HomeMy WebLinkAboutLayton Const (24) t r
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2158
NOT�: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT Pennit # PW08-0293
Job Address: 1 VAIL RD VA1L Status . . . : ISSUED
Location.....: W. Meadow Drive Applied . . : 1 U13/2008
Parcel No...: 210107101016 Issued . . . 11/13/2008
Expires . .: 11/20/2008
APPLICANT LAYTON CONSTRUCTION CO. INC 11/13/2008 Phone: (801) 568-9090
9090 SOUTH SANDY PARKWAY
SANDY
UT 840-70-640
License: 333-A
CONTRACTOR LAYTON CONSTRUCTION CO. INC 11/13/2008 Phone: (801) 568-9090
9090 SOUTH SANDY PARKWAY
SANDY
UT 840-70-640
License: 333-A
OWNER VAIL DEVELOPMENT LLC 11/13/2008
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Desciption:
Removal of Tower Crane, smaller of two, Single lane closure
on W. Meadow Drive. DEVELOPMENT OF FOUR SEASONS HOTEL
■**x*+***�r***r**s+*r***r**s**s*****«***********��**t*r*►****�t***r� FEE SU M MARY *►***r�*+*r*«s�*r****rs***m***xr*+►r:****+*s*►*r**��**:er«w*
Public Way------> ??
Bond Amount---> $0.00
Payments--------------> $1,7 0 0.0 0
TOTAL F�ES---> $1,700.00 [3ALANC�DUE----> $0.00
*►**r***+►■:****r►rrr*:*+**r*r:+r*■**rr*►«r***r**«r*a.****rx**►r■****r�x**:►****��*r+*r*«w*****�***r*«*x�**r*x******�■�***»r*x■.:*r***w+■■..***rsx
Approvals:
Item: 05500 PUBLIC WORKS
11/13/2008 ls Action: AP Pending weather conditons, to determine if
closure all allowed.
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
*«*�*......*****.**.****.*.**.....***�.*..***��.*.*.*******�,:*.....*.*.***.*.*..*.**»***.**�*..*.***.****.�*..*.�*»**,:.**.*,**.*.**.*.*....�.**»*
DECLARATIONS
I certify that I have read all chapters oi'Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and diat all utilities as renuired.
Public Works will have a spec/detail book available in April of 1998.
**** REQUESTS FOR 1NSPECTION SHALL BE MADE TWENTY-FOUR HOURS 1N ****
ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
( f
*****#*#**#*#**##*#****#*#****###&#*###�###***##*##**#***�#*********##****#***###***#***#*#*
TOWN OF VAIL, COLORADO Statement
�***+**********+**************+**++**********++*�**++*�****+*********+**********************
Statement Number: R080002181 Amount: $1, 700. 00 11/13/200802:06 PM
Payment Method: Cash Init: CAD
Notation: Layton paid
with credit card #09864C
-----------------------------------------------------------------------------
Permit No: PW08-0293 Type: PUBLIC WAY PERMIT
Parcel No: 2101-071-0101-6
Site Address: 1 VAIL RD VAIL
Location: W. Meadow Drive
Total Fees: $1, 700.00
This Payment: $1, 700.00 Total ALL Pmts: $1, 700. 00
Balance: $0.00
*++***+********+**********+*******+*******+**********+*+*�+***�******************+**********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
ST 00100003112100 PUBLIC WAY FEES 1, 700.00
-----------------------------------------------------------------------------
t �
Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft ofClosure
Single Lane $ 0.15 X x = $ -
Two Lane $ 0.45 x x = $ _
Three Lane $ 1.50 X x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months S ft of Closure
Paved Surface $ 0.25 x � X = $ -
Non-Paved Surface $ 0.05 X x = $ -
Fee Weeks S ft of Closure
Core Areas Heated Streetscape $ 0.25 X � X = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ 1.00 X 4 x 400 = $ 1,600.00
Two Lane $ 3.00 X x = $ -
Three Lane $ 6.00 X x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months S ft of Closure
Paved Surface $ 1.00 x � X = $ -
Non-Paved Surface $ 0.20 X x = $ -
Fee Da s Scft of Closure
Core Areas Heated Streetscape $ 0.50 X � X = $ -
Sub-total $ 1,600.00
Street Cut(min$50) '
Non-Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 0.30 X = $ -
Brick Paver $ 1.00 X = $ -
Pothole(each) $ 50.00 X = $ -
Non-Paved Surface $ 0.05 = S -
Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 8�00 x - $ '
Brick Paver $ 15.00 X = S -
Pothole(each) $ 200.00 X = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ -
Application/inspection Fee $ 100.00
Total Permit Fee r$ 1,700.00
Tower crane removal,single lane for staging on W.Meadow Drive
East crane
11-16 thru 11-19-2008
F:IPWISpecificationslRDWY SfandardslPermit Fee Woricsheef.xls
; `
�...i �
�
NIUST BE SUBMiTTED NIIN 3 BUSiNESS DAYS PRi(�R TO PEI'.IvIiT 1SSUANCE
APPLICATiON FOR
32IGHT OF WAY USE-STR��T CUT P�RMIT
PRl#�: �� � � �� E � Town ofVail
PW�: �.,/�_ a�CJ`� PublicWorhsDept
��r� ]309 Elkhom Dr
Parcel#:
Bld�Permit�': B - Vail, CO 816i7
11�ARNTNC: Inclusion of false informa[ion in this perrnit applicalion establishes an automatic denial For a Ridht of Way Use-
5lreet Cuf Permil and forfeiture of application Fees. By signino this permit, the applicani declares he/she has read all content;oF
tliis document,Town of Vnii Roadway S[andards and chap[ers ofTitle 8—Public Ways and Property, of the Vail Ivlunicipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee:��0.00
Company q
CompanyName: L.C�..,'fOv�_ �d�Sr. Phone: �'��` � � c���� 1 C�
a � � City/State/ t
(��C� � . �-.�v�C� ���� Zi � �'1��,�T� � �`��� G
Campany Address: `( � P� .'�—
Contr:ictor •• [ ,}.
