FINAL REPORT OF SPECIAL INSPECTIONS
Project: =our Seasons - Resor-
PermitNumber: 806 -0_96
Project Location: 2109 `or ^_ F Road
Owner RA ComiDan es & Aff _ia_-es, _LC
Address 86 C^ar:�ers S :reec, 704
City: -NY' -NY Zip: 10007
Design Professional InCharge:Cro::ad ^ai eeri a - �onsu_zaazs, :^c(Spec-ai 1^sz)ec:ors)
Address: PO Box 464, 101A Ai--D Dr've :09
City: Gypsum State: CO Zip: 8+637 Phone: 970 -524 -0720
Fax: 970 - 524 -072 E -mail: m'_kewricgrourae_ ^.a.eom
To the best of my information., knowledge, and belief, the special inspections and /or testing required for
this project, have been cemp;eted in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interirn reports
have been corrected.
Prepared by:
v -c.^ K. War' - :er P.E
Type or Prnt Name
Signature
Date
P . R fF!R4
U� z9,_
Preparer's Seal and Signature Required
-12-
I AUG - 3 2010
rnWN OF VAIL
Page 1 of 11
GROUND
ENGINEERING CONSULTRNTS
List of Outstanding Discrepancies
Project Name:
Four Seasons Resort
Project No:
07 -6528
Client:
Black Diamond Resorts - Vail, LLC
Address:
c/o RAL Companies & Affiliates, LLC
Accepted
86 Chambers Street
NY, NY 10007
Attn:
Mr. Michael Rossi, P.E.
Date: 07/24/10
Faxed to :
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Need copies of AWS D1.1 WPS and WQTRs for all
03 -28 -08
1
welders on this project.
5/27/08
Per Plan
Embeds anchored to concrete slabs are not
05 -27 -08
2
embedded. Stairs N -F
7/30/08
Per RFI #0735
Missing welds and un- chipped welds on Stairs N and
05 -27 -08
3
F.
7/30/08
Per DMR #049
Rebar was used to fill gaps on landings. Stairs N and
05 -27 -08
4
F
06 -10 -08
Per Plan
Missing or loose anchors on landings. Stairs N and F
05 -27 -08
5
06 -10 -08
Per Plan
Missing welds on Level 5.5 floor landing pan.
07 -21 -08
6
07 -21 -08
Per Plan
Missing welds in several locations in Stair C on Level
7/30/2008
7
1 - Level 5 per details A/E8101, M/E8105, and
7/31/08
Per Plan
N/E8103.
Unchipped welds in Stair C on Level 1 to Level 5.
7/30/2008
8
7/31/08
Per Plan
Landing angle seat on Level 4 1/2 was extended with
7/30/2008
9
a plate (detail A/E8101).
11 -04 -08
Per DMR #60
Missing anchor on NE post on Level 3 of Stair C.
Per email from Kurt
7/31/2008
10
07 -09-10
McCormick dated 7
8-10
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 2 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Under - filled CJP weld on 8" x 8" x 0.5" hanger on
7/31/2008
11
Level 5 at gridlines A5 - 15.3 (DMR #057).
11 -04 -08
Per Plan
Non - compliant CJP welds on columns at Gridlines
08 -04 -08
12
A5/15.3 and A5/14.6 on Level 5.
11 -04 -08
Per Plan
Need copies of AWS D1.1 WPS and WQTRs for
08 -14 -08
13
open root CJP welds.
08 -21 -08
Per Plan
Flat bar was used to fill the gap between stringers
Per Clausen
08 -19 -08
14
and embed on Level 3 1/2 of Stair J.
12 -18 -08
Engineering email
dated 12 -17 -08
Shim was used between landing and support angle
Per Clausen
08 -19 -08
15
on Level 4 of Stair J at the southeast comer.
12 -18 -08
Engineering email
dated 12 -17 -08
Missing welds at two locations on landing in Stair Q
08 -21 -08
16
on Level 2 1/2. Marked with orange paint.
12 -16 -08
Per Plan
Flat bar was used to fill gaps between stringers and
Per Clausen
08 -21 -08
17
landings in Stair Q on Level 4.
