HomeMy WebLinkAboutLayton Const (09) �
'fOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2158
NOTE: THIS PERMiT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT Permit # PW07-0177
Job Address: 1 VAIL RD VAIL Status . . . : ISSUED
Location.....: 13 VAIL ROAD Applied . . : 08/14/2007
Parcel No...: 210107101016 Issued . . : 08/16/2007
Expires . .:
APPLICANT VAIL DEVELOPMENT LLC 08/14/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR LAYTON CONSTRUCTION CO. INC 08/14/2007 Phone: (801) 568-9090
9090 SOUTH SANDY PARKWAY
SANDY
UT 840-70-640
License: 333-A
OWNER VAIL DEVELOPMENT LLC 08/14/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Desciption:
Main water line repair along S. Frontage Road , damaged
cause by Coging & Sons installing last tie back for shoring
wall . Excavation and asphalt repair is included caused by
track equipment unloaded with asphalt protection. REZONING
OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC
ACCOMODATIONS (PA) DISTRICT TO HIGH DENSITY MULTI FAMILY
DISTRICT (HDMF)
s*+a*r*s*r*►�******+***+++++s**s+*+*+*+**+*****+++*s++*s**+*****++++ FEE SUMMARY ********************srrr*�***�**�******r*�r*+*+�+**+**s*+
Public Way------> ??
Bond Amount---> $0.00
Payments--------------> $420.00
TOTAL FEES---> $225.00 BALANCE DUE----> $o.00
f####*##*##t####t#t######t#**4**##*#*############tf########�F####*f**t*#*#t####*####*t#####***##f#i**i*##*#############t##t#f####tff#t##t#*###
Approvals:
Item: 05500 PUBLIC WORKS
08/16/2007 ls Action: AP
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
�..�...+++�+....f...»*..*.,»..***......�*.+***++*.....+....*�*..*...:.+..*..+..�.+.+.**.*.+*........�*........*....�*.*....**.*..,.....**.*..
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec/detail book available in April of 1998.
<
�`*** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ****
ADVANCE BY T�LEPHONE AT��79-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
f ,
�c'l�'L�^ � '� ._..
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
i
!
, c �CEIVED
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUAN E
APPLICATION FOR AUG 3 �007
RIGHT OF WAY USE-STREET CUT PERMIT �—r.
PR.1#: ��`� Y �l �Y: ►—�,
P W . ���i - O/�/ own
Parcel#:
Public Works Dept
1309 Elkhorn Dr
Bldg Permit#: B - Vail CO S 1657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use-
Street Cut Permit and forfeiture of application fees. By signing this permit,the applicant declares he/she has read all conYents of
this document,Town of Vail Roadway Standards and chapters of TiUe 8—Public Ways and Property,of the Vail Municipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee:$50.00
Company
Company Name: �c ny�� �✓�.S-r�.�dC� ����, Phone: `�� v- y n i- , > > �
-- � -
City/State/
CompanyAddress:����S.n. �iy�d� P,r-�w�, Zip: ���y (�{f�c��'�(j
Contractor
License Number: � Email• �1�1�'C sv��in r 4v�St.0 o�
I Contact
Contact Name: ,r k � e,�l. Phone: �() r'7 -� n�-• � 1 l 1
ROW Use Location:
Requested ROW Requested
Use Dates: _ � ° � to c4S ` Work Times: ��� - j / ; Q`ZI
Purpose for Request: Street Cut Dimension(if applicable):
❑ Underground Utility Installation
❑ Landscaping � Length:
❑ Temp Site Access
❑ Construction Staging Width(min 4'):
❑ Roadway Constructio ,
�1 Other(explain):_(,� � � i Total Square Footage:
Requested ROW Use:
�.! Single Lane Closure-Ift of closure(including taper)
❑ Two Lane Closure-lft of closure(including taper) "���
❑ Three Lane Closure-Ift of closure(including taper) :�
❑ Sidewalk/Bike Path-Ift of closure
❑ Other(explain):
l. Applicant shall submit a traffic control plan,and work site/staging plan with this application. Traffic
Control Plan shall be in compliance with the MUTCD and shall show streets with names,adjacent
intersections,advanced warning signage,taper lengths,buffer space and work zone dimensions. No full
street closures are a/lowed.
2. Applicant must contact Public Works Department at 479-2198 24 hours�rior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site,applicant has option of routing application through the Publie Works offiee to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
XcelEnery (800-922-1987) Qwest(800-922-1987)
Comcast(800-922-1987) Holy Cross Electric(800-922-1987)
Eagle River Water&Sanitation District(970-477-5453)
Town of Vail Electric(970-479-2158) Town of Vail Irrigation(970-479-2158)
�ar�� '�� ����'�� �� 6-0 �
Prmt Applicant Name Apphcant Signature Date
F:\PW\Specifications\RDWY Standards\ROW permits\ROW Application.doc
Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ 0.15 x x = $ _
Two Lane $ 0.45 X x = $ .
Three Lane $ 1.50 X x - $ _
SidewalklBike Path $ 0.15 x X = $ _
Fee Months S ft of Closure
Paved Surface $ 0•25 X x = g .
Non-Paved Surface $ 0.05 X x - $ .
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ 1.00 x 1 x 100 = $ 100.00
' Two Lane $ 3.00 X x = $ _
Three Lane $ 6.00 x x = $ _
Sidewalk/Bike Path $ 0.50 x x = $ _
Fee Months S ft of Closure
Paved Surface $ 1.00 x x = $ _
Non-Paved Surface $ 0�2� x x = $ .
Sub-total r$ - 100.00�
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 0.30 X 200 = $ 60.00
Brick Paver $ �•�� x = $ -
Pothole(each) $ 50.00 x = $ _
Non-Paved Surface $ 0.05 300 = $ 15.00
Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 8•00 x = $ -
Brick Paver $ 15.00 X = $ _
Pothole(each) $ 200.00 X = $ _
Non-Paved Surface $ 0.25 = $ _
Sub-Total r$ 60.00
Application/Inspection Fee $ 50.00
Total Permit Fee 210.00
08/06/2007
Four Season Water repair on CCOT ROW
Fee also includes the asphalt repair damage cause by track machine unloaded on frontage road with any protection.
Double fee required for a total of$420.00 dollars
. ��, 0'
F:1PlMSpecificationslRDWY StandardslPermit Fee Worksheet.xls
�r•
* ' **********
**********
*********
T���F VAIL, COI.,p ****************
*Statement Nu�e***RADO***********�** **********************************
*************
____ a�ent Met$od, R07000k535 ****** $420* 00*08** **********� ment
Che Amount: *********** State
/15/200702:27 *********
Init: �S PM
Parcel No: PW07-0177 "------
No: 2101- Notation: ck# 318859
Site Address: 071-0101-6 T�e' ` "--
Location: 13 VVAILR��IL P�LIC WAY PERMIT -�------___
. This Pa
Yment;
************ $420. 00 Total
*********** Fees;
, _ ACCOUNTITEA,j **************** Total .�LL pmts: $420. 00
Account_CodeLIST: ************************B**a** *•* $4$O. O�
Descri *********** �
ST 001 --'--- Ption ********
00003112100 -"----
'------------------ PUBL.IC WAY FEES ---------- Current Pmts
_-'---------- 420. 0p