HomeMy WebLinkAboutLayton Const (17)TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970 - 479 -2158
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PUBLIC WAY PERMIT
Job Address: 1 VAIL RD VAIL
Location.....: 13 VAIL ROAD
Parcel No...: 210107101016
APPLICANT LAYTON CONSTRUCTION CO. INC
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
CONTRACTOR LAYTON CONSTRUCTION CO. INC
9090 SOUTH SANDY PARKWAY
SANDY
UT 840 -70 -640
License: 333 -A
OWNER VAIL DEVELOPMENT LLC
50 S SIXTH ST STE 1480
MINNEAPOLIS
MN 55402
Permit # PW08 -0050
Status ...:
ISSUED
Applied..:
04/24/2008
Issued. ..
04/24/2008
Expires . .:
04/25/2008
04/24/2008 Phone: (801) 568 -9090
04/24/2008
04/24/2008
Phone: (801) 568 -9090
Desciption:
Single Lane closure for 2 days. 1. day to remove
construction trailer, 1 day to setup and stage concrete
pumper on W. Meadow Drive.
+***+*++**+++*+*++**+*++*++***++++*+* * + * * * + + + + + * * + * * + + + + * + * + * * * * * * +# FEE SUMMARY +*+ s}#*#*#####*+*###*#+}*} * * * * * * * + + + * * * * + + + * + + + + * * * + + + + *+
Public Way ------ > ??
Bond Amount --- > $0.00
Payments--------- - - - - -> $220.00
TOTAL FEES --- > $170.00 BALANCE DUE ---- > $0.00
Approvals:
Item: 05500 PUBLIC WORKS
04/24/2008 is Action: AP single lane closure for 2 days
Item: 05550 ENGINEERING CIVILS
CONDITION OF APPROVAL
DECLARATIONS
I certify that I have read all chapters of Title 8 and Title 13 of the Vail Municipal Code and all utility company agreements, signed
by me, and will abide by the same, and that all utilities as required.
Public Works will have a spec /detail book available in April of 1998.
* * * * REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN
ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
Permit Fee Worksheet
ROW Use (min $50)
Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 0.15 x 2 x
Two Lane $ 0.45 x x
Three Lane $ 1.50 x x
Sidewalk/Bike Path $ 0.15 x 2 x
Fee Months
Paved Surface $ 0.25 1 x � x
Non -Paved Surface $ 0.05 x x
Fee Weeks
Core Areas Heated Streetscape $ 0.25 x I x
Lft of Closure
200
Non - Construction Season (as defined by Town of Vail Municipal Code)
Fee Days
Single Lane $ 1.00 x x
Two Lane $ 3.00 x x
Three Lane $ 6.00 x x
Sidewalk/Bike Path $ 0.50 x x
Fee Months
Paved Surface $ 1.00 1 x � x
Non -Paved Surface $ 0.20 x x
Fee D
a s j
Core Areas Heated Streetscapel $ 0.50 x u x
Sub -total
Street Cut (min $50)
Non - Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Moratorium Streets
Surface
ACC /PCC
Brick Paver
Pothole (each)
Non -Paved Surface
Sub -Total
Application /Inspection Fee
Total Permit Fee
Fee S ft of Cut
$ 0.30 x
$ 1.00 x
$ 50.00 x
$ 0.05
Fee Scift of Cut
$ 8.00 x
$ 15.00 x
$ 200.00 x
$ 0.25
F.- PMSpecificationsV?DWY StandardslPermit Fee Worksheet.xls
200
$ 60.00
$ 60.00
$ -
_ $ -
=D
_ $ -
$ -
=D
$ 120.00
$ 0-
$ 100.00
$ 220.00
TOWN OF VAIL, COLORADO Statement
Statement Number: R080000524 Amount: $220.00 04/24/200809:34 AM
Payment Method: Check Init: LS
Notation: Credit card #
5031 - Layton Construction
-----------------------------------------------------------------------------
Permit No: PW08 -0050 Type: PUBLIC WAY PERMIT
Parcel No: 2101- 071 - 0101 -6
Site Address: 1 VAIL RD VAIL
Location: 13 VAIL ROAD
Total Fees: $220.00
This Payment: $220.00 Total ALL Pmts: $220.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
ST 00100003112100 PUBLIC WAY FEES 220.00
RECEJVED
MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUA CE APR 2 2008
APPLICATION FOR
RIGHT OF WAY USE- STREET CUT PERMIT
RItI: OQ.��fliS Town of Vail
P ✓ �� Public Works Dept
PR l Qa 1309 Elkhorn Dr
Parce
Bldg Permit#! B d�— 0/ C 6 Vail, CO 8]657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use -
Street Cut Permit and forfeiture of application fees. By signior this permit, the applicant declares he /she has read all contents of
this document, Town of Vail Roadway Standards and chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code
and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: y50.00
Company / �+
Company Name: L 01 -S'41 �f„/!�� f t� ('j Phone:. a L� %'� b �SS 7o IT Q
nn C � City/State
Company Address:'109 G � . S71,iwi F /�Ci .Y zip: i", ',., ��i` (Fyn 7o
Contractor
License Number: 3�3 fl
Contact Name
- /ZzrA- 27E e W
Z9 LA ,
ROW Use.Location:
Email: "e( t tl_%qtzg -r.��
Contact
Phone:
y-
Requested ROW /
`i- l/ {l
Requested
Use Dates: to r
:Work Times:
Purpose for Request:
Street Cut Dimension (if applicable)::
❑ Underground Utility Installation -
❑ Landscaping :''
Length:
❑ Temp Site Access -
• Construction Staging
W idth min 4' •
( )
• Roadway Construe on
�✓ec-�"
•Total.Square.Footage:
�• "-'• �-
Other (explain): `vlAr�•
Requested -ROW Use:
Single Lane Closure— Ift of closure•(including.taper)�.
• Two Lane Closure — Ift of closure'(including taper) `
• Three Lane Closure — Ift of closure (including taper)
❑ Sidewalk/Bike Path•'• = lft•of closure
-
❑ Other fexnlainl:•
1. • Applicant shall submit a traffic control plan, and work'slie /staging plan with this application. Traffic
Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent
intersections, advanced yarning signage, taper lengths, buffer space and work zone dimensions. Nafirll
slree! closures are allowed.
2. Applicant must contact Public Works Department at 479 - 2198 24 hours prior to commencing of work.
Failure to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within
the project site, applicant has option of routine application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
acel Enery (800 - 922 -1987) Qwest (800 -922 -1987)
Comcast (800- 922 -1987) Holy Cross Electric (800 -922 -1987)
Eagle River Water 8c Sanitation District (970 - 477 -5453
Town of Vail Electrif, (970 - =179 -2158
Torun of Vail Irrigation (970-479-1-15S)
Print Applicant Name 6.pplicani Signature
F:\cdev\F0KMS \Permits \Pub1ic Wori.s\roH_opplication_2006.doc
Date
!,,_,
. `FRC? ":CC ENTERPRISES
FAX N0. :9702420530 Sep. 10 2007 01:53PM P9
CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC
Contractor: LAYTON CONSTRUCTION MHT #8
Project: WEST MEADOW RD - VAIL - 4 SEASONS RESORT
Method of Handling Traffic: ONE LANE ROAD
N
PREPARED BY: W E I
IJr /
[( +C47.(�A� A' oar ,
ATSSA TCS NAME DATE S
PHONE; 970 -242 -0669
CERTIFICATION # 0003704.
ISSUE DATE:
EXPIRATION DATE; " j
i ft-ft
S. FRONTAGE ROAD — — — , / %
— — — — ROUND (-A-
1
C
-------- �--- - ----- � - - - - -- , our �
C FOUR SEASONS�>
GATE
DEAD I
END
100' 100'
1n
ROAD
WORK
AHr— E
ROAD
WORK
AHFAI7
�y T
A 100'
GATE
100'
WEST MEADOW RD
NOTES;
1. CONTRACTOR WILL NEED FLAGGERS TO STOP TRAFFIC FOR THE TRUCKS
TURNING ON HIGHWAY DURING WORKING HOURS ONLY
2, ONE FLAGGER WILL BE AT THE FIRE STATION TO ALLOW ACCESS FOR THE
FIRE DEPT,
3, FLAGGERS WILL USE RADIOS TO COMMUNICATE.
SIGNS & DEVICES:
3 - ROAD WORK AHEAD 2 - FLAGGER SYMBOLS
�_.�/
J
EAST MEADOW
DRIVE
r.:
s