License Number: �i,33�� • �m�il: �..� �Cxv'(C�C?i'LSt �-G>�.`^
.�-� ContactQ
Contact Name: �r� IG_���--� Phone: f� � '��(��_.�;��� 1
ROVr'UseLocation: 1,���f ���!'t�L)vl�'� - Sc'Svl��� 5� ���, �C�N(' �C/.��ZJv`S
Requested ROW ' � �Requested �� ' ,`
Use Dates: l � -/ 1 to
�l�'� Work Times �'i�� '`;'� • ��`'� . `
Purpose for Request: Street Cut Dimension (if appli.cable):
❑ Llnderground Utility lnstallation ``- �
O Landscaping , LenUth:
❑ Temp 5ite Access -
❑ Construction Staging W idth (min 4'):_ '
❑ Roadway Construc �on . ,. `- -` , :
,. :.
I,� Other(explain):�C:-�-�2�C'� �- �—►2"��1.�� Total,Square.Footage:
... , _
. .....
,;: sii.,
' Requested ROW Use: `.: " i - _
� 5ingle Lane Closure—Ift of closure•(including taper)�l�
D T�vo Lane Closure—]ft of closure(including taper) ` '
❑ Three Lane Closure—Ift of closure(including taper) _
Cl' Sidew�alUBike Path`-Tft of closure "� - '
❑.. Other(eaplain):- .
1. Applicant shall submit a traffic control plan;and work'site/stagine plan with this applic�tion. Traffic
Control Ptan shall be in compliance with the MUTCD and shal)sbow str:eets with names,adj�cent
intersections,advanced warning signage,taper lenb hs, buffer space and work zone dimensions. Ib"ojul/
streeY clasures are a!lo�ved.
2. Applicant must contact Public Works Department ar 479-2195 24 hours prior to commencind of wor1::.
Failure to notiiy the Torvn will result in farfeiture of bond money
3. Applicant is responsible for obtaining approvals irom all utility companies havin; an existing utility line within
the project site, applicanr has option of routino app]ication throubh the Public ��orlcs office to oUtain the
necessary To��n af Vail sidnatures. Please allow�up to one week to process.
Xcel Ener�� (8D0-9?2-1957) l � TT Qwest (800-922-1957) / 1 / '
n
Comcast(500-932-1957) f�(� Holy Cross Elecvic(500-9�'2-]9S7) _.
ragle River Water&5anitation District(970-477-�4�3)_--��.
"1n��m ofVail Electric(970-=179-21�5) 'To�vn ofVail lrrigation (97D-479�'i�E)
L�`� �� �/�/�'��
Print Applicani Name P,pplicant Signawre Ciaie
F:1cde��1FOP�1v15\Permits\Puhlic Worl:s\row_�pplication_?D06.doc
. .
� FROM :CC ENTERPRISES FAX N0. :9702420530 Sep. 10 2007 a1:53PM P9
.
�=
CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC
Contractor; LAYTON CONSTRUCTION MHT #8
Project; WEST M�ADOW RD - VAIL - 4 SEASONS RESORT
Method of Handling Traffic: ONE LANE ROAD
N
PI�EPARED BY; W E ��
�o. ��� /
C4l,C�RI �'c�4r�*/ � —�—
S
ATSSA TCS NAME DATE
PHONE; 97D-242-0669 �
Q
CERTIFICATION # 0003704.� Q�
ISSUE DATE: . �, �
EXPIRATION DAT�;�"�_ >
S_FRONTAGEROAD ,_„ _ _ _, _ _. _ _ _ , � '~ � - - - �.- •- �
- - _ _ _ - - - - - - - - - r ROUND �
�� -A-
_ ... _ - - - -, ..., _ - - - - --� - - - - - - - - - --- - - - - - • � eou�r � -- - - - - �
� � /
f3VNJ
WORK
AHFM
C_ FOUR SEASONS1> ��+ T
__ �� 11
100'
GATE GATE
� WORK SITE 1 / .;qL� EAST MEADOW
i oo� DRIVE
bEAD �r�°,� �°"�
END WEST MEADOW RD ��"��
��-=�� ...._.-_—
100' � 100' —�'��' '
�,r� R�
r.��a�
WORK
AHEAU �
�
NOTES; �
1 , CONTRACTOR WILL NEED FIAGGERS TO STOP TRAFFIC FOR THE TRUCKS �
TURNING ON HIGHWAY DURING WORKING HOURS ONLY,
2, ONE FLAGGER WILL �E AT THE FIRE STATION TO ALLOW ACCFSS FOR THE
FIRE DEPT,
3. FLAGGERS Wll.l USE f�ADIOS TO COMMUNICATE.
SiGNS & DEVICES:
3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOI.S