Loading...
HomeMy WebLinkAboutB06-0196 G&E Permit Submittal 09/29/06LAYTON CONSTRUCTION COMPANY G 8 E PERMIT SUBMITTAL F Gc~ 6 'zoos iOVJiv Gi = `JriL Zo~ po L CH(o c,:r. A B,- a-, pe';% BoG-n 196 TOWN OF VAIL THE FOUR SEASONS RESORT - VAIL, COLORADO JHG PROJECT NO: 24584 SEPTEMBER 29, 2006 September 28, 2006 Town of Vail Department of Public Works & Transportation 1309 Elkhorn Drive Vail, CO 81657 Attention: Matt Gennett, Planner Chad Salli, Project Engineer Tom Kassmel, Town Engineer Layton CONSTRUCTING WITH INTEGRITY Subject: General Constractor's response to G&E Permit review comments Four Seasons Redevelopment SL a6 R40;, it 0 8 0 & - 0 111, Gentlemen: Pursuant to the Town of Vail's review comments in a memo, dated 8/17/06, we submit this notebook as our response for further review and comment. This revised information #AV is being submitted per the G&E Permit requirements. We continue to work in conjunction with Black Diamond Resort (developer), The John Hardy Group (construction manager), and Hill Glazier Architects to augment the phased permit process. We understand that early permitting for grading and excavation is ,a possibility with the Town of Vail. Therefore, this information is being provided as further communication regarding Layton Construction's overall approach to managing construction on the Four- Seasons project. If you have any questions and/or- concerns, please do not hesitate to call me at 801-563- 4360. Sincerely, Layton Construction Company Doug CaZe P roject Manager Cc: Dave Brooks - The John Hardy Group File Layton Construction Company, Inc. 9090 South Sandy Parkway Sandy, Utah 84070 801.568.9090 Far. 569.5450 http://www.layton-const.com qW Es TABLE OF CONTENTS 1. Excavation Pan 2. LCC Staging Plan 3. Shoring Plan 4. CDOT Special Use Permit 5. CDOT Lease Agreement 6. Revocable Permit 7. Ground Water Permit 8. Strom Water Permit G&E Permit Submittal Town of Vail The Four Seasons Resort - Vail, Colorado JHG Project No.: 24584 September 29, 2006 Layton 1 CONSTRUCTING WITH INTEGRITY -Mabb r- L 9090 South Sandy Parkway Sandy, UT 84070 801-568-9090 PH 801-569-5450 FX 0 Excavation Plan Four Seasons Resorts Vail, Colorado Prepared By: :1~6 WVC Company 7302 Ivanhoe Street Commerce City, CO 80022 E C I. Location The Four Seasons Resorts Project is located at the Southwest corner of the intersection of Vail Road and South Frontage Road West. The project borders South Frontage Road West on the North, Vail road to the East and West Meadow Drive to the south. The site is currently a vacant lot of approximately 3 acres and slopes from the north to south. II. Scope of Excavation The proposed building excavation consists of an excavation volume of approximately 162,000 cubic yards. All of the excavation must be exported from the site. The total number of truck loads from the site will be approximately 10,125 loads. All material will be exported to several sites near Eagle Colorado. In addition to the export, WVC Company will also be hauling an additional 5,000 cubic yards of material back to the site for the backfilling the south foundation walls. The import of this material is due to the limited storage areas on the active construction site. III. Excavation Procedure The excavation of the proposed building will be preformed in conjunction with the shoring installation. WVC will start the mass excavation on the Southside of the building foot print simultaneously with the shoring contractor. Once all shoring micro piles have been installed from the surface, WVC will provide excavated benches at the appropriate intervals for the installation of the tie-backs for the shoring contractor. WVC currently expects to haul approximately 1000 cubic yards of material per haul day. The material will be exported from the site using the North entrance or the South Frontage Road West. The initial excavation process will for a short period of time allow WVC to load trucks on the site. WVC will drive trucks on to the site looping trucks through the site and back to the exit on the South Frontage Road West. Once the excavation has proceeded to a point where it is not feasible to load directly on site, WVC will push the export material to the north east coiner of the building. The material will be then directly loaded by an excavator into waiting trucks along the South Frontage Road West. (See excavation plan) WVC expects to remove approximately 120,000 cubic yards from the South Frontage Road West entrance. As the shoring walls become complete and the north entrance becomes inaccessible all remaining export material will be exported from the South side of the Project (West Meadow Drive). C IV. Winter Excavation - Alternate Plan If excavation is to start in November or December the following plan will be adhered to as weather permits. WVC will remove approximately 40,000 CY of material from the site as quickly as possible or as weather permits. The 40,000 CY of material would be enough material to displace the entire shoring area for the shoring contractor. This would allow for the shoring contractor to complete his work through out the winter months. Export of material would then only occur on good weather days. WVC would maintain a small excavation crew on site to excavate shoring walls for tie-back installations during in climate weather days. V. Traffic Control WVC will have a traffic control / pedestrian control plan prepared by a certified traffic control consultant. This plan will incorporate the required flaggers, balTiers, and warning signs to safely work in all right of ways and streets. VI. Cleaning streets and Erosion control WVC will have a full time flagger/labor maintaining the streets. WVC does not expect to have a mud problem. However, the streets will be strictly maintained during our construction activities. The erosion control plan will be strictly complied to and best management practices will be in force for the duration of the excavation activities for project. 0 Parking Plan 0 Layton COWTRUCTING WITH ATEGRI7Y Layton CtNr~ ~r PARKING PLAN - FOUR SEASONS RESORT at VAIL, CO Layton Construction will work in conjunction with the Town of Vail to coordinate construction employee parking for the duration of the project. Communication will be constant to determine what parking options are possible through each phase of construction as it relates to seasonal events and tourism in the Town of Vail. The overall project schedule has been developed using a standard 40 hour / 5 day work week and utilizing the 6`h day when necessary. We are prepared to have our staff and subcontractors work six-day work weeks on an "as needed" basis to meet the needs of the project. We anticipate there will be approximately 30 parking stalls available onsite, on the south side of the site off of West Meadows Dr. Phase I of construction will begin in early November 06 with Dewatering, mass excavation, and constructing the earth retention system. Phase I of construction will be completed mid April 06. We believe there will be adequate parking onsite to facilitate employee parking for Phase I. Approximate # of parking needed = 20 Phase II transitions into the next phase of construction mid April. 07 thru March. 08. It will consist of concrete, underground utilities, roofing system, and MEP rough-ins. Construction employee parking will ramp-up during this phase and will require off-site parking. Additional parking will be at the Lionshead Parking Garage and the Vail Transportation Center. We request a block of 30 parking stalls at each facility to accommodate increasing parking needs. Crew members will then carpool into the jobsite and park in the available parking stalls located on the south side. The parking stalls inside of each public parking area will be located away from stair wells and elevator access as an effort to avoid conflicts with seasonal tourism. Approximate # of parking needed = 100 Phase III will start approximately April 08 thru Nov. 08 and will consist of exterior finishes, interior finishes, landscaping, and site work. The jobsite office trailers will be removed during this phase and relocated into the subterranean parking structure. We will use the parking garage for limited parking for our Layton's Project Management Team and subcontractor leads. Should additional parking be required, construction personnel shall utilize Paid, Permit and Free Parking locations, such as at Gerald Ford Amphitheater. Construction personnel can utilize Public Transportation and Shuttle Services to commute to and from the parking areas to and from the jobsite. Approximate # of parking needed = 200 Phase IV will start Sept 08 thru project completion March 09. The final phase will consist of completing interior finishes, MEP trim - out, FF & E, completing street improvements and demobilization. Approximate # of parking needed = 90 J) VVV~ L BUILDINGI& MEMBER.INDEX _16 "iqE - - STRAN, F e u.u raw /I AASTBAK WESWM - - 160 ASERTET GARDEN . 05 136-CASCADE VILLAGE THEATER WC ._.U-9 17 FIRSTBANK OF VAIL , visit" r 3 AID BUIDING F-1 23 CHAIN O/X%BULDWG._._ _Y-10 123 FLYWGBURRDO. St a - 96 ACTWITIES DESK OF AIL 0-1 136 CHAP'S GRILL 6 CHRAROUSE U-9 o FWD PARK TERMS CENTER 15 - -I6 MANTIMEANIGE......... ___._0.2 136 CNATER SPORTS. WC. U-9 0 FRIRIEN PIERCE ARGHEIECTS C~ ? 21 CHATEAU VNL . _45 50 GAATYx LODGE _ 167 ALDER" I _.__J-5 31 CHINA SARIDEx 1.5 51 GAME CREEK CRIB S 3 NPNORN Y-6 25 GNN iANALGOGE . _.G-3 52 GASTHDA GRAMSXMAMER A tV IS CHRIST' SPORTS H-I 53 GERADR FORD 1P111A1 6 AAAL K-6 167 CLEY GALLERY _ J-5 51 GL BUIDWG 113 MESUCA AMERICAN CMRAL FUN DW6 -4 21 CLOCK TOWER BURDINGUDDING. H-1 155 GLOBAL HOSPITALITY, WL 119 AMERICAN EOUCATIRIAL III -5 1E2 LUMCFE J-6 1 GOLE VAILVALLEY 169 AMERICA' SKI EKCNAIG 1-1 26 COLDSTRF CONDOS V-B 55 GOLDEN PEAR RUROINC 7 ANU SATVAL _.R-S 1 CDI.OWEURANKER 113 GOLDEN PEA CMLDREN S OF 6 MMOPA t IODGE _ 1-1 FINGER. I NE RE REAL ESTATE H-1 55 GADENBEAR PEAK SKI GFET& 136 AUA CLUB CWB I SPA _ .V-9 139 CRDRAG D9ADDMOUNIAx CEEG ...U-9 PASS OFFICE - 9 AOSA CXALEi7ESCAPE'WiM SPACE Z-6 159 COLORIDOMOVNTWxMEOICAL....... M-fi 113 GOLDEN PEA SMALIWORLD (9~/' ~~y'7 [`'y~ X10 ASPFN PEE _....._WERALT-51 29 COLORADO SKI EAU SEDN..______._.__. H-5 PLAY SCHOOL Chamber ~.I'~,TOI"LL 1JI11 Bureau 136 ASNTRI PEE SONNENALP 1-5 39 COLORADO WEST REGEENAL 56 GORE CREEKYEADOWS........ 155 BADA9ING GOURMET MENTAL HEALTH 0-7 11 GRLE CREEK PVSA PIZZA COMPANYU-10 31 CONCERTHAIPWA R-7 916CRE CREEK PRIMATES_ 140, w AM PACK SHOP ._._..._...._.___I.5 32 COVERED BRIDGE BUILDING X-S II SCREW EMOUNTAHWORI 1l1`BA6Atl'SITNJANKRCHEN._----- .Y-10 33 CREEKStDE BUILOWG_.-._________15 27 C0.Y4LCH. LTD. 11 BELL TOWERBUIWING 1.1 35 C80SSR610SCINEYA.._.__-._._._ 1.5 26 HIR BLOCK O East Meadow 12 BESTWESTERN-VALGLOLODGE 5-7 3A CROSSROADSP I-S 6B HEAVEN MASSAGE 6 SPA O L Drive, Suite 3 I 93 RI6MORN PROPEPT'MANA6EYENi F- .11 9 31. CROSSROADS REALtt..._...._..._.___. 1-5 159 NIGX CDUHIRY HFAM CARE, 'tl RSHOP PARK CONDOS._...__.__-,...IK-< M CROSSROADS SNCPPING CENTER.__.- 1-5 159 ON CGNPRYHUAA 15 BWMCREEKLR00...._-_-...- 1II DAMS ADDID WDED R-11 RESCULGE ASSOCIAUON... Vail, Colorado 8 1 6 5 7 ' 171 BOOM GREEK MANAGEMENT CORE S-11 15D DESIGN WORKSHOP. We T-9 59 H0N_AAE COH0M'_-. 16 ENAND IS BUILD ING....____..._....._-_.W-B 61 DESTINATION MSRIR-_____. R-1 I6 BAAIDE3$-LAOMUS MALTY H-1 36 DOBSON ICE AGENA N-7 JL AEU CONS3RIICIIDN 9 7 0 - 4 7 6 - 1 0 0 0 17 BREAKAWAY WEST V-10 171 DOMINO'S FUEL, Y-10 95 IA1EKBERG CASTLEI 1, SEE QE SKI RENTALS I-1 H EAGLE POINT V-B BAVARAN BREWERY 9i BREEZE SKI FINIALS R-6 39 EAGLE RIVER WATER I 69 KENNY'S DOUBLE DWAOND F 96 BRIND SKI RENTALS SA i-3 1N MICT ASLANTT-9 SPORT, INC. w w w. v l s I t v a t 1 v a l l e Y. c o m 116 BREEZ E E MEET LDING..____.__.. H-A 131-FAGLE IFVALLEYE 14B GO - 20 WWGESTREETLOGGE...._......__.-H-3 FOR SUSTAWMATTYM-7 17]KVBA-NB61VI1_-_ 21 81100ME` en 10 EMU SAM- -.0-2 160 LABOII_-____-A.. 119 gaur ACX....._..._...I-5 /1. EDELWEISS J-1 161 LATOURRUTA7RANT_ :161 CAMPO OF FIC .......,.:__.-._._J-5 IY. EEF PRODUCDRIS, LLC____..___ R-7 11 LAICROTWN___..__- ]5 CANDI JRINS SALON ".._.__.-~.....-1-5 12 EN2UN 5.6 173 LAID TIRE GUARANTEE COLD 72 GAROWAL6AIERIEE_-__...__.-_.. I-A 13 EVERGREEN LCDGE M-1 61 LADMARKTOWER__-___ 1150 CARET GUNN HELM DFWIZFNBURG, 41r FALUIDGC _._.._.__.._._._....._...-.L-9 55 LW;SRIR RESTAiRANI, ttFF; PUNTS 6 PLANE, ESP-.__U-9 /S' FALLS AT V.VL F-10 , BALI WRNk'i..___ A • B • C • D • E T • U • V • W • X O Y • Z Chairii4 #6 1 • 85 92 • gO _ 181 2 113E 2 - r ~ ~ '~y~ fir • Vail Nature ~3•` Center 87 • 4 P"t / /I 53 1-M\ 74 / 3 ~P\l i el j ord tJA'V/ 14A 5 3 • . '.49 3 ttv rc d't~ n I 74 ~a`{ t l NPi1 S1~~A~ 4J~ ~e~3 de`s •f ! ~"l l ) • !Q al 4 'CQfntuCny 1 1 ro So• v f Avon, & Eagve,i 4 • ! ns 5 OVER FW w , - ,A'~ • Pvrk I V.11 P.. • B&e Path 4ie~\ 70 Y5 GAWe - & 1 56 - j♦ w 6 136 w } North Q.....: ~o 6 • ° r 7 new Trail r P s' a~~ mC j~ T .u U 5z` • z-ik e dy,9P4A ~ ~ S .•r`"'4s.~P tze 7 70 East to s / s°n / U~ West Vail Denverw S 4 / z aA Exit 173 • v~ E4 caBCaeBLln I 8 ~a s" e w ~\#211 8 Bighorn Creek,`• T4 6utiehr CreeH - Trail `J Trail 9 3 2 Civ`j6 ~•f -Ci oEV p~ Bsa.. West Vail/-;2 • PitkAn Lakc, Exit 173 _ 10 Trail X55] f 3~ 10 I> -CC <171, 1. a6C2 Ga,...----" 651 North 7-11 • p West Vail To Piney River Ranch 4c 1 & Lost Lake Inset • A • B O C O D O E T O U l _V q W 0 X 0 Y 0 z • Preliminary Construction Schedule Layton CONST IMC77NG WITH IMEGRIN • • - U m O n Q otl . _ . N... _ Y x N d N 0 a) i IT IM E m m a N Y X N O U) JO) C U v - a x_ > o a o.:.. N m O ~ C Q) J Y N U m aC N N H m ~ U m m c o a E O N 06 U - O n a I. E a o. J .a E 3 m m a Q M C)-Fu O1 o v i E . .........-cr.-Q -tfi o - --m---m---2`-•~- _ H U) --o-Y~ ~.:s m E g m o N tz m m Q V) JQ~ 0 C a (n ® N U c o m n a o o c c x m m C C N ~ w N U Y 'v U/ L N : L C N o c U d c m d+ E ~+.a 3 - io o 0 OI U c O 0 V) N O d.. - D1 . . . otj c. Q IN Y O a aS. U. N.... N 0 a a F... a_U_. 0.. 3...E-~. a ~ O . m L 'w m c E E o Z H vl K N - t m N U F m J N N 1 H ® o _ O . c ` . L m . c r m m U) U) O 4 n~" O o n' n n' n 11 n n 0 0 0 . O Clo a s a~ of of ~ n n n, n n n n' n n 1 m eo ao m 1 m t 0 0 0 O o 0:01 o o C I O ~ O 0 212 r r r r rr:a aiala ~ m m m' m l' m m co m m m' ' m m m m WI W m m m 0l 1 0 0 o' 0 0 0: 0 O o 0 0:0 0 0 0 0 0 0 a'Ia ala a s a'a a cD (D: (D U U U n 0 a ala Q < i a'a a'laa a i ¢ Q a a a Q - a ala QlQ ¢ wlwlw w•U . ¢ ¢ 2' 2i 2i :2 zi2 2 U) U) to : U) 0 w'w w w'w,w w w w U > 77 D D > > > > U) U) U) U) to to cn , 0 m O ¢ ¢ <,< ¢ ¢ ¢ Q ¢ m tn m (D O O ' a Q l(] '1nN O O ; to. n lTl mUl O N M (D. Mn n m. NI MIfO u).n M ~ N IN OlO ~ N N Nj Oi~ 04 , , l0 comj n o~ ~I V,(D ~I M N (A 0100'0 O: 0010 O N N O c~ co 0'. m 00 > n n n n n n 0 O O OO O ' n n n n n'. n'.. n n n N O O O',O 001,0 010 ~ ' co co m m O O O O O rla a a a a to m' m m1 co co m m m m m1.m co co m co N'W o7 m 0 O.O O O OO 0 0 N O' 0 0 0 O O. 01 O O O, ° C7 C7.09 0 C9 U'U U U m a a a a a a'a a a a+ ` (o O -0 U'.OIIU z z z !a.a a.a a a , , ~ a a a ¢I¢ ¢ ¢ <1LU:WIw w w I U t 1 ~ U 1 w Q 1 . l - W w.w w w w.W:w w w w;9•> > DID > U > > > 1W to t m Q ¢ ¢ l ¢ ¢ ¢ Q Q Q 'U 0 z s O O O O ¢ ¢ << ¢ ¢ ml n n1 co M 0 N-~ N _ w ) , o :y ¢ Q " M V n'. M' m m m N N tOl (O n ID ; C N N'NI OII C. ~NI N O'i r~ N 0 1 o10 0 0:w W ! ; L to N O O~ O tD t0 nl m' <o! V V nl co m m O CI. O'OOO O 010 0'. N m 0 0 0 O d M,•-. r w M'. Ini MIaO IN N m N O W 1 N. N„- V -M V-M .