NOTE: THIS PERMIT MUST BE POS1'ED ON JOBSITE AT ALL TIMES
� PUBLIC WAY PERMIT Permit # PW07-0001
Job Address: 1 VAIL RD VAIL Status . . . : ISSUED
Location.....: 13 VAIL ROAD Applied . . : O1/04/2007
Parcel No...: 210107101016 Issued . . . O1/04/2007
Expires . .:
APPLICANT VAIL DEVELOPMENT LLC O1/04/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR LAYTON CONSTRUCTION CO. INC O1/04/2007 Phone: (801) 568-9090
License: 333-A
OWNER VAIL DEVELOPMENT LLC Ol/04/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Desciption:
Temp site access for partical dewatering permit only within
private property. No approval on CDOT ROW work allowed.
REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING
PUBLIC ACCOMODATIONS (PA) DISTRICT TO HIGH DENSITY MULTI
FAMILY DISTRICT (HDMF)
+*+r*rar+*+»*++**�**s******►*rww»»*►++***+*s***�**t**«�**+**++**r++w FEE SUMMA R Y r**���*rr*�*+*+******r***�s*********+****+**�as*+r*+***r*
Public Way------> ??
lnvestigation-----> ??
Payments--------------> $0.0 0
I3ond Amount---> BALANCE DUE----> $0.00
TOTAL FEES---> $50.00
•r.r►wr+�+s++**rs�..*+.*+..+s*»+*+�a***r�*s+*s+�****+++*.*�**�rfir**�.�*..++.s*+*��**s*�+*+..*..+rrr*avv+r:.r....+.+*.�..***«�*+++.+..+►*+**+.*
Approvals:
Item: 05500 PUBLIC WORKS
O1/04/2007 ls Action: AP See Conditions
01/04/2007 ls Action: PA When CDOT approval is granted and a copy o
permit
is submitted to the TOV. A new public way permit will be issued to Layton Constru
at
that time the fee in the amount of $1987 . 00 dollars will be deposit .
This permit will expire April 15, 2007 and a new one will be required.
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
Cond: CON0008618
Reference letter from Tom Kassmel to Layton Construction -
Doug Carley. Dated 11-29-06
The Town of Vail has completed the reviews and per review
of the dewatering plan. The following are the remaining
comments that must be addressed and the required conditions
�
�
for� dewatering.
�Comments:
1 . A valid CDOT utility permit will be required. The permit
must not refer to the lease agreement unless the lease
agreenent is signed and a copy submitted to the Town of
Vail .
2 . The discharge of line # 2 needs to be verified.
The Town would perfer it to be pumped to Spraddle Creek.
3 . Provide and updated construction schedule for
dewatering.
Conditions:
1 . The subsurface soil conditions on the site shall be
logged as the dewatering wells are installed, a copy of the
logs shall be provided to the Town of Vail and the
developer' s Geotechnical/Dewatering consultant for review.
2 . Prior to commencing dewatering, a pump test shall be
completed to verify that the flowrate is within the
estimated ground water flow.
3 . An action plan shall be developed prior to commencing
dewatering in the event excessive turbitity or settlement
is encountered. What is Plan B' ?
4 . Logs of the monitoring activity shall be made available
to the Town of Vail upon request .
**.*+.�.***...�*�....«.#.�..*.�..+......**....�.+......,,,�*..+.....+..�+��*»»**�..�.*.**...*...+...«.»***...,..*,..**+..*..*.*...*.....+....
DECLARATIONS
I certify that I have read all chapters of Titte 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec/detail book available in April of 1998.
**** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ****
ADVANC BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNA URE OF O OR CONTRACTOR FOR HIMSELF AND OWNER
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PR10R TO PERMIT ISSUANCE
' APPLICATI�ON FOR
RIGHT OF WAY US�-STR�ET CIJT PERMIT
s
PRJ#: Q y6� Town of Vail
Pv✓�: �7 ODD l Public Works Dept
Parcel#: 1309 Ellchom Dr
Bldg Permii#: B Qd- Qi46 Vail CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Righi of Wa}�Use-
Street Cui Permit antl forfeiture of application fees. By signing this permii,the applicant declares helshe llas read all contents of
this documeni,Town of Vai]Roadway 5tandaa•ds antl d�apters of Title 8—PuUlic Ways and Properry, of the Vail Municipal Code
and is full}�aware oPits requirements and agrees to pay all applicable fees. Application Iee:$50.00
Company Name: Company G,,� �} G
__L�1��� lC✓✓�'��rG,II� Phone: Lj�� ��� _/����
�, � City/State/ , �
Company Address:�%�/��, � 1,,9� }ywJ+J Zip: ���r.�� �'[�l'7(.�
Contractor_
License Number: _ %�. , � / �Y'=' ��^_ _ �mail• G!`�1�6� '3 �/ 5/>�O�
Gl7t1�r�r,� , � R G��c�ue'� �/�?���!��i�/ .