12 -18 -08
Engineering email
dated 12 -17 -08
Need written clarification from the Engineer of Record
08 -29 -08
18
for high strength bolt tightening.
01 -23 -09
Per DMR #077
Missing welds on bearing angle to landings on Levels
09 -12 -08
19
3 1/2 and 4 1/2 in Stair D.
12 -16 -08
Per Plan
Shims were used between columns and landing on
Per Clausen
09 -12 -08
20
Level 4 of Stair D.
12 -18 -08
Engineering email
dated 12 -17 -08
Column base connections on Level 5 of Stair D are
09 -12 -08
21
not complete.
01 -21 -09
Per Plan
Various areas were observed with missing welds and
10 -14 -08
22
welds that were not slagged. Stair A
12 -16 -08
Per Plan
Preliminary observations were conducted on the arc
spot welds for the roof deck. Non - compliant welds
were observed due to lack of fusion around the
Per DMR #087 and
10/14/2008
23
circumference of the arc spot weld. Paragraph 2.3.5.1
10 -28 -08
DMR #078
also states that arc spot welds are restricted to only
the flat position
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 2891989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 3 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hand copies of any changes or approvals made by the Structural
Enaineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RM
GROUND also has not received copies of the AWS
10/14/2008
24
D1.3 welding procedure specifications (WPS) or
12 -10 -08
Per plan
welder qualification test records (WQTRS).
It was also observed that the side laps on the roof
deck have been button punched together, the
10/14/2008
25
structural notes states that button punches are not
10 -15 -08
Per DMR #89
permitted.
At Gridlines A14/2, beam to embed connection is in
Per Menninger's
10 -15 -08
26
non - compliance. Area 3A
10 -24 -08
Field Report dated
10 -16 -08
At Gridlines A14/1, missing weld on tube steel to tube
10 -15 -08
27
steel connection. Area 3A
10 -17 -08
Per Plan
At Gridlines A14.8/1, shear plate is only welded on
10 -15 -08
28
one side to embed. Area 3A
10 -24 -08
Per Plan
At Gridlines Al 5.6/2, butt weld on shim plate between
Per Nishkian
10 -15 -08
29
column and embed. Area 3A
10 -17 -08
Menninger drwg.
dated 10 -16 -08
At Gridlines Al 5.6/2, undersized weld on top end of
10 -15 -08
30
diagonal brace. Area 3A
10 -17 -08
Per Plan
At Gridlines A15.3/4.9, plate for fix per DMR #64 did
Per Menninger's
10 -15 -08
31
not have 3/8" fillet weld on three sides. Area 3A
10 -24 -08
Field Report dated
10 -16 -08
At Gridlines Al 5.3/5.4, butt weld on shim plate
Per Nishkian
10 -15 -08
32
between column and embed. Area 3A
10 -17 -08
Menninger drwg.
dated 10 -16-08
At Gridlines A14.1/4.9, butt weld on shim plate
Per Nishkian
10 -15 -08
33
between column and embed. Area 3A
10 -17 -08
Menninger drwg.
dated 10 -16 -08
At Gridlines A14.6/1.4, loose bolt in beam- to-beam
10 -15 -08
34
connections.
