Loading...
HomeMy WebLinkAboutLayton Const (09) � 'fOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2158 NOTE: THIS PERMiT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Permit # PW07-0177 Job Address: 1 VAIL RD VAIL Status . . . : ISSUED Location.....: 13 VAIL ROAD Applied . . : 08/14/2007 Parcel No...: 210107101016 Issued . . : 08/16/2007 Expires . .: APPLICANT VAIL DEVELOPMENT LLC 08/14/2007 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 CONTRACTOR LAYTON CONSTRUCTION CO. INC 08/14/2007 Phone: (801) 568-9090 9090 SOUTH SANDY PARKWAY SANDY UT 840-70-640 License: 333-A OWNER VAIL DEVELOPMENT LLC 08/14/2007 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Desciption: Main water line repair along S. Frontage Road , damaged cause by Coging & Sons installing last tie back for shoring wall . Excavation and asphalt repair is included caused by track equipment unloaded with asphalt protection. REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS (PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) s*+a*r*s*r*►�******+***+++++s**s+*+*+*+**+*****+++*s++*s**+*****++++ FEE SUMMARY ********************srrr*�***�**�******r*�r*+*+�+**+**s*+ Public Way------> ?? Bond Amount---> $0.00 Payments--------------> $420.00 TOTAL FEES---> $225.00 BALANCE DUE----> $o.00 f####*##*##t####t#t######t#**4**##*#*############tf########�F####*f**t*#*#t####*####*t#####***##f#i**i*##*#############t##t#f####tff#t##t#*### Approvals: Item: 05500 PUBLIC WORKS 08/16/2007 ls Action: AP Item: 05550 ENGINEERING CIVILS CONDITION OF APPROVAL �..�...+++�+....f...»*..*.,»..***......�*.+***++*.....+....*�*..*...:.+..*..+..�.+.+.**.*.+*........�*........*....�*.*....**.*..,.....**.*.. DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec/detail book available in April of 1998. < �`*** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN **** ADVANCE BY T�LEPHONE AT��79-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. f , �c'l�'L�^ � '� ._.. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER i ! , c �CEIVED MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUAN E APPLICATION FOR AUG 3 �007 RIGHT OF WAY USE-STREET CUT PERMIT �—r. PR.1#: ��`� Y �l �Y: ►—�, P W . ���i - O/�/ own Parcel#: Public Works Dept 1309 Elkhorn Dr Bldg Permit#: B - Vail CO S 1657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use- Street Cut Permit and forfeiture of application fees. By signing this permit,the applicant declares he/she has read all conYents of this document,Town of Vail Roadway Standards and chapters of TiUe 8—Public Ways and Property,of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee:$50.00 Company Company Name: �c ny�� �✓�.S-r�.�dC� ����, Phone: `�� v- y n i- , > > � -- � - City/State/ CompanyAddress:����S.n. �iy�d� P,r-�w�, Zip: ���y (�{f�c��'�(j Contractor License Number: � Email• �1�1�'C sv��in r 4v�St.0 o� I Contact Contact Name: ,r k � e,�l. Phone: �() r'7 -� n�-• � 1 l 1 ROW Use Location: Requested ROW Requested Use Dates: _ � ° � to c4S ` Work Times: ��� - j / ; Q`ZI Purpose for Request: Street Cut Dimension(if applicable): ❑ Underground Utility Installation ❑ Landscaping � Length: ❑ Temp Site Access ❑ Construction Staging Width(min 4'): ❑ Roadway Constructio , �1 Other(explain):_(,� � � i Total Square Footage: Requested ROW Use: �.! Single Lane Closure-Ift of closure(including taper) ❑ Two Lane Closure-lft of closure(including taper) "��� ❑ Three Lane Closure-Ift of closure(including taper) :� ❑ Sidewalk/Bike Path-Ift of closure ❑ Other(explain): l. Applicant shall submit a traffic control plan,and work site/staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names,adjacent intersections,advanced warning signage,taper lengths,buffer space and work zone dimensions. No full street closures are a/lowed. 2. Applicant must contact Public Works Department at 479-2198 24 hours�rior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site,applicant has option of routing application through the Publie Works offiee to obtain the necessary Town of Vail signatures. Please allow up to one week to process. XcelEnery (800-922-1987) Qwest(800-922-1987) Comcast(800-922-1987) Holy Cross Electric(800-922-1987) Eagle River Water&Sanitation District(970-477-5453) Town of Vail Electric(970-479-2158) Town of Vail Irrigation(970-479-2158) �ar�� '�� ����'�� �� 6-0 � Prmt Applicant Name Apphcant Signature Date F:\PW\Specifications\RDWY Standards\ROW permits\ROW Application.doc Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Da s Lft of Closure Single Lane $ 0.15 x x = $ _ Two Lane $ 0.45 X x = $ . Three Lane $ 1.50 X x - $ _ SidewalklBike Path $ 0.15 x X = $ _ Fee Months S ft of Closure Paved Surface $ 0•25 X x = g . Non-Paved Surface $ 0.05 X x - $ . Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Da s Lft of Closure Single Lane $ 1.00 x 1 x 100 = $ 100.00 ' Two Lane $ 3.00 X x = $ _ Three Lane $ 6.00 x x = $ _ Sidewalk/Bike Path $ 0.50 x x = $ _ Fee Months S ft of Closure Paved Surface $ 1.00 x x = $ _ Non-Paved Surface $ 0�2� x x = $ . Sub-total r$ - 100.00� Street Cut(min$50) Non-Moratorium Streets Surface Fee S ft of Cut ACC/PCC $ 0.30 X 200 = $ 60.00 Brick Paver $ �•�� x = $ - Pothole(each) $ 50.00 x = $ _ Non-Paved Surface $ 0.05 300 = $ 15.00 Moratorium Streets Surface Fee S ft of Cut ACC/PCC $ 8•00 x = $ - Brick Paver $ 15.00 X = $ _ Pothole(each) $ 200.00 X = $ _ Non-Paved Surface $ 0.25 = $ _ Sub-Total r$ 60.00 Application/Inspection Fee $ 50.00 Total Permit Fee 210.00 08/06/2007 Four Season Water repair on CCOT ROW Fee also includes the asphalt repair damage cause by track machine unloaded on frontage road with any protection. Double fee required for a total of$420.00 dollars . ��, 0' F:1PlMSpecificationslRDWY StandardslPermit Fee Worksheet.xls �r• * ' ********** ********** ********* T���F VAIL, COI.,p **************** *Statement Nu�e***RADO***********�** ********************************** ************* ____ a�ent Met$od, R07000k535 ****** $420* 00*08** **********� ment Che Amount: *********** State /15/200702:27 ********* Init: �S PM Parcel No: PW07-0177 "------ No: 2101- Notation: ck# 318859 Site Address: 071-0101-6 T�e' ` "-- Location: 13 VVAILR��IL P�LIC WAY PERMIT -�------___ . This Pa Yment; ************ $420. 00 Total *********** Fees; , _ ACCOUNTITEA,j **************** Total .�LL pmts: $420. 00 Account_CodeLIST: ************************B**a** *•* $4$O. O� Descri *********** � ST 001 --'--- Ption ******** 00003112100 -"---- '------------------ PUBL.IC WAY FEES ---------- Current Pmts _-'---------- 420. 0p