HomeMy WebLinkAboutLayton Const (07)t
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
4 75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address: 1 VAIL RD VAIL
Location.....: 13 VAIL ROAD
Parcel No...: 210107101016
APPLICANT VAIL DEVELOPMENT LLC
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
CONTRACTOR LAYTON CONSTRUCTION CO.
License: 333 -A
OWNER VAIL DEVELOPMENT LLC
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
01/04/2007
Permit # PW07 -0001
Status ... .
Applied .. :
Issued . . .
Expires . .:
ISSUED
01/04/2007
01/04/2007
INC 01/04/2007 Phone: (801) 568 -9090
01/04/2007
Desciption:
Temp site access for partical dewatering permit only within
private property. No approval on CDOT ROW work allowed.
REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING
PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI
FAMILY DISTRICT (HDMF)
*****+****************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Public Way ------ >
??
Investigation - - - - ->
??
Payments--------- - - - - ->
$0.00
Bond Amount --- >
BALANCE DUE ----
> $0.00
TOTAL FEES --- >
$50.00
**************************************************************************************************************
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Approvals:
Item: 05500 PUBLIC WORKS
01/04/2007 is
Action: AP
See Conditions
01/04/2007 is
Action: PA
When CDOT approval
is granted and a copy o
permit
is submitted to the
TOV. A new public
way permit will be
issued to Layton Constru
at
that time the fee in the amount of $1987.00 dollars will be deposit.
This permit will expire April 15, 2007 and a new one will be required.
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
Cond: CON0008618
Reference letter from Tom Kassmel to Layton Construction -
Doug Carley. Dated 11 -29 -06
The Town of Vail has completed the reviews and per review
of the dewatering plan. The following are the remaining
comments that must be addressed and the required conditions
for,dewatering.
*Comments:
1. A valid CDOT utility permit will be required. The permit
must not refer to the lease agreement unless the lease
agreenent is signed and a copy submitted to the Town of
Vail.
2. The discharge of line # 2 needs to be verified.
The Town would perfer it to be pumped to Spraddle Creek.
3. Provide and updated construction schedule for
dewatering.
Conditions:
1. The subsurface soil conditions on the site shall be
logged as the dewatering wells are installed, a copy of the
logs shall be provided to the Town of Vail and the
developer's Geotechnical /Dewatering consultant for review.
2. Prior to commencing dewatering, a pump test shall be
completed to verify that the flowrate is within the
estimated ground water flow.
3. An action plan shall be developed prior to commencing
dewatering in the event excessive turbitity or settlement
is encountered. What is Plan B'?
4. Logs of the monitoring activity shall be made available
to the Town of Vail upon request.
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN
ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE
APPLICATION FOR
RIGHT OF WAY USE - STREET CUT PERMIT
PR7 4: �; J 4o / Town of Vail
PW#: Ot! Public Works Dept
Parcel #: 1309 Elkhorn Dr
Bldg Permit #: B 06- Q 1e6 Vail CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use -
Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he /she has read all contents of
this document, Town of Vail Roadway Standards and chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $50.00
Company
Company Name: 1AyP /0911Z JJ'' Phone: J�� /1� --7�&
�,�, City /State / r�
Company Address:�1"l^ /�.`j> ��it /Dy }j(�lrJy Zip rl`�t�l? /(]
Contractor
License Number: Email: G-<� /mil 11
kw9
Contact Name: ��, Contact / ,/
�L'%1 ��� Phone: ��` _ 5� 3 � i 3Pa
ROW Use Location:
Requested ROW 1'T_Zy Requested
Use Dates: AN zea to J// Work Times:
Purpose for Request: -7 Street Cut Dimension (if applicable):
❑ Underground Utility Installation
❑ Landscaping Length:
❑ Temp Site Access
❑ Construction Staging Width (min 4'):
❑ Roadway Construction
Other (explain): & Total Square Footage:
Requested ROW Use:
❑ Single Lane Closure - Ift of closure (including taper)
❑ Two Lane Closure - Ift of closure (including taper)
❑ Three Lane Closure — Ift of closure ,(including taper)
❑ Sidewalk/Bike Path — Ift of closure
❑ ; Other (explain):
1. Applicant shall submit a traffic control plan, and work site /staging plan with this application. Traffic
Control Plan shall be in compliance with .the °MUTCD and shall show streets with names, adjacent
intersections, advanced warning signage, taper lengths, 'buffer space and work zone dimensions. No full
street closures are:allowed.
2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail �1,cynatures. Pl�pe allow up to one week to process,.,
acel Enei3, (800 -922 -19,8 )) Wi-� Qwest (800 - 922 - 1987)
Comcast (800- 922 -1957 r= - �Bo,�: ross Electric (8 0- 922 -19
(r �r
Eagle River Water &Sanitation istrict (970- 477 -5453) — -
Town of Vail Electric (970- 479 -2158) Tgn of Vail Irrigation (970- 479 -21
Print 4plicant Name
Applicant
FAPW \Specifications \RDWY Standards \ROW permits\Pemtit Application.doc
WN
TOWN
- vyurtmeru uj ruotic worts (k transportation
1309 Elkhorn Drive
Vail, CO 81657
970 - 479 -2158
Fax: 970 - 479 -2166
www vailgov. com
MEMO
To:
Doug Carley, Layton Construction
From:
Tom Kassmel, Town Engineer
Re:
Four Season, Dewatering Permit
Date:
11/29/06
The Town of Vail has completed the review and peer review of the dewatering plan. The following are the
remaining comments that must be addressed and the required conditions for dewatering.
Comments:
1. A valid CDOT utility permit will be required. The permit must not refer to the lease agreement unless
the lease agreement is signed and a copy submitted to the Town of Vail.
2. The discharge of line #2 needs to be verified. The Town would prefer it to be pumped to Spraddle
Creek.
3. Provide an updated construction schedule for dewatering
Conditions:
1. The subsurface soil conditions on the site shall be logged as the dewatering wells are installed, a copy of
the logs shall be provided to the Town of Vail and the developer's Geotechnical /Dewatering consultant
for review.
2. Prior to commencing dewatering, a pump test shall be completed to verify that the flowrate is within the
estimated ground water flow.
3. An action plan shall be developed prior to commencing dewatering in the event excessive turbitity or
settlement is encountered. What is Plan 'B'?
4. Logs of the monitoring activity shall be made available to the Town of Vail upon request.