12 -10 -08
Per DMR #090
At Gridlines A16.4/1 -1.6, tube steel to channel
10 -15 -08
35
connections were welded, not bolted. Area 3A
12 -10 -08
Per DMR #090
At Gridlines A16.8/2 -2.3, tube steel to channel
10 -15 -08
36
connections are welded, not bolted. Area 3A
12 -10 -08
Per DMR #090
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 4 of 11
it is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
At Gridlines A17- A17.4/3.7, loose bolts in two column
10 -15 -08
37
to beam connections. Area 3A
10 -17 -08
Per Plan
At Gridlines All 7.4/3.7, torch gouges in plate for fix
10 -15 -08
38
per DMR #64. Area 3A
10 -17 -08
Per Plan
At Gridlines Al 7.6/4.4, torch gouges in plate for fix
10 -15 -08
39
per DMR #64. Area 3A
10 -17 -08
Per Plan
At Gridlines Al 7.9/132, column is not fully bearing on
10 -15 -08
40
embed. Area 3A
10 -17 -08
Per DMR #64
At Gridlines A16/5.6, beam -to -beam connection is
10 -15 -08
41
missing one bolt and welded. Area 3A
03 -12 -09
Per Plan
At Gridlines A15.3/5.5, column is not fully bearing on
10 -15-08
42
embed. Area 3A
10 -24 -08
Per DMR #64
At Gridlines A14- A15.3/5, missing welds on horizontal
10 -15 -08
43
tube steel pieces. Area 3A
10 -17 -08
Per Plan & DMR
#64
Roof deck at Area 3A - several locations did not have
10 -15 -08
44
2" of bearing per General Note IX.5. Area 3A
12 -10 -08
Per DMR #092
Type B roof deck on Level 8 at Gridlines A15.4- A17/1-
10-28-08
45
2.3 was not installed at this time.
03 -16 -09
Per Plan
Two tube steel to channel connections on Level 8 at
10 -28 -08
46
Gridlines A18/3.7 -4 were welded, not bolted.
12 -10 -08
Per DMR #090
Missing welds on columns and diagonal braces to
11 -04 -08
47
embeds on Level 7 at Gddlines BC- 13D.4/131.8 -134.7.
11 -06 -08
Per Plan
Stair landing channels to support angles are in non-
Per Clausen Engr
11 -04 -08
48
compliance with the project plans on Level 4 1/2 of
7/12/10
letter PRO03 dated
Stair D.
7/12/10
Top flange moment weld @ BA.8/131.6, welded
11 -11 -08
49
without backing or back gouge.
01 -23 -09
Per Plan
Incomplete welded, tek screwed and PAF pin
Nishkian Meninger Email
11 -17 -08
50
connections of roof deck at Gridlines BC -BD /B6 - B7
12 -10 -08
dated 11 -24 -08 and DMR
and BD.3 - BE/136.3 - B7 in Area 3B.
#106
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 5 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Enaineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Need copies of AWS D1.3 WPS and WQTR for arc
11 -17 -08
51
seam welds with 7018 on Typ B deck in Area 3B.
7/24/10
Per Plan
Bottom Flange moment weld connections on Level
11 -20 -08
52
10, Area 1 at Gridline 5/A11 -Al2 could not be tested
12 -10 -08
Per RFI #1270
due to joint configuration, FOR approval required.
Missing 2" of deck support on Level 9 at grids BC /131
Per revised RFI #2760
11 -21 -08
53
and BC /B6 roof deck level.
7/9/10
dated 5-7 -10
Roof deck tek screwed to deck supports on Level 9 at
Nishkian Meninger Email
11 -21 -08
54
Gridlines BA.5 -13C.3 /131 -136.3 and on Level 10 at
12 -10 -08
dated I1 -24 -08 and DMR
Gridlines A10- 68/9.6 -12.6.
#106
Roof deck connections not complete on Level 10 at
11 -21 -08
55
Gridlines A10- A15/9.5 -9.6 and A10- A14/12.6 -12.8. -
04 -13 -09
Per Plan and
outer edge of dormer.
DMR's
Roof deck under the light gauge dormers on Level 10
11 -21 -08
56
at Gridlines A10- A15/.6 -12.6 could not be observed.
12 -29 -08
Per Plan
Roof deck was tek screwed to supports in several
Nishkian Meninger Email
11 -26 -08
57
locations at Gridlines A1.6- OA10.4/15 -17.6 on Level
12 -10 -08
dated 11 -24 -08 and DMR
11.
#106
Low sections of dormer roof deck at Gridlines A1.6 -
Per Plan and
11 -26 -08
58
Al 0.4/15-17.6 are not complete.
04 -13 -09
DMR's
Level 5 at Gridlines BC.2/136.4 and 1313/136.4 only 1
Hyder Constr RFI
11 -26 -08
59
side of shear plates are welded to embeds for beam
2/19/10
#2760 received
connections.
