HomeMy WebLinkAboutLayton Const (22) j
l
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2158
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT Permit # PW08-0278
Job Address: 1 VAIL RD VAIL Status . . . : ISSUED
Location.....: 13 VAIL ROAD Applied . . : 10/28/2008
Parcel No...: 210107101016 Issued . . . 10/28/2008
Expires . .: 10/19/2008
APPLICANT LAYTON CONSTRUCTION 10/28/2008
OWNER VAIL DEVELOPMENT LLC 10/28/2008
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR WVC COMPANY 10/28/2008 Phone: (303) 287-3322
7302 IVANHOE STREET
COMMERCE CITY
COLORADO 80022
License: 294-X
Desciption:
Staging and use of S. Frontage Road for excavation near
fire hydrant. DEVELOPMENT OF FOUR SEASONS HOTEL
*a****as****a*srr*sa*r�#+*«*�****►s**s****s+****ss+**s****r►sra**+*► FEE SUMMARY +**a*+**r***r*n�**a****+**s**r�**s*rw*r++***s+**++***a�r**
Public Way------> ??
Bond Amount---> $0.00
Payments--------------> $190.00
TOTAL FEES---> $140.00 BALANCE DUE----> $0.00
ft##**#**�R#*##**+h#*##***�k#***►t►*►►*t*##t*##AtR#i*f*ft#�##*###*tttt#tit#4#####*#########*�**i#*�*##***#*#####t##**itt**###**►�*t*###*t######4
Approvals:
Item: 05500 PUBLIC WORKS
10/28/2008 ls Action: AP
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
..*».:�...**.......*.*::......**.......�...:....*:.:..**..»***.**....+..........*f..+*.*..:.*:*.***..........*.*.............+.*....*....*...
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec/detail book available in April of 1998.
**** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ****
ADVANCE B TELEPHONE 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
d/L � �
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
�
z:,
� .
;
Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ 0.15 X 2 x 300 = $ 90.00
Two Lane $ 0.45 x x - $ -
Three Lane $ 1.50 X x = $ -
Sidewalk/Bike Path $ 0.15 x x - $ -
Fee Months S ft of Closure
Paved Surface $ �•25 x B x = $ -
Non-Paved Surface $ 0•05 x x = $ -
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 x � x - $ �
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ �•�� x X = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 X x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months S ft of Closure
Paved Surface $ 1.00 X B X = $ -
Non-Paved Surface $ 0.20 X x = $ -
Fee Da s S ft of Closure
Core Areas Heated Streetscape $ 0.50 X � X = S -
Sub-total 3 90.00
Street Cut(min$50)
Non-Moratorium Streets
Surtace Fee S ft of Cut
ACC/PCC $ 0.30 X = $ -
Brick Paver $ 1.00 X = $ -
Pothole(each) $ 50.00 X = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 8��0 x = $ '
Brick Paver $ 15.00 X = $ -
Pothole(each) $ 200.00 X = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ -
Application/lnspection Fee $ 100.00
Total Permit Fee $ 190.00
F:IPWISpeci�icationslRDWY StandaNslPemiif Fee Worksheet.xls
:
�*�**��*+�**�+*******�**�*�*****�***��**�******��******�******************�*�***+*�*�*+�+**�
TOWN OF'VAIL, COLOKADO Statement
«**�++�+��*********************�+*****�*+�+*+++**�********�***********�*�����***�****���*���
Statement Number: R080002050 Amount: $190. 00 10/28/200811:51 AM
Payment Method: Cash Init: LS
Notation: credit card,
Layton Const. #07164C
-----------------------------------------------------------------------------
Permit No: PW08-0278 Type: PUBLIC WAY PERMIT
Parcel No: 2101-071-0101-6
Site Address: 1 VAIL RD VAIL
Location: 13 VAIL ROAD
Total Fees: $190.00
This Payment: $190.00 Total ALL Pmts: $190. 00
Balance: $0.00
w***�***�*���*�****�+***����*****�**��*+*******�*****�*********��*�*******�**�*************�
ACCOUNT ITEM L1ST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
ST 00100003112100 PUBLIC WAY FEES 190.00
-----------------------------------------------------------------------------
� � � -------._.
