or screwed field connections.
D. Place and finish concrete fill for treads and platforms to comply with Division 3 Section "Cast -in -Place
Concrete."
I . Install abrasive nosings with anchors fully embedded in concrete.
E. Install precast treads with adhesive supplied by manufacturer.
F. Attach handrails to wall with wail brackets.
1. Use type of bracket with predrilled hole for exposed bolt anchorage_
G. Adjusting and Cleaning:
1. Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint,
and paint exposed areas with the same material as used for shop painting.
2_ Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair
galvanizing to comply with ASTM A 780_
END OF SECTION 05511
METAL STAIRS 05511 -5
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05521 - PIPE AND TUBE RAILINGS
PARTI - GENERAL
1.1 SUMMARY
A. This Section includes the following:
I . Steel pipe and tube railings.
B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.
1.2 PERFORMANCE REQUIREMENTS
A. Structural Performance: Provide railings capable of withstanding the effects of gravity loads and the
following loads and stresses within limits and under conditions indicated:
I. Handrails:
a. Uniform load of 50 Ibf/ ft. (0.73 kN /m) applied in any direction.
b. Concentrated load of 200 Ibf (0.89 kN) applied in any direction.
C. Uniform and concentrated loads need not be assumed to act concurrently.
2. Top Rails of Guards:
a. Uniform load of 50 Ibf/ ft. (0.73 kN /m) applied in any direction.
b. Concentrated load of 200 Ibf (0.89 kN) applied in any direction.
C. Uniform and concentrated loads need not be assumed to act concurrently.
3. Inlill of Guards:
a. Concentrated load of 50 Ibf (0.22 kN) applied horizontally on an area of I sq. ft. (0.093 sq.
m).
b. Uniform load of 25 lbf /sq. ft. (1.2 kN /sq. m) applied horizontally.
C. Infill load and other loads need not be assumed to act concurrently.
B. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and
other materials from direct contact with incompatible materials.
1.3 SUBMITTALS
A. Product Data: For grout, anchoring cement, and paint products.
B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other Work.
I. For installed products indicated to comply with design loads, include structural analysis data
signed and sealed by the qualified professional engineer responsible for their preparation.
C. Samples: For each exposed finish required.
PIPE AND TUBE RAILINGS 05521 - I
LION SQUARE LODGE NORTH
Vail, Colorado
D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing
agency, according to ASTM E 894 and ASTM E 935.
PART 2- PRODUCTS
2.1
MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
Steel Pipe and Tube Railings:
a. Pisor Industries, Inc.
b. Sharpe Products.
c_ Wagner, R & B, Inc.; a division of the Wagner Companies.
2.2
METALS
A. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported
rails, unless otherwise indicated_
B. Steel and Iron:
I . Tubing: ASTM A 500 (cold foamed) or ASTM A 513, Type 5 (mandrel drawn).
2. Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless
another grade and weight are required by structural loads.
3. Plates, Shapes, and Bars: ASTM A 36/A 36M.
4. Castings: Either gray or malleable iron, unless otherwise indicated.
a. Gray Iron: ASTM A 48/A 48M, Class 30, unless another class is indicated or required by
structural loads.
b. Malleable Iron: ASTM A 47/A 47M.
5. Expanded Metal: ASTM F 1267, Type 1 (expanded), Class 1 (uncoated).
6_ Woven -Wire Mesh: Intermediate- crimp, 2 -inch (50 -mm) woven -wire mesh, made from 0.135 -
inch (3.5 -nim) nominal diameter wire complying with ASTM A 510 (ASTM A 510M).
2.3
MISCELLANEOUS MATERIALS
A. Fasteners: Provide concealed fasteners, unless unavoidable or standard for railings indicated.
I. Steel Railings: Plated steel fasteners complying with ASTM B 633, Class Fe /Zn 25 for
electrodeposited zinc coating_
B. Anchors: Provide cast -in- place, chemical or torque- controlled expansion anchors, fabricated from
corrosion - resistant materials with capability to sustain, without failure, a load equal to six times the load
imposed when installed in unit masonry and equal to four times the load imposed when installed in
concrete, as determined by testing per ASTM E 488.
C. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.