2/15/10
On Level 8 at Gridlines BC.2/131.3, the shear tab for
11 -26 -08
60
the 8x10 had long slots and the washers did not cover
12 -10 -08
Per DMR #090
the slots.
On Level 8 at Gridlines BC.3/135.5, the beam
Hyder Constr RFI
11 -26 -08
61
connection to embed was a clip angle, not a shear
2/19/10
#2760 received
tab.
2/15/10
On Level 8 at Gridlines BC. 1/B5.5, the lower and
Hyder Constr RFI
11 -26 -08
62
upper beam connections, the shear tabs were only
2/19/10
#2760 received
welded on one side.
2/15/10
The bolted connections of the fascia channel were not
11 -26 -08
63
complete on Level 8 at Gridlines BC- BE.3 /B1 - B7.
03 -09 -09
Per Plan, DMR's
and RFI's
At Gridlines BA.5 /61 and BA.5/65.8 on Level 9 -
12 -02 -08
64
missing gussets under columns (columns are not fully
01 -23 -09
Per Plan
bearing on embeds).
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 6 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
At Gridlines BA.6 /133 on Level 9, beam copes were
12 -02 -08
65
torch cut and no radius.
12 -04 -08
Per Plan
At Gridlines BC.2/64.3 on Level 9, two short bolts in
12 -02 -08
66
beam to column connection.
12 -04 -08
Per Plan
At Gridlines A14/11.6 on Level 9, diagonal brace
12 -02 -08
67
gusset is not welded to embed.
12 -04 -08
Per Plan
At Gridlines Al 0/9.6 and Al 0/12.6 on Level 10,
Per Nishkian
12 -02 -08
68
embeds were too low for beam connections.
4/21/10
Menninger; RFI
3131
At Gridlines Al 1/12.6 on Level 10, beam to column
12 -02 -08
69
connection is not tight ply, not in firm contact.
12 -10 -08
Per DMR #090
At Gridlines Al 1/10.8 on Level 10, long slots in beam
12 -02 -08
70
connection.
12 -04 -08
Per Plan and
DMR's
At Gridlines A14.3/11.6 and A14/12.6, Level 10, torch
12 -02 -08
71
cuts on beam flanges are not ground.
12 -29 -08
Per Plan
At Gridlines A3/14 on Level 11, stiffener is missing
12 -04 -08
72
top welds.
12 -10 -08
Per Plan
At Gridlines A3/15.1 on Level 11, shear plate is not
12 -04 -08
73
welded directly to column (3/4" spacer).
12 -18 -08
Per DMR #125
At Gridlines AA.7 /14.5 on Level 11, column cap plate
12 -04 -08
74
is welded, not bolted to beam.
12 -10 -08
Per DMR #0890
At Gridlines EA/E1 -E2 on Level 11, six moment
12 -04-08
75
connections are not complete.
01 -23 -09
Per RFI #1389
At Gridlines A8.6/16.9 on Level 11, shear plate is not
12 -04 -08
76
continuous through column.
12 -16 -08
Per DMR #121.
At Gridlines Al 0/17.2 on Level 11, column is not
12 -04 -08
77
welded all around to embed (bottom).
12 -10 -08
Per Plan
At Gridlines Al 0/16.4 and Al 0/16.8 on Level 11,
12 -04-08
78
embeds are off for beam connections.
12 -16 -08
Per DMR #119.
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 7 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
At Gridlines A9.7/16, A10 /16 and Al 0/15.8 on Level
12 -04 -08
79
11, embeds are off for beam connections.
12 -16 -08
Per DMR #119.
At Gridlines A9.7/16 and A9.7/15.8 on Level 11, beam
12 -04 -08
80
connections were welded on two sides and shear
12 -16 -08
Per DMR #120.
plates were smaller.
Stair S on Level 2 flat bar used to fill gap between
Per Clausen
12 -16 -08
81
stringer and landing.
12 -18 -08
Engineering email
dated 12 -17 -08
Stair AE on Level 1 bottom of stair not anchored to
Per email from Kurt
12 -16 -08
82
concrete.
