Loading...
HomeMy WebLinkAboutDRB050418/otq/9 Design Review Board ACTION FORM ' Department of Community Development WN OF V ATL' 75 South Frontage Road, Vail, Colorado 81557 te1:97€3.479.2139 fax: 970.479.2452 x.. WJZ%17YCC.CU. web: www.vailgov.com Project Name: FOUR SEASONS HOTEL Project Description: Participants: DRB Number: DRB050418 FINAL APPROVAL FOR THE CONSTRUCTION OF A NEW HOTEL, CONDOMINIUM AND FRACTIONAL FEE CLUB. (FOUR SEASONS) OWNER VAIL DEVELOPMENT LLC 08/15/2005 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 APPLICANT NICOLLET ISLAND DEVELOPMENT 08/15/2005 Phone: 612-332-1500 600 FOSHWAY TOWER MINNIAPOLIS, MN 55402 Project Address: 13 VAIL RD VAIL Location: 13 VAIL ROAD Legal Description: Lot: 9- A Block: Subdivision: VAIL VILLAGE FILING 2 Parcel Number: 2101-071-0101-6 Comments: Conditions per Ordinance No. 20, 2005 BOARD/STAFF ACTION Motion By: Dorward Second By: Rogers Vote: 4-0-1 Conditions: Action: APPROVED Date of Approval: 01/18/2006 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond:201 DRB approval shall not become valid for 20 days following the date of approval. Cond:202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0007795 Further conditions of approval are as stated in Ordinance No. 20, Series of 2005. New Construction w Application for Design Re~~e I Department of Community Development 1 ~ OF 75 South Frontage Road, Vail, Colorado 81657' TOM te1:970.479.2128 fax: 970.479.2452 i; web: www.vailgoy.com General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Location of the Proposal: Physical Address: & VII rQ;N , ~I,A~ I Parcel No.: D 0 0 D D (0 (Contact Eagle Co. Zoning: GJ'17(~ Name(s) of owner(s): Mailing Address: Owner(s) Signature(s): _ Name of Applicant: vii Mailing Address: 100 E-mail Address: Type of Review and Fee: ❑ Signs ❑ Conceptual Review New Construction ❑ Addition ❑ Minor Alteration (multi-family/commercial) ❑ Minor Alteration (single-family/duplex) ❑ Changes to Approved Plans ❑ Separation Request Phone: at 970-328-8640 for parcel no.) S $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction of a new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee For Office Use-Only Fee Paid: L'i 5 0 Check No.: By: Meeting Date: G ` 7 DRB No.: _r_ S~ _h 18 Planner: Project No.; C ~1+ W TOWN *NVA NE W CONSTRUCTION SUBMITTAL REQUIREMENTS General Information: The review process for new construction normally requires two separate meetings of the Design Review Board: a conceptual review and a final review. Applicants should plan on presenting their development proposal at a minimum of two meetings before obtaining final approval. I. SUBMITTAL REQUIREMENTS** ❑ All pages of Application is complete ❑ Checklist is completed and signed ❑ Stamped Topographic Survey* ❑ Site and Grading Plan* ❑ Landscape Plan* L7 Architectural Elevations* ❑ Exterior color and material samples and specifications. ❑ Architectural Floor Plans* ❑ Lighting Plan* and Cut-sheet(s) for proposed fixtures Title report, including Schedules A & B to verify ownership and easements* Photos of the existing site and adjacent structures, where applicable. Written approval from a condominium association, landlord, and joint owner, if applicable Site-specific Geological Hazard Report, if applicable* The Administrator and/or DRB may require the submission of additional plans, drawings, specifications, samples and other materials (including a model) if deemed necessary to determine whether a project will comply with Design Guidelines or if the intent of the proposal is not clearly indicated. Please submit three (3) copies of the materials noted with an asterisk **For interior conversions with no exterior changes, the submittal requirements include a complete set of existing and proposed floor plans, a title report, and written approval from a condominium association, landlord, and joint owner, if applicable. I have read and understand the above listed submittal requirements: Project Name: Contractor Signature Date Signed TOWN OF VAIL, COLORADO Statement Statement Number: R050001336 Amount: $650.00 08/19/200510:55 AM Payment Method: Check Init: JS Notation: 1085/VAIL DEVELOPMENT Permit No: DRB050418 Type: DRB - New Construction Parcel No: 2101-071-0101-6 Site Address: 13 VAIL RD VAIL Location: 13 VAIL ROAD Total Fees: $650.00 This Payment: $650.00 Total ALL Pmts: $650.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts DR 00100003112200 DESIGN REVIEW FEES 650.00