✓
�CEIVED�
NfUST BE SU�1NfiTTEU Iv1IlJ ; BUSIN�SS DA1'S PRfGR TO PET:IvIfT 1;SUA CE OCT � �
7��$
A1'PLICATION FUR
P]GHT Or VVAY US�-STI:��T CtfT P�I:MIT BY:___�_____`
Pi:l�l: �`v�� Town ofVail
pWf: �g���Q�B' Public Worl�Dept
I'arcel�: 1�09 Elkhom Dr
Bld�Perrnil t!: Il�h'— )/ �j \iail. CO 816�7
�1�Ai:NINC: lnclu:;ion oi Ialse iniorn�ation in this permi( applica�ion e;ta6lishes an automatic denial ior a Richt of Way Use-
Strcel Cul Perrr�i! �ncl lurfeiturc o�applica[ion f�es. B}�signin�, this permiL lhe�pplicanl tiecl:ue::h��sii�nas rc�d all conten[s of
this document,Tn�vn of Vuil Roadway 5tand�rds and chapters ofTitle E—f'ublic Ways and Yropert}�, of the Vail Ivlunicipal Cvde
and i; fully awar�oi�its requirem�nts and anrees lo pay all applicable (ees. Application 1=ee: �i�0.00
� �,y /� CornPany^ /� c G�
Corn��.iny Narnc: �_ C,'���.-/`i (_�/J;^�l . C. �� Phouc: ��%-�t� � ` l�� l �
� City/Stai�
Cnmpan�� Address:�n`� C-' �?-C� ���r��i �L%`%/Ci.���,7,' Zip: �'i-9 '��i� �,�f `�y�7���
Contr;ictor
Liccnsc NumLer: �z��� Lm iil: r;��'P c-� '�7Y� �r.i5�'.^S'f��1�
/ / Contact
Contact Namc: ���'�f'/'\ /� C��l Plionc: C� �7_(��/ /��l 7 7
,^ ,
Ft0ti1' Use Lucation: ��,f.J,2Lv"t[ �.-/ � �C-L��I"�l2le�"t_,�., ! �C7t-ic=� � `
Requested ROW +.�� Rec�uested f ' ` . ,,.�
Usc Dates: ,'�C_�"�� to �� � f Work Times � ��' 'i�� . '�r' , �` `�:4 l,��
Yurpose for Request: Street Cut Dime�nsion (if appli.cable):
❑ Underground Utility Instaliation ::`
❑ Landscaping Len�th:
❑ Temp Site Access - .
❑ Construction 5ta�ino V✓id[h (min 4'):
. ❑ Road�vay Construction , ;
�� Other (explain):�-P�C���.::, �C'�;'.�.N�r� Total.Square.Footage: � - -
P�equested ROW Use: - - . "
'x1 Single Lane Closure—Ift ot closure�(includine.taper) ?_«r� ' ` _
❑ Tavo Lane Closure—lft of closure(includinp taper) ` - ' •
❑ Three Lane Closure—Ift of closure (including[aper) �
.. ,.
,:
o s,aewalUBike Path'=1ft of closure � -
❑:. Other(e�plain);
1. 'Applicant shal]submit a ti-aff c contro] plan;.�nd wnrk sitc/stapine plan with this�applic�tion. Traffic
Control Plan shall be in compliance with tlic MUTCD and shall st�ow str.eets with names, adjacent
intersections,adti•anced n•amind sib inde,taper leno hs, bufFer space and worJc zone dimensions. 1Y'aju!/
srreer closures are atlo�ved
�. Applicant musi contact Public VI'urlts Department a[479-�'19S 2.4 hours prior to commencind of work.
Fsilur� to notiiy the To�vn will result in fort�i[w•e oC bond money.
3. Applicant is responsi6lc far abtaining approvals irom all utility compani�s havin�� an existing utilit�� line within
Ihe project site, applicanr lias opiion of�routin� application throuch the PuLlic \�1'orlcs of�ce to obtain tl�e
necessury To���n of\�ail si�natures. Yl�ase allo���up to one weel; to prnc�ss.
ac:l:n�n� (bOG-9?2-19E7) lls� Qwesc (FDCi-922-19f;7) �l"/7
Comcast(80D-92�-19�71 �J%'-'� Hol�� Cross�lecvic (oD0-0�'2-19i�7) —lt.�/?T/7/�-��
L-a��le P�iv�r V��a�er c�Sanitation District(570-477-i�':�31 ,�v"'A
To��m ofV`ail �lec[ric(970-�79-=';SE) �%1 io��m ofV�ail Lri�ation (97Q-�74-�1�E) /L�"
� � � %
c�,. � �� ? ._.� �.�'---✓'�-- f� ../�' �� �
Prin�Appli:an!l�ame r�,pplicam Signatur^_ uate
F:\cdevli�OPJ�QS\Pe�mii;`,Puofi:Worl:svoH_appiic�tior,_?OOci.do: