Loading...
HomeMy WebLinkAboutB06-0196 Structural Column Repair Submittal #16 04/13/10nnmei.k: Revision Submittals: /* xp �'r / t 1. "Field Set" of approved plans MUST accompany revisions. —, l V ` 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. it #(s) information applies to:� ^Attention: =Ct e dress: 7 M t (Number) (Street) ite #) Building /Complex Name: L . Contact Inforrpation: Company: Com yAddress: CJ A . City: ��(� St Zip: Contact Name: fu 1 40 Contact Phone: - 1—, Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) j Building: Plumbing: Electrical: Mechanical: Total: ( ) Response to Correction Letter _attached copy of correction letter ( ) Deferred Submittal ( ) Other Date Received: e e APR 132010 TOWN" L IL C . 01- Jan -10 Description / List of rhnnnoa- NISHKIAN MENNINGER CONSULTING AND STRUCTURAL ENGINEERS SINCE 1919 April 12, 2010 Mr. Eric Pendley, Building Official SAFEbuilt Colorado, Inc. 1286 Chambers Avenue, #101 Eagle, CO 81631 Re: Four Seasons Hotel Vail, Colorado Response to Plan Review of Structural Slab Fixes NM Job No. 7083.11 Dear Mr. Pendley: APR 13 2010 TOWN OF VAIL Following is Nishkian Menninger's response to the Plan Review Comments by James Home S.E. dated March 18, 2010 on the subject project: 1. Please provide. concrete break data demonstrating conformance with statistical reductions in average strength, to permit the use of f'c= 5600psi. IBC 1901.2; ACI 318, Ch. 5. The ACI 318-02 Code Section 5.6 Evaluation and acceptance of concrete, using the criteria for standard laboratory cured specimens under Section 5.6.3.3, was used to establish the minimum as -built concrete compressive strength for the floor slabs of 5600 psi. Please note this is not an alternative analysis. The results of the 28-day and 56-day compressive strength tests by Ground Engineering Consultants of concrete cylinders taken during construction of Levels 2 through 10 floor slabs were reviewed for the criteria in Section 5.6.3.3: "(a) Every arithmetic average of any three consecutive strength tests equals or exceeds f c." "(b) No individual strength test (average of two cylinders) falls below f by more than 500 psi when f is 5000 psi or less; or by more than 0.10 f when f is more than 5000 psi. Please refer to the attached highlighted summary of the laboratory concrete cylinder tests by Ground Engineering Consultants. 1200 FOLSOM STREET, SAN FRANCISCO, CA TEL 415 - 541 -9477 FAX 415 -543 -5071 Mr. Eric Pendley, Building Official Re: Four Seasons Hotel, Vail, Colorado Response to Plan Review of Structural Slab Fixes April 12, 2010 Page 2 2. Equation used for concrete shear strength outside of the retrofit drop panel or shear reinforcing assumes the critical section is located 3.5d away from column face, which may not apply at all columns. Verify 2.17�fc is accurate for concrete nominal strength given each column to slab connection geometry. Note that over 4d away from the column face, the concrete nominal shear strength is 2�fc as proposed by the Dilger report. IBC 1901.2; ACI 318, 1.4, 11.12.2.2. 2. As a clarification, ACI 318 -02 Equation (11 -36) for concrete shear strength at columns and edges of drop panels for prestressed two -way slabs was used for concrete shear strength .outside the retrofit drop panels. Please note this is not an alternative analysis. The equation.used for nominal concrete shear strength (vn) outside the shear reinforced zone for prestressed two -way slabs was recommended by Professor Walter Dilger and is presented as Equations (3.1) and (3.2) in his report prepared for this project dated March, 2010. The equation is conservative and is composed of three parts: The first term represents a straight line decrease of 3(sgrt f c) at d from the column face to 2(sgrt fc) at 4d from the column face based on research and testing. The multiplier from 3 to 2(sgrt fc) varies depending on the length of the shear reinforcement away from the column and the slab depth. As a clarification, the multiplier