-iM N N j I fU I + i Io EI I ~ I II 1 0 d. ml m~ T• o ' G7 y l0 m N N Nj XI m m N 1 = I C o ILL LL M11 N m 5 c m 1, O m~, lL U '.N m of 1 E v U) p 1 o C~ UI U) C Ito o 0: o fn m S v y > o m j a Itn 3.w O E 1' = cLi N '~I m. 1' C7 d m o l' > rn r c O' J U v . m to ..31 w p T ` . 1 a m F E1 (L H ° V) w 3 r r E F s > U o m c m 0 5 `o a U O 2 FU in > 2 U Q -o a ao o L 3 a> E E L to n to W O , U U H a C m E 3 c! `:u u - o o- m 3 E E° w z H to w 0 Q N ~ I II o, I I ~ I ~ I i ~ III I N X1 X Im" j C 1 O N co E C 10 a O) C C C _O I 3 L Y p''.. C' U): '.O u) 1, m m U LL U', J .N ' m U - m w N 'X 3' w o m o - v 06 ' D a X N N N w l m o 01 5 O N m v E ) E C9 ' a W 0 a3 m N N c m o m N 05 - a U m a m x L U m 3 a m a a~ m O oe J C p Nlh - O V L U m - m a m v> c N O O m In N E 3 m 3 n o O E E 3 3 n ° E m n n a z a U' n a J a to a Z¢ n J a LM c 0 a c E ~ c 4 co 0 X1 0 > d j J > CL 'r of o'o z, 1- > f 0 O N'O W II N R 1 ~ 2 z J~ a a i > J lao m mco mlm i ;10 0 O 'o c 0 > 1-' 0 0 0 m0 0m 0m ' Z Zlml ' l Im m mm m co O' . OI O O O; O O O O O• m, w l w l> O > z Z m > U U m I U' o 'm ' : ¢ w x w ¢ (n' -I U)i 2 N 1~ 0) (o N I O o U 0 1 Z O Z V' O N O , 1 a1a a x¢ O xiw w ¢'¢1¢'~ m r N N M f~ 0 . w 0 o'O ¢ ¢Iw'w wlw ¢ ul O z 0 SILL LL LL LL's M (0 M N O) N N N N N , f o w w ww a¢¢ ¢ O w a Z o olo'a ¢I~ 2 2 Z LL M N to I (o N N N r~ r O O NIA N'OIN , O~ ~O N O.O-~.- I , NO N.~ N~~:N N N 4 N NON O N'NIO O N N o0 I N 0 0 ice''^'nl tiles. ~.n O. of 00 .DO ~ p. p p 0 p. p 0 O O, O O p > > a U W, w'' a' I i~I ~I of aDW o7 oJ'a0 p'1 O O' O O O. O O O O'.. O C7 a aH > m I~~ r,'~ c0 MIN O r r~ W O'. O O O. O. O OII 0 0 0 p, p 0 O O. O m w' w' t aF- > m wI a.> U U Z U U ¢ O 1 ' I i . Z J Z J aa,~•~I w.w Lul*a~¢~,¢ z . ¢ ¢ cn 0 OI 2'. ¢I ~ ~ ' { I Z: Z•ZZ Z l '',w w U O ¢.¢,w U- aJ O Z w N O O N - ' ' . Z. w'U o Owl¢ w w ¢ ¢ al w 0 w.w.¢ 1 u), O Z Z'D LL LL ¢ 0 Z O O r' V of N' O W f~ N N M m I~ m N ' (0 N N N N (o f- V I N N N W Q V C O O', 0~ ~I N N N'N~. O'. N . 01 N (O , N N N O N OI ~I ~I M. MI O; N O' N i ' 0 1 n N' 0 O 0 M', • OH N N co 01 M N!1 W• O N O O O O O M V fD N N' O O O O "I M'~M 'IT 0[ o' O 04 (V M o I o l o N'N N l N I O I O MIV M O N O O'' O O' O O' O O O O O N V M M V V V M'I V N N M( N y' rn y N d N > N C L E J d. U.J J, N . .N 0, C IS , O ~.0 O > > OI' OI 01 O U V U U7 c O j LL L LL ` ` N O 0 C > N U in d W M a m U) w w W W O r 31 1N ~I 0) N. 7 3 yp 6 A .i,7 (L p.~ a d CL: (n m o m' O rn N o C N C L m m 3 ~ 3 .E ul N; 4D E m m p vOiN N Ul ry "c 1 (0 (n y w_ 2 O D 0 H U LL J LL w 2 O 3 v x 3 y~ I 0 ELI O p6 4) W O, . p , ~I C 6 a I N W E U F U ii J 7 U ~ ~ 2 O • 'r1 I I I I I w I ~ 10. I N o o' o E x x x v 3i v E 3 c o , d Y Q) Y "Q1 Y Y I W N W c N etf p v W W c. m. c2f o W' m.~ w c N otS O W, c.~ W' c o . oC ❑ op o a~ _ o c o. m _ N ❑ .o o a~ _ o,o o n m m m rn _ m m m _ m O O (n N .C C O N L:._ .C N N .C C O L N C (n N .C C .0 L N N. C N (n N C C C _ 0 (0 N N l9 V=1 N T N N (0 N N T N 'L N 7 t~/1 N T~ N N f0 D N l0 (V 22 U i.i U J LLCc o n. U S U ii J ti - n. U 5 i~ U i= J _LL a U ii U- J ❑ U 0 COGGI NS & SONS, INC. Caisson Drilling, Excavation Shoring, Tieback Anchors August 30, 2006 Layton Construction Company, Inc. RECEIVED 9090 South Sandy Parkway A.s~ Sandy, UT 84070 " 3 1 Attention: Doug Carley The Layton Companies Subject: AMEC Earth Retention Review We have reviewed AMEC's earth retention review report dated June 30, 2006. In general, we agree with their comments and appreciated their review effort. AMEC's summary determined two deficiencies. We have revised our earth retention design to strengthen the deficiencies. In lieu of a micropile cantilever system, we have switched to a soldier beam and lagging cantilever system. Please find attached revised calculations and earth retention drawings reflecting changes. If you have any questions, please feel free to call. Sincerely, p• RE~s po ; •°NY DE'••TF~ °:z~ ~:0 7 ~i 773 17 G 0 John H. Hart, PE ;~z o~ 0 9512 Titan Park Circle • Littleton, Colorado 80125 • (303) 791-9911 • FAX (303) 791-0967 COGGINS & SO Caisson Drilling, Excavation Shoring, Tieback Anchors STRUCTURAL DESIGN CALCULATIONS EARTH RETENTION SYSTEM RECEIVED for PROJECT NO. - 5117 PROJECT DESCRIPTION: EARTH RETENTION FOUR SEASONS HOTELS AND RESORTS Prepared for CLIENT: LAYTON CONSTRUCTION COMPANY ADDRESS: 9090 SOUTH SANDY PARKWAY CITY: SANDY STATE: UTAH 84070 TEL: 801-568-9090 FAX: 801-569-5450 p° REGD. p~ ° S v\ 0 Z~ U°O Prepared By: JOHN H. HART, P.E. COGGINS & SONS, INC. C DATE: August 28, 2006 AUG 3 1 2006 The Layton Como-;. 9512 Titan Park Circle • Littleton, Colorado 80125,1 (303) 791-9911 • FAX (303) 791-0967 COGGINS & SO NS, INC. 9. ) Caisson Drilling, Excavation Shoring, Tieback Anchors EARTH RETENTION CALCULATIONS INDEX for PROJECT NO. - 5117 PROJECT: FOUR SEASONS ITEM NO. DESCRIPTION PAGES 1 SOILS S1.0-S1.2 2 "RISA-213" ANALYSIS OF 7'-0" CANTILEVER S2.0-S2.4 3 "RISA-2D" ANALYSIS OF 10'-0" CANTILEVER S3.0-S3.4 4 "RISA-213" ANALYSIS OF 13'-0" CANTILEVER S4.0-S4.4 5 EXCEL CHECKS S5.0-S5.2 6 "L-PILE 5.0" ANALYSIS T-0" EXPOSED - 8'-0" EMBED S6.0-S6.6 7 "L-PILE 5.0" ANALYSIS 10'-0" EXPOSED -10'-0" EMBED S7.0-S7.6 8 "L-PILE 5.0" ANALYSIS 13'-0" EXPOSED -12'-0" EMBED S8.0 - S8.6 APPENDIX "A", REFERENCE MATERIAL AND CODES APPENDIX "B". LAGGING DESIGN CRITERIA AND REFERENCES N (OGGINS & SONS, INC. Name 7 ~~4---T- PH. (303) 791-9911 FAX(303)797-0967 _ CAISSON DRILLING PROJECT: EARTH RETENTION TIE BACK ANCHORS SUBJECT: s° G GC i c- lJ "P TbP IbS' t -PA-*Y-~ SU✓vt Z2 2c~oS cx> ~o.~t~1c~ I 2 5 ~t 151- Z f 4 6 ~~LT7 ((c G~ pc CZ--C-c- y4 r tail ? pc- D O VJ 1 L( ll fl L Y l t- : vl_ O U i _ O t Li a . rt °S C 4~ 0 'Fo 4 G' a 8 i av v 0 v J 0 O O ~or~br , U v E~: C+~.Jp~-zza-~ c t, D L~ 1 ` J Q;11~ f i }~IST11 L-t, (c VL-ovd. r t.:~ 112.-L ,~c~;` V~w~_ ~{;:^'7P v~.L .r~\''."C:•'` L: ~wL-•. PROJECT NO.: DATE: ~ ` s (OGGINS & SONS, INC N>.» -T. W PH. (303)797-9977 FAX(303)797-0967 CAISSON DRILLING PROJECT: EARTH RETENTION TIEBACKANCHORS SUBJECT: fz~ ~S , S,'~- o,~- PROJECT NO.: DATE: 2 v s4.e z.. Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:14 AM Job Number : 5117 FOUR SEASONS Checked By: Hot Ro/ ed Steel Properties Lahpi F (ksil C, rkcil ~I rti na~r r 1 A36 Gr.36 - 29000 - 11154 .3 I,w„„ uw 1 .65 -.01t AIR 0 .49 1IUIU Kbi 36 2 A572 Gr.50 29000 11154 .3 .65 .49 50 3 A992 29000 11154 .3 .65 .49 50 4 A500 Gr.42 29000 11154 .3 .65 .49 42 5 A500 Gr.46 29000 11154 _ .3 .65 .49 46 Hot Rolled Steel Section Sets 1A W14X30 I Wide Flange Beam I A572 Gr.50 Typical 8.85 19.6 Hot Rolled Steel Desiqn Parameters Joint Coordinates and Temperatures 1 ahal Y rffl v rai • 1 N1 0 7 „0 , 2 N2 0 0 0 Joint Boundary Conditions Joint Label X k/in Y k/in Rotation k-ft/rad Footing 1 N2 Reaction Reaction Reaction Member Primary Data Label I Joint J Joint Rotate de Section/Shape Desi n List T e Material Des', n Rules _g) g 1 M1 N1 N2 HR1A Wide Flange Beam A572 Gr.50 T ical Member Distributed Loads (BLC 1 : SOIL) Member Label Direction Start Ma nitude k/ft,... End Ma nitude k/ft d... Start Location ft 1Y.1 End Location ft 1 M1 X 0 -2.3 n n Joint Loads and Enforced Displacements Joint Label L,D M Direction Magnitude[k k-ft in rad k*s^2/ft] No Data to Print Member Point Loads (w I Member Label Direction Ma nitude k k-ft Location ft,% No Data to Print RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\7 FT HEIGHT.r2d] Page 1 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:14 AM Job Number : 5117 FOUR SEASONS Checked By: Basic Load Cases BLC Description Cat o X Gravity Y Gravit Joint Point Distributed 1 SOIL EPL 1 Load Combination Design Description ASIF CD ABIF Service Hot Rolled Cold Formed Wood Concrete Footin s 1 CANTILEVER Yes Load Combinations Descri tion Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 CANTILEVER Yes 1 1 Joint Deflections (By Combination) LC Joint I_ahel X rinl v r;-, o -11 1 1 N1 -.043 0 ~vaati Vi I I pV 5.609e-4 1 2 I 1 I N2 0 0 0 Joint Reactions LC Inint I nhal Y ri, v nn 1 1 N2 8.05 -.211 IvIL n-Il -18.783 2 1 Totals: 8.05 -.211 3 1 COG ft : X: 0 Y: 3.5 Member Section Deflections LC Mamhar I ANA Qar 1 1 M 1 1 0 -.043 II L/ RGllu 1960.012 2 2 0 -.017 4937.869 3 3 0 0 NC Member Section Forces LC Memher I ahal Gar Av;~lrl,i eti,....rl., 1 1 M1 - 1 0 0 Ivlvnlcnn-n 0 2 2 -.105 -2.012 2.348 3 3 -.211 -8.05 18.783 Member Section Stresses LC Memher I ahel Rar Avinirlreil Qr.-rt-n T o l: n. n C. 1 1 M1 - 1 0 .",..w. 0 . v va.gun I nol 0 Iwa ucl IUII i RJI 0 2 2 -.012 -.539 -.67 .67 3 3 -.024 -2.154 -5.36 5.36 RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\7 FT HEIGHT.r2d] Page 2 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:14 AM Job Number : 5117 FOUR SEASONS Checked By: Member AISC ASD Steel Code Checks (By Combination) LC Member Shape UC Max Loc ft Shear UC Loc ft Fa ksi Ft ksi Fb ksi Cb Cm E n 1 1 M1 W 14X30 .179 7 .108 7 28.836 30 30 1.75 .85 H2-1 • C RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\7 FT HEIGHT.r2d] Page 3 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:27 AM Job Number : 5117 FOUR SEASONS Checked By: L Hot Rolled Steel Properties I ahPl F rksll rksil Nu Thorm ni F5 Fl noncitvrie/ftAQl Viawnecil 1 A36 Gr.36 29000 11154 .3 .65 .49 36 2 A572 Gr.50 29000 11154 .3 .65 .49 50 3 A992 29000 11154 .3 .65 .49 50 4 A500 Gr.42 29000 11154 .3 .65 .49 42 5 A500 Gr.46 29000 11154 .3 .65 .49 46 Hot Rolled Steel Section Sets Label Shape Design List Type Material Design Rules A in2 1(90,270) i... 1(0,180) in4 1 HR1A W16X50 Wide Flange Beam A572 Gr.50 Typical 14.7 37.2 659 Hot Rolled Steel Design Parameters Label Shape Len th ft Lb-out[ft] Lb-in ftLcom to ...Lcom bot K-out K-in Cm Cb Out s... In swa 1 M1 HR1A 10 1 Joint Coordinates and Temperatures l ahPl E X rffl v fftl Tumn rm 1 N1 0 10 0 2 N2 0 0 0 Joint Boundary Conditions Joint Label X k/in Y k/in Rotation k-ft/rad Footin 1 N2 Reaction Reaction Reaction Member Primary Data Label I Joint J Joint Rotate(deq) Section/Sha a Design List Type Material Desi n Rules 1 M1 N1 N2 HR1A Wide Flange Beam A572 Gr.50 Typical Member Distributed Loads (BLC 9 : SOIL) Member Label Direction Start Ma nitude k/ft End Ma nitude k/ft d... Start Location ft % End Location ft 1 M1 X 0 -3.7 0 0 Joint Loads and Enforced Displacements Joint Label L D,M Direction Ma nitude k k-ft in rad k's^2/ftNo Data to Print Member Point Loads Member Label Direction Ma nitude k k-ft Location ft,% No Data to Print RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\10 FT HEIGHT.r2d] Page 4 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:27 AM Job Number : 5117 FOUR SEASONS Checked By: it Basic Load Cases BLC Description Category X Gravity Y Gravity Joint Point Distributed 1 SOIL EPL 1 1 Load Combination Design Descri tion ASIF CD ABIF Service Hot Rolled Cold Formed Wood Concrete Footin s 1 CANTILEVER Yes Load Combinations Description Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 CANTILEVER Yes 1 1 Joint Deflections (By Combination) LC Joint I ahel Y not v n.,t o,...,,:,.., r. ,A, 1 1 N1 -.122 0 1.162e-3 1 2 1 1 1 N2 1 0 0 0 c. Joint Reactions LC .Inint I nhal Y rot v r6, 11A~ n. A, 1 1 N2 18.5 -.5 -61.667 2 1 Totals: 18.5 -.5 3 1 COG ft : X: 0 Y: 5 Member Section Deflections LC Mamhar I ahal 1 1 M 1 1 0 -.122 vy I.a.I~ 984.07 2 2 0 -.048 2505.068 3 3 0 0 NC Member Section Forces LC MBmhPr I ahal far a ~u4t eti .rL,, r A arL 4, 1 1 - M1 1 - 0 0 IIL 1,-Il 0 2 2 -.25 -4.625 7.708 3 3 -.5 -18.5 61.667 Member Section Stresses LC Memher I ahPl Sar. Avinineen C] 1 1 M1 - - 1 - - - 0 0 0 IIVII I I,JI 0 2 2 -.017 -:749 -1.141 1.141 3 3 -.034 -2.994 -9.129 9.129 RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\10 FT HEIGHT.r2d] Page 5 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:27 AM Job Number : 5117 FOUR SEASONS Checked By: Member A1SC ASD Steel Code Checks (By Combination) LC Member Shape UC Max Loc ft Shear UC Loc ft Fa ksi Ft ksi Fb ksi Cb Cm E n 1 1 M1 W16X50 .305 10 .150 10 28.515 30 30 1.75 .85 H2-1 c, • RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\10 FT HEIGHT.r2d] Page 6 'i-,,4-. COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:38 AM Job Number : 5117 FOUR SEASONS Checked By: Hot Rolled Steel Pro erti es I ahpl F rlrcil ( rlrcil AL. TL n4ffc rx 1 A36 Gr.36 29000 - 1 - 1154 .3 .65 OH NR J .49 . IGIU n Jl 36 2 A572 Gr.50 29000 11154 .3 .65 .49 50 3 A992 29000 11154 .3 .65 .49 50 4 A500 Gr.42 29000 11154 .3 65 .49 42 5 A500 Gr.46 29000 11154 .3 .65 .49 46 Hot Rolled Steel Section Sets Label Shape Design List Type Material Desi n Rules A in2 1(90,270) i... 1(0,180) in4 1 HR1A W18X60 Wide Flange Beam A572Gr.50 T ical 17.6 50.1 984 Hot Rolled Steel Design Parameters Label Shape Length[ft] Lb-out[ftl Lb-in[ftl Lcomp top[ ...Lcomp bot[... K-out K-in Cm Cb Out In swav Joint Coordinates and Temperatures I nh,-l v rs+1 ra, r7l L---j 1 N1 0 13 Icnl r 0 2 N2 0 0 0 Joint Boundary Conditions Member Primary Data Label I Joint J Joint Rotate(deg) Section/Shape Desi n List Type Material Design Rules 1 M1 N1 N2 HR1A Wide Flanae Beam A572 Gr.50 Tvnical Member Distributed Loads (BLC 1 : SOIL) Joint Loads and Enforced Displacements No Data to Print Member Point Loads L I Member Label Direction Ma nitude k k-ft Location ft Nn nntn to Print RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\13 FT HEIGHT.r2d] Page 7 (~4 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:38 AM Job Number : 5117 FOUR SEASONS Checked By: Basic Load Cases BLC Description Category X Gravity Y Gravity Joint Point Distributed 1 SOIL EPL 1 1 Load Combination Design Description ASIF CD ABIF Service Hot Rolled Cold Formed Wood Concrete Footin s 1 CANTILEVER Yes Load Combinations Descri tion Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 CANTILEVER Yes 1 1 Joint Deflections (By Combination) LC Joint LahPl x rinl V finl Rnfnfinn frnrll 1 1 N1 -.252 0 1.894e-3 2 I 1 I N2 0 0 0 Joint Reactions 1.01 IC Inint I ahal Y rLl v ro KA7 fL kl 1 1 N2 26.65 -.779 -115.483 2 1 Totals: 26.65 -.779 3 1 COG ft : X: 0 Y: 6.5 Member Section Deflections LC Member Label Sec x ring v finl lnl I ! Patin 1 1 M 1 1 0 -.252 618.4 2 2 0 -.098 1584.837 3 3 0 0 NC Member Section Forces LC MPmhar I ahal Sar Arinlriel choarrLl ner , ontrL al 1 1 M1 1 0 0 0 2 2 -.389 -6.662 14.435 3 3 -.779 -26.65 115.483 Member Section Stresses LC MPmhar I ahal Roc Avialr4cil Ch-fteil Tnn Mnn linnfLcit Qn+ Gvn linnfL~O • 1 1 M1 1 0 0 0 0 2 2 -.022 -.88 -1.605 1.605 3 3 -.044 -3.521 -12.844 12.844 RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\13 FT HEIGHT.r2d] Page 8 Company COGGINS AND SONS, INC. Aug 28, 2006 Designer JOHN H. HART, PE 10:38 AM Job Number : 5117 FOUR SEASONS Checked By: Member AISC ASD Steel Code Checks (By Combination) LC Member Shape UC Max Loc ft Shear UC Loc ft Fa ksi Ft ksi Fb ksi Cb Cm E n 1 1 M1 W18X60 .430 13 .176 13 28.208 30 30 1.75 .85 H2-1 • • RISA-2D Version 6.5 [C:\...\...