Contact / �j
Contact Name: �L�(�� ���`'Y Phone: �G�!� J��'�'7 J��
�—..
ROW Use Location: � ��Q�� �`j"� �j��L �.%� � ��vut(';� ' �ti--�7F'St`.v�S �5��'`�
Requested ROW A �'1� 1�� Re uested '
Use Dates: fl���?� to � � q M 7
�— L�y Work Times: (''t�:� p�-tv� ��'�p�
Purpose for Request: Street Cut Dimension (if applicable):
❑ Underground Utility Installation - '
❑ Landscaping Length:
❑ Temp Site Access
❑ Consiruction Staging Width (min 4'):
❑ Roadway Construction
� Other(explain): �r'�✓ / �� Total Sc�uare Footage:
Requested ROW Use: ; ': ^
❑ Single Lane Closure—Ift of c]osure(including taper)
❑ Two Lane Closure—lft of closure(including taper)
-
❑ Three Lane Closure—]ft of closure(including taper) - `
❑ Sidewallc/Bike Path—]ft of closure
`❑ Other(explain):
1. ApPlicant shall submit a traffic control plan, and worlc site/staging plan with this application. Traffic
Control Plan shall be in compliance with the`MUTCD and shall showstreets with names, adjacent
intersections, advanced w�arning signage, taper lenbths,'buffer space and worl:zone dimensions. No fi�l/
street closures are alloive�!
2. Applicant must contact Public Worlcs Department at.479-2198 24 hours prior to commencing of worlc.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routinb application throubh the Public V1'orlcs office to obtain the
necessary Town of Vail siRnatures. Ple e allow up to one weelc to process
acel Enei � 800-923-1957 +�i✓t'�G�� �--- ����
7 � ) Qwest(800-922-1987) �cs
Comcast(800-922-1957 r' — Ho.l.� ross Electric(8 0-922-1957) ��+�' <
�' ��* �
�ag1e River Water B. Sanitation istrici(970-477-54�3) '�--- ����' _ � ��_ �--:�� -. �
. Town of Vail�lectric(970-479-2158) T� n of Vail In�igation(970-479-21�5)
' _ � ���'
Print plicantName Applicvri �nawre ate �
F:U'W\Specifications\RDVJY Stmidards\P�OW permits\Pemiit Application.doc
.
• t
; �
TOWN OF VA� '
Department ofPublic Works& Transportation
1309 Elkhorn Drive
Vail, CO 81657
970-479-21 SS
Fax: 970-479-2166
www.vailgov,com
MEMO
To: Doug Carley, Layton Construction
From: Tom Kassmel, Town Engineer
Re: Four Season, Dewatering Permit
Date: 11/29/06
The Town of Vail has completed the review and peer review of the dewatering plan. The following are the
remaining comments that must be addressed and the required conditions for dewatering.
Comments:
1. A valid CDOT utility permit will be required. The permit must not refer to the lease agreement unless
the lease agreement is signed and a copy submitted to the Town of Vail.
2. The discharge of line #2 needs to be verified. The Town would prefer it to be pumped to Spraddle
Creek.
3. Provide an updated construction schedule for dewatering
Conditions:
1. The subsurface soil conditions on the site shall be logged as the dewatering wells are installed, a copy of
the logs shall be provided to the Town of Vail and the developer's Geotechnical/Dewatering consultant
for review.
2. Prior to commencing dewatering, a pump test shall be completed to verify that the flowrate is within the
estimated ground water flow. .
3. An action plan shall be developed prior to commencing dewatering in the event excessive turbitity or
settlement is encountered. What is Plan 'B'?
4. Logs of the monitoring activity shall be made available to the Town of Vail upon request.