is 2.17 for Type A studrails in an 8.6" thick slab, however, it varied from 2 to 2.51 (sqrt fc) for other studrail lengths and slab thicknesses. The second term, 0.133 fc, is the effective concrete compressive stress due to prestress averaged in two orthogonal directions. A clarification is that the term 0.092 was used without applying phi which is a slight reduction (more conservative) from the Dilger term of 0.133 before phi is applied (0.133 x 0.75 = 0.10 > 0.092.) The third term, Vp /(bo *d), is the sum of all vertical components due to effective prestress in all the tendons that intersect the critical section outside the shear reinforced zone. NISHKIAN MENNINGER Mr. Eric Pendley, Building Official Re: Four Seasons Hotel, Vail, Colorado Response to Plan Review of Structural Slab Fixes April 12, 2010 Page 2 3. Value of vertical prestressing force component Vp is utilized for additional strength. Please describe how this value was obtained for use in the punching shear calculations. IBC 1901.2; ACI 318, 1.4, 11.12.1.1. The vertical prestressing force Vp is calculated using slope of a conservative straight line tendon profile between the column and mid -span for the uniform tendon direction, and using the slope of an inverted parabola over the column fitted to the actual tendon drape from the PT shop drawings for the banded tendon direction. The actual PT chair heights from the Suncoast shop drawings were used to establish the drape for the banded tendon at each column. Then the slope of the parabola at the critical section is calculated using the studrail type (length) specified, and the vertical component is calculated based on the tangent slope. The lower of the vertical components calculated on either side of the column is selected (usually for longer adjacent span), and the reported Vp value is the lower vertical component multiplied by two for an interior column banded direction. Of course for edge and corner columns the free edge does not contribute to the Vp calculation. The attached sample calculation for the derivation of this force is attached. If all locations are required for review they will be transmitted. Please do not hesitate to contact me if you should have questions or comments. Very truly yours, NISHKIAN MENNINGER i Abe on H President - KLM c1Y Enclosure 7063- KllMv49 NISHKIAN MENNINGER Four Seasons Vail Vail, Colorado NM Job No.7083 April 12, 2010 Plan Check Response on Punching Shear Analysis Table of Contents 1. Concrete Cylinder Compression Test Reports from Ground Engineering 2. Calculation for Vp Force. NISHKIAN MENNINGER 4 Concrete Cylinder Compression Test Reports from Ground Engineering NISHKIAN MENNINGER 0 J u �i W Z� 3 tA S LA 9 5 L S r- 0 ,1 M J u �i W Z� 'f i 4 6 ACC era iMICEECECCCCCEECIECEECEECEECEECECEICEE mmicceooaeccccccooccrsa 'f i 4 6 m (P O u 0 �n 'I i Mill 1 10011111111 IIIIENE1111111011 HIM ME E � L L Q E6Li LLE �[L[�L CCLGL L'L� 9E�aL�E� ECE��E� L�t�t �f LL�EQfifi [�[flli[[' 9€�i €f�G�[ ���EE€ €�E[CL[fLlll�ffff�ft[ 'I i r N � r„ 0 g UcLLLLoLLooLLooLinLLLL0000LL000000LoiiUL000` ln-EIEEEEEEcEEcEEcEccEECEECCCEEECEECEEEEIEIEEECCEE ��e�6�eeeeeeee��ee�ee��e�e�e��e�eeeeeee�e���e� MM000eoE000ioECoEcEoiflie[iE'G'eEEF.EEEeEEOEEo eoICoE 0 c P � J � ! P r' •F E lilt EM EEEEE �E c�EEFfEEEGttTE����� mere €� €er�e��e�a�e� eee [[FEE �ucc cce oc�oc ce E Calculation for Vp Force. NISHKIAN MENNINGER Raths, Raths $ Johnson, Inc. Four Seasons Vail 635 Midway Drive Vertical Component of Prestress, Vp 09096 Willowbrook, IL 60527 Calculations Job Number (630) 325-6160 By: CWG I Date: I Chkd: Sheet Input Height, in ADAPT Default Inflection Locations Level 6th x1/1- = 0.1 Column 62 -1313 x2/L = 0.5 Lr = 16 in x3 /L = 0.1 Ls = 24 in 10.500 .Tendon Span H to Lr Critical Section Location 4.75 X, ft Studrail Type A 18.29 4 Distance to last stud = 21 in 18.29 8 d = 7.125 in 23.71 4 a = 23.71 8 Span 1 (South) - Banded Tendon Profile per Shop Drawings Supports L = 21.000 ft 0.0726 *Fse Column Una