\My Documents\2006JOBS\5117FOURSEASONS\13 FT HEIGHT.r2d] Page 9 FOUR SEASONS - SB1 - SB2 USE 37H WITH 9' SPACING LOAD PER TOTAL BEAM BEAM FOOT HEIGHT INERTIA SECTION K/FT FT in^4 in^3 2.3 7 291 42 EXCAVA. LOAD V MOMENT CANT. SECTION MODULUS K K-ft in^3 8 19 8 HEIGHT (FT) 7 RECOMMENDED SHAPE W14x30 USE SHAPE W14x30 ANTICIPATED DEFLECTION (in) 0.038 CODE CHECK 0.179 NOTE: INPUT CALC. OUTPUT BEAM PROPERTIES BEAM Sin"3 I in^4 W 14x30 42 291 W 16x45 73 586 W 16x50 81 659 W 18x60 108 984 W 18x65 117 1070 W 18x71 127 1170 W 18x76 146 1330 0 J FOUR SEASONS - SB3 - S65 USE 37H WITH 10' SPACING LOAD PER TOTAL BEAM BEAM FOOT HEIGHT INERTIA SECTION K/FT FT in^4 in^3 3.7 10 659 81 EXCAVA. LOAD V MOMENT CANT. SECTION MODULUS K K-ft in^3 19 62 25 HEIGHT (FT) 10 RECOMMENDED SHAPE W14x30 USE SHAPE W16x50 ANTICIPATED DEFLECTION (in) 0.112 NOTE: INPUT CALC. OUTPUT BEAM PROPERTIES BEAM Sin^3 I in^4 W 14x30 42 291 W 16x45 73 586 W 16x50 81 659 W 18x60 108 984 W 18x65 117 1070 W 18x71 127 1170 W 18x76 146 1330 CODE CHECK 0.305 • FOUR SEASONS - SB6 - S137 USE 37H WITH 8.5 SPACING LOAD PER TOTAL BEAM BEAM FOOT HEIGHT INERTIA SECTION K/FT FT in^4 in^3 4.1 13 984 108 EXCAVA. LOAD V MOMENT CANT. SECTION MODULUS K K-ft in^3 27 115 46 HEIGHT (FT) 13 RECOMMENDED SHAPE W16x45 USE SHAPE W18x60 ANTICIPATED DEFLECTION (in) 0.236 CODE CHECK 0.428 NOTE: INPUT CAL C. OUTPUT BEAM PROPERTIES BEAM Sin^3 I in^4 W 14x30 42 291 W 16x45 73 586 W 16x50 81 659 W 18x60 108 984 W 18x65 117 1070 W 18x71 127 1170 W 18x76 146 1330 ICJ 7 0 O 0 0 0 O ti O O O O O U') O O v O O C C O th v o d d D N t0 O ~ O a+ J r O O O r O O N O 0 Cl) O O O 0 w m w BO w O a. X w ti D 0 L Z £ b 5 9 L 8 (:4) yjdap c r--,9 L---j C Z'l 6'L 6 6'0 8'0 L'0 9'0 5'0 17'0 £'0 Z'0 6'0 (u!) u01400904 peOH-01!d o _ LO t c m J d 'a 0 v 7HEIGHT.lpo LPILE Plus for windows, version 5.0 (5.0.1) Analysis of individual Piles and Drilled Shafts subjected to Lateral Loading using the p-y method (c) Copyrigght ENSOFT, Inc., 1985-2004 A11 Rights Reserved This program is licensed to: JOHN H. HART COGGINS Path to file locations: C:\DOCUments and Settings\COGGINS AND SONS\My Documents\2006JOBs\5117FOUR SEASONS\ Name of input data file: 7HEIGHT.lpd Name of output file: 7HEIGHT.lpo Name of plot output file: 7HEIGHT.Ipp Name of runtime file: 7HEIGHT.lpr Time and Date of Analysis Date: August 28, 2006 Time: 10:51: 4 Problem Title FOUR SEASONS - 7' EXPSOED (8' EMBED) Program options Units Used in Computations - us customary units, inches, pounds Basic Program Options: Analysis Type 1: - Computation of Lateral Pile Response Using User-specified Constant EI Computation Options: - Only internally-generated p-y curves used in analysis - Analysis does not use p-y multipliers (individual pile or shaft action only) - Analysis assumes no shear resistance at pile tip - Analysis includes automatic computation of pile-top deflection vs. pile embedment length - No computation of foundation stiffness matrix elements - output pile response for full length of pile - Analysis assumes no soil movements acting on pile - No additional p-y curves to be computed at user-specified depths C Solution control Parameters: Page 1 7HEIGHT.lpo Number of pile increments = 48 - Maximum number of iterations allowed = 100 - Deflection tolerance for convergence = 1.0000E-05 in - Maximum allowable deflection = 1.0000E+02 in Printing options: - values of pile-head deflection, bending moment, shear force, and soil reaction are printed for full length of pile. - Printing Increment (spacing of output points) = 1 Pile structural Properties and Geometry Pile Length = 96.00 in Depth of ground surface below top of pile = .00 in slope angle of ground surface = .00 deg. Structural properties of pile defined using 2 points L J ~J Point Depth Pile Moment of Pile x Diameter Inertia Area in in in**4 Sq.in - - - - - - - - - - - - - - 1 0.0000 - - - - - - - - - - - 24.000 - - - - - - - - - - 16577.0000 - - - - - - - - - - 452.0000 2 96.0000 24.000 16577.0000 452.0000 f Modulus of ``may Jai Elasticity lbs/Sq.in' - - - - - - - - - - - A._.32122019.000 32122019.000 soil and Rock Layering Information The soil profile is modelled using 1 layers Layer 1 is sand, p-y criteria by API RP-2A, 1987 Distance from top of pile to top of layer = .000 in Distance from top of ppile to bottom of layer = 96.000 in p-y subgrade modulus k for top of soil layer = 250.000 lbs/in *3 p-y subgrade modulus k for bottom of layer = 250.000 lbs/in**3 (Depth of lowest layer extends .00 in below pile tip) Effective unit weight of soil vs. Depth Distribution of effective unit weight of soil with depth is defined using 2 points Point Depth x Eff. Unit weight No. in l bs/i n**3 1 .00 .07500 2 96.00 .07500 shear strength of soils Page 2 7HEIGHT.Ipo Distribution of shear strength parameters with depth defined using 2 points Point Depth x cohesion c Angle of Friction E50 or RQD No. in lbs/in**2 Deg. k_rm 1 .000 .00000 34.00 2 96.000 .00000 34.00 Notes: (1) Cohesion = uniaxial compressive strength for rock materials. (2) values of E50 are repported for clay strata. (3) Default values will be generated for E50 when input values are 0. (4) RQD and k_rm are reported only for weak rock strata. Loading Type Static loading criteria was used for computation of p-y curves Pile-head Loading and Pile-head Fixity conditions Number of loads specified = 1 Load Case Number 1 Pile-head boundary conditions are shear and moment (BC Type 1) Shear force at pile head = 8000.000 lbs Bending moment at pile head = 228000.000 in-lbs Axial load at pile head = .000 lbs Non-zero moment at pile head for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment) condition. Computed values of Load Distribution and Deflection for Lateral Loading for Load Case Number 1 Pile-head boundary conditions are shear and moment (BC Type 1) Specified shear force at pile head = 8000.000 lbs specified bending moment at pile head = 228000.000 in-lbs specified axial load at pile head = .000 lbs Non-zero moment for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment )condition. Depth Deflect. Moment Shear Slope Total Soil Res x y M V S Stress p in in lbs-in lbs Rad. lbs/in**2 1bs/in Page 3 7HEIGHT.Ipo 0.000 .098856 228000.0001 8000.0000 - -.001436 - 165.0480 0.0000 2.000 .095985 244000.0000 7968.2698 -.001435 176.6303 -31.7302 4.000 .093117 259873.0791 7872.3541 -.001434 188.1207 -64.1855 6.000 .090250 275489.4163 7711.3567 -.001433 199.4253 -96.8119 8.000 .087386 290718.5058 7485.4216 -.001432 210.4495 -129.1231 10.000 .084524 305431.1027 7195.6010 -.001431 221.0999 -160.6975 12.000 .081664 319500.9099 6843.7305 -.001429 231.2850 -191.1731 14.000 .078806 332806.0249 6432.3157 -.001428 240.9165 -220.2418 16.000 .075951 345230.1726 5964.4309 -.001427 249.9102 -247.6429 18.000 .073099 356663.7486 5443.6311 -.001426 258.1869 -273.1569 20.000 .070249 367004.6969 4873.8747 -.001424 265.6727 -296.5995 22.000 .067402 376159.2472 4259.4585 -.001423 272.2996 -317.8167 24.000 .064558 384042.5309 3604.9620 -.001421 278.0063 -336.6799 26.000 .061716 390579.0951 2915.2000 -.001420 282.7381 -353.0821 28.000 .058878 395703.3310 2195.1837 -.001418 286.4475 -366.9342 30.000 .056042 399359.8300 1450.0872 -.001417 289.0944 -378.1623 32.000 .053210 401503.6799 685.2205 -.001415 290.6463 -386.7045 34.000 .050381 402100.7118 -93.9935 -.001414 291.0785 -392.5095 36.000 .047554 401127.7057 -882.0375 -.001412 290.3742 -395.5344 38.000 .044731 398572.5619 -1673.3148 -.001411 288.5245 -395.7429 40.000 .041911 394434.4466 -2462.1620 -.001409 285.5289 -393.1043 42.000 .039093 388723.9140 -3242.8585 -.001408 281.3951 -387.5922 44.000 .036279 381463.0126 -4009.6343 -.001407 276.1390 -379.1835 46.000 .033467 372685.3769 -4756.6754 -.001405 269.7849 -367.8576 48.000 .030658 362436.3109 -5478.1284 -.001404 262.3657 -353.5954 50.000 .027852 350772.8635 -6168.1028 -.001402 253.9226 -336.3791 52.000 .025049 337763.8998 -6820.6731 -.001401 244.5054 -316.1913 54.000 .022248 323490.1710 -7429.8793 -.001400 234.1728 -293.0149 56.000 .019449 308044.3827 -7989.7270 -.001399 222.9917 -266.8328 58.000 .016653 291531.2631 -8494.1880 -.001398 211.0379 -237.6282 60.000 .013859 274067.6307 -8937.2012 -.001396 198.3961 -205.3851 62.000 .011067 255782.4581 -9312.6766 -.001395 185.1595 -170.0903 64.000 .008277 236816.9243 -9614.5543 -.001395 171.4305 -131.7874 66.000 .005489 217324.2408 -9836.7229 -.001394 157.3198 -90.3812 68.000 .002702 197470.0326 -9973.0230 -.001393 142.9475 -45.9189 70.000 -8.27E-05 177432.1487 -10017.4947 -.001392 128.4422 1.4472 72.000 -.002866 157400.0537 -9964.4768 -.001392 113.9410 51.5707 74.000 -.005649 137574.2416 -9808.5931 -.001391 99.5892 104.3129 76.000 -.008431 118165.6812 -9544.7366 -.001391 85.5395 159.5436 78.000 -.011211 99395.2951 -9168.0514 -.001390 71.9517 217.1417 80.000 -.013991 81493.4755 -8673.9140 -.001390 58.9927 276.9958 82.000 -.016771 64699.6390 -8057.9145 -.001390 46.8357 339.0038 84.000 -.019549 49261.8177 -7315.8378 -.001389 35.6604 403.0728 86.000 -.022328 35436.2877 -6443.6463 -.001389 25.6521 469.1187 88.000 -.025106 23487.2324 -5437.4622 -.001389 17.0023 537.0654 90.000 -.027884 13686.4390 -4293.5521 -.001389 9.9075 606.8447 92.000 -.030662 6313.0242 -3008.3124 -.001389 4.5700 678.3950 94.000 -.033440 1653.1893 -1578.2560 -.001389 1.1967 751.6614 96.000 -.036218 0.0000 0.0000 -.001389 0.0000 826.5946 Output verification : Computed forces and moments are within spec ified convergence limits. Output summary for Load Case No . 1: rte, Pile-head deflectio n = . 09 885 5 54 in Computed slope at p ile head = -.00 143557 Maximum b ending mom ent = 4021 00.712 lbs-in Maximum shear force = -100 17.495 lbs Depth of maximum be nding moment = 34.000 in Page 4 - 1 ? , 41- z W l~k',,~ ~L Depth of maximum shear force = Number of iterations = Number of zero deflection points = 7HEIGHT.lpo 70.000 in 8 1 Summary of Pile-head Response Definition of symbols for pile-head boundary conditions: y = pile-head displacment, in m = pile-head moment, lbs-in v = pile-head shear force, lbs S = pile-head slope, radians R = rotational stiffness of pile-head, in-lbs/rad BC Boundary Boundary Axial Pile Head maximum maximum Type condition condition Load Deflection Moment Shear 1 2 lbs in in-lbs lbs 1 V= 8000.000 - M= 2.28E+05 0.0000 .098856 402100.7118 -10017.4947 Pile-head Deflection vs. Pile Length Boundary condition Type 1, shear and moment shear = Moment = Axial Load = Pile Length in 96.000 91.200 86.400 81.600 76.800 72.000 67.200 8000. 1bs 228000. in-lbs 0. lbs Pile Head Deflection in .09885554 .11485786 .13652818 .16796563 .21933787 .32829055 1.15334747 Maximum Moment in-lbs 402100.712 394733.239 387951.693 381955.206 376985.117 373911.974 372954.226 The analysis ended normally. Maximum Shear lbs -10017.495 -10387.984 -10846.134 -11437.515 -12254.293 -13552.637 -17039.276 Page 5 00 17 0 O 0 V r O N r O r O O O C O C O U O ~ O O d t6 L ~ r ~ J ~ N O O O N O O O O (D O O 0 w co w 0 D w w O a. X w 0 D 0 L Z £ t7 9 9 L 8 6 OL (4) yldea r.~ ~J L U 9'U 5'0 17'0 E'0 (ui) u01438980 peOH-arid --7 i 0 N Q W T m W O T p T 1 T VJ O ^ LL X W p C) O T T D O O O O O ti C O co s ..1 c d J d 'a 0 0 ch 0 N O O Z'0 V0 0 10HT.Ipo LPILE Plus for Windows, version 5.0 (5.0.1) Analysis of Individual Piles and Drilled shafts subjected to Lateral Loading using the p-y method (c) Copyrigght ENSOFT, Inc., 1985-2004 A11 Rights Reserved This program is licensed to: JOHN H. HART COGGINS Path to file locations: C:\Documents and Settings\COGGINS AND SONS\My Documents\20063065\5117FOUR SEASONS\ Name of input data file: 10HT.lpd Name of output file: 10HT.lpo Name of plot output file: 10HT.lpp Name of runtime file: 10HT.lpr Time and Date of Analysis Date: August 28, 2006 Time: 10:54: 6 Problem Title FOUR SEASONS - 10' EXPSOED (10' EMBED) Program Options Units used in computations - us customary units, inches, pounds Basic Program options: Analysis Type 1: - Computation of Lateral Pile Response Using User-specified Constant EI Computation Options: - Only internally-generated p-y curves used in analysis - Analysis does not use p-y multipliers (individual pile or shaft action only) - Analysis assumes no shear resistance at pile tip - Analysis includes automatic computation of pile-top deflection vs. pile embedment length - No computation of foundation stiffness matrix elements - Output pile response for full length of pile - Analysis assumes no soil movements acting on pile - No additional p-y curves to be computed at user-specified depths Solution Control Parameters: Page 1 j.. 10HT.Ipo - Number of pile increments = 40 - Maximum number of iterations allowed = 100 - Deflection tolerance for convergence = 1.0000E-05 in - Maximum allowable deflection = 1.0000E+02 in Printing options: - values of pile-head deflection, bending moment, shear force, and soil reaction are printed for full length of pile. - Printing Increment (spacing of output points) = 1 Pile Structural Properties and Geometry Pile Length = 120.00 in Depth of ground surface below top of pile = .00 in slope angle of ground surface = .00 deg. Structural properties of pile defined using 2 points Point Depth Pile Moment of Pile Modulus of X Diameter Inertia Area Elasticity in in in**4 Sq.in lbs/Sq.in 1 0.0000 24.000 16945.0000 452.0000 32122019.000 2 120.0000 24.000 16945.0000 452.0000 32122019.000 Soil and Rock Layering Information The soil profile is modelled using 1 layers Layer 1 is sand, p-y criteria by API RP-2A, 1987 Distance from top of pile to top of layer = .000 in Distance from top of pile to bottom of layer = p 120.000 in p-y subgrade modulus for top of soil layer = 250.000 lbs/in"*3 p-y subgrade modulus k for bottom of layer = 250.000 lbs/in**3 (Depth of lowest layer extends .00 in below pile tip) Effective unit weight of soil vs. Depth Distribution of effective unit weight of soil with depth is defined using 2 points Point Depth x Eff. Unit weight No. in l bs/i n**3 1 .00 .07500 2 120.00 .07500 Shear Strength of soils Page 2 `s1 ~l 10HT.Ipo Distribution of shear strength parameters with depth defined using 2 points Point Depth x cohesion c Angle of Friction E50 or RQD No. in lbs/in* 2 Deg. k_rm 1 .000 .00000 34.00 2 120.000 .00000 34.00 Notes: (1) Cohesion = uniaxial compressive strength for rock materials. (2) values of E50 are repported for clay strata. (3) Default values will be generated for E50 when input values are 0. (4) RQD and k_rm are reported only for weak rock strata. Loading Type static loading criteria was used for computation of p-y curves Pile-head Loading and Pile-head Fixity conditions Number of loads specified = 1 Load Case Number 1 Pile-head boundary conditions are shear and moment (BC Type 1) Shear force at pile head = 19000.000 lbs Bending moment at pile head = 744000.000 in-lbs Axial load at pile head = .000 lbs Non-zero moment at pile head for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment) condition. Computed values of Load Distribution and Deflection for Lateral Loading for Load Case Number 1 Pile-head boundary conditions are shear and moment (BC Type 1) specified shear force at pile head = 19000.000 ls Specified bending moment at pile head = 744000.000 in-lbs specified axial load at pile head = .000 lbs Non-zero moment for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment )condition. Depth Deflect. Moment shear slope Total Soil Res x in ° y M V in lbs-in lbs S Stress Rad. lbs/in**2 lbs/in Page 3 10HT.Ipo 0.000 .193652 744000.0000 19000.0000 -.002274 - 526.8811 0.0000 3.000 .186837 800999.9999 18916.7178 -.002269 567.2470 -55.5215 6.000 .180036 857500.3067 18658.7326 -.002265 607.2590 -116.4687 9.000 .173248 912952.3954 18212.1057 -.002260 646.5287 -181.2826 12.000 .166476 966772.9407 17567.5696 -.002255 684.6430 -248.4081 15.000 .159720 1.018E+06 16720.4482 -.002249 721.1740 -316.3394 18.000 .152981 1.067E+06 15670.4553 -.002243 755.6888 -383.6559 21.000 .146259 1.112E+06 