PIPE AND TUBE RAILINGS
05521 -2
r
1
1
fl
fl
LION SQUARE LODGE NORTH
Vail, Colorado
D. Shop Primer for Galvanized Steel: Zinc -dust, zinc -oxide primer compatible with finish paint systems
indicated, and complying with SSPC -Paint 5.
E. Grout and Anchoring Cement: Factory- packaged, nonshrink, nonmetallic grout complying with
ASTM C 1107; or water - resistant, nonshrink anchoring cement; recommended by manufacturer for
exterior use.
2.4 FABRICATION
A. General: Fabricate railings to comply with design, dimensions, and details indicated, but not less than
that required to support structural loads.
B. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for
this purpose. Weld all around at connections, including at fittings.
C. Form changes in direction by bending or by inserting prefabricated elbow fittings.
D. Form curves by bending in jigs to produce uniform curvature; maintain cross section of member
throughout bend without cracking or otherwise deforming exposed surfaces.
E. Close exposed ends of railing members with prefabricated end fittings.
F. Provide wall returns at ends of wall - mounted handrails, unless otherwise indicated.
G. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and
anchors to interconnect railing members to other work, unless otherwise indicated_
H. Woven -Wire Mesh Infill Panels: Fabricate infill panels from woven -wire mesh crimped into 1- by -1/2-
by -1/8 -inch (25- by- 13- by -3 -mm) metal channel frames.
2.5 FINISHES
A. Steel and Iron:
t. Galvanized Railings: Hot -dip galvanize exterior railings, after fabrication, to comply with
ASTM A 123/A 123M. Provide hot -dip galvanized fittings, brackets, fasteners, sleeves, and other
ferrous components.
2. Shop- Primed Galvanized Railings: After galvanizing, clean railings, treat with metallic- phosphate
process, and apply primer to comply with SSPC -PA 1.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in
location, alignment, and elevation.
1. Set posts plumb within a tolerance of 1/16 inch in 3 feet (2 mm in I m).
2. Align rails so variations from level for horizontal members and variations from parallel with rake
of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (5 nun in 3 m).
PIPE AND TUBE RAILINGS 05521 -3
LION SQUARE LODGE NORTH
Vail, Colorado
B. Anchor posts in concrete by inserting into preset steel pipe sleeves or formed or core - drilled holes and
grouting annular space_
C. Anchor posts to metal surfaces with oval flanges.
D. Anchor railing ends to concrete and masonry with round flanges connected to railing ends and anchored
to wall construction with anchors and bolts.
E. Attach handrails to wall with wall brackets.
I . Use type of bracket with flange tapped for concealed anchorage to threaded hanger bolt.
F. Adjusting and Cleaning:
1. Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint,
and paint exposed areas with the same material as used for shop painting.
2. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair
galvanizing to comply with ASTM A 780.
END OF SECTION 05521
PIPE AND TUBE RAILINGS 05521 -4
LION SQUARE LODGE NORTH
Vail, Colorado
SECTION 05530 - GRATINGS
PART 1 - GENERAL
1.I SUMMARY
A. This Section includes the following:
I . Metal bar gratings.
2. Metal frames and supports for gratings.
1.2 PERFORMANCE REQUIREMENTS
A. Structural Performance of Gratings: Provide gratings capable of withstanding the effects of gravity loads
and the following loads and stresses within limits and under conditions indicated:
I . Floors: Uniform load of 75 Ibf /sq. ft. (3.59 kN /sq. m) or concentrated load of 2000 lbf (8.90 kN),
whichever produces the greater stress.
1.3 SUBMITTALS
A. Product Data: For the following:
1. Clips and anchorage devices for gratings.
2. Paint products.
B. Shop Drawings: Detail fabrication and installation of gratings.
L Include structural analysis data signed and sealed by the qualified professional engineer
responsible for their preparation.
1.4 QUALITY ASSURANCE
A. Metal Bar Grating Standards: Comply with NAAMM MBG 531, "Metal Bar Grating Manual."
PART2- PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that
may be incorporated into the Work include, but are not limited to, the following:
1. Metal Bar Gratings:
a. Alabama Metal Industries Corporation.
b. All American Grating, Inc.
c. Barnett/Bates Corp.