Height, in X, ft BC.2 8.50 0.000 X1 = 2.100 ft 7.00 3.500 x2 = 10.500 ft 4.25 7.000 x3 = 18.900 ft 2.00 10.500 2.75 14.000 4.75 17.500 BB 7.00 21.000 a = 0.009 a = -0.031 Slope at Critical Section = 0.0728 a = 0.0727 red BA Vp = 0.0726 *Fse Using Straight Line Slope ADAPT Inflection Parabola 1 Parabola 2 Locations (x -h) = 4p(y -k) (x -h) = 4p(y -k) X1 = 2.100 ft h = 10.500 ft h = 21.000 ft x2 = 10.500 ft k = 2 in k= 7 in x3 = 18.900 ft x = 17.500 ft x = 17500 ft y = 4.75 in y = 4.75 in p = 53.45 p = -16.33 slope = a(x -h) slope = a(x -h) a = 0.009 a = -0.031 Slope at Critical Section = 0.0728 a = 0.0727 red BA Vp = 0.0726 *Fse Using Straight Line Slope Slope = 0.0397 Vp = 0.0397 *Fse Span 2 (North) - Banded Tendon Profile per Shop Drawings Supports L = 32.500 ft Column Line Height, In x, ft BB 7.00 21.000 x1 = 24.250 ft 5.50 24.250 x2 = 37.250 ft 3.50 27.500 x3 = 50.250 ft 2.25 30.750 1.25 34.000 1.00 37.250 1.25 40.500 2.25 43.750 3.50 47.000 5.50 50.250 BA 7.00 53.500 VerbealPrestressForce (2).){s 1 of 3 Parabola 3 Parabola 4 ADAPT Inflection Locations (x -h) = 4p(y -k) (x -h) = 4p(y -k) x1 = 24.250 ft h = 21 ft h = 37.250 ft x2 = 37.250 ft k = 7 in k= 1 in x3 = 50.250 ft x = 24.25 ft x = 24.25 ft Y = 5.50 in y = 5.50 in p = -21.13 p = 112.67 slope = a(x -h) slope = a(x -h) a = -0.024 a = 0.004 Slope at Critical Section = - 0.0642 a = - 0.0641 red Vp = - 0.0641 *Fse Using Straight Line Slope Slope = 0.0308 Vp = 0.0308 *Fse VerbealPrestressForce (2).){s 1 of 3 Reths, Raths & Johnson, Inc. Four Seasons Vail 835 Midway Drive Vertical Component of Prestress, Vp 09096 Willowbrook, IL 60527 Calculations Job Number (630) 3256160 By. CWG I Date: I Chkd: Sheet Straight Line Slope for Uniform Strands F West Uniform Span � Parabola 3 • Reths, Raths & Johnson, Inc. Four Seasons Vail 835 Midway Drive Vertical Component of Prestress, Vp 09096 Willowbrook, IL 60527 Calculations Job Number (630) 3256160 By. CWG I Date: I Chkd: Sheet Straight Line Slope for Uniform Strands Sp an2 West Uniform Span Parabola 2 Parabola 3 Parabola 4 L. ft Low Pt, High Pt, Sloe p V p In in ft Height, in 25.96 1.00 7.50 0.0417 0.0417 Fast Uniform Span 7.00 24.25 5.50 L, ft Low Pt, High Pt, Slope Vp in in 24.80 5.13 31.17 1.00 7.50 0.0348 0.0347 Tanrinn Pmfiir3 eer Parahnlic Fnnatinns 6.92 S n1 Sp an2 Parabola 1 Parabola 2 Parabola 3 Parabola 4 X, ft Height, In X, ft Height, in X, ft Height, In ft Height, in 2.10 5.96 17.50 4.75 21.00 7.00 24.25 5.50 2.50 5.59 17.75 5.06 21.25 6.99 24.80 5.13 3.00 5.16 18.00 5.35 21.75 6.92 25.35 4.77 3.50 1 4.75 18.25 5.61 22.25 6.78 25.90 4.43 4.00 4.37 18.50 5.85 22.75 6.57 26.45 4.11 4.50 4.02 18.75 6.07 23.25 6.28 27.00 3.80 5.00 3.70 19.00 627 23.75 5.93 27.55 3.51 5.50 3.40 19.25 6.44 24.25 5.50 28.10 3.23 6.00 3.14 19.50 6.59 1 28.65 2.97 6.50 1 2.90 19.75 6.71 29.20 2.73 7.00 2.69 20.00 6.82 29.75 2.50 7.50 2.51 20.25 6.90 30.30 2.29 8.00 2.35 20.50 6.95 30.85 2.09 8.50 2.22 20.75 6.99 31.40 1.91 9.00 2.13 21.00 7.00 31.95 1.75 9.50 1 2.06 32.50 1.60 10.00 2.01 33.05 1.47 10.50 2.00 33.60 1.35 11.00 2.01 34.15 1.26 11.50 2.06 34.70 1.17 12.00 2.13 35.25 1.11 12.50 2.22 35.80 1.06 13.00 2.35 36.35 1.02 13.50 2.51 36.90 1.00 14.00 2.69 37.45 1.00 14.50 2.90 1 38.00 1.01 15.00 3.14 38.55 1.05 15.50 3.40 39.10 1.09 16.00 3.70 39.65 1.15 16.50 4.02 40.20 1.23 17.00 4.37 40.75 1.33 17.50 4.75 1 41.30 1.44 18.00 5.16 41.85 1.56 18.50 1 5.59 42.40 1.71 42.95 1.87 43.50 2.04 44.05 2.23 44.60 2.44 45.15 2.66 VerticalPrestressForce (2).xis 2 of 3 r a Raths, Raths & Johnson Inc. Four Seasons Vail 635 Midway Drive Vertical Component of Prestress, Vp 09096 Willowbrook. IL 605211 Calculations Job Number (630) 325 -6160 By: CMG I Date: I Cftd: Sheet Vertical Prestress Force (2).xls 3of3 J P IL J m M � M . W O L CL C O V c tm O _ O L7 O O R O W W Q1 O - o N O o T O O O O O O O C DJ 1�- tp tfi tt M N T ut `ly6iaH 0 L Q U- in L " O _ O d O U_ C 'C O O O O O O O C DJ 1�- tp tfi tt M N T ut `ly6iaH r s 'c F 0 e LLe� C V 9 C H e i W ¢e �