14421.4012 -.002237 787.7584 -449.0468 24.000 .139556 1.154E+06 12980.8417 -.002231 816.9660 -511.3261 27.000 .132872 1.190E+06 11359.6961 -.002225 842.9146 -569.4376 30.000 .126207 1.222E+06 9571.8584 -.002218 865.2338 -622.4542 33.000 .119563 1.248E+06 7633.8187 -.002211 883.5858 -669.5723 36.000 .112939 1.268E+06 5564.3058 -.002204 897.6702 -710.1030 39.000 .106337 1.281E+06 3383.9585 -.002197 907.2287 -743.4618 42.000 .099755 1.288E+06 1115.0299 -.002190 912.0488 -769.1573 45.000 .093195 1.288E+06 -1218.8763 -.002183 911.9665 -786.7802 48.000 .086656 1.281E+06 -3593.0356 -.002176 906.8697 -795.9927 51.000 .080138 1.266E+06 -5981.8021 -.002169 896.6996 -796.5183 54.000 .073641 1.245E+06 -8358.7784 -.002162 881.4528 -788.1326 57.000 .067165 1.216E+06 -10696.9600 -.002155 861.1828 -770.6551 60.000 .060709 1.181E+06 -12968.8552 -.002149 836.0010 -743.9417 63.000 .054272 1.138E+06 -15146.5841 -.002142 806.0776 -707.8776 66.000 .047855 1.090E+06 -17235.6659 -.002136 771.6425 -684.8436 69.000 .041455 1.035E+06 -19230.3160 -.002130 732.8425 -644.9231 72.000 .035072 974241.6465 -21079.5447 -.002125 689.9321 -587.8960 75.000 .028706 908357.4804 -22732.5724 -.002120 643.2747 -514.1225 78.000 .022354 837846.2119 -24140.4417 -.002115 593.3405 -424.4571 81.000 .016016 763514.8300 -25257.3160 -.002110 540.7010 -320.1258 84.000 .009691 686302.3157 -26041.3913 -.002106 486.0211 -202.5910 87.000 .003377 607266.4823 -26455.4106 -.002103 430.0500 -73.4219 90.000 -.002926 527569.8523 -26466.8218 -.002100 373.6110 65.8144 93.000 -.009221 448465.5518 -26047.6488 -.002097 317.5914 213.6343 96.000 -.015509 371283.9596 -25174.1594 -.002095 262.9335 368.6920 99.000 -.021790 297420.5956 -23826.4078 -.002093 210.6254 529.8090 102.000 -.028067 228325.5126 -21987.7195 -.002092 161.6941 695.9832 105.000 -.034339 165494.2787 -19644.1672 -.002090 117.1987 866.3850 108.000 -.040609 110460.5095 -16784.0747 -.002090 78.2252 1040.3434 111.000 -.046877 64789.8307 -13397.5669 -.002089 45.8824 1217.3285 114.000 -.053144 30075.1082 -9476.1778 -.002089 21.2984 1396.9309 117.000 -.059411 7932.7639 -5012.5180 -.002089 5.6178 1578.8423 120.000 -.065677 0.0000 0.0000 -.002089 0.0000 1762.8364 Output ve rification : Computed forces and moments are within specified converge nce limits. Output Su mmary for Load Case No . 1: Pile-head deflectio n = .19365165 in Computed slope at p ile head = -.00227360 - - - - - - Maximum b i ending mom h ent = 1287888.877 lbs-in Y_ Max mum s ear force = -264 66.822 lbs Depth of maximum be nding moment = 42.000 in Depth of maximum sh ear force = 90.000 in Number of iteration s = 14 Number of zero defl ection point s = 1 = q 2, Page 4 ~3 1 C~ 10HT.1po ------------------------Summary of Pile-head Response Definition of symbols for pile-head boundary conditions: y = pile-head displacment, in m = pile-head moment, lbs-in v = pile-head shear force, lbs S = pile-head slope, radians R = rotational stiffness of pile-head, in-lbs/rad BC Boundary Boundary Axial Pile Head maximum maximum Type condition condition Load Deflection Moment shear 1 2 - lbs in in-lbs lbs 1 v= 19000.000 M= 7.44E+05 0.0000 .1937 1.288E+06 -26466.8218 Pile-head Deflection vs. Pile Length Boundary Condition Type 1, shear and moment shear = 19000. lbs moment = 744000. in-lbs Axial Load = 0. lbs Pile Pile Head Maximum Length Deflection Moment in in in-lbs 120.000 .19365165 1287888.877 114.000 .24391931 1275405.942 108.000 .34003824 1266646.430 102.000 .70733377 1263397.291 The analysis ended normally. Maximum Shear lbs -26466.822 -28164.907 -30638.496 -35421.296 Page 5 0 'IT O M O N r O r r O O 0 w m 2 w N r w Cf) 0 0- x w ih r D O O O 00 O O O O C tD = O O w d o o v i'6 0 ~ r o J Cl) O 0 N O O O O C O Q O r O O N O O co O O 0 L Z E ti 9 9 L 8 6 OL LL U U l"W (4) 44dea C O t E C Q1 O J r d IL O O 0 0 v O Cl) 0 N O 55 U 9,0 917'0 17'0 9E'0 £'0 9Z'0 Z'0 9 Vo (ui) u01108990 POOH-arid C` ~ y O 0 CO ~ W Cm G w N r LO ~ 0 W U) O ,t a x w in o M D ~ O N O r O O r O O C O Vo 90'0 0 13HEIGHT.lpo LPILE Plus for Windows, version 5.0 (5.0.1) Analysis of Individual Piles and Drilled shafts subjected to Lateral Loading Using the p-y method (c) Copyrigght ENSOFT, Inc., 1985-2004 A11 Rights Reserved This program is licensed to: JOHN H. HART COGGINS Path to file locations: C:\Documents and Settings\COGGINS AND SONS\My Documents\2006JOBS\5117FOURSEASONS\ Name of input data file: 13HEIGHT.Ipd Name of output file: 13HEIGHT.lpo Name of plot output file: 13HEIGHT.Ipp Name of runtime file: 13HEIGHT.lpr Time and Date of Analysis Date: August 28, 2006 Time: 12:32:32 Problem Title FOUR SEASONS - 13' EXPSOED (12' EMBED) Program Options Units Used in computations - US Customary units, inches, pounds Basic Program Options: Analysis Type 1: - Computation of Lateral Pile Response Using User-specified Constant EI Computation Options: - Only internally-generated p-y curves used in analysis - Analysis does not use p-y multipliers (individual pile or shaft action only) - Analysis assumes no shear resistance at pile tip - Analysis includes automatic computation of pile-top deflection vs. pile embedment length - No computation of foundation stiffness matrix elements - Output pile response for full length of pile - Analysis assumes no soil movements acting on pile - No additional p-y curves to be computed at user-specified depths solution control Parameters: Page 1 13HEIGHT.Ipo - Number of pile increments = 52 - Maximum number of iterations allowed = 100 - Deflection tolerance for convergence = 1.0000E-05 in - Maximum allowable deflection = 1.0000E+02 in printing options: - values of pile-head deflection, bending moment, shear force, and soil reaction are printed for full length of pile. - Printing Increment (spacing of output points) = 1 Pile Structural Properties and Geometry Pile Length = 156.00 in Depth of ground surface below top of pile = .00 in Slope angle of ground surface = .00 deg. Structural properties of pile defined using 2 points Point Depth Pile Moment of Pile Modulus of X Diameter Inertia Area Elasticity in in in**4 - Sq.in lbs/Sq.in 1 0.0000 24.000 17270.0000 452.0000 3 2122019.000 2 156.0000 24.000 17270.0000 452.0000 3 2122019.000 Soil and Rock Layering Information The soil profile is modelled using 1 layers Layer 1 is sand, p-y criteria by API RP-2A, 1987 Distance from top of pile to top of layer = .000 in Distance from top of ppile to bottom of layer = 156.000 in p-y subgrade modulus k for top of soil layer = 250.000 lbs/in`*3 p-y subgrade modulus k for bottom of layer = 250.000 lbs/in*3 (Depth of lowest layer extends .00 in below pile tip) Effective unit weight of Soil VS. Depth Distribution of effective unit weight of soil with depth is defined using 2 points Point gepth x Eff. unit weight No in--- lbs/in *3 1 .00 .07500 2 156.00 .07500 Shear Strength of soils Page 2 13HEIGHT.lpo Distribution of shear strength parameters with depth defined using 2 points Point Depth x Cohesion c Angle of Friction E50 or RQD No. in lbs/in**2 Deg. k_rm 1 .000 .00000 34.00 2 156.000 .00000 34.00 Notes: (1) Cohesion = uniaxial compressive strength for rock materials. (2) values of E50 are repported for clay strata. (3) Default values will be generated for E50 when input values are 0. (4) RQD and k_rm are reported only for weak rock strata. Loading Type Static loading criteria was used for computation of p-y curves Pile-head Loading and Pile-head Fixity Conditions Number of loads specified = 1 Load Case Number 1 Pile-head boundary conditions are shear and moment (BC Type 1) Shear force at pile head = 27000.000 lbs Bending moment at pile head = 1380000.000 in-lbs Axial load at pile head = .000 lbs Non-zero moment at pile head for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment) condition. Computed values of Load Distribution and Deflection for Lateral Loading for Load case Number 1 Pile-head boundary conditions are shear and moment (BC T e 1) Specified shear force at pile head = 27000.000 lbs Specified bending moment at pile head = 1380000.000 in-lbs specified axial load at pile head = .000 lbs Non-zero moment for this load case indicates the pile-head may rotate under the applied pile-head loading, but is not a free-head (zero moment )condition. Depth Deflect. Moment shear Slope Total Soil Res x y M V S Stress p in in lbs-in lbs Rad. lbs/in**2 lbs/in Page 3 13HEIGHT.lpo 0.000 .158685 1.380E+06 - 27000.0000 -.001595 - 958.8882 0.0000 3.000 .153912 1.461E+06 26918.3121 -.001587 1015.1708 -54 4586 6.000 .149162 1.542E+06 26666.2625 -.001579 1071.1128 . -113 5745 9.000 .144437 1.621E+06 26232.2619 -.001571 1126.3446 . -175 7593 12.000 .139738 1.699E+06 25609.3135 -.001562 1180.4772 . -239 5396 15.000 .135067 1.775E+06 24794.6197 -.001552 1233.1118 . -303 5896 18.000 .130424 1.848E+06 23789.1189 -.001542 1283.8479 . -366 7443 21.000 .125812 1.917E+06 22597.0018 -.001532 1332.2906 . -428 0004 24.000 .121231 1.983E+06 21225.2402 -.001522 1378.0566 . -486 5073 27.000 .116681 2.045E+06 19683.1502 -.001511 1420.7803 . -541 5527 30.000 .112165 2.101E+06 17982.0005 -.001500 1460.1172 . -592 5471 33.000 .107684 2.153E+06 16134.6710 -.001488 1495.7487 . -639.0059 36.000 .103237 2.198E+06 14155.3628 -.001476 1527.3840 -680.5330 39.000 .098825 2.238E+06 12059.3557 -.001464 1554.7635 -716.8051 42.000 .094450 2.271E+06 9862.8137 -.001452 1577.6604 -747.5563 45.000 .090112 2.297E+06 7582.6333 -.001440 1595.8823 -772.5640 48.000 .085811 2.316E+06 5236.3352 -.001427 1609.2730 -791.6348 51.000 .081548 2.328E+06 2841.9984 -.001415 1617.7130 -804.5897 54.000 .077322 2.333E+06 418.2427 -.001402 1621.1215 -811.2474 57.000 .073135 2.331E+06 -2015.7338 -.001390 1619.4567 -811.4035 60.000 .068985 2.321E+06 -4440.0434 -.001377 1612.7177 -804.8029 63.000 .064873 2.304E+06 -6833.8941 -.001365 1600.9458 -791.0976 66.000 .060798 2.280E+06 -9231.6122 -.001352 1584.2267 -807.3811 69.000 .056760 2.249E+06 -11666.3014 -.001340 1562.4585 -815.7450 72.000 .052759 2.210E+06 -14113.6406 -.001328 1535.5890 -815.8145 75.000 .048793 2.164E+06 -16548.4219 -.001316 1503.6176 -807.3731 78.000 .044863 2.111E+06 -18945.0065 -.001304 1466.5973 -790.3499 81.000 .040967 2.050E+06 -21277.7331 -.001293 1424.6344 -764.8011 84.000 .037104 1.983E+06 -23521.2663 -.001282 1377.8887 -730.8876 87.000 .033273 1.909E+06 -25650.8758 -.001272 1326.5724 -688 8520 90.000 .029473 1.829E+06 -27642.6474 -.001262 1270.9482 . -638.9958 93.000 .025703 1.743E+06 -29473.6288 -.001252 1211.3280 -581.6585 96.000 .021961 1.652E+06 -31121.9165 -.001243 1148.0703 -517.2000 99.000 .018246 1.557E+06 -32566.6948 -.001234 1081.5782 -445.9855 102.000 .014557 1.457E+06 -33788.2334 -.001226 1012.2972 -368.3736 105.000 .010890 1.354E+06 -34767.8555 -.001218 940.7124 -284.7079 108.000 .007246 1.248E+06 -35487.8834 -.001211 867.3472 -195.3107 111.000 .003622 1.141E+06 -35931.5688 -.001205 792.7606 -100.4796 114.000 1.70E-05 1.033E+06 -36083.0152 -.001199 717.5456 -.4847 117.000 -.003572 924416.5509 -35927.0954 -.001194 642.3277 104.4312 120.000 -.007145 817105.2050 -35449.3701 -.001189 567.7627 214.0523 123.000 -.010706 711720.3303 -34636.0082 -.001185 494.5364 328.1889 126.000 -.014254 609289.1559 -33473.7123 -.001181 423.3625 446.6750 129.000 -.017793 510878.0564 -31949.6503 -.001178 354.9819 569.3663 132.000 -.021324 417591.2538 -30051.3939 -.001176 290.1618 696.1380 135.000 -.024848 330569.6932 -27766.8638 -.001174 229.6952 826.8820 138.000 -.028366 250990.0709 -25084.2837 -.001172 174.3996 961.5047 141.000 -.031881 180063.9908 -21992.1406 -.001171 125.1168 1099.9241 144.000 -.035392 119037.2276 -18479.1525 -.001170 82.7126 1242.0679 147.000 -.038902 69189.0758 -14534.2442 -.001170 48.0758 1387.8710 150.000 -.042410 31831.7626 -10146.5283 -.001169 22.1182 1537.2730 153.000 -.045918 8309.9062 -5305.2938 -.001169 5.7741 1690.2167 156.000 -.049426 0.0000 0.0000 -.001169 0.0000 1846.6458 Output Ve rification : Computed forces and moments are within specified converg ence limits. Output Summary for Load Case No. 1: Pile-head deflection = .15868541 in Page 4 13HEIGHT.lpo Computed slope at pile head = -.00159498 Maximum bending moment 2333064.025 lbs-in maximum shear force -36083.015 lbs Depth of maximum bending moment = 54.000 in Depth of maximum shear force = 114.000 in Number of iterations = 11 Number of zero deflection points = 1 - - summary -Of-Pile-head- Response Definition of symbols for pile-head boundary conditions: E y = pile-head displacment, in M = pile-head moment, lbs-in v = pile-head shear force, lbs S = pile-head slope, radians R = rotational stiffness of pile-head, in-lbs/rad BC Boundary Boundary Axial Pile Head maximum maximum Type condition condition Load Deflection moment shear 1 2 lbs in in-lbs lbs 1 v= 27000.000 M= 1.38E+06 0.0000 .1587 2.333E+06 -36083.0152 Pile-head Deflection vs. Pile Length Boundary condition Type 1, Shear and moment shear = Moment = Axial Load = Pile Length in 156.000 148.200 140.400 132.600 124.800 27000. lbs 1380000. in-lbs 0. lbs Pile Head Deflection in .15868541 .18796687 .23419204 .32191147 .59355185 Maximum Moment in-lbs 2333064.025 2303795.329 2279511.906 2262146.038 2255406.123 The analysis ended normally. Maximum shear lbs -36083.015 -38042.217 -40577.081 -44328.411 -51243.334 Page 5 ILA- APPIINDIx «A„ REFERENCE MATERIAL AND CODES SHORING DESIGN REFERENCE DOCUMENTS & BIBLIOGRAPHY REFERENCE DESIGN CODES AND STANDARDS 1 Hj • COGGINS & SONS, INC., SHORING DESIGN REFERENCE MATERIALS APRIL 16, 2002, BY STANLEY H. SMITH, PE AND JOHN H. HART, PE SHORING DESIGN REFERENCE DOCUMENTS & BIBLIOGRAPHY 1) PECK, HANSON & THORNBURN, "FOUNDATION ENGINEERING", SECOND EDITION, 1973. 2) GROUND ANCHORS AND ANCHORED SYSTEMS, GEOTECHNICAL ENGINEERING CIRCULAR NO. 4, FHWA OFFICE OF BRIDGE TECHNOLOGY, JUNE 1999. 3) JOSEPH E. BOWLES, "FOUNDATION ANALYSIS AND DESIGN", FOURTH AND FIFTH EDITIONS, 1988 & 1996. 4) BRAJA M. DAS, "PRINCIPLES OF FOUNDATION ENGINEERING", SECOND EDITION, 1990. 5) HOLTZ AND KOVACS, "AN INTRODUCTION TO GEOTECHNICAL ENGINEERING", 1981. 6) ROBERT M. KOERNER, "DESIGNING WITH GEOSYNTHETICS", THIRD EDITION, 1994. 7) NAVFAC 7.01, "SOIL MECHANICS", SEPTEMBER, 1986 8) NAVFAC 7.02, "FOUNDATIONS AND EARTH STRUCTURES", SEPTEMBER, 1986 9) HANNA, "FOUNDATIONS IN TENSION - GROUND ANCHORS". 10) FHWA/RD-82/047, "TIEBACKS", JULY 1982. 11) PTI, "POST-TENSIONING MANUAL', FIFTH EDITION, 1997. 12) PTI, "RECOMMENDATIONS FOR PRESTRESSED ROCK AND SOIL ANCHORS", THIRD EDITION, 1996. 13) ASCE, "SERVICEABILITY OF EARTH RETAINING STRUCTURES", GSP #42, 1994. 14) FHWA, FHWA-RD-75-128, "LATERAL SUPPORT SYSTEMS AND UNDERPINNING", APRIL 1976, VOLUMES I, II, Ill. 15) ASCE, GEOTECH ICAL SPECIAL PUBICATION NO. 74, "GUIDELINES OF ENGINEERING PRACTICE FOR BRACED AND TIED-BACK EXCAVATIONS". 16) CHEN & ASSOCIATES, "DESIGN OF LATERALLY LOADED PIERS", 1983. 17) ALAN MACNAB,"EARTH RETENTION SYSTEMS HANDBOOK", 2002. SOIL NAILING REFERENCE DOCUMENTS & BIBLIOGRAPHY 1) ASCE,"SOIL NAILING AND REINFORCED SOIL WALLS", 1992. 2) FHWA/GOLDER PUBLICATION # FHWA-SA-96-069,"MANUAL FOR DESIGN AND CONSTRUCTION MONITORING OF SOIL NAIL WALLS", NOVEMBER 1996. 3) ASCE,"GROUND IMPROVEMENT / GROUND REINFORCEMENT / GROUND TREATMENT' SPECIAL PUBLICATION #69, JULY 1997. 4) XANTHAKOS, ABRAMSON & BRUCE,"GROUND CONTROL AND IMPROVEMENT', 1994. SOFTWARE 1) CALIFORNIA DOT,"SNAIL PROGRAM", VERSION 2.11-PC VERSION. 2) RISA TECHNOLOGIES, "RISA-21) VERSION 4.0, RAPID INTERACTIVE STRUCTURAL ANALYSIS- 2D, FRAME ANALYSIS. 