Loading...
HomeMy WebLinkAboutConcrete Analysis Engineers 102610 m ip MARTIN /MARTIN CONSULTING ENGINEERS October 26, 2010 Mr. Levon Nishkian Nishkian Menninger 1200 Folsom Street San Francisco, CA 94103 Re: Vail Four Seasons Hotel, Vail, Colorado Mr. Nishkian: As you know, we have been retained by legal counsel representing JD Steel for the pending lawsuit on the above - referenced project. As part of this engagement, we have performed structural engineering analyses to determine the effect of alleged missing studrails on the punching shear capacity of the concrete floor slabs. In the course of our investigation, we have identified five column locations where our analysis indicates that the concrete slabs are overstressed by more than 30 %. It is our understanding that no repairs have been performed at these locations. We believe these conditions could potentially be unsafe and therefore should be reviewed in detail by the engineer of record and repairs made as necessary prior to building occupancy. Our analysis was performed using loads provided to us by your office and considered a concrete strength of 5460 psi (per ACI 214) to account for as -built conditions, and an increased phi factor in accordance with ACI -318, Chapter 20. The demand /capacity (d /c) ratios reported below incorporate these items; without them the d/c ratios would be approximately 11% higher. Capacities were calculated using ACI -318 as incorporated by the International Building Code adopted by the Town of Vail. BI — Level 9, Grids A5/16: Demand /Capacity Ratio = approximately 2.6 BJ — Level 10, Grids A10/4: Demand/Capacity Ratio = approximately 1.3 BN — Level 10, Grids A2/10.6: Demand /Capacity Ratio = approximately 1.4 BO — Level 10, Grids A10 /11.6: Demand /Capacity Ratio = approximately 1.8 BQ — Level 4, Grids BB /B2: Demand /Capacity Ratio = approximately 1.4 Please call me if you have any questions or require additional information regarding our analysis or conclusions. Sincerely, \_ ...J John S. Lund. PE Principal, Investigative Engineering cc: Town of Vail, Building Department; Moye White LLP, The Holt Group LLC, Stein, Ray & Harris LLP 12499 WEST COLFAX AVENUE • P.O.BOX 151500 • LAKEWOOD, COLORADO 5021 5 • 303.431 .61 00