HomeMy WebLinkAboutLayton Const (04)I
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2158
NOTE:
DEPARTMENT OF COMMUNITY DEVELOPMENT
THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address: 1 VAIL RD VAIL
Location.....: 13 VAIL ROAD
Parcel No...: 210107101016
APPLICANT VAIL DEVELOPMENT LLC
09/06/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR LAYTON CONSTRUCTION CO. INC
09/06/2007
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
OWNER VAIL DEVELOPMENT LLC
09/06/2007
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Permit 4 PW07 -0202
Status ... .
Applied .. :
Issued . . .
Expires. .:
ISSUED
09/06/2007
09/06/2007
Phone: (801) 568 -9090
Desciption:
New Curb and Gutter on Vail Road in Front of the 9 Vail
Road Building. Part of the approved Building permit set of
plans and DIA. REZONING OF CHATEAU & ALPINE STANDARD SITES
FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH
DENSITY MULTI FAMILY DISTRICT (HDMF)
# #4 # ## # # + # +# rtrt##+*####### rt###*###+### # #* # # # # * # # * # # # #+# * * # # # # # # # # * # ## FEE SUMMARY *########*#***########*##* # * # # # + # # * * * # # * # # * * * + # * # # # # # # ###
Public Way ------ > ??
Bond Amount --- > $0.00
TOTAL FEES --- > $50.00
Approvals:
Item: 05500 PUBLIC WORKS
09/06/2007 is Action: AP
Item: 05550 ENGINEERING CIVILS
Payments--------- - - - - -> $0.00
BALANCE DUE ---- > $0.00
CONDITION OF APPROVAL
#rt # #rt # * # # * # * # # # *+ rtrt #rt+ # #rt * # + +rt # * * * # #rt + # # # # * * * * *# rtrt * # # # * * * * + # #rt # * # * # # ## rtrtrt * * # # # * # # # *+ *rtrtrt # * # * * * * * # #+ #rtrt #rt *rt * * #rt +# #rtrt +rtrt * #+rt # *rt +rt+ +rtrtrt #* *rtrt # ###
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN
ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF
FOR HIMSELF AND OWNER
MUST BE SUBIV117TED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE
APPLICATION FOR
RIGHT OF WAY USE - STREET CUT PERMIT
PRA: C3
Town of Vail
PW#: Public Works Dept
Parcel #: 1309 Elkhorn Dr
Bldg Permit #: B #A- 0/9% Vail, CO 81657
WARNING: Inclusion of False information in this permit application establishes an automatic denial for a Right of Way Use -
Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of
this document, Town orVail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code
and is fully aware-of its requirements and agrees to pay all applicable fees. Application Flee: 350.00
�-- Company
Company Name: Lax /e p CCAICZ1� I Phone:. YU L / 7 -7
Company Address: ?Ow S, _'aMJy
Contractor 3 13 ,
License Number:
Contact Name: n ....
ROW Use Location: ✓G �� `^ .C:'7rr+'i
City /State % /
Zip: % L/
Email Lae/ cemS/ C'dv^
Contact
Phone: L%U!
•I:.
4,f. 9 "Ltu--
Requested ROW
Use Dates: C "
Requested
qa5�"� 4t
/�S to /
Work Times: Y44'-
Purpose for Request:
Street Cut Dimension (if applicable): .:
❑ Underground Utility Installation
❑ Landscaping
Length: _� 06e
❑ Temp Site Access
❑ Ponstruction Staging
W idth (min 4'): L+ i• i
Roadway Construction
13 Other (explain):
Total.Square.Footage:
Requ sted ROW Use:
Single Lane Closure — Ift of closure-(including taper)
❑ Two Lane Closure — Ift of closure (including taper)
❑ Three Lane Closure — Ift of closure (including taper)
❑ Sidewalk/Bike Path` ' Ift of closure
-
❑ Other (explain): -
1. Applicant shall submit a traffic control plan, and work
site /staging plan with this application. Traffic
Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent
intersections, advanced warning signage, taper lengths,
buffer space and work zone dimensions. Nafull
tYreet closures are allaJVed.
2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
Xcel Enery (800 - 922 -1987) Qwest (800- 923 -1987)
Comcast (800 -923 -1987) - Holy Cross Electric (800 - 922 -1987)
L-agle River Water & Sanitation District (970- 477- 5453)-
Town of Vail Electric (970-479-2158) Town of Vail Irrigation (97 79 -2158)
Print Applicant Name Applicant Signature Date
F, \edev\FOP�MS\ Permits \Publ ic.W orics \row_appli cation_3006.doc
FROM CC ENTERPRISES
FAX N0. :9702420530 Aug. 29 2007 05:36PM P2
CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC
Contractor: LAYfON CONSTRUCTION MHT #2
Project: 4 SEASONS RESORT - VAIL ROAD
Method of Handling Traffic: SOUTHBOUND LANE CLOSED ON VAIL RD
PREPARED BY:
oaf 08/.'/x/07
ATSSA TCS NAME DATE
PHONE: 97 - 242 -0kL99
CERTIFICATION 10_0037043.
ISSUE DATE: 1[1.1 2004
EXPIRATION DATE: 1 M 200 O
ROAD C
WORK J
AD a
--
FRONTAG
-A-
` BOUT
360'
ROM
WORK
AHEAD
O
IJJ
�
FOUR SEASONS
6
x
c
RFPLACE
CURB & GUTTER
. - - --w-
100'
100/ ROAD
WORK
FR:AP
NOTES;
1. CONTRACTOR WILL NEED ONE LANE CLOSED ON TWO LANE DURING WORKING HOURS ONLY.
2, FLAGGERS WILL STOP TRAFFIC FOR ONE LANE ROAD WORK ZONE,
3. REFER TO COLORADO STANDARDS CASE #17 FOR TYPICAL LANE CLOSURE SETUP
SIGNS & DEVICES:
3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOLS CONES
N
w
S