3) GEO-SLOPE International Ltd., "SLOPEIW", VERSION 5 REFERENCE DOCUMENTS 1) AMERICAN INSTITUTE OF STEEL CONSTRUCTION, "MANUAL OF STEEL CONSTRUCTION - ALLOWABLE STRESS DESIGN", NINTH EDITION, 1989 2) AMERICAN INSTITUTE OF STEEL CONSTRUCTION, "MANUAL OF STEEL CONSTRUCTION - LOAD AND RESISTANCE FACTOR DESIGN", THIRD EDITION, 2001 3) ACI 381-99/318R-99, "BUILDING CODE AND COMMENTARY", 1999. 4) ANSI/ASCE 7-95,"MINUVRJM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES". 5) ACI,"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-99) AND COMMENTARY (ACI 318R-99). " 6) ANSI/AF&PA NDS-1997, NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION'. 7) ASCE,"STANDARD FOR LOAD AND RESISTANCE FACTOR DESIGN (LRFD) FOR ENGINEERED WOOD CONSTRUCTION'. APPENDIX "B" LAGGING DESIGN CRITERIA & REFERENCES • 0 COGGINS & SO Caisson Drilling, Excavation Shoring, Tieback Anchors TIMBER LAGGING DESIGN CRITERIA AND REFERENCES Updated July 21, 2003 [I] The design of lagging is primarily based upon experience and semi-empirical relationships rather than by any rigorous analysis. Coggins & Sons, Inc. have been utilizing thick rough sawn #2 Douglas fir lumber for many years as lagging. The %2" diameter SAE Grade 2 lagging anchor bolts have been in use since 1994. This design has been implemented successfully for numerous projects. From our experience, we have determined the #2 Douglas fir can easily span 9'-0" in most soil conditions. On occasion, the #2 Douglas fir can span 10'-0" in appropriate soils without any failure problems. We have used 9'-0" typical spacing for numerous projects ranging from 10'-0" to 45'-0" deep without any problems. Please see figures 1 through 3 for examples of our 9'-0" spacing at various depths. The criteria followed for lagging design is from three sources: "Earth Retention Systems Handbook", FHWA Publication No. IF-99-016, "Ground Anchors and Anchored Systems", June 1999 and FHWA-RD-75-128, "Lateral Support Systems and Underpinning", April 1976, Volumes I, II, & III). All of these documents indicate the timber lagging should not be designed, but rather based on experience and semi-empirical rules. Goldberg has assembled a table in his report to the FHWA 1976 suggesting lagging thicknesses for various types of soils (a copy can be seen in Table 1). If a design analysis is attempted, it is suggested from the three references listed previously to design the lagging for a soil pressure equal to 50 percent of the apparent earth pressure. Coggin & Sons, Inc. experience indicates this is conservative in many cases because of the "hard to estimate" arching affect behind the shoring wall. In addition, we believe that most lagging will deflect to the point where the retained soils will arch between the soldier piles and relieve the pressure on the lagging. Once a point of equilibrium is reached, the deflection will stop. The following two pages show results for estimated lagging design. In addition, excerpts from the above-mentioned references and steel stud / #2 Douglas Fir strengths are shown. 9512 Titan Park Circle - Littleton, Colorado 80125 - (303) 791-9911 • FAX (303) 791-0967 http://cogginsandsons.uswestdex.com FOUR SEASONS LAGGING DESIGN GIVEN: SOIL TYPE: SAND AND COBBLES DESIGN PRESSURE (X)(h) (psf): 37 EXCAVATION DEPTH (ft): 13 SOLDIER BEAM SPACING (ft): 8.5 CLEAR SPAN (ft): 6.5 BOARD HEIGHT (in): 12 BOARD THICK (in): 3 FLEX. STRESS OF 72 DOUGLAS FIR (psi): 1200 FIND: BENDING STRESS 1) COMPUTE MOMENT M = (w*(I^2)) / 8 w (psf) = 240.5 1 (ft) = 6.5 M (ft - = 1270 2) COMPUTE SECTION MODULUS S = (b*(h^2))/6 b (in) = 12 h (in) = 3 S (in^3) = 18 3) COMPUTE BENDING STRESS fb = M/S E O z c~ J W w w z z ~ P O = RF U (f) O i~ F- O W O J 0 z CD CD Q 0 z Q O z ry O z V) J Q U_ n f- Ll- O w z Q • Q J \ M J mZ M x 2 z = O U ►i O N N d co uj IMF DENVER MUSEUM CLEAN, SAND 26' - 0" TO 28' - 0" EXCAVATION 9' -0" BEAM SPACING T---L7, t.{YL t--- l c. DENVER MUSEUM CLEAN, SAND 26' - 0" TO 28' - 0" EXCAVATION 9' - 0" BEAM SPACING E PORTOFINO CLEAN,-SAND 30' - 0" EXCAVATION - 0" BEAM SPACING O~ O Ah W Q 4) 14-4 as •b^ c~ O Q~ w O y N O H .b 4) b N O U (V a~ .03 03 H > , o S O y d r C c N G l'! ~ G G u pC GG E E 1 u N O S Q C i v v ~ 1 7 ^ N n o o CA N. h 00 ~ G to 0o ca N ~ v u o c rz 42 u °O• h h C a~ n .N-. H a 3 E E to 00 U E co , OC h 00 .a A v C 00 CD O h 00 ,p > V C ...a w~•~Oc C7~ ti x G~ 72 w 3 x x ai U U U ? o h U U . ] vi U ~ V C7 ai U U ~ ~ o u a U O h 3 h C o u ° a4 c y o o c ar u to, d y C MO W w y y N •y .C .Vi A C•i CO 09 V y N aV+ A o 40 C13 C-3 39E cna °&a8 V 6) by ' V W ~l .c ~cl > acc 0 3? Uc U u ai Uv3 Uo U ~ C°n in3 U~ uuo u ~ u F P-4 ~ O ~~"~O v n Ln ~ UO F~ A u 0 z N 00 J u c i °q oo a ° ° to o on o P 4) 4~ Co UcC a>> w 'o o x.0 O w tu t4 o n .00 v w w y b M > v o4 ccd 0 00 4, bo -or-. a o ti• v d a oo a ono oi° V w O y V cd .O t1. cd N «f a 'q w y p cd 3 O r~ > cd .0 .fl F p v' O cad cVCa 'o C 'N V K E -d o ~ .O wO w V q w 0 F~i b o W u cd 4, -0 o O 3 0 ~~c~ ab.°~ o u a 4) 0 C «S w~ <j O a> o a) bo y pp . ° a' •C 0 cOi bo u a~ cn b a on w v s w ca a w u ° x n ap A A y - y a; 'o O c O V r pq ~ N 00 a~i O~ O a, Z~ o a 0 3 a S o b o u o w o>= co u u 3 r a 11 V A w U V .O .D w L1. pq ' -P q 4) y p H .40) cis v boo y w II w v, a~ a3i '`y ttU, a > 4) o ~ d a4i G ~ h O cp cd C 0 ow -0 00 • 00 U ° vpi U O v] o 4. ^ ^ ~ ° ~ ~ cd Q U a r. cl w cd .S >0 V r 3 co o oo V 3 ° u n. oo O c~ V > w . 'A 'd •0 V ~o cu" cd 6 cd x 4? y o° ° c`di [ v E o > W5 o o u, n 0 C) o°$0 c cts o•3' 3 o o u oo 04 ca Cd 400 .0 0 V '0 a w V i 4) C7 0 o ai o0 u > w a> a o w r o v a ° C,3 Z o O cu c. w Q p+ m v' t4, 4 ra V. N79. u C7 o_~'~ ooh N b o0 St, 'h o• u z o cd ono 0 o o ° 3 .0y 4L) Cd .0 ~ co = 0 b = ~ o Q cod o o~~o O O "o 0 Z O 1 >.4 wr.~w vw 2 .!2 oo'N oo a ~ •3 ~ A` °v cd N 4, a O V U b O N c~ 3 h bO l •0 > C* p 00 id o ~ \i ti) u s~ v .~e 0 L7 wO N '27 > a) ♦ . • u q of cNd w K • ♦ . • ♦ c a) V ♦ ♦ T _ P W h .y N h O it ♦ ♦ VCCC C co; L1] oo VV+ rV Tom. N tV ((c •G cls cd .0 3 o ic7 G a' O YC ` W W fJ r 1- a n n O C. 5 00 0. H uo' 0 S 'v tt ar O co 11 O O O TABLE 11.1 Goldberg Zoino Chart (Courtesy of the Federal Highway Administration) Values of Ncq 00 N A C0 7 0 N O m O A R CL CD o 0 CD CD CO N O Recommended Thicknesses of Unined Logging"(roughcuf) got Clear Spans of: Soil D•ecrlption Classification Depth S. 6' 7'.- It'. 10' Silts or fine and and silt ML above water table SM-ML Sands and gravels (medium OM. GP. CM, 0' to 25' 2' 7" 1" J. 46' 4" dense to dames). , GC, SW. SP, SM Clays (stiff to very 2=. CL, CH 25' to 60' 7" 3'' 4" 4" S•' non-fissured. Clays, medium cousfs- CL, CH tency and A < S. Sande and silty sands, SM. SP. SM (loose). - Clayey sands (medium SC . 0' to 2S' P 7' 4" 4" S" dense to dense) below water table. Clays, beavilyover- CL, CH 2S' to 60' 7' 2".. 4" 4' S" S" consolidated fissured. Cobesionlees out or fine ML; SM-ML send and am below water table. Soft clays I ) 5.- Cl. CH 0' to 15' S" 7" 4" 5" Slightly plastic silts ML - 15' to 25, 7" 4" S" 6" below water table. Clayey sand. (loose). SC 25' to -l5' 4" 5" 6" below water table. K C F F W 6 C0 U O sf N a a .V. {r D N O w Oq Note: e La the category of "potentially dangerous soils", use of Lagging is questionable. - N to -Cho en O N j O A 7 m O -Al 7 O R CL CD 40 CD o CE) N Co 0 W~ F z O F ~i N N M z 0 cN A a Q ti l a~ ti o ° a L b 'Rf N U w C ~ ~ C a a A A N ~ N M a. R, ~ cy a~ > a~ b w V w Fy ~ H ~ ca w q ~F U o t o w V (Q ~ v C.o bQ '.O4 S` O O v O O v O ~ rZ3 CIS O a a G y c y ca ~ u q Ei w° a ti ; o0 rci -°o 0o O o ~ G `o Q N a' a E V Lur n N V 00 C bo N .ti C~ w . - h 0g u H.o G G vi 'l7 C O N C's N A . t a .U U O om - 8 c cl ' o v °4, y 4) > 04 to U = co U C4 h O Eb vO to a 3 ^a o o u a w. o 0 4) -0 N td O N ct, p .q aU. p U w _ 3 b a ~ a v fin s.. 7 s 74 U a ~ N OA rr' o 3 cd a 4., h ° a a~ N i o a~ U ~ G CIS N • U N N Z ti a ~O O O to, 0-0 ° 00 ~ H as i t.. w ~ O o U N w > O h v w O o a ~ w Q a y h A 3 ~ w o t4 a~ C. y V) N c; n O V) w a ELL LL rn Yw r a 0. O OG a 0 U z w W ca ti O Y a ~F cts v o 3 a 00 o ~ a y W p 30 U N v o v 0 ai ' °U W bo o C: O U 0 N 4. q CIS 'a N o .~C O ~ O Cd.~ co o z 0" 0' y o o a ='ca 3 „ z Q 3 0 C W o ~ ~ oo u x ~ ~ ~ 3 a a~ w ~ w C a~ c d M O cn °,0 3 ~'o W o o4 `r 3 oo x ~ X 0 4 r.q w wo•o o . o o o Cry .L' .-r u O y cd w o G u "3 4. oo 0 3 ,o N y p y N d o c 0 a o ~ 41 y O 30 C C O r, N U O d0 iE Q co q p w . cd •.r ~ o b o o 3 ca c' to US q v R. o 4) w a a~ 3 ctl _ o o a in o o c,3 00 o.) zi r. o6 3 y o nOi w 0 r4 N ° c C) w CV U a> N ~ C c. O cn~n CO Z U G ~ C'q Q a b b > w ~ oo cl ca co U •r. -p c L Q rn C L0 Q mCO ~0 ♦r c C C .0 CL 0 (D m 00 N U W .N 4. C C N ,u N u 61 _3w N W tNi 0 N V V O 0 C C O u 'd u b ~ N a=_ ~b C C r~ u C ~ a u b u 6 > c V u .7 C7 co m N m a L W w c Y 75 v cr C d b v N 0 v 5 'a N s 4 ti 0 ~ u sb 15 u eo ~ = 3 A C 4, N O c Q = x~ U ~ V u w Y. . wi,. r11YVA-11--99-015 Obw U.S.Department of iroruportation ~eder~~. Highway Administration JUNE 1999 OITICIt. Or BRIDGE T C~INOLOGY 400.5 WENSTREET, $W WASM'NGTON, DC 20590 GwacWiaeu EIJGIlVEF,RJNG CIlZCIIL4R Nn_ 4 For permanent walls and temporary walls that are considered critical, an allowable bending stress in the soldier beam, K, of 0.55 Fr, where Fr is the yield stress of the steel, is recommended. Steel sheet-pile and soldier beams are commonly either Grade 36 (Fy = 248 MPa) or Grade 54 MPa). For temporary SOB walls, a 20 percent increase in the allowable stress may be allowed for positive wall bending moments between anchor locations; no allowable stress increase is recommended for negative wall bending movements at the anchor locations. The required section modulus S„ q, is calculated as: S,.q _ M MU (Equation 22) Standard Sl units are S(mm3), M,,,.x (Mm), and f% (MPa). In most cases, several available steel sdctions will typically meet this requirement. The actual wall section selected will be 'based on contractor/owner preference, cost, constructability, and details of the anchor/wall connection. When designing permanent anchored walls in relatively uniform competent materials, it is usually only necessary to check the final stage of construction provided that: (1) the ground can develop adequate passive resistance below the excavation to support the wall; (2) apparent earth pressure diagrams are used to assess the loading on the wall; and (3) there is minimal over excavation below each anchor level (FHWA-RD-97-130, 1998). For cases where there are large concentrated surcharges or berms at the ground surface, it is prudent to check wall bending moments for the initial cantilever stage (i.e., stage just prior to installation and lock-off of uppermost anchor). Where the final excavation height is not the most critical condition, designers commonly use a staged construction analysis where the maximum wall bending moment, wall deflections, and wall embedment depth are evaluated for several stages of construction. An analysis is required for this case since the maximum bending moment may occur at an intermediate stage of construction (i.e., before the final excavation depth is reached). Intermediate construction stages may be critical when: (1) triangular earth pressure diagrams are used to design the wall; (2) the excavation extends significantly below an anchor level prior to stressing that anchor, (3) a cutoff wall is used to maintain the water level behind the wall; (4) the soil below the bottom of the excavation is weak resulting in active earth pressures that are greater than available resistance provided by the toe of the wall; and (5) structures are located near the wall. 5.4.2 Design of Lagging for Temporary Support The thickness of temporary timber lagging for soldier beam and lagging walls is based primarily on experience or semi-empirical rules. Table 12 presents recommended thicknesses of construction grade lumber for temporary timber lagging. For temporary SOB walls, contractors may use other lagging thicknesses provided they can demonstrate good performance of the lagging thickness for walls constructed in similar ground. Permanent timber lagging has been used in lieu of a concrete face to carry permanent wall loads. For permanent applications, the timber grade and dimensions should be designed according to structural guidelines. Several problems may exist for permanent timber lagging including: (1) need to provide fire protection for the lagging; (2) limited service life for timber,, and (3) difficulty in providing 81 PB 257 .21C Report No. FHWA-RO- 75-128 LATERAL SUPPORT SYSTEMS AND UNDERPINNING Vol. I. Design and Construction B. T. Goldberg, W. E. laworski, and M. D. Gordon April 1976 Final Report This document is available to the public through the National Technical Information Service, Springfield, Virginia 22161 NATIONAL YEVINICAL Prepared for :INF.°RMAiF SER~ICE 1U. DEPARlMEMENF O Of COMMERCE CE SPRIN6fIEtD. rA. 21161 FEDERAL HIGHWAY ADMINISTRATION Offices of Research & Development. . , Washington, D.C. 20590 9.32 Wood La. in 9.32.1 Wood Materials United States is The most common wood used for lagging in the construction grade lumber, usually rough -cu tural stress-graded lumber may be specified t. Struc- Preferred woods are Douglas Fir or Southern Yellow ePine used. which provide a desirable balance between flexural stren both of formation modulus. gth and de- May be used for wood Table 3 lists the properties of some woods that the table is for nod lagging. The towable flexural stress stated lal or repetitive use construction. 9.32.2 Arcldrg the cont*entionnal .Experience has shown that lagging installed in manner in most reasonably competent soils does not receive the total earth pressure acting pressure concentrates on the relatively s on the wall. The lateral sure is a tiff soldier piles; less pres- PPlied to the more flexible lagging between the soldier piles. This redistribution of pressure, known as arch- ing, is inherently related to the usual lagging is manner of construction, The behind the lagging gging supported to on the front flange; a slight Over-cut is made facilitate placement of the boards; and the inter- vening space behind the boards is filled with soil. lagging is relatively A related phenomenon is that the pressure on ly unaffected b de the greater forces y It therefore follows that associated with deeper excavations must be trans- mitted through soldier piles. 3 +u~xaie s s Lagging thickness design is based primarily 'Poll experience and/ox empirical rules. amplitude of the pressure diagram with m One procedure is to vary the sold- ier pile and minimum pressure midway b axietmweenum the psoldierressure at pile the see Lacroix and Jackson, 1972). Another Procedure is to reduce the basic g am used in the design of bracing applying a reduction factor. and/or tiebacks by ing lagging for the B For example, Armento (1972), in design- ARTD system, applied factor to the basic trapezoidal earth ressure diagram used for strut design. The New York Transit Authority uses the basic pressure -118- Table 3. Strength properties for typical grades of timber. 