HomeMy WebLinkAboutLayton Const (02)a
TONYN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address: 1 VAIL RD VAIL
Location.....: 13 VAIL ROAD
Parcel No...: 210107101016
APPLICANT VAIL DEVELOPMENT LLC
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR LAYTON CONSTRUCTION CO. INC
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
OWNER VAIL DEVELOPMENT LLC
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
05/04/2007
Permit # PW07 -0053
Status ... .
Applied.
Issued . . .
Expires . ..
ISSUED
05/04/2007
05/04/2007
05/04/2007 Phone: (801) 568 -9090
05/04/2007
Desciption:
Also included is on this permit is the Site dewatering is
fully approved per town requirements by the Town of Vail
Use of staging for the Four Seasons along the S. Frontage
Road. Use from 4 -15 -07 thru 9 -4 -07. Staging only. REZONING
OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC
ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY
DISTRICT (HDMF)
************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY *************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Public Way ------ > ??
Investigation - - - - -> ? ?
Payments--------- - - - - -> $3,462.50
Bond Amount --- > BALANCE DUE ---- > $0.00
TOTAL FEES --- > $3,462.25
Approvals:
Item: 05500 PUBLIC WORKS
05/04/2007 gc Action: AP
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements,
signed by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * ** REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN * * **
ADVANCE BAY TEDtPgONE A1,479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNED OR'CONTRACTOR FOR HIMSELF AND OWNER
h
TOWN OF VAIL, COLORADO Statement
Statement Number: R070000623 Amount: $3,462.50 05/04/200701:42 PM
Payment Method: Check Init: GC
Notation: ck# 314650
-----------------------------------------------------------------------------
Permit No: PW07 -0053 Type: PUBLIC WAY PERMIT
Parcel No: 2101 -071- 0101 -6
Site Address: 1 VAIL RD VAIL
Location: 13 VAIL ROAD
Total Fees: $3,462.50
This Payment: $3,462.50 Total ALL Pmts: $3,462.50
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
ST 00100003112100 PUBLIC WAY FEES 3,462.50
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x x
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk /Bike Path $ 0.15 x x
Fee Months S ft of Closure
Paved Surface $ 0.25 1 x x
Non -Paved Surface $ 0.05 x 2.5 x 1 6500
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk /Bike Path $ 0.50 x x
Fee Months
Paved Surface $ 1.00 x x
Non -Paved Surface $ 0.20 x 2 x
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface Fee S ft of Cut
$ 0.30 x
$ 1.00 x
$ 50.00 x
$ 0.05
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /inspection Fee
Total Permit Fee
Fee S ft of Cut
$ 8.00 x
$ 15.00 x
$ 200.00 x
$ 0.25
Four Season use of ROW along Frontage Road from 4 -15 -07 thru 9 -4 -07
Staging .
FAPWISpecificationsWDWY StandardsFermit Fee Worksheet.xls
_ $ 812.50
_ $
$ 2,600.00
$ 3,412.50
0
50.00
$ 3,462.50
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE
APPLICATION FOR
RIGHT OF WAY USE - STREET CUT PERMIT
PRJ #: U Town of Vail
PW #: Public Works Dept
Parcel #: 1309 Elkhorn Dr
Bldg Permit #: B - Vail, CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use -
Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of
this document, Town of Vail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $50.00
frf/ f-c Company
Company Name: rrrr c !i✓1 Phone:
Company Add
Contractor
License Number:
Contact Name:
ROW Use Location:
City/State/
Zip:
Email:
Contact
Phone:
Requested ROW Requested
Use Dates: to Work Times
Purpose for Request: Street Cut Dimension (if applicable):
❑ Underground Utility Installation
Landscaping Length:
Construction cStagin Width
P
Staging (min 4'):
• Roadway Construction
• Other (explain): - Total Square. Footage:
Requested ROW Use:
• Single Lane Closure — Ift of closure (including taper)
• Two Lane Closure — lft of closure (including taper)" `
• Three Lane Closure — lft of closure (including taper)
• SideWalk/Blke Path'` -1ft of closure
• Other (explain):
1. Applicant shall submit a traffic control plan, and work site /staging plan with this application. Traffic
Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent
intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. lVofall
screel closures are allowed.
2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
Xcel Enery (800- 922 -1987) Qwest (800- 922 -1987)
Comcast (800- 922 -1987) Holy Cross Electric (800 -922 -1
Eagle River Water & Sanitation District (970 - 477 -5453)
Town of Vail Electric (970 -479 -2158) Town of Vail Irrigation (970- 479 -2158)
n
In Vic-., y- CJ
Print Applicant Name Applicant Signature Date
F: \cdev \FORMS \Permits \Public Works \row_application_2006.doc
AL i -r/