HomeMy WebLinkAboutLayton Const (07)t TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 4 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: 13 VAIL ROAD Parcel No...: 210107101016 APPLICANT VAIL DEVELOPMENT LLC 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 CONTRACTOR LAYTON CONSTRUCTION CO. License: 333 -A OWNER VAIL DEVELOPMENT LLC 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 01/04/2007 Permit # PW07 -0001 Status ... . Applied .. : Issued . . . Expires . .: ISSUED 01/04/2007 01/04/2007 INC 01/04/2007 Phone: (801) 568 -9090 01/04/2007 Desciption: Temp site access for partical dewatering permit only within private property. No approval on CDOT ROW work allowed. REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) *****+****************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Public Way ------ > ?? Investigation - - - - -> ?? Payments--------- - - - - -> $0.00 Bond Amount --- > BALANCE DUE ---- > $0.00 TOTAL FEES --- > $50.00 ************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approvals: Item: 05500 PUBLIC WORKS 01/04/2007 is Action: AP See Conditions 01/04/2007 is Action: PA When CDOT approval is granted and a copy o permit is submitted to the TOV. A new public way permit will be issued to Layton Constru at that time the fee in the amount of $1987.00 dollars will be deposit. This permit will expire April 15, 2007 and a new one will be required. Item: 05550 ENGINEERING CIVILS CONDITION OF APPROVAL Cond: CON0008618 Reference letter from Tom Kassmel to Layton Construction - Doug Carley. Dated 11 -29 -06 The Town of Vail has completed the reviews and per review of the dewatering plan. The following are the remaining comments that must be addressed and the required conditions for,dewatering. *Comments: 1. A valid CDOT utility permit will be required. The permit must not refer to the lease agreement unless the lease agreenent is signed and a copy submitted to the Town of Vail. 2. The discharge of line # 2 needs to be verified. The Town would perfer it to be pumped to Spraddle Creek. 3. Provide and updated construction schedule for dewatering. Conditions: 1. The subsurface soil conditions on the site shall be logged as the dewatering wells are installed, a copy of the logs shall be provided to the Town of Vail and the developer's Geotechnical /Dewatering consultant for review. 2. Prior to commencing dewatering, a pump test shall be completed to verify that the flowrate is within the estimated ground water flow. 3. An action plan shall be developed prior to commencing dewatering in the event excessive turbitity or settlement is encountered. What is Plan B'? 4. Logs of the monitoring activity shall be made available to the Town of Vail upon request. DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Works will have a spec /detail book available in April of 1998. * * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT PR7 4: �; J 4o / Town of Vail PW#: Ot! Public Works Dept Parcel #: 1309 Elkhorn Dr Bldg Permit #: B 06- Q 1e6 Vail CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of this document, Town of Vail Roadway Standards and chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $50.00 Company Company Name: 1AyP /0911Z JJ'' Phone: J�� /1� --7�& �,�, City /State / r� Company Address:�1"l^ /�.`j> ��it /Dy }j(�lrJy Zip rl`�t�l? /(] Contractor License Number: Email: G-<� /mil 11 kw9 Contact Name: ��, Contact / ,/ �L'%1 ��� Phone: ��` _ 5� 3 � i 3Pa ROW Use Location: Requested ROW 1'T_Zy Requested Use Dates: AN zea to J// Work Times: Purpose for Request: -7 Street Cut Dimension (if applicable): ❑ Underground Utility Installation ❑ Landscaping Length: ❑ Temp Site Access ❑ Construction Staging Width (min 4'): ❑ Roadway Construction Other (explain): & Total Square Footage: Requested ROW Use: ❑ Single Lane Closure - Ift of closure (including taper) ❑ Two Lane Closure - Ift of closure (including taper) ❑ Three Lane Closure — Ift of closure ,(including taper) ❑ Sidewalk/Bike Path — Ift of closure ❑ ; Other (explain): 1. Applicant shall submit a traffic control plan, and work site /staging plan with this application. Traffic Control Plan shall be in compliance with .the °MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, 'buffer space and work zone dimensions. No full street closures are:allowed. 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail �1,cynatures. Pl�pe allow up to one week to process,., acel Enei3, (800 -922 -19,8 )) Wi-� Qwest (800 - 922 - 1987) Comcast (800- 922 -1957 r= - �Bo,�: ross Electric (8 0- 922 -19 (r �r Eagle River Water &Sanitation istrict (970- 477 -5453) — - Town of Vail Electric (970- 479 -2158) Tgn of Vail Irrigation (970- 479 -21 Print 4plicant Name Applicant FAPW \Specifications \RDWY Standards \ROW permits\Pemtit Application.doc WN TOWN - vyurtmeru uj ruotic worts (k transportation 1309 Elkhorn Drive Vail, CO 81657 970 - 479 -2158 Fax: 970 - 479 -2166 www vailgov. com MEMO To: Doug Carley, Layton Construction From: Tom Kassmel, Town Engineer Re: Four Season, Dewatering Permit Date: 11/29/06 The Town of Vail has completed the review and peer review of the dewatering plan. The following are the remaining comments that must be addressed and the required conditions for dewatering. Comments: 1. A valid CDOT utility permit will be required. The permit must not refer to the lease agreement unless the lease agreement is signed and a copy submitted to the Town of Vail. 2. The discharge of line #2 needs to be verified. The Town would prefer it to be pumped to Spraddle Creek. 3. Provide an updated construction schedule for dewatering Conditions: 1. The subsurface soil conditions on the site shall be logged as the dewatering wells are installed, a copy of the logs shall be provided to the Town of Vail and the developer's Geotechnical /Dewatering consultant for review. 2. Prior to commencing dewatering, a pump test shall be completed to verify that the flowrate is within the estimated ground water flow. 3. An action plan shall be developed prior to commencing dewatering in the event excessive turbitity or settlement is encountered. What is Plan 'B'? 4. Logs of the monitoring activity shall be made available to the Town of Vail upon request.