Loading...
HomeMy WebLinkAboutLayton Const (04)I TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: DEPARTMENT OF COMMUNITY DEVELOPMENT THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT VAIL DEVELOPMENT LLC 09/06/2007 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 CONTRACTOR LAYTON CONSTRUCTION CO. INC 09/06/2007 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 09/06/2007 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit 4 PW07 -0202 Status ... . Applied .. : Issued . . . Expires. .: ISSUED 09/06/2007 09/06/2007 Phone: (801) 568 -9090 Desciption: New Curb and Gutter on Vail Road in Front of the 9 Vail Road Building. Part of the approved Building permit set of plans and DIA. REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) # #4 # ## # # + # +# rtrt##+*####### rt###*###+### # #* # # # # * # # * # # # #+# * * # # # # # # # # * # ## FEE SUMMARY *########*#***########*##* # * # # # + # # * * * # # * # # * * * + # * # # # # # # ### Public Way ------ > ?? Bond Amount --- > $0.00 TOTAL FEES --- > $50.00 Approvals: Item: 05500 PUBLIC WORKS 09/06/2007 is Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $0.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL #rt # #rt # * # # * # * # # # *+ rtrt #rt+ # #rt * # + +rt # * * * # #rt + # # # # * * * * *# rtrt * # # # * * * * + # #rt # * # * # # ## rtrtrt * * # # # * # # # *+ *rtrtrt # * # * * * * * # #+ #rtrt #rt *rt * * #rt +# #rtrt +rtrt * #+rt # *rt +rt+ +rtrtrt #* *rtrt # ### DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF FOR HIMSELF AND OWNER MUST BE SUBIV117TED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT PRA: C3 Town of Vail PW#: Public Works Dept Parcel #: 1309 Elkhorn Dr Bldg Permit #: B #A- 0/9% Vail, CO 81657 WARNING: Inclusion of False information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of this document, Town orVail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and is fully aware-of its requirements and agrees to pay all applicable fees. Application Flee: 350.00 �-- Company Company Name: Lax /e p CCAICZ1� I Phone:. YU L / 7 -7 Company Address: ?Ow S, _'aMJy Contractor 3 13 , License Number: Contact Name: n .... ROW Use Location: ✓G �� `^ .C:'7rr+'i City /State % / Zip: % L/ Email Lae/ cemS/ C'dv^ Contact Phone: L%U! •I:. 4,f. 9 "Ltu-- Requested ROW Use Dates: C " Requested qa5�"� 4t /�S to / Work Times: Y44'- Purpose for Request: Street Cut Dimension (if applicable): .: ❑ Underground Utility Installation ❑ Landscaping Length: _� 06e ❑ Temp Site Access ❑ Ponstruction Staging W idth (min 4'): L+ i• i Roadway Construction 13 Other (explain): Total.Square.Footage: Requ sted ROW Use: Single Lane Closure — Ift of closure-(including taper) ❑ Two Lane Closure — Ift of closure (including taper) ❑ Three Lane Closure — Ift of closure (including taper) ❑ Sidewalk/Bike Path` ' Ift of closure - ❑ Other (explain): - 1. Applicant shall submit a traffic control plan, and work site /staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. Nafull tYreet closures are allaJVed. 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Enery (800 - 922 -1987) Qwest (800- 923 -1987) Comcast (800 -923 -1987) - Holy Cross Electric (800 - 922 -1987) L-agle River Water & Sanitation District (970- 477- 5453)- Town of Vail Electric (970-479-2158) Town of Vail Irrigation (97 79 -2158) Print Applicant Name Applicant Signature Date F, \edev\FOP�MS\ Permits \Publ ic.W orics \row_appli cation_3006.doc FROM CC ENTERPRISES FAX N0. :9702420530 Aug. 29 2007 05:36PM P2 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: LAYfON CONSTRUCTION MHT #2 Project: 4 SEASONS RESORT - VAIL ROAD Method of Handling Traffic: SOUTHBOUND LANE CLOSED ON VAIL RD PREPARED BY: oaf 08/.'/x/07 ATSSA TCS NAME DATE PHONE: 97 - 242 -0kL99 CERTIFICATION 10_0037043. ISSUE DATE: 1[1.1 2004 EXPIRATION DATE: 1 M 200 O ROAD C WORK J AD a -- FRONTAG -A- ` BOUT 360' ROM WORK AHEAD O IJJ � FOUR SEASONS 6 x c RFPLACE CURB & GUTTER . - - --w- 100' 100/ ROAD WORK FR:AP NOTES; 1. CONTRACTOR WILL NEED ONE LANE CLOSED ON TWO LANE DURING WORKING HOURS ONLY. 2, FLAGGERS WILL STOP TRAFFIC FOR ONE LANE ROAD WORK ZONE, 3. REFER TO COLORADO STANDARDS CASE #17 FOR TYPICAL LANE CLOSURE SETUP SIGNS & DEVICES: 3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOLS CONES N w S