07 -09 -10
McCormick dated 7
8 -10
Stair A on Level 4 1/2, 1/2" shim plate used to
Per Clausen
12 -16 -08
83
between landing and post.
12 -18 -08
Engineering email
dated 12 -17 -08
Stair A on Levels 6, 8 and 10 flat bar used to fill gaps
Per Clausen
12 -16 -08
84
between stringers and landings.
12 -18 -08
Engineering email
dated 12 -17 -08
Stair A on Level 9, there is a gap between post base
Per Clausen
12 -16 -08
85
plate and embed and welded. Need Engineer of
12 -19 -08
Engineering email
Record's approval.
dated 12 -19-08
Stair B on Level 5, base plate on NE landing post was
Per email from Kurt
12 -18 -08
86
cut off and had only one anchor.
07 -09 -10
McCormick dated 7
8 -10
Stair B on Levels 8 and 9, tube steel on NW corner
12 -18 -08
87
was not welded all around to embed. Embeds were
07 -09 -10
Per RFI #3484
off.
Stair B on Level 9, plate was welded between
Per Claussen
12 -18 -08
88
embeds for stringer connections.
12 -19 -08
Engineering email
dated 12 -19-08
Stair B is missing welds in several locations and
12 -19 -08
89
undersized welds.
12 -29 -08
Per Plan
Stair G on Level A, the clip angles are not fully
12 -30 -08
90
bearing on the concrete.
07 -15 -09
Per Plan
Stair G on Level 4 1/2, southwest post was not
01 -05 -09
91
welded all around to landing.
6/14/10
Per Plan
Stair H on Level 7 angles welded to landing posts and
Per Clausen
01 -09 -09
92
anchored to concrete.
01 -23 -09
Engineer's email
dated 01 -22 -09
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 8 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Enaineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Stair E on Level 6, two landing posts are not
01 -13 -09
93
anchored to the concrete.
01 -21 -09
Per Plan
Stair E on Level 61/2, landing to support angle on NE
01 -13 -09
94
comer has an undercut weld.
01 -21 -09
Per Plan
Roof deck was not attached to the beam at Gridlines
01 -19 -09
95
A.3/A4.6 - 5.3 - covered by stud track.
01 -21 -09
Per Plan
Elevator hoist beam was missing an anchor on Level
01 -21 -09
96
10 in Elevator HS1 and HS2.
01 -23 -09
Per Plan
Elevator divider beam connection to concrete was not
01 -21 -09
97
per Detail 21/S1.0.5 on Level 5 in Elevator HS1 and
01 -23 -09
Per RFI #1392
HS2.
Missing bolts in beam to column connection on Level
Nishkian
01 -26 -09
98
11 at Gridlines A10 /9.
4/21/10
Menninger RFI
3131; Per DMR 90
Shear plate for beam connection is only welded on
Hyder Constr RFI
01 -26 -09
99
one side on Level 10 at Gridlines A4.3/5.3.
2/19/10
#2760 received
2/15/10
Missing overhead welds on light gauge deck support
01 -26 -09
100
on Level 11 at Gridlines A10 - Al 0.3/6.8-8 and A5-
04 -13 -09
Per Plan
A6/6.8 -8.
Missing anchors in beam to concrete connection on
02 -03 -09
101
Level 7 at Gridlines A10.3/1.9.
03 -12 -09
Per Plan
Hole torch cut in anchored plate is bigger than the
02 -03 -09
102
washer on the anchor on Level 7 at Gridlines A10.1.
07 -12 -10
Per RFI #3484
Missing deck support in several locations on Level 7
02 -03 -09
103
at Gridlines A7 - A11/1 -2.
02 -09 -09
Per Plan
Missing button punches or seam welds on mansard
02 -03 -09
104
roof decks on Levels 6, 8 and 10.
02 -09 -09
Per Plan
Missing seam welds on mansards roof deck on Level
02 -05 -09
105
7 in Area 3B.
02 -09 -09
Per Plan
Adhesive anchors for timber handrails did not have 7"
Per Nishkian
02 -05 -09
106
of embedment per DMR #96.