4L I Wood Type and Grade D-ouglas Fir Larch, surfaced dry or surfaced green used at max. 19% M. C. Construction Select Structural c' Doffs Fir South, surfaced dry or surfaced green used at max. 19% M. C. Construction Select Structural Northern Pine, surfaced at 15°, moisture content, used at 15% max. 19% M. C. Construction Select Structural Allowable Flexural Stress fb, psi 1200 2050 1150 1950 1050 1750 Southern Pine, surfaced at 15F2250 moisture content K. D. , used 15% max. M. C. Construction Select Structural 00 Modulus of Elasticity E, psi 1,500,000 11800,000 1,100,000 1,400,000 1,200,006 1,500,000 1, 500, 000 1,900,000 Southern Pine, surfaced dry, used at max. 1970 M. C. Construction Select. Structural F2050 Depraveilablerom - copY. 11400,000 1,800,000 W T ' American Institute of Timber Construction, "Timber Construction Manual", 2nd Edition, Wiley, 1974. -119- diagram but allows a 5o percent increase in the stress of stress graded lumber. allowable flexural 9. 32.4 Recommended La m Thickness devel A table of recommended this oped and is presented as Table 4. Since the table has been devn elop- ed on the basis of construction grade lumberj ustment for stress- s are require - graded lumber. , ad d are t lcauYeith The so-called "competent soils', shown herein er granular with relatively high angles of inter friction or stiff to ver s ti are those y ti ff clays, Medium clays included in the table with a ratio of . than 5. overburden stress to undrained strength of less granular soils The category of 'idifficult soils" includes loose, tendenc with low angles of internal friction and soils-y'to run when saturated_ having Heavil a clays are also included because the y have overconsolidated fissured especially in deep excavations ave a tendency to expand laterally, . 9.33 Dis lacements and Loss of Ground 9.33.1 General are the soil i bmp°rtant factors contributing to ground loss in zones immediately behind the la of the lagging board itself. gg~g and the flexure loss caused b The following discussion concerns ground y the inherent characteristics of soldier pile walls, in particular the teG}ques used in construction. The not deal with overall deformations discussion of the retained earth mass, does 9. 33.2 Deflection of La in in Table 4 will generall The ~g~ board thicknesses recommended Y maintain deflection to less than about 1 inch. 9. 33, 3 Overcut by effective Movements caused by overcut are best controlled Packi-ng of soil behind lagging. The most effective way of each la am the soil into the space from the upperside of ggZN board. If there is difficul Sion innaterial r ty obtaining sufficient cohe- fu,~ ammed in this manner and/or there is concern ashout from groundwater action, the soil can be mixed -120- V Table 4. Recommended thicknesses of wood lagging. Sail Desc ription United . Classification Silts or fine and and silt abov ML e water table M SM-ML FA Sands and gravels (medium GW . GP, CM. N dense to dense) . GC , Sw. SP, SM N Clara (stiff to very stiff): CL CH 61 non-fissured. , 04 Clays, medium consis- CL CH t/ tency and yH , Su < S. Sands and silty sands, (loose). SW. SP, SM Clayey sands (medium SC dense to dense) below N water table. V Clays- heavily over- CL CH consolidated fissured. , Q Cohesiooless silt or fine sand and silt bel . h(I,; SM-ML ow water table. S Soft clay. uH > s. CL, CH O z a Slightly plastic silts y below water tabl 14W ML G e. Nz Clayey s <p o ands (loose), A a SC ' " below water table. s Note: t la the category of "Potentfallr dangerous soils", use of lagging is questionable. I Recommended Thicknesses of Depth 5Lagg~ (roughcut) for Clear Spans of: ' 81 9 10' -0' to 25' 211 34t 311 3" 414 411 251 to 60' 3" 3" 3" 414 41' 511 0' to 25' I 3" 3" 3" 411 4" 5" 25' to 601 1 3" 3" 4" 4" 5" 514 O' to 15, 311 3" 4" 5" 15' to 25 314 411 .5" 6" 25' to 351- 4" 5" 6" -121- i , Ste. P::.ei WCNANICAL ANDMATERIAL REQUIREMENTS FGk EXTERNALLY THREADED FASTEgEPS--SAE J419 AUG83 SAE ~Sfalidatd IS IN" K the k. and Sad T , ar(IS+~ai Coassa+etee, approved January 1910. ckvcrdl ml striae ISM C Diruaiors 2!. Ilalmt 19e1. • ' , l t pe 71tu SAF. Standard cure for:sted b ts the medianical'and material re. Num: Previous issu quirrmenls bolls, screws, studs, semss and U-bultss es dos etatldard e se covered n used in separately in SAE J195 (A gdA 19..-67). luts, now core ' dutUmulive and related industries in-sizes.lo I % in indusive. crew and mraslser 2; Dcriratiati i i SFens: S y~,,,~ty • f i • 2.1 Designation Srsltm~-(;ndcs ir drsignalcd bytnuMbety rrl ' U4 a"' -ft--"d bx (fih SAE Standard arc those used I,r ma7y b N,e arrptl,s „ increasing numbers rlptrsltt0itstrcasingatensile strength, and by dm, related arras of rehidly:-For ld dedmals rept'c" U-WO as studs. Thus, specifstalioa Proposes. Ibis 'tasld*J. &M, pGed• ( 'd1eer the ward of whole number w "utsdr"•appeara, "U bull'" is also W. rariatitiima at the strcttgth Icvd.'11te grade iWipations art diretm in.TAGle 1. . load elitgivai., 60 6 Ilw* is tPr sud nAis 1 of1sat Ilthse -U. t .1.2 Grades-$olts anU screws asc normally aralabl j only in Gn ' carrying -"c"t -f Ufa ar e =mw sizr attug kmd S. 5.2, 7. 8, attd 8:2; Studs are potsnally available; i i d1b1'ld ddc**Ia4ed by !addle bad iesua ! . s 4. 5, 8, and 8.:1. GAd 5.1 is applicable to scmii only only i ill Cara are I T7 a-awcal .M aullt~ s A/te KKNT ICAUGH AtARmra iar. can, seREw>~ sjwx SEA% Am tl-parr , - ? I , : ! trtls star 0.R i•sl sf•da,owe of i sarl•a C.r. ~+w•. st+d., s.aw sok4 screws, a" stall. tt4141oss ~lardaau'. fr••l I ' sf n•u' T•wetl• l i 114r,drsi,l sl T-A. per. O tad >;korall, s11N+` stsvw~IG R•dacN•n j R•dcvr•N New fr•ducts g ► n is aX funs) 04-1) - (slr••s) EI•w~aN•nr •1Ikd• Radcarill 30H Osa1• 1 ' Mlw, ►•1 Min, Mt IM4 Pd % 1NIn, Y. ~M•,c Min Most tNar4l,s~s : . ; • i s, 1 /J ltaa 1.1/2. 330004 40 000 as ba 60 ooa 1 t ]5 f , - 170 grub N•n. r 7 2 gobs, 114 9" Z%4, ' ssYrw2, 330004 71000 $7000 74000 le Zs gg0 gtoo i Sludt oir 3141a 1-1/2 33 000 - .10000 360004 60 000 Is 75. , 170 10b rtoM a Slid) 11I Aaa 1- i/Z 631100. 113.000 100000 115000 10 33' gab V a2 "z N l es oob 120000 ' I - l A 3 f! Screws, t errr 1 92000 12000 11 75 . 1 :34 -125 CZ4 - swd, ai.r 1 b 1-1n 74000 103060 I I r 1 , j 1 ; 41000 103 000 a asj j sa Cl? C:)6 S*ft I f,l i bait r' -Nd. d lRrar 5/0 03 000 120000 I S9-Sr C23 ' C4 j I Screws N'. d 111" 1/2 I I i i.j 1 r '3.T 1/r Naa 1 ' Strews I 05000 120 000 92 000 120 000 11 751 j Sd C26 C36 i j ' 7e cobs 1/I Ifa+l 1.1/2 • . ' ~ , Screws ; 105 000 133000 113 000 - 133 000 12 j C20 ZSI 51 I l i . i l~ , 4 V Smi$ 1 %1 Ilp+, 1.1/2 sieds 120 000 - 150 000 130 000 150 000 12 35I . ( 38.3 pJ CZ f I / . :•,;i.t~ stad+ 114 Mau 1-1n 1 120000 150 000 130 000 150 two 10 93' cat rJe Nan. e.4 ' ell t/a N,,,, 1 120000 150000 130000 150000 1o 9.5 I 5e-6 ' cat screws 120000 130 ODO 130000 150000 to 9.5 50.6 C33 1 ield she„plh j, styet s of ~.fikh a , or 4 Yield'potnl slwq Pera,anenl set of 0.2% of tape knplh arccvrs• , e Grade Z ie apply haled of yl'U skenglh at 0.2% offsel. , i +egakemrnls q'drensenls sizes 111 16-- 3 14 to ,apply only b bdlt and J&wl d in and rhorler to and to duds d 01i ten9tla. Far 00911 and screws b' apply. ~0d+ raper Mraa d k,. Grade S 6k, cn hear keeled bei«e ons-"r with a IKxdened wiz het h an acceplaWe substitute. Cxad `Grad. 7 oohs and screw, ore rot Geoded alter heat keotment. ' `See Took 6 tar pope knob.. tie' wosiier head and heir 57.5. 0""" Pr•docls without assembldd w•+Mrs shop have • care hosdnes, not e,iceedng RodweM CSB an Semi and sin d a sartau hardden not •kraedinp Roclw•p Z, • , _J ' .l See (oolnola (~;odocts wilhoot wadler,• llal q:prica4k to tlvd, or+blled end aosr lest, recot+ Mod ProducU. 4 Prod food Re9Nadot, in Ilwse grades 001f arr,ly torhess r~Gered Prodvcl,. 4.01 , DICKMAN-HINES NUMBER COMPANY P.O. BOX 6137, FEDERAL WAY, WA 98063 PHONE 2534386790 FAX 253.838.3569 Memo February 29, 2000 COGGINS & SONS DRILLING From. MIKE COOK 8512 TITAN PARK CIRCLE LITTLETON, CO 80125 Attn. LARRY PHOW6. 303 781&911 FAX:303-7910967 Re: Bending Design Values for 3 x 12 The Adjusted Fb for Doug Fir # 2 is 1,250 Psi The Adjusted Fb for Hem Fir # 2 is 1,175 Psi These figures rePresent the minimum design value allowed for straight # 2 Grade. In both cases the lumber provided is # 2 & Btr, with the amount of "better" varying from manufacturer to manufacturer. We know that the Hem-Fir from this manufacturer has all of the higher grades left in it, meaning that the Percentage of 91 and Select Structural grades in the mix i$ higher than In the Doug Fir-_ therefore, one can reasonably equate the overall strength of the two species to be very dose. OTE: Fb ( Exteme fiber in bending) to meet or exceed the abov"fter- sdiustments for size, repetitive member, and flaWse use. Fb may be rounded to the nearest 25 or 50 Psi inorement, according to ASThf Designation; D 24,5 Section 6. i. MIKE COOK Dickman-Hines Lumber Co. TO/To -'4 ~ocr orn NOTICE TO PERMITTEE: You must notify owner or operator of underground utility facilities at least two (2) business days prior to making or beginning excavations in the vicinity of such facilities, as required under Section 9-15-103, Colorado Revised Statutes. CALL UTILITY NOTIFICATION CENTER OF COLORADO (UNCC/CDOT), 1-800-922-1987/(970) 248-7230, FOR MARKING OF MEMBER UTILITIES.. CONTACT NON-MEMBER UTILITIES DIRECTLY NATURE OF ACTIVITY INSTALL SOIL NAILS FOR FOUNDATION SUPPORT AND TEMPARY DEWATERING WELLS. THIS WORK IS BEING DONE UNDER A LEASE AGREEMENT WITH CDOT RIGHT OF WAY SECTION. ALL TERMS AND CONDITIONS OF THIS AGREEMENT SHALL BE FOLLOWED. LOCATION: State Hwy. No.070A Frontage Rd County EAGLE City/Town VAIL Mile paint(s) 175wro IntPT rt•ng F •at rg(c)• Cnt[TH FR(INTACF RC)An AT FXIT 176RnliNnARnITT Other Location Information ADDITIONAL REMARKS CURRENT INSURANCE CERTIFICATE ON FILE. the Department) The and conmtlons of tnis Any work shall only be in accordance with the special provisions and other applicable details as set forth in this permit and its attachments. The CDOT Inspector is: LARRY DUNGAN Work is to be completed on or before: 8/15/06 Ext. to 11/15/06 Telephone (970)845-8816 Fax(970)845-8816 or within days, (as applicable) Work time restrictions: DAYLIGHT HOURS ONLY, NO WEEKENDS OR HOLIDAYS. (ALSO SEE ATTACHED STANDARD PROVISIONS, AND ADDITIONAL SPECIAL PROVISIONS), (TRAFFIC CONTROL MUST CONFORM TO THE MUTCD) Other: Permittee is prohibited from commencing any activity within highway ROW prior to issuance of a fully endorsed and validated permit. Permit, insurance certificate(s), and traffic control plan must be available on site during work. High visibility vests are required at all times during working hours. COLORADO DEPARTMENT OF TRANSPORTATION SPECIAL USE PERMIT ❑LANDSCAPE XXXGENRAL CONSTN ❑SURVEY ❑OTHER ( ) PERMITTEE R Name ECEIVED DEPARTMENT USE ONLY Date issued 12/19/05 BLACK DIAMOND RESORTS-VAIL, LLC Permit # 12,878 Address S.H.# 070A Frontage Rd. M.P. 175mm 50 SOUTH 6TH STREET, SUITE 1480 f District 03 MINNEAPOLIS, MN 55402 y` Section 02 Telephone (612)313-0123 Representative: DOUG HIPSKIND Patrol 2MARY4 1. Your request to perform the work as described above is granted subject to the terms and conditions of this permit, including the Standard and Special Provisions as shown on the permit and all attachments hereto. 2. To the extent authorized by law, the Permittee shall indemnify, save, and hold harmless the State, its employees and agents, against any and all claims, damages, liability, and court awards including costs, expenses, and attorney fees incurred as a result of any act or omission by the Permittee, or its employees, agents, subcontractors or assignees pursuant to the terms of this permit. 3. Failure by the Permittee to comply with any of the included terms or conditions may subject this permit to suspension or cancellation, at the discretion of the Department of Transportation. 4. THIS PERMIT IS NOT VALID UNTIL FULLY ENDORSED BY ALL PARTIES, WITH DATE OF ISSUE AFFIXED BY AN AUTHORIZED REPRESENTATIVE OF THE DEPARTMENT. A FULLY EXECUTED COPY OF THIS PERMIT MUST BE ON FILE AT THE TRANSPORTATION REGION OFFICE. 5. In accepting this permit the undersigned, representing the Permittee, verifies that he or she has the authority to sign for and bind the Permittee, and that he or she has read, understands and accepts all the included conditions. Attested Date I Signature Date ~TiilieC I t 4G ER 27t' 4 X%\ - Jti1.d? t.fr l t .G I rrS Mw-1 A. ell , , I r t~t3 ►.sgL ('0I OR %D0 DFPARTNIF.NT OF TRANSPORTATION BY, A<. Date of issue ( hii l I n~inrc; I<i•~;~u;al I ; :u;yn;; ~.;~nn; I)i;.. I~~ .r';i. 1 ' • 1273 VAIL DEVELOPMENT LLC 50 SOUTH 6TH STREET, STE. 1480 MINNEAPOLIS, MN 55402 17_1 DATE- 0 L PAY v To THE pya~~T MENU ~,~s'POR~-rD 1, ' $ ORDER OF LbR-ADC t C~ZS•._ o 0 _ ~Jmi27 d4~'~ 1t4ouSArJ~ .aE "LAt4bR> 7Ei x lr ~ryl~ ~►s~J ~,~rIoLLARS m FWells Fargo Bank NA Private Client Services Minneapolis, MN 55479 wellsfargocom AA FOR 70~~- N~+.u- ~i~SE +t4R~~MFNG' t1'0012731!• t:091,0000L91:7L658245L2B' E 0 PROPERTY MGMT.NO. NO: PROJECT FAP-25-A(1) LOCATION: South Side of 1-70 South Frontage Road, West of Vail Road, Vail, Colorado LEASE AGREEMENT (Vacant Land) THIS LEASE AGREEMENT made and entered into this day of by and between the State of Colorado acting by and through the Colorado Department of Transportation, CDOT, hereinafter referred to as "Lessor", and Vail Development, LLC and its successors hereinafter referred to as "Lessee". WITNESSETH: NOW, THEREFORE, in consideration of the mutual promises contained herein, the parties hereto agree as follows: 1. PREMISES, Lessor hereby leases and demises unto Lessee the Premises, hereinafter referred to as "Premises" located at along the south side of the 1-70 South Frontage Road and west of Vail Road in Vail, Colorado. The Premises, known and described as Parcel L-101, Project FAP-25-A(1) includes approximately 18,990 square feet of land area; the leased Premises being as shown on the plat attached hereto, made a part hereof and marked "Exhibit A. 2. TERM The term of this lease shall begin at 12 noon on June 1, 2006 and end at 12 noon on May 31, 2011, subject to the cancellation and termination provisions herein. 3. RENT. Lessee shall pay $ 100.00 per (month) or per (year) as rent on the first of each month or annual period during the term hereof. The first payment shall be due upon signing of the lease. Payments shall be made payable to the Colorado Department of Transportation at: Colo. Dept. of Transportation C/o Accounting Receipts & Deposits 4201 East Arkansas Ave., Rm. 212 Denver, CO 80222 or at such place as Lessor from time to time designates by notice as provided herein. In the event Lessor has not received the rental installment hereunder on or before the tenth (10) day of the month when due, a late charge of five percent (5%) of the total installment will be assessed to the Lessee for that month and each succeeding month the payment is not received on or before the 10th day of that month. In the event the Lessee for a rental installment tenders a check, and it is returned to Lessor for insufficient funds, Lessee agrees to pay administrative charges to Lessor of Twenty Dollars ($20.00). Both Lessor and Lessee agree that acceptance by the Lessor of the late payment does not waive Lessor's right to declare Lessee in default of this Lease Agreement. 