GRATINGS 05530-1
LION SQUARE LODGE NORTH
Vail, Colorado
d. Borden Metal Products (Canada) Limited.
e. Fisher & Ludlow-
f. Grupo Metclmex, S.A. de C.V.
g. IKG Industries; a Harsco Company.
h. Marwas Steel Co.; Laurel Steel Products Division.
i. Ohio Gratings, Inc.
j. Seidelhuber Metal Products, Inc.
k. Tru -Weld.
2.2 METALS
A. Ferrous Metals:
1. Galvanized Steel: ASTM A 653/A 653M, structural quality, Grade 33 (Grade 230), with G90
(Z275) coating.
2.3 FASTENERS
A. General: Unless otherwise indicated, provide Type 304 stainless -steel fasteners for exterior use and zinc -
plated fasteners with coating complying with ASTM B 633, Class Fe /Zn 5, at exterior walls. Provide
stainless -steel fasteners for fastening aluminum. Select fasteners for type, grade, and class required.
B. Anchors: Provide anchors with capability to sustain, without failure, a load equal to six times the load
imposed when installed in unit masonry and equal to four times the load imposed when installed in
concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency.
2.4 MISCELLANEOUS MATERIALS
A. Galvanizing Repair Paint: High- zinc -dust- content paint for regalvanizing welds in steel, complying with
SSPC -Paint 20.
2.5 FABRICATION
A. Cut, drill, and punch material cleanly and accurately. Remove burrs and ease edges. Remove sharp or
rough areas on exposed surfaces.
B. Form from materials of size, thickness, and shapes indicated, but not less than that needed to support
indicated loads.
C. Fit exposed connections accurately together to form hairline joints.
D. Fabricate toeplates for attaching in the field.
E. Removable Grating Sections: Fabricate with banding bars attached by welding to entire perimeter of
each section. Include anchors and fasteners of type indicated or, if not indicated, as recommended by
manufacturer for attaching to supports.
F. Fabricate cutouts in grating sections for penetrations indicated. Edge -band openings in grating that
internipt four or more bearing bars with bars of same size and material as bearing bars.
G. Do not notch bearing bars at supports to maintain elevation.
GRATINGS 05530-2
LION SQUARE LODGE NORTH
Vail, Colorado
2.6 GRATING FRAMES AND SUPPORTS
A. Frames and Supports for Metal Gratings: Fabricate from metal shapes, plates, and bars of welded
construction to sizes, shapes, and profiles indicated and as necessary to receive gratings. Miter and weld
connections for perimeter angle frames. Cut, drill, and tap units to receive hardware and similar items.
I . Unless otherwise indicated, fabricate from same basic metal as gratings.
2. Equip units indicated to be cast into concrete or built into masonry with integrally welded anchors.
Unless otherwise indicated, space anchors 24 inches (600 mm) o.c. and provide minimum anchor
units in the form of steel straps 1 -1/4 inches (32 mm) wide by 1/4 inch (6 mm) thick by 8 inches
(200 mm) long.
B. Galvanize steel frames and supports in the following locations:
1. Exterior.
2. Interior, where indicated.
2.7 STEEL FINISHES
A. Finish gratings, frames, and supports after assembly.
B. Galvanizing: For those items indicated for galvanizing, apply zinc coating by the hot -dip process
complying with ASTM A 123 /A 123M.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Perform cutting, drilling, and fitting required for installing gratings. Set units accurately in location,
alignment, and elevation; measured from established lines and levels and free of rack.
B. Fit exposed connections accurately together to form hairline joints.
I. Weld connections that are not to be left as exposed joints but cannot be shop welded. Do not
weld, cut, or abrade the surfaces of units that have been hot -dip galvanized after fabrication and
are for bolted or screwed field connections.
C. Attach toeplates to gratings by welding at locations indicated.
D. Metal Bar Gratings: Comply with recommendations of referenced metal bar grating standards, including
installation clearances and standard anchoring details.
Attach removable units to supporting members with type and size of clips and fasteners indicated
or, if not indicated, as recommended by grating manufacturer for type of installation conditions
shown_
2. Attach nonremovable units to supporting members by welding where both materials are same;
otherwise, fasten by bolting as indicated above.
E. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to
comply with ASTM A 780.
GRATINGS 05530-3
END OF SECTION 05530
LION SQUARE LODGE NORTH
Vail, Colorado
I
s
1
GRATINGS
05530-4