02 -09 -09
Menninger email
dated 02 -05-09
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 9 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Engineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Need written approval from the Engineer of Record
Per Nishkian
02 -05 -09
107
for testing adhesive anchors for timber handrails that
02 -09 -09
Menninger email
1were not observed.
dated 02 -05 -09
Missing side lap connections on roof deck at Gridlines
02 -09 -09
108
A4- A5/6.6 - 8.4.
04 -08 -09
Per Plan
Loose anchor bolts on column base plates at
02 -16 -09
109
Gridlines A1.6 - A6/5.4 - 9.5 (Porte Cochere).
03 -09 -09
Per Plan
Beam and framing connections at Gridlines A4.8 -
02 -16 -09
110
A6/9.5, A6/5.4 - 9.5 and A4.8 - A6/5.4, were not
04 -09 -09
Per Plan
complete (Porte Cochere).
Hole torch cut in beam web from cutting off shear tab
02 -16 -09
111
at Gridlines A2.5/8.2 (Porte Cochere).
03 -12 -09
Per Plan
Missing welds, embeds misplaced and gaps between
1/4" stiffener plates and embeds on mansard bent
Hyder Constr RFI
02 -16 -09
112
plates to embeds on Level 6, 7 and 8 per Detail
2/19/10
#2760 received
28/S7.03.
2/
2/15/10
Loose bolts in fascia channels on Roof Level at
02 -16 -09
113
Gridlines A10 - Al 5.6/1.7 - 5.4 (Area 3A).
02 -19 -09
Per Plan
Missing welds on stringers to landings in Stair P from
02 -17 -09
114
Level 8 to Level 10.
02 -19 -09
Per Plan
Incomplete bolted connections of fascia channel at
02 -19 -09
115
Gridlines A10 -A13.5/5 - 5.4 and A14 -A116/1 - 5.4.
04 -03 -09
Per Plan
Incomplete bolted connections of fascia channel at
02 -19 -09
116
Gridlines A10 -A10.5/5 -9.7 and A10 -A15/9.4 -9.7.
02 -27 -09
Per Plan
Missing bolts in fascia channel at Gridlines EA/E1 -
02 -23 -09
117
E2.
02 -26 -09
Per Plan
Fascia channel at Gridlines A1.7 - Al 0.5/13.5-18 had
02 -23 -09
118
several connections welded, not bolted (welded all
03 -04 -09
Per RFI #1480
around with a 1/4" fillet).
Porte Cochere roof deck is missing all side lap
02 -26 -09
119
connections.
04 -08 -09
Per Plan
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 10 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Enaineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
Missing and loose bolts in fascia channel at Gridlines
02 -27 -09
120
A2 - A6/3.3 -12 (Area 1 and 2).
03 -05 -09
Per Plan, DMR's
and RFI's
Missing sag rod in tube steel wind girt on Level 6 at
03 -12 -09
121
Gridlines A3.2/1.
7/9/10
Per Revised RFI #3484
dated 7 -9-10
Missing anchor in wind girt end plate on Level 4 at
03 -16 -09
122
Gridlines A9.9/9.6.
04 -03 -09
Per Plan
Sag rods on tube steel wind girt were spliced on Level
Nishkian Menninger
03 -16 -09
123
4 at Gridlines A10/13 -14x3.
4/21/10
response to RFI
3131;
Missing tek screws on PAF pins in roof deck on Level
03 -20 -09
124
10 at Gridlines A14 - A15.6/3 -4. Cooling Tower
04 -08 -09
Per Plan
Missing tube steel on the Roof Level at Gridlines 3 -
03 -20 -09
125
3.5/15.2, Area 3A. Cooling Tower
7/20/10
omitted per RFI
3131; rcvd 7/20/10
Missing deck support (roof deck) at Gridlines A14 -
03 -20 -09
126
A15.6/3 -4. Cooling Tower
04 -03 -09
Per Plan
Non - compliant welded connection of tube steel to
Nishkian Menninger
04 -08 -09
127
gusset on Level 10 at Gridlines Al 4/3.7, gap and two
4/21/10
response to RFI
plates were used to span the gap.