4. USE. It is understood and agreed that the that the Lessee intends to use the Premises only for installation of 12 "de-watering" wells and 643 "soil nails". The Premises may not be used for any other purpose without the specific written prior permission of the Lessor. Any other use of the Premises shall constitute material breach of this Lease and may cause this lease to terminate immediately at the Lessor's option. Rev.3/06 Page 1 of 8 5. TAXES, UTILITIES, MAINTENANCE AND OTHER EXPENSES. It is understood and agreed that this Lease shall be an absolute Net Lease with respect to Lessor, and that all taxes, assessments, insurance, utilities and other operating costs and the cost of all maintenance, repairs, and improvements, and all other direct costs, charges and expenses of any kind whatsoever respecting the Premises shall be borne by Lessee and not by the Lessor so that the rental return to Lessor shall not be reduced, offset or diminished directly or indirectly by any cost or charge. Lessee shall maintain the Premises in good repair and in tenable condition free of trash and debris during the term of this lease. Lessor shall have the right to enter the Premises at any time for the purpose of making necessary inspections. 6. HOLD HARMLESS. The Lessee shall save, indemnify and hold harmless the Lessor and FHWA for any liability for damage or loss to persons or property resulting from Lessee's occupancy or use of the Premises. 7. OWNERSHIP. The State of Colorado is the owner or the Premises. Lessor warrants and represents himself to be the authorized agent of the State of Colorado for the purposes of granting this Lease. 8. LEASE ASSIGNMENT. Lessee shall not assign this Lease and shall not sublet the demised Premises without specific written permission of the Lessor and will not permit the use of said Premises to anyone, other than Lessee, its agents or employees, without the prior written consent of Lessor. 9. APPLICABLE LAW. The laws of the State of Colorado and rules and regulations issued pursuant thereto shall be applied in the interpretation, execution and enforcement of this Lease. Any provision of this Lease, whether or not incorporated herein by reference, which provides for arbitration by any extra- judicial body or person or which is otherwise in conflict with said laws, rules and regulations shall be considered null and void. Nothing contained in any provision incorporated herein by reference which purports to negate this or any other special provision in whole or in part shall be valid or enforceable or available in any action at law whether by way of compliant, defense or otherwise. Any provision rendered null and void by the operation of this provision will not invalidate the remainder of this Lease to the extent that this agreement is capable of execution. 10. CANCELLATION. Both parties understand that at any time before the scheduled expiration of the term of this Lease, Lessor has the right to cancel the lease without liability by giving the Lessee 90 days written notice of its intention to cancel the Lease. The notice shall be hand delivered, posted on the Premises, or sent to the Lessee, at the address of the Lessee contained herein by Certified Mail, return receipt requested. This Lease may also be canceled by the Lessee by giving the Lessor 90 days written notice of their intent to do so and after receiving permission of the Lessor to remove, and having removed all soil noils and filling and capping all de-watering wells. 11. COMPLETE AGREEMENT. This Lease, including all exhibits, supersedes any and all prior written or oral agreements and there are no covenants, conditions or agreements between the parties except as set forth herein. No prior or contemporaneous addition, deletion, or other amendment hereto shall have any force or affect whatsoever unless embodied herein in writing. No subsequent novation, renewal, addition, deletion or other amendment hereto shall have any force or effect unless embodied in a written contract executed and approved pursuant to the State Fiscal Rules. 12. CAPTIONS, CONSTRUCTION, AND LEASE EFFECT. The captions and headings used in this Lease are for identification only, and shall be disregarded in any construction of the lease provisions. All of the terms of this Lease shall inure to the benefit of and be binding upon the respective heirs, successors, and assigns of both the Lessor and the Lessee. If any provision of this Lease shall be determined to be invalid, illegal, or without force by a court of law or rendered so by legislative act then the remaining provisions of this Lease shall remain in full force and effect. Rev.3/06 Page 2 of 8 13. NO BENEFICIAL INTEREST. The signatories aver that to their knowledge, no state employee has any personal or beneficial interest whatsoever in the service or property described herein. 14. NO VIOLATION OF LAW. The Lessee shall not commit, nor permit the commission of, any act or thing, which shall be a violation of any ordinance of the municipality, City, County, or of any law of the State of Colorado or the United States. The Lessee shall not use the Premises for any manner, which shall constitute a nuisance or public annoyance. The signatories hereto aver that they are familiar with 18-8-301, et seq., (Bribery and Corrupt Influences) and 18-8-401, et seq., (Abuse of Public Office), C.R.S., as amended, and that no violation of such provisions is present. The signatories aver that to their knowledge, no state employee has any personal or beneficial interest whatsoever in the service or property described herein. 15. NOTICE. Any notice required or permitted by this Lease may be delivered in person or sent by registered or certified mail, return receipt requested, to the party at the address as hereinafter provided, and if sent by mail it shall be effective when posted in the U.S. Mail Depository with sufficient postage attached thereto: LESSOR: Colo. Dept. of Transportation Property Management Manager 15285 S. Golden Rd., Bldg. 47 Golden, Colorado 80401 LESSEE: Vail Development, LLC c/o Black Diamond Resort - Vail, LLC 50 S. Sixth Street, Suite 1480 Minneapolois, MN 55402 Notice of change of address shall be treated as any other notice. The Lessee warrants that the address listed above is the Lessee's current mailing address and that the Lessee will notify the Lessor in writing of any changes in that address within ten (10) days of such change. 16. HOLDING OVER. If the Lessor allows the Lessee to occupy or use the Premises after the expiration or sooner termination of this Lease, the Lessee becomes a Holdover Tenant and shall be a month-to-month Lessee subject to all the laws of the State of Colorado applicable to such tenancy. The rent to be paid by Lessee during such continued occupancy shall be the same being paid by Lessee as of the date of expiration or sooner termination. Lessor and Lessee each hereby agree to give the other party at least thirty (30) days written notice prior to termination of this holdover tenancy. 17. CHIEF ENGINEER'S APPROVAL. This Lease shall not be deemed valid until it has been approved by the Chief Engineer of the Colorado Department of Transportation and by the Lessee. 18. HAZARDOUS MATERIALS. The Lessee agrees to defend, indemnify and hold harmless the Lessor and any employees, agents, contractors, and officials of the Lessor against any and all damages, claims, liability, loss, fines or expenses, including attorney's fees and litigation costs, related to the presence, disposal, release or clean-up of any contaminants, hazardous materials or pollutants on, over, under, from or affecting the property subject to this Lease, which contaminants or hazardous materials the Lessee or its employees, agents, contractors or officials has caused to be located, disposed, or released on the property. The Lessee shall also be responsible for all damages, claims and liability to the soil, water, vegetation, buildings or personal property located thereon as well as any personal injury or property damage related to such contaminants or hazardous materials. 19. NO NEW PERMANENT STRUCTURES OR IMPROVEMENTS. No new permanent structures or improvements of any kind, other than those described in Section 2 of this lease, shall be erected or moved upon the Premises by the Lessee without the express written prior permission of the Lessor. Any Rev.3/06 Page 3 of 8 such structure or improvement erected or moved upon the Premises without the express written consent of the Lessor may be immediately removed by the Lessor at the expense of the Lessee. Further, any structures, improvements or items of any kind remaining on the Premises at the termination of the Lease will be considered abandoned by the Lessee and may be immediately removed by Lessor at the Lessee's expense; provided, howver, that abandonment of the soil nails is anticipated by this agreement and conpensation for any future removeal is provided for in Section 23 below and such abandonment of the soil nails shall not in and of itself require the immediate removal of the soil nails by Lessor. 20. BINDING AGREEMENT. This Lease shall be binding upon and inure to the benefit of the partners, heirs, executors, administrators, and successors of the respective parties hereto. 21. DEFAULT. If: (1) Lessee shall fail to pay any rent or other sum payable hereunder for a period of 10 days after the same is due; (2) Lessee shall fail to observe, keep or perform any of the other terms, agreements or conditions contained herein or in regulations to be observed or performed by Lessee and such default continues for a period of 30 days after notice by Lessor; (3) This Lease or any interest of Lessee hereunder shall be levied upon by any attachment or execution, then any such event shall constitute an event of default by Lessee. Upon the occurrence of any event of default by Lessee hereunder, Lessor may, at its option and without any further notice or demand, in addition to any other rights and remedies given hereunder or by law, do any of the following: (a) Lessor shall have the right, so long as such default continues, to give notice of termination to Lessee. On the date specified in such notice (which shall not be less than 3 days after the giving of such notice) this Lease shall terminate. (b) In the event of any such termination of this Lease, Lessor may then or at any time thereafter, re-enter the Premises and remove there from all persons and property and again repossess and enjoy the Premises, without prejudice to any other remedies that Lessor may have by reason of Lessee's default or of such termination. (c) The amount of damages which Lessor may recover in event of such termination shall include, without limitation, (1) the amount at the time of award of unpaid rental earned and other sums owed by Lessee to Lessor hereunder, as of the time of termination, together with interest thereon as provided in this Lease, (2) all legal expenses and other related costs incurred by Lessor following Lessee's default including reasonable attorneys' fees incurred in collecting any amount owed hereunder (3) any damages to the property beyond its present condition. (d) Upon the Lessee's failure to remove its personal property from the Premises after the expiration of the term of this Lease, (with the exception of the soil nails that will remain) Lessor may in its sole discretion, without notice to or demand upon Lessee, remove, sell or dispose of any and all personal property located on the Premises. Lessee waives all claims for damages that may be caused by Lessor's removal of property as herein provided. 22. INSURANCE. (Revised 2006 per State Controller Requirements) (a) The Lessee shall obtain and maintain, at all times during the duration of this Lease, insurance in the kinds and amounts detailed below. The Lessee shall require any Contractor working for them on the Premises to obtain like coverage. The following insurance requirements must be in effect during the entire term of the Lease. Lessee shall, at it sole cost and expense, obtain insurance on its inventory, equipment and all other personal property located on the Premises against loss resulting from fire, theft or other casualty. Rev.3/06 Page 4 of 8 (b) Workers' Compensation Insurance as required by State statute, and Employer's Liability Insurance covering all employees acting within the course and scope of their employment and work on the activities authorized by this Lease in Paragraph 4. (c) Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering Premises operations, fire damage, independent Consultants, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows: 1. $1,000,000 each occurrence; 2. $2,000,000 general aggregate; 3. $50,000 any one fire. If any aggregate limit is reduced below, $1,000,000 because of claims made or paid, the Lessee, or as applicable, its Contractor, shall immediately obtain additional insurance to restore the full aggregate limit and furnish to CDOT a certificate or other document satisfactory to CDOT showing compliance with this provision. (d) If any operations are anticipated that might in any way result in the creation of a pollution exposure, Lessee shall also provide Pollution Legal Liability Insurance with minimum limits of liability of $1,000,000 Each Claim and $1,000,000 Annual Aggregate. CDOT shall be named as an Additional Insured to the Pollution Legal Liability policy. The Policy shall be written on a Claims Made form, with an extended reporting period of at least two year following finalization of the Lease. (e) Umbrella or Excess Liability Insurance with minimum limits of $1,000,000. This policy shall become primary (drop down) in the event the primary Liability Policy limits are impaired or exhausted. The Policy shall be written on an Occurrence form and shall be following form of the primary. The following form Excess Liability shall include CDOT as an Additional Insured. (f) CDOT shall be named as Additional Insured on the Commercial General Liability Insurance policy. Coverage required by the Lease will be primary over any insurance or self-insurance program carried by the State of Colorado. (g) The Insurance shall include provisions preventing cancellation or non-renewal without at least 30 days prior notice to CDOT by certified mail to the address contained in this document. (h) The insurance policies related to the Lease shall include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, against CDOT, its agencies, institutions, organizations, officers, agents, employees and volunteers. (i) All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies satisfactory to CDOT. (j) In order for this lease to be executed, the Lessee, or as applicable, their Contractor, shall provide certificates showing insurance coverage required by this Lease to CDOT prior to the execution of this lease. No later than 30 days prior to the expiration date of any such coverage, the Lessee or Contractor shall deliver to the Notice Address of CDOT certificates of insurance evidencing renewals thereof. At any time during the term of this Lease, CDOT may request in writing, and the Lessee or Contractor shall thereupon within 10 days supply to CDOT, evidence satisfactory to CDOT of compliance with the provisions of this section. Insurance coverage must be in effect or this lease is in default. (k) Notwithstanding subsection (a.) of this section, if the Lessee is a "public entity' within the meaning of the Colorado Governmental Immunity Act CRS 24-10-101, et seq., as amended ("Act'), the Rev.3/06 Page 5 of 8 Lessee shall at all times during the term of this Lease maintain only such liability insurance, by commercial policy or self-insurance, as is necessary to meet its liabilities under the Act. Upon request by CDOT, the Lessee shall show proof of such insurance satisfactory to CDOT. Public entity Lessees are not required to name CDOT as an Additional Insured. (I) If the Lessee engages a Contractor to act independently from the Lessee on the Premises, that Contractor shall be required to provide an endorsement naming CDOT as an Additional Insured on their Commercial General Liability, and Umbrella or Excess Liability policies. 23. ADDITIONAL PROVISIONS. The Lessee proposes to install "soil nails" and "de-watering" wells in the parcel described above, and as shown on Sheet XBS-2 of the construction plans by Coggins & Sons, Inc. Shoring Contracts of Littleton, Colorado, dated 9/9/05 as attached hereto. The purpose of the proposed installation is to shore up the Lessor's property subsequent to excavation of the Lessee's adjoining property and to prevent water seepage into the excavated area. The "soil nails" shall remain in the subsurface of the Lessor's property until they are removed by or with the permission of the Lessor; but in no event shall the soil nails be removed prior to the end of the term of the Lease Ageement. The "de-watering" wells shall be filled and capped in accordance with local, State and Federal regulations, laws and guidelines/standards before the end of the term of this lease. (a) The payment for this lease will consist of two parts: (i) The first part is that described in Section 3 and shall be fixed for a period of FIVE (5) YEARS or 60 monthly payments. (ii) The second part of the payment consists of ONE PAYMENT of $48,225.00, due upon signing of this lease, which is the calculated current cost of removing the soil nails during excavation and is based on 643 nails at $75.00 per nail. Any addition or subtraction of the number of nails shall be reflected in the total amount of this payment on the basis of $75.00 per nail. This payment is agreed upon between the parties to be the total amount to be paid by the Lessee to offset any future costs of removal of the soil nails by the Lessor. (b) The Lessee has represented to the Lessor that their building is freestanding and not dependent upon the soil nails for support. The Lessee therefore agrees that they will have no legal recourse against the Lessor, it's agents or Permitees if during the responsible removal of the soil nails the Lessee's property is damaged due to lack of support. (c) The Lessee further agrees that it will indemnify the Lessor for any damages incurred by Permittees of the Lessor, if during the normal course of their business their equipment or facilities are damaged in connection with the installation of the soil nails or de-watering wells on the Premises. i. The Lessee acknowledges that it is aware of the existing utilities in the area to be leased and agrees that it will submit plans of its proposed installations to the affected utility companies for review and concurrence. The Lessee further agrees that it will provide the Lessor with copies of written documentation from each utility that they have reviewed the proposed installation and concur with the plans to avoid and protect the existing utilities and to mitigate any damages. Such documentation will be submitted to Lessor prior to any work being conducted on the Premises by Lessee. ii. The Lessee agrees that it will not damage utility facilities presently existing and will repair at its cost such facilities if damage occurs due to its work within the right of way. Lessee further agrees that it will indemnify and hold harmless the Lessor and all utility companies presently occupying the right of way as a consequence of Lessee's action. Rev.3/06 Page 6 of 8 (d) The designer of the shoring system, Coggins & Sons, Inc. of Littleton, Colorado has required regular monitoring of the excavation during construction. The Lessee agrees to include the Lessor in the distribution list for the results of the monitoring. Monitoring results will be sent in a timely manner to CDOT Materials and Geotechnical Branch Attention: Mark Vessely. 4201 East Arkansas Avenue. Denver, CO 80222 970-618-3284 (e) Lessee further agrees to provide prompt notification of any indications of failure, including but not limited to soil or pavement cracking, to the party noted above and to the following parties, James Pitkin, Senior Supervisor 970-471-1242 Larry Dungan, Vail TM-III 970-845-8816 Office 970-471-9768 Cell David Lykins 970-845-1027 Office 970-401-2326 Cell Co Rev.3/06 Page 7 of 8 r6 IN WITNESS WHEREOF, the parties hereto have executed this lease agreement on the day and year first above written. LESSEE: Vail Development, LLC (Full Legal Name) (If Corporation) By Attest (Seal) (Nam ~'Dou4uas C. ~pSy-~rJU Title l Ge- MA'- p 4 C- }2- By 20 - 12l '7 2-9 4 Federal Tax Identification Number ) ss COUNTY OF gyp' V~ ) The foregoing instrument was subscribed and sworn to before me this 1/1-ayof Secretary "Yt ink Sa STATE OF E6L-9R ) by Witness my hand and official seal. My commission expires _x NOtAiF~4• ~;€.l.4~: 4N;9!~~~,,~P,TrRt My c.~.~•. ~aet~~, ;t3 , X683 Address: ATTEST: CSC-t-.,✓ ' Notary Public 50' s. S ixi-h 5;+ s}c Nzo r Mills, K41v s540 7. LESSOR: COLORADO DEPARTMENT OF TRANSPORTATION DOUGLAS W. BENNETT CRAIG SIRACUSA, P.E. Chief Clerk for Right of Way Chief Engineer Rev.3/06 Page 8 of 8 TOWN OF VAIL TOW APPLICATION FOR REVOCABLE PERMIT TO ERECTOR MAINTAIN IMPROVEMENTS ON A PUBLIC RIGHT-Of- WAY *THIS FORM CANNOT BE REDUCED (PLEASE TYPE) TYPES OF IMPROVEMENTS Fence Wall Landscaping Other t>~I N~Ir,s OWNER OF PROPERTY IZISOtCrS -V,+ it-_ I- I-C ADDRESS 550 se'c{7-tl S/ X-Z2 _5RE S~~ ATE /fit-y M11VA1Eqlacis, M .0) 5`1Z?ZZ LEGAL DESCRIPTION OF PROPERTY TO BE SERVED: LOT BLOCK SUBDIVISION (If necessary, attach description on separate sheet). Corner lot Inside lot DETAILED DESCRIPTION OF STRUCTURE OR ITEM(s) INTO RIGHT-OF-WAY: soi- Ivn 1 L 11w5.rni_L_,t-'t7cAj BG~~ ~H vAll- RaA-D rWIE5 r' '.51DC- Of VA-4- Does structure presently exist? /VC' Proposed date for commencement of construction 10- 0& In consideration of the issuance of a revocable permit for the structure above indicated, applicant agrees as follows: 1. That the structure herein authorized on a revocable permit basis is restricted exclusively to the land above described. 2. That the permit is limited specifically to the type of structure described in this application. 3. That the applicant shall notify the Project Planner and Public Works Department, or their duly authorized agent, twenty-four hours in advance of the time for commencement of construction, in order that proper inspection may be made by the Town. 4. The applicant agrees to indemnify and hold harmless the Town of Vail, its officers, employees and agents against all liability, claims and demands on account of injury, loss or damage, including without limitation claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out of or are in any manner connected with applicant's activities pursuant to this permit, if such injury, loss, or damage is caused in whole or in part by, or is claimed to be caused in whole or in part by, the act, omission, error, professional error, mistake, negligence or other fault of the applicant, his contractor or subcontractor or any officer, employee or representative of the applicant, his contractor or his subcontractor. The applicant agrees to investigate, handle respond to, and to provide defense for and defend against, any such liability, claims, or demands at the sole expense of the applicant. The applicant also agrees to bear all expenses relating thereto, including court costs and Revised 08/04/04 F:\Users\cdev\FORMS\PERMITS\Revcable ROW Permit doc attorney's fees, whether or not any such liability, claims, or demands alleged are groundless, false, or fraudulent. Applicant agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient to ensure against all liability claims, demands and other obligations assumed by the applicant pursuant to this Paragraph 4. Applicants further agree to release the Town of Vail, its officers, agents and employees from any and all liability, claims, demands, or actions or causes of actions whatsoever arising out of any damage, loss or injury to the applicant or to the applicant's property caused by the Town of Vail, its officers, agents and employees while engaged in maintenance or snow removal activities or any other activities whatsoever on Town of Vail property, streets, sidewalks, or rights-of-way. 5. That the permit may be revoked whenever it is determined that the encroachment, obstruction, or other structure constitutes a nuisance, destroys or impairs the use of the right-of-way by the public, constitutes a traffic hazard, or the property upon which the encroachment, obstruction, or structure exists is required for use by the public; or it may be revoked at any time for any reason deemed sufficient by the Town of Vail. 6. That the applicant will remove, at his expense, the encroachment, obstruction, or structure within ten days after receiving notice of any revocation of said permit. 7. That the applicant agrees to maintain any landscaping associated with the encroachment on the right-of-way. 8. That in the event said removal of the encroachment, obstruction, or structure is not accomplished within ten days, the Town is hereby authorized to remove same and have the right to make an assessment against the property and collect the costs or removal in the same manner as general taxes are collected. 9. That the applicant has read and understands all of the terms and conditions set forth in this application. 10. The Revocable Right-of-way Permit fee is $35.00; $11.00 of the fee pays for Eagle County Clerk and L Recorder recording. Make checks payable to Town of Vail. 11. Special conditions: Signature of Property Owner Date (If joint ownership, both signatures) Signature of Property Owner Date (If joint ownership, both signatures) APPROVED: Project Planner Department of Public Works Revised 08/04/04 F:\Users\cdev\FORMS\PERMITS\Revcable ROW Permit.doc C EXHIBIT A LEGAL DESCRIPTION OF VAIL PROPERTY A part of Lots A, B and C of Amended Map of Sheet 1 of 2 of Vail Village, Second Filing, Eagle County, Colorado, being more particularly described as follows: Commencing at the Northeast corner of Section 7, Township 5 South, Range 80 West of the Sixth Principal Meridian; thence along the East line of the Northeast Quarter of the Northeast Quarter of said Section 7, and referring all bearings contained herein to said line, SO0°09'28"W, a distance of 39.20 feet; thence departing said line N79°08'45"W, a distance of 25.44 feet to the Northeast corner of said Lot A and the Point of Beginning of the herein described parcel of land; thence along the East line of said Lot A and the West right-of way line of Vail Road (50' wide) SO0°09'28"W, a distance of 125.00 feet; thence continue along said line SO0°09'28"W, a distance of 29.15 feet to the Northeast corner of Condominium Map for the Holiday House as recorded in Book 229 at Page 936; thence along the North and West boundaries of said Condominium Map. The following five (5) courses and distances: 1) N73°43'44"W, 156.13 feet; 2) S28°00'55"E, 67.00 feet; 3) S61°59'05"W, 18.27 feet; 4) S28°00'55"E, 86.00 feet; to, 5) S74°12'22"W, 101.49 feet to intersect the North right-of-way line of West Meadow Drive (50' wide); thence along said right-of-way line the following two (2) courses and distances: 1) N67°34'08"W, 264.42 feet; 2) 58.51 feet along the arc of a curve to the left having a radius of 525.00', a central angle of 6°23'09" and a chord which bears N70°45'43"W, 58.48' to the Southwest corner of said Lot C; thence along the West line of said Lot C N10°51' 15"E, a distance of 251.25 feet to the Northwest corner of said Lot C; thence along the North line of said Lot C S79°08'45"E, a distance of 300.00 feet to the Northeast corner a said Lot C and the Northwest corner of said Lot A; thence along the North line of said Lot A S79°08'45"E, a distance of 152.65 feet to the Point of Beginning. Containing 118765 square feet or 2.726 acres of land more or less. Bearings are based on State Plane Coordinates, Colorado Central Zone. 0 { 104772.DOC} LOT FOUR SEASONS RESORTS VAR, COLORADO m A- STATE OF COLORADO Bill Owens, Governor Douglas H. Benevento, Executive Director Dedicated to protecting and improving the health and environment of the people of Colorado 4300 Cherry Creek Dr. S. Denver, Colorado 80246-1530 Phone (303) 692-2000 TDD Line (303) 691-7700 Located in Glendale, Colorado http://www.cdphe.state.co.us November 1, 2005 Douglas Hipskind, Owner Vail Development, LLC 50 S. 6th Street Minneapolis, MN 55402 Laboratory Services Division 8100 Lowry Blvd. Denver, Colorado 80230-6928 (303) 692-3090 OF SOLO 1876 Colorado Department of Public Health and Environment RE: Certification, Colorado Wastewater Discharge Permit System: Permit Number: COG-070000, Facility Number: COG-072055 Dear Mr. Hipskind: Enclosed please find a copy of your certification which was issued under the Colorado Water Quality Control Act. You are legally obligated to comply with all terms and conditions of the permit and certifications. Please read the permit and if you have any questions contact this office at (303) 692-3590. Sincerely, Debbie Jessop, Administrative Assistant Water Quality Protection Section WATER QUALITY CONTROL DIVISION xc: Regional Council of Government Eagle County, Local County Health Department Mark Kadnuck/Andy Poirot, District Engineer, WQCD Permit File Permit Fees File PAYMENT IS DUE UPON RECEIPT OF THE PERMIT/CERTIFICATION PLEASE WRITE YOUR PERMIT NUMBER ON YOUR CHECK TO ENSURE PROPER CREDIT PERMIT # COG-0720-55 a . - FOUR SEASONS RESORTS VAIL, COLORADO ~g0 SEIAIpITATI°N ? DIKES AT 0a5TIN° W&V -tl I y ~ UYERFL I~ g O% MET TO FtE)AA#4 1 VE BRDN NER FIGURE 3 HOLIDAY HOUSE FOUR SEASONS RESORT CI CONSTRUCTION DE WATERING PROJECT COG-072055 _ rl PAGE 19 SCALE: 1°=40 ozsv coNrMeNru cou;T. szos CRECKEeGp°L. caoeAOO ao+z~ SHEET 2 OF 2 F.O. R°o ;A °"A°~; FOUR SEASONS RESORTS VAIL, COLORADO LOT D aoom r.r a rm I Or s wCWTA. r. mw rsm "I rim r l ws ~ a ~ 1 l~ oasiric 711 AND u F hoscAw,c io eown -Duu,c Dawnum h t ; meTa , P POSED SEDINAMADON H _ PONDS T N -y SOW 11114 ~ ej 2 x 1~ NVA L aiT I~ \ NSr u sum x else AT wm 4 y ~ FIGURE 2 FOUR SEASONS RESORT x A CONSTR UMON DEWATERING PROJECT x COG-072055 ~ ~ _"_;so ri' ~a x\ PAGE 18 u ou9 AL G« .nos e~~GL cao1I 60424 O ,sao-GOGA - `o`oww~31 80443 BOX SCALE: 1"=40' SHEET 1 OF 2 r.o. V Permit No. COR-030000 Facility No. COR-038447 PAGE 1 of 17 CERTIFICATION CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION Construction Activity: The construction activity includes demolition of existing buildings and construction of a new building with parking. This permit specifically authorizes: Vail Development, L•LC to discharge stormwater from the facility identified as Four Seasons which is located at: 13 Vail Road & 28 S. Frontage Vail, Co 81657 latitude 39/38/45, longitude 106/23/30 in Eagle County Gore Creek to: Colorado River effective: 06/2 8 /2005 Annual Fee: $270.00 (DO NOT PAY NOW. You will receive a prorated bill.) 0