Loading...
HomeMy WebLinkAboutLayton Const (11)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2158 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PUBLIC WAY PERMIT Job Address: 1 VAIL RD VAIL Location.....: S. Frontage Road Parcel No...: 210107101016 APPLICANT LAYTON CONSTRUCTION CO. INC 11/01/2007 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A CONTRACTOR LAYTON CONSTRUCTION CO. INC 11/01/2007 9090 SOUTH SANDY PARKWAY SANDY UT 840 -70 -640 License: 333 -A OWNER VAIL DEVELOPMENT LLC 11/01/2007 50 S SIXTH ST STE 1480 MINNEAPOLIS MN 55402 Permit # PW07 -0274 Status ...: ISSUED Applied ..: 11/01/2007 Issued . .. 11/08/2007 Expires . .: 11/09/2007 Phone: (801) 568 -9090 Phone: (801) 568 -9090 Desciption: Phase II, staging plan. Installing new tem sidewalk along curb and gutter along S. Frontage Road and moving the construction fence and relocating street lights to accomadate a construction staging area on CDOT ROW. REZONING OF CHATEAU & ALPINE STANDARD SITES FROM EXISTING PUBLIC ACCOMODATIONS(PA) DISTRICT TO HIGH DENSITY MULTI FAMILY DISTRICT (HDMF) ***++++****++*+*****+*++*+****+++++** * + + * * + + + + + + + + * + * + * * + + * + + * * * * + ++ FEE SUMMARY *****+****++*+++*#******++ * * * * + * * * + + * * + * * + + * * + * * * + # * * + + +* Public Way ------ > ?? Bond Amount --- > $0.00 TOTAL FEES --- > $860.00 Approvals: Item: 05500 PUBLIC WORKS 11/08/2007 is Action: AP Item: 05550 ENGINEERING CIVILS Payments--------- - - - - -> $860.00 BALANCE DUE ---- > $0.00 CONDITION OF APPROVAL DECLARATIONS I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities as required. Public Wbrks will have a spec /detail book available in April of 1998. REQUES FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE UYNELEPHOWE AM479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER TOWN OF VAIL, COLORADOCopy Reprinted on 11 -08 -2007 at 11:02:06 11/08/2007 Statement Statement Number: R070002473 Amount: $860.00 11/08/200710:15 AM Payment Method: Check Init: LS Notation: ck# 322278 ----------------------------------------------------------------------------- Permit No: PW07 -0274 Type: PUBLIC WAY PERMIT Parcel No: 2101 - 071 - 0101 -6 Site Address: 1 VAIL RD VAIL Location: S. Frontage Road Total Fees: $860.00 This Payment: $860.00 Total ALL Pmts: $860.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- ST 00100003112100 PUBLIC WAY FEES 860.00 MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE - STREET CUT PERMIT pp-,:.P?- Town of Vail PW #: 0, B Public Works Dept Parcel ,r 1309 Elkhorn Dr Bldg Permit #: B4O0 —0117(.o Vail, CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use - Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he/she has read all contents of this document, Town of Vail Roadway Standards and chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: 550.00 Company Company Name: _ Phone: City /State/ Company Address: C,^�' � Zip: Contractor License Number: Contact Contact Name: fl y�V Phone: ROW Use Location: 00 L F1' la—e -W t4 cet,4 _ Requested ROW 1 Requested Use Dates: to :Work Times: -' lQ Purpose for Request: - Street Cut Dimension (if applicable):.: • Underground Utility Installation _ • Landscaping Length: "` "' • Temp Site Access • Construction Staging Width (min 4'): =''• -'' Roadway Construction /❑ Other (explain): TotaL.SquareFootage. Requested -ROW Use:,` • Single Lane Closure - Ift of closure,(including.ta a ,. • Two Lane Closure - Ift of closure (including taper) -' ❑ Three Lane Closure - Ift of closure (including taper) ❑' Sidevralk/Bike Path'- 'Ift-of closure ❑ 1 Other (explain)--- 1. 'Applicant shall submit a traffic control plan', and work'site /staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced waiving signage, taper lengths, buffer space and work zone dimensions. Nof rl/ slreel c1axmrer are allowed 2. Applicant must contact Public Works Department at 479 -2198 24 hours prior to commencing of work- Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routine application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Enery (800 - 922 -1987) Qwest (800- 922 -1987) Comcast (800 -922 -1987) Holy Cross Electric (800 -922 -1987) Eagle River Water & Sanitation District (970 -477 -5453 Town of Vail Electric (9749 =2158) . A Town of Vail Irrigation (970479 -2158) Applicant Name X Applicant Signature F:\cdev \FORMS \Permits\Public.Woris\row appiication_2006.doc Date 4on rLt r—vM `i0/M/2007 17:01 19702420530 CC ENTERPRISES PAGE 02/02 l , , CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor; LAWON CONSTRUCTION MHT #13 Project: 4 SEASONS RESORT - SOUTH FRONTAGE ROAD REVISED Method of Handling Traffic: SHOULDER CLOSURE PREPARED BY: W604 0121107 ATSSA TCS NAME DATE PHONE: 970. 242 -0669 CERTIFICATION #M. 37043 ISSUE DATE: 11/11/2004 EXPIRATION DATE. JW5 2( 008 F2.15 AP es • NOTES: 1. CONTRACTOR WILL NEED SHOULDER CLOSED DURING WORKING HOURS ONLY 2. REFER TO MUTCD FIGURE 6H -3 FOR TYPICAL SHOULDER CLOSURE SETUP. SIGNS AND DEVICES: 2 - UTILITY WORK AHEAD 1 - SHOULDER WORK CONES O J N w $ S - - --- - Permit Fee Worksheet ROW Use (min $50) Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 9 x 300 Two Lane $ 0.45 x x Three Lane $ 1.50 x x Sidewalk /Bike Path $ 0.15 x 9 x 300 Fee Months S ft of Closure Paved Surface $ 0.25 1 x x Non -Paved Surface $ 0.05 x x Non - Construction Season (as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x Two Lane $ 3.00 x x Three Lane $ 6.00 x x Sidewalk /Bike Path $ 0.50 x x Fee Months S ft of Closure Paved Surface $ 1.00 1 x � x Non -Paved Surface $ 0.20 x x Sub -total Street Cut (min $50) Non - Moratorium Streets Surface Fee $ 0.30 $ 1.00 $ 50.00 $ 0.05 ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Moratorium Streets Surface ACC /PCC Brick Paver Pothole (each) Non -Paved Surface Sub -Total Application /Inspection Fee Total Permit Fee 10/30/2007 Layton Construction /Four Seasons Phase II staging plan. S ft of Cut x x x Fee S ft of Cut $ 8.00 x $ 15.00 x $ 200.00 x $ 0.25 F. PMSpecfficationsIRDWY StandardsFermit Fee Worksheet.xls $ 405.00 $ 405.00 _ $ _ $ $ r$ 810.00 0 $ 50.00 $ 860.00