3131;
Missing PAF pins and missing and non - compliant arc
04 -09 -09
128
spot -welds on level 8 at Gridlines A14- A16/2.7 -3 and
04 -10 -09
Per Plan
A14- - Al 5.6/3.9 - 4.4.
No side lap connections on the roof deck at Level 8
04 -09 -09
129
on Gridlines A14 - A16/2.7 - 3.4 and A14 - Al 5.6/3.9 -
04 -10 -09
Per Plan
4.4.
4 "x8 "x3/8" HSS column, top connection on south is
12 -07 -09
130
missing two anchors, because of embed, cap plate
07 -09-10
Per RFI #3484
welded to embed on Level 5 of Elevator RS -3 per RFI
#2333.
4 "x8 "x3/8" HSS column top connection on north is
12 -07 -09
131
missing one anchor, because of embed, cap plate
07 -09 -10
Per RFI #3484
welded to embed and one loose anchor on Level 5 at
Elevator RS -3.
4 "x8 "x3/8" HSS column top north is missing two
12 -07 -09
132
anchors because a pipe was in the way on Level 3 of
06 -14 -10
Per RFI #2796
Elevator RS -3.
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721
Page 11 of 11
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural
Enaineer of Record.
Date
Item
Outstanding Discrepancy
Date
Per Plan/ Per
Reported
No.
Accepted
RFI
4 "x8 "x3/8" HSS column top south, one hole was torch
12 -07 -09
133
cut and oversized (bigger than the washer) on Level 2
07 -09 -10
Per RFI #3484
of Elevator RS -3.
Missing PAF pins in roof deck at Gridlines 16.9/A8.2-
01-06-10
134
A10- 8' -0 ". Marked with a yellow paint marker.
06 -14 -10
Per Plan
Bulletin #113.
Extra 5 "x5 "x3/8" HSS added at Gridlines A9- A10 -8'-
01-06-10
135
016.9 and not shown on Bulletin #113, S7.01 K. No
Detail for top connection on Level 8. Bulletin #113.
07 -09 -10
Per RFI #3484
6 "x6 "x3/8" HSS to 6 "x6 "x3/8" HSS at Gridlines
01 -06 -10
136
A8.9/16.9 is not per Detail 23/S1.05 on Level 8.
06 -14 -10
Per Plan
Angle seat was miss located. Bulletin #113.
6 "x6 "x3/8" HSS sloped bottom end, not welded to the
5 "x5" HSS column at Gridlines A8.6/16.9 per Detail
01 -06 -10
137
A/01 C on S7.01 K and the sloped 6 "x6 "x3/8" HSS was
07 -09 -10
Per RFI #3484
notched with a cutting torch. Bulletin #113.
Two HSS 6 "x6 "x3/8" connections at Gridlines
Nishkian Menninger
01 -06 -10
138
A8.6/17.3 and A8.9/17.3 were to moment connections
4/21/10
response to RFI
on Level 8. Bulletin #113, S7.01 K.
3131;
01 -06 -10
139
W8 "x18 to W1 2"x22 ridge beam was welded, not
bolted at Gridlines A8.8/16.9 on Level 9 per Detail
4/21/10
Nishkian Menninger
responsieto RFI 3131; Per
3/01 C on S7.01 K. Bulletin #113
DMR 90
W1 2"x26 to existing 5 "x5" column at Gridlines
Nishkian Menninger
01 -06 -10
140
A8.5/16.9 shear plate was only welded on one side,
4/21/10
response to RFI
Level 9. Bulletin #113.
3131;
New column base plates at Gridlines A8.9/16.9 and
01 -06 -10
141
A9/17.3 were spliced, so 4 anchors could be installed
06 -14 -10
Per RFI #3131
on Level 8. Bulletin #113.
41 Inverness Drive East PO Box 464
Englewood, CO 80112 Gypsum, CO 81637
Tel:(303) 289 1989 Tel:(970) 524 0720
Fax:(303) 289 1